K.Thompson, May 23, 2001, Slide 1 Building the Framework of an Integral Building the Framework of an Integral Process to Ensure Fine Pitch Probe Process to Ensure Fine Pitch Probe with Fine Pitch Wirebond with Fine Pitch Wirebond Ken Thompson Sheila Chopin Packaging Engineering Soosan Yong Assembly Engineering Semiconductor Products Sector Motorola Inc.

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 1

Building the Framework of an Integral Building the Framework of an Integral Process to Ensure Fine Pitch ProbeProcess to Ensure Fine Pitch Probe

with Fine Pitch Wirebondwith Fine Pitch Wirebond

Ken ThompsonSheila Chopin

Packaging Engineering

Soosan YongAssembly Engineering

Semiconductor Products SectorMotorola Inc.

Page 2: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 2

Presentation OverviewPresentation Overview– Fine Pitch Wirebond & Probe Interaction Background

• Impact of Probe Mark on Fine Pitch Bonding• NPI with Fine Pitch Probe & Bonding needs

– Previous Wirebond Study with Fine Pitch NPI• Probe mark sizes resulting from production probe• Wirebond integrity degraded by probe mark size

– Current Wirebond Experiment Integrated with Controlled Probe• Design of Experiment, desired responses and sampling• Probe test settings• Probe tip and probe mark measurements• Wirebond test settings• Intermetalic growth results• Ball shear, wire pull, lifted metal, surface contamination results• Experiment Summary

– Successful Probe and Wirebond Integration for Fine Pitch

Page 3: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 3

Probe Mark Limits Fine Pitch BondingProbe Mark Limits Fine Pitch Bonding“Large” Probe Mark

(with target ball)Intermetallic (IMC) Formation

Impaired by Probe Mark

eff. BBD

BBD = D

Lifted Metal

At small pad sizes the mark disturbs a significant portion of the bond area

Lifted metal, as well as non-sticks and lower shear strength can result

Poor IMC for probed die

Good IMC forunprobed die

The effective bond diameter (actual pad contact area) is even smaller than the ball bond diameter (BBD)

Wirebond Characteristics Degraded

Page 4: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 4

NPI is Fine Pitch Bonding ChallengeNPI is Fine Pitch Bonding ChallengeKEY NPI FEATURES

Pad Opening - 60 x 90µmMinimum Pad Pitch - 66µmMinimum Wire Pitch - 63µmNo TiN layer under Al pad

6.3KA

20KA

NPI Bond Pad Cross SectionMOS 13 Hip4 0.25 µm CMOS core Al technology

7KA

IMPACT• Fine pitch wirebonding required

– Smaller Ball Bond Diameter: 43µm• Accurate placement at fine pad pitch• Larger 50µm ball has 1.31% defect rate

– Thinner Au Wire Diameter: 1.0mil• Required for fine wire pitch bonding

• Lack of TiN barrier layer may reduce pad integrity and contribute to metal lift

Ball placement failure

Ball Size Cpx

43um 1.53

50um 0.65

Page 5: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 5

Prior Wirebond CZ with Probed DicePrior Wirebond CZ with Probed Dice• Uncontrolled Probe Marks Disturb Majority of a 43um ball area

• Large Probe Marks Degrade Small Ball Bond Performance– Larger ball has greater shear strength, low occurrence of lifted metal– Probe Mark Limits Intermetallic Growth with Smaller ball

• Smaller ball has a highoccurrence of lifted metal

• Smaller ball shear strengthdecreases after PMC

• Further optimization decreased smaller ball lifted metal to 1.86%, though still unacceptable

X Y Z Probe Area Probe/Ball AreaAverage 24.3 46.3 1.7 1125 77%

Maximum 29.0 57.1 2.0 1656 114%Minimum 20.1 36.3 1.0 730 51%

Ball Size PMC

Shear Strength

(gm)Std Dev

Shear per Area

(gm/mil2)

% Lifted Metal

43um Before 20.55 1.8 6.7After 18.96 0.7 6.2 13.8%

50um Before 24.86 3.0 5.8After 33.19 2.7 7.8 0.2%

Page 6: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 6

Controlled Probing Wirebond Experiment Controlled Probing Wirebond Experiment Mixed Full Factorial DOE

Factors– Ball size - 43 & 50µm– # of probe touchdowns

(0-control, 1, 3, 6)– Cantilever probe tip hardware

(0.8, 1.0, 1.2 - reference)Sample Size

– 480 units (18 Cells)– 3 Wafers from MOS-13

Constants– Fine Pitch Wirebonder (43 &

50µm ball settings)– 272 PBGA Substrates

Responses– Probe mark size for 1, 3, & 6

touchdowns– Ball Shear Strength - Before &

after PMC– Rip Test - Before & after PMC – Ball Diameter - Before & after

PMC– Wirepull - Before & after PMC – 100% Inspection (Non-stick)– Cratering after wirebond– % IMC– Moisture Sensitivity (MSL 3 -

240C) - Delamination

Page 7: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 7

Test Cell BreakdownTest Cell Breakdown# of Probe Probe Tip Ball Bond

Cell # TouchDowns Diameter Diameter No PMC PMC Molded1 0 N/A 43 2 2 12 0 N/A 50 2 2 13 1 1 43 2 2 14 1 1 50 2 2 15 1 0.8 43 2 2 16 1 0.8 50 2 2 17 3 1 43 2 2 18 3 1 50 2 2 19 3 0.8 43 2 2 1

10 3 0.8 50 2 2 111 6 1 43 2 2 112 6 1 50 2 2 113 6 0.8 43 2 2 114 6 0.8 50 2 2 115 unknown 1.2 43 2 2 116 unknown 1.2 50 2 2 1

# of Strips*

Reference

Worst CaseOnly Case w/

Non-stick(6 Lifted Pad)

No Probe

* - 6 Units per Strip 3 Cases per Cell

Page 8: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 8

Data Collection Flow ChartData Collection Flow ChartWafer Saw

SEM PhotosAuger Analysis

Surface Analysis LabContamination Exam at ATX

Die for pad

eval.?Non-stick100% Inspect

KLMWire Bond

43 & 50

Die Bond

Yes No

Probe Mark Exam(AFM)

Probe Mark SizeSurface Roughness

U of Malaysia - KL

Go to PMC?

Return Die to KLM Heat @

175CMSL 3 Testing

Mold Units? YesNoYes

Wafer Flow

Die Flow

Substrate/Unit Flow

Data

LEGEND

Requested Data Collection

No

30C/85% w/ 240C x3Pass/FailCSAM/X-Ray

Oak Hill Stress Lab

Ball ShearBall Dia. (BS/A)Placement Acc. Intermetallic %

Wire PullRip TestCratering

KLM

Perform Testing

Page 9: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 9

Test Case SamplingTest Case SamplingTest Measurement Instrument Sampling Per Case

Ball Shear Force (gm), Mode Dage 4000 8 Units – 40 balls/unitBall Placement

/Diameter x1, y1, x2, y2 Fine Focus Microscope 6 Units – 8 balls/unit

Rip Test # with Lifted Metal, # of Lifted Ball Hook 2 Units – all wires

Wirepull Force (gm), Mode Dage 8 Units – 40 wires/unitIntermetallic Formation % IMC Fine Focus

Microscope 1 Unit – 3 balls/unit

Cratering # of cratered pads Fine Focus Microscope 1 Unit – all pads

Probe Mark Size dx, dy, dz AFM 1 die/quadrant – min & max mark

Probe Mark Size dx, dy Fine Focus Microscope 3 Units – 10 pads/unit

Auger Analysis Contaminants 5 die/quadrant

Notes:– 264 die pads per unit available– Sample sizes based upon KLM NPI specifications, and the minimum

necessary to gather significant data

Page 10: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 10

Test Cell Probe SettingsTest Cell Probe SettingsNominal Probe Tip Diameter 0.8 mil 1.0 mil 1.2 milProbe Tip Diameter ToleranceProbe Card VendorContact Force unknownOverdrive unknownPolish Frequency (Online) unknownEvery 150 dice (3 touches at 25µm)

1.3 gm/mil65µm (from 1st Touch)

+/- 0.3milProbe Technology - Duraprobe

– 1.2 mil Probe Card probed dice were uncontrolled and the settings unknown

Result: Sample 0.8 mil Probe Tip Marks

1 TD 3 TD’s 6 TD’s

Page 11: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 11

Actual Probe Tip Diameter DescriptionActual Probe Tip Diameter DescriptionProbe Card Analyzer Tip Measurements Subsequent Tip Measurements

0.7

0.8

0.9

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1.7

0.8mil Nom.

Original Ranges

0.7

0.8

0.9

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.0mil Nom.0.8 mil 1.0 mil1.060.68

1.020.61

MaximumMinimum

– Pareto of original tip sizes unavailable– Significant tolerance on probe tips allows

for large and overlapping ranges– Tip measurements are not consistent

between analyzers, accurate values difficult to define

– 0.8 mil probe card tips worn by subsequent production use (1.0 mil card not used subsequently)

0.8 mil 1.0 mil

1.38901.06580.88671.06750.0747

1.23700.95940.77010.96570.0749

MaximumMedian

MinimumMean

Std Dev

Page 12: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 12

Probe Mark Area MeasurementsProbe Mark Area MeasurementsAFM MeasurementsMicroscope Measurements

X

Y

– Area correlates to tip size and number of touchdowns

– Interpretation of precise AFM measurements very subjective

– Uncontrolled probed wafer (1.2 mil) not the worst case as expected

– Probe sizes smaller than previous probing

0

200

400

600

800

1000

0.8 - 1

0.8 - 3

0.8 - 6

1.0 - 1

1.0 - 3

1.0 - 6

1.2 - un

k

Test Cell (Tip - #td)

Prob

e M

ark

Are

a (µ

m2 )

Microscope AFM

% P

ad O

peni

ng

0

5

10

15

Page 13: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 13

Limitation of Probe Mark Measurements Limitation of Probe Mark Measurements

– Due to expense, AFM sample size has to be limited

– Limited to six linear measurements, chosen by the operator

– AFM depth measurements inconsistent (dependent on interpretation)

– A less expensive and simpler method is needed to gather Z-direction data

0

0.5

1

1.5

2

0.8 - 1

0.8 - 3

0.8 - 6

1.0 - 1

1.0 - 3

1.0 - 6

1.2 - un

k

Test Cell (Tip - #td)

AFM

Mea

sure

men

t ( µ

m)

AFM Mark Height AFM Mark Depth

05

101520253035404550

0.8 - 1

0.8 - 3

0.8 - 6

1.0 - 1

1.0 - 3

1.0 - 6

1.2 - un

k

Prob

e M

ark

Dim

ensi

on ( µ

m)

Scope XAFM XScope YAFM Y

Page 14: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 14

Wirebond Assembly Test SettingsWirebond Assembly Test Settings– To form 43 and 50um ball bonds, different settings were required, the

resulting wirebond results may not be directly comparable

WirebonderWire TypeWire Diameter (µm)Ball Diameter (µm) 43 50Capillary 414FD-2031 SBNE-30ZABall Bond Force (mN) 210 190Ball Ultrasonic Power (%) 12.2 10.6Ball Impact Force (mN) 300 280EFO Current (mA) 50.24 32.8EFO Time (ms) 0.4 0.6

Fine Pitch CapableGold

25

– The above table notes most of the important factors which were different for the two ball bond sizes

Page 15: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 15

Intermetallics Reduced by TouchdownsIntermetallics Reduced by TouchdownsSample0.8 milprobed

ball bonds

1 TD 3 TD’s 6 TD’s

Areas without IMC

30

40

50

100

No Probe 1 3 6 1 3

1.0 - 6

1.2 - un

k

% IM

C

43um - Before PMC 50um - Before PMCProbe Mark Area (um2)

1000

43um 50um

85

9075

80

7065

0

10

20

60

45

55

% IM

C

35

250 200 400 600 800

0.8 -

0.8 -

0.8 -

1.0 -

1.0 -

Page 16: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 16

Probe Mark Area Relation to Shear StrengthProbe Mark Area Relation to Shear Strength– Strength degraded by probe mark area (fine focus microscope measurements),

particularly before PMC– Strength increases after PMC, diminishing effect of probe mark– 43um and 50um bond strength per unit area do not overlap, larger diameter

ball has lower shear strength per unit area

2

15.0

17.5

20.0

22.5

25.0

27.5

30.0

0 200 400 600 800 1000

Bal

l She

ar S

tren

gth

(gm

)

Probe Mark Area (um2)0 200 400 600 800 1000

Probe Mark Area (um2)

6.0

7.0

8.0

9.0

10.0

11.0

Bal

l She

ar S

tren

gth

per

Uni

t Are

a (g

m/m

il)

43um Ball - Before PMC 43um Ball - After PMC50um Ball - Before PMC 50um Ball - After PMC

Page 17: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 17

Further Shear Relation to Probe MarkFurther Shear Relation to Probe Mark– Before PMC, the 50um bond strength degrades at a smaller ratio of probe

mark to ball bond area than the 43um bond (43um > 50%, 50um > 38%)– 0.8 mil probed bonds have lower strength than 1.0 mil probed bonds for each

number of touchdowns before PMC (except the 50um ball at 1 touchdown)

43um Ball - Before PMC 43um Ball - After PMC50um Ball - Before PMC 50um Ball - After PMC

Probe Mark/Ball Bond Area (%)

15.0

17.5

20.0

22.5

25.0

27.5

30.0

0% 10% 20% 30% 40% 50% 60%

Bal

l She

ar S

tren

gth

(gm

)

15

16.5

18

19.5

21

No Prob

e0.8

- 10.8

- 30.8

- 61.0

- 11.0

- 31.0

- 61.2

- unk

43um - Before PMC 50um - Before PMC

Bal

l She

ar S

tren

gth

(gm

)

Page 18: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 18

Wire Pull and Rip Test ResultsWire Pull and Rip Test Results– The Probe Mark only significantly degrades the 43um ball bond Wire

Pull Strength before PMC – Occurrence of lifted metal pads increases dramatically with Probe

Mark Area (particularly over 750um2) and especially after PMC

9.2

9.4

9.6

9.8

10.0

10.2

10.4

10.6

0 200 400 600 800 1000

Probe Mark Area (um2)

Wir

e Pu

ll St

reng

th (g

m)

0 200 400 600 800 1000

Probe Mark Area (um2)

# of

Lift

ed M

etal

Pad

s

0

20

40

60

80

100

750

43um Ball - Before PMC 43um Ball - After PMC50um Ball - Before PMC 50um Ball - After PMC

Page 19: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 19

Surface Contaminant AnalysisSurface Contaminant Analysis– Auger analysis did not reveal foreign material or contamination– A normal thickness of Aluminum Oxide found– Older 1.2mil probed wafer had less surface oxygen and more carbon

than the newer 0.8 and 1.0mil probed wafer

0 50 100 150 200 250

Depth (Angstroms)

100

50

0

Al

OSi

C0 50 100 150 200 250

Depth (Angstroms)

0.8 mil probed wafer100

50

0

1.2 mil probed wafer

Al

O

C

Si

Page 20: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 20

Summary of Experimental ResultsSummary of Experimental Results– Tests show degradation of wirebond strength is a function of

probe mark area and ball bond size, however, the range of damagedoes not appear large enough to establish significant relationship

• Non-stick at wirebond only seen on one cell(1.0mil tip, 6 td’s, 43um ball)

• Drop in strength from no probe to max probe sizenot very large, minimum strength still acceptable

• No failures found after Jedec MSL 3-240C soaking• Subsequent production lots revealed much larger probe marks

– The probe mark area is a function of the number of probe touchdowns

• Limitation specification needed at probe on number of touchdowns• Wirebond data shows six touchdowns creates too much damage

– The 0.8 mil nominal probe tip gives smaller probe marks in most cases, versus the 1.0 mil nominal probe tip, but not all

• Need to correlate actual probe tip to resulting mark area rather than the nominal dimension (insufficient due to wear and tolerance)

Page 21: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 21

Successful Fine Pitch Deployment Requires Successful Fine Pitch Deployment Requires an Integration of Probe and Assemblyan Integration of Probe and Assembly– As pitch decreases, the probe tip size, number of touchdowns, and

probe settings degrade the wirebond integrity• Assembly and Probe must characterize probe mark damage to wirebond

characteristics to optimize both processes• Production probe specifications should be established based on fine pitch

characterization to place a limit on probe tip diameter and number of touchdowns for a given pad and ball bond size

– Communication between Probe and Assembly Engineering crucialAdditional Work Required– Establish accuracy of Wafer-level probe mark measuring system, for

mark characterization at the probe floor, separate from the prober– Establish probe contact performance of 0.8 mil and smaller probe tips– Establish the 0.8 & 1.0 mil probe tip wear rate to define lifetime– Gather probe damage depth and height data to further understand

wirebond results

Page 22: Building the Framework of an Integral Process to Ensure ... · K.Thompson, May 23, 2001, Slide 4. NPI is Fine Pitch Bonding Challenge. KEY NPI FEATURES ¾Pad Opening - 60 x 90µm

K.Thompson, May 23, 2001, Slide 22

Thanks for Contributions Provided by:Thanks for Contributions Provided by:

BAT-1 Probe:Kris HollingsworthTiffany JacksonTom Scuderi

Technology Center:Bill WilliamsChris MorrowChuck MillerPaul Laberge

KLM PBGA Assembly:Dominic KoeyChow-Leng LaiY.V. HewFuaida HarunIrene Wong

Packaging Engineering:Ziep TranGloria Estrada