    Bull Runner Project

    Neeraj Aggarwal, James Knapp, and Pratik Shah

    EIN 6179 Six Sigma

    Professor Beata Abbs

    May 5, 2010

  • 8/8/2019 Bull Runner Project

    2/16

    Executive Summary

    The main problem occurring that we decided to analyze and try to fix

    were the wait times involved in waiting and commuting through Bull Runner.

    The Bull Runner Shuttle system performs with long wait times varying on

    average from 13 to 19 minutes as against the expected time of 8 minutes

    causing delays and frustrations among commuters. This has been a problem

    for quite some time and the Bull Runner Operation team already knows this.

    Their thoughts on fixing this in the recently has considered inserting a GPS

    system to allow for the buses to know where the others are located. They

    think this will let the buses flow more efficiently and create a more

    consistent wait time for riders. This could help but we feel more needs to be

    done and analyzed in order to make commuters happy.

    Our goal for this project deals with using an array of different methods

    through Six Sigma and analyzing this data to reduce wait times. We will only

    be analyzing 2 out of the 5 routes, which our solution will be employed to all

    once they are found. The desired wait time between buses will be set to 8

    minutes in which the recorded average as of the beginning of the project was

    16 minutes. We will use a whole semester in which to find out which data to

    gather, gather it, and use it to our advantage. The use of the voice of the

    customers, riders, as well our strategy in this time limit will be directly

    related to the significance of our results. Once all the tools are used properly

    controlling and maintaining the solution or solutions will also be looked at.

  • 8/8/2019 Bull Runner Project

    3/16

    Background

    Any student at a major university can tell you that one of the most

    frustrating parts of the day deals with parking. It times of over an hour at

    some campuses have been recorded in which parking spots were not

    available. This turns into missed classes, quizzes, tests, and just about

    anything a student needs not to miss in order to do as good as they can. To

    fix this problem many universities such as USF have developed a shuttle

    system in which various locations off of campus are shuttled to there and

    back. USF calls their system Bull Runner and just like many of the other

    systems it can be called insufficient at times. Considering the main reason

    for the shuttles in the first place deals with being late for class, if the shuttles

    are late what would the point be?

    The Bull Runner Shuttles have been around for quite some time at USF

    and take on the routes A, B, C, D, and E. Multiple buses run on each route

    and vary throughout the day in the amount per route. Drivers drive at

    different speeds but always follow the proper route in which they are order

    to drive. The system does follow a consistent path each week in which the

    same number of buses will start and stop on certain routes at certain times.

    This leads way to a system that can be analyzed in which it does have

    consistent variables although the wait times are very inconsistent.

    Approach

  • 8/8/2019 Bull Runner Project

    4/16

    The approach to this project could be considered the most important

    aspect of the entire thing. We first started to observe the operation as a

    whole from an outsiders perspective. We found that Bull Runner actually

    has a website in which you can track the routes and buses by a map. This

    website showed their estimated arrival times and the actual times and

    places they were in current time. Another resource we found that might be

    somewhat beneficial was Bull Runner management. After creating our

    mission, vision, and strategy our first strategic plan developed the map in

    which you see below.

    Boun

    dary

    Boun

    dary

    S I P O C

    Suppliers Input Process Output Customer

    Parking &

    Transportat

    ion services

    Bull

    Runner

    buses

    Transportat

    ion

    Student

    Bus Stops Staff

    USF Card

    Tracking

    System

    This mapped set the guidance to what we were looking at as a whole.

  • 8/8/2019 Bull Runner Project

    5/16

    Rick Fallen the person involved in management which we were able to

    contact us helped us a great deal. We were able to get information on the

    pay of each driver, information on the new GPS system, and he allowed us to

    pass surveys out on the bus to get the voice of the actual customer. The

    next major step involved finding our variables and strategizing what variable

    effected the wait time. A detailed look below:

    Y-Variable

    Wait Time between buses

    X-Variable

    Number of Buses

    Drivers

    Condition of Buses

    Different day times

    Number of Stops

    Traffic Conditions

    Communication System response

    Driver Changeover

    From this data our goal throughout the entire project will be to find which of

    these X-variables will affect the Y-variable, wait time between buses.

    Voice of the Customer

    An important aspect of any project should involve the people that are

    considered the customers of the system. In our case this would be the users

    of the Bull Runner System at anytime throughout the week. Our strategy at

    first was to send out an email to receive information from all of the Bull

  • 8/8/2019 Bull Runner Project

    6/16

    Runner users that went to USF. This strategy overlooked the challenge

    having access to send a mass email to all of these USF students. Our next

    strategy involved Rick Fallen in which he permitted us to leave these surveys

    in the shuttles in which the customers rode. The list of question below

    describe the information that we wanted to achieve and they either had

    rating from 1-10 in which you could answer, multiple choice, or fill in the

    blank answers. Questions:

    1. How many times a week you use Bull Runner service?

    2. Which Bull Runner route do you travel most often?

    3. What is your average wait time to board the Bull Runner?

    4. Do you have information on the schedule following which Bull runner

    makes stops at your stop?

    5. Bull Runner always arrives at my stop on time?

    6. On an average, how many co-passengers are there on Bull Runner trips

    you take between 07:00 AM and 05:00 PM?

    7. On an average, how many co-passengers are there on Bull Runner trips

    you take between 05:00 PM to mid night?

    8. I am satisfied with the pull chain stop alert system.

    9. How do you rate Bull Runner Service?

    10.Please include any comment (Positive or Negative) on Bull Runner

    service.

  • 8/8/2019 Bull Runner Project

    7/16

    We not only wanted to hear about the waiting times of Bull Runner, but the

    system as a whole. If it lacked in other areas we might have been able to

    analyze these areas as well and use them to our advantage.

    Process Mapping

    Once some information can be retained the fact of mapping out the

    process of a whole can be crucial in finding the weak links in the chain so to

    speak. The process map we have created shows the process of an everyday

    user enters the shuttle to when they exit. As you look at it you will notice

    that the shuttle has contact with one another and use this to gage how fast

    they should drive. Process Map:

    One of the most interesting notes to take from this involves the fact that

    drivers actually slow down in order to keep a proper distance from the next

    driver. The reason for this makes sense in the need for spacing the shuttles,

    but this obviously will slow down the system as a whole.

    Tools Used

    Throughout this project a various amount of tools were used. The first

    tool we used involved the quality function deployment in which we tried to

    focus on Bull Runner as a whole. This data exhibited below:

    Quality Function Deployment

    How

    WhatCI

    Timely avialbility 5155

    Availability at

    desired location 13

    Room to sit 333

    Cleaniness 22

    Safe to travel 36

    Quiet atmosphere 11

    Comfortable 2

    20

    18 5 23 45 27 48 3 3 18

    Strong 9

    Medium 3

    Weak 1

    Number

    of stops

    Tracking

    &

    Commun

    ication

    System

    CustomerNeeds

    Metrics

    Numbe

    r of

    Buses

    Number

    of drivers

    Conditio

    n and

    year of

    Manufact

    ure Schedule

    Seating

    capacity

    Time

    betweeb

    buses

    Administ

    ration

    quality

  • 8/8/2019 Bull Runner Project

    8/16

    By observing the totals in the lowest and furthest to the right sections, it

    helps in the overall assessment of Bull Runner.

    The next step in using certain tools we choose the Ishikawa Diagram.

    This diagram helped us focus on the all the factors that were involved in the

    process. The Xs on the diagram show were the factors to be considered are

    located and there are 6 different categories in which we focused on. These

    categories are management, man, method, measurement, machine and

    materials. This diagram is below:

  • 8/8/2019 Bull Runner Project

    9/16

    Bull Runner has a website in which it was very helpful in collecting data

    called the Bull Runner tracking system. We also rode the shuttles as while in

    order to receive data from these trips and see firsthand the steps taken.

    Through this data and Minitab our team developed many different graphs on

    to determine the appropriate factors that effects the wait time. These

    graphs are shown below some have brief descriptions of why they were

    used:

    Stability chart in order to see if there persists of any common factors dealing

    with the wait times:

    Normality Chart much with the same reasoning to find out if a consistent

    duration of waiting time exists:

  • 8/8/2019 Bull Runner Project

    10/16

    Normalization plot of the data to see if we can find a formula within these

    wait times:

    We compared the wait times vs. the time of day in order to see if a certain

    time of the day held higher average wait times than other times:

  • 8/8/2019 Bull Runner Project

    11/16

    Turned the line chart into a graph that would be easier to see the differences

    in a bar chart for wait times relevant to the time of the day:

    The number of buses was our next area of focus and to see if this affected

    the wait times:

    We took a further in depth look of actually riding the bus all of Monday and

    comparing these times to wait times:

    We took the wait times between five and six and compared the number of

    buses to wait times:

    Through Minitab we were able to test for a significant P-value < .005:

  • 8/8/2019 Bull Runner Project

    12/16

    We tested for the same relevant to the time of day:

  • 8/8/2019 Bull Runner Project

    13/16

    All of these tools were crucial in the outcome and solutions to our project.

    Through the use of Minitab and graphs the project could be broken down and

    analyzed from many different angles.

    Critical X identification and Improvement Approaches

    We found four critical X factors that affect the wait time in a negative

    way. The first X factor deals with the number of buses per route. At times

    bus utilization can be handled better and our solution to the problem is to

    increase the number of buses to a maximum of 5 per route. The next X

    factor deals with the routes themselves. Unnecessary steps throughout the

    routes are taken in which new routes will be utilized. One of the X factor that

    involves technology deals with the use of adjusting the lights so that the

    buses travel through with less stops. This goal will work if the routes are

    scheduled properly and the lights change at the proper times. The last X

    factor that contributes is to set standards of operating the shuttles by the

    drivers. Drivers as of now differ from one to the next in terms of the speed

    in which they drive. The ability to influence standards among all will set a

    better system and place and prove beneficial in the long run. A list of the

    solutions to implement is below:

    1. Increasing the number of Buses to a maximum of 5.

    2. Shortening the route by removing unnecessary miles.

  • 8/8/2019 Bull Runner Project

    14/16

    3. Adjusting schedules and providing Traffic light monitoring to avoid

    traffic lights.

    4. Setting standard operating procedures for drivers.

    Risk Assessment and Mitigation Strategy

    To implement the use of our first solution we first graphed the

    difference in wait times compared to the number of buses used:

    We ran the numbers to find out how much this would cost the company:

    1. Additional Cost = Average cost of running a bus * # of hours

    Avg. Cost = $42/hr.

    # of hours = 10 hrs a weekday*days in a year

    Additional Cost For Route D = $109,500 per year

    2. Annual Savings to Customers = (227193)*5/7(Weekdays/(16-8)/60*Average Student

    Salary

    Annual Savings to Customers = $21,637

    3. Savings From Additional Bus = $10,687

    The next area of focus involved the path taken by the buses

    throughout the trips. By taking a new strategy on how the path should be

    taken miles can be cut off the trip and yet all the necessary places can still

    be stopped at. A series of bullet points displays our findings:

  • 8/8/2019 Bull Runner Project

    15/16

    Extra miles traveled each day = 1.2 miles

    Average number of trips per day = 45.5 trips

    Number of extra miles per day = 54.6 miles

    Annual fuel saving without extra miles = $3919

    Annual time cut off for customers = 2 minutes per hour

    Extra time if used for work instead of waiting = $13521 per year

    The other two solutions involve implementing new technology to the lights

    as well as making a systematic schedule that all drivers must follow. This

    also involves standardizing arriving and leaving times for all drivers in order

    to implement the system correctly.

    Control

    Once all of the steps to our solution have been taken controlling them

    will be the next phase. Any problem can receive a solution and it may work,

    but it can fail if not properly controlled. The most important way of

    controlling these solutions involves following the system correctly. If Bull

    Runner converts back to its old ways in any area it can break the new

    approach and ruin the advances taken. The number of shuttles as well as

    the routes taken cannot be strayed from at any point in time and it must be

    consistent. For the last two solutions a proper system should be

    implemented and if done properly it should be consistent and not changed.

    One variable will always be in need of analyzing and that is the drivers.

    Checks on whether all drivers are properly holding true to the system will be

  • 8/8/2019 Bull Runner Project

    16/16

    given. Examinations on knowledge of the system as well as paths and times

    taken will be recorded. If drivers do not abide by the system properly

    necessary steps will be taken and possible relieving them of their duties may

    be the only solution at times.

    Conclusion

    Through our approach and results it seems as though we may have

    found a proper solution. All necessary steps were taken in finding the

    appropriate X factors and then analyzing them. The factors that seem to

    affect the wait times are very plausible and are well backed up through the

    data we found. The next step will be to implement these findings and see if

    the forecasted results occur. We hope to show Rick Fallen our results and

    encourage him to try the solutions and see how they work. These four

    solutions are to add Bus drivers, optimize the routes, change the times in

    which the lights will turn, and to set a systematic way of having more

    consistent drivers and travel times. All of this will in turn make for less wait

    times and overall not only save Bull Runner money, but the customers as

    well. If a little more can be put into Bull Runner it can be an efficient system

    in which other universities will be jealous of and want for themselves.