building the renewable energy sector in saudi arabia · daily load during a work day in august...

34
Building the Renewable Energy Sector in Saudi Arabia

Upload: others

Post on 04-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Building the Renewable Energy

Sector

in Saudi Arabia

Page 2: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Established by Royal Order on

17 April 2010, the Mission is to be:

2

…The driving force for making atomic and renewable energy an integral part of a national

sustainable energy mix, creating and leveraging the competitive advantages of

relevant technologies for the social and economic development of the

Kingdom of Saudi Arabia…

” “King Abdullah City for Atomic and Renewable Energy” Royal Decree No. A/35 3/5/1431 A.H.

Page 3: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Renewable Energy Development

Targets

3

Page 4: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Target Capacity by 2032

Nuclear

Optimizing Energy Generation with Alternative

Energy Economic Sector Development

17 GW

54 GW Renewable

4

Page 5: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Target Renewable Capacity by 2032

5

16 GW Solar PV الكهروضوئية

25 GW Solar CSP الشمسية الحرارية

3 GW Waste-to-energy تحويل النفايات إلى طاقة

9 GW Wind الرياح

1 GW Geothermal حرارة جوف األرض

Page 6: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

The Case for Alternative Energy

6

Page 7: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

7

Industrial 17.9%

Agricultural 2.6%

Commercial 12.2%

Governmental 15.1%

Residential 52.2%

Building 79.5%

Source: Saudi Electricity Company (SEC) 2009

70%

consumed

by HVAC

Energy Consumption Patterns

Total of 193,472 GWH

Page 8: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

…Creating Tremendous Capacity Gap

Peak Demand

New Committed

Existing Diesel

Existing HFO

Existing Crude

Existing Gas v

v

v

v

v

GW

140

120

100

80

60

40

20

0

2012 2020 2032

60 GW

(Approx.)

Year

Gap between peak demand and existing + planned capacity

8

Page 9: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

9

Maximizing Return

Oil Saved

Economic Sector

Sustainability

How Much Can We Do ? Demand Growth

Demand Pattern

Technology Characteristics

How Much Should We Do ? Economics

Sustainability

Technology maturity

Page 10: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Selecting the Optimum Energy Mix

10

Page 11: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Annual Electricity Demand Pattern in KSA

11

Week Number (July 2009 – August 2010)

MW

Seasonal change in peak

load exceeds 40%

Page 12: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

1 15 29 43 57 71 85 99 113

127

141

155

169

183

197

211

225

239

253

267

281

295

309

323

337

351

365

GW

Day-Night Load Variation for Saudi Arabia

Uniform day-to-night

variation year round

12

Night

Day

Page 13: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

0 0 : 0 0 0 6 : 0 0 1 2 : 0 0 1 8 : 0 0 2 4 : 0 0

Se

aso

na

l va

ria

tio

n o

f d

aily

lo

ad

Demand

Peak load

Base load

Daily load during a work day in August

Daily load during a holiday in January

Time of Day

Daily Electricity Demand Pattern

13

Page 14: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Proposed Energy Mix

14

Solar PV

Solar CSP

Hydrocarbons

Nuclear + Geothermal + Waste-to-Energy

16 GW

25 GW

21 GW

Page 15: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

K∙A∙CARE Mandate

15

Page 16: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

K.A.CARE

City

Investment

& Business

Internation

al Relations

Execution Policies &

Strategies

Regulatory

Human

Capacity

R&D &

Innovation

16

Mandate

Page 17: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Renewable Energy Value

Chain Development

17

Page 18: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

18

Manufacturing, EPC and O&M split

100

80

60

40

20

0

O&M

O&M

O&M O&M O&M

O&M

O&M

O&M

EPCEPC

EPC EPC

EPC

EPC

EPC

EPC

CSP Trough CSP Tower Silicon PV Thin Film PV HCPV Wind Geothermal Waste-to-

energy

Core Localization Localization not considered for industrial impact

Mirrors

Absorber

Structures

Turbine

Steam generator HTF Molten salt

Other

Structures

Mirrors Receptor

Steam turbine

Molten salt

Other

Integrated module manufac-turing

Tower

Rotor blades

Gearbox

Other

Nacelle housing Generator

Turbine

Cooling tower

Pre-heater

Condenser Other

Rest of manufacturing

Boiler

Air pollution control

Turbine & generator

Fuel & ash handling

Other Other

Integrated module manufac-turing

Polysilicon

Cell

Module

% total capex and opex throughout the plant lifetime

Page 19: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

19

Technology Elements

Wind • Blades

• Towers

• EPC & O&M

• Gearbox

• Generator

• Power converter

• Nacelle housing and

assembly

• Bearings

• Minor elements

Waste-to-

Energy

• EPC & O&M

• Steam Turbine

• Boiler

• Grate

• Other power block elements

• Minor elements

Geothermal • EPC and O&M

• Steam Turbine

• Heat exchanger

• Condenser

• Minor elements

CSP Technology Elements

Trough • Collector

• Mirror

• Absorber

• EPC & O&M

• Molten Salts

• HTF

• Steam turbine and

generator

• Storage Tank

• Other power block

elements

• Minor elements

Tower • Heliostat

• Mirror

• EPC & O&M

• Receiver

• Molten Salts

• Steam turbine and

generator

• Storage tank

• Other power block

elements

• Minor elements

PV Technology Elements

Thin Film • Integrated Module

Factory

• EPC & O&M

• Inverter

• Rest of balance of system

HCPV • Integrated Module

Factory

• Tracking System

• EPC & O&M

• Inverter

• Rest of balance of system

Silicon • EPC & O&M

• Poly Silicon

manufacturing

• Inverter

• Wafer

• Cell

• Module

• Rest of balance of system

1

2

3

4

5

6

7

8

Potential RE Value Chain Components

Page 20: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Building a World-Class Solar Energy Sector:

Value Chain Development

Industrial

investment

Research,

development

and innovation

Technology

development

Education

and training Human capacity

development

20

Page 21: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Value Chain Development: Beyond the

Solar Cell and the Mirror

21

Electricity

Generation

Industrial

Energy

Applications

Seawater

Desalination

& Water

Management

Applications

District &

Solar

Cooling

Page 22: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Research & Development

& Innovation (RDI)

22

Page 23: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

The RDI mission supports the K.A.CARE mandate

of sustainable energy mix and a viable value chain…

23

RDI Mission

Be the national technology leader in renewable and nuclear energy and

the global leader in development of renewable and nuclear energy technologies optimized for Saudi Arabian environments

to support K.A.CARE’s target of 50% renewable and nuclear energy in the

Kingdom by 2030.

Page 24: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

The top-level missions and long-term measures of the

success of the RDI program…

24

Nuclear Energy

Mission Establish a technical base in applied nuclear science in the power, medical, and industrial fields to develop the

safe use of atomic energy for peaceful purposes in the KSA. Measure

Develop, design, and license new technologies optimized for the Kingdom for the next wave of nuclear power to generate value chain revenue greater than the development costs by 2030.

Renewable Energy

Mission Renewable energy technology research and development program that enables significant and optimized

deployment of renewable technologies in Middle East & North African environments. Measure

Develop technologies that will generate renewable power in the Kingdom at a cost equal to or less than retail generation rates (achieve local grid parity) with a diverse energy mix for baseload power by 2030.

Energy Efficiency Mission

Technology and outreach program that enables efficient use of energy, cost savings, and conservation of resources by KSA industry & residents.

Measure Develop technologies with 50% lower energy consumption than current commercial products in the top electricity

consuming sectors by 2020.

Page 25: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Achieving K.A.CARE’S goals for transformation of the Saudi energy mix requires excellence in “Mission-

Directed” RDI

Mission Directed Research*:

Scientific investigation and technological development

…designed to achieve specific, well-identified technical and commercial

outcomes

…essential to fulfillment of major policy or economics driven outcomes

..within a defined timeline and a budgeted investment

25 *From RDI Strategy report by SRI and Battelle, June 2011.

Page 26: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Renewable Resource Monitoring &

Mapping Program (RRMM)

Page 27: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Renewable Resource Monitoring and Mapping (RRMM)

Program Purpose

• Program Purpose: To establish a high-quality, solar and wind

resource monitoring network for KSA, and integrate solar and wind

(and eventually geothermal and waste-to-energy data) into an

online, interactive Renewable Resource Atlas

• The RRMM Program will provide data that fulfills multiple

stakeholder needs, such as:

– Resource data for energy facility (power project) investors

– Detailed, quality data to enable researchers to develop new and improved

technologies

– Data for other studies such as renewable grid integration

Page 28: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

RRMM Projects

• The RRMM program covers four projects in the near term as

shown below (up to the year 2020)

• We are approaching the end of the 1st project which covers

the installation of the monitoring stations and Renewable

Resource Atlas release

28

Page 29: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Current Progress

• Around thirty “Tier 2” stations installed (about halfway

through) - Earliest installed in January 2013

• One “100 meter Met-Mast” installed in the future K.A.CARE

site south of Riyadh

• Finalizing the Renewable Resource Atlas (Atlas will be officially

launched in the end of November 2013, with data only from

ground solar monitoring stations)

29

Page 30: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Stations Currently Installed

30

Page 31: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

First Met-Mast Installed Early September 2013

31

Page 32: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Renewable Resource Atlas – Home Page

32

Page 33: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Next Steps

• Create a solar resource model covering all of KSA

that utilizes the ground stations and satellite

readings

• Create a solar resource forecasting model (big

part of this will be creating a dust prediction

model)

• Create a PV and CSP simulation tool for KSA

• Create similar models and tools for wind energy

33

Page 34: Building the Renewable Energy Sector in Saudi Arabia · Daily load during a work day in August Daily load during a holiday in January Time of Day Daily Electricity Demand Pattern

Thank You …..

34

.....شكرا جزيال