    May 11,2006 - 1

    MMEA Presentation

    Building New Baseload

    Generation in the Midwest

    Black & Veatch

    May 11, 2006

  • 7/29/2019 Building New Generation May11_2006

    2/27

    May 11,2006 - 2

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Process Steps for New Generation

    Monte CarloAnalysis

    SystemsAnalysis

    Licensing /Permitting

    PreliminarySchedules

    PreliminaryCost

    Estimates

    ProjectSchedule

    SystemDefinitions

    ArrangementDrawings

    DetailedCost

    Estimates

    CommercialConstructionStrategies

    SoilsTesting

    ConceptualEngineering

    Feasibili ty / Init ialEngineering

    Feasibili ty / InitialEngineering

    Conceptual / DefinitionEngineering

    Conceptual / DefinitionEngineering

    Project ExecutionProject Execution

    MarketAssessment

    FeasibilityStudy

    PlantConfiguration

    Study

    SelectMajor

    Equipment

    EngineeringReview

    ProcurementAssistance

    ConstructionManagement

    StartupAssistance

    OperatorTraining

    ProjectPlanning

    & Controls

    ProjectCompletion

    Beyond

  • 7/29/2019 Building New Generation May11_2006

    3/27

    May 11,2006 - 3

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    U.S. Energy Market Signals Remain

    Favorable for New Coal-Fired Generation

    Over 80 GW of

    Planned New

    U.S. CoalProjects

    Of the 16 Units Under

    Construction, We Are

    Involved In 6

  • 7/29/2019 Building New Generation May11_2006

    4/27

    May 11,2006 - 4

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Tri-State

    Springerville

    400 MW

    Manatowoc

    Unit 9

    63 MW

    MidAmerican

    CB4

    790 MW

    Xcel

    King

    600 MW

    Santee Coop.

    Cross Unit 3580 MW

    WPSC

    Weston 4

    532 MW

    Black Hills

    Wyg2 , Unit 4

    90 MW

    Newmont

    TS Plant200 MW

    OPPD

    NC2

    663 MW

    WE Energies

    Elm Road 1

    615 MW

    Santee Coop.

    Cross Unit 4580 MW

    CLECO

    Rodemacher

    600 MW

    EKPC

    Spurlock 4

    278 MW

    CWLP

    Dallman 34

    201 MW

    Xcel

    Comanche 3

    750 MW

    WE Energies

    Elm Rd. 2

    615 MW

    Sunflower

    Holcomb 2600 MW

    NAPG

    Two Elk

    280 MW

    CPS

    Spruce 2

    758 MW

    LSP

    Plum Point 1

    665 MW

    KCP&L

    Iatan Unit 2

    750 MW

    NRGBig Cajn. II, 4

    675 MW

    Peabody

    Prairie St. 1

    750 MW

    TXU

    Oakgrove

    850 MW

    TXU

    Sandow 5575 MW

    EKPC

    J.K. Smith 1

    278 MW

    BS II Owners

    Big Stone II

    600 MW

    AECI

    Norborne 1

    660 MW

    Basin Elec.

    NE Wyoming250 MW

    LG&E

    Trimble Cty 2

    732 MW

    HG2 Owners

    Hugo Unit 2

    750 MW

    CUS

    Southwest 2

    275 MW

    LSP

    Texas

    600-800 MW

    Sierra PacificWhite Pine

    750 MW

    LSP

    Blk Hwk Iowa

    600 MW

    LSP

    Nevada

    600-800 MW

    Tri-State

    Holcomb 3600 MW

    PPGA

    Hastings 2

    220 MW

    Seminole

    Palatka 3

    750 MW

    BPU

    Nearmn Cr 2235 MW

    Peabody

    Prairie St. 2

    750 MW

    JEA/FMPA

    N. Florida

    800 MW

    Dominion

    SW VA Proj.

    600 MW

    UAMPs/Pacif

    Intermt. 3

    950 MW

    FPLFlorida Unit 1

    850 MW

    LSP

    Georgia

    600-800 MW

    Tri-State

    Holcomb 4

    600 MW

    WPSC

    Baseload II

    530 MW

    FPL

    Florida Unit 2

    850 MW

    Pacificorp

    Hunter 4500 MW

    Sierra Pacific

    White Pine

    750 MW

    Tri-State

    CO Coal Unit

    656 MW

    2006 2007 2008 2009 2010 2011 2012 2013 2014

    Units

    Under Construction

    Full NTP With Permits

    LNTP, or NTP With Limit onConstruction

    Detailed Design Awarded, orEPC Award / LOI WithoutLNTP

    Development & PermittingWork Awarded(Selected Basis)

    U.S. CoalProjects

    (Units and COD)

    MDU

    Hardin, Mont.116 MW

  • 7/29/2019 Building New Generation May11_2006

    5/27

    May 11,2006 - 5

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Black & Veatch Current Coal Projects

    2010EPC665 MWPlum Point Energy StationLS Power

    2006OE2 x 300 MWPrimadaya (PT S2P)PT Sumber Segara

    2009EPC201 MWDallman Unit 34CWLP

    2012Conceptual Design /Permitting Support

    220 MWWhelan Energy Center 2PPGA

    2011EpCM600 MWBig Stone IIBig Stone II OwnershipGroup

    2011Conceptual Engineering /

    Cost Estimate1 x 130 MWAlaska Coal Project

    Chugach ElectricAssociation, Inc.

    2008OE / P1 x 90 MWWygen 2 Unit 4Black Hills Energy

    2010EPC758 MWJ.K. Spruce Unit 2CPS

    2009EPC663 MWNebraska City Unit 2OPPD

    2008Ep, Field Engr., SU532 MWWeston Unit 4WPSC

    2007Ep2 x 250 MWBhilai, IndiaBESCL

    2007Ep600 MWKing Rehabilitation ProjectXcel Energy

    2006EP2 x 660 MWTanjung Jati BPower Plant

    Sumitomo Corporation

    Scope CODProject SizeProjectOwner

  • 7/29/2019 Building New Generation May11_2006

    6/27

    May 11,2006 - 6

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    CWLP Dallman 34, Springfield, Ill inois

    201 MW PC Subcritical Unit

    Designed to Burn High

    Sulfur Illinois Coals

    Contract Signed:October 3, 2005

    B&V Role: EP

    KIC Role: C

    EPC JV: KIC and B&V

    FW Boiler, Toshiba Turbine

    Generator

    FF, Wet FGD, Wet ESP

    Scheduled Completion:September 2009

  • 7/29/2019 Building New Generation May11_2006

    7/27

    May 11,2006 - 7

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    CWLP Dallman 34, Springfield, Ill inois

  • 7/29/2019 Building New Generation May11_2006

    8/27

    May 11,2006 - 8

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    New Generation Project Layout and Design Basis

  • 7/29/2019 Building New Generation May11_2006

    9/27

    May 11,2006 - 9

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Site Plan

  • 7/29/2019 Building New Generation May11_2006

    10/27

    May 11,2006 - 10

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Dallman Site

    CityWaterPlant

    Unit 3

    Units 1and 2

    FGDUnit 3 FGD and 1,2,

    and 3 Limestoneand Dewatering

    Units 1and 2

    LakesidePlant

  • 7/29/2019 Building New Generation May11_2006

    11/27

    May 11,2006 - 11

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Coal Pile

    Existing

    Truckunloading

    ExistingStockoutNew

    UnitStockout

    NewTransferConveyor

    New UnitReclaim

    andConveyor

  • 7/29/2019 Building New Generation May11_2006

    12/27

    May 11,2006 - 12

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Cooling Tower

    SoundWall

    DrainageTrench

    Sound and PlumeAbated Cooling

    Tower

    LakeSpringfield

  • 7/29/2019 Building New Generation May11_2006

    13/27

    May 11,2006 - 13

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Overall AQCS

  • 7/29/2019 Building New Generation May11_2006

    14/27

    May 11,2006 - 14

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    City of Springfield 3-D Model

  • 7/29/2019 Building New Generation May11_2006

    15/27

    May 11,2006 - 15

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Project Schedule

    CWLP

    Begin EPCSpec Prep / RFQ

    Responses Due

    Select EPC BidderStart Negotiations

    Issue RFQStartPhase 1

    EPCContract

    AwardEngr

    -38 -16 -15 -5 -4 -2 0 47

    ReceivePermit

    -10

    Permit ApplicationSubmitted

    5

    StartConstruction

    NTP Mobilization StartSite Modification

    ReceiveEPCBids

    IssueEPC RFP

    -11

    GuaranteedPower

    Delivery Sept2009

    -25 -24

    Phase 1Complete

    Start Phase 2Engr andPermitting

  • 7/29/2019 Building New Generation May11_2006

    16/27

    May 11,2006 - 16

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Actual U.S. Coal Plant

    Construction Schedules

    0 10 20 30 40 50 60 70

    Months

    600 700 MW

    250 400 MW

    5858

    5050

    3737

    4444

    425 500 MW

    100 200 MW

    75 100 MW

    3737

    4646

    4040

    3434

    4040

    2828

  • 7/29/2019 Building New Generation May11_2006

    17/27

    May 11,2006 - 17

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    76

    52

    68

    72

    0

    10

    20

    30

    40

    50

    60

    70

    80

    April 2004 October

    2004

    April 2005 January

    2006

    Wee

    ks

    Market and Sourcing Example

    Pipe Material to Fabricator Lead Times

    Significant Factor in Project Schedules

  • 7/29/2019 Building New Generation May11_2006

    18/27

    May 11,2006 - 18

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    20 to 24

    161616

    0

    5

    10

    15

    20

    25

    30

    2003 2004 2005 2006

    Weeks

    Market and Sourcing Example

    Total Structural Steel Mill Order Lead Times

    Significant Factor in Project Schedules

    Mill Order Times:

    2003 to 2005 = 8 Wks 2006 = 12 to 16 Wks

  • 7/29/2019 Building New Generation May11_2006

    19/27

    May 11,2006 - 19

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    0

    5

    10

    15

    20

    25

    30

    Dec 2003 May 2005 Sep 2005 January 2006

    Months

    Market and Sourcing Example

    Steam Turbine Lead Times

    Significant Factor in Project Schedules

    1820 20

    22-24

  • 7/29/2019 Building New Generation May11_2006

    20/27

    May 11,2006 - 20

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Escalation Summary Market and Sourcing

    Price Escalation on Commodities Such as Steel,Copper and Alloy Have Driven Prices and LeadTimes Up Dramatically

    AQCS Equipment Extremely Tight Market Due toOngoing Retrofit Work (30% Materials Required)

    Boiler Prices Increasing (30% Materials Required)

    The E&C Industry Is Also Tight With a

    Limited Number of Capable Players

    Increasing Coal Plant Costs

  • 7/29/2019 Building New Generation May11_2006

    21/27

    May 11,2006 - 21

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    300

    350

    400

    450

    500

    550

    600

    650

    700

    Jan'04

    Dec

    '04

    Jan'05

    Dec

    '05

    Jan'06

    Month

    $/Ton

    Total Mill Price

    Escalation Example Steel

    36%

    Increase

  • 7/29/2019 Building New Generation May11_2006

    22/27

    May 11,2006 - 22

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Escalation LaborAs-Stated Escalation Rates for Midwest Coal Project

    6.1%$21.90*$20.70$19.50Laborers

    5.2%$30.10$28.60$27.80Boilermaker

    7.2%$29.35$27.50$25.65Carpenter

    6.2%Average

    6.0%$34.43*$32.58*$30.73Electricians

    6.4%$36.93$34.83$32.73Pipefitter

    7.4%$28.80$26.95$25.10Ironworker

    6.2%$33.70$31.85$30.00Millwright

    5.3%$31.06*$29.56$28.06Operators

    2007 Rate

    Annual

    Escalation

    Rate

    2006 Rate2005 RateCraft

    *Future Estimate

  • 7/29/2019 Building New Generation May11_2006

    23/27

    May 11,2006 - 23

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Total Craft Labor Full Time Equivalents

    (FTEs)

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

    Year

    FTE's

    Based on

    U.S. Coal

    Projects Slide(Units and COD)

  • 7/29/2019 Building New Generation May11_2006

    24/27

    May 11,2006 - 24

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Equipment Suppliers Boilers

    Alstom Power

    Babcock & Wilcox

    Foster Wheeler

    Babcock Power

    IHI, Inc.

    Mitsubishi Power

    Mitsui Babcock

    Babcock Hitachi

    Domestic Based International Based

  • 7/29/2019 Building New Generation May11_2006

    25/27

    May 11,2006 - 25

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Equipment Suppliers STGs

    Alstom Power

    General Electric

    Mitsubishi Power

    Siemens Westinghouse

    Toshiba

    Hitachi

    Fuji

  • 7/29/2019 Building New Generation May11_2006

    26/27

    May 11,2006 - 26

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    Equipment Suppliers FGD, Fabric Filters

    and Electrostatic Precipitators

    XMarsulex

    XAdvaTech (MHI & URS)

    XXXXXWheelabrator

    XHitachi

    XXXHamon RCXChiyoda

    XXXXXBabcock & Wilcox

    XXBabcock Power

    XXXXXAlstom Power

    Wet ESPDry ESPFFWet FGDDry FGD

  • 7/29/2019 Building New Generation May11_2006

    27/27

    May 11,2006 - 29

    Confidential information. Copyright Black & Veatch Corporation, 2005. All rights reserved.

    CWLP Dallman 34, Springfield, Ill inois