Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson. Introduction. Introduction. Introduction. Hypothesis. Valuable Understandable General Non Proprietary Competitive Open Verifiable Compliant Funded Five Year Programme. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

1

Building (& Asset) Information Modelling (& Management)

Mark BewCIO URS/Scott Wilson

Page 2: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

2

Introduction

Page 3: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

3

Introduction

Page 4: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

4

Hypothesis

Government as a client can derive significant improvements in

cost, value and carbon performance through the use of

open sharable asset information”

1. Valuable2. Understandable3. General4. Non Proprietary5. Competitive6. Open7. Verifiable8. Compliant9. Funded10.Five Year Programme

Introduction

Page 5: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

5

PUSH PULL

PROJECT

How can we make it easier for the supply chain to move forward?

But not force or distort the market?

· Contracts· Training· Technology· Legal's

How do we ensure we get the information we need to operate the Asset we have bought?

How do we gather the information we need to manage the asset?

How do we make it fair so we don’t force or distort the market?

· Make it clear what we want · When we want it· Collect it electronically· Keep it simple to start

Push - Pull

Supply Side Client Side

Page 6: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

6

Work Streams

1. Contracts & Legal

2. Delivery Standards & Documentation

3. Training & Support Systems

4. Handover Information

5. Data Management Systems

6. Stakeholder Benefit Analysis

7. Communications, KTN and Institutions

Page 7: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

7

Work Streams

1. Contracts & Legal

2. Delivery Standards & Documentation

3. Training & Support Systems

4. Handover Information

5. Data Management Systems

6. Stakeholder Benefit Analysis

7. Communications, KTN and Institutions

Page 8: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

8

BS555 Roadmap

CAD

2D 3D

BIMs

iB IM

AIM

BSIM

FIMSIM

BRIM

CPICAVANTI

BS 1192:2007User Guides CPIC , Avanti, BSI

ISO BIM

Drawings, lines arcs text etc. Models, , collaboration

IFCIDM IFD

Integrated, Interoperable Data

Life

cycl

e Managem

ent

© 2008/10 Bew - Richards

Level 0 Level 1 Level 2 Level 3

objects

Standards

Guides

Classifications

Delivery

BS 1192:2007BS1192:2 CAPEX

Building Information Management : inc Guide to BS 1192

Guide 1 Guide 2 Guide 3

CPIC Uniclass/CAWS

CPIC RIBA/ACE/BSRIA Plan of workIncludes contractual and level of detail

Increase level of detail and content as lifecycle knowledge grows

New classifications to assist lifecycle delivery

BS 7000 : 4

BS 8541:2 BS 8541:1:3:4

BS1192:3 OPEX

IFC

IDM

IFD

Delivery Standards & Documentation

Page 9: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

9

BS555 Roadmap

CAD

2D 3D

BIMs

iB IM

AIM

BSIM

FIMSIM

BRIM

CPICAVANTI

BS 1192:2007User Guides CPIC , Avanti, BSI

ISO BIM

Drawings, lines arcs text etc. Models, , collaboration

IFCIDM IFD

Integrated, Interoperable Data

Life

cycl

e Managem

ent

© 2008/10 Bew - Richards

Level 0 Level 1 Level 2 Level 3

objects

Standards

Guides

Classifications

Delivery

BS 1192:2007BS1192:2 CAPEX

Building Information Management : inc Guide to BS 1192

Guide 1 Guide 2 Guide 3

CPIC Uniclass/CAWS

CPIC RIBA/ACE/BSRIA Plan of workIncludes contractual and level of detail

Increase level of detail and content as lifecycle knowledge grows

New classifications to assist lifecycle delivery

BS 7000 : 4

BS 8541:2 BS 8541:1:3:4

BS1192:3 OPEX

IFC

IDM

IFD

Delivery Standards & Documentation

Page 10: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

10

Handover Information

App

rais

al

Des

ign

Bri

ef

Con

cep

t

Des

ign

D

eve

lopm

ent

Tech

nic

al

Des

ign

Pro

duct

ion

Info

rma

tion

Tend

er A

ctio

n

Te

nder

Doc

um

en

tatio

n

Mob

ilisa

tion

Con

stru

ctio

n

to P

ract

ica

l C

omp

letio

n

Operational UseConstructionPre-ConstructionDesignP reperation

A B C D E F G H J K L

Post Practical Completion

Generic & Specific Building and Civils Delivery Stages

Stage 0Strategy

Stage 1Outcome Definition

Stage 2Feasibility

Stage 3ConceptDesign

Stage 4Detailed Design

Stage 5Delivery

Stage 6Project Close

Stage 7Benefits

Realisation

Gate 0 Gate 6Gate 5Gate 4Gate 3Gate 2Gate 1 Gate 7

ACommence

B OptionSelect

DAward

CPre-tender

EClose

The Project Management Framework

(PFM) Lifecycle

Gate 1

TfL(CGAP)

OGCGateways

DevelopBusiness

Case

DevelopDelivery Strategy

Gate 2

UndertakeCompetitiveProcurement

Gate 3

DesignBuildTest

Gate 4

EstablishService

Gate 5

ManageAsset

Network RailGRIP

GRIP 1Output

Definition

GRIP 2/3Pre FeasibilityOption Select

GRIP 5 Detailed Design

GRIP 4Single Option

Selection

GRIP 6/7Const, Test

Comm & Handback

GRIP 8Project

Closeout

TfLCIMM

StartupDefine

RequirementsDevelop (Build)

Procure /Design

Deliver /Close

Pipeling

TfLSpearmint

Startup Initiation CloseDelivery

RIBAWork stage

Page 11: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

11

Handover Information

A

ppra

isal

Des

ign

Bri

e f

Con

cep

t

Des

ign

D

eve

lopm

ent

Tech

nic

al

Des

ign

Pro

duct

ion

Info

rma

tion

Tend

er A

ctio

n

Te

nder

Doc

um

en

tatio

n

Mob

ilisa

tion

Con

stru

ctio

n

to P

ract

ica

l C

omp

letio

n

Operational UseConstructionPre-ConstructionDesignP reperation

A B C D E F G H J K L

20

40

60

80

1 2 4

X Data Drops

Check against clients briefCost planningRisk Management

Check against project briefCost planningTender transparencyEnvironmental Checks

Package Scope checkCost ChecksCarbon Checks

O&M Data HandoverActual CostsActual ProgrammeActual Carbon Performance

Post Practical Completion

N N N

% B

en

efit

N

3

RIBAWork stage

Gather

Maintain

Use

KeyClient

Benefits

Key

Data Management

Industry Delivery Stages

Does the brief meet my requirements in terms of function, cost and carbon?

Has anything changed?What is being priced by the main contractor?

Has anything changed?Has the design been over value engineered?

Did I get what I asked for?Data to effectively manage my asset

Data and information to manage the asset base in a safe, clean and cost effective manner.

Data drops (N) will be provided as often as is necessary, reflecting notifiable changes to the asset either through maintenance or re-purposing

Transparency and clear availability of information to proactively managed cost and carbon performance of the asset.

Easy presentation of HMG reporting systems for future planning and performance management

Savings Achieved

Anticipated Savings

Page 12: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

12

Handover Information

App

rais

al

Des

ign

Bri

ef

Con

cep

t

Des

ign

D

eve

lopm

ent

Tech

nic

al

Des

ign

Pro

duct

ion

Info

rma

tion

Tend

er A

ctio

n

Te

nder

Doc

um

en

tatio

n

Mob

ilisa

tion

Con

stru

ctio

n

to P

ract

ica

l C

omp

letio

n

Operational UseConstructionPre-ConstructionDesignP reperation

A B C D E F G H J K L

20

40

60

80

1 2 4

X Data Drops

Check against clients briefCost planningRisk Management

Check against project briefCost planningTender transparencyEnvironmental Checks

Package Scope checkCost ChecksCarbon Checks

O&M Data HandoverActual CostsActual ProgrammeActual Carbon Performance

Post Practical Completion

N N N

% B

enef

it N

3

Generic & Specific Building and Civils Delivery Stages

Stage 0Strategy

Stage 1Outcome Definition

Stage 2Feasibility

Stage 3ConceptDesign

Stage 4Detailed Design

Stage 5Delivery

Stage 6Project Close

Stage 7Benefits

Realisation

Gate 0 Gate 6Gate 5Gate 4Gate 3Gate 2Gate 1 Gate 7

ACommence

B OptionSelect

DAward

CPre-tender

EClose

The Project Management Framework

(PFM) Lifecycle

Gate 1

TfL(CGAP)

OGCGateways

DevelopBusiness

Case

DevelopDelivery Strategy

Gate 2

UndertakeCompetitiveProcurement

Gate 3

DesignBuildTest

Gate 4

EstablishService

Gate 5

ManageAsset

Network RailGRIP

GRIP 1Output

Definition

GRIP 2/3Pre FeasibilityOption Select

GRIP 5 Detailed Design

GRIP 4Single Option

Selection

GRIP 6/7Const, Test

Comm & Handback

GRIP 8Project

Closeout

TfLCIMM

StartupDefine

RequirementsDevelop (Build)

Procure /Design

Deliver /Close

Pipeling

TfLSpearmint

Startup Initiation CloseDelivery

RIBAWork stage

Gather

Maintain

Use

KeyClient

Benefits

Key

Data Management

Industry Delivery Stages

Does the brief meet my requirements in terms of function, cost and carbon?

Has anything changed?What is being priced by the main contractor?

Has anything changed?Has the design been over value engineered?

Did I get what I asked for?Data to effectively manage my asset

Data and information to manage the asset base in a safe, clean and cost effective manner.

Data drops (N) will be provided as often as is necessary, reflecting notifiable changes to the asset either through maintenance or re-purposing

Transparency and clear availability of information to proactively managed cost and carbon performance of the asset.

Easy presentation of HMG reporting systems for future planning and performance management

Savings Achieved

Anticipated Savings

Page 13: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

13

Programme

Mobilisation

COBIEFile Based

COBIE

Database Repository

Enriched Data

Web“Data” Driven

Web“Process” Driven

Five Years More Years

Red Team Projects

Blue Team Projects

Live Operations

Early Adopters

O& M HandoverConsistencyCultural ChangePackagingPUSH - PULL

Live OperationsResilienceCarbonCostPlanningetc

Active ManagementBuilding ManagementStrategic ManagementBudgetsCarbonEnable IGT Delivery Green Economy Roadmap

Phase 1 Phase 2 Phase 3 Phase 4

Page 14: Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson

14

Questions