Page 1: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library

Building Feasibility Study forRenovations to St. Martin Catholic School

Kuch Stephenson Gibson Malo Architects & Engineer2008086 08.11.19

Page 2: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Existing Building Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

• Building Condition Report

• Asbestos Report

Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Appendix A: Kitchen Consultant

Appendix B: Mechanical Report

Appendix C: Electrical Report

Appendix D: Drawings

Page 3: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 1

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

INTRODUCTION This report has been commissioned by the Township of Terrace Bay to

consider the potential for reuse of a portion of the former St. Martin

School structure as a new public library for the community and include

the renovation of the gymnasium and change rooms to accommodate a

commercial kitchen and associated washrooms to allow the existing

gymnasium to be used as a licensed banquet/meeting centre/multi-

purpose area. The scope of work is limited to two areas of the existing

school structure as well as adjacent grounds upgrades to accommodate

parking, a main entrance and barrier free access.

The remainder of the facility is currently in use as a seniors centre and

this will continue. Both types of occupancy are classified as A2

Assembly occupancy and are permitted under the current zoning by-

laws.

Page 4: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 2

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

EXISTING BUILDING

CONDITIONS

Condition Report

A comprehensive building condition assessment report using the

RECAPP Validation Survey (RVS) was given to the Kuch Stephenson

Gibson Malo for their use in preparing this report. The RVS identifies

deficiencies, recommended repairs and estimated timelines for repairs

for the entire facility. The following is a list of the particular deficiencies

associated with the portion of renovations under consideration as part of

this report.

• Replacement of original wood windows in 1952 Wing

• Replacement of original wood doors in 1952 Wing

• Replacement of original millwork in 1952 Wing

• Repair or replacement of worn and zipping carpet

• Replacement of existing vinyl tiles in 1952 Wing

• Replacement of damaged or stained ceiling tiles

• Replacement of existing window coverings

• Replacement of existing concrete stairs

Asbestos Report

A Hazardous Materials Assessment Report was prepared for by the

Resource Centre for Occupational Health and Safety and Lakehead

University for the North of Superior Catholic School Board and it

identifies two areas where asbestos was present. The original pipe

insulation within the existing Boiler Room was identified as amosite,

Chrysotile and crocidolite. This insulation has since been replaced or

clearly identified on site as being asbestos. It is assumed the insulation

on the existing pipes within the perimeter pipe chase will contain these

contaminants. The floor tile in the 1952 original building, 1956 Addition

and 1965 addition are vinyl asbestos tiles containing Chrysotile

asbestos. All areas of tile are scheduled to be removed per this report. A

program of asbestos abatement will have to be carried out by the owner

in preparation of upgrading the new areas identified. KSGM can assist

the Owner in obtaining a suitable Consultant to carry out this scope of

work. True Grit Consulting has reviewed the intended scope of

remediation and provided an estimated cost for this scope of work.

Page 5: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 3

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

SCOPE OF WORK Description EstimatedCost

Existing Seniors Centre Renovations

Men’s and Women’s Washrooms: 102

• convert existing girl’s change room into newwashrooms

• break terrazzo floor as required for new plumbing• break down terrazzo base, make good wall and

floor and install new sheet flooring • install new plumbing fixtures and millwork• install new toilet partitions• paint and refinish all surfaces• new gypsum board ceiling and light fixtures

includedbelow

Bar Area: 103

• convert existing kitchen to bar:• remove existing access door and create larger

pass-thru opening• remove existing shelves and patch wall• remove dishwasher and relocate sink• remove back half of millwork to allow for cooler• remove existing and install new sheet flooring • paint walls and ceiling

includedbelow

Kitchen: 105

• convert existing boy’s change area into kitchen• break terrazzo floor as required for new plumbing• break down existing terrazzo base, make good

wall and floor and install new sheet flooring • repair and paint walls and ceiling• supply and install kitchen equipment, final hook-

up by others• refer to Kitchen Summary for comments and

itemized costs

includedbelow

Subtotal Architectural Renovations (listed above) $ 94,000

Kitchen Equipment

• refer to Appendix for quotation $ 71,350

Subtotal Mechanical Renovations

• refer to Appendix $ 52,500

Subtotal Electrical Renovations

• refer to Appendix $ 38,000

Page 6: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 4

Description EstimatedCost

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

Total Kitchen/Washroom Renovations(excluding GST)

$255,850

Terrace Bay Library Renovations

Demolition

• remove all interior partitions as shown• remove all existing flooring and ceiling tiles and

scabble exposed concrete floor ready to acceptnew flooring

• remove all interior door and frames• remove all existing ceilings• mechanical and electrical work defined elsewhere

(refer to appendices)• remove existing canopy/overhang at front

entrance

$ 62,700

General Exterior Renovations

• scrape and paint existing fascia and soffit• remove existing wood entrance doors and install

new aluminum glazed entrance and vestibuledoors with barrier free automatic door openers onboth sets of doors

• remove existing wood windows in 1952 and 1956building and install new PVC inserts

• cap existing sills and columns remaining withprefinished metal

• remove existing glass block and infill with woodframe construction with insulation and gypsumboard interior finish, stucco exterior

• clean existing brick and patch mortar joints whererequired

• remove existing concrete step and sidewalk atmain entrance and install new concrete sidewalkalong front and side to provide barrier-free access

• sod front yard• new paving and parking lines along north side and

building• new entrance canopy along east and portion of

north side of building, wood column supports

$ 324,500

Page 7: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 5

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

General Interior Renovations

• supply and install new solid core wood doors inhollow metal frames - glazed upper portion of doorfor viewing of occupied spaces

• patch and repair all surfaces damaged bydemolition and renovation and repaint

• install new sheet flooring and carpet as shown(sheet flooring in Work Room, Special Use,Storage, Archives and Washrooms)

• install new ceilings as shown• new millwork as shown (note that library stacks

and study carrels are provided by owner, all othershelving, including that shown in Archives andChildren’s Area as well as perimeter shelving andwork stations and counters, are included in scopeof work)

• new partitions as noted, paint finish• exposed heating units (no millwork surround -

typical unless otherwise noted)

$ 155,100

Stacks/Study Carrels

• new carpet and ceiling• two wall mounted display boards with glass doors• shelving and carrels supplied by owner

$ 18,700

Circulation Desk

• new custom birch veneer ply and plastic laminatecounter with open work space and storagedrawers/doors below (50% each)

• separate work counter with under counter side (2)storage unit and upper closed cabinets

• dropped bulkhead with accent lighting above desk• fur out east wall to allow for wiring and refinish• retail display with glass doors adjacent to new

closet alcove

$ 58,300

Office

• new carpet and ceiling tile $ 1,100

Work Room

• new sheet flooring and ceiling tile• upper shelving, lower storage unit with sink

$ 14,850

Page 8: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 6

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

Meeting Room

• new carpet• dropped bulkhead and accent lighting around

perimeter, new ceiling tile• millwork surround for perimeter heating unit• wiring for smart board and presentations

$ 20,350

Vestibule

• new porcelain tile• new gypsum board ceiling

$ 3,300

Special Purpose

• new carpet• dropped bulkhead and accent lighting around

perimeter, new ceiling tile• millwork surround for perimeter heating unit• wiring for smart board and presentations

$ 24,200

Storage

new sheet flooring and ceiling tile• open full height metal shelving one side and

standard upper/lower storage cabinets one side

$ 14,850

Children’s Area

• new carpet and ceiling tile• accent gypsum board bulkhead and lighting over

counter• low built in shelving unit along east wall and work

counter on west side• fur out existing east wall

$ 34,100

Reference

• built in computer counter work stations• new carpet and ceiling tile• fur out existing west wall

$ 16,500

Washrooms

• new sheet flooring and gypsum board ceiling• new fixtures (refer to mechanical)• new metal washroom partitions• new ceramic tile wall finish on sink wall• new mirrors• new barrier free sink with counter

$ 30,800

Page 9: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 7

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

Janitor

• seal concrete floor• new mop sink and eye wash station (refer to

mechanical)• paint new walls and gypsum board ceiling

$ 2,000

Computer Room

• built in computer counter work stations• new carpet and ceiling tile• fur out existing east wall

$ 17,050

Fireside Reading Room

• new carpet and ceiling tile with dropped bulkheadand accent lighting

• electric fireplace with stone surround andporcelain hearth

• millwork surround for perimeter heating unit

$ 37,950

Archives

• new sheet flooring and ceiling tile• new full height metal storage shelving units

$ 16,500

Existing Corridor (to west end)

• new sheet flooring and ceiling tile $ 3,300

Structural

• demolition of concrete floor for new footings• cast new footings (5 - 1200 G + 6 - 900 G)• new steel columns (11 - HSS 89X89X4.8)• new steel beams (8 - W310X28)

includedabove

Mechanical

• refer to Appendix for comments and itemized cost $ 231,000

Electrical

• refer to Appendix for comments and itemized cost $ 112,500

Asbestos Abatement

• remove asbestos on pipes as per original reportprepared for school board

• provide inspection and testing during removal

$ 80,000

Page 10: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 8

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

Subtotal Estimated Costs(excluding GST)

$1,279,650

Total Library and Kitchen/Washroom Renovations $ 255,850

Estimated Construction Cost(kitchen/wc renovations and library renovations)

$1,535,500

+ $1,612,275 GST on above $1,612,275

Design Contingency 10% $ 161,228

Total Estimated Construction Cost (includes GST)

$1,773,503

Professional Fees (± 10 % of total construction cost)

$ 177,350

Asbestos Abatement Consulting Fees $ 15,000

CONCLUSION The condition of the existing building is generally good. It has been well

maintained by the previous owners and with relatively minor

renovations, the building can be altered for use as a Library for the

Township of Terrace Bay.

Estimates assume a construction start in early summer 2009. If

construction is delayed, we recommend an escalation factor of 5% per

annum be applied to the total estimated construction costs.

Page 11: Building Feasibility Study for Renovations to St. Martin

Terrace Bay Library Feasibility StudyTerrace Bay, ON

Page 9

Kuch Stephenson Gibson Malo Architects & Engineer Project No. 2008086

Page 12: Building Feasibility Study for Renovations to St. Martin

APPENDIX A: Kitchen

Page 13: Building Feasibility Study for Renovations to St. Martin
Page 14: Building Feasibility Study for Renovations to St. Martin

Nov.14, 200830 days

Janet Brookstbasite

extra

ITEM DESCRIPTION MAKE PRICE QNTY EXPANDED

1 60" RANGE, ELECTRIC GARLAND $8,500.00 1 $8,500.00

1A OPTION: Make one oven convection, add to above price.

GARLAND $2,082.00 1 $2,082.00

2 COLD PREP. TABLE BEVERAGE AIR $2,100.00 1 $2,100.00

3 FOOD WARMER DUKE $250.00 1 $250.00

4 MICROWAVE PANASONIC $800.00 1 $800.00

5 EXHAUST HOOD, 6' QUEST $2,335.00 1 $2,335.00

6 FIRE SUPPRESSION SUPERIOR SAFETY $6,500.00 1 $6,500.00

7 EXHAUST FAN & M/U AIR BY OTHERS

1 SOILED DISH TABLE, 84" QUEST $2,080.00 1 $2,080.00

2 DISHWASHER, HOOD TYPE CHAMPION $10,230.00 1 $10,230.00

3 CLEAN TABLE, 84" QUEST $840.00 1 $840.00

CONTACT PERSON: Ian McEachernADDRESS: Court StreetPHONE # 345-5582

TERMS:FOB:

TAXES:

Quotation

PREPARED BY:COMPANY: KSGM

Four elements, 36" grill, two standard ovens, high back and shelf. 208V or 240V. See specs. Model S684-36G.

COOKING EQUIPMENT

Below are rough budget prices for equipment for the project in Terrace Bay.

DATE:VALID FOR:

DISH WASHING

Includes vapour proof light, fire guard filters, duct take-off. Insulated top, back and ends may be required to meet NFPA-96 code (not included in price). Size and price will change with equipment selection. 115V, single phase, 1 amp (for lights)

Estimate only. 115V, single phase, 1 amp.

Includes pre-rinse sink with scrap basket, spray assembly, over shelf. Size is approximate.

Straight through or corner model with 40F rise internal booster (70F rise booster available, please specify). 208V or 240V. See specs. Model D-HB

120V, single phase, 1000 watts.

27" self contained with two doors. Full length poly cutting board. 115V, single phase, 4 amps, 1/6 HP.

Single well, counter top food warmer. Holds two 11 quart containers (1/2 size X 6" inserts). 120V, single phase, 1200 watts.

441 Hardisty StreetThunder Bay, ON P7C 3G9Phone:(807) 623-2544Toll Free: 877-232-2212Fax:(807) 623-6584Web Page: russellfood.ca

RFE Page 1 of 3 19/11/2008

Page 15: Building Feasibility Study for Renovations to St. Martin

ITEM DESCRIPTION MAKE PRICE QNTY EXPANDED4 POT SINK, 2 COMP. QUEST $2,000.00 1 $2,000.00

5 DISH STORAGE RACKS OLYMPIC $540.00 LOT $500.00

6 CHEMICAL DISPENSER BY OTHERS

7 CONDENSATE HOOD QUEST $443.00 1 $443.008 EXHAUST FAN BY OTHERS

9 GREASE INTERCEPTOR BY OTHERS

1 DRY STORAGE SHELVING OLYMPIC $720.00 LOT $720.00

2 REACH-IN COOLER, 2 DOOR HABCO $4,000.00 1 OR 2 $4,000.00

3 REACH-IN FREEZER, 2 DOOR HABCO $5,200.00 1 $5,200.00

1 S/S WORK TABLES, 30" X 60" DUKE $330.00 4 $1,320.002 VEGETABLE SINK, 1 COMP. QUEST $1,250.00 1 $1,250.00

3 SLICER BERKEL $1,410.00 1 $1,410.00

4 25 QT. MIXER GLOBE $2,815.00 1 $2,815.00

5 MIXER ACCESS. RACK QUEST $275.00 1 $275.00

1 ICE MAKER ICE-O-MATIC $2,860.00 1 $2,860.00

2 ICE CREAM FREEZER SILVER KING $2,244.00 1 $2,244.00

3 COFFEE MAKER, BANQUETS BUNN-O-MATIC $2,850.00 1 $2,850.00

4 COFFEE MAKER, CAFÉ BUNN-O-MATIC $950.00 1 $950.00

Includes faucet. 24" comp.

Under counter unit. 250 pounds per day with 100 pound storage bin. 115V, single phase, 11.6 amps.

Comes with 3 warmers and hot water faucet. Model CWTF15-3. 120V, single phase, 1670 watts, 13.9 amps.

MISC. ITEMS

115V, single phase, 2.6 amps.

120/208V, single phase, 6075 watts.

12" blade. 115V, single phase, 1/4 HP.

C/w whip, beater, dough hook, s/s bowl and bowl guard. 120V, single phase, 11 amps, 3/4 HP.

To be wired to dishwasher. Will come on when washer is in use and automatically shut off approximately 20 minutes after machine stops. Fan not supplied by Russell.

Requires electrical? Not supplied by Russell.

STORAGE

Three units 24" x 48" with four shelves per unit

PREP EQUIPMENT

24" compartments with 24" drainboard and faucet.

115V, single phase, 8.7 amps, 1/2 HP.

115V, single phase, 12.2 amps, 3/4 HP.

Four units 24" x 48" with four shelves per unit.

RFE Page 2 of 3 19/11/2008

Page 16: Building Feasibility Study for Renovations to St. Martin

ITEM DESCRIPTION MAKE PRICE QNTY EXPANDED5 HAND SINKS POLAR WARE $350.00 2 $700.006 BUFFET CHAFERS POLAR WARE $110.00 10 $1,100.007 SMALL WARES ASSORTED $5,000.00 LOT $5,000.00

TOTAL $71,354.00

OPTIONS:1 CONVECTION OVEN DUKE $4500-$7000 1 $4500-$7000

2 100 CUP COFFEE URNS REGAL $180.00 2 OR 3 $360.003 INSTALLATION RFE $10,000.00 1 $10,000.00

To include but not limited to; pots, pans, measuring utensils, knives, trash cans, inserts, bake pans, misc. utensils and small appliances.

Contract Design

The above prices are intended for budget purposes only and are valid for 30 days. Due to the fluctuations in the dollar and the unstable markets, it is difficult to project prices into the new year and beyond. Historically, we planned for increases of 3-5% from our manufacturers. This year, however, we are expecting increases of 10% on some items (Garland, Ice-O-Matic, Polarware, Silver King). Some manufacturers have not informed us of their increases, yet, but we feel it would be prudent to expect them.

I hope the above is helpful. Please give me a call if you have any questions.

RUSSELL FOOD EQUIPMENT

Regards

Janet Brooks

Installation to include uncrating, disposing of crating, setting in place, levelling and preparing equipment for final connections by others.

Available in econo model or medium duty.

Should you decide to proceed with the project at a later date, please request an update in pricing.

RFE Page 3 of 3 19/11/2008

Page 17: Building Feasibility Study for Renovations to St. Martin

APPENDIX B: Mechanical Report

Page 18: Building Feasibility Study for Renovations to St. Martin

Cuthbertson

1111 EAST VICTORIA AVENUE - 2ND FLOOR THUNDER BAY, ONTARIO P7C 1B7 Telephone: (807) 622-3600 Facsimile: (807) 622-3633 Email: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]

Terrace Bay Library November, 2008 Kuch, Stephenson, Gibson, Malo, Architects and Engineer has requested that Cuthbertson Mechanical Engineers provide a design report and cost estimates to convert part of the existing St. Martins School building to a new Library. Kitchen/New Washrooms: The existing Boys Change Room, shower and drying area are to be reconfigured to a new Kitchen. The existing plumbing fixtures are to be removed, as well as the supply air and exhaust systems. The existing double stainless steel sink is being relocated. There are 2 Hot Water tanks presently serving the existing washrooms, showers, etc. and it is anticipated that they have sufficient capacity for the new kitchen. A new handsink will be required, as well as a grease interceptor. As we have no details on the new kitchen layout, we can only speak in generalities. Kitchen ventilation will consist of a canopy hood exhaust system, with a rooftop make-up air unit being installed to account for the exhausted air. An electric unit heater will be required for heating the space. The existing washrooms are to be reconfigured. New plumbing fixtures will be installed, and the existing exhaust system will be revised to suit the new room layouts. Budget figures for the above : Heating/Ventilation - $31,000.00 Plumbing - $18,000.00 Controls - $3,500.00 Library : The heating of these rooms is thru a boiler system, feeding hot water to cabinet and fin tube type heaters, generally located on outside walls. There are 2 electric boilers, and 1 propane fired boiler (converted from oil). There is new piping in the mechanical room, connected to the existing, which runs thru a tunnel on both sides of the “classroom” wing.

Page 19: Building Feasibility Study for Renovations to St. Martin

The conceptual plan is to demolish the interior of the classroom wing, including the heating system,and redesign the mechanical systems accordingly. It is the intent of the proposed work to remove all existing heaters and piping, back to the new piping in the boiler room. We are proposing, installing a new, insulated, reverse return piping system along with baseboard heaters for space heating. Each room will have it`s own thermostat. The existing ventilation system, located in the corridor ceiling, will be removed. A new ventilation system, consisting of two electric rooftop units along with a ductwork distribution system will provide the required ventilation for the spaces. (Due to Structural constraints, using one rooftop unit is not feasible.) It will consist of supply and return air, ducted to each room. Air conditioning will not be provided. Humidification to the Archive room and Stacks/Reference/Computer room will be provided. The existing girls and boys washrooms are going to be demolished, replaced by two new, smaller washrooms and a new janitors room. New plumbing fixtures will be installed, as well as an emergency eyewash station, which will be located in the janitors room. A new exhaust air system will be installed to exhaust the washrooms and janitors room. In the work room, a counter mounted sink (stainless steel) will be installed. Budget figures for the above : (Includes Demolition)

Heating/Ventilation - $ 165,000.00 Plumbing - $39,000.00 Insulation - $15,000.00 Air/Water Balancing - $6,0000.00 Controls - $6,000.00

Page 20: Building Feasibility Study for Renovations to St. Martin

APPENDIX C: Electrical Report

Page 21: Building Feasibility Study for Renovations to St. Martin
Page 22: Building Feasibility Study for Renovations to St. Martin
Page 23: Building Feasibility Study for Renovations to St. Martin
Page 24: Building Feasibility Study for Renovations to St. Martin
Page 25: Building Feasibility Study for Renovations to St. Martin

APPENDIX D: Drawings

Site Plan A1

Demolition Plan A2

South Wing (Seniors Centre) Floor Plan A3

North Wing (Library) Floor Plan A4

North Wing (Library) Reflected Ceiling Plan A5

North Wing (Library) Building Elevations A6

Page 26: Building Feasibility Study for Renovations to St. Martin

L A U R I E R A V E

L A U R I E R A V E

S

E

L

K

I R

K

A

V

E

EXISTINGCHURCH

PROPOSED LIBRARY

LOADING

22

8

4

4

9

SODSOD

SOD

SOD

K S G M

architecturestructures

interiorsKuch Stephenson Gibson Malo

Architects & Engineera partnership of corporations

131 Court Street N., Thunder BayOntario, Canada P7A 4V1

phone 807.345.5582fax 807.345.4093

www.ksgm.ca

Project:

Date:

Drawn:

A-12008086

November 2008

IanTERRACE BAY LIBRARYTerrace Bay, Ontario

scale = 1 : 4001Site Plan

Page 27: Building Feasibility Study for Renovations to St. Martin

E1

BOILER

E2

STORAGE

E3

CLASSROOM #3

E4

CLASSROOM

E5

OFFICE

E7

CLASSROOM

E9

CLASSROOM

E10

CLASSROOM

E11

WC

E12

WC

E15

CLASSROOM

E13

CORRIDOR

E8

FOYER

E16

Room

E14

Room

E6

WC

K S G M

architecturestructures

interiorsKuch Stephenson Gibson Malo

Architects & Engineera partnership of corporations

131 Court Street N., Thunder BayOntario, Canada P7A 4V1

phone 807.345.5582fax 807.345.4093

www.ksgm.ca

Project:

Date:

Drawn:

A-22008086

November 2008

hmaTERRACE BAY LIBRARYTerrace Bay, Ontario

scale = 1 : 1251North Wing (Library) Demolition Plan

PROJECT NORTH

Page 28: Building Feasibility Study for Renovations to St. Martin

REFER TO KITCHENLAYOUT ATTACHED

ADMIN OFFICES

W/R

CORRIDOR

STORAGE

LOUNGE

KITCHEN

BAR

GENERAL PURPOSE ROOM

MEN'S W/C WOMEN'S W/C

STAGE

W/R

ACCESS TO

LOBBY

MECH. RM.OVER

STORAGE

CLEAN CRAFTS

K S G M

architecturestructures

interiorsKuch Stephenson Gibson Malo

Architects & Engineera partnership of corporations

131 Court Street N., Thunder BayOntario, Canada P7A 4V1

phone 807.345.5582fax 807.345.4093

www.ksgm.ca

Project:

Date:

Drawn:

A-32008086

November 2008

IanTERRACE BAY LIBRARYTerrace Bay, Ontario

scale = 1 : 1251South Wing (Senior's Centre) Floor Plan

Page 29: Building Feasibility Study for Renovations to St. Martin

FD

194.8 m² (2097 ft²)02

Stacks/Reference/Computers

41.5 m² (446 ft²)06

MeetingRoom

13.8 m² (148 ft²)05

WorkRoom

15781050

8.7 m² (94 ft²)08

Vestibule

44.1 m² (474 ft²)01

BoilerRoom

11.4 m² (123 ft²)15

FemaleWC-

11.5 m² (124 ft²)16

Male WC

DISPLAY BOARD

11.5 m² (124 ft²)04

Office

15.5 m² (167 ft²)10

Storage

51.0 m² (549 ft²)09

SpecialPurpose

3.9 m² (42 ft²)14

Janitor

11.2 m² (120 ft²)13

ScreenedWC Entry

RETAIL DISPLAY

CO

ATS

37.3 m² (402 ft²)19

Archives

21.2 m² (228 ft²)17

Computer/ Training

16.7 m² (179 ft²)07

CORRIDOR

43.9 m² (472 ft²)18

Museum /Reading

Area

COUNTER c/w GRILLE

COUNTER c/w GRILLE

COUNTER c/w GRILLE

CO

UN

TER

25.4 m² (274 ft²)12

ResearchArea

44.2 m² (476 ft²)11

Childrens'Area

CO

ATS

DISPLAY BOARD

ELEC

TRIC

FIRE

PLAC

E53.8 m² (579 ft²)

03

Circulation/WorkStations

1000400

NEW

CT

FIN

ISH

NEW

CT

FIN

ISH

CO

UN

TER

c/w

GRI

LLE

CO

UN

TER

c/w

GRI

LLE

LOW

HEI

GH

T BU

ILT-

IN S

HEL

VIN

G

MET

AL S

HEL

VIN

G

COUNTER c/w GRILLE

12.8 m² (137 ft²)20

Corridor

K S G M

architecturestructures

interiorsKuch Stephenson Gibson Malo

Architects & Engineera partnership of corporations

131 Court Street N., Thunder BayOntario, Canada P7A 4V1

phone 807.345.5582fax 807.345.4093

www.ksgm.ca

Project:

Date:

Drawn:

A-42008086

November 2008

hmaTERRACE BAY LIBRARYTerrace Bay, Ontario

scale = 1 : 1251North Wing (Library) Floor Plan

PROJECT NORTH

Page 30: Building Feasibility Study for Renovations to St. Martin

05

Work Room

06

Meeting Room

08

Vestibule

09

Special Purpose

10

Storage

01

Boiler Room

16

Male WC

15

Female WC-

14

Janitor

13

Screened WC Entry

04

Office

19

Archives

18

Museum / Reading Area17

Computer / Training

07

CORRIDOR

11

Childrens' Area

12

Research Area

02

Stacks/Reference/Computers

1183 1183

1272

700

700

700

700

700 700

03

Circulation/Work Stations

700

K S G M

architecturestructures

interiorsKuch Stephenson Gibson Malo

Architects & Engineera partnership of corporations

131 Court Street N., Thunder BayOntario, Canada P7A 4V1

phone 807.345.5582fax 807.345.4093

www.ksgm.ca

Project:

Date:

Drawn:

A-52008086

Nov. 2008

hmaTERRACE BAY LIBRARYTerrace Bay, Ontario

scale = 1 : 1251North Wing (Library) Reflected Ceiling Plan

PROJECT NORTH

Page 31: Building Feasibility Study for Renovations to St. Martin

T/O SLAB0

T/O PARAPET4000

U/S ROOF3375

U/S CANOPY2400

TERRACE BAY PUBLIC LIBRARY

T/O SLAB0

T/O PARAPET4000

U/S ROOF3375

U/S CANOPY2400

U/S ROOF3375

U/S CANOPY2400

K S G M

architecturestructures

interiorsKuch Stephenson Gibson Malo

Architects & Engineera partnership of corporations

131 Court Street N., Thunder BayOntario, Canada P7A 4V1

phone 807.345.5582fax 807.345.4093

www.ksgm.ca

Project:

Date:

Drawn:

A-62008086

November 2008

hmaTERRACE BAY LIBRARYTerrace Bay, Ontario

scale = 1 : 1251East

scale = 1 : 1253North

scale = 1 : 1252South

North Wing (Library) Building Elevations