Bundle Pipeline Systems
& Shell FRAM DevelopmentIain Watson & Peter Walker
March 21st, 2012
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
2/62
Bundle Technologies
Advantages of Bundle Systems
Agenda
27.1.11 2Page
2Page27.1.11
Shell Fram Bundle FEED
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
3/62
Bundle Technologies
Agenda
27.1.11 3Page
3Page27.1.11
Shell Fram FEED
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
4/62
What is a Bundle / Towed Pipeline Solution? A Pipeline Bundle is a carrier pipe within which any combination of
individual pipelines and umbilical components is carried.
The individual components terminate in Towheads within which
manifolding may take place. A Towed Pipeline Solution provides a low stress installation method
where-by a pipeline bundle is towed and installed using the ControlledDepth Tow Method.
27.1.11 4Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
5/62
Subsea 7 Installed Bundles
sgard
Heidrun
NorwayNorway
Osprey
Cormorant
Frigg East
Murchison
GullfaksBruce
65 bundles in 33 years
Up to 7.6km length
Up to 28.7km in series
Up to 320m water depth
Shallowest 42m
27.1.11 5Page
Claymore
PiperSaltire Thelma
Cyrus, FarragonScapa
Alba
Gannet
Embla
Dan DenmarkDenmark
WickWick
ScotlandScotland
Buckland Leadon
Skene
Longest tow 1000 km Up to 49.5 carrier
Up to 545 te towhead
Heaviest bundle 9154 te
Up to 3 PiP flowlines
U-value
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
6/62
Bundle Components
Flowlines
Insulation
Sleeve Pipe
Control/Chemical Tubes
27.1.11 6Page
, ,
Main Spacer
Centraliser Pipe-in-Pipe Spacer
Bulkheads
Ballast Chains
Anodes
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
7/62
What exactly is a Pipeline Bundle?
27.1.11 7Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
8/62
Typical Bundle Layout
BP Machar
27.1.11 8Page
BP Andrew
Kerr McGee Leadon
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
9/62
Materials
Flowline Materials
Carbon steel - X52, X65, X70 with SS or
Alloy Liners
Corrosion Resistant Alloys - 13% 22% & 25%
Cr Steels
27.1.11 9Page
Plastic (HDPE) Liners for Water Injection Lines
Controls
Hard Pipe Hydraulic and Chemical Systems -
316 SS, 25% Cr Duplex to Carbon Steel
Electrical & Fibre Optic Control Systems
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
10/62
The Long Trek West
27.1.11 10Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
11/62
Wester Fabrication Facility
27.1.11 11Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
12/62
Hastigrow Fabrication Facility
27.1.11 12Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
13/62
Welding Firing Lines
27.1.11 13Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
14/62
Inner Bundle Fabrication
27.1.11 14Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
15/62
Insulation Type
Passive Insulation System
27.1.11 15Page
Pipe-in-Pipe System
Electrical Active/Trace Heating
Indirect Hot Water Heating
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
16/62
Production Line Insulation
27.1.11 16Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
17/62
Applying ITP Izoflex Insulation
27.1.11 17Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
18/62
Applying ITP Izoflex Insulation
27.1.11 18Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
19/62
Spot Welding Steel Sheet Over ITP Izoflex
27.1.11 19Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
20/62
Spot Welding Steel Sheet Over ITP Izoflex
27.1.11 20Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
21/62
Bundle System Applicability
1500
2000
m)
Wet Insulation
27.1.11 21Page
0
500
1000
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
WaterDep
th(
U-Value (W/m2K)
Pipe-in-Pipe
Bundles - Towed Pipeline Systems
Flexibles
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
22/62
Flow Assurance Geometry of Pipelines
The environment within the carrier pipe provides an ideal opportunity forinnovative solutions in Flow Assurance.
The pipelines can be arranged to facilitate heat transfer between product linesor from dedicated heating lines.
Heat transfer analysis confirmed by experimental results.
27.1.11 22Page
Active Heating Systems
Warm-up before Start-up
Increase Temperatures for Low Production Rates
Keep System Temperature High during Shutdowns
Reduce Chemical Injection
Six Active Heating Systems installed in the North Sea
Hot Water Circulation over distances of 15 km
Electric Heat Transfer
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
23/62
Carrier Sheathing
27.1.11 23Page
27m lengths welded into 500-1000m trains All production operations on line
Trains sheathed to final location
Final field joint tie-ins
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
24/62
Towheads
27.1.11 24Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
25/62
Jura Manifold Beach Landing
27.1.11 25Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
26/62
Jura Manifold Beach Landing
27.1.11 26Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
27/62
Bulkheads
27.1.11 27Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
28/62
Bulkheads
27.1.11 28Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
29/62
Towhead Tie-In
27.1.11 29Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
30/62
Bundle Launch
Structures greater than 500Te
Tidal currents monitored & tug
locations altered accordingly
Tug bollard pull up to 400Te
Capstan winch providing
27.1.11 30Page
o ac tens on up to e
A99 road bridge opens to allow
large structures to pass through
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
31/62
Launch
27.1.11 31Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
32/62
Control Depth Tow Method Chains attached at regular intervals along the
bundle.
Ensures accurate weight control to
approximately 0.5%.
Weight of chain links on seabed is submergedweight of bundle.
27.1.11 32Page
for tow if required.
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
33/62
CDTM in Practice
27.1.11 33Page
A data highway runs thelength of the bundle andallows acoustic commandsmade at one end of thebundle to be implemented atthe other, for example forvalve actuation or acousticspool metrology.
Towmasters real-time display of bundle shape and water depth
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
34/62
What We Can Do
Field Concept Development, FEED Studies
Tender Engineering
Detailed Design & Fabrication Launch, Tow & Installation Analysis
Dynamic & Fatigue Analysis
27.1.11 34Page
Regional Support (Bundles), Norway & Asia Pacific
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
35/62
Bundle Technologies
Advantages of Bundle Systems
Agenda
27.1.11 35Page 35Page27.1.11
Shell Fram Bundle FEED
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
36/62
Why Bundles? - Advantages
Eliminate the requirement for heavy lift vessels by incorporating Subsea Structures within a
Towed Production System (Maximum to date 545te).
Testing and commissioning of complete system onshore therefore reducing offshore time: -
Hydro testing, dewatering, drying, control fluid flushing, valve operations etc.
Fast hook up and commissioning for early first oil dates.
Installation under existing or temporary floating assets.
27.1.11 36Page
Reduced number of subsea tie-ins and spool installations.
Seabed stability using Gravity Based or Piled design.
Protection incorporated in structure design.
Improved Flow Assurance / thermal Management (Heated Hot Water, Trace Heating).
Leak mitigation in case of internal flowline failure (maintain leaked oil within Carrier Annulus) -
Flowline safety class can be reduced when using DNV-OS-F101 Design Code.
Use of CRA Lined pipe in place of Clad pipe or solid CRA pipe.
High Temperature Flowline Design (up to 160C curre ntly).
Turn out cost more predictable (reduced exposure to weather/soils risk).
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
37/62
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
38/62
Fram Field Location
27.1.11 38Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
39/62
Fram Field Location
27.1.11 39Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
40/62
Fram Development Proposed Field Concept
27.1.11 40Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
41/62
Fram Development Proposed Field Layout (Xodus)
27.1.11 41Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
42/62
Fram Infield Layout
27.1.11 42Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
43/62
Fram FPSO Approaches (Xodus)
27.1.11 43Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
44/62
Fram Drill Centre East Towhead & Well Tie-ins (Xodus)
27.1.11 44Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
45/62
Fram Drill Centre West Towhead & Well Tie-ins (Xodus)
27.1.11 45Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
46/62
Fram Bundle FEED - Principal Design Assumptions
Principal Design Data / Assumptions for Fram FEED:
8 Slot towhead manifold at DCE (5 wells initially).
6 Slot towhead manifold at DCW (3 wells initially).
2 midline SSIV structures required at FPSO (out with swing circle).
14 NB Gas Export SSIV located in Midline Towhead (East).
Shared services between drill centres sin le test riser as lift riser & riser umbilical .
27.1.11 46Page
Mixture of Oil & Gas Wells at both drill centres. 345 Barg Design Pressure / 110C Design Temperature (Production/Test).
Max CO2 content ~1.1 mol.% in produced fluids.
Max. H2S ~6 ppmv in produced fluids.
~47,000 mg/l Chlorides in produced water.
Water depth infield ~ 95 m (wrt LAT).
20 year system design life
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
47/62
Fram Bundle Cross Section Designs
DCE & DCW Bundle Cross Sections
27.1.11 47Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
48/62
Midline Bundle Cross Section (Shared Services)
Fram Bundle Cross Section Designs
27.1.11 48Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
49/62
Fram Bundle Cross Section Designs
Pipe-in-pipe Insulation System Performance (both options)
27.1.11 49Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
50/62
CRA Lined Pipe (Butting) Mechanically Bonded (BuBi)
Fram Bundle Production & Test Line Linepipe Design
27.1.11 50Page
The Mechanically bonded Butting Bimetal Pipe (BuBi Linepipe)
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
51/62
Fram Bundle Simplified Configuration (P&ID)
27.1.11 51Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
52/62
Fram Bundle - DCE Towhead Pipework (General Assembly)
27.1.11 52Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
53/62
Fram Bundle - DCW Towhead (General Assembly)
27.1.11 53Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
54/62
Fram Bundle - Midline Structure East (GA)
27.1.11 54Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
55/62
Fram Bundle - Midline Structure West (GA)
27.1.11 55Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
56/62
Bundle Launch at Subsea 7s Wester Site
27.1.11 56Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
57/62
Bundle Tow Route
27.1.11 57Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
58/62
Bundle Tow Configuration
27.1.11 58Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
59/62
Bundle Tow Route
27.1.11 59Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
60/62
Control Depth Tow Method
Chains attached at regular intervals along thebundle.
Ensures accurate weight control toapproximately 0.5%.
Weight of chain links on seabed is submergedweight of bundle.
27.1.11 60Page
for tow if required.
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
61/62
Questions?
27.1.11 61Page
-
8/12/2019 Bundles Subsea Uk Lunch and Learn 2012
62/62
27.1.11 62Page
seabed-to-surface
www.subsea7.com