Building Feasibility Study forRenovations to St. Martin Catholic School
Kuch Stephenson Gibson Malo Architects & Engineer2008086 08.11.19
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Existing Building Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
• Building Condition Report
• Asbestos Report
Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Appendix A: Kitchen Consultant
Appendix B: Mechanical Report
Appendix C: Electrical Report
Appendix D: Drawings
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 1
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
INTRODUCTION This report has been commissioned by the Township of Terrace Bay to
consider the potential for reuse of a portion of the former St. Martin
School structure as a new public library for the community and include
the renovation of the gymnasium and change rooms to accommodate a
commercial kitchen and associated washrooms to allow the existing
gymnasium to be used as a licensed banquet/meeting centre/multi-
purpose area. The scope of work is limited to two areas of the existing
school structure as well as adjacent grounds upgrades to accommodate
parking, a main entrance and barrier free access.
The remainder of the facility is currently in use as a seniors centre and
this will continue. Both types of occupancy are classified as A2
Assembly occupancy and are permitted under the current zoning by-
laws.
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 2
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
EXISTING BUILDING
CONDITIONS
Condition Report
A comprehensive building condition assessment report using the
RECAPP Validation Survey (RVS) was given to the Kuch Stephenson
Gibson Malo for their use in preparing this report. The RVS identifies
deficiencies, recommended repairs and estimated timelines for repairs
for the entire facility. The following is a list of the particular deficiencies
associated with the portion of renovations under consideration as part of
this report.
• Replacement of original wood windows in 1952 Wing
• Replacement of original wood doors in 1952 Wing
• Replacement of original millwork in 1952 Wing
• Repair or replacement of worn and zipping carpet
• Replacement of existing vinyl tiles in 1952 Wing
• Replacement of damaged or stained ceiling tiles
• Replacement of existing window coverings
• Replacement of existing concrete stairs
Asbestos Report
A Hazardous Materials Assessment Report was prepared for by the
Resource Centre for Occupational Health and Safety and Lakehead
University for the North of Superior Catholic School Board and it
identifies two areas where asbestos was present. The original pipe
insulation within the existing Boiler Room was identified as amosite,
Chrysotile and crocidolite. This insulation has since been replaced or
clearly identified on site as being asbestos. It is assumed the insulation
on the existing pipes within the perimeter pipe chase will contain these
contaminants. The floor tile in the 1952 original building, 1956 Addition
and 1965 addition are vinyl asbestos tiles containing Chrysotile
asbestos. All areas of tile are scheduled to be removed per this report. A
program of asbestos abatement will have to be carried out by the owner
in preparation of upgrading the new areas identified. KSGM can assist
the Owner in obtaining a suitable Consultant to carry out this scope of
work. True Grit Consulting has reviewed the intended scope of
remediation and provided an estimated cost for this scope of work.
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 3
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
SCOPE OF WORK Description EstimatedCost
Existing Seniors Centre Renovations
Men’s and Women’s Washrooms: 102
• convert existing girl’s change room into newwashrooms
• break terrazzo floor as required for new plumbing• break down terrazzo base, make good wall and
floor and install new sheet flooring • install new plumbing fixtures and millwork• install new toilet partitions• paint and refinish all surfaces• new gypsum board ceiling and light fixtures
includedbelow
Bar Area: 103
• convert existing kitchen to bar:• remove existing access door and create larger
pass-thru opening• remove existing shelves and patch wall• remove dishwasher and relocate sink• remove back half of millwork to allow for cooler• remove existing and install new sheet flooring • paint walls and ceiling
includedbelow
Kitchen: 105
• convert existing boy’s change area into kitchen• break terrazzo floor as required for new plumbing• break down existing terrazzo base, make good
wall and floor and install new sheet flooring • repair and paint walls and ceiling• supply and install kitchen equipment, final hook-
up by others• refer to Kitchen Summary for comments and
itemized costs
includedbelow
Subtotal Architectural Renovations (listed above) $ 94,000
Kitchen Equipment
• refer to Appendix for quotation $ 71,350
Subtotal Mechanical Renovations
• refer to Appendix $ 52,500
Subtotal Electrical Renovations
• refer to Appendix $ 38,000
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 4
Description EstimatedCost
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
Total Kitchen/Washroom Renovations(excluding GST)
$255,850
Terrace Bay Library Renovations
Demolition
• remove all interior partitions as shown• remove all existing flooring and ceiling tiles and
scabble exposed concrete floor ready to acceptnew flooring
• remove all interior door and frames• remove all existing ceilings• mechanical and electrical work defined elsewhere
(refer to appendices)• remove existing canopy/overhang at front
entrance
$ 62,700
General Exterior Renovations
• scrape and paint existing fascia and soffit• remove existing wood entrance doors and install
new aluminum glazed entrance and vestibuledoors with barrier free automatic door openers onboth sets of doors
• remove existing wood windows in 1952 and 1956building and install new PVC inserts
• cap existing sills and columns remaining withprefinished metal
• remove existing glass block and infill with woodframe construction with insulation and gypsumboard interior finish, stucco exterior
• clean existing brick and patch mortar joints whererequired
• remove existing concrete step and sidewalk atmain entrance and install new concrete sidewalkalong front and side to provide barrier-free access
• sod front yard• new paving and parking lines along north side and
building• new entrance canopy along east and portion of
north side of building, wood column supports
$ 324,500
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 5
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
General Interior Renovations
• supply and install new solid core wood doors inhollow metal frames - glazed upper portion of doorfor viewing of occupied spaces
• patch and repair all surfaces damaged bydemolition and renovation and repaint
• install new sheet flooring and carpet as shown(sheet flooring in Work Room, Special Use,Storage, Archives and Washrooms)
• install new ceilings as shown• new millwork as shown (note that library stacks
and study carrels are provided by owner, all othershelving, including that shown in Archives andChildren’s Area as well as perimeter shelving andwork stations and counters, are included in scopeof work)
• new partitions as noted, paint finish• exposed heating units (no millwork surround -
typical unless otherwise noted)
$ 155,100
Stacks/Study Carrels
• new carpet and ceiling• two wall mounted display boards with glass doors• shelving and carrels supplied by owner
$ 18,700
Circulation Desk
• new custom birch veneer ply and plastic laminatecounter with open work space and storagedrawers/doors below (50% each)
• separate work counter with under counter side (2)storage unit and upper closed cabinets
• dropped bulkhead with accent lighting above desk• fur out east wall to allow for wiring and refinish• retail display with glass doors adjacent to new
closet alcove
$ 58,300
Office
• new carpet and ceiling tile $ 1,100
Work Room
• new sheet flooring and ceiling tile• upper shelving, lower storage unit with sink
$ 14,850
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 6
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
Meeting Room
• new carpet• dropped bulkhead and accent lighting around
perimeter, new ceiling tile• millwork surround for perimeter heating unit• wiring for smart board and presentations
$ 20,350
Vestibule
• new porcelain tile• new gypsum board ceiling
$ 3,300
Special Purpose
• new carpet• dropped bulkhead and accent lighting around
perimeter, new ceiling tile• millwork surround for perimeter heating unit• wiring for smart board and presentations
$ 24,200
Storage
new sheet flooring and ceiling tile• open full height metal shelving one side and
standard upper/lower storage cabinets one side
$ 14,850
Children’s Area
• new carpet and ceiling tile• accent gypsum board bulkhead and lighting over
counter• low built in shelving unit along east wall and work
counter on west side• fur out existing east wall
$ 34,100
Reference
• built in computer counter work stations• new carpet and ceiling tile• fur out existing west wall
$ 16,500
Washrooms
• new sheet flooring and gypsum board ceiling• new fixtures (refer to mechanical)• new metal washroom partitions• new ceramic tile wall finish on sink wall• new mirrors• new barrier free sink with counter
$ 30,800
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 7
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
Janitor
• seal concrete floor• new mop sink and eye wash station (refer to
mechanical)• paint new walls and gypsum board ceiling
$ 2,000
Computer Room
• built in computer counter work stations• new carpet and ceiling tile• fur out existing east wall
$ 17,050
Fireside Reading Room
• new carpet and ceiling tile with dropped bulkheadand accent lighting
• electric fireplace with stone surround andporcelain hearth
• millwork surround for perimeter heating unit
$ 37,950
Archives
• new sheet flooring and ceiling tile• new full height metal storage shelving units
$ 16,500
Existing Corridor (to west end)
• new sheet flooring and ceiling tile $ 3,300
Structural
• demolition of concrete floor for new footings• cast new footings (5 - 1200 G + 6 - 900 G)• new steel columns (11 - HSS 89X89X4.8)• new steel beams (8 - W310X28)
includedabove
Mechanical
• refer to Appendix for comments and itemized cost $ 231,000
Electrical
• refer to Appendix for comments and itemized cost $ 112,500
Asbestos Abatement
• remove asbestos on pipes as per original reportprepared for school board
• provide inspection and testing during removal
$ 80,000
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 8
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
Subtotal Estimated Costs(excluding GST)
$1,279,650
Total Library and Kitchen/Washroom Renovations $ 255,850
Estimated Construction Cost(kitchen/wc renovations and library renovations)
$1,535,500
+ $1,612,275 GST on above $1,612,275
Design Contingency 10% $ 161,228
Total Estimated Construction Cost (includes GST)
$1,773,503
Professional Fees (± 10 % of total construction cost)
$ 177,350
Asbestos Abatement Consulting Fees $ 15,000
CONCLUSION The condition of the existing building is generally good. It has been well
maintained by the previous owners and with relatively minor
renovations, the building can be altered for use as a Library for the
Township of Terrace Bay.
Estimates assume a construction start in early summer 2009. If
construction is delayed, we recommend an escalation factor of 5% per
annum be applied to the total estimated construction costs.
Terrace Bay Library Feasibility StudyTerrace Bay, ON
Page 9
Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086
APPENDIX A: Kitchen
Nov.14, 200830 days
Janet Brookstbasite
extra
ITEM DESCRIPTION MAKE PRICE QNTY EXPANDED
1 60" RANGE, ELECTRIC GARLAND $8,500.00 1 $8,500.00
1A OPTION: Make one oven convection, add to above price.
GARLAND $2,082.00 1 $2,082.00
2 COLD PREP. TABLE BEVERAGE AIR $2,100.00 1 $2,100.00
3 FOOD WARMER DUKE $250.00 1 $250.00
4 MICROWAVE PANASONIC $800.00 1 $800.00
5 EXHAUST HOOD, 6' QUEST $2,335.00 1 $2,335.00
6 FIRE SUPPRESSION SUPERIOR SAFETY $6,500.00 1 $6,500.00
7 EXHAUST FAN & M/U AIR BY OTHERS
1 SOILED DISH TABLE, 84" QUEST $2,080.00 1 $2,080.00
2 DISHWASHER, HOOD TYPE CHAMPION $10,230.00 1 $10,230.00
3 CLEAN TABLE, 84" QUEST $840.00 1 $840.00
CONTACT PERSON: Ian McEachernADDRESS: Court StreetPHONE # 345-5582
TERMS:FOB:
TAXES:
Quotation
PREPARED BY:COMPANY: KSGM
Four elements, 36" grill, two standard ovens, high back and shelf. 208V or 240V. See specs. Model S684-36G.
COOKING EQUIPMENT
Below are rough budget prices for equipment for the project in Terrace Bay.
DATE:VALID FOR:
DISH WASHING
Includes vapour proof light, fire guard filters, duct take-off. Insulated top, back and ends may be required to meet NFPA-96 code (not included in price). Size and price will change with equipment selection. 115V, single phase, 1 amp (for lights)
Estimate only. 115V, single phase, 1 amp.
Includes pre-rinse sink with scrap basket, spray assembly, over shelf. Size is approximate.
Straight through or corner model with 40F rise internal booster (70F rise booster available, please specify). 208V or 240V. See specs. Model D-HB
120V, single phase, 1000 watts.
27" self contained with two doors. Full length poly cutting board. 115V, single phase, 4 amps, 1/6 HP.
Single well, counter top food warmer. Holds two 11 quart containers (1/2 size X 6" inserts). 120V, single phase, 1200 watts.
441 Hardisty StreetThunder Bay, ON P7C 3G9Phone:(807) 623-2544Toll Free: 877-232-2212Fax:(807) 623-6584Web Page: russellfood.ca
RFE Page 1 of 3 19/11/2008
ITEM DESCRIPTION MAKE PRICE QNTY EXPANDED4 POT SINK, 2 COMP. QUEST $2,000.00 1 $2,000.00
5 DISH STORAGE RACKS OLYMPIC $540.00 LOT $500.00
6 CHEMICAL DISPENSER BY OTHERS
7 CONDENSATE HOOD QUEST $443.00 1 $443.008 EXHAUST FAN BY OTHERS
9 GREASE INTERCEPTOR BY OTHERS
1 DRY STORAGE SHELVING OLYMPIC $720.00 LOT $720.00
2 REACH-IN COOLER, 2 DOOR HABCO $4,000.00 1 OR 2 $4,000.00
3 REACH-IN FREEZER, 2 DOOR HABCO $5,200.00 1 $5,200.00
1 S/S WORK TABLES, 30" X 60" DUKE $330.00 4 $1,320.002 VEGETABLE SINK, 1 COMP. QUEST $1,250.00 1 $1,250.00
3 SLICER BERKEL $1,410.00 1 $1,410.00
4 25 QT. MIXER GLOBE $2,815.00 1 $2,815.00
5 MIXER ACCESS. RACK QUEST $275.00 1 $275.00
1 ICE MAKER ICE-O-MATIC $2,860.00 1 $2,860.00
2 ICE CREAM FREEZER SILVER KING $2,244.00 1 $2,244.00
3 COFFEE MAKER, BANQUETS BUNN-O-MATIC $2,850.00 1 $2,850.00
4 COFFEE MAKER, CAFÉ BUNN-O-MATIC $950.00 1 $950.00
Includes faucet. 24" comp.
Under counter unit. 250 pounds per day with 100 pound storage bin. 115V, single phase, 11.6 amps.
Comes with 3 warmers and hot water faucet. Model CWTF15-3. 120V, single phase, 1670 watts, 13.9 amps.
MISC. ITEMS
115V, single phase, 2.6 amps.
120/208V, single phase, 6075 watts.
12" blade. 115V, single phase, 1/4 HP.
C/w whip, beater, dough hook, s/s bowl and bowl guard. 120V, single phase, 11 amps, 3/4 HP.
To be wired to dishwasher. Will come on when washer is in use and automatically shut off approximately 20 minutes after machine stops. Fan not supplied by Russell.
Requires electrical? Not supplied by Russell.
STORAGE
Three units 24" x 48" with four shelves per unit
PREP EQUIPMENT
24" compartments with 24" drainboard and faucet.
115V, single phase, 8.7 amps, 1/2 HP.
115V, single phase, 12.2 amps, 3/4 HP.
Four units 24" x 48" with four shelves per unit.
RFE Page 2 of 3 19/11/2008
ITEM DESCRIPTION MAKE PRICE QNTY EXPANDED5 HAND SINKS POLAR WARE $350.00 2 $700.006 BUFFET CHAFERS POLAR WARE $110.00 10 $1,100.007 SMALL WARES ASSORTED $5,000.00 LOT $5,000.00
TOTAL $71,354.00
OPTIONS:1 CONVECTION OVEN DUKE $4500-$7000 1 $4500-$7000
2 100 CUP COFFEE URNS REGAL $180.00 2 OR 3 $360.003 INSTALLATION RFE $10,000.00 1 $10,000.00
To include but not limited to; pots, pans, measuring utensils, knives, trash cans, inserts, bake pans, misc. utensils and small appliances.
Contract Design
The above prices are intended for budget purposes only and are valid for 30 days. Due to the fluctuations in the dollar and the unstable markets, it is difficult to project prices into the new year and beyond. Historically, we planned for increases of 3-5% from our manufacturers. This year, however, we are expecting increases of 10% on some items (Garland, Ice-O-Matic, Polarware, Silver King). Some manufacturers have not informed us of their increases, yet, but we feel it would be prudent to expect them.
I hope the above is helpful. Please give me a call if you have any questions.
RUSSELL FOOD EQUIPMENT
Regards
Janet Brooks
Installation to include uncrating, disposing of crating, setting in place, levelling and preparing equipment for final connections by others.
Available in econo model or medium duty.
Should you decide to proceed with the project at a later date, please request an update in pricing.
RFE Page 3 of 3 19/11/2008
APPENDIX B: Mechanical Report
Cuthbertson
1111 EAST VICTORIA AVENUE - 2ND FLOOR THUNDER BAY, ONTARIO P7C 1B7 Telephone: (807) 622-3600 Facsimile: (807) 622-3633 Email: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]
Terrace Bay Library November, 2008 Kuch, Stephenson, Gibson, Malo, Architects and Engineer has requested that Cuthbertson Mechanical Engineers provide a design report and cost estimates to convert part of the existing St. Martins School building to a new Library. Kitchen/New Washrooms: The existing Boys Change Room, shower and drying area are to be reconfigured to a new Kitchen. The existing plumbing fixtures are to be removed, as well as the supply air and exhaust systems. The existing double stainless steel sink is being relocated. There are 2 Hot Water tanks presently serving the existing washrooms, showers, etc. and it is anticipated that they have sufficient capacity for the new kitchen. A new handsink will be required, as well as a grease interceptor. As we have no details on the new kitchen layout, we can only speak in generalities. Kitchen ventilation will consist of a canopy hood exhaust system, with a rooftop make-up air unit being installed to account for the exhausted air. An electric unit heater will be required for heating the space. The existing washrooms are to be reconfigured. New plumbing fixtures will be installed, and the existing exhaust system will be revised to suit the new room layouts. Budget figures for the above : Heating/Ventilation - $31,000.00 Plumbing - $18,000.00 Controls - $3,500.00 Library : The heating of these rooms is thru a boiler system, feeding hot water to cabinet and fin tube type heaters, generally located on outside walls. There are 2 electric boilers, and 1 propane fired boiler (converted from oil). There is new piping in the mechanical room, connected to the existing, which runs thru a tunnel on both sides of the “classroom” wing.
The conceptual plan is to demolish the interior of the classroom wing, including the heating system,and redesign the mechanical systems accordingly. It is the intent of the proposed work to remove all existing heaters and piping, back to the new piping in the boiler room. We are proposing, installing a new, insulated, reverse return piping system along with baseboard heaters for space heating. Each room will have it`s own thermostat. The existing ventilation system, located in the corridor ceiling, will be removed. A new ventilation system, consisting of two electric rooftop units along with a ductwork distribution system will provide the required ventilation for the spaces. (Due to Structural constraints, using one rooftop unit is not feasible.) It will consist of supply and return air, ducted to each room. Air conditioning will not be provided. Humidification to the Archive room and Stacks/Reference/Computer room will be provided. The existing girls and boys washrooms are going to be demolished, replaced by two new, smaller washrooms and a new janitors room. New plumbing fixtures will be installed, as well as an emergency eyewash station, which will be located in the janitors room. A new exhaust air system will be installed to exhaust the washrooms and janitors room. In the work room, a counter mounted sink (stainless steel) will be installed. Budget figures for the above : (Includes Demolition)
Heating/Ventilation - $ 165,000.00 Plumbing - $39,000.00 Insulation - $15,000.00 Air/Water Balancing - $6,0000.00 Controls - $6,000.00
APPENDIX C: Electrical Report
APPENDIX D: Drawings
Site Plan A1
Demolition Plan A2
South Wing (Seniors Centre) Floor Plan A3
North Wing (Library) Floor Plan A4
North Wing (Library) Reflected Ceiling Plan A5
North Wing (Library) Building Elevations A6
L A U R I E R A V E
L A U R I E R A V E
S
E
L
K
I R
K
A
V
E
EXISTINGCHURCH
PROPOSED LIBRARY
LOADING
22
8
4
4
9
SODSOD
SOD
SOD
K S G M
architecturestructures
interiorsKuch Stephenson Gibson Malo
Architects & Engineera partnership of corporations
131 Court Street N., Thunder BayOntario, Canada P7A 4V1
phone 807.345.5582fax 807.345.4093
www.ksgm.ca
Project:
Date:
Drawn:
A-12008086
November 2008
IanTERRACE BAY LIBRARYTerrace Bay, Ontario
scale = 1 : 4001Site Plan
E1
BOILER
E2
STORAGE
E3
CLASSROOM #3
E4
CLASSROOM
E5
OFFICE
E7
CLASSROOM
E9
CLASSROOM
E10
CLASSROOM
E11
WC
E12
WC
E15
CLASSROOM
E13
CORRIDOR
E8
FOYER
E16
Room
E14
Room
E6
WC
K S G M
architecturestructures
interiorsKuch Stephenson Gibson Malo
Architects & Engineera partnership of corporations
131 Court Street N., Thunder BayOntario, Canada P7A 4V1
phone 807.345.5582fax 807.345.4093
www.ksgm.ca
Project:
Date:
Drawn:
A-22008086
November 2008
hmaTERRACE BAY LIBRARYTerrace Bay, Ontario
scale = 1 : 1251North Wing (Library) Demolition Plan
PROJECT NORTH
REFER TO KITCHENLAYOUT ATTACHED
ADMIN OFFICES
W/R
CORRIDOR
STORAGE
LOUNGE
KITCHEN
BAR
GENERAL PURPOSE ROOM
MEN'S W/C WOMEN'S W/C
STAGE
W/R
ACCESS TO
LOBBY
MECH. RM.OVER
STORAGE
CLEAN CRAFTS
K S G M
architecturestructures
interiorsKuch Stephenson Gibson Malo
Architects & Engineera partnership of corporations
131 Court Street N., Thunder BayOntario, Canada P7A 4V1
phone 807.345.5582fax 807.345.4093
www.ksgm.ca
Project:
Date:
Drawn:
A-32008086
November 2008
IanTERRACE BAY LIBRARYTerrace Bay, Ontario
scale = 1 : 1251South Wing (Senior's Centre) Floor Plan
FD
194.8 m² (2097 ft²)02
Stacks/Reference/Computers
41.5 m² (446 ft²)06
MeetingRoom
13.8 m² (148 ft²)05
WorkRoom
15781050
8.7 m² (94 ft²)08
Vestibule
44.1 m² (474 ft²)01
BoilerRoom
11.4 m² (123 ft²)15
FemaleWC-
11.5 m² (124 ft²)16
Male WC
DISPLAY BOARD
11.5 m² (124 ft²)04
Office
15.5 m² (167 ft²)10
Storage
51.0 m² (549 ft²)09
SpecialPurpose
3.9 m² (42 ft²)14
Janitor
11.2 m² (120 ft²)13
ScreenedWC Entry
RETAIL DISPLAY
CO
ATS
37.3 m² (402 ft²)19
Archives
21.2 m² (228 ft²)17
Computer/ Training
16.7 m² (179 ft²)07
CORRIDOR
43.9 m² (472 ft²)18
Museum /Reading
Area
COUNTER c/w GRILLE
COUNTER c/w GRILLE
COUNTER c/w GRILLE
CO
UN
TER
25.4 m² (274 ft²)12
ResearchArea
44.2 m² (476 ft²)11
Childrens'Area
CO
ATS
DISPLAY BOARD
ELEC
TRIC
FIRE
PLAC
E53.8 m² (579 ft²)
03
Circulation/WorkStations
1000400
NEW
CT
FIN
ISH
NEW
CT
FIN
ISH
CO
UN
TER
c/w
GRI
LLE
CO
UN
TER
c/w
GRI
LLE
LOW
HEI
GH
T BU
ILT-
IN S
HEL
VIN
G
MET
AL S
HEL
VIN
G
COUNTER c/w GRILLE
12.8 m² (137 ft²)20
Corridor
K S G M
architecturestructures
interiorsKuch Stephenson Gibson Malo
Architects & Engineera partnership of corporations
131 Court Street N., Thunder BayOntario, Canada P7A 4V1
phone 807.345.5582fax 807.345.4093
www.ksgm.ca
Project:
Date:
Drawn:
A-42008086
November 2008
hmaTERRACE BAY LIBRARYTerrace Bay, Ontario
scale = 1 : 1251North Wing (Library) Floor Plan
PROJECT NORTH
05
Work Room
06
Meeting Room
08
Vestibule
09
Special Purpose
10
Storage
01
Boiler Room
16
Male WC
15
Female WC-
14
Janitor
13
Screened WC Entry
04
Office
19
Archives
18
Museum / Reading Area17
Computer / Training
07
CORRIDOR
11
Childrens' Area
12
Research Area
02
Stacks/Reference/Computers
1183 1183
1272
700
700
700
700
700 700
03
Circulation/Work Stations
700
K S G M
architecturestructures
interiorsKuch Stephenson Gibson Malo
Architects & Engineera partnership of corporations
131 Court Street N., Thunder BayOntario, Canada P7A 4V1
phone 807.345.5582fax 807.345.4093
www.ksgm.ca
Project:
Date:
Drawn:
A-52008086
Nov. 2008
hmaTERRACE BAY LIBRARYTerrace Bay, Ontario
scale = 1 : 1251North Wing (Library) Reflected Ceiling Plan
PROJECT NORTH
T/O SLAB0
T/O PARAPET4000
U/S ROOF3375
U/S CANOPY2400
TERRACE BAY PUBLIC LIBRARY
T/O SLAB0
T/O PARAPET4000
U/S ROOF3375
U/S CANOPY2400
U/S ROOF3375
U/S CANOPY2400
K S G M
architecturestructures
interiorsKuch Stephenson Gibson Malo
Architects & Engineera partnership of corporations
131 Court Street N., Thunder BayOntario, Canada P7A 4V1
phone 807.345.5582fax 807.345.4093
www.ksgm.ca
Project:
Date:
Drawn:
A-62008086
November 2008
hmaTERRACE BAY LIBRARYTerrace Bay, Ontario
scale = 1 : 1251East
scale = 1 : 1253North
scale = 1 : 1252South
North Wing (Library) Building Elevations