Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page i
BUILDING ACTIVITY
APPLICATION PACKAGE ADELAIDE and PARAFIELD AIRPORTS
JUNE 2016
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page ii
Contents Page
INTRODUCTION 1
SUBMISSION OF APPLICATION 1
Application Information 2
Supporting Documentation 2
Applicant / Lessee Responsibilities 3
General Compliance 3
Drawing Standards 3
FEES AND PAYMENTS 4
Fees Payable to Adelaide Airport Limited (AAL) 4
Invoicing 4
Fees Payable to Airport Building Controller 4
REVIEW BY ADELAIDE AIRPORT LIMITED 5
Administration 5
Review of Building Consent 5
REVIEW BY AIRPORT BUILDING CONTROLLER 6
WORK PHASE 7
Client / Applicant Obligations 7
Other Client Responsibilities 7
ANNEXURE
Application Forms
AAL (with check list) 4 Pages
Airport Building Controller
Application for Building Permit 3 Pages
Application for Works Permit 3 Pages
Demolition Authorisation 2 Pages
Building Approval Close Out Request 1 Page
Site Rules and Conditions for Contractors 12 Pages
BUILDING ACTIVITY
APPLICATION PACKAGE ADELAIDE and PARAFIELD AIRPORTS
DECEMBER 2013
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 1 of 8
APPLICATION PACKAGE
BUILDING ACTIVITY
ADELAIDE & PARAFIELD AIRPORTS
INTRODUCTION
Building activity on Adelaide Airport is subject to statutory controls under the Airports Act 1996 and the Airports (Building Control) Regulations.
Approval is required from Adelaide Airport Limited (AAL) and the Airport Building Controller (ABC) prior to the commencement of works.
SUBMISSION OF APPLICATION
Separate written application need to be submitted to the:
Airport Building Controller
Adelaide Airport Limited Applications should include the appropriate application form and all supporting documentation.
Airport Building Controller An application for either:
Building Permit
Works Permit
Demolition authorisation should be made to the Airport Building Controller with supporting information at: Mr David Nash Tonkin Consulting Level 2, 66 Rundle Street KENT TOWN SA 5067 Telephone: (08) 8110 2220 Facsimile: (08) 8110 2281 Email [email protected]
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 2 of 8
Adelaide Airport Limited An application for:
Building Activity Consent (by external applicant) should be made to Adelaide Airport Limited at: Adelaide Airport Limited Infrastructure Planning Officer 1 James Schofield Drive ADELAIDE AIRPORT SA 5950 Telephone: (08) 8308 9211 Facsimile: (08) 8308 9311 Email [email protected]
Applicant Information The applicant shall provide all information detailed in the correct application form. To facilitate efficient transfer of information and documentation including reference documentation, the applicant shall supply the following contact information as a minimum:
Name of applicant company
Applicant point of contact (Project Officer)
Contact number
Facsimile number
Email address Applicants should complete the “Check List” provided and submit with their application to AAL.
Supporting Documentation Supporting documentation must comply with the Airport (Building Control) Regulations 1996 and is summarised below. A single copy of the supporting documents shall be submitted with each application. Documentation shall be commensurate with the activity to be undertaken, supporting documentation should include but not be limited to: Minimal Requirement (simple project)
Scope of Work
Program or Schedule
Location/Site Plan
Plan detailing service connection points (if applicable)
Work Health and Safety compliance documentation (where applicable):
Appropriate Safe Work Method Statement (SWMS) or Job Safety Analysis (JSA)
Risk register or analysis for high risk activities
Operator licences for EWP or high risk equipment
A statement/declaration indicating compliance with the following:
Airport Master Plan
Airport Environmental Strategy
Master Development Plan (MDP) as appropriate
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 3 of 8
Additional Information (detailed project)
Certificates required under applicable law (health, services, communications etc)
Design Engineers Certificate
Details of progress inspections
Construction Environmental Management Plan
Maximum Electrical Demand
Water flow calculations and demands
Building Plan, including:
class of building
type of construction
dimensions
floor plans at each level
elevations
fire safety design
construction material
Drawings as appropriate including:
All services
Sections / Elevations
Specifications as appropriate, including:
Detail type of construction and material
method of drainage
gas water sewerage supply
use of second hand material
Applicant / Lessee Responsibilities All lessees/applicants are expected to take all reasonable steps to ensure a safe and compliant workplace during Building Approval works. This should be reflected in the application and the quality of documentation submitted. Changes to the WHS Act and Regulations places additional responsibilities on the provision of documentation and processes associated with risk assessment, safety documentation such as Safe Work Method Statement (SWMS) and compliance documentation such as operator licences for high risk equipment
Work Health and Safety Compliance All works undertaken on the airport is to be compliant with the WHS Act and Workplace Health and Safety Regulations 2012 and be supported by the appropriate documentation as part of the application. This may include but not limited to
Appropriate Safe Work Method Statement (SWMS) or Job Safety Analysis (JSA)
Risk register or analysis for high risk activities
Operator licences for EWP or high risk equipment Copies of this documentation are to be provided to AAL prior to the commencement of works and at any time thereafter when reasonably requested.
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 4 of 8
General Compliance All application should be compliant with all appropriate state and Commonwealth legislation and or standards as appropriate, including but not limited to
Environmental Protection Authority
Work Health and Safety (WHS)
Lighting in the Vicinity of Aerodromes - MOS Part 139
Drawing Standards Drawing submitted in support of a Building Approval should be provided in “standard engineering scale” in hard copy format. Electronic submission should be in PDF format.
FEES AND PAYMENTS
Application fees apply for both the AAL and the ABC assessment. Payment to AAL must be received on submission of the Building Activity Consent application and prior to commencement of application processing. The fee is based on the estimated value of the building activity as follows:
Fees Payable to AAL ESTIMATED
CONSTRUCTION COST
FEE PAYABLE
(including GST)
under $10,000 $150
$10,000 to $100,000 $300
over $100,000 $500 + 0.1% of the balance in excess of $ 100,000
NOTE: AAL fees are GST inclusive.
Invoicing AAL will issue a tax compliant invoice to the applicant / lessee upon receipt of either the application and / or payment of the application fee in accordance with ATO GST legislation. There will be no other invoice requirements for that application beyond this. Details of the application will be provided to AAL Finance department for invoicing purpose upon receipt of an application. This will ensure AAL is complaint with its obligations whilst providing AAL customers with the necessary documentation.
Fees Payable to Airport Building Controller A separate fee applies for Permit applications to the Airport Building Controller. The Airport Building Controller fee structure is based on Schedule 1, Part 1 of the Regulations.
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 5 of 8
REVIEW BY ADELAIDE AIRPORT LIMITED (AAL)
Administration Applications complete with supporting information must be submitted independently to both the Airport Building Controller and Adelaide Airport Limited. Upon receipt, the application must be reviewed for completeness and any deficiencies noted. The application will then be registered in the AAL database and numbered with a BA number and AAL document file number. These details shall be recorded on the front page of the first application sheet. Invoicing and payment procedures shall be finalised appropriate to the payment status, prior to any further review. Any documentation identified as ABC application documentation shall be immediately forwarded to the ABC via the email, external mail or courier system within 48 hrs of receipt. The AAL document package will be forwarded to the AAL Building Approval Project Officer for processing to commence as early as is practicable once full payment has been received. AAL will provided the applicant/client with a letter acknowledging receipt of the application and requesting final payment and full documentation prior to assessment. Assessment may take up to 28 days from submission of the complete application. Delays in the submission of correct and detailed information may delay assessment and approval or otherwise.
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 6 of 8
Review of Building Consent Processing and approval of the Building Consent must address the following criteria:
AAL Master Plan
Major Development Plan (if appropriate)
AAL Environmental Strategy
AAL’s Planning Objectives Sub-criteria to be considered as part of the planning objectives shall include:
Compliance of building appearance with surrounds
Ground RL and Finished Floor Level (FFL)
Connection to services and location of same
Capacity of existing services to cope with additional capacity
Maximum demands
Compliance with regulatory bodies.
Stormwater management
OLS and PANS-OPS compliance
Radar and Navigation aid interference
Landscaping
Signage and Lighting
Contractor access/parking and affect on Airport Operations
Insurances A summary of typical approval conditions to be considered for all applications are listed at the end of this document.
REVIEW BY AIRPORT BUILDING CONTROLLER
The Airport Building Controller represents the Commonwealth, (Department of Infrastructure & Transport) throughout the approval process and is responsible for “Building Approval”. The Airport Building Controller will review the application for compliance with the Building Code of Australia (BCA), Australian Standards, engineering, aviation and environmental compliance.
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 7 of 8
WORKS PHASE
Client / Applicant Obligations
The client / applicant is responsible for conducting all works in a safe and secure manner ensuring compliance with the condition of the approvals. It is the client’s responsibility to ensure all contractors comply with these same conditions. Only those works approved by AAL and the Airport Building Controller are authorised to be carried out. The Client /applicant is also responsible for the provision of documentation to meet general compliance obligation and the conditions detailed with the AAL Consent and Airport Building Controller Permit. Where applicable, copies of this documentation are to be provided to the AAL Project Officer prior to the commencement of works.
Other Client Responsibilities
The Client is responsible to liaise with the AAL Project Officer identified on the approval to provide additional documentation and or complete additional activities in relation to the works. These may include activities such as:
Completing or securing:
Inductions
Airside access
Security passes
Escorts
Additional permits Excavation Isolation etc
Drug & Alcohol Management Plan (DAMP) compliance
Provision of documentation prior to commencement of works including:
Construction Environmental Management Plan (CEMP)
Insurances certificates
Schedules & staff lists
Work Zone Traffic Management Plans
WHS , including: Safe Work Method Statements (SWMS) Job Safety Analysis (JSA) Copy of operator licence (high risk equipment) Risk registers
Completion of approved works only
Ensuring general compliance with the conditions of the approval, in particular:
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 8 of 8
Construction Environmental Management Plan
Works plans for airside
Traffic Management Plan
Ensuring compliance with airport operational and safety requirements
Work site refurbished and left clean and tidy
Finalising project close off documentation within 14 days of completion:
Providing as constructed drawings at the completion of the works for submission to the AAL Drawing Office
Statutory certificates
O&M to Facilities Maintenance department
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page i
APPLICATION FORMS
Adelaide Airport Limited
Airport Building Controller
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 1 of 4
APPLICATION FOR
BUILDING ACTIVITY CONSENT
This application is covered under the Airport Act 1996 and the Airport (Building Control) Regulation 2.03
OFFICE USE ONLY
Date Received BA Number
APPLICANT DETAILS
Name
Postal Address
Contact Person
Telephone Facsimile
LESSEE DETAILS (IF NOT APPLICANT)
Name
Postal Address
Contact Person
Telephone Facsimile
BUILDING ACTIVITY
Location of Works
Description of Works
Estimated Start Date Estimated Completion Date
BUILDING CONTRACTOR
Name
Postal Address
Contact Person
Telephone Facsimile
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 2 of 4
APPLICATION FEE
Estimated Value of Building Activity $
Fee Amount $150 (Value under $10,000 $300 (Value between $10,000 and $100,000
$500 + 0.1% (Value of the balance in excess of $100,000)
WORKS COMPLY WITH
Complete this section in full
Masterplan Yes Not Applicable
Environmental Strategy Yes Not Applicable
MDP (as applicable) Yes Not Applicable
SIGNATURE OF OWNER OR AGENT
Signature Date
ATTACHED DOCUMENTS (PLEASE LIST)
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 3 of 4
CHECKLIST
Use the following checklist as a guide to be considered as part of your application package
1. Application
Documentation
Scope of Works Yes No N/A
Specifications Yes No N/A
Hardcopy of Drawings / Plans Yes No N/A
Electronic copy of Drawings / Plans Yes No N/A
Schedule of Works Yes No N/A
Construction Environmental Management Plan Yes No N/A
Work Health and Safety (WHS) documentation Yes No N/A
2. Services General Service connection points identified Yes No N/A
Meters provided for service connections: Electricity, Water, Gas
Yes No N/A
3. Electrical Application for electrical supply required Yes No N/A
Electrical maximum demand & supply. Number of Phases: 1 2 3
Amps Per Phases ..............................
Total Power Demand (kwh) .................
N/A
4. Hydraulics Domestic water demand has been provided Yes No N/A
Fire water demand has been provided Yes No N/A
Sewerage demands have been provided Yes No N/A
Trade Waste Form has been provided Yes No N/A
Backflow prevention devices are required to be installed on all water supply pipe work within the tenancy?
Yes No N/A
5. Development
Details
Development details to be provided Site Area ............ m2
Building Site Coverage ............. %
Building Setback Front ............. m
Back ............. m
Car Parking Numbers ................
N/A
6. Communications Telecommunication requirement has been provided Yes No N/A
7. Asbestos Has the asbestos register for the building/infrastructure been reviewed?
Yes No N/A
8. Dust, Fumes or
Odours
Does your equipment or nature of business produce dust, fumes or odours?
Yes No N/A
If yes, please provide details:
.............................................................
.............................................................
9. Penetrations within
Existing Buildings
Do you have any requirements for any additional penetrations in the floor / wall of your tenancy?
Yes No N/A
If yes, please provide detail
.............................................................
.............................................................
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 4 of 4
10. Landscaping Does your project include landscaping? Yes No N/A If yes, do the plants comply with the
Environmental Strategy and Guidelines? Yes No
11. Exhaust / Vents /
Ventilation
Do you intend on installing any ventilation equipment e.g. fans, hoods, etc?
Yes No N/A
If yes, please provide detail
.............................................................
.............................................................
12. Lighting Details of all internal lighting have been provided. Yes No N/A
Details of all external lighting has been provided and is compliant with MOS 139
Yes No N/A
13. Fuel, Toxic and
Hazardous Material
Storage
Details of any fuel, toxic and hazardous material storage has been provided. Yes No N/A
14. Gas Will you be installing any gas appliances for cooking or otherwise?
Yes No N/A
15. Security Is the project located in a Security Restricted Area? Yes No
Is the project located in a Customs Controlled Area? Yes No
Is the project located in a Sterile Area? Yes No
Will the project require a change to the Airside fence? Yes No
16. Radio Interference Will the project generate any potential radio interference? Yes No N/A
If yes, demonstrate ACMA Compliance
.............................................................
Licence Details ....................................
Frequency ................ Band .................
Transmission Power ...........................
Antenna Height & Location ........ m
17. External Signage Confirm all external signage is consistent with the AAL Sign Policy
Yes No N/A
18. Staff Numbers The expected number of staff to be located at this development, once completed?
No. of people ……. N/A
19. Fire Engineering This project requires a Fire Engineering Solution. Yes No N/A
20. Traffic
Management Plan
Traffic Management Plan has been provided. Yes No N/A
21. Sustainable
Aspects
Design complies with Section J of the Building Code of Australia
Yes No
Method and capacity of rainwater harvesting has been provided.
Yes No N/A
Note: Please provide supporting documentation as appropriate. All contractors working on Adelaide Airport must provide evidence of appropriate insurances including:
Public and Product Liability Insurance
Work Cover/Workers Compensation Insurance
Contract Work Insurance (indemnifying AAL and the C of Aust)
APPLICATION FOR A BUILDING PERMIT
Airports Act 1996 Airports (Building Control) Regulations 1996 Regulation 2.02
To: .......................... Airport Building Controller
Applicant: Owner or Agent (delete as applicable)
Name ………………………………………………
Postal Address ………………………………………………
……………………………………………… Postcode …………….….
Contact Person ………………………………………………
Telephone ……………………………………………… Fax. ………………..
Email ………………………………………………
Lessee Details:
Name ………………………………………………
Postal Address ………………………………………………
……………………………………………… Postcode ………………..
Location of Building Works:
Address …………………………………………………………………………………
…………………………………………………………………………………
Building Experts
to be engaged in the building work:
Name Cat./ Class Reg. No.
1. Architect
2. Eng/Civil
3. Eng/Mechanical
4. Eng/Electrical
5. Quantity Surveyor
6. Builder
Building Contractor:
Name ………………………………………………… Reg.No. …….…..…….
Address …………………………………………………
………………………………………………… Postcode: …..…………..
Telephone ………………………………………………… Fax. ……………....
Contact Person …………………………………………………
Telephone ………………………………………………… Fax: ……...……….
Description of Building Activity
………………………………………………………………………………………
………………………………………………………………………………………
Does the existing building involve a fire engineered solution? Yes / No………………………………………….
If yes, a statement from an appropriately qualified fire engineer stating that the proposed building activity is consistent with the fire engineered solution will be required prior to the issue of a Building Permit.
Duration of Building Activity ……………………………………………………………………………………….
Estimated Value of Building Activity $.……………………………………………………………..
Does the proposed building activity being the subject of this application comprise part of a major airport development or part of, a draft major development plan within the meaning of the Airports Act 1996 and Airports Building Control Regulations 1996? Yes / No
Is the proposed building activity consistent with the final master plan of the airport, which includes compliance to the environmental strategy?
Signature of owner or agent ………………………………………………
Yes / No / Not Applicable
Date: ………….....
Please Print Name………………...……………………………………………………………………..
Capacity of Signatory ……………………………………………………………………………..……….
Additional Attachments:
For the required information/documents to be included in an application for a building permit, refer to the Airport (Building Control) Regulations 1996 2.05, 2.06 and 2.07 and consult with the Airport Building Controller;
Required information for attached building plan: refer to regulation 2.07(2);
Required information for attached specification: refer to regulation 2.07(4).
Note 1 Application fee
In accordance with regulation 2.02(1), an application fee is required to be paid to the CPM
Department of Infrastructure and Transport (to be collected by the Airport Building Controller)
prior to the issue of the building permit. The basis for calculation of that fee is set out in
regulation 2.02.
Note 2 AAT Review
Under regulation 5.02, the applicant for the approval may make application to the Administrative Appeals Tribunal to have the decision of the Airport Building Controller to refuse or fail to approve a building activity reviewed.
Note 3 Publication of Information Regarding this Application
The Applicant should note that information provided on this Application Form may be published or declared.
Airport Environmental Protection and Building Control Office - Appointed by the Australian Government
GPO Box 594 Canberra City ACT 2601 (Adelaide Office telephone number 8110 2220)
Airport Building Controllers (ABCs) are appointed by the Secretary of the Department of Infrastructure and Regional Development (the Department) under the Airports
(Building Control) Regulations 1996 (the Regulations) to exercise the powers and functions which the Regulations vest in the ABCs, in relation to building control at leased
federal airports. ABCs are also appointed as authorised officers by the secretary under the Airports Act 1996 to exercise certain powers under this Act, in relation to leased
federal airports.
ABCs are contracted private companies, or employees or officers of such companies, and act independently of the Department. However, ABCs consult with the Department
as necessary on certain matters, such as the interpretation of the regulations.
APPLICATION FOR A WORKS PERMIT
Airports Act 1996 Airports (Building Control) Regulations 1996 Regulation 2.02
To: ...............................Airport Building Controller
Applicant: Owner or Agent (delete as applicable)
Name ………………………………………………
Postal Address ………………………………………………
……………………………………………… Postcode ………………..
Contact Person ………………………………………………
Telephone ……………………………………………… Fax: ……………..…
Email: ………………………………………………
Lessee Details:
Name ………………………………………………
Postal Address ………………………………………………
……………………………………………… Postcode ………………..
Location of Works:
Address …………………………………………………………………………………
…………………………………………………………………………………
Works Experts
to be engaged in the construction or alteration of works:
Name Cat./ Class Reg. No.
1. Architect
2. Eng/Civil
3. Eng/Mechanical
4. Eng/Electrical
5. Quantity Surveyor
6. Builder
Works Contractor:
Name ………………………………………………… Reg.No. ………………...
Address …………………………………………………
………………………………………………… Postcode ………………...
Telephone ………………………………………………… Fax. ………………...
Contact Person …………………………………………………
Telephone ………………………………………………… Fax. ………………...
Email: ……………………………………………………..………………............................
Description of Works
………………………………………………………………………………………..
………………………………………………………………………………………...
Duration of Works ……………………………………………………………………………………….
Estimated Value of the Works $.……………………………………………………………………….
Does the proposed building activity being the subject of this application comprise part of a major airport development or part of, a draft major development plan within the meaning of the Airports Act 1996 and Airports (Building Control) Regulations 1996?
Yes / No
Is the proposed building activity consistent with the final master plan of the airport, which includes compliance to the environmental strategy?
Signature of owner or agent …………………………………………..
Yes / No / Not Applicable
Date: ………………………..
Please Print Name…………………………………………………………………….
Capacity of Signatory …………………………………………………
Additional Attachments:
For the required information/documents to be included in an application for a works permit, refer to the Airport (Building Control) Regulations 1996 clauses 2.05, 2.06 and 2.08 and consult with the Airport Building Controller.
Note 1 Application fee In accordance with regulation 2.02(1), an application fee is required to be paid to the CPM Department of Infrastructure and Transport (to be collected by the Airport Building Controller) prior to the issue of the works permit. The basis for calculation of that fee is set out in regulation 2.02.
Note 2 AAT Review Under regulation 5.02 the applicant for the approval may make application to the Administrative Appeals Tribunal to have the decision of the Airport Building Controller to refuse or fail to approve a building activity reviewed.
Note 3 Publication of Information Regarding this Application
The Applicant should note that information provided on this Application Form may be published or declared.
Airport Environmental Protection and Building Control Office - Appointed by the Australian Government
GPO Box 594 Canberra City ACT 2601 (Adelaide Office telephone number 8110 2220)
Airport Building Controllers (ABCs) are appointed by the Secretary of the Department of Infrastructure and Regional Development (the Department) under the Airports
(Building Control) Regulations 1996 (the Regulations) to exercise the powers and functions which the Regulations vest in the ABCs, in relation to building control at leased
federal airports. ABCs are also appointed as authorised officers by the secretary under the Airports Act 1996 to exercise certain powers under this Act, in relation to leased
federal airports.
ABCs are contracted private companies, or employees or officers of such companies, and act independently of the Department. However, ABCs consult with the Department
as necessary on certain matters, such as the interpretation of the regulations.
APPLICATION FOR A DEMOLITION AUTHORISATION
Airports Act 1996 Airports (Building Control) Regulations 1996 Regulation 2.02
To: ........................ Airport Building Controller
Applicant: Owner or Agent (delete as applicable)
Name …………………………………………………................................................
Postal Address
…………………………………………………................................................
…………………………………………………………………………………...
Postcode ………………..
Contact Person ……………………………………………..
Telephone …………………………………………….. Fax: ………………..
Email ………………………………………………
Lessee Details:
Name …………………………………………..
Postal Address …………………………………………..
………………………………………….. Postcode ………………..
Location of Demolition Works:
Address …………………………………………………..….……………………………….
……………………………………………………………………………………….
Demolition Contractor:
Name ……………………………………….…… Reg.No. ……………….........
Address
………………………………………………………………………………………...
………………………………………………………………………………………...
Postcode ………………..
Telephone …………………………………………… Fax. ………………..
Email: ……………………………………………
Contact Person ……………………………………………
Telephone …………………………………………… Fax. ………………...
Email: ……………………………………………
Additional Attachments: For the required information/documents to be included in an application for a demolition authorisation, refer to the Airport (Building Control) Regulations 2.05, 2.06 and 2.09 and consult with the Airport Building Controller.
Note 1 Application fee In accordance with regulation 2.02(1), an application fee is required to be paid to the CPM Department of Infrastructure and Transport (to be collected by the Airport Building Controller) prior to the issue of the demolition permit. The basis for calculation of that fee is set out in regulation 2.02.
Note 2 AAT Review Under regulation 5.02 the applicant for the approval may make application to the Administrative Appeals Tribunal to have the decision of the Airport Building Controller to refuse or fail to approve a building activity reviewed.
Note 3 Publication of Information Regarding this Application The Applicant should note that information provided on this Application Form may be published or declared.
Airport Environmental Protection and Building Control Office - Appointed by the Australian Government
GPO Box 594 Canberra City ACT 2601 (Adelaide Office telephone number 8110 2220)
Airport Building Controllers (ABCs) are appointed by the Secretary of the Department of Infrastructure and Regional Development (the Department) under the Airports
(Building Control) Regulations 1996 (the Regulations) to exercise the powers and functions which the Regulations vest in the ABCs, in relation to building control at leased
federal airports. ABCs are also appointed as authorised officers by the secretary under the Airports Act 1996 to exercise certain powers under this Act, in relation to leased
federal airports.
ABCs are contracted private companies, or employees or officers of such companies, and act independently of the Department. However, ABCs consult with the Department
as necessary on certain matters, such as the interpretation of the regulations.
Description of
Demolition Works
………………………………………………………………………………………
………………………………………………………………………………………...
Duration of Works ………………………………………………………………………………………...
Estimated Value of the
Works $………………………………………………………………………………………
Does the proposed building activity being the subject of this application comprise part of a major airport development or part of, a draft major development plan within the meaning of the Airports Act 1996 and Airports Building Control Regulations 1996?
Yes / No
Is the proposed building activity consistent with the final master plan
of the airport, which includes compliance to the environmental
strategy?
Signature of owner or agent ……………………………………………..
Yes / No / Not Applicable
Date: ……………………..
Please Print
Name…………………………………………………………………….
Capacity of Signatory ……………………………………………………
BUILDING APPROVAL CLOSE OUT PHASE
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211
Page 1 of 1
BUILDING APPROVAL
CLOSE OUT PHASE
This form shall be submitted to AAL by the applicant at the completion of the approved works to notify AAL of the works completion.
DETAILS OF THE BUILDING APPROVAL ACTIVITY
Applicant
Activity
BA No
Location
Contact Name Phone No
The above mentioned works have been completed or will be completed on the following date / /
The following documents have been attached
As Building Drawings
Inspection Certificate
Other (please specify)
SIGNATURE OF OWNER OF AGENT
Signature Date
AAL OFFICE USE ONLY
Task Signature Date
Site Inspection Conducted
Site Inspection Approved
As Builts Received
As Builts Approved
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page i
SITE RULES AND CONDITIONS FOR
CONTRACTORS
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page 1
Provided Separately