building committee reportcvhts.org/docs/2019_gbm/2019 gbm building committee... · 2019-04-30 ·...
TRANSCRIPT
![Page 1: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/1.jpg)
- By Sudhir Shah
Building Committee Report
![Page 2: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/2.jpg)
• PHASE III PLAN WAS IN THE WORKS FOR SEVERAL YEARS.
• TWO STOREY 7000+ SQ. FT. ADDITION NORTHSIDE OF THE TEMPLE BUILDING.
• PHASE III CONCEPT PLAN APPROVED ON OCTOBER 07, 2017.
• BUILDING COMMITTEE (BC) APPOINTED ON DECEMBER 3, 2017.
![Page 3: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/3.jpg)
• MR. SUDHIR SHAH (CHAIRPERSON)
• DR. MOHAN KASARANENI
• MR. BANGALORE NEELAKANTIAH
• MR. VINOD GADHIA
• MR. GURPREET SINGH (MEMBER, EC)
• MR. ADISH JAIN (CHAIR, FUND RAISING)
• DR. V. NARLA (CHAIR, BOARD OF TRUSTEES)
• MR. KIRAN PYNENI (PRESIDENT, EC)
![Page 4: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/4.jpg)
NEW TEMPLE ENTRANCE WITH VESTIBULE.
FOUR (4) CLASS ROOMS.
SPACIOUS COAT AND SHOE ROOM WITH BENCH SEATING .
MULTI-USE BATHROOM FACILTY FOR MEN AND WOMEN.
INFORMATION CENTER IN THE LOBBY.
ELEVATOR AND TWO STAIRCASES TO PROVIDE HANDICAP
ACCESS TO THE MAIN LEVEL.
SPACIOUS LOBBY.
HALLWAY AROUND THE MEETING HALL.
![Page 5: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/5.jpg)
N E W 2 2 2 4 S Q . F T. P R AY E R H A L L .
S E C O N D A RY A C C E S S T O T H E M A I N S A N C T U M F O R
UNITERRUPTED GANESH SANCTUM WORSHIP.
DESIGNATED SPACE FOR PRIVATE PUJA.
NEW ENTRANCE WITH VESTIBULE TO KEEP PARVATHI HALL PRISTINE.
A D M I N I S T R AT I V E O F F I C E S W I T H A S E RV I C E C O U N T E R .
STRONG ROOM TO STORE VALUABLES & CASH RECEIPTS.
AREA FOR CENTRAL MONITORING OF VIDEO EQUIPMENT.
STORAGE AREA FOR SERVERS AND OFFICIAL RECORDS.
![Page 6: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/6.jpg)
DESIGNED FOR FUTURE DIGITAL LEARNING CENTER
FOUR (4) ADDITIONAL CLASSROOMS AT LOWER LEVEL.
MEETING HALL REDESIGN FOR IMPROVED FUNCTIONALITY & PROVISION FOR FOLDING PARTITION FOR MORE CLASSROOMS.
THE OLD PRIEST QUARTER CONVERTED & RENOVATED AS MEDITATION ROOM & LIBRARY WITH AN INDEPENDENT ENTRANCE.
![Page 7: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/7.jpg)
DESIGNATED DROP OFF AND PICK-UP AREA AT THE
LOWER LEVEL.
DESIGNATED AND IMPROVED HANDICAP PARKING.
WIDER DRIVEWAYS.
CHARGING STATIONS FOR ELECTRIC CARS.
![Page 8: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/8.jpg)
CONSTRUCTION DOCUMENTS ARE COMPLETE.
VARIOUS CITY AGENCIES HAVE INFORMALLY REVIEWED
PLANS.
THREE (3) FIRMS WERE INTERVIEWED FOR SERVICES OF
CONSTRUCTION MANAGER (CM) AT RISK FOR THE
PROJECT.
ENFIELD BUILDERS WAS REOMMENDED AS CM AND
WERE APPROVED BY BOTH BOT & EC.
ENFIELD BUILDERS ESTIMATED CONSTRUCTION COST
$2.965 MILLIONS.
![Page 9: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/9.jpg)
ARCHITECT & BC REVIEWED THE PROJECT PLANS AND SCOPE
TO REDUCE THE PROJECT COST.
BC & ARCHITECT IN CONSULTATION WITH ENFIELD BUILDERS
CAME UP WITH THE REDUCE COST OF $246,OOO.
CM HAS AGREED TO $2.6 MILLION GMP, REVISED PROJECT
SCOPE & TO SHARE ANY FUTURE SAVINGS AT 70% CVHTS & 30%
CM.
BOT & EC APPROVED TO INCREASE THE PROJECT BUDGET
FROM $2.5 MILLIONS TO $2.86 MILLIONS INCLUDING THE
ARCHITECT’S FEE.
![Page 10: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/10.jpg)
PREPARE & EXECUTE CM AGREEMENT SOON.
• SUBMIT PLANS FOR THE CITY’S BUILDING PERMIT
BEFORE THE END OF APRIL. CITY REVIEW TIME-
UPTO 30 CALENDAR DAYS.
• ANTICIPATE CONSTRUCTION TO START MID TO LATE
JUNE 2019.
• CONSTRUCTION PERIOD 10 MONTHS-COMPLETION
APRIL 2020.
![Page 11: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/11.jpg)
THANK YOU
![Page 12: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/12.jpg)
- By Adish Jain
Fundraising Committee Report
![Page 13: Building Committee Reportcvhts.org/docs/2019_GBM/2019 GBM BUILDING COMMITTEE... · 2019-04-30 · Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee,](https://reader033.vdocuments.net/reader033/viewer/2022053016/5f1941137a6c6150cd63877a/html5/thumbnails/13.jpg)
Fund Raising Committee Report Team Members – Adish Jain, Surendra Chawla, Gita Agrawal, Mohan
Kasaraneni, Rachna Khanna, V Narla, Subbarao Bollepalli, BP Nelkantiah, Siva Jada, Gurpreet Singh, Kiran Pyneni, Girish Chokshi, Krishna Pandey, Saumitra Banerjee, Prasad Srinivasan and Sudhir Shah
Fund Raising Target –$1.3 Million in donations and commitments from our
devotees
Current Status – We have currently raised $600K in donations and commitments from 128 of our devotees Diwali Dinner for the members and the guests Recognition thru bricks in the walkway with donor’s name Swarna Pushpa Pujas Commitments from major donors and fund raising committee members Separate Account for total transparency
Planned Activities – We are planning Fund Raising Cultural Events and reach
out to major donors to raise new commitments from our devotees