US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® STEPHANIE GROLEAU AARON SNYDER 2015 National Planning Community of Practice Training 3 June 2015 Documenting Study Tasks in the PMP and P2 based on the RR and DMP Case Study: Loxahatchee River

Upload: others

Post on 17-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

US Army Corps of Engineers PLANNING SMART BUILDING STRONG®

US Army Corps of Engineers PLANNING SMART BUILDING STRONG®

US Army Corps of Engineers PLANNING SMART BUILDING STRONG®

STEPHANIE GROLEAU

AARON SNYDER

2015 National Planning Community of Practice Training

3 June 2015

Documenting Study Tasks in the PMP and P2 based on the RR and DMP Case Study: Loxahatchee River

PLANNING SMART BUILDING STRONG®

It’s 156 weeks to a Chief’s report, we got a full laptop battery, half a risk register, it’s indoors, and we’re wearing sunglasses….. HIT IT!

PLANNING SMART BUILDING STRONG®

Session Purposes 1. Demonstrate the relationship between the

Risk Register, Decision Management Plan(s), PMP, and SMART P2 schedule

2. Describe the evolution of a PMP from study start to the TSP Milestone

3. Show online tools for SMART Planning and Project Management.

PLANNING SMART BUILDING STRONG®

Online Tools IWRM Suite

► Risk Register ► Decision Management Plan

SMART Guide ► Project Management Plan

P2 ► SMART Feasibility study template

PLANNING SMART BUILDING STRONG®

IWRM Suite – Project Dashboard

PLANNING SMART BUILDING STRONG®

Case Study Loxahatchee River Watershed Restoration Our team took the PDT’s RRs and DMPs from

study start until now (Alt MS) and developed a SMART PMP

PLANNING SMART BUILDING STRONG®

Part 1 RR at study start DMP at study start How RR and DMP evolve to the Alt MS How the RR and DMP inform the PMP that

gets concurrence at the Alt MS How tasks in the PMP cost spreadsheet are

derived from risks and decisions

PLANNING SMART BUILDING STRONG®

Part 2 RR after Alt MS DMP after Alt MS How RR, DMP, and PMP evolve to the TSP MS How tasks in the PMP cost spreadsheet are

derived from risks and decisions

PLANNING SMART BUILDING STRONG®

Part 3 Show risks carried through to CWRB in RR Show looking ahead in DMP Discuss residual and transferred risk

PLANNING SMART BUILDING STRONG®

P2 Template A walk through of the SMART P2 template

► Located in P2 (Primavera) ► Expand HQ – ME (Global Templates) ► Select CW-SMART-LONG

PLANNING SMART BUILDING STRONG®

Q&A Please direct any unanswered questions to

Stephanie Groleau at [email protected]

PLANNING SMART BUILDING STRONG®

Everybody Needs Somebody… To help them when they need it!

Thanks to Brad Foster and the Loxahatchee PDT