Building the Network

09 January 2013

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Planning the Network

Objectives

Translating from the conceptual to an integrated, fieldable network architecture

Objective - Executive View

BDE TOC

BN TOC

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Leveraging The Agile Process

Concept Fielding

Baseline

Network

Design

SoS Lab

Developmental

Risk Reduction

WSMR

Operational

Validation

PORs

SUEs

Materiel

Alternatives

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Integrating the Network

NIE Network IPT Overview

Network IPT

Routing IPT

MC IPT

Ops Lead

PMs/PdMs support all

groups on an as-needed

basis

Transport

Routing

Voice

QoS

Data Products

Network Configs

IP Addressing

MC

FBCB2

DCGS-A

SoSI IA Spt

SoSI LBRR Spt Initialization

IPT

Purpose: The Network IPT is the forum where all SUTs and

SUEs

get integrated into the NIE network

Network IPT Baseline

Products • Network Map (Routing IPT)

• Network-Apps Map (Network/ MC IPT)

• Radio Line Diagram (Routing IPT)

• Routing Description Document (Routing

IPT)

• Server Architecture (MC IPT)

• IP addressing assignment (Init IPT)

• Network Configurations (Init IPT)

• Data Products (Init IPT)

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

SUE TIM

NIE Bullpen Session

Network IPT

Network IPT meets with SUEs at the Integration

booth

Detailed NIE network design

is worked

NIE

LBRR

SUEs are evaluated. Network IPT leads

the Integration Factor •First engagement with

SUT/SUEs is at the NIE

bullpen sessions held at

FTBTX

•Following bullpen

session, weekly Network

IPT meetings are held to

synchronize the sub-IPTs

•Sub-IPTs hold meetings

as needed to work

specific functional area

issues

Integrating the Network

NIE Network IPT Battle Rhythm

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Architecting an NIE Network Map

Establishing top level SATCOM and terrestrial radio network connectivity across the formation

NIE Architecture

HICON

47 BSB

MAINGATE Mid-Tier Possible CS 14 Bridge

No Mid-Tier Possible CS 14 Bridge

ANW2 Mid Tier Capability Set 13 Bridge

1-6 IN 1-35 AR (IBCT BN)

MAINGATE Mid-Tier Possible CS 14 Bridge

1-1 CAV

ANW2 Mid Tier Capability Set 13 Bridge

4-27 FA

OPS/INTEL Convergence

OPS/INTEL Convergence

OPS/INTEL Convergence

OPS/INTEL Convergence

OPS/INTEL Convergence

OPS/INTEL Convergence

COE(v)1

JBC-P LUT

LIFERING

WIN-T INC 2 FIELDED SYSTEM

WNAN

NETT WARRIOR IOT&E

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Tech and Ops Leads

• Full time On Site support

• 12 hour shifts

Supporting the Network

PEO C3T NIE Field Support

Network IPT Leads

• 1st Shift/On Site

• 2nd Shift/On Call

Tier 3 Support

• 24/7 Ops

– 2 Lead engineers per day shift

– 1 Lead engineer per night shift/on call

• 2 day overlap between rotations

• 2 week rotations/10 day off

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Take Aways

• Collaborative Design – Building the network is a collaborative

process that translates NIE operational vision into technical reality

• Managing Complexity – Ongoing challenge minimizing

warfighter burden using and managing new technology insertions

• NIE Network Objective – Objective end state is to create

fieldable Capability Set architectures based on NIE decisions

PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH

Questions?