Page 1: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Building Capacities to Implement theSierra Leone Poverty Reduction Strategy

Programme Framework

November2005

Page 2: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Table of Contents

List of Acronyms 3Abstract 5

Introduction6

1. Overview of the Capacity Challenges the Programme Addresses7

1.1 Coordination, Monitoring, Evaluation and Resource Mobilization7

1.2 Policy Development, Service Delivery and Decentralization8

1.3 Institutional Environment 111.4 Civil Society and Private Sector

14

2. The Strategy 152.1 Need for a Comprehensive Framework

152.2 Guiding Principles

162.3 Goals & Objectives 172.4 Strategic Thrust and Basic Premise 172.5 Programme Components

17

3. Management Arrangements19

3.1 Implementation Arrangements19

3.2 Monitoring & Reporting20

4. Indicative Budget21

Annex 1: Implementation Matrix- Time Frame22

Annex 2: Project Matrix on Strengthening Institutional Framework for23

Coordination, Monitoring and Resource MobilizationAnnex 3: Project Matrix on Strengthening Policy Development, support

26 to Service Delivery and DecentralizationAnnex 4: Project Matrix on Improving Institutional Environment, Capacity

29 Retention and Sustainability

2

Page 3: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Annex 5: Project Matrix on Strengthening civil society and private sector31

Annex 6: Matrix of Training, Staffing/Manpower, Technical Assistance33

and Other Needs Identified in Key MDAs

Appendix I: Draft Memorandum of Understanding among a Group of37

Development Partners on Cooperation for Support to the Capacity Building Programme Appendix II: Draft Terms of Reference for the Basket Steering Committee

43Appendix III: Draft Terms of Reference for the Programme Management Unit (PMU)

45Appendix IV: Draft Terms of Reference of Staff of Programme Unit

List of Acronyms

ACBF African Capacity Building FoundationAFRISATCHO Community Health OfficerCSM/SL Civil Society Movement/Sierra LeoneCSO Civil Society OrganizationsDACO Development Aid Coordination OfficeDECSEC Decentralization SecretariatDEPAC Development Partnership Committee (Sierra Leone)DEVINFO Development InformationDFID Department for International Development (UK)DMO District Medical OfficerECOWAS Economic Community of West African StatesENCISS Enhancing the Interaction and Interface between Civil Society and the

State to improve poor people’s lives ESO Establishment Secretary’s OfficeEU European UnionFAO Food and Agricultural OrganizationGIMPA Ghana Institute of Management and Public AdministrationGIS Geographic Information SystemGOSL Government of Sierra LeoneGRS Governance Reform SecretariatHDI Human Development IndexHRMO Human Resources Management OfficeHQ Headquarters

3

Page 4: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

ICT Information Communication TechnologyIMC Inter-Ministerial CommitteeIMF International Monetary FundIOM International Organization for MigrationIPAM Institute for Public Administration and Management (University of

Sierra Leone)IRCBP Institutional Reform and Capacity Building ProjectIT Information TechnologyLC Local CouncilsMAFFS Ministry of Agriculture, Forestry and Food SecurityMCH Maternal and Child HealthMEST Ministry of Education, Science and TechnologyMDAs Ministries, Departments and AgenciesMICS Multiple Indicator Cluster SurveyMIDA Migration for Development in AfricaMIS Management Information SystemsMFMR Ministry of Fisheries and Marine ResourcesMODEP Ministry of Planning and Economic DevelopmentMOF Ministry of FinanceMOHS Ministry of Health and SanitationMoU Memorandum of UnderstandingMPPA/OP Ministry of Presidential and Public Affairs/Office of the PresidentMTI Ministry of Trade and IndustryM&E Monitoring and EvaluationMTEF Medium Term Expenditure FrameworkNASSIT National Social Security and Insurance TrustNEX National Execution (UNDP)NGO Non Governmental OrganizationNRA National Revenue AuthorityNTC National Technical CommitteeO & G Obstetrician – gynaecologistsPEMSD Planning, Evaluation, Monitoring and Statistics Division (MAFFS)PETS Public Expenditure Tracking SystemPH Public HealthPHC Primary Health CarePMU Project Management UnitPRSP Poverty Reduction Strategy PaperPIU Programme Implementation UnitSES Senior Executive ServiceSLEDIC Sierra Leone Export Development and Investment CorporationSLIBA Sierra Leone Indigenous Business AssociationSL-PRSP Sierra Leone Poverty Reduction Strategy Paper SLSB Sierra Leone Standards BureauSME Small and Medium EnterprisesSRN State Registered NurseSSL Statistics Sierra LeoneTOKTEN Transfer of Knowledge through Expatriate NationalsToR Terms of ReferenceUN United NationsUNCT United Nations Country Team

4

Page 5: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

UNDP United Nations Development ProgrammeUNICEF United Nations Children’s FundUNMANSIL United Nations Mission in Sierra LeoneUNV United Nations VolunteersVSAT Very Small Aperture TerminalVVF Vesico Vaginal FistulaeWAIFEM West African Institute for Financial and Economic ManagementWATSAN Water and SanitationWB World BankWTO World Trade OrganizationWHO World Health Organization

Abstract This programme aims to build capacities to implement the SL-PRSP. It focuses on actions to enhance the capacities of key ministries, departments and agencies (MDAs), Local governments and other stakeholders (civil society, private sector and Parliament) in order that the outcomes, impacts and goals of the PRSP can be fully met and to strengthen synergies in capacity building efforts.

The specific objectives are to:

1. Facilitate timely and full implementation of the PRSP;2. Ensure coherent support to capacity building efforts by government and its

partners; and3. Strengthen national ownership and sustainability of capacity building in the

public service.

In line with the goal and objectives outlined above, the programme will intervene in four key areas, namely:

Strengthen the national, regional and local institutional framework for coordination, resource mobilization, delivering and monitoring of the PRSP and strategic development of Sierra leone

Improve capacity and key competencies of MDAs for policy development, design and support for service delivery and the decentralization process, with priority focus on the key MDAs;

5

Page 6: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Support improvement of the institutional environment through a comprehensive public service reform to ensure capacity retention and sustainability; and

Enhance capacities of civil society organizations and the private sector to play a more effective role in PRSP implementation.

The end result is to have:

Targets of PRSP met in a timely manner; Better skilled and oriented cadres; Enhancement of management cadres as change leaders in the civil service; Improved capacities to plan, absorb and utilize resources; and Responsive and effective public institutions through a comprehensive public

service reform.

INTRODUCTION

Sierra Leone has experienced decades of economic decline, starting in the mid-1980s and an 11-year brutal armed conflict that saw the breakdown of civil and political authority, widespread destruction of economic and social infrastructure and untold human suffering – over 20,000 dead, countless wounded and/or maimed and millions displaced. With the strong support of the international community (UN, Bilateral and Multilateral donors, International Financial Institutions, NGOs, etc) a comprehensive recovery strategy has been implemented which has restored stability and rebuilt basic social and economic infrastructure destroyed by war and years of economic decline. Most of the war-affected populations have now been successfully reintegrated into their villages and communities and state authority re-established throughout the country. A Local Government Act was enacted in 2004 and elections for local councils held the same year. The country is at a crucial turning point in the transition from post-conflict recovery to longer-term economic and social development. Although many challenges still lie ahead, the foundation for peace and stability has been laid. The formulation and adoption of a Poverty Reduction Strategy Paper (the SL- PRSP) marks an important step on the road to long-term social and economic development of the country.

Poverty in Sierra Leone is endemic and pervasive with about 80% of the population below the poverty line; i.e. expenditures less than 1US$ a day. The cumulative effect of years of economic decline, bad governance and the war is to place Sierra Leone near the bottom of the ranking for Human Development Index (HDI) - ahead of only Niger in 2005. The human development and social indicators, including

6

Page 7: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

illiteracy, primary school enrolments, life expectancy, maternal deaths, malnutrition, and child mortality rates, rank among the worst in the world. The SL-PRSP aims to address the deep and pervasive poverty in a comprehensive manner, taking into account the country’s war-torn history.

Weak institutional capacities in the public sector and civil society are a major challenge for implementation of the SL-PRSP. The capacities of state institutions in Sierra Leone have been in serious decline for decades and were further considerably degraded as a result of the 11-year civil war. Shortage of personnel, gaps in expertise and skills and poor motivation are pervasive in state institutions, civil society and the business sector. As a consequence of the bottlenecks arising from a poorly functioning public service, post-conflict reconstruction relied heavily on institutional arrangements that by-passed state structures to ensure speedy and effective implementation of planned activities. The changed situation/context now calls into question many of these operational modalities – programme implementation units (PIUs), commissions and other specialized entities created to deliver assistance. While effective in the short-term, they have tended to distort the incentive structure in the public service and must now be progressively phased out and be replaced by longer-term support that strengthens the ability of state institutions to formulate and coordinate policies and ensure deliver of services on a sustained basis. This issue is central to the capacity building challenge in Sierra Leone and implementing the PRSP as well as the long –term development of Sierra Leone.

This paper presents a comprehensive programme to build capacities required to implement the PRSP. The programme builds upon prior and ongoing assistance provided by Government and Sierra Leone’s development partners, and seeks to ensure that the outcomes, impacts and goals of the PRSP are fully met. By offering a framework for capacity building, the programme aims to strengthen synergies and reduce duplication of efforts. Institutional issues that shape the retention of capacities are addressed in order to ensure that capacity building efforts are sustainable and demand-led.The paper is structured as follows: Section I provides an overview of the capacity challenges the programme will address. This is followed in Section II by the strategy to address the challenges, including the programme objectives and main outcomes. The management arrangements and budget are in Sections III and IV respectively.

1. Overview of the Main Capacity Challenges the Programme Addresses

The main capacity gaps the programme is designed to address are grouped under the following clusters:

Coordination, resource mobilization, monitoring, and evaluation; Policy development, strategic planning, and support to service delivery and

decentralization process. The institutional environment and its impact on capacity creation and

retention in the public service; and Civil society and private sector.

7

Page 8: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

1.1 Coordination, Monitoring, Evaluation and Resource Mobilization

Institutional Framework for Coordination and Strategy Development

In keeping with its participatory and inclusive principles, implementation of the PRSP will involve a diverse number of actors/stakeholders – at national, district, chiefdom and ward levels, and various stakeholders (government entities, civil society and donors). A robust institutional framework to coordinate and direct actions is therefore vital to success. At present, the institutional architecture to coordinate implementation consists of the Development Aid Coordination Office (DACO) tasked with performing the functions of a PRSP secretariat, and the Inter-Ministerial Committee (IMC) and the National Technical Committee to provide policy, strategic and technical guidance. The aim is to establish a permanent coordination structure embedded within government institutions to coordinate implementation. The institutional anchor to coordinate the PRSP will be decided based on the outcome of the current management and functional reviews of MODEP and MOF, which includes the ‘architecture of government’ review across all ministries. In the interim, the mandate of the Development Aid Coordination Office has been expanded to perform this coordination function in addition to its aid coordination role. Given the many challenges to be faced during this initial phase of implementation, DACO in its present form will require significant strengthening in order to carry out these new functions. The competencies built within DACO in the interim phase will be subsequently transferred to the host institution for the PRSP and future development programmes. DACO is understaffed and it currently lacks the expertise to undertake the functions of the PRSP secretariat, including overseeing monitoring and evaluation of the PRSP and its staff would require additional training to be effective. The functional linkages of DACO with other initiatives also need to be reviewed and strengthened. For example, improved links with the decentralization secretariat are necessary to ensure proper alignment between the funding of the PRSP activities at district level with arrangements for financing Local Councils. The Inter Ministerial Committee (IMC) and the National Technical Committee (NTC) will require further strengthening as well.

Resource Mobilization

The ability of government to mobilize, absorb and effectively use resources is a critical factor for success. According to estimates, the PRSP would require additional expenditure of approximately US$ 200-300 million above the MTEF. The current low institutional absorption capacity will lead to slow and ineffective implementation of the PRSP. An improved resource mobilization capacity for Local Councils and Ministries is also essential; a pilot UNDP programme (Agricultural Business Units) and the DFID support to GRS(2) is aimed at strengthening such capacities. Further support is needed to expand the resource mobilization capacities of local councils.

Monitoring and Evaluating the PRSP

Effective monitoring and evaluation of the PRSP entails capacity to generate and effectively use high-quality and timely data to track progress and capacity for

8

Page 9: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

participatory M&E involving communities, civil society and the public at large. While a positive step has been taken with the development of an M&E framework, important and significant capacity gaps exist for M&E at all levels and among the key actors. An important challenge and priority is to establish the baseline conditions against which to measure progress.

Statistics Sierra Leone (SSL) and the PETS taskforce are key to a poverty-monitoring framework. SSL has improved institutional capacities for data collection and analysis through the Household Income and Expenditure Survey, the Core Welfare Indicator Survey, DEVINFO, and other routine surveys (e.g. UNICEF-sponsored Multiple Indicator Cluster Survey - MICS-3 survey), which makes it a lead institution for a comprehensive poverty monitoring architecture. SSL can help harmonize data collection protocols and definitions, ensure data quality and reliability and provide guidance and training in data collection and survey methods and data analysis for MDA staff, local council personnel and other stakeholders. Yet SSL continues to lose staff to other organizations (e.g. NASSIT, NRA) due to non-competitive salaries. The gap left behind is difficult to fill as most of the skills are acquired by on-the-job training, which newly recruited staff do not have.

Within MDAs, greater efforts are also needed to establish and/or rehabilitate management information systems and upgrade the skills of relevant staff to undertake M&E. Centralized planning and decision-making have in the past marginalized communities and civil society in public policy processes. Support will therefore be needed to ensure that civil society and communities have the capacities to play their role in M&E. Parliament’s oversight role also needs strengthening.

1.2 Policy Development and Coordination, Strategic Planning, Service Delivery and Support to Decentralization.

The main tasks of MDAs in the implementation of the PRSP are to develop effective policies, and to develop mechanisms and management structures to support service delivery and decentralization. There is also the need for the creation of a focal point for the development and co-ordination of policy across government and SL enterprise. The review of the institutional framework currently underway will address this along with the placement of the successor to DACO These roles have not fully matured yet and substantial support would be needed to accomplish these tasks and facilitate institutional transformation. These capacities need to be enhanced as a matter of urgency but be closely coordinated with and take into account the more comprehensive public service reform process underway.

Support to Service Delivery

With respect to support to service delivery, a major problem is the inadequate number of staff in both the professional and other categories and lack of expertise in critical areas. Poor remuneration for civil servants combined with imbalances in incentives created by donor-supported implementation units, NGO recruitments and

9

Page 10: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

other factors have led to severe loss of personnel in MDAs. For example, MODEP reports that it has lost about 70% of its professional staff to projects, NGOs and other higher paying organizations. In MOHS, there are only 66 medical officers while 300 are needed1. The lack of personnel is further compounded by poorly qualified staff particularly at the middle and upper levels responsible for output/deliverables. Existing staff are also not effectively utilized due to lack of clear strategies in MDAS and poor staff supervision. Staff have limited opportunity to upgrade their skills and many have not received training in more than a decade. Transfer of skills from expatriate technical staff to nationals is also limited. Training budgets for MDAs are so small as to have only symbolic value. Staff promoted to new positions (e.g. from technical to managerial positions) often do not get trained to assume their new functions. Training is uncoordinated, haphazard and based more on personal than institutional needs. There is no training policy in place although a draft policy was recently developed. The capacity of local institutions to provide training also needs attention as they may also be handicapped by lack of facilities and adequately trained instructors. In the long-term the existing technical expertise gaps in key MDAs is best addressed through public sector linkages2 to a reform of the tertiary education institutions so that they produce people with the right skills and orientation to support development of the country. Once schooled and trained, there should be a speedy and effective process to absorb and develop them into a public service with the right structures and incentives. Plans to establish a Distance Learning Centre by the World Bank and the ESO/ HRMO review will help address some of the training needs and co-ordination gaps.

Inadequate manpower planning capacity in MDAs has aggravated the situation. This needs to be strengthened to ensure that MDAS have the expertise and minimum core capacities to discharge their functions and ensure effective and efficient service delivery3. An additional problem is the poor matching of staff to jobs, which weakens staff supervision and monitoring of performance. Furthermore, in many MDAs, reference materials (technical publications, etc) for staff to consult are unavailable or outdated. Human resources management units are to be set up in MDAs to strengthen staff development and career planning. Even when qualified staff are available, obsolete and cumbersome procedures in the Establishment secretary’s office (ESO) when recruiting personnel constitutes a bottleneck. The government is therefore faced with a paradoxical situation of high rates of vacancies in the civil service and high rates of unemployment, including for many trained nationals within the country. Efforts to transform the Establishment Secretary’s Office (ESO) into a modern Human Resources Management Office with support from DFID is a significant step forward.

Generally, capacities in all MDAs have been degraded to the extent that their ability to perform core functions is weakened. The outreach capacity of MDAs and capacity to deliver services is cause for concern. Serious consideration therefore needs to be

1 The gross shortage in personnel has created high personnel/population ratios especially for specialist cadres (e.g. doctor/population ratio in 2003 was estimated to be 1:40,000) and consequently high workloads for existing staff.2 The Training and Development Policy will focus on the integration of public and private provision for training and core skills development 3 Donor coordination of support provided to MDAs human resources development is vital. In the MOHS, efforts are being done by WHO, EU, WB in that direction.

10

Page 11: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

given to providing integrated institutional support to rebuild capacities of some of the MDAs. The MAFFS is a prime candidate for such institutional support.

The scale and scope of the personnel and expertise gaps in Sierra Leone are of a magnitude that requires a multi-pronged and comprehensive short and long-term strategy to address them. The elements of a short-term strategy would include the following:

New competitive recruitments to fill critical posts (taking into account decentralization, the personnel verification exercise and the ceiling on the government’s wage bill4); mechanism to retain capacity;

Short-term and on-the-job training to enable staff currently in post undertake their functions better and/or perform new higher functions (e.g. in the medical field experience from Mozambique and elsewhere show that many routine surgical procedures can be performed by specially trained nurses);

Short-term gap-filling strategies that would include: A MIDA (Migration for Development in Africa) programme designed to

bring in highly skilled Sierra Leone nationals in Diaspora; and Expanding the current technical cooperation agreements between

GOSL and other governments; Long-term training in-country and within the region; and Carefully targeted Technical Assistance and skills transfer – both short and

medium-term.

To be effective, this strategy must be underpinned by comprehensive public service reform, particularly the elements dealing with incentives and motivation (e.g. the government’s policy to establish a Senior Executive Service), transformation of the ESO into an HRMO, re-definition of core functions of MDAs (i.e. implementing outcomes of the functional reviews) and adoption of a training and human resource development policy.

4 This currently estimated at 265 billion Leones annually or 6.3% of GDP

11

Page 12: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Policy Development and Strategic Planning

In addition to gross shortages of personnel to support service delivery, many MDAs also suffer from lack of expertise to perform key functions such as policy development and coordination, and strategic planning5. 6For example, the directorate of planning in MEST has nearly all its professional positions unfilled, and it is currently headed by a staff in an acting capacity. As a result the ability to undertake core functions such as educational policy development and planning are weak, a situation worsened by poor statistics and data collection and analysis. Similarly, the Planning, Evaluation, Monitoring and Statistical Division (PEMSD) of MAFFS is weak. The division is unable to design agricultural policy as it lacks the requisite expertise. A related problem is weakness in data gathering, analysis and presentation for evidence-based policy formulation and review. GoSL as a whole currently lacks a central strategic planning capability and is heavily reliant on MDAs inputs. Competencies to integrate gender in policy formulation, programme development, implementation and monitoring are also weak across MDAs. The ‘architecture of government’ review will seek to address this issue.

Another area of concern is capacities for financial management and budgeting, including budget and expenditure management and control, particularly in the context of the MTEF. The expertise to discharge these functions needs to be strengthened to improve resource planning, resource mobilization and utilization.

Support to Decentralization

Lack of staff, expertise and appropriate skills to support decentralization must be urgently addressed. The multi-donor decentralization project (IRCBP) is undertaking significant capacity building for the newly elected Local Councils but the ability of central government institutions to support this process is weak. Poor capacities for policy oversight, monitoring and reporting on the devolution process and subsequently on assessing the impact of the PRSP are evident. In addition, the MDAs are also currently unable to provide training support to sector specialists in Local Councils, help them interpret new policy directives, set national standards to guide programme interventions, and prepare councils to implement the PRSP and monitor impact. MAFFS and MOHS have completed plans to devolve functions to local councils and MEST will be following suit. The training provided to local councils by Decentralization Secretariat (DECSEC) should therefore be complemented by training that targets technical staff under local council jurisdiction. The goal is to have services qualitatively better as a result of decentralization.

1.3 Institutional Environment to Create, Nurture and Retain Capacities

A poor institutional environment is the main cause for the lack of skilled personnel and the poor performance and lack of motivation in MDAs. The public service in 5 MODEP is currently reviewing its structure and has proposed a re-alignment of functions into four clusters: strategic planning; capacity to support district-based planning; coordination (NGO and donor); and monitoring and evaluation. This should result in a tighter and more focused institution. However, the future of MODEP depends on the outcome of the functional review of the institution. Various options mooted include merging elements of MODEP with MOF, creating a separate policy and planning secretariat at the centre, a commission or status quo.6The DFID supported MFR have revealed the weakness in this area.

12

Page 13: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Sierra Leone is dysfunctional and unable in its current form to provide strategic direction for implementation of key government macroeconomic and social policies, including the PRSP. Early and more recent concept papers on reforming the public service since the resumption of power by the government in 1996 include the National Strategy for Good Governance (1997), Strategic Options for Public Sector Reform (2005) and importantly, the creation of a Senior Executive Service (2003) to manage and lead change.

Government’s Policy to Establish a Senior Executive Service (SES)

Skilled professional and managerial staff are a sine qua none for development. “They are crucial for collecting and managing data, and debating and developing good policies, …… They are essential to implementing those policies and to monitoring how they are put into effect”7 The creation of an SES is underpinned by the rationale that an efficient management core, covering civil service grades 11-14, will provide leadership and the momentum to restructure and revitalize the civil service. The SES would:

Dispense with excess labour Institute competitive merit-based recruitment and selection criteria through

an assessment centre process; Pay competitive wages to attract and retain highly skilled management staff Open the civil service to outside expertise, infuse it with new blood and

introduce the element of competition into the system. The mechanism of lateral entry into the service is seen as an omnibus instrument to attract Sierra Leone nationals in the Diaspora, and those from academia, the private sector, as well as many professionals currently on contract in PIUs;

Institute a process of accelerated development and promotion opportunities to motivate “high-flyers” to move to and stay at the top echelons of the service;

Ensure that the process of entry into, retention, promotion and re-numeration would be based on total competition and would thus remove the element of corruption and political interference;

Have as an underlying principle of the service, the evaluation of performance wherein good performance is rewarded and persistent bad performance sanctioned by removal;

Encourage and act as an incentive to lower and middle level civil servants (especially the “feeder grades” of 8-10);

Enhance government’s revenue generation capacity in addition to the improved service delivery functions of state institutions. Government is experimenting with new institutional models based on streamlining agencies and this has significantly enhanced its revenue generating capacity – e.g. National Revenue Authority

Generally maximize public service productivity.

7 Our Common Interest – Report of the Commission for Africa (2005)

13

Page 14: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

The end result sought is a leaner civil service with significantly improved

performance. Other Public Service Reform Initiatives

The SES policy is only one of many other initiatives underway which include payroll/personnel verification undertaken by the Office of the President, the DFID supported Governance and Civil Service Reform Project, Phase II (2004-2007) comprising organizational reviews of key MDAs, preparation of a public service reform strategy, review of pay and grading system, records management improvements (personnel records), transformation of the Establishment Secretary’s Office (ESO) into a modern Human Resources Management Office, and the resuscitation of the Civil Service Training College. The various strands in public service reform in Sierra Leone constitute a good basis for formulating a comprehensive agenda to revitalize public sector institutions. However, the initiatives have so far been parallel. Government has therefore identified the need to prepare a comprehensive Public Service Reform Strategy that would link the various components of reform.8

The SES policy is a first stage of a comprehensive public service reform that would integrate key recommendations of the functional reviews and other processes. Positive developments have taken place recently and several ideas are being discussed on the way forward including for example the development of a ‘change leadership team’ formulated from the SES to implement. Creating and retaining capacities should be government-led and nationally driven, and addresses the overall incentive structure, not just salary related ones; even strong institutions will collapse under poor governance situation. This programme will contribute to the reform process by strengthening government capacity to provide leadership for implementing the PRS and for the wider public service reform.

Programme Implementation Units

A World Bank lessons learnt exercise on PIUs proposes the following formula for the establishment of PIUs9:

8 Public sector institutions can be defined as all organizations (i.e. the civil service, autonomous and semi-autonomous entities, security services, parastatals, parliament and judiciary) involved in policy making, management of resources, service delivery and regulation.9 Utilization of Project Implementation Units (PIUs), World Bank Operations Evaluation Department

14

The Senior Executive Service - SESDeveloped in 2003, the government sees this as its main policy for public service reform and capacity building. GOSL was inspired by similar initiatives in Tanzania, Malaysia and Singapore. High-ranking government officials believe that a lot of the efforts made by partners if structured within the public service would have a greater impact. Current capacity building efforts are described as ad hoc and not tackled on the basis of national demand but driven by supply-side needs and concern of donors. It is stated that Sierra Leone has excellent policies to drive the country, but what it lacks is a critical mass of management specialists to lead. Government has set up an SES implementation team under the Secretary to the President. SES remuneration is a shift from across-the-board increases to selective increases, similar to the Selective Accelerated Salary Enhancement (SASE) in Tanzania. The cost of creating SES is US$2.6m in the first year, for which donor support is crucial. It could motivate the lower cadre staff, and improve their performance in order to join this senior cadre.

Page 15: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Use them only in exceptional circumstances and build in a commitment to a monitorable phase-out plan;

They should contribute to the rapid implementation of projects; and They should be integral parts of line ministries rather than as independent units operating

autonomously

Any public service reform process in Sierra Leone must address the reality of a large number of project implementation units (PIUs) and similar institutional models created by donors. At present there are 104 contract officers at a cost of approximately US$ 3 million annually – the largest numbers are in MOF (24) and MOHS (22). These structures which by-pass the national mechanisms raise a number of questions:

Are they a necessary evil or institutional models that have outlived their usefulness?

Has the reliance on PIUs created a “comfort zone” for donors and hence a reluctance to move to institutional models more directly under government control?

Are they now an impediment to creating, nurturing and retaining capacities? Are the higher salaries of staff in these entities acting as a further reason for

declining motivation in the civil service? Are the entities prolonging the inability of state institutions to function

effectively?

Parallel implementation structures are not limited to Sierra Leone and have long been utilized to fill technical skills gap in management of development assistance programmes. They are a mixed blessing, although they continue to be used widely. The consensus is that although enclave projects have improved performance in a significant way, these gains need to be embedded within the normal operations/functions of state institutions, and not created as time-bound project support activities.

In the present context doing away with PIUs in the short-term without putting in place an effective public service could be detrimental. However, prolonging their existence would lead to unacceptable delays in building effective state institutions. The idea of absorbing and integrating qualified staff currently in PIUs into state institutions as proposed under the SES would significantly contribute to capacity building and retention in the public service.

Access to ICT

A cross-cutting concern is the poor ICT base in most MDAs. In most government institutions, access to internet and other knowledge management tools is limited. As a result, many MDAs operate in an environment reminiscent of the 1980s rather than as modern institutions. Poor communication within and between MDAs and partners is an obstacle to the exercise by MDAs of new functions relating to policy coordination, monitoring and regulation. A training needs assessment conducted in March 2005 showed that a high priority was accorded to information and computer training10. 10 Development of a Comprehensive Training Policy for the Civil Service, DFID, March 2005

15

Page 16: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

1.4 Civil Society Organizations and the Private Sector

The PRSP process in Sierra Leone affords Civil Society Organizations (CSO) an improved opportunity to contribute to a landmark policy framework in partnership with government and donors. It improves substantially the access of civil society organizations to public policy making in the country. This opportunity must be capitalized upon by CSOs.

The PRSP has moved into the more crucial phase of implementation as policy priorities are translated into concrete activities, resources allocated and detailed plans are designed and implemented at the local level. This is the most challenging part and requires effective participation of CSOs. It also calls for capacities different from those required of the CSOs during the preparatory phase.

However, many weaknesses prevent civil society in Sierra Leone from playing a more meaningful role. A 2003 DFID study notes that “the organizational, technical, strategic and advocacy capacity of civil society is weak. The main areas that require attention including the following: Capacity to continue to engage in policy discussions on the PRSP not only within

the structures set up to coordinate implementation at the national level but also to dialogue with the districts and communities and ensure these outcomes are fed to national level processes;

Enhanced capacity for independent research and policy analysis for an informed and constructive engagement;

Reinforced capacities for advocacy: inevitably, implementation of the PRSP requires hard choices on priorities. CSOs must have an improved ability for advocacy and lobbying;

Strengthening capacities for civic engagement, especially targeting Ward committees and women’s groups and members of such committees;

Monitoring all phases of implementation, but especially on: (i) lobbying for activities that would have the greatest impact on the poor; (ii) budgets: budget formulation, budget debate/analysis, skills for analyzing budgets, etc), and monitoring budget implementation (monitoring budget inputs, outputs and outcomes)

ENCISS (Enhancing the Interaction and Interface Between Civil Society and the State to Improve Poor Peoples Lives), a five year DFID supported programme designed to strengthen public engagement on two key policy frameworks – the PRSP and decentralization - addresses many of these challenges. The capacity building programme will complement ENCISS by focusing on strengthening coordination and outreach capacities and strengthening community-based organizations. The ability and capacities of the poor, especially women, to lift themselves through individual initiative and enterprise is the foundation of poverty reduction efforts and must be strengthened. Efforts to enhance the access of individuals and the poor to information to claim their rights are therefore of vital importance. In this context, the programme will provide assistance to networks especially for women.

16

Page 17: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

An expanding economy through the efforts of the private sector is key to reducing poverty, growing jobs and enhancing incomes. The role of the private sector in implementing the PRSP is therefore of vital importance as government can only be a facilitator in job creation and income generation. Under current conditions, the government’s policy of private sector-led growth is constrained by the absence of an indigenous business class and the weak capacities of organizations such as the Chamber of Commerce, the Sierra Leone Indigenous Business Association (SLIBA) and other apex organizations. Business skills and capacities have to be built. In addition, public-private partnerships (including the outsourcing of certain aspects of the implementation of the PRSP both at central and district levels) need to be forged and the regulatory environment to ensure SME development improved.

2. THE STRATEGY TO ADDRESS THE CHALLENGES

2.1 The Need for a Comprehensive Capacity Building Programme

The programme is designed as a comprehensive framework in order to address the following issues:

Implementing the PRSP will require enhanced capacities in government institutions, district-level structures, civil society, private sector and the poor – capacity building should therefore be based on a holistic approach.

The country is emerging from decades of conflict and mass displacement – there is severe erosion of human and social capital and acute lack of capacity, which requires a comprehensive approach.

Past donor and government efforts have often been piece-meal, sector-based, ad hoc and mostly supply-driven. Even more importantly, efforts tended to focus more on skills acquisition and were mostly short-term in nature. Longer-term capacity building efforts must address the issue of institutional incentives that shape the utilization and retention of capacities created, which is vital for sustainability. The summary of capacity building efforts underway found in Appendix IV buttresses this fact and also indicates the imbalance across sectors and institutions.

The comprehensive reform agenda underway in the country requires a comprehensive approach to capacity building: GOSL with the support of its partners is engaged in a far-reaching and comprehensive economic, social, political and governance reform agenda. Key elements of this new architecture include the Poverty Reduction Strategy, Decentralization, Justice and Security sector reform, Public Service Reform, as well as a spate of new legislation and instruments for improved management of the economy (Budgeting and Accountability Act, National Public Procurement Authority, National Commission on Privatization, the MTEF, etc). These policy instruments will play a determinant role in the success of the PRSP, and provide a good basis for identifying the most critical sets of capacities to spearhead the transformation process. At the same time, they also underscore the need for a comprehensive approach to capacity building.

The programme builds upon sector capacity building initiatives (e.g. the Justice Sector Development Programme) and takes account of ongoing work to revitalize the public service. In particular, it draws upon the government’s capacity building

17

Page 18: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

policy, i.e., the establishment of a “Senior Executive Service” (SES), the outcomes of the ongoing functional reviews and other activities supported by GRS/DFID and other processes. The programme also factors the departure of UNAMSIL11, and integrates other capacity building efforts underway.

2.2 Guiding Principles

The Capacity Building Programme is guided by the following principles:

Foster national ownership and be demand-driven rather than supply-led; Enhancement of management cadres as change leaders in the civil service; Comprehensive – integrate needs across sectors and stakeholder groups; Address capacity development at the individual, institutional and societal

levels – as well as organizational processes that make for effective institutions;

Focus on “quick-win” options while paying attention to longer-term needs; Pay attention to sustainability - an enabling institutional environment to

ensure the effective use and retention of capacities created or in place; and Address “software” and not “hardware” capacity needs – i.e. the proposal will

focus on training and human resources needs, better tools and work methods and institutional development.

2.3 Goal and Objectives

The goal of the capacity building programme is to ensure that the outcomes, impacts and goals of the PRSP are fully met, and to strengthen synergies. The main objectives of the programme are:

I. Facilitate timely and full implementation of PRSP and Strategic Policy Development activities;

II. Ensure coherent support to capacity building efforts by government and its partners; and

III. Strengthen national ownership and sustainability of capacity enhancement in the public sector.

The end result is to have:

Targets of PRSP met in a timely manner; Better skilled and oriented cadres and individuals; Enhancement of management cadres as change leaders in the civil service;

11 In many parts of the country UNAMSIL personnel are playing a vital role in delivery of services. A significant capacity gap will thus be created by the departure of UNAMSIL. The UNAMSIL/UNCT Transition Strategy outlines specific capacity building efforts to prepare the various institutions of government take over responsibilities in key areas such as security, consolidation of peace and civil authority and national recovery and economic development

18

Page 19: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Enhanced capacities for resource planning, absorption and utilization; and Responsive and effective institutions – a public service that is effective and

efficient for longer-term sustainability and national ownership through a comprehensive public service reform.

2.4 Strategic Thrust and Basic Premise

The basic premise of the Capacity Building programme is that flexible and speedy implementation of activities under the PRSP is critical to ensure that targets are met in a timely manner, but this has to be done within a public service that is effective and efficient for longer-term sustainability and national ownership. The strategy is therefore centred upon the following elements:

Enhancing the human resource capacities of MDAs to facilitate speedy implementation of the PRSP. This will be done through a variety of means to fill critical gaps in the short-term and will entail more effective utilization of existing staff, provision of short-term national and international expertise, expediting recruitments to critical posts and other measures;

Upgrading in the short-term of the skills of staff to perform existing functions better and/or assume new higher functions through short-term training (both in country and outside), exposure visits and study tours. A particular focus for such activities are middle level cadres responsible for delivery and output;

Providing longer-term training to strengthen the expertise base of MDAS to perform critical functions;

Improving the institutional environment such that a leaner and more performance oriented civil service is in place to promote and facilitate the mission of government in the provision of core public goods and service delivery; and

Training that targets civil society and the private sector and removing barriers to development of these two stakeholder groups.

2.5 Programme Components

To address the capacity challenges presented in section II, and in line with the objectives and strategy outlined above, the programme will intervene in four key areas, namely:

Strengthen the institutional framework for coordination, resource mobilization and monitoring;

Strengthen capacities and competencies of key MDAs in policy development, service delivery and support to decentralization;

Support improvement of the institutional environment through comprehensive public service reform to ensure capacity retention and sustainability; and

Enhance capacities of civil society organizations and private sector to play a more effective role in PRSP implementation.

19

Page 20: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

The Table 1 below highlights the key outputs for each of the four programme components. A broad implementation timeframe is presented in Annex 1. Project matrices for the four components of the capacity building programme are presented in Annexes 2-5.

Capacity building is a long-term process requiring long-term commitments and efforts. The initial timeframe for the capacity building programme is two years (2006-2007) in line with the adjusted PRSP timetable. It is recognized that the programme will be a rolling one in keeping with the PRSP and MTEF.

Table 1: Capacity Building Programme Components and Intended Outcomes

Programme Component

Intended Outcomes

1. Strengthening Institutional Framework for Coordination, Monitoring and Resource Mobilization

1. Effective coordination mechanisms in place at national and district levels2. Key lessons on PRSP implementation documented and disseminated3. Baseline established and quality poverty monitoring reports produced to

ensure timely monitoring and assessment of impacts4. Improved priority setting, resource mobilization and allocation, including

better resource planning and utilization in MDAs5. Cross government institutional framework communicating and responding

effectively

2. Enhancing capacities for Policy development, support to service delivery and Decentralization

1. MDAs have adequate and better skilled cadres and their outreach capacities strengthened

2. Key MDAs have improved ability to support decentralization3. Capacities and competencies in policy development, strategic planning and

development management in MDAS strengthened, especially for key MDAs4. In-country capacity to provide training in policy, planning and development

management and other areas strengthened

3. Improving Institutional Environment, Capacity Retention and Sustainability

1. Comprehensive public service reform completed under Government leadership, and PIUs integrated into the civil service

2. Leadership and management capacities developed in the civil service to spearhead institutional transformation

3. Improved Human Resources Management in the Civil Service4. A Government ICT policy developed and improved ICT infrastructure and

information technology skills in MDAs

4. Strengthening Civil Society and Private Sector

1. Strengthened Civil Society coordination and consultation mechanisms in place

2. Capacities of Community based organizations, including women’s networks strengthened

3. Capacity built for policy research, analysis and development in civil society 4. An improved regulatory framework to promote SME development and

enhanced public-private partnerships to support PRSP implementation

3. MANAGEMENT ARRANGEMENTS

20

Page 21: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

3.1 Implementation Arrangements

Funding Arrangements: In view of the urgency to address capacity needs for the PRSP, “Basket” Fund12 would be put in place to facilitate rapid mobilization of resources needed in the short-term. The Basket Funding is aimed at supporting the overarching goals, outcomes and other potential areas of support and will be managed by government and lead donors. Development Partners will each provide further details on administration of financing, depositing and disbursement of funds, financial accountability, and other matters. The Office of the President as executing agency will be informed of all of these separate arrangements. The instrument (MOU) relating to the basket fund is found in Appendix I.

A Programme Steering Committee, drawn from government, development partners will provide overall leadership and strategic guidance to the Basket Programme as well as to allow for better coordination among all the actors contributing to the capacity building programme, in particular Government and Development Partners. The Steering Committee will consist of the following members: five representative(s) from the Government; three selected Development Partners; one representative from civil society; the PMU, which will also act as the Secretariat to the Steering Committee. A representative of DACO (or its replacement) and MOF will be essential to attend ex officio at any meeting. Should the need arises, GoSL and donors will invite any other parties, in addition to the normal members. See TOR in Appendix II for further details.

The Ministry of Presidential and Public Affairs in the Office of the President will have overall responsibility for executing the programme. Locating management of the programme in the Ministry of Presidential and Public Affairs/Office of the President will ensure that capacity building goes hand-in-hand with the larger public service reform process. The Ministry of Presidential and Public Affairs and the Office of the President will therefore need to be appropriately strengthened to fulfil this role – see Programme Management Unit below.

A Programme Management Unit will be created in Office of the President (see TOR in Appendix III). It will be staffed by a programme coordinator, a senior Capacity Development Advisor13, programme officers and financial and support staff (TORs in Appendix V). Its functions include setting up joint financing procedure and managing agreements, substantive support to the capacity building programme management, coordination and oversight of basket sub-programmes, and financial management and audit.

Implementing Partners

Each of the MDAs concerned (Implementing Partners) would be responsible for managing the detailed planning of training and capacity building activities. Based on the approved work plans, the Implementing Partners are responsible for preparing Terms of Reference for programme activities and specifications for 12 This will be part of the PRS Trust Fund set aside for Capacity Building13 It is suggested that the post of capacity development advisor be transformed into a senior civil service post by end of the project.

21

Page 22: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

equipment, mobilising and managing inputs, implementing activities and producing outputs.

 The Implementing Partners prepare periodic and annual work plans for review, consolidation and approval by the steering committee. They also prepare periodic annual progress reports as an integral part of the reporting requirements. The Implementing Partners participate in the review, monitoring, evaluation, audit and coordination of programme activities. They are responsible for implementing, in a timely and effective manner, the decisions taken by as well as the recommendations made by such events.

Management of Training Activities

As the programme foresees significant training activities, the draft training policy developed by GoSL with support from DFID recommends a Training Advisory Group, to support the ESO/HRMO as the organ of government to support the PRSP and development programmes led by MDAs, who with representation across public, civic and pubic sectors would contribute to the policy development, management and co-ordination of a comprehensive training and development programme. Key partners such as EU, WB and DFID who are providing training, as well as the ACBF project may be co-opted into the training advisory group, which would include the Public Services Commission and other key contributors. A priority task of the would be to carry out a comprehensive inventory of all donor and government-sponsored training activities and resources committed in order to integrate them into the capacity building programme “Basket Fund”, in line with the MoU (Appendix I).

Each MDA and concerned implementing partners will prepare an annual training plan for approval by the ESO/HRMO to integrate into the TAG approved programme. The ESO/HRMO will be responsible for vetting candidates for training and development to ensure transparency and cost effectiveness.

To be effective the training received would be considered when placing and promoting staff. Consideration should be given to “bonding” of staff who benefit from training for periods of one year or more. This will avoid a “revolving door” situation wherein newly trained staff quickly leave at much cost to public resources. The TAG should make proposals on how such a policy will be implemented, in consultation with the ESO/HRMO and PSC .

Implementation of Civil Society Capacity Building Activities

Capacity building activities for civil society organizations will be implemented by MODEP through its NGO unit, which will be appropriately strengthened. This component will be closely coordinated with ENCISS.

Management of the grant funds targeting women and women organizations are to be l be outsourced to an NGO based on competitive bidding.

22

Page 23: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

3.2 Monitoring, Evaluation and Reporting The programme is subject to review every calendar year on request of the government and partners. Towards the end of the programme, a terminal review will be held. The programme may be subject to an in-depth, external evaluation to assess its overall performance, the outputs/outcomes produced against its initial targets, the impact it has brought about or would likely bring about, its relevance to the national context and management efficiency. A mid-term evaluation will be undertaken to ensure that such lessons and recommendations are incorporated in the work plans of the programme during the rest of its life. The timing and necessity of this evaluation will be decided based on mutual agreement between Government and partners.

4. Indicative BudgetThe estimated cost of the programme is about $11.7m, broken down as shown in the table below (excluding support to civil society and the private sector

Table 2: Indicative Programme Budget

Programme Components Budget in US$(2006-2007)

1. Improving Institutional Environment, Capacity Retention and Sustainability

3,560,640

2. Strengthening Institutional Framework for coordination, Monitoring and Resource Mobilization

2,051,000

3. Enhancing Capacity for Policy Development, Support to Service Delivery and Decentralization

5,200,500

4. Admin Costs (3%) 324,3645. Contingencies (5%) 540,607TOTAL 11,677,111Strengthening civil society and the private sector 3,684,000

15,361,111

The indicative budget does not include cost of elements of some of the components of the programme, and these are marked “UB” (Unbudgeted)in the detailed project matrices. With respect to component one, funds already committed by UNDP, EU and DFID, as well as GOSL will cover a substantial part of the budgeted figure for that component. Similarly, with respect to component three dealing with the institutional environment some of the key activities benefit from ongoing support. The budgetary support for an improved incentive package in the civil service could not be determined at this stage.

23

Page 24: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Programme Component

Intended Outcomes 2006 2007Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

1. Strengthening Institutional Framework for coordination, Monitoring and Resource Mobilization

1. Effective coordination mechanisms in place at national and district levels

2. Key lessons on PRSP implementation documented and disseminated

3. Quality poverty monitoring reports produced to ensure timely monitoring and assessment of impacts

4. Improved priority setting, resource mobilization and allocation, including better resource planning and utilization in MDAs

2. Enhancing capacities for Policy development, support to service delivery and Decentralization

1. MDAs have adequate better skilled cadres and their outreach capacities strengthened

2. Key MDAs have improved ability to support decentralization

3. A strategy for strengthening policy and planning units in various MDAS, developed and improved skills in policy analysis, strategic planning in key MDAs

4. In-country capacity to provide training in policy, planning and development management strengthened

3. Improving Institutional environment, capacity retention and sustainability

1. Comprehensive public service reform completed under Government leadership, and PIUs integrated into civil service

2. Leadership capacities developed in the civil service to spearhead institutional transformation

3. Improved Human Resources Management

4. A government ICT policy developed and improved ICT infrastructure and information technology skills in key MDAs

4. Strengthening civil society and private sector

1. Strengthened civil society coordination and consultation mechanisms in place

2. Capacities of Community based organizations, including women’s network strengthened

3. Capacity built for policy research, analysis and development in civil society

4. Improved regulatory environment to promote SME development and public-private partnerships in place to support PRSP implementation

Annex 1: Implementation Matrix- Time Frame

24

Page 25: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Programme Management Unit

Intended Outputs1. Effective coordination mechanisms in place at national and district levels2. Key lessons on PRSP implementation documented and disseminated3. Quality poverty monitoring reports produced to ensure timely monitoring and assessment of impacts4. Cross government institutional framework communicating and responding effectively

Indicative Activities Inputs Budget(2006-2007)

1.1 Strengthen Secretariat to undertake coordination functions – recruit technical and support staff

Personnel - Director, Development Aid Coordinator, Programme Officers and Development Communication Officer

$391,000

1.2 Provide training (short-term) and organize exposure visits/study tours within the region and elsewhere

Fees and Travel $200,000

1.3 Provide support for Coordination Activities – servicing DEPAC, IMC and NTC, and liaison with MDAs, Donors and other stakeholders

- $150,000

1.4 Strengthen technical capacities through a pool of expertise (international and national) to provide advisory services on demand, including assisting the coordinating team to review and document key lessons learnt from implementation

International expertise National expertise

$150,000$75,000

1.5 Arrange exposure visits for IMC and NTC members to countries implementing PRSP and support their participation in relevant poverty conferences, workshops and related fora

Travel and study tours $50,000

1.6 Strengthen district coordination mechanisms – provide support to establish them and conduct training on their roles: design training, deliver training and monitor impact by follow up

National expertise plus 4 facilitators (24 months)

4 regional workshops/year Travel

$36,000

$60,000$50,000

Annex 2: Project Matrix on Strengthening Institutional Framework for Coordination, Resource Mobilization and Monitoring – Intended Outputs, Indicative Activities and Budget

25

Page 26: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

2.1 Organize regular fora (e.g. workshops) for stakeholders to share experiences at national and regional levels – on an annual basis organize one national workshop and 4 regional ones (East, West, North and South)

National expertise and 4 facilitators 4 regional workshops each targeting

100 participants 1 national workshop/year Report production and other costs

$36,000

$64,000

$16,000$25,000

2.2 Publish on a quarterly basis a PRSP bulletin and other products (e.g. policy briefs) to encourage sharing of experiences, disseminate timely information on the PRSP to the public and policy makers, respectively

Printing and distribution $30,000

3.1 Strengthen staff capacities to coordinate M&E activities and provide guidance to other entities involved in M&E – recruit M&E expert

Staff position $36,000

3.2 Strengthen capacity for poverty analysis – recruit a poverty data analyst (to be located within SSL in order to strengthen institutional linkages)

Staff position $28,800

3.3 Provide technical assistance to design and put in place a poverty monitoring framework to adequately track poverty outcomes, impacts and goals at both macro-level and at the grassroots

International expertise (2 months) Travel

$20,000$6,000

3.4 Provide technical support to design and set up a poverty monitoring data base at the Secretariat, assess needs to strengthen management information systems of key MDAS and establish data bases as needed

International expertise (3 months) Travel Equipment for data base

$30,000$6,000$100,000

3.5 Provide external training (within region) to SSL staff to improve M&E capacities

Training within region of 12 staff $40,000

3.6 Design and conduct or outsource training on data collection and analysis for relevant staff in key MDAs (agriculture, education and health)

International expertise (1 months) Travel 2 training workshops – participants,

venue, etc Local facilitators/trainers (6m)

$10,000$6,000$20,000

$9,0003.7 Design courses and conduct training for local council line ministry staff involved in data collection and analysis

National expertise (6 months) 4 regional w/shops Follow up and assessment of

training impact

$9,000$28,000$7,200

3.8 Conduct a poverty and social impact assessment and baseline survey and produce report

National expertise (design assessment, train and supervise

$250,000

26

Page 27: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

staff, analyze and write report) Data collectors/facilitators Travel Report production costs

3.9 Collate data and produce PRSP monitoring reports twice yearly – expertise, training of Secretariat staff, production costs)

Report production costs $10,000

3.10 Strengthen M&E supervisory capacity of NTC sector working groups (Macroeconomic, Social, Private Sector Development, Governance & Security and Agriculture & Food Security)

Study tour/Travel $20,000

3.11 Design and conduct training on poverty social impact assessments and budget analysis and public expenditure management for civil society organizations

National expertise (6 months) 1 national workshop/year targeting

100-200 participants Follow up and assessment

$9,000$20,000

3.12 Strengthen the role of Parliament in M&E activities through networking and exposure visits

Local Training/exposure $25,000

4.1 Expertise to help develop an Aid policy for Sierra Leone that will guide resource mobilization priorities; and hold national consultations on draft policy

International expertise (1 months) Travel National workshop

$10,000$6,000$12,000

TOTAL BUDGET FOR COMPONENT $2,051,000

27

Page 28: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Intended Outputs1. MDAs have adequate and better skilled cadres (to support service delivery) and their outreach capacities strengthened14

2. Key MDAs have improved ability to support decentralization3. Capacities and competencies in policy development, strategic planning and development management in MDAS strengthened, especially

for key MDAs4. In-country capacity to provide training in policy, planning and development management strengthened, and strategy to

strengthen middle level training institutions developedIndicative Activities Inputs Budget

(2006-2007)1.1Undertake assessment of key vacancies in MDAs and work with Establishment secretary’s Office to fill the vacancies, taking into account recommendations of the functional reviews and decentralization – expertise to conduct staff vacancy assessment

National expertise (3months)

$4,500

1.2 Conduct short-term refresher or skills upgrading courses (in-country) targeted at middle level staff in key MDAs (MAFFS, MEST, MOHS, MFMR) - assessment of training needs, design of training courses and conduct of training activities. Activities for distance learning for unqualified teachers include Reproduction of distance learning packages Facilitators Support for traineesFollow up and monitoring

Conduct of training

sessions for various MDAs (36 per year – five sets of training sessions per MDA/year)

Distance learning package for unqualified teachers - 2000

Evaluation and follow up of training activities

$400,000

$400,000

$10,000

1.3 Provide longer-term training (in-country and outside) to upgrade technical skills – post-graduate level training in key MDAs

Scholarship pool of 1 per year per MDA (12 graduate and post graduate

$240,000

14 A preliminary assessment of needs is presented in Annex 6.

Annex 3: Project Matrix on Strengthening Policy Development, support to Service Delivery and Decentralization – Intended Outputs, Indicative Activities and Budget

28

Page 29: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

scholarships1.4 Develop and implement a programme to deploy 5 experts (TOKTEN) to fill immediate short-term needs and gaps in the middle-level cadre in agriculture, education and health

5 (TOKTEN) staff and other costs

$500,000

1.5 Develop and implement, in collaboration with donors and IOM, a MIDA programme to bring in 25 highly skilled Sierra Leone nationals in the Diaspora – the skills required and host MDAs to be specified during design of programme

5 experts from Diaspora $500,000

1.6 Negotiate and deploy 25 professionals through other south-south exchanges

UB

2.1 Provide staff to strengthen the capacities of key ministries to support the decentralization process – health, education and agriculture, including setting up and/or strengthening decentralization M&E capacity within key MDAs

6 national experts (MAFFS, MEST, MOHS) for 12 months

Study tours for staff in decentralization units

$108,000

$50,000

2.2Design and conduct Training of Trainers for key ministries and expand training of youth and women involved in productive activities (e.g. farming and fisheries): Training of Trainers (MAFFS) – 1,500 trainers and 1,400 farmer facilitators Training to establish 100,000 Farmer Field schools Training of 150 communities on inland fisheries technologies (MFMR)

Expertise (national and international) to design courses

Cost of training of trainers Cost of training activities Follow up of training

activities

$1,000,000

2.3Design and conduct or outsource training for district technical staff on the decentralization process and their roles and responsibilities in improved service delivery

National expertise for 2 experts

1 training w/shop/year for each of the four regions)

Local travel and other costs to assess impact of training activities

$10,000

$80,000

$10,000

2.4Strengthen capacity of MODEP to support district-based planning – staff, expertise to design and conduct training sessions on district-based planning15

Put in place a decentralized development planning system Prepare national development planning guidelines for district planning

to ensure consistency with PRSP

MODEP staff position International expertise (3

months) Travel 4 facilitators

$24,000$30,000

$6,000$16,000

15 Activities identified for MODEP will depend on outcome of the reviews of MOF and MODEP

29

Page 30: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Provide support in the preparation of LC plans Assist in setting up participatory monitoring of district plans

4 regional training courses per year

Local travel and other costs

to assess impact

$80,000

$60,0003.1 Provide technical support to review the existing policy planning units, make recommendations on their re-structuring and develop a strategy on strengthening policy development and strategic planning capacities across key MDAs (MAFFS, MEST, MODEP, MOHS) – expertise, etc

International expertise (3m) Travel Departmental counterparts

$30,000$6,000$6,000

3.2 Provide technical assistance to strengthen planning and policy divisions in key MDAs giving priority to agriculture, education, health, development and trade

TA in Policy planning Units of MAFFS, MEST, MOHS, MTI, MODEP) – 12 months

$600,000

4.1 Strengthen the capacity of local institutions, particularly the Civil Service Training College IPAM to provide training on policy formulation and strategic planning to meet the continuing need for the upgrading of skills for a variety of state and non-state actors16

Staff development Facilities Training costs

$1,000,000

4.2 Assessment of training resources (facilities, staffing, etc) of the main training institutes for middle level technical staff for agriculture, health and education and developing a strategy to strengthen them

Expertise (national and International) to conduct assessments and develop strategy

$30,000

TOTAL BUDGET FOR COMPONENT $5,200,500

16 See detailed study by Prof Stephen Adei: Report on Capacity Building Plans for the Institute of Public Administration and Management and the Civil Service Training College.

30

Page 31: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

31

Page 32: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Intended Outputs1. Comprehensive Public Service Reform completed under Government leadership and PIUs integrated into civil service2. Leadership and management capacities developed in the civil service to spearhead institutional transformation3. Improved Human Resources Management and Records Management4. A government ICT policy developed and improved ICT infrastructure and information technology skills in key MDAs

Indicative Activities Inputs Budget (2006-2007)

1.1 Strengthen the OP through creation of a Programme Management Unit (PMU) to implement capacity building programme and coordinate public service reform process – expertise, staffing and operational costs. Key activities include: finalization of a comprehensive public Service Reform strategy building upon various initiatives; conduct workshop to select design options and develop implementation plan

Staff (Programme coordinator, capacity dev. Advisor, admin/finance, programme staff),

Expertise (International and national),

study tour travels, workshop

Operational costs other costs (equipment,

vehicle)

$316,000

$100,000

$100,000$150,000$100,000

1.2 Support (through outsourcing) the process of re-profiling, development of key competencies and selection of new management cadre and change leaders, including creating a Senior Executive Service

Re-profiling and development of key competencies

Creating a Senior Executive Service

$100,000

$2,552,6401.3 Finalize a comprehensive pay and grading system for “non SES staff” of civil service

UB

1.4 Provision of budgetary support for an improved incentive package in the upper levels of the Civil Service17

1.4 Undertake comprehensive organizational reviews and restructure key MDAs – expertise, retreats to agree restructuring options and develop

UB

17 The budgetary support will be on the basis of a sliding scale wherein Government would assume major responsibility by year 5.

Annex 4: Project Matrix on Improving Institutional Environment, Capacity Retention and Sustainability, through a comprehensive Public Service Reform – Intended Outputs, Indicative Activities and Budget

32

Page 33: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

implementation plans and approval by Cabinet2.1 Design and conduct or outsource training for management cadres to act as change agents in the context of revitalizing the public service – leadership training and team building to infuse a new ethos

UB

3.1 Establish a Human Resources Management Office – expertise, conduct training and provide supporting equipment

UB

3.2 Strengthen HRM units in key MDAs – provide expertise to strengthen HRM units

UB

3.3 Revitalize the civil service training college and provide capacity for training middle level civil servants

UB

3.4 Review and adopt draft Training Policy UB4.1 Provide technical assistance to help develop a government ICT policy – expertise to design policy, validate and seek Cabinet approval

Int. expertise (2 m) Travel Workshop on draft policy

$20,000$6,000$10,000

4.2 Undertake a feasibility study on upgrading the ICT base of key MDAs and National expertise (3m) $6,000

4.3 Establish a Wide Area Network (WAN) to link key MDAS and to upgrade ICT infrastructure in key MDAs – set up VSAT equipment, etc

ICT equipment VSAT Installation and other

costs

UB$100,000UB

TOTAL BUDGET FOR COMPONENT $3,560,640

33

Page 34: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Intended Outputs1. Strengthened civil society coordination and consultation mechanisms in place2. Capacities of Community based organizations, including women’s network strengthened 3. Capacity built for policy research, analysis and development in civil society 4. An improved regulatory framework to promote SME development and enhanced public-private partnerships to support

PRSP implementation

Indicative Activities Inputs Budget1.1 Provide support to Civil Society Movement (CSM/SL) to develop and validate a strategy for civil society involvement in PRSP implementation – expertise and workshops

National expertise (2m) Workshop participation Report production and

dissemination

$6,000$10,000$3,000

1.2 Provide institutional support to strengthen institutional capacities for coordination and consultation by CSM/SL – staff, coordination and operating costs (24m)

Staff Coordination costs Other

$100,000

1.3 Provide staff to strengthen capacity of MODEP to act as clearing house of NGOs and support streamlining of activities

Maintain data base of NGOs in country and sectors of intervention and geographic focus

Guide operations and facilitate more balanced distribution of NGO activities in country

Provide relevant information on NGO activities

National staff (24 months) Data base and other costs Operating costs

$36,000$25,000$50,000

2.1 Provide training and capacity building to community based organizations (target 4,000 individuals) to strengthen planning, project implementation and resource mobilization capacities – consultants to design courses, conduct training one for each of the four regions

National expertise (48 months)

Training workshops – 40 Training Facilitators – 10 Follow up activities

$72,000

$400,000$96,000$5,000

2.2 Establish a small grants programme to support activities of rural and urban Programme coordinator $48,000

Annex 5: Project Matrix on Strengthening civil society and private sector – Intended Outputs, Indicative Activities and Budget

34

Page 35: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

women organizations – prepare guidelines, provide information and training, set up grant approval mechanism, set up follow up and evaluation mechanisms in collaboration with LCs and NGOs

Grant M&E

$2,000,000$50,000

2.3 Provide financial support and technical assistance to the Women’s Forum and network - institutional support to facilitate participation in policy dialogues, various implementation mechanisms and to take part in M&E exercises, aimed specifically to ensuring the integration of gender concerns in PRSP implementation

Expertise for strategy development

Validation workshop Coordination activities –

travel and other costs

$9,000

$10,000$50,000

2.4 Provide training support to women members of WARD committees to strengthen their participation in monitoring and reporting activities

National expertise (12m) 4 regional workshops/year Follow up to assess

impact and provide further coaching and mentoring (Travel)

$18,000

$40,000$25,000

3.1 Provide training to strengthen policy research, analysis and development skills in civil society – expertise for development of training materials and conduct of workshops

UB

3.2 Provide small grants to NGOs and other civil society organizations to undertake policy research

UB

4.1 Strengthen MTI to develop improved regulatory framework for SME development

International expertise (2m)

Travel Other costs

$20,000$6,000$30,000

4.2 Support re-structuring of SLEDIC – a detailed needs assessment conducted. Staff Training

UB

4.3 Improve performance of Standards Bureau Staff – assessors Equipment, Attachments

and study tours

UB$ 75,000

4.4 Developing public-private partnerships in energy, agriculture and infrastructure

UB

4.5 Provide training and strengthen the capacity of the Private Sector Organizations, including support to SLIBA

International Expert (3m)

Travel National Expertise

(12m) Training Workshops

30,0006,00024,000300,00050,00040,000

35

Page 36: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

(30) Training facilitator (5) Follow up Support to SLIBA

50,000

TOTAL BUDGET FOR COMPONENT $3,684,000

Ministry, Department and Agency

Training Needs Manpower/Staffing Technical Assistance Other Support

Ministry of Agriculture Forestry and Food Security - MAFFS

Training of 1,500 trainers and 1,400 Farmer Facilitators in order to establish an additional 100,000 Farmer Field Schools

Middle-level cadres: Forestry (20), Livestock (livestock Assistants – 50, livestock inspectors -50), Crops (100), M&E (20), Research (40), Land and Water (10)

Management training for cadres at District Director Level and above (50)

Higher level training: Livestock (15), Research (69), M&E (22), Crops (50) Land and water (10), Forestry (30)

PEMSD: Planning - short-term courses (8), post graduate

Senior Policy Advisors and Planners

M&E Experts

Rehabilitate/revitalize MAFFS training centers at Ogoo Farm, Makali, Musaia, Teko, Kenema, Batkanu, Pendembu, Kpuwabu, Woama, Gberia

Annex 6: Matrix of Training, Staffing/Manpower, Technical Assistance and Other Needs Identified in Key MDAs

36

Page 37: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

level (6), Seminars and other short-term courses; M&E - Short-term training for M&E (8), post graduate training M&E (6), train 12 junior, 48 middle-level; Statistics – 6 senior level and 12 other levels.

Ministry of Education, Science & Technology - MEST

Distance learning – develop distance learning packages to target 3,000 unqualified teachers over three years

Training in educational planning and statistics

15 Officers in Planning Directorate and 6 junior staff

Strengthening the decentralization unit -

Technical Assistance to review Education sector policy

Technical assistance to strengthen educational planning activities

Technical Assistance to strengthen budgeting capacities

Technical assistance to establish a GIS-based schools facilities mapping

Consultancy and Technical support to design and establish a Payroll Unit at MEST HQ;

Support to Establish Teaching Service Commission;

Support to align Education Act with Local Government Act;

Public information and awareness through establishment of Mobile Units

Develop a BSc in Science degree at Milton Maggai College

Ministry of Health and Sanitation - MOHS

Primary Health Care (PHC): 75 Community Health Officers; 1000 MCH Aides to acquire life saving skills and increase intake of MCH Aides to 1500

Local training/In-service: 4 Midwifery trainers; 600 State enrolled Community Health Nurses; 200 Medical Officers; 300 SRN; 20 Nurse Anaesthetists; training in data analysis (various packages); training on management of severe malnutrition

234 Medical Officers 25 Obstetrician –

gynaecologists Hospital Managers 11 PH specialists 488 SRN 368 CHO 103 State Certified

Midwives 847 State Enrolled

Community Health Nurses

115 Environmental Health Officers and

Technical assistance in food fortification – 6-12 months

Conducting sensitization for national micronutrient days

37

Page 38: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

External training: 8 DMOs; 8 Programme coordinators; 4 Midwifery Trainers; 13 Public Health sisters; 4 O & G; 3 VVF surgeons; 1 Researcher and 2 Assistants.

Malaria Control Programme: currently receiving support from Global Fund, WB UNICEF and WHO. Gap includes training of staff in M&E, Research methods, Advocacy and partnership building.

Superintendents; 3 Sanitary Engineers 13 Nutritionists Health statisticians

Ministry of Trade and Industry - MTI

On-the-job training; in-service training for SLEDIC staff; SLEDIC school providing training for business community

Attachment programmes for Assessors in SLSB to older standards institutions abroad

Enhancing competition and export - restructuring of SLEDIC & regulatory environment for SMEs– 1 Director, 1 Deputy Director, 2 Senior economists, 2 Economists, staff for proposed Investment & Export Agencies)

Business environment supportive of SME development – 1 senior Industrial Officer, I Engineer, 1 Economist

Standards Bureau – 5 Lead assessors, 12 Assessors

SLEDIC “One Stop Shop” – 4 Project officers and 3 Field officers

Cooperatives – 6 senior cooperative officers

2 International Consultants - SLEDIC

I international consultant - SLEDIC

1 international consultant for SLSB

MTI – consultancies for legal reforms

Product development workshops;

Micro-credit workshops

Website/Web Portal Access to

information – internet facilities, journals and enhancement of WTO Reference centre

Ministry of Fisheries and Capacity to train 400 persons Promotion of inland 1 Freshwater Biologist Logistics support

38

Page 39: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Marine Resources - MFMR in aquaculture – 5 Resource Persons.

Capacity to Train 150 people in Fish Pond Development – 5 Resource Persons.

Training of 60 extension workers to man 6 fisheries outstations (Training in Fisheries Management, Boat Building, Marine Engineering, Fishing Technology, Fish Processing and Handling, Logistics, Fisheries Policy and Legislation).

fisheries: 30 field staff, 5 supervisors and 2 coordinators.

Four Management Staff and 3 Technicians.

and 1 Fishing Gear Technologist.

Aquaculture Planner and Fish Feed Technologist

Socio-Economist (Extension Techniques), Processing and Packaging Experts, Shrimp Culture Experts, Marketing Expert and Shrimp Hatchery Manager

Ministry of Development and Economic Planning - MODEP

Training on strategic planning, programme/project development and M&E

Training on district-based planning for LCs

Director strategic planning & deputy

Director M&E Coordinator NGO

activities Others

3 International experts (district-based planning, M&E and MIS)

Upgrading MODEP documentation centre

Ministry of Energy & Power – Water and Sanitation Division

Organization of 5-day training workshop on field data collection for enumerators

Organization of 5-day training workshop on water quality surveillance and monitoring for field monitors

Field enumerators (12 months) to carry out nationwide inventory of WATSAN facilities to determine coverage

Trained water analyst (12 months)

Water quality surveillance and monitoring expert (6 months)

Expert trainer – 18 months

IT specialist – 6 months

Hydrologist – 36 months

Technical assistance for 4 months to develop Integrated National Water Supply and Sanitation Sector Policy

Consulting firm to undertake environmental impact assessment studies of project areas

Organization of 2 consultative workshops for development of a national water sector policy

Statistic Sierra Leone - SL National Accounts and Statistics: training of 30 staff (WAIFEM, IMF and Statistics Institute);

External Trade Statistics:

39

Page 40: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

training of 24 staff (Development Training International, Foundation for International Development, Statistical Institute, WAIFEM, AFRISTAT, Statistics Britain)

Price and Labour Statistics: training 10 staff (WAIFEM, ECOWAS Community Computer Centre);

Business and Industry Statistics: training 2 staff (overseas).

40

Page 41: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Appendix I: Draft MEMORANDUM OF UNDERSTANDING

AMONG A GROUP OF DEVELOPMENT PARTNERSON

COOPERATION FOR SUPPORT TOCAPACITY BUILDING FOR THE SIERRA LEONE POVERT REDUCTION

STRATEGY PAPER 2005-2007

The Participants to this Memorandum of Understanding (hereinafter “MOU”) are the Government of Sierra Leone as represented by their official representatives in Freetown, and agents of Donors (hereinafter the “Donors”), as represented by their official representative in Freetown. These Partner Government and Donors together constitute the “Development Partners” under this MOU. Other partners may join the MOU and become members of Development Partner Governments by Addendum to it.

Noting that Sierra Leone has now embarked upon full implementation of the PRSP and has designed a capacity building programme to ensure full implementation

Noting that the Parties to this MOU have decided to extend support to ensure that adequate capacities are in place to ensure that the PRSP is implemented in a timely manner;

Noting further that residual resources from support activities currently being conducted by the Development Partners in the context of support to capacity building activities may be transferred into the 2006 – 2007 capacity building Basket;

Emphasizing that ultimately any support to capacity building must stress Sierra Leonean ownership and leadership;

Emphasizing that the overall quality of past efforts although significant has been ad hoc and largely uncoordinated and that a more coordinated donor support will contribute to overcoming extensive challenges faced by Government and all stakeholders in meeting the PRSP objectives in a timely manner

Have accepted on the following:

Article 1: Targeted Results

1. The three overarching goals and expected outcomes of the Development Partners’ support to the capacity building programme to support implementation of the SL-PRSP:

a. Facilitating timely and full implementation of the PRSP;b. Ensuring coherent support to capacity building efforts by government

and its partners; andc. Strengthening national ownership and sustainability of capacity

enhancement through a comprehensive public service reform.

41

Page 42: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

2. The Development Partners expect that Government, and civil society, together with the Development Partners, will foster a collaborative approach to capacity building for the PRSP. The programme targets a broad range of stakeholders involved with implementing the PRSP – MDAs, civil society, district councils, local communities and the private sector and would benefit under this MOU. Other institutions, organisations and processes may be supported by and through it according to needs that are subsequently identified and accepted by the Development Partners.

3. To enhance work towards the overarching goals and expected outcomes, the Development Partners will promote and participate in general coordination activities and information sharing with partners outside of this group.

4. A programme matrix and budget contained in a project document, based on a comprehensive needs assessment, analysis, research and extensive consultation has been developed to further articulate and operationalize the Development Partners’ contribution to the strategic results identified above.

Article 2: Financing Arrangements

1. The Partner Government will enter into joint financing arrangement, which is part of the PRS Trust Fund to support the overarching goals, outcomes and other potential areas of support as stated in Article 1. This arrangement is referred to hereinafter as “the Capacity Building Basket” or simply “the Basket.”

2. The Basket will be managed by GoSL (Minisry of Presidential and Public Affairs in the Office of the President). The Development Partner will therefore enter into separate cost sharing arrangements that will each provide further details on administration of financing, depositing and disbursement of funds, financial accountability, and other matters. The separate cost sharing arrangements will be governed by their own termination and duration clauses. The OP will be informed of all of these separate arrangements.

Article 3: Management Arrangements

A Basket Steering Committee (hereinafter ‘The Steering Committee’) will be established and be responsible for overall leadership of the Basket

1. The Steering Committee will provide guidance and strategic direction of the programme of work of the Capacity Building Basket. Membership on the Steering Committee will consist of representatives of Government, civil society, selected and Partner Governments. The Ministry of Presidential and Public Affairs/Office of the President will act as the Secretariat to the Steering Committee. The Minister of Presidential Affairs and the two lead Development Partners will chair the Steering Committee as a triumvirate. Development Partner representatives to the Steering Committee will ensure that perspectives of all the Basket members are taken on board and also they will be obliged to share the outcome of steering committee meetings with other Basket members.

42

Page 43: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

2. The Development Partners agree that a dedicated Programme Management Unit (hereinafter “PMU”) will be established by GoSL/Donors to manage the Basket on a day-to-day basis. The PMU will be staffed with the appropriate capacity, including financial expertise, to manage the substantive and operational aspects of the Basket and will be supplemented by internal human and material capacity of donors. Detailed Terms of Reference, attached to this MOU, set out parameters of the PMU.

3. The Terms of Reference for the Steering Committee (Appendix III) shall be subject to amendment by addendum to this MOU. The Terms of Reference of the PMU (Appendix II) shall be subject to amendment by decision of the Steering Committee. All Terms of Reference shall be an integral part of this MOU. 4. The work of the Steering Committee will ensure the Government is part of the management of the program, not only in the Government’s membership on the Committee, but also in terms of coordinating the Government’s financial and substantive input to the capacity building programme covered by this MOU.

Article 4: Guiding Principles

1. Activity components under the Basket that are contracted out will be processed through competitive bidding, according to agreed procurement rules and regulations.

2. Procedures for submission and selection of proposals for any of the technical activities under the Basket will be processed in accordance with procedures to be developed by the PMU and donor guidelines.

3. To the extent possible, the PMU will take the cost effectiveness and good track record into consideration when making contracting and programming decisions under this MOU.

Article 5: Consultation and Communication

1. Frequency of Steering Committee meetings are established in their Terms of Reference. The Secretariat to the Steering Committee will take on responsibility for disseminating information on Basket decisions to the Development Partners by circulating the relevant agreed documents. Participants in the meetings will be the members of the Steering Committee and/or their designated representatives.

2. Complementary to their role as co-chairs of the Steering Committee, the lead Development Partners will interface between the Secretariat (OP), the Basket donors, and will lead political engagement processes necessary for effective implementation of this MOU on behalf of the Development Partners.

3. The Secretariat shall circulate minutes of the Steering Committee to its members and all Development Partners.

4. All contributors to the Basket, that is all Development Partners, will meet at least once every six months to review programme progress.

43

Page 44: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

5. Additional consultation and communication mechanisms may be developed ad hoc.

44

Page 45: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Article 6: Administration, Monitoring, Reporting and Audit

1. In the interests of local ownership and national capacity transfer the PMU assist the Ministry of Presidential and Public Affairs in the Office of the President understand the underlying principles of accountability and financial probity being exercised in the management of the Basket. 2. The administrative, monitoring and reporting requirements among GoSL and Donors will be articulated in the following documents, as appropriate: the respective cost sharing agreements, the various Terms of Reference appended to this MOU specifically those of PMU and the project document.

3. Notwithstanding the above, these functions will include, inter alia, submission of quarterly substantive/technical reports, financial monitoring and reporting; and monitoring and reporting of results, including that signed against outcome indicators as may be articulated in the project document.

4. The Basket will be audited / reviewed at least once during the programme implementation and after its termination. Additional audit(s) shall also be subject to established rules and regulations

Article 7: Benchmarking

1. The Development Partners accept to assess the effectiveness of the Basket and development partner support for the capacity building programme by reference to the following key, but non-comprehensive, benchmarks:

a. Institutional Coordination of Implementation: effective coordination mechanisms in place at national and district levels; key lessons on PRSP implementation documented and disseminated; quality poverty monitoring reports produced to ensure timely monitoring and assessment of impacts; improved priority setting and resource allocation for the PRSP, including better resource planning and utilization among MDAs.

b. Capacity development for Policy development, support to Service Delivery and Decentralization: adequate and better skilled cadres; key MDAs have improved ability to support decentralization; a strategy for strengthening policy and planning units in various MDAS, developed; improved skills in policy analysis, strategic planning and development management.

c. Improving Institutional environment, Capacity retention and Sustainability: comprehensive Public sector reform completed under Government leadership; leadership capacities developed in the civil service to spearhead institutional transformation; improved Human Resources Management, Records Management and better skilled middle level civil servants – administrative cadres; Government ICT policy developed and improved ICT infrastructure and information technology skills in key MDAs

45

Page 46: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

d. Strengthening civil society and private sector: strengthened civil society coordination and consultation mechanisms; capacities of Community based organizations, including women’s network strengthened; capacity built for policy research, analysis and development in civil society; regulatory framework to promote SME development in place.

Article 8: Interpretation and Amendment of the MOU

1. Any dispute, controversy or claim arising out of the arrangements described in this MOU or any addendum concluded hereunder will be settled by consultations or negotiations between the Development Partners or in such other manner as the Development Partners may agree.

2. Consultations with a view to amending this MOU may be held at the request of the Development Partners. The proposed amendment will be communicated in writing to the Secretariat to the Steering Committee, which will circulate it to the Development Partners and will convene an ad hoc meeting of the Development Partners to decide on the amendment. The quorum for such an ad hoc meeting is 75 percent of all Development Partners signatory to this MOU and the decisions will be adopted by 75 percent of the present and voting Development Partners. The decision on the amendment will be circulated by the Secretariat to all Development Partners present and voted for signing and upon signing by all of them it will enter into force and will be binding to all Development Partners signatory to this MOU. The amendments will form an integral part of the MOU as addenda to it.

3. The Development Partners agree while interpreting the provisions contained in the following documents, they take precedence over one another in case of conflict in the following order:

This MOU The Terms of Reference for the Steering Committee (Appendix III) The Terms of Reference of the PMU (Appendix II)

Article 9: Termination

This MOU expires, after the national elections and not later than 31 December 2007 or when the Development Partners decide that it is no longer needed. It may be terminated sooner by consensus of the Development Partners, and likewise may be extended under the same circumstances. A Development Partner may withdraw unilaterally by the provision of three months’ notice without affecting the validity of the MOU for the remaining Participants.

Article 10: Entry into force

This MOU enters into force upon the signature of all Participants.

46

Page 47: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

47

Page 48: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Article 11: Addresses

Any written communications between the Development Partners pursuant to this MOU may be sent to the addresses specified below, or to such addresses that the party concerned may specify:

Signed in ______ # of copies in the English language at Freetown, Sierra Leone,

this ____ day of ___________, in the year Two Thousand and Five.

Signature: Signature:

Designation:

Designation:

Date: Date:

And Witnessed by

Signature: Signature:

Designation:

Designation:

Date: Date:

48

Page 49: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Appendix II: Terms of Reference for the

Basket Steering Committee

Capacity Building Programme to Implement the Sierra Leone Poverty Reduction Strategy Paper 2006-2007

Background1. Sierra Leone has embarked upon implementation of the Poverty Reduction

Strategy Paper. This capacity building programme has been developed to address the multifaceted capacity needs to implement the PRSP. It is based on the clear recognition that the poor institutional capacities in the public sector to plan and deliver services coupled with the weaknesses in institutional absorptive capacities if un-addressed will make it difficult to implement the PRSP. The programme builds upon prior and ongoing assistance provided by Government and Sierra Leone’s development partners, and seeks to ensure that the outcomes, impacts and goals of the PRSP are fully met. By offering a framework for capacity building, the programme aims to strengthen synergies and reduce duplication of efforts. Institutional issues that shape the retention of capacities are addressed in order to ensure that capacity building efforts are sustainable and demand-led.

2. Following discussions with donors, an agreement has been reached in principle that the ………… be vested with responsibility for the management of the multi-donor basket. The multi-donor framework (i.e. the basket) has as its overarching goal supporting the comprehensive capacity building framework to ensure that the targets of PRSP met in a timely manner, the key ministries, departments and agencies have better skilled and oriented cadres; there are improved capacities to plan, absorb and utilize resources; and responsive and effective public institutions. The main outputs of the multi-donor programme are contained in the parent MOU document, and to be agreed to.

3. Donors propose to establish a dedicated Programme Management Unit (PMU) at the Ministry of Presidential Affairs to manage the programme. The strategy to establish a dedicated Unit is informed by the recognition that as Sierra Leone moves to a more long-term development process, government capacity to execute programmes must be reinforced through establishment of a NEX modality.

Overarching Responsibility of the Steering Committee

4. As outlined in the Development Partner’s MOU, a high-level Basket Steering Committee (hereinafter ‘The Steering Committee’) will be constituted to provide overall leadership and strategic guidance to the Basket Programme as well as to allow for better coordination among all the actors contributing to the capacity building programme, in particular Government and Development Partners.

49

Page 50: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Specific Responsibilities5. The Steering Committee will perform the following:

a. Make decisions by consensus on any issues that would facilitate the effective management and functioning of the PMU in line with the provisions of the MOU, and the TORs for the PMU.

b. Review and provide guidance on matters relating to substantive support to the capacity building programme, (financing procedure; coordination and oversight of basket sub-programmes).

c. Provide guidance to the PMU on implementation of specific matters decided upon during the Steering Committee meetings.

d. Donor representatives to the Steering Committee will ensure that perspectives of all the Basket members are taken on board, and also they will be obliged to share the outcome of Steering Committee meetings with other Basket members at the regular Basket meetings.

Constitution of the Steering Committee6. The Steering Committee will consist of the following members:

a. Five representative(s) from the Government; b. Three selected Development Partners; and c. One representative from civil society;d. The PMU, which will also act as the Secretariat to the Steering

Committee.

7. Director of DACO may attend ex officio at any meeting. The co-chairs may decide to invite any other parties, in addition to the normal members, if need arises.

Quorum8. Quorum will be seven of the members of the steering committee

Chairs and meetings:9. The Minister of Presidential Affairs and the lead Development Partners will co-

chair the Basket Steering Committee. The members accept that UNDP and DFID will serve in the role of lead Development Partners and co-chair of the Steering Committee.

10. The Steering Committee will meet at least once every two months, and more frequently at the request of any of the Committee members, and at least once a quarter will meet for the purpose of substantive and financial progress reporting. Ministry of Presidential and Public Affairs/Office of the President as Secretariat will be responsible for circulating the agendas and minutes of the Steering Committee.

50

Page 51: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

Appendix III: Draft Terms of Reference for the

Programme Management Unit (PMU)

Capacity Building Programme for Sierra Leone Poverty Reduction Strategy Paper 2006-2007

Background1. These Terms of Reference (hereinafter ‘TORs’) should be read alongside the

Development Partners’ Memorandum of Understanding (hereinafter the ‘MOU’), the TORs for the Sierra Leone Basket Steering Committee (hereinafter ‘The Steering Committee’) and the Project Documents on support to the Capacity Building Programme for the SL-PRSP.

2. Drawing on the lessons learnt from the management of donor support to electoral processes and other best practices, it is proposed to establish a dedicated Programme Management Unit (PMU) to manage the programme of support in all its dimensions. The strategy to establish a dedicated Unit is informed by the recognition that as Sierra Leone moves to a more long-term development process, government capacity to execute programmes must be reinforced through establishment of a NEX modality.

3. PMU will be staffed with the following core competencies: a. Project Managementb. Senior Capacity Development Advisorc. Finance Supportd. Programme/Operations Support

Summary of Principal Responsibilities4. The functional responsibilities of the PMU would comprise the following broad

categories:a. set up joint financing procedure and manage donor agreements;b. substantive support to the capacity building programmec. management, coordination and oversight of basket sub-programmesd. procurement for the capacity building programmee. financial management and audit

Specific responsibilities:5. Substantive support to the capacity building programme: The PMU will:

a. Produce a new MOU among the basket members for the capacity building support programme.

b. Act as the Secretariat of the Steering Committee and provide substantive input, derived from best practices, in the strategic direction of the work of the Steering Committee

c. Provide substantive progress report, on a regular basis, to update the Basket donors on the status of the capacity building activities.

51

Page 52: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

d. Provide strategic advice to the lead Development Partners on the capacity building programme in their engagement with the Governmenti. Provide expert support to the capacity building activities in

accordance with the benchmarks in the Development Partners MOU.

6. Financial Management and Audit: The PMU will:a. Ensure timely disbursement of funds to all contracted partners as per

agreed budget and disbursement schedulesb. Provide financial monitoring and guidelines to all contracted partners by

collecting accounts, reports and receipts from the partner organisations.c. Prepare regular financial summary narratives and consolidated accounts

of the basket for circulation/presentation, together with the substantive progress report, to the Basket donors and the Steering Committee

d. Provide Terms of Reference and provide all necessary documentation for an audit of the Basket Fund, as well as prepare responses to audit observations and account examinations

7. Other Requirements: a. General progress reporting: The PMU will use the regular monitoring

reports from the various partners implementing activities to produce a quarterly technical progress report for discussion with the Basket Donors and at the Steering Committee. This will outline progress against the outcomes and benchmarks articulated in the project document.

b. The PMU will also provide regular substantive progress reports on the status of the capacity building programme, drawing attention to any key issues that would impact on planned activities.

c. Contract Approvals and Changes: The PMU will not authorise or conclude agreements with partner organisations without referral to the Basket Steering Committee.

d. Evaluation: The PMU will sub-contract consultants (or select donors outside the basket) to undertake an independent post-Basket evaluation

e. The PMU will act as a common information point for all implementing partners and basket stakeholders. It will take responsibility for circulating meeting reports and agendas.

8. Key Outputs by which Basket will assess performance:a. Monitoring of technical and financial areas carried out regularly across

range of implementing partners, quarterly reports from implementing partners received, quarterly financial summaries and progress reports provided to the Basket, stakeholder forum meetings as scheduled.

b. Coordination among all those parties involved in the Basket enhanced through regular meetings, and day-to-day answering of queries and liaison.

c. Independent evaluation of the Basket contracted in a timely and efficient manner

9. Timing: GoSL/donors will provide services to the Basket for duration of MOU this TOR is an addendum to.

52

Page 53: Building Capacities to Implement the - World Banksiteresources.worldbank.org/INTSIERRALEONE/Resources/... · Web viewThis programme aims to build capacities to implement the SL-PRSP

10. Skills: OP/Donors will ensure that the PMU staff have the following key skills:a. Technical expertiseb. Financial management expertisec. Leadership and facilitation skillsd. Analytical skills e. Information management

53