build-up (permeable)...this drawing to be read in conjunction with relevant consultant's...
TRANSCRIPT
![Page 1: Build-up (Permeable)...THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT'S DRAWINGS. CHECKED BY: Scott Tallon Walker Architects PROJECT STATUS J:\19\19080\01 STW\01 MODELS+DWGS\1.2](https://reader035.vdocuments.net/reader035/viewer/2022062604/5f0b55dc7e708231d4300222/html5/thumbnails/1.jpg)
A.X.04
A.Y
.02
A.X
.03
A.X
.02
A.X
.01
A.Y
.01
A.Y
.03
A.Y
.04
A.Y
.05
A.Y
.03
A.Y
.04
A.Y
.05
A.X
.04
A.Y
.09
A.X
.03
A.X.0
2
A.X.0
1
A.Y
.10
A.Y
.08
A.Y
.07
A.Y
.06
A.Y
.08
A.Y
.07
A.Y
.06
S.R
.+
3
P.V
. P
AN
EL
Latch-on Fall
Prevention System
A.X.04
A.Y
.02
A.X
.03
A.X
.02
A.X
.01
A.Y
.01
A.Y
.03
A.Y
.04
A.Y
.05
A.Y
.03
A.Y
.04
A.Y
.05
A.X
.04
A.Y
.09
A.X
.03
A.X.0
2
A.X.0
1
A.Y
.10
A.Y
.08
A.Y
.07
A.Y
.06
A.Y
.08
A.Y
.07
A.Y
.06
S.R
.+
3
10715
10265
10265
5005
10265
10265
10715
8215
1815
8215
13230
10265
10265
4418 4418
10270
10265
13230
8215
1815
8215
31245
31245
18245
33760
9009
33760
18245
Latch-on Fall
Prevention System
LIF
T O
VE
R-R
UN
P.V
. P
AN
EL
P.V
. P
AN
EL
Access Hatch
(ladder below to include
integrated push-up post)
+88.75
Finished Roof Level
88.75
Finished Roof Level
+88.95
Top of Parapet
+88.95
Top of Parapet
+88.95
Top of Parapet
+88.95
Top of Parapet
+88.95
Top of Parapet
+88.95
Top of Parapet
89.95
Top of Parapet
90.43
Top of All P.V. Panels
89.35
Top of Access Hatch
+88.75
Finished Roof Level
88.75
Finished Roof Level
DRAWING
DRAWING NO. REVISION
SCALE @A0
FILE REFERENCE
PROJECT
CLIENT
NOTES:
MODIFIED TIME:
DRAWN BY:
Copyright. All Rights Reserved.
This work is copyright and cannot be produced or copied in any form or by any means
(graphic, electronic or mechanical including photocopying) without the written permission
of the originator. Any license, express or implied, to use this document for any purpose
whatsoever is restricted to the terms of the agreement or implied agreement between the
originator and the instructing party.
Levels and contours are relative to an Ordnance Survey
DO NOT SCALE FROM THIS DRAWING. WORK ONLY FROM FIGURED DIMENSIONS.
THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT'S
DRAWINGS.
CHECKED BY:
Scott Tallon Walker Architects
PROJECT STATUS
J:\19\19080\01 STW\01 MODELS+DWGS\1.2 2D
[CAD]\_SHEETS\19080-GEA-PLAN-APTA-000R.dwg
Revision Schedule
No. Date Description
19080-GEA-PLAN-APTA-000R
Plot Time:
4/7/2020 12:35:06 AM
Modified By: Padhraic Moneley
12/12/2019 12:58:53 PM
19 Merrion Square, Dublin 2, Ireland
Tel: +351 (0)1 669 3000
Fax: +351 (0)1 661 3300
Email: [email protected]
Web: www.stwarchitects.com
PROJECT ARCHITECT:PROJECT NO:
CRODAUN SHD
19080 Planning PM
Crodaun Development Company Ltd.
ROOF PLAN
APARTMENT BLOCK 'A'
1:100
AK SJH
P1
P1 06.04.2020 PLANNING ISSUE
NN
Sedum 'Extensive' Green Roof
Build-up (Permeable)
Washed Stone Pebbles
(Permeable)
GENERAL NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH;
· THE ARCHITECTS DRAWINGS
· CONSULTANT ENGINEERS DRAWINGS & SPECIFICATIONS
· LANDSCAPE ARCHITECTS DRAWINGS & SPECIFICATIONS
2. FOR ROAD & SITE LEVELS REFER TO GDCL CONSULTING
ENGINEERS DRAWINGS.
APARTMENT BLOCK 'A' - SCHEDULE OF ACCOMMODATION:
Floor Level Apt. Type Bedrooms People No. of Units
Ground Floor 2B.A 2 Bed 4 8
2B.B 2 Bed 4 2
2B.C 2 Bed 4 2
First Floor 2B.A 2 Bed 4 8
2B.B 2 Bed 4 2
3B.A 3 Bed 6 2
Second Floor 2B.A 2 Bed 4 8
2B.B 2 Bed 4 2
3B.A 3 Bed 6 2
Third Floor 2B.A 2 Bed 4 8
2B.B 2 Bed 4 2
3B.A 3 Bed 6 2
Fourth Floor 2B.A 2 Bed 4 8
2B.B 2 Bed 4 2
3B.A 3 Bed 6 2
Fifth Floor 2B.D 2 Bed 4 4
(Set-back) 2B.E 2 Bed 4 4
BLOCK A TOTALS 2 Bed 60
% of Total Units 12.85%
3 Bed 8
% of Total Units 1.71%
Total No. of Units 68
% of Total Units 14.56%
Scott Tallon Walker Architects
KEY PLAN
(Not to Scale)