burgess design group / jdsi consulting engineers
TRANSCRIPT
BURGESS DESIGN GROUP /
JDSI CONSULTING ENGINEERS
BROOKLANDS HENLEY BROOK DEVELOPMENT
APA GROUP
PARMELIA GAS PIPELINE
AS2885 SAFETY MANAGEMENT STUDY
WORKSHOP REPORT
Document No: R-BDG-1336
Rev Date Description Prepared Checked Approved Licensee
0 11/01/2019 Issued for Use
R Thornton M Woolridge R Thornton
Snr Pipeline Integrity Engineer
Graduate Mechanical Engineer
Snr Pipeline Integrity Engineer
1 31/07/2019
Issued for Use – Updated as per results of Workshop Session #2
R Thornton B Watters R Thornton
Snr Pipeline Integrity Engineer
Project Officer Snr Pipeline Integrity Engineer
1a 15/08/2019 Issued for Use – Updated as per Client comments
R Thornton B Watters R Thornton Snr Pipeline
Integrity Engineer
Project Officer Snr Pipeline Integrity Engineer
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 i
Disclaimer
1. Whilst the information contained in this document is considered to be true and correct at the date of publication, changes in circumstances after the time of publication may impact on the accuracy of the information. The information may change without notice and Pipeline Integrity Pty Ltd is not in any way liable for the accuracy of any information printed and stored or in any way interpreted and used by a user.
2. Whilst the information contained in this document has been presented with all due care, Pipeline Integrity Pty Ltd does not warrant or represent that the information is free from errors or omission.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 ii
CONTENTS
1.0 TABLE OF ABBREVIATIONS AND TERMS ............................................................... 1
2.0 REFERENCES ........................................................................................................... 2
3.0 EXECUTIVE SUMMARY ............................................................................................ 3
4.0 INTRODUCTION ........................................................................................................ 4
5.0 PIPELINE OVERVIEW ............................................................................................... 4
6.0 PROPOSED DEVELOPMENT OVERVIEW ............................................................... 5
6.1 Construction Details .................................................................................................... 6
7.0 SCOPE OF WORKSHOP ........................................................................................... 7
7.1 Excluded from Scope................................................................................................... 7
8.0 METHODOLOGY ....................................................................................................... 8
8.1 Assumptions ................................................................................................................ 8
9.0 WORKSHOP SCHEDULE .......................................................................................... 8
10.0 ATTENDEES .............................................................................................................. 9
11.0 LOCATION CLASSIFICATION REVIEW .................................................................. 10
12.0 RESULTS ................................................................................................................. 11
12.1 Major Accident Events ............................................................................................. 11
12.2 Formal ALARP Assessment .................................................................................... 12
12.3 Actions .................................................................................................................... 13
13.0 CONCLUSION ......................................................................................................... 18
APPENDIX A: LOCATION CLASSIFICATION REVIEW RESULTS .................................... 19
APPENDIX B: AS2885 SAFETY MANAGEMENT STUDY RESULTS ................................. 20
APPENDIX C: SIGN ON SHEETS ...................................................................................... 21
APPENDIX D: REFERENCE DOCUMENTS ....................................................................... 22
APPENDIX E: RISK ASSESSMENT MATRIX ..................................................................... 23
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 iii
LIST OF TABLES
Table 1: Abbreviations and Terms used in the Report ........................................................... 1
Table 2: Reference Documents ............................................................................................. 2
Table 3: Pipeline Overview.................................................................................................... 4
Table 4: Workshop Schedule ................................................................................................ 8
Table 5: Workshop #1 Attendees .......................................................................................... 9
Table 6: Workshop #2 Attendees .......................................................................................... 9
Table 7: Location Classification Review .............................................................................. 10
Table 8: MAE Summary ...................................................................................................... 11
Table 9: ALARP Summary .................................................................................................. 12
Table 10: Action Item Summary .......................................................................................... 17
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 1
1.0 TABLE OF ABBREVIATIONS AND TERMS
Abbreviation /
Term
Description
ALARP Risk associated with a Threat is deemed ALARP if the threat is controlled,
or the residual risk is assessed to be low or negligible, or the residual risk is
assessed to be intermediate and is formally demonstrated to be ALARP.
(AS2885.0 Section 1.5.3)
BDG Burgess Design Group
JDSI JDSI Consulting Engineers
KP Kilometre Point
MAE A Major Accident Event (MAE) is defined as “an event connected with a
pipeline operation, including a natural event, having the potential to cause
multiple fatalities of persons engaged in the operation or other protected
persons”. (AS2885.3 Appendix E2)
MAOP Maximum Allowable Operating Pressure
Multiple More than two (with respect to MAE)
Non-Credible
Threat
Threat for which the likelihood of occurrence is so low that it does not exist
for any practical purpose at that location. (AS2885.0 Section 1.5.43)
PGP Parmelia Gas Pipeline
SMS Safety Management Study
TOR Terms of Reference
Table 1: Abbreviations and Terms used in the Report
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 2
2.0 REFERENCES
Table 2: Reference Documents
Document Number Title
Standards
AS2885.0 - 2018 Pipelines Gas and Liquid Petroleum, Part 0 – General Requirements
AS2885.1 - 2018 Pipelines Gas and Liquid Petroleum, Part 1 – Design and Construction
AS2885.3 - 2012 Pipelines Gas and Liquid Petroleum, Part 3 – Operation & Maintenance
AS2885.6 - 2018 Pipelines Gas and Liquid Petroleum, Part 6 – Pipeline Safety Management
AS ISO 31000 Risk Management – Principles and Guidelines
Documents
PGP.2373-RP-HSE-0001 Parmelia Gas Pipeline System 2018 AS2885 SMS Workshop Report
R-BDG-1336, Rev 0 Brooklands Estate Initial Safety Management Study Workshop Report
TOR-JDSI-1469 Brooklands Estate Safety Management Study Update Terms of Reference
AS2885.6 - 2018 AS2885.6-2018 Risk Assessment Matrix
R-PI-453 SMS Guide Words
Drawings
PRO BRO 03-011-01
(Date: 26.06.19)
Structure Plan Map - Brooklands Estate
MIRHB-1-008A
(Rev A, Date: 6/6/2019)
Proposed Lot Typology Plan - Brooklands Estate
N/A Aerial Photograph - Brooklands Estate
N/A Locality Plan - Brooklands Estate
N/A Aerial Photograph with Pipeline Centreline - Brooklands Estate
101-D-L-39 PGP Alignment Sheet
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 3
3.0 EXECUTIVE SUMMARY
The AS2885 Safety Management Study for the proposed development at Brooklands, Henley Brook has been successfully completed in accordance with the Terms of Reference Document No: TOR-JDSI-1469 and AS2885.
All identified threats to and from the Parmelia Gas Pipeline from the proposed development were assessed to ensure the on-going safe operation of the Pipeline.
24 Actions were raised in the initial workshop and 3 additional actions were raised in the second workshop. There were also 3 hazards identified which require a Formal ALARP Assessment.
Upon completion of these Actions and Formal ALARP Assessments all threats to and from the Pipeline from the proposed development are considered to be adequately controlled and managed as per the requirements of AS2885.
The AS2885 Safety Management Study Workshop was conducted at the APA Group Office, Level 5 Eastpoint Plaza Perth. The first workshop was held on the 6th December 2018 and a second workshop was held on the 25th July 2019. These workshops contained all parties required for the successful completion of the Safety Management Study.
As part of the Safety Management Study a Location Classification Review was also performed in accordance with AS2885.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 4
4.0 INTRODUCTION
Pipeline Integrity Pty Ltd was engaged by Burgess Design Group and JDSI to perform an AS2885 Safety Management Study and Location Classification Review Workshop for the Parmelia Gas Pipeline in the location of the proposed development at Brooklands Estate, Henley Brook.
This document forms the Workshop Report and outlines the Safety Management Study and Location Classification Review Workshop details, results and actions raised.
5.0 PIPELINE OVERVIEW
An overview of the Pipeline for the relevant section is outlined below.
Item Parmelia Pipeline
Pipeline License No 1, 2, 3
Location of Pipeline Affected by
Proposed Works
Gnangara Road – KP305.977 (Start)
Park Street – KP308.048 (Finish)
Product Natural Gas
Design Code AS 2885 (Originally built to ASME B31.8)
Diameter DN350
MAOP 7.48 MPa
Pipe Type API 5L X52
Wall Thickness Standard - 5.16 mm
Heavy Wall – 6.35mm
Coating Type Bonded HDPE Coating (Yellow Jacket)
Measurement Length (4.7kW/m2 Radiation Contour)
300 m
(180 m to 12.6 kW/m2)
(as per 2018 SMS Workshop Report Appendix 4 – Section ID 2)
Current Location Class (Prior to Development)
T1 (No Secondary Class)
(as per 2018 SMS Workshop Report Appendix 5 – Section ID 10)
Depth of Cover Generally 800mm to 1500mm
Above Ground Facilities Nil
DMIRS Licenced Asset Yes
Easement (50’)
Table 3: Pipeline Overview
For further details refer to the drawings and documentation listed in Section 2.0.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 5
6.0 PROPOSED DEVELOPMENT OVERVIEW
Burgess Design Group/JDSI are proposing to undertake a Residential Subdivision Property Development Project at Brooklands Estate in Henley Brook.
The Local Structure Plan area will encompass the following area / roads:
Gnangara Road
Pine Street
Henley Brook Ave
Park Street, and
Lord Street
The JDSI component of the development is as per the proposed Lot Topography Plan,
Document Number: MIRHB-1-008A.
The Proposed Works are within the vicinity of the Parmelia Gas Pipeline which is operated by APA Group.
The proposed development consists of the following:
Total Site Area is approximately 234 ha
Approximately 3500 dwellings with an average lot size of 350 to 375m2
Residential lots which include areas of: o R30 zoning o R40 zoning o R60 zoning
Primary Schools (two)
Possible Future Lifestyle Village
Public Open Space (approx. 15% of Gross Area, 13.09% creditable under planning calculations)
Foreshore Area
Water Corporation Facilities (three)
Roads and Installation of Services
Proposed Road Crossing the PGP at POS14 along with Buried Services in the Road Easement
Note: The above areas are approximated only and subject to Final Survey and Design.
The development is encumbered by an Easement for the Parmelia Gas Pipeline (PGP). This corridor extends in a North to South direction through the centre of the development area.
Details of the proposed development are as per the following documents which are included as part of the Terms of Reference attached in Appendix D.
Document No: Title
PRO BRO 03-011-01
(Date: 26.06.19)
Structure Plan Map - Brooklands Estate
MIRHB-1-008A
(Rev A, Date: 6/6/2019)
Proposed Lot Typology Plan - Brooklands Estate
N/A Aerial Photograph - Brooklands Estate
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 6
6.1 Construction Details
Details of the proposed Construction Activities in the vicinity of the Parmelia Gas Pipeline are as outlined below:
• Surveying and Marking
• Establishment of Site Facilities (TBC)
• Earth Works
o Clear and Grade
o Clear and Removal of Large Trees
o Import and fill
o Compaction
• Construction activities for:
o Roadworks
o New Road crossing of the PGP at POS14
o Concrete footpaths
o Landscaping
o Hardscaping
o Fencing
o Light Poles
• Installation of Services (Trenching, Backfill, Compaction, Potential Micro tunnelling)
o Electrical/Power
o Communications
o Gas
o Water
o Drainage
o Sewer
o Irrigation for Landscaping
Note: The majority of the above activities will be performed around and on the Parmelia
Gas Pipeline Easement.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 7
7.0 SCOPE OF WORKSHOP
The Workshop Scope undertaken was to perform an AS2885 Safety Management Study (SMS) Workshop and document the process for the proposed development at Brooklands Estate in Henley Brook.
This assessment was required to take into account the relevant section of the following existing operating Pipeline:
Parmelia Gas Pipeline (Operated by APA Group) (KP305.977 308.048)
As part of the SMS Workshop assessment, the following is required:
1. Review of the Location Classification for the above Pipeline taking into account the Proposed Works
2. Safety Management Study for the above Pipeline for the section in which the pipeline measurement length encompasses the Proposed Works (Location Specific and Non-Location Specific Threats)
The Safety Management Study is required to assess:
1. Threats to the Pipeline from proposed Construction activities 2. Any new threats which may exist from the proposed works (during Operations) 3. If current controls to existing threats are sufficient taking into account the proposed
works and any Location Class changes which may arise (Loc Specific and Non-Loc Specific Threats)
The above is a License and AS2885 requirement for the Parmelia Gas Pipeline.
The purpose of the Safety Management Study it to ensure the continued safe operation of the pipeline and safety of those in the surrounding area from the pipeline.
An initial Safety Management Study was performed in December of 2018 for Burgess Design Group. However, since then a new road crossing of the PGP as well as minor changes to the Structure Plan have been proposed. As such, a second workshop was performed in order to update the Safety Management Study accordingly against the revised Structure Plan.
7.1 Excluded from Scope
The following items are excluded from the Scope:
Construction HAZID
Formal ALARP Assessment (Performed Post Workshop as Required)
Assessment of the any other gas pipelines
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 8
8.0 METHODOLOGY
The Location Classification Review was performed by assessing each pipeline section and utilising local knowledge of relevant personnel within the workshop to establish the land use for each section. Location Class was assigned in accordance with AS2885.6.
The Safety Management Study Workshop was performed in accordance with AS2885 (Sections 0 / 1 / 3 / 6) and the process outlined in the Terms of Reference Document No: TOR-JDSI-1469. The Terms of Reference document is attached in Appendix D and should be referred to where further information is required.
Documentation utilised during the workshop included the reference documentation as listed in Section 2.0.
8.1 Assumptions
All information supplied is a true and accurate representation of the relevant pipeline details and proposed development works.
9.0 WORKSHOP SCHEDULE
The Safety Management Study was conducted in the APA Group Perth Office located at Eastpoint Plaza, Adelaide Tce Perth, WA per the details below.
Date Detail Start Finish
6th December 2018 SMS Workshop #1 9:00 am 2:00 pm
25th July 2019 SMS Workshop #2 9:00 am 12:00 pm
Table 4: Workshop Schedule
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 9
10.0 ATTENDEES
The attendees for the two workshops are listed in the tables below.
Prior to commencement of the workshops, the group confirmed that all required parties were present to allow the Safety Management Study to be performed.
Name Initials Position Company
Developer’s Consultant – BDG
Mark Szabo MS Associate Director BDG
Mitchell Bisby MB Senior Designer BDG
Owner & Operator – APA
Gerry Connell GC Technical Officer APA Group
Adam Crichton AC Risk Engineer APA Group
Andre Schmitz AS Corridor Protection APA Group
Bill Ivory BI Corridor Protection Lead WA & NT APA Group
Facilitator - Pipeline Integrity
Rob Thornton RT Independent Facilitator & Scribe Pipeline Integrity
Table 5: Workshop #1 Attendees
Name Initials Position Company
Developer’s Consultant – JDSI
David Hellmuth DH Director JDSI Consulting Engineers
Owner & Operator – APA
Gerry Connell GC Technical Officer APA Group
Adam Crichton AC Risk / Pipeline Engineer APA Group
Warren Guthrie WG Regional Manager – PGP South APA Group
Facilitator - Pipeline Integrity
Rob Thornton RT Independent Facilitator & Scribe Pipeline Integrity
Table 6: Workshop #2 Attendees
A copy of the Attendance Sign on Sheets are attached in Appendix C.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 10
11.0 LOCATION CLASSIFICATION REVIEW
A Location Classification Review was performed for the relevant section of the Parmelia Gas Pipeline as part of the SMS Workshop. The Location Classification Review was performed in accordance with AS2885.6 - 2018.
A copy of the Location Classification Review is attached in Appendix A.
The Results of the Location Classification Review are summarised below.
Section Pipeline Kilometre Post (kilometre)
Current Location
Classification
Revised Location
Classification
Start Finish Primary Secondary Primary Secondary
1 PGP Gnangara Rd
(KP - 305.977)
Park Street
(KP -
308.048)
T1
Residential -
Remains at
T1
Residential
-
Table 7: Location Classification Review
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 11
12.0 RESULTS
The results of the Safety Management Study Workshop were recorded using a spread sheet based logging tool and included assessment of the following:
Construction Activities and Threats to Pipeline
New Location Specific Threats (from Proposed Works during Operations)
Location Specific Threats (Existing which needs to be assessed based on a Location Class Change)
Non Location Specific Threats (During Operations which could result in a Failure Event. Assessed based on changes to Location Class which could potentially affect consequences and risk analysis)
A copy of the results is attached in Appendix B.
12.1 Major Accident Events
Major Accident Events (MAE) describes those hazards which could result in multiple fatalities. There were 3 Major Accident Events identified during the Safety Management Study and are summarised below.
Job
Step
ID
Loc.
Description
Kilometre
Point Threat Description
Additional Controls
/ Actions Risk Level
Construction Activities and Threats to Pipeline
C - 11
Gnangara
Road to Park
Street
305.977 to
308.048 Open Trenching
Refer actions 16, 17,
18, 19, 20 in Table 9
Failure not
credible once
slab is installed
C - 12
Gnangara
Road to Park
Street
305.977 to
308.048
Micro-tunnelling of
service installation
under gas pipeline
(likely to be sewer or
storm water only)
Refer action 25 in
Table 9
Intermediate
(Catastrophic,
Hypothetical)
New & Existing Location Specific Threats (During Operations)
LS –
10
Gnangara
Road to Park
Street
305.977 to
308.048 Installation of Bores
Refer to action 23 in
Table 9
Intermediate
(Catastrophic,
Hypothetical)
Table 8: MAE Summary
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 12
12.2 Formal ALARP Assessment
Formal ALARP Assessments are required for the following threats:
Major Accident Events
Threats with Risk Levels of Intermediate or higher
Prior to additional controls being specified, Item ID C-11 (Open Trenching) was identified as a Major Accident Event with a Risk Level of Intermediate or Higher. With the additional controls that were specified, Failure was considered no longer possible for C-11, hence Formal ALARP Assessment is not required.
Three hazards were identified during the workshop which require a Formal ALARP Assessment, a summary is provided below.
Job
Step
ID
Loc.
Description
Kilometre
Point Threat Description
Additional Controls
/ Actions Risk Level
Construction Activities and Threats to Pipeline
C – 8
Gnangara
Road to Park
Street
305.977 to
308.048
Auguring for Light Pole
Installation
Refer action 12 in
Table 9
Intermediate
(Major, Remote)
C - 12
Gnangara
Road to Park
Street
305.977 to
308.048
Micro-tunnelling of
service installation
under gas pipeline
(likely to be sewer or
storm water only)
Refer action 25 in
Table 9
Intermediate
(Catastrophic,
Hypothetical)
New & Existing Location Specific Threats (During Operations)
LS –
10
Gnangara
Road to Park
Street
305.977 to
308.048 Installation of Bores
Refer to action 23 in
Table 9
Intermediate
(Catastrophic,
Hypothetical)
Table 9: ALARP Summary
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 13
12.3 Actions
The Actions from the Safety Management Study and Location Classification Review Workshop were also recorded using a spread sheet based logging tool.
27 Actions were raised during the Safety Management Study and Location Classification Review Workshop. A summary is outlined in the table below.
Item
ID
Lo
cati
on
Pip
elin
e
Feature
Description
Threat
Description
Action / Control
Measure
Acti
on
ee
Date
Required
Construction Activities and Threats to Pipeline
C-1
Gnangara
Road to
Park
Street
PGP General
Road Legal
Vehicles
crossing the
Gas Pipeline
1. Ensure designated
vehicle & equipment
crossing points are
installed across the gas
pipeline and build up
cover to 1200mm at this
location
MS
Prior to
Works
C-2
Gnangara
Road to
Park
Street
PGP General
Non - Road
Legal Vehicles /
Equipment
crossing the
Gas Pipeline
2. Details of all Non Road
Legal Vehicles and
equipment to cross the
gas pipeline easement
are to be submitted to
APA Group for
assessment prior to
commencing works
3. Refer to action 1 above
regarding crossing points
MS Prior to
Works
C-3
Gnangara
Road to
Park
Street
PGP
Installation of
Offices and Set
Up of Lay Down
Areas
Equipment /
Building loads
over the
Pipeline
4. No Equipment / Offices
or Laydown areas to be
established on the
Pipeline Easement
MS Duration
of Works
C-4
Gnangara
Road to
Park
Street
PGP Survey and
Marking
Installation of
Survey Pegs
(Including
Marking of
Pipeline
Easement)
5. Survey of the PGP
(incl. potholing) to be
performed by Approved
Contractor under APA
PTW System
6. The PGP corridor is be
surveyed and pegged out
with Hi Viz Rope Flagged
Fence prior to any site
MS
MS
Prior to
Works
Prior to
Works
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 14
Item
ID
Lo
cati
on
Pip
elin
e
Feature
Description
Threat
Description
Action / Control
Measure
Acti
on
ee
Date
Required
clearing / earthworks
commencing
7. All works on Pipeline
Easement to be under
APA PTW System and all
works adjacent to Pipeline
Easement to be under
Third Party Works
Authorisation
8. APA to confirm marker
sign spacing is in
accordance with required
Location Class
Requirements and rectify
as required
MS
GC
Duration
of Works
Prior to
Works
C-5
Gnangara
Road to
Park
Street
PGP
Clearing and
Grubbing (minor
vegetation,
bushes, trees)
Entangled
vegetation roots
around pipeline
9. Any trees to be
removed on Pipeline
Easement to be removed
under APA PTW
requirements
MS At time of
Works
C -6
Gnangara
Road to
Park
Street
PGP Earthworks
Excavation /
Removal of
Cover (Clear
and Grade, Strip
Top Soil,
Landscaping
Works,
Establishing Site
Levels)
10. Refer actions above
regarding Flagging of
Easement
C-7
Gnangara
Road to
Park
Street
PGP Earthworks
Auguring for
Bollard / Fence
Post Installation
11. Refer actions above
C-8
Gnangara
Road to
Park
Street
PGP Earthworks
Auguring for
Light Pole
Installation
12. Refer existing ALARP
Assessment and actions
above
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 15
Item
ID
Lo
cati
on
Pip
elin
e
Feature
Description
Threat
Description
Action / Control
Measure
Acti
on
ee
Date
Required
C - 10
Gnangara
Road to
Park
Street
PGP
Earthworks -
Compaction
Activities
(Development
and at Road
Crossings)
Compaction /
Vibrations from
Equipment
13. There must be no
vibrating compaction used
within 10 metres of the
Gas Pipeline and only
static rollers or light walk
behind plate compactors
(600mm x 600mm
maximum plate size) are
to be utilised within 10
metres either side of the
Gas Pipeline
14. BDG to provide
proposed vibratory
equipment for approval for
works within 10m of gas
pipeline
15. Refer additional
actions above
MS
MS
Duration
of Works
Prior to
Works
C - 11
Gnangara
Road to
Park
Street
PGP
Buried Service
Installation:
Lighting cables,
Power, Water,
Gas,
Communication,
Drainage,
Sewer, Irrigation
for Landscaping
Open Trenching
16. Excavator Size limited
to 10 Tonne and GP
Teeth Only
17. Refer to Actions
above regarding works on
Pipeline Easement
18. Install Concrete Slabs
under road and in road
reserve prior to additional
services going in.
19. APA to provide details
of slabbing requirements
20. Any major services
crossing pipeline including
Sewer, Water Mains etc
will require a slab over the
Pipeline
MS
MS
GC
MS
Duration
of Works
Prior to
Road Construction
Prior to
Works
Prior to
Road Construction
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 16
Item
ID
Lo
cati
on
Pip
elin
e
Feature
Description
Threat
Description
Action / Control
Measure
Acti
on
ee
Date
Required
C - 12
Gnangara
Road to
Park
Street
PGP
Service
Installation:
Lighting cables,
Power, Water,
Gas
Communication,
Drainage,
Sewer
Micro tunnelling
of service
installation
under gas
pipeline (likely to
be sewer or
storm water
only)
25. Refer to Actions
regarding works on
Pipeline Easement.
MS/
DH
Prior to
Works
C - 13
Gnangara
Road to
Park
Street
PGP
Construction
Activities for:
Roadworks,
Concrete
footpaths,
Landscaping,
Hardscaping
(Retaining
Walls, Fencing
etc)
No additional
threats
identified.
Threats from
these activities
covered under
threat
assessments
above (eg.
Excavation,
Compaction,
Vehicle Loads)
21. Excavation, Inspection
and Recoating of Pipeline
required at new road
crossing location
TBC Prior to
Road Construction
New & Existing Loc Specific Threats (During Operations)
LS - 6
Gnangara
Road to
Park
Street
PGP
Buried Services
(Existing or
New) at Road
Crossing
Excavation and
Maintenance of
services at
Road Crossings
22. Refer action above regarding requirement for slabs at road crossings
LS –
6A/B/C
Gnangara
Road to
Park
Street
PGP
New Buried
Services and
New Road
Crossing of
PGP - at POS14
connecting
Brooklands
Drive to Park St
Vehicle Loads,
Maintenance
Activities
including: road
widening,
grading, open
drain, clearing
and vibratory
compaction.
Excavation and
Maintenance
services at
Road Crossings
26. Install Slabs above gas pipeline at new
service crossing locations and new road crossing
location (under road and either side).
APA to provide details of required slab.
DH/
GC
Prior to
Works
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 17
Item
ID
Lo
cati
on
Pip
elin
e
Feature
Description
Threat
Description
Action / Control
Measure
Acti
on
ee
Date
Required
LS - 10
Gnangara
Road to
Park
Street
PGP Public Open
Space
Installation of
Bores
23. Consider improving
liaison and signage
27. 100m is the maximum
preferred sign spacing.
Anything beyond 100m to
be approved by APA
Group.
GC
MH
Prior to
Works
Prior to
Works
LS - 16
Gnangara
Road to
Park
Street
PGP
Electrical
Transformers
and Equipment
Refer to action
24. Details of Electrical
Equipment and
Transformers to be
submitted to APA for
assessment to confirm
compliance with AS4853
BDG /
APA
Prior to
Electrical
Equipment
Installation
Table 10: Action Item Summary
For further details of the actions raised, please refer to Appendix B.
The Actions were assigned only to persons in the Safety Management Study Workshop with a view that they could be re-assigned to a relevant team member following consultation with the person concerned.
An estimated target date has been assigned during the workshop. This may be updated following review and approval of the action plan developed.
The above will allow the Safety Management Study to be closed out and the actions to be performed as a separate item.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 18
13.0 CONCLUSION
The AS2885 Safety Management Study and Location Classification Review Workshop for the Parmelia Gas Pipeline in the location of the proposed development at Brooklands Estate, Henley Brook has been successfully completed in accordance with the Terms of Reference Document No: TOR-JDSI-1469 and AS2885.
All identified threats to and from the Parmelia Gas Pipeline from the proposed development were assessed with 27 Actions raised to ensure the on-going safe operation of the Pipeline. There were also 3 hazards identified which require a Formal ALARP Assessment.
Upon completion of these actions and Formal ALARP Assessments, all threats to and from the Pipeline from the proposed development are considered to be adequately controlled and managed as per the requirements of the Terms of Reference and AS2885.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 19
APPENDIX A: LOCATION CLASSIFICATION REVIEW RESULTS
Document No: LCR-BDG-1309, Rev B
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AS2885 LOCATION CLASSIFICATION REVIEWDoc No: LCR-BDG-1309 Rev: B
Note: Changes made in Session #2 are in blue
MAOP
Measurement Length @ MAOP
(4.7kW/m2
Radiation Contour)
(See Note 2)
Development / Encroachment within Measurement Length
Location ClassChange
Start Finish MPa metre Primary Secondary Yes / No Yes / No Primary Secondary
1Parmelia
Gas Pipeline
Gnangara Rd(KP -
305.977)
Park Street (KP - 308.048)
101-D-L-39 7.48 300mT1
Residential -
YesBrooklands Estate, Henley Brook Residential Development(Refer Development Structure Plan for details)
Session #2Assessed updated Structure Plan which includes:- Possible Future Lifestyle Village- New Road Crossing of PGP and Buried Services Crossings of PGP at POS14 connecting Brooklands Drive to Park St- Change in location of Primary Schools (x2) (but outside PGP 4.7kW/m2 radiation contour)
No - -
DBP corridor discussed and CIC deemed not required as its in its
own Easement.
Lifestyle Village location acceptable subject to not including
a Aged Care Facility.
-
Note 2: Radiation Contour is as per Parmelia Gas Pipeline 2018 AS2885 SMS Workshop Report (Appendix 4 - Section ID 2)
Action
Note 1: Current Location Class for PGP is as per Parmelia Gas Pipeline 2018 AS2885 SMS Workshop Report (Appendix 5 - Section ID 10 - Ellenbrook South)
BROOKLANDS ESTATE, HENLEY BROOK DEVELOPMENT
SectionKilometre Post (kilometre)
Alignment Sheet
Drawing No:
Current Location Classification(See Note 1)
Revised Location Classification NotePipeline
1 of 1
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 20
APPENDIX B: AS2885 SAFETY MANAGEMENT STUDY RESULTS
Document No: RA-BDG-1310, Rev B
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AS2885 SMS RISK ASSESSMENT
BROOKLANDS, HENLEY BROOK DEVELOPMENT
Doc. No: RA-BDG-1310, Rev B Note: Changes made in Session #2 are in blue
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Wall Thickness Marking 1. Ensure designated vehicle & equipment crossing points are installed across the gas pipeline and build up cover to 1200mm at this location
MS Prior to Works
Burial Liaison
Burial Marking 2. Details of all Non Road Legal Vehicles and equipment to cross the gas pipeline easement are to be submitted to APA Group for assessment prior to commencing works
MS Prior to Works
Liaison 3. Refer to action 1 above regarding crossing points
Wall Thickness Marking 4. No Equipment / Offices or Laydown areas to be established on the Pipeline Easement
MS Duration of Works
Burial Liaison
Wall Thickness Marking 5. Survey of the PGP (incl. pot-holing) to be performed by Approved Contractor under APA PTW System
MS Prior to Works
Burial DBYD 6. The PGP corridor is be surveyed and pegged out with Hi Viz Rope Flagged Fence prior to any site clearing / earthworks commencing
MS Prior to Works
Liaison 7. All works on Pipeline Easement to be under APA PTW System and all works adjacent to Pipeline Easement to be under Third Party Works Authorisation
MS Duration of Works
8. APA to confirm marker sign spacing is in accordance with required Location Class Requirements and rectify as required
GC Prior to Works
Marking 9. Any trees to be removed on Pipeline Easement under APA PTW requirements
MS At time of Works
Liaison
APA PTW and Procedures
Marking 10. Refer actions above regarding Flagging of Easement
DBYDAPA PTW and ProceduresLiaison
Burial Marking 11. Refer actions above
Wall Thickness DBYDLiaison
Marking 12. Refer existing ALARP Assessment and actions above
DBYDLiaison
Wall Thickness LiaisonAPA Procedures
APA PTW & Procedures 13. There must be no vibrating compaction used within 10 metres of the Gas Pipeline and only static rollers or light walk behind plate compactors (600mm x 600mm maximum plate size) are to be utilised within 10 metres either side of the Gas Pipeline
MS Duration of Works
Liaison 14. BDG to provide proposed vibratory equipment for approval for works within 10m of gas pipeline
MS Prior to Works
15. Refer additional actions above
Marking 16. Excavator Size limited to 10 Tonne and GP Teeth Only
MS Duration of Works
DBYD 17. Refer to Actions above regarding works on Pipeline Easement
APA PTW and Procedures 18. Install Concrete Slabs under road and in road reserve prior to additional services going in.
MS Prior to Road Road Construction
Liaison 19. APA to provide details of slabbing requirements
GC Prior to Works
Pot Holing 20. Any major services crossing pipeline including Sewer, Water Mains etc. will require a slab over the Pipeline
MS During Construction Works
Marking 25. Refer to Actions above regarding works on Pipeline Easement
MS/DH Prior to Works
DBYD
APA PTW and Procedures
Liaison
Pot Holing
21. Excavation, Inspection and Recoating of Pipeline required at new road crossing location
TBC Prior to Road Construction
PGP 305.977 to 308.048
YesT1 YesM
ajor
Construction Activities for: - Roadworks - Concrete footpaths- Landscaping- Hardscaping (Retaining Walls, Fencing etc.)
No additional threats identified Threats from these activities covered under threat assessments above (e.g. Excavation, Compaction, Vehicle Loads)
Neg
ligib
le
Neg
ligib
le
Yes
Yes
305.977 to 308.048
C - 13
C - 12
C - 10 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
PGP
C - 11
Gnangara Road to Park Street
C - 14 Gnangara Road to Park Street
Yes305.977 to 308.048
PGPGnangara Road to Park Street
Micro tunnelling of service installation under gas pipeline (likely to be sewer or storm water only)
Yes
Threat Identification
Threat DescriptionThreat Credibility
Justification Location Description Pipeline
Additional Threat ControlRisk Analysis
Kilometre Point
Lo
cati
on
Cla
ssif
icat
ion
Feature Description
Location
Physical Controls (External Interference
protection if applicable)
Yes
Is Threat Credible?
Installation of Survey Pegs (Including Marking of Pipeline Easement)
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
No Yes
Gnangara Road to Park Street
PGP 305.977 to 308.048
Yes
No
No
Sev
ere
Sev
ere
Min
or
Consequence Severity
Failure Mode and Consequences (Refer
AS2885.6 Section 3.4 for guidance)
Rem
ote
N/A
Sev
ere
N/A
Sev
ere
Triv
ial
Min
or
Min
or
N/A
Min
or
Sev
ere
Inte
rmed
iate
Neg
ligib
le
Neg
ligib
le
Cat
astr
ophi
c
Is Formal ALARP
Assessment required?
(Requirements as per AS2885.6,
Section 4)
Action Comments
Priority Date
Required
Failure Event and
ConsequenceAction / Control Measure
Act
ion
ee Failure Event Credible /
AS2885 Non-Compliance
Construction Activities and Threats to Pipeline
Consequence Severity Risk Level
Maj
or
Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Yes
Triv
ial
Min
or
Neg
ligib
le
T1 Clearing and Grubbing (minor vegetation, bushes, trees)
Yes No
Yes
Neg
ligib
le
Neg
ligib
le
Pipe buckling requiring repair
2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Item ID
Existing Threat Control
Yes Pipeline Rupture & Ignition
Hyp
othe
tical
Cat
astr
ophi
c
Sev
ere
Min
or
Maj
or
Sev
ere
Sev
ere
Inte
rmed
iate
Neg
ligib
le
Residual Risk Analysis
Is this a Major Accident Event?
Additional CommentsExt. Int. Threat?
Procedural Controls(Design and/or procedural
protection if applicable)
Required Controls for EI Threats (Physical / Procedural
/ Sign Spacing / Rupture / Energy Release)
T1/T2 require Separation & Resistance to Penetration. Refer AS2885.6 Sect 5.4.4
Failure Event Credible /
AS2885 Non-Compliance
Rem
ote
Dent and Gouge requiring repair
C -6
Rem
ote
N/A
Fre
qu
ency
Risk Level
Fre
qu
encyIs Risk
Acceptable or ALARP?
No
C-7 Auguring for Bollard / Fence Post Installation
EarthworksT1
Gnangara Road to Park Street
Neg
ligib
le
PGP
2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Yes
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
305.977 to 308.048
T1 Earthworks Excavation / Removal of Cover (Clear and Grade, Strip Top Soil, Landscaping Works, Establishing Site Levels)
Yes
Is this a Major
Accident Event?
Is Risk Acceptable or
ALARP?
Is Formal ALARP
Assessment required?
Low
Low
Min
or
Pipeline Rupture & Ignition
Hyp
othe
tical
Cat
astr
ophi
c
Sev
ere
Min
or
Pipeline Rupture & Ignition
Hyp
othe
tical
No
NoNo
YesNo
Neg
ligib
le
Neg
ligib
le
Neg
ligib
le
Yes Yes No
Sev
ere
Sev
ere
Inte
rmed
iate
Failure not credible once slab is installed
N/A
Sev
ere
N/A
Low
Neg
ligib
le
Neg
ligib
le
No Yes
Low
Neg
ligib
le
Neg
ligib
le
Yes Yes YesGnangara Road to Park Street
PGP 305.977 to 308.048
T1 Service Installation - Lighting cables- Power- Water- Gas- Communication- Drainage - Sewer
T1
T1 Installation of Services within roads:- Electrical and Communications- Water, Drainage
No additional threats identified Threats from these activities covered under threat assessments above (e.g. Excavation, Compaction, Vehicle Loads)
Neg
ligib
le
No Yes No
Yes No
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1
305.977 to 308.048
T1 Earthworks - Compaction Activities (Development and at Road Crossings)
Compaction / Vibrations from Equipment
Yes YesGnangara Road to Park Street
C-9 Earthworks - Import of Fill (approx. maximum of 0.5m additional cover over pipeline)
Loads on Pipeline
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Installation of Offices and Set Up of Lay Down Areas
Equipment / Building loads over the Pipeline
Triv
ial
Min
or
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Survey and Marking
2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Neg
ligib
le
Neg
ligib
le
No
Gnangara Road to Park Street
PGP
C-1 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 General Road Legal Vehicles crossing the Gas Pipeline
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
Neg
ligib
le
Neg
ligib
le
C-2 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 General Non - Road Legal Vehicles / Equipment crossing the Gas Pipeline
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Yes Pipeline Dent requiring repair
C-5 Entangled vegetation roots around pipeline
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Yes
C-3
305.977 to 308.048
Low
Low
C-4
Buried Service Installation - Lighting cables- Power- Water- Gas- Communication- Drainage - Sewer- Irrigation for Landscaping
Open Trenching
PGP
C-8 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Earthworks Auguring for Light Pole Installation
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Yes Minor Leak (from Pilot Drill) with potential ignition
Rem
ote
Maj
or
Sev
ere
Min
or
Sev
ere
Min
or
Min
or
Inte
rmed
iate
Low
Neg
ligib
le
Low
Neg
ligib
le
Neg
ligib
le
No Yes Yes
Page 1 of 3
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Threat Identification
Threat DescriptionThreat Credibility
Justification Location Description Pipeline
Additional Threat ControlRisk Analysis
Kilometre Point
Lo
cati
on
Cla
ssif
icat
ion
Feature Description
Location
Physical Controls (External Interference
protection if applicable)
Is Threat Credible?
Consequence Severity
Failure Mode and Consequences (Refer
AS2885.6 Section 3.4 for guidance)
Is Formal ALARP
Assessment required?
(Requirements as per AS2885.6,
Section 4)
Action Comments
Priority Date
Required
Failure Event and
ConsequenceAction / Control Measure
Act
ion
ee Failure Event Credible /
AS2885 Non-Compliance
Consequence Severity Risk Level
Item ID
Existing Threat Control Residual Risk Analysis
Is this a Major Accident Event?
Additional CommentsExt. Int. Threat?
Procedural Controls(Design and/or procedural
protection if applicable)
Required Controls for EI Threats (Physical / Procedural
/ Sign Spacing / Rupture / Energy Release)
T1/T2 require Separation & Resistance to Penetration. Refer AS2885.6 Sect 5.4.4
Failure Event Credible /
AS2885 Non-Compliance F
req
uen
cy
Risk Level
Fre
qu
encyIs Risk
Acceptable or ALARP?
Is this a Major
Accident Event?
Is Risk Acceptable or
ALARP?
Is Formal ALARP
Assessment required?
Burial MarkingWall Thickness Patrolling
DBYDLiaison
Burial MarkingWall Thickness Patrolling
DBYDLiaison
Burial PatrollingWall Thickness InspectionsSlab
Burial LiaisonWall Thickness PatrollingSlab DBYD
Burial Marking 22. Refer action above regarding requirement for slabs at road crossings
Slab PatrollingDBYDLiaison
Burial Patrolling 26. Install Slabs above gas pipeline at new service crossing locations and new road crossing location (under road and either side).APA to provide details of required slab.
DH/GC Prior to works
Wall Thickness InspectionsSlab
Burial Liaison 26. Install Slabs above gas pipeline at new service crossing locations and new road crossing location (under road and either side).APA to provide details of required slab.
DH/GC Prior to works
Slab PatrollingDBYD
Burial Marking 26. Install Slabs above gas pipeline at new service crossing locations and new road crossing location (under road and either side).APA to provide details of required slab.
DH/GC Prior to works
Slab PatrollingDBYDLiaison
Wall Thickness Marking
Burial PatrollingLiaison
Wall Thickness Marking
Burial PatrollingLiaison
Wall Thickness Marking
Burial PatrollingLiaison
Marking 23. Consider improving liaison and signage GC Prior to Works
Liaison 27. 100m is the maximum preferred sign spacing. Anything beyond 100m to be approved by APA Group.
DH Prior to Works
DBYDPatrolling
Wall Thickness Patrolling
Burial LiaisonDBYD
Slab Marking
PatrollingDBYDLiaison
LS - 6C Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 New Buried Services at New Road Crossing of PGP - at POS14 connecting Brooklands Drive to Park St
Session #2 - 25/7/19
Excavation and Maintenance of services at Road Crossings
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
No
Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
T1 Major Service Crossing under Gas Pipeline (with Slabs Installed above Gas Pipeline) (incl. Sewer, Water Main or Drain)
No
LS - 6A Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 New Road Crossing of PGP -at POS14 connecting Brooklands Drive to Park St
Session #2 - 25/7/19
Vehicle Loads Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
LS - 6B
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Public Open Space - Drainage infrastructure located outside Pipeline Easement, however draining overflow into easement
Drainage overflow into easement and potential erosion.
Hyp
othe
tical
LS - 11 Yes No
Gnangara Road to Park Street
PGP 305.977 to 308.048
2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
Yes
No
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Public Open Space Maintenance Activities (Irrigation repairs, Mowing etc.)
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 New Road Crossing of PGP -at POS14 connecting Brooklands Drive to Park St
Session #2 - 25/7/19
Maintenance activities impacting pipeline including road widening, grading, open drain clearing and vibratory compaction
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
Gnangara Road to Park Street
PGP
Maintenance activities impacting pipeline including road widening, grading, open drain clearing and vibratory compaction
Rupture with potential ignition
Drainage Basin outside of Pipeline Easement
Maintenance Activities No Drainage Basins outside of Pipeline Easement
T1
Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
Min
or
Sev
ere
LS - 3 Gnangara Road to Park Street
Yes
PGP 305.977 to 308.048
T1 Public Open Space
LS - 4 T1 New Road Crossing - x3 to 4 Roads being upgraded
Vehicle Loads Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
New Road Crossing - x3 to 4 Roads being upgraded
LS - 9
No
305.977 to 308.048
305.977 to 308.048
LS - 7 Gnangara Road to Park Street
Road Legal Vehicle Loads (Although no tracks expected)
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
LS - 5 Gnangara Road to Park Street
PGP T1
Pedestrian Paths Maintenance activities impacting pipeline
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
LS - 15 POS over Pipeline Easement
Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Fencing / Bollards Installation / Maintenance activities impacting pipeline
Yes
PGP 305.977 to 308.048
T1
Cat
astr
ophi
c
Sev
ere
Min
or
Maj
or
New & Existing Loc Specific Threats (During Operations)
Inte
rmed
iate
Neg
ligib
le
Neg
ligib
le
Low
Neg
ligib
le
Neg
ligib
le
YesLS - 10 Gnangara Road to Park Street
LS - 13 Gnangara Road to Park Street
LS - 12
LS - 6 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Buried Services (Existing or New) at Road Crossing
Excavation and Maintenance of services at Road Crossings
Yes
Excavation and Maintenance Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
PGP 305.977 to 308.048
T1 Public Open Space Installation of Bores Yes
No
LS - 14 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Drainage Basin Flooding of Easement No Drainage basins designed for 1 in 1 year flood and outside of the easement
LS - 8 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Public Open Space Fencing Maintenance / Bollards
Yes Yes 2 Phys / 2 Proc / 100m / No Rupture / 10 GJ/s
No
PGP 305.977 to 308.048
T1 Access along Pipeline by APA Group
Access restricted
Subject to ALARP Assessment which is to be performed
Yes
PGP 305.977 to 308.048
YesYes
LS - 1 Gnangara Road to Park Street
LS - 2 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 Residential Landowner Activities (Abutting Easement)
Fence Maintenance, Reticulation, Mowing, Gardening, Bores, Pergolas, Cultivating, Horticulture Activity and External Building Construction
No Separation between Residence Fence and Pipeline of approx. 10m
Page 2 of 3
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Peo
ple
Com
mer
cial
or
Sup
ply
Env
ironm
ent
Rep
utat
ion
or
Reg
ulat
ory
Bus
ines
s C
ontin
uity
Ass
ets
or P
rofit
abili
ty
Threat Identification
Threat DescriptionThreat Credibility
Justification Location Description Pipeline
Additional Threat ControlRisk Analysis
Kilometre Point
Lo
cati
on
Cla
ssif
icat
ion
Feature Description
Location
Physical Controls (External Interference
protection if applicable)
Is Threat Credible?
Consequence Severity
Failure Mode and Consequences (Refer
AS2885.6 Section 3.4 for guidance)
Is Formal ALARP
Assessment required?
(Requirements as per AS2885.6,
Section 4)
Action Comments
Priority Date
Required
Failure Event and
ConsequenceAction / Control Measure
Act
ion
ee Failure Event Credible /
AS2885 Non-Compliance
Consequence Severity Risk Level
Item ID
Existing Threat Control Residual Risk Analysis
Is this a Major Accident Event?
Additional CommentsExt. Int. Threat?
Procedural Controls(Design and/or procedural
protection if applicable)
Required Controls for EI Threats (Physical / Procedural
/ Sign Spacing / Rupture / Energy Release)
T1/T2 require Separation & Resistance to Penetration. Refer AS2885.6 Sect 5.4.4
Failure Event Credible /
AS2885 Non-Compliance F
req
uen
cy
Risk Level
Fre
qu
encyIs Risk
Acceptable or ALARP?
Is this a Major
Accident Event?
Is Risk Acceptable or
ALARP?
Is Formal ALARP
Assessment required?
24. Details of Electrical Equipment and Transformers to be submitted to APA for assessment to confirm compliance with AS4853
BDG / APA
Prior to Electrical Equipment Installation
Non Location Specific Threats (During Operations which could result in a Failure Event) - No Change to Location Class Wall Thickness In-Line InspectionCathodic Protection InspectionsPipe Coating Patrolling
Odorised GasDCVG Survey
NLS - 3 Gnangara Road to Park Street
PGP 305.977 to 308.048
T1 N/A Failure of Threat Control Measures - All Controls Fail - Leading to a Failure Event (as per AS2885.6 Sect 3.7, Control Failure Check)
No Failure Event, LS-10, already assessed so no further assessment required for All Controls Fail
PGP 305.977 to 308.048
T1 Electrical Transformers and Equipment
Refer to action Yes Refer to Action
NLS - 1 Gnangara Road to Park Street
Low
Neg
ligib
le
Neg
ligib
le
Leak (pin hole expected with no ignition)
Rem
ote
Yes NoNo
No
Low
NLS - 2 305.977 to 308.048
Internal CorrosionGnangara Road to Park Street
N/A
Sev
ere
Min
or
Sev
ere
Min
or
Min
or
Gnangara Road to Park Street
LS - 16
NoYes
No active internal corrosion on pipeline as evident by ILI
T1 N/A
305.977 to 308.048
PGP
Neg
ligib
le
PGP
T1 N/A External Corrosion Yes
Page 3 of 3
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 21
APPENDIX C: SIGN ON SHEETS
Workshop Session #1
Workshop Session #2
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 22
APPENDIX D: REFERENCE DOCUMENTS
Terms of Reference Document (Doc No: TOR-JDSI-1469)
SMS Guide Words
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERS
BROOKLANDS, HENLEY BROOK DEVELOPMENT
APA GROUP
PARMELIA GAS PIPELINE
AS2885 SAFETY MANAGEMENT STUDY WORKSHOP
TERMS OF REFERENCE
Document No: TOR-JDSI-1469Rev Date Description Prepared Checked Approved Licensee
0 18/07/2019 Issued for Use R Thornton
B Watters R Thornton
Snr Pipeline Engineer
Project Officer Snr Pipeline Engineer
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 i
Disclaimer
1. Whilst the information contained in this document is considered to be true and correct at the date of publication, changes in circumstances after the time of publication may impact on the accuracy of the information. The information may change without notice and Pipeline Integrity Pty Ltd is not in any way liable for the accuracy of any information printed and stored or in any way interpreted and used by a user.
2. Whilst the information contained in this document has been presented with all due care, Pipeline Integrity Pty Ltd does not warrant or represent that the information is free from errors or omission.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 ii
CONTENTS
1.0 TABLE OF ABBREVIATIONS AND TERMS ................................................................ 4
2.0 REFERENCES ............................................................................................................. 5
3.0 SCOPE ......................................................................................................................... 6
3.1 Excluded from Scope .................................................................................................... 6
4.0 PIPELINE OVERVIEW ................................................................................................. 7
5.0 PROPOSED DEVELOPMENT OVERVIEW ................................................................ 8
5.1 Proposed Construction Activities ................................................................................... 9
6.0 ATTENDEES, VENUE & WORKSHOP SCHEDULE ................................................. 10
7.0 TERMS OF REFERENCE ......................................................................................... 11
7.1 Safety Management Study Facilitator ......................................................................... 11
7.2 Process ....................................................................................................................... 11
7.3 Preparation .................................................................................................................. 12
7.4 Workshop .................................................................................................................... 13
7.5 Reporting ..................................................................................................................... 15
7.6 Management of Actions ............................................................................................... 15
APPENDIX A: RISK MATRIX ............................................................................................... 16
APPENDIX B: PROPOSED DEVELOPMENT DRAWINGS ................................................. 17
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 iii
LIST OF FIGURES
Figure 1: SMS Workshop Process ........................................................................................ 13
LIST OF TABLES
Table 1: Abbreviations and Terms used in the body of the Report ......................................... 4
Table 2: Reference Documents .............................................................................................. 5
Table 3: Pipeline Overview ..................................................................................................... 7
Table 4: Proposed Works Drawings ....................................................................................... 8
Table 5: Workshop Schedule ................................................................................................ 10
Table 6: Proposed Workshop Attendees .............................................................................. 10
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 4
1.0 TABLE OF ABBREVIATIONS AND TERMS
Abbreviation / Term
Description
ALARP Risk associated with a Threat is deemed ALARP if the threat is controlled, or the residual risk is assessed to be low or negligible, or the residual risk is assessed to be intermediate and is formally demonstrated to be ALARP. (AS2885.0 Section 1.5.3)
JDSI JDSI Consulting Engineers KP Kilometre Point MAE A Major Accident Event (MAE) is defined as “an event connected with a
pipeline operation, including a natural event, having the potential to cause multiple fatalities of persons engaged in the operation or other protected persons”. (AS2885.3 Appendix E2)
MAOP Maximum Allowable Operating Pressure Multiple More than two (with respect to MAE) Non-Credible Threat Threat for which the likelihood of occurrence is so low that it does not exist
for any practical purpose at that location. (AS2885.0 Section 1.5.43) PGP Parmelia Gas Pipeline SMS Safety Management Study TOR Terms of Reference
Table 1: Abbreviations and Terms used in the body of the Report
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 5
2.0 REFERENCES
Table 2: Reference Documents
Document Number Title Standards AS2885.0 - 2018 Pipelines Gas and Liquid Petroleum, Part 0 – General Requirements AS2885.1 - 2018 Pipelines Gas and Liquid Petroleum, Part 1 – Design and Construction AS2885.3 - 2012 Pipelines Gas and Liquid Petroleum, Part 3 – Operation & Maintenance AS2885.6 - 2018 Pipelines Gas and Liquid Petroleum, Part 6 – Pipeline Safety Management AS ISO 31000 Risk Management – Principles and Guidelines Documents PGP.2373-RP-HSE-0001 Parmelia Gas Pipeline System 2018 AS2885 SMS Workshop Report R-BDG-1336 Brooklands Estate Initial Safety Management Study Workshop Report AS2885.6 - 2018 AS2885.6-2018 Risk Assessment Matrix R-PI-453 SMS Guide Words Drawings PRO BRO 03-011-01 (Date: 26.06.19)
Structure Plan Map - Brooklands Estate
MIRHB-1-008A (Rev A, Date: 6/6/2019)
Proposed Lot Typology Plan - Brooklands Estate
N/A Aerial Photograph - Brooklands Estate
N/A Locality Plan - Brooklands Estate
N/A Aerial Photograph with Pipeline Centreline - Brooklands Estate
101-D-L-39 PGP Alignment Sheet
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 6
3.0 SCOPE
The Scope of this Terms of Reference document is to outline the requirements for an AS2885 Safety Management Study (SMS) Workshop and document the process for the proposed Residential Subdivision Property Development Project at Brooklands Estate, in Henley Brook.
This SMS Workshop is required to take into account the relevant section of the following existing operating pipeline:
Parmelia Gas Pipeline (Operated by APA Group) (KP305.977 KP308.048)
As part of the SMS Workshop assessment, the following is required:
1. Review of the Location Classification for the above pipeline taking into account the Proposed Works
2. Safety Management Study for the above Pipeline for the section in which the pipeline measurement length encompasses the Proposed Works (Location Specific and Non-Location Specific Threats)
The Safety Management Study is required to assess:
1. Threats to the pipeline from proposed construction activities 2. Any new threats which may exist from the proposed works (during Operations) 3. If current controls to existing threats are sufficient taking into account the proposed
works and any Location Class changes which may arise
The above is a License and AS2885 requirement for the Parmelia Gas Pipeline.
The purpose of the Safety Management Study is to ensure the continued safe operation of the pipeline and safety of those in the surrounding area from the pipeline.
An initial Safety Management Study was performed in December of 2018 for Burgess Design Group (refer Workshop Report Doc No: R-BDG-1336). However, since then a new road crossing of the PGP as well as minor changes to the Structure Plan have been proposed. As such, a second workshop needs to be performed in order to update the Safety Management Study accordingly against the revised Structure Plan.
3.1 Excluded from Scope
The following items are excluded from the Scope:
Construction HAZID Formal ALARP Assessment (Performed Post Workshop as Required). Assessment of any other Gas Pipelines.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 7
4.0 PIPELINE OVERVIEW
An overview of the Pipeline and relevant section which is to be assessed as part of the above Scope is outlined below.
Item Parmelia Pipeline
Pipeline License No 1, 2, 3
Location of Pipeline Affected by Proposed Works
Gnangara Road – KP305.977 (Start) Park Street – KP308.048 (Finish)
Product Natural Gas
Design Code AS 2885 (Originally built to ASME B31.8)
Diameter DN350
MAOP 7.48 MPa
Pipe Type API 5L X52
Wall Thickness Standard - 5.16 mm
Heavy Wall – 6.35mm
Coating Type Bonded HDPE Coating (Yellow Jacket)
Measurement Length (4.7kW/m2 Radiation Contour)
300 m (180 m to 12.6 kW/m2)
(as per 2018 SMS Workshop Report Appendix 4 – Section ID 2)
Current Location Class (Prior to Development)
T1 (No Secondary Class) (as per 2018 SMS Workshop Report Appendix 5 – Section ID
10)
Depth of Cover Generally 800mm to 1500mm
Above Ground Facilities Nil
DMP Licenced Asset Yes
Easement 50’
Table 3: Pipeline Overview
For further details refer to the drawings and documentation listed in Section 2.0.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 8
5.0 PROPOSED DEVELOPMENT OVERVIEW
JDSI Consulting Engineers are involved in the Residential Subdivision Property Development Project at Brooklands Estate, in Henley Brook.
The development will encompass the following area / roads:
Gnangara Road Pine Street Henley Brook Ave Park Street, and Lord Street
The Proposed Works are within the vicinity of the Parmelia Gas Pipeline which is operated by APA Group.
The proposed development consists of the following:
Total Site Area is approximately 135 ha Approximately 3600 dwellings with an average Lot Size of 375m2 Residential lots which include areas of:
o R30 zoning o R40 zoning o R60 zoning
Primary Schools (two) Possible Future Lifestyle Village Public Open Space (approx. 12% of Area) Foreshore Area Water Corporation Facilities (three) Roads and Installation of Services A new road crossing the PGP (at Public Open Space 14)
Note: The above areas are approximated only and subject to Final Survey and Design.
The development is encumbered by an Easement for the Parmelia Gas Pipeline (PGP). This corridor extends in a North to South direction through the development area.
Details of the proposed works are as per the following documents which are attached in Appendix B:
Table 4: Proposed Works Drawings
Document No: Title
PRO BRO 03-011-01 (Date: 26.06.19) Structure Plan Map - Brooklands Estate
MIRHB-1-008A (Rev A, Date: 6/6/2019)
Proposed Lot Typology Plan - Brooklands Estate
N/A Aerial Photograph - Brooklands Estate
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 9
5.1 Proposed Construction Activities
Details of the proposed Construction Activities in the vicinity of the Parmelia Gas Pipeline are as outlined below:
Surveying and Marking
Establishment of Site Facilities (TBC)
Earth Works o Clear and Grade o Clear and Removal of Large Trees o Import and fill o Compaction
Construction activities for:
o Roadworks o New Road crossing of the PGP o Concrete footpaths o Landscaping o Hardscaping o Fencing o Light Poles
Installation of Services (Trenching, Backfill, Compaction)
o Electrical/Power o Communications o Gas o Water o Drainage o Sewer o Irrigation for Landscaping
Note: The majority of the above activities will be performed on the Parmelia Gas Pipeline Easement.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 10
6.0 ATTENDEES, VENUE & WORKSHOP SCHEDULE
The Safety Management Study is scheduled to be conducted at the APA Group Office located at Eastpoint Plaza, Adelaide Tce Perth, WA per the details below.
Date Detail Start Finish Report Submission
25/07/2019 SMS Workshop 9:00 am 1:00 pm Draft - 1-2 weeks
Final – 1 week from receiving Draft comments
Table 5: Workshop Schedule
The proposed attendees for the workshop are listed below:
Name Initials Position Company Developer’s Consultant – JDSI Consulting Engineers
David Hellmuth DH Managing Director JDSI
Owner & Operator – APA
Gerry Connell GC Technical Officer APA Group
Adam Crichton AC Risk Engineer APA Group
Warren Guthrie WG PGP Team Leader APA Group
Facilitator – Pipeline Integrity
Rob Thornton RT Independent Facilitator & Scribe Pipeline Integrity
Table 6: Proposed Workshop Attendees
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 11
7.0 TERMS OF REFERENCE
7.1 Safety Management Study Facilitator
The Facilitator provides a key role and shall:
Be given the necessary support and authority to objectively, systematically and impartially execute the requirements of these TOR
Provide requirements to the Workshop Sponsor that are necessary to ensure that the requirements of these TOR are met, with regard to the conduct of the workshop, preparation and issuance of the necessary documents
Have suitable equipment for recording minutes of the workshop Be experienced in facilitating similar style workshops and have suitable personal
attributes in order to foster the active participation of all attendees and maintain effective time and resources management
Possess adequate and relevant technical knowledge and experience to understand and control discussion and / or facilitate resolution of issues
Liaise with the Workshop Sponsor and / or other relevant parties to plan the Workshop
Ensure the adequacy, currency and validity of all documentations, data and information prior to use in the AS2885 SMS Workshop
Lead and conduct the SMS Workshop Ensure the workshop team comprises representation by all required stakeholders,
together with a broad spectrum of experiences relevant to the design & operation of pipeline systems
Record, review, approve and distribute the workshop meeting minutes, including a record of all decisions
Produce a record of all threats (inclusive of both credible and non-credible hazards) considered and Corrective Recommendations (based on the assessed risks) identified
Prepare, approve and distribute the Workshop Report outlining and demonstrating how the purpose and requirements of these TOR are met
Have a good knowledge of AS2885
7.2 Process
The following sections outline the SMS process and requirements for each stage of the SMS.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 12
7.3 Preparation
As preparation for the workshop the following shall be performed:
Populate the SMS logging tool with all relevant Features, Crossings, Location Classification and KP points required to perform the SMS.
Collate all necessary reference documentation consisting of: o Design Basis Manual or relevant Pipeline details o Drawings (including Facility General Arrangements, Route Drawing/Alignment
Sheets where applicable) o Previous SMS / Location Classification Review (where relevant) o Pipeline Easement Reference Documentation (Patrol reports, Photographs,
Encroachments, Proposed Crossings as applicable) o Calculations:
Penetration resistance calculations (including Critical Defect Length) 4.7KW/m2 Radiation Contour (Measurement Length)
o Details of any Proposed Works or Developments near the Pipeline Prepare a summary of the following pipeline details:
o MAOP o Design Code o Nominal Diameter o Wall Thickness o Pipe Grade o Pipe Coating o Minimum Depth of Cover
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 13
7.4 Workshop
The Workshop will be conducted as per the requirements of AS2885.6-2018. The SMS process will be as outlined in the table below (taken from AS2885.6 Figure A1).
Figure 1: SMS Workshop Process
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 14
Essentially the process will be as follows:
Present the pipeline details Conduct Location Classification Review “Walk” the line section via aerial photographs or similar (e.g. Photos of identified
features) and refer to the location classes as defined by the Location Classification Review
Employ AS2885 with regard to location sub-classes, signage requirements and minimum number of protection measures (physical and procedural)
Select first section and review landowners and activities Review / log non-location threats that are general to that section including parallel
threats. If the threat is credible, log external interference protection measures and other prevention measures as necessary
If necessary, proceed to risk assessment using the risk matrix from AS2885.6-2018 attached in Appendix A
Select “Location Specific Threats” and review / log threats and external interference protection measures and other prevention measures as necessary, and proceed to risk matrix assessment as necessary
Log recommendations where required. Assign to appropriate personnel in attendance at workshop and provide estimated target date for completion.
Where the Risk is deemed not acceptable or not “As Low as Reasonably Practical (ALARP)” apply further control measures and re-assess until residual risk is acceptable
Identify Major Accident Events (events which could cause multiple fatalities) Identify threats requiring a Formal ALARP Assessment (includes MAE Events and
Threats with Risk Levels of Intermediate or higher) Note: Where required Formal ALARP Assessments will be done as a separate
Scope of Work and is outside this Terms of Reference Repeat steps above for subsequent sections
NOTE 1: Typical threats will be risk assessed the first time they are encountered and then referenced (or copied) where they apply for subsequent typical threats
NOTE 2: Non-Location Threats include non-process threats to Pipeline including corrosion, intentional damage etc.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 15
7.5 Reporting
The documentation to be submitted upon completion of the SMS Workshop consists of a Report containing:
A populated register of the threats identified in the workshop and their assessment A list of actions generated during the workshop A copy of or reference to the Logging Tool Worksheet used in the SMS The Location Class Review Results A list of any Major Accident Events identified An outline of the Methodology and Reference to the Terms of Reference
The Reporting Schedule is as outlined in Section 6.0.
7.6 Management of Actions
Upon completion of the final report, the Client will perform a review and prepare a proposed action plan. This will be submitted to the Pipeline Licensee in a timely manner along with the SMS report prepared in order to facilitate the management of the required actions.
Actions raised from the SMS will be implemented in the Client’s relevant Action Management System.
This will close out the SMS Project and allow management of the required actions to be taken as a separate project.
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 16
APPENDIX A: RISK MATRIX
AS2885.6 - 2018 Risk Matrix
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AS2885.6‐2018 RISK MATRIX
Catastrophic Major Severe Minor Trivial
Multiple fatalities result
One or two fatalities; or several
people with life-threatening injuries
Injury or illness requiring hospital
treatment
Injuries requiring first aid treatment
Minimal impact on health & safety
Fre
qu
ent
Expected to occur once per year or more.
Extreme Extreme High Intermediate Low
Occ
asio
nal
May occur occasionally in the life of the pipeline
Extreme High Intermediate Low Low
Un
like
ly
Unlikely to occur within the life of the pipeline, but possible.
High High Intermediate Low Negligible
Rem
ote Not anticipated for this
pipeline at this location.High Intermediate Low Negligible Negligible
Hyp
oth
etic
al
Theoretically possible but would only occur under extraordinary circumstances
Intermediate Low Negligible Negligible Negligible
No loss or restriction of
pipeline supply
Environment
Widespread or significant societal
impact, such as complete loss of supply to a major
city for an extended time
(more than a few days)
Widespread societal impact such as loss of
supply to a major city for a short time (hours to days) or to a localized area for a longer time
Localized societal impact or short-
term supply interruption (hours)
Interruption or restriction of supply
but shortfall met from other sources
Intermediate Repeat threat identification and risk evaluation processes to verify the risk estimation; determine the accuracy and uncertainty of the
estimation. Where the risk rank is confirmed to be "intermediate", where reasonably practicable modify the threat, the frequency or the
consequence to reduce the risk rank to "low" or "negligible".
Where it is not reasonably practicable to reduce the risk rank to "low" or "negligible", action shall be taken to:
(a) remove threats, reduce frequencies and/or reduce severity of consequences to the extent practicable; and
(b) Formally demonstrate ALARP
For an in‐service pipeline, the reduction to "low" or "negligible" or demonstration of ALARP shall be completed as soon as possible. Risk
reduction or demonstration of ALARP should be completed within a few months.Low
Impact widespread; viability of
ecosystems or species affected; or
permanent major changes
Major impact well outside Pipeline
Corridor or site; or long-term severe
effects; or rectification difficult
Localised impact, substantially
rectified within a year or so
Impact very localized and very
short-term (weeks), minimal
rectification
No effect; or minor impact rectified
rapidly (days) with negligible residual
effect
FR
EQ
UE
NC
YC
ON
SE
QU
EN
CE
S
Typical Severity Classes
People
Supply
NOTE: Appendix G in AS2885.6:2018 provides guidance on assessment of consequence severities
Risk Rank Risk Treatment Actions
Extreme Modify the threat, the frequency or the consequences so that the risk rank is reduced to Intermediate or lower.
For an in‐service pipeline, the risk shall be reduced immediately.
High Modify the threat, the frequency or the consequences so that the risk rank is reduced to Intermediate or lower.
For an in‐service pipeline, the risk shall be reduced as soon as possible. Risk Reduction should be completed within a timescale of not more than
a few weeks.
Determine the management plan for the threat to prevent occurrence and to monitor changes that could affect the classification
Negligible Review at the next relevant SMS (for periodic operational review, Land Use Change, Encroachment, or change of operating conditions)
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI CONSULTING ENGINEERSBROOKLANDS DEVELOPMENT
AS2885 SMS WORKSHOPTERMS OF REFERENCE
Rev 0 TOR-JDSI-1469 17
APPENDIX B: PROPOSED DEVELOPMENT DRAWINGS
Document No: Title
PRO BRO 03-011-01 (Date: 26.06.19) Structure Plan Map - Brooklands Estate
MIRHB-1-008A (Rev A, Date: 6/6/2019)
Proposed Lot Typology Plan - Brooklands Estate
N/A Aerial Photograph - Brooklands Estate
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
POS 2
POS 9
1.8105ha
3.8789ha
1.5546ha
2.8455ha
Partridge Street
WC
1.8921haPOS 6
POS 4
Henley Street
Drive
POS 10
1.3007ha
Henley
New
4.1810ha
Place
POS 13
POS 3
3.5001ha
Old
PSPS
Street
0.7741haPOS 1
1.8106ha
Place
3.5005ha
Lord
Brooklands
Fairmount Blvd
Astu
rian
Driv
e
Gnangara Road
Street
Martingale A
ve
Pine Street
Andrea Drive
Petrana
Park Street
Martingale
Ave
Pinaster Pde
Losino Blvd
Arpent Link
WC
POS 7
0.9482haPOS 8
WC
POS 150.3867ha
POS 50.5249ha
POS 145.7756ha
POS 160.2901ha
NON-CREDITABLE
POS 115.4733ha
POS 121.5820ha
BrookA
ve
Lord
POSSIBLE ROAD CROSSING,SUBJECT TO PIPELINE RISKASSESSMENT
NORTH
Plan No:Date:
Client:Planner:26.06.19
PROGRESSMS/MB
CITY OF SWANHENLEY BROOK
HENLEY BROOK STRUCTURE PLANPLAN 1: STRUCTURE PLAN MAP
All areas and dimensions are subject to survey, engineering and detailed design
and may change without notice. © Copyright of Burgess Design Group.
LEGEND
STRUCTURE PLAN AREA
MRS RESERVES
OTHER REGIONAL ROAD
LOCAL SCHEME ZONES
RESIDENTIAL (R30-R60)
LOCAL SCHEME RESERVES
PUBLIC OPEN SPACE
PUBLIC PURPOSES - PRIMARY SCHOOL
PUBLIC PURPOSES - WATER CORPORATION
ROADS
INTEGRATOR B (25.2m)
NEIGHBOURHOOD CONNECTOR A (24.4m)
NEIGHBOURHOOD CONNECTOR B (19.4m)
ACCESS STREET B (18m)
ACCESS STREET C & D (10-15m)
SAFE ACTIVE STREET (15m)
LANEWAY (6m)
INDICATIVE EXTERNAL ROADS
OTHER
INDICATIVE ST LEONARDS CREEK ALIGNMENT(SUBJECT TO FURTHER ASSESSMENT)
GAS PIPELINE EASEMENT
NOISE MODELLING REQUIRED
POSSIBLE FUTURE LIFESTYLE VILLAGE
POSSIBLE FUTURE RAILWAY
ROUNDABOUT INTERSECTION
POSSIBLE BLACK COCKATOO ROOST TREETO BE RETAINED
PS
WC
0 100 200 300m
SCALE 1:7,500
5025
(A3)
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AVEN
UE
HENLEY BRO
OK
STREETLO
RD
DRIVEGNANGARA
DRIVE
AST
URIA
N
JOHN
SAUNDERS
STREETRO
BERT
STREETPIN
E
STREETPARK
STREET
GEORGEFFPLA
CEDIANE DRIVE
BROOKLANDS
STREET
HENLEY
NORTH
Date: 30.07.15
CITY OF SWANHENLEY BROOK
BROOKLANDSAERIAL PHOTOGRAPH
Plan No:
Client: ProgressPlanner: ZM
PRO BRO 9-03
LEGEND
Subject Land
500m400300200
SCALE 1:15,000
0 100
(A4)
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
BROOKLANDS DRIVE
HENLEY STREET
PARK STREET
30M WID
E DAMPIER PIP
ELINE
20M WID
E PAR
MELIA PIP
ELINE
20
M WID
E PAR
MELIA
PIP
ELINE
30
M WID
E DA
MPIER PIP
ELINE
20
M WID
E PAR
MELIA
PIP
ELINE
30
M WID
E DA
MPIER PIP
ELINE
34
34
36
35
32
34
37
35
36
31
33
32
38
36
35
34
31
36
44
32
31
37
32
38
33
34
37
38
33
35
36
33
39
33
33
35
34
33
34
31
36
39
38
36
35
32
33
35
34
33
32
32
38
37
34
35
39
36
38
42
32
37
33
33
33
34
36
33
32
37
36
32
33
34
38
39
37
32
35
33
32
37
31
31
32
38
31
34
34
36
43
37
33
35
41
35
32
35
37
39
35
3134
40
37
34
12.9 4.2
17
15.9
20
20
12.5
12.5
20
12.5
12.5
17
4.2 12
15
12.5
25
12.5
25
12.5
12.5
25
15
15
25
17
17
25
15
15
25
14
14
25
4.2
27
15.9
30
12.9
30
12.5
12.5
30
12.5
12.5
27
4.212
15
14
30.9
30.9
30.9
15
30.9
17
30.9
15
30.9
12.5
30.9
12.5
8.5
27
4.25.5
30
30
7.5
7.5
30
7.5
7.5
30
7.5
7.5
30
7.5
7.5
30
7.5
7.5
30
7.5
7.5
30
7.5
7.5
27 4.2
5.5308.5
7.5307.5
307.5
7.57.5307.5
7.5307.5
307.5
7.5
307.5
7.57.5307.5
307.5
7.57.5307.5
307.5
7.57.5307.5
307.5
7.5
7.5
7.530
4.219
4.2
5.7
25
5.7
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
4.2 19 4.2
5.7
5.7
4.2
27
12.5
30
9.5
30
12.5
12.5
30
12.5
12.5
26.6
4.89.1
12.5
17
25
17
25
15
15
25
12.5
12.5
25
12.5
12.5
25
25
12.5
12.5
25
15
15
12.5
12.5
25
25
15
15
4.2
17
12.5
20
9.5
12.5
20
12.5
20
12.5
12.5
4.29.5
12.5
17
25
25
15
25
12.5
25
15
25
12.5
25
12.5
25
12.5
25
15
25
17
12 4.2
27
15
3030
12.5
12.530
12.5
12.5
4.2 12
15
27
25
17
25
17
17
25
17
15
25
15
12.5
25
12.5
12.5
25
12.5
12.5
25
12.5
15
25
15
12.5
25
12.5
15
25
15
4.2
17
15
20
12
20
12.5
12.5
20
12.5
12.5
17
4.212
15
15
30
30
12.5
30
30
1512.5
30
12.5
30
12.5
30
3015
30
17
30
17
4.2
23
17.5
26
14.5
26
15
15
4.2 14.5
17.5
23
12.5
25
12.5
25
25
15
15
25
12.5
12.5
25
12.5
12.5
25
12.5
12.5
15
1525
4.2
27
12.5
30
9.5
30
12.5
12.5
30
12.5
12.5
27
4.29.5
12.5
15
25
25
12.5
25
12.5
25
25
12.5
25
1512.5
25
4.2
15
8.8
18
5.87.5
7.5
18
15
4.2 5.7
8.8
7.5257.5
16.3
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
7.5257.5
4.219
4.24
.5
4.5
4.2 6.3
30
9.2
27 30
7.5
7.5
30
7.5
7.5 7.5
30
7.5
30
7.5
7.5 7.5
30
7.5
4.2
27
9.3
6.3
4.219
4.24
.5 25
4.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.5
7.5
25
7.57.5
7.5
25
15
4.2 5.8
18
8.8
7.5
18
7.5
4.2
15
8.8
5.8 14.5 4.2
27
17.5
3030
12.5
12.5
30
12.5
12.5
4.2 14.5
17.5
27
30
15
30
15
17
17
30
30
15
15
12.5
12.5
30
10.5
10.5
30
10.5
10.5
30
12.5
12.5
30
12.5
12.5
30
12.5
12.5
30
30
15
15
27
4.2
13
16
15
20
15
20 17
4.212
15
11
30
11
30
12.5
30
12.5
30
12.5
30
10.5
30
10.5
30
12.5
30
15
30
17
30
30
15
9.5 4.2
27
12.5
3030
12.5
12.5
30
12.5
12.5
27
4.2 14.5
17.5
12.5
30
12.5
30
15
15
30
12.5
12.5
30
15
15
30
12.5
12.5
30
15
15
30
30
17
17
30
17
17
30
15
15
27
4.2
14.5
17.5
12.5
29.5
4.38.2
30
28.2
20
11.4
4.2
4.810.7
15
27.8
32.4 20.5
23.911.5
25
13
25
15
25
12.5
25
15
25
12.5
25
25
1512.5
25
4.24.3
28.7
21.1
0
34.8
17
28.4
0
18.5
5.9
11.8
7.1
30.8
12.7
12.5
30.8
12.5
15
30.8
15
12.5
30.8
12.5
15
30.8
1512.5
0
12.5
30.8
15.8
30
15.8
30
27
4.2 12
15
30
13.2
30
13.2
15
30
15
12.5
30
12.5
12.5
30
12.5
15.5
30
15.5
4.2
27
17
14
20
15
20
15
4.2 17
15
12
30
12.5
30
12.5
12.5
30
30
12.5 15
30
13.2
30
30
12.5
30
12.5
12.5
30
12.5
12.5
30
12.5
12.5
30
12.5
12.5
30
12.5
3.8
27.6
14.9
18
4.6 15.8
30
24.9
27.6
15
30
15
12.5
30
9.2 3.4
29.4
12.7
27
17
4.2 12
20
15
20
12.5
12.5 12.5
20
12.5
12.5
20
12.5
3.8
17.4
17.5
18.6
12.8
37.5
12.5
40
10.5
10.7
35.3
12.5
12.8
32.8
15 141.3
30
12.5
12.5
30
15
15
30
17
17
30
15
15
30
12
30
1212.5
12.5
30
12.5
12.5
30
15
22
4.212
25
15
25
15
15
25
15
4.2
22
15
12
12.5
30
30
12.5
30
12
30
15
30
17
30
15
30
12.5
30
15
30
12.5
30
10.5
30
12.5
30
4.2 12
20
15
17
15
20
15
15
20
15
4.2
17
15
12
12.5
30
12.5
30
10.5
3010.5
12.5
30
12.5
15
30
15
12.5
30
12.5
15
30
15
17
30
17
15
30
15
12
30
12
12.5
30
12.5
12.5
30
12.5
15
22
4.212
25
15
25
15
15
25
15
4.2
22
15
12
30
12.5
30
12.5
30
12
30
15
30
17
30
15
30
12.5
30
15
30
12.5
30
10.5
30
12.5
30
17
4.2 12
20
15
12.5
20
12.5
12.5
20
12.5
4.2
17
15
12
17
30
17
30
15
30
15
15
30
15
15
30
15
30
15
1527
4.212
30
15
12.50
30
12.512.5
12.5
30
12
4.2
27
15
25
15
25
15
25
15
25
15
25
17
25
15
20
15
20
4.2
17
15
12
30
12.5
30
12.5
12.5
30
12.5
12.5
30
12.5
12.5
30
12.5
12.5
30
12.5
14.5
30
14.5
27
4.212
30
15
15
30
15
15
30
15
22.8
3.6
28.1
17.5
28.5
32.5
15
25
1312.5
25
12.5
25
12.5
25
15
25
15
4.2 22
17.5
14.5
22
4.214.5
25
17.5
15
25
15
12.5
25
12.5
12.5
25
12.5
12.5
25
12.5
15
25
15
12.5
25
12.5
10.5
25
10.5
12.5
25
12.5
12.5
25
12.5
17.1
25
17.1
16.6
10.7
30
10.5
17
4.2
12 20
15
15 20
15
15 20
15
12
4.2
17
15
10.8
25
30
12.5
25
12.5
25
10.525
12.5
25
15
25
12.5
25
12.5
25
12.5
25
12.5
12.5
25
12.5
20
12.5
20
17 4.2
9.512.5
23.3 4
9.6
24.7
12.5
12.6
23.1
12.5
12.6
21.6
12.5
4.517
12.5 9.6
12.5
25
12.5
25
12.5
25
12.5
12.5
25
12.5
12.5
25
12.5
12.5
25
12.5
10.5
25
10.5
10.5
25
10.5
25
10.5
10.5
8.7
13.911.3
15
15
17
4.2
12 2015 20
15 20
15
12
4.2
17
1530
10.8
25
19
12.5
25
12.5
12.5
25
12.5
25
12.5
25
12.5
25
12.5
25
15
20
15
20
12.5
20
12.5
12.5
25
12.5
25
12.5
25
12.5
12.5
30
12.5
30
30
12
4.227
15
1515
30
30
12.5
12.5
27.1 4
15.2
15.3
12.6
27.8
26.5
10.92.1
31.5
28.1
13.1
24.3
13.1
29.3
25.5
15.7
20.9
12
11
30
21
23.5
17
30
17
15.9
7.5
34.2
10
37
13.2
24.2
11.6
37
23.2
38.8
12.531.5
13.6
23.7
24.4
12.814.9
30
37.1
47.2
15
30
15
30
17
17
30
15
15
30
12.5
12.5
30
12.5
12.5
4.2
27
15
12
12.730
12.6
30
12.5
12.5
30
15.8
23
7.27.5
13.9
21.5
15
25
5.7
22 4.2
1215
13.9
3030
12.5
30
12.5
30
12.7
30
12.6
30
30
10.5
10.5
30
12.5
12.5
30
10.5
10.5
30
12.5
12.5
30
15
15
30
17
17
30
15
15
32.6
0.5
20.3
5.316.9
20
31.9
12.5
12.5
31.3
12.5
12.5
27.4 4.4
1215
15
3030
17
3030
15
30
12.5
30
10.512.5
3030
10.5
30
12.5
12.7
30
12.6
30
10.5
10.5
30
12.5
12.5
30
10.5
10.5
30
12.5
12.5
30
15
15
30
17
17
30
15
15
30
4.126.3
15
28.5
12
27.7
15
15
26.8
15
15
23 4.4
1215
30
15
30
17
30
15
30
12.5
30
10.5
30
12.5
30
10.5
3030
12.5
12.8
25
12.8
25
10.5
25
10.512.5
12.5
25
15
15
25
17
25
17
15
25
15
17
4.2
12
20
15
12.5
20
12.5
12.5
20
12.5
12
4.2 17
15
30
15
30
17
30
15
30
12.5
30
10.5
30
12.8
30
30
12.8
30
12.8
10.5
30
10.5
12.5
30
12.5
15
30
15
17
30
1715
15
30
17
4.2
12
20
15
12.5
20
12.5
12.5
20
12.5
12
4.2 17
15
15
25
25
17
25
15
25
12.5
25
10.5
25
12.8
25
25
15.3
25
15.3
15
25
15
12.5
25
12.5
12
4.2
22
15
22.4
4.2 12
25.3
12.5
25.3
15
25.2
15.3
25.2
12.2
23.4
27.9
28.3
9.4
3.8
12.5
30
30
12.5
12.5
4.227
15 12
22 4.2
14
25
17
17
25
17
4.7
22.8
22.1
12.7
17
26.1
17.5
30.4
0.814.2
30.6
15
15
30.6
15
15
30.6
15
12.5
30.5
12.5
4.2
27.5
15.4
12.4
4.2 12.4
30
27
12.5
30
15
30
15
30
15
30
17
30
22 4.2
12
25
15
15
25
15
15
25
15
12
4.222
15
30
17
30
17
15
30
15
15
30
15
15
30
15
12.5
30
12.5
12.4
4.2
27
15.4
27
4.2 12.4
30
12.5
30
15
30
15
30
15
30
17
30
17
30
17
30
15
15
3030
17
17
15
15
30
17
17
30
4.2
27
15.9
12.9
20
15
20
15
20
15
15
15
15
20
20
15
15
15
15
20
15
15
20
20
15
15
20
15
15
20
15
15
20
15
15
20
15
15
20
15
15
4.217
15.5
12.5
5.6
119.9
4.4
45.8
61.2
6.1
190.3
6.1
DESIGNINDICATIVE
DESIGNINDICATIVE
1.126ha
1.332ha
1075m²
1393m²
3162m²
9871m²
760m²
1100m²
5118m² 352m²
557m²
3980m²
8086m²4619m²
458m²
3116m²
1.205ha
4989m²
2513m²
POS 2
POS 5
POS 6
POS 7 POS 8
POS 10
POS 9
POS 11 POS 12
POS 13
POS 14
POS 15
POS 4
314m²250m²250m²296m²
313m²
313m²
375m²
425m²
375m²
349m²
473m² 375m² 375m² 445m²
432m²
464m²
526m²
464m²
387m²
387m²
251m²225m²225m²225m²225m²225m²225m²225m²
249m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
225m²
209m²
187m²
188m²
187m²
187m²
188m²
187m²
188m²
187m²
188m²
187m²
188m²
210m²
371m²375m²375m²369m²
424m²
375m²
313m²
313m²
313m²
375m²
313m²
375m²
245m² 250m² 250m² 245m²
375m²
313m²
375m²
312m²
312m²
312m²
375m²
424m²
446m²375m²375m²445m²
424m²
425m²
375m²
313m²
313m²
313m²
375m²
313m²
375m²
295m² 250m² 250m² 296m²
450m²
375m²
450m²
375m²
375m²
375m²
450m²
510m²
509m²
450m²390m²450m²
312m²
375m²
312m²
313m²
313m²
375m²
370m² 375m² 375m² 370m²
375m²
313m²
313m²
312m²
375m²
313m²
153m²135m²153m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
179m²
273m²225m²225m²225m²225m²225m²273m²
179m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
188m²
187m²
153m²135m²153m²
521m²375m²375m²520m²
450m²
510m²
450m²
375m²
315m²
315m²
375m²
375m²
375m²
450m²
475m²300m² 296m²
329m²
375m²
375m²
375m²
315m²
315m²
375m²
450m²
510m²
450m²
370m²375m²375m²521m²
375m²
450m²
375m²
450m²
375m²
450m²
510m²
510m²
450m²
520m²
374m² 447m²494m²
616m²
523m²
375m²
313m²
375m²
313m²
375m²
313m²
447m²
421m²
561m²
385m²
462m²
385m²
462m²
385m²
475m²445m²
395m²450m²375m²375m²465m²505m²
300m²
296m²
375m² 375m² 375m² 450m² 395m²
375m²375m²375m²375m²375m²534m²
651m² 450m² 375m² 374m² 352m²
295m² 250m² 250m² 250m² 386m²
484m²
382m²
426m²
469m²
375m²
450m²
510m²
450m²
359m²
375m²
375m²
371m²375m²375m²371m²
375m²
375m²
359m²
450m²
510m²
450m²
375m²
450m²
375m²
315m²
375m²
296m² 300m² 300m² 296m²
375m²
315m²
375m²
450m²
375m²
450m²
510m²
450m²
359m²
375m²
375m²
371m²375m²375m²371m²
375m²
375m²
359m²
450m²
510m²
450m²
375m²
450m²
375m²
315m²
375m²
296m² 250m² 250m² 296m²
509m²
450m²
450m²
450m²
450m²
445m²375m²375m²445m²
375m²
375m²
375m²
375m²
424m²
300m² 295m²
375m²
375m²
375m²
375m²
375m²
434m²
446m²450m²450m²645m²
441m²
334m²
313m²
312m²
312m²
375m²
433m²
433m²375m²313m²313m²313m²375m²313m²263m²313m²313m²427m²525m²
296m²
300m²
300m²
296m²
534m² 313m² 312m² 262m² 312m² 375m² 312m² 312m² 312m² 312m²
250m²
246m²
314m²
299m²
279m²
255m²
313m²313m²313m²313m²313m²263m²263m²263m²459m²296m²
300m²
300m²
296m²
523m² 312m² 312m² 312m² 312m² 312m² 313m²
300m² 250m²313m² 313m²
375m²
446m²
450m²
375m²
498m²
339m²375m²
328m²
342m²348m²
597m²
510m²
536m²647m²
643m²428m²
490m² 906m²
450m²
510m²
450m²
375m²
375m²
446m²
380m² 375m² 600m²
428m²
371m²
417m²375m²377m²
380m² 315m² 375m² 315m² 375m² 450m² 510m² 450m²
525m²
404m²
395m²
458m²
450m²510m²450m²375m²315m²375m²315m²377m²
380m² 315m² 375m² 315m² 375m² 450m² 510m² 450m²
429m²
421m²
409m²
392m²
450m²510m²450m²375m²315m²375m²315m²377m²
320m²263m²313m²375m²425m²375m²
295m²
250m²
250m²
296m²
450m² 510m² 450m² 375m² 315m² 384m²
384m²315m²375m²450m²510m²450m²
296m²
250m²
250m²
296m²
375m² 425m² 375m² 313m² 263m² 320m²
383m²375m²312m²370m²
376m² 316m² 379m² 386m²
470m²
372m²
375m²
446m²
421m²
425m²
468m²479m²458m²458m²458m²382m²466m²
458m² 375m² 450m² 450m² 450m² 510m²
371m²
375m²
375m²
371m²
510m²450m²450m²450m²375m²458m²
458m² 375m² 450m² 450m² 450m² 510m²
510m²450m²510m²450m²510m²473m²
300m²
300m²
300m²
300m²
300m²
300m²
300m²
300m²
300m²
300m²
300m²
300m²
306m²
7527m²
128 129
132
133
102103104106107
94
12352 95 96 97 99
80818283
84
59 60 61 62
43914
140
160
126 127
108
109
93
11
10
86
87
54 55 56 57
14332
58
130
98
131
105
100
101
102
103
104
105
106107108
109
110
111
112
113
114
115 116 117 118
119
120
121
122
123
124
125126127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142 143 144 145 146 147 148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163 164 165
166167168169
170
171
172
173
174
175
176
177
178
179
180181 182
183
184
185
186
187
188
189
190
191
192
193194195196
197
198
199
200
201
202
203
204
205
206
207 208209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226227
228229230231232233
234
235
236 237 238 239 240
241242243244245246
247 248 249 250 251
252 253 254 255 256
257
258
259
260
261
262
263
264
265
266
267
268269270271
272
273
274
275
276
277
278
279
280
281
282
283 284 285 286
287
288
289
290
291
292
293
294
295
296
297
298299300301
302
303
304
305
306
307
308
309
310
311
312
313 314 315 316
317
318
319
320
321
322323324325
326
327
328
329
330
331 332
333
334
335
336
337
338
339340341342
343
344
345
346
347
348
349
350351352353354355356357358359360361
362
363
364
365
366 367 368 369 370 371 372 373 374 375
376
377
378
379
380
381
382383384385386387388389390391
392
393
394
395 396 397 398 399 400 401
402 403404 405
406
407
408
409
410
411412
413
414415
416
417
418419
420421
422 423
424
425
426
427
428
429
430 431 432
433
434
435436437
438 439 440 441 442 443 444 445
446
447
448
449
450451452453454455456457
458 459 460 461 462 463 464 465
466
467
468
469
470471472473474475476477
478479480481482483
484
485
486
487
488 489 490 491 492 493
494495496497498499
500
501
502
503
504 505 506 507 508 509
510511512513
514 515 516 517
518
519
520
521
522
523
524525526527528529530
531 532 533 534 535 536
537
538
539
540
541542543544545546
547 548 549 550 551 552
553554555556557558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
GH
1234
5
6
7
8
9
10
11 12 13 14
15
16
17
18
19
20
2122232425262728
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56575859
60
61
62
63
64
65
66
67
68 69 70 71
72
73
74
75
76
77
78
79
80818283
84
85
86
87
88
89
90
91
92
93 94 95 96
97
98
99
creativedp.com.auW
(08) 9325 0200P
28 Brown Street, East Perth WA 6004A
A Mirvac ProjectDATUM: AHD
PROJECTION: PCG 94
DATE: 06/06/2019
PLAN: MIRHB-1-008ALots 102 - 107 & 14332 Henley Street, Lots 56 & 57 Park St & Lots 10, 11, 83, 84, 94 - 99 & 12352 Brooklands Drive, HENLEY BROOK
PROPOSED LOT TYPOLOGY PLAN
CHECK: BK
PLANNER: BK
DRAWN: RF
REVISION: A
0
shown on plan are subject to final survey. Carriageways depicted on plan are diagrammatic only.
responsibility is taken for any errors or omissions and is subject to change. Areas and dimensions
without prior consent from CD+P. All care has been taken in preparation of this plan but no
No part of this plan may be reproduced in any formCopyright Creative Design + Planning.
NORTH
15 30 45m
@ A1Scale: NTS
Size No. %
Lots Total Lots
119m² - 159m² 1.05%
160m² - 179m² 0.35%
180m² - 234m² 11.19%
235m² - 319m² 153 26.75%
320m² - 449m² 213 37.24%
450m² - 499m² 15.03%
500m² - 549m² 6.64%
550m² - 599m² 0.35%
600m² - 1000m² 1.22%
0.17%
Total Number of Lots 572
Minimum Lot Size 135m²
Maximum Lot Size 7527m²
Average Lot Size 373m²
Total Lot Area 21.3426ha
1001m²+ (GH)
6
2
64
86
38
2
7
1
TOTAL
17 x 30 Lots
15 x 30 Lots
12.5 x 30 Lots
10.5 x 30 Lots
7.5 x 30 RL Lots
17 x 25 Lots
15 x 25 Lots
12.5 x 25 Lots
10.5 x 25 Lots
7.5 x 25 RL Lots
15 x 20 Lots
12.5 x 20 Lots
7.5 x 18 Lots
94%
6%
20%
15%
8%
0%
0%
20%
8%
3%
0%
14%
0%
0%
TARGET %
+1 GH Lots
571 Lots
37 Lots
94 Lots
121 Lots
19 Lots
29 Lots
15 Lots
62 Lots
69 Lots
8 Lots
41 Lots
47 Lots
23 Lots
6 Lots
LOTS
100%
6.5%
16.5%
21.2%
3.3%
5.1%
2.6%
10.9%
12.1%
1.4%
7.2%
8.2%
4.0%
1.0%
%
LEGEND
LOT YIELD
DRAFT
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
GUIDE WORDS FOR AS2885
SAFETY MANAGEMENT STUDY WORKSHOP –
THREAT IDENTIFICATION
Document No: R-PI-453 Rev Date Description Prepared Checked Approved Licensee
0 03/07/2015 Issued for Use R Thornton
R Thornton
Snr Pipeline Integrity Engineer
Snr Pipeline Integrity Engineer
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AS2885 SMS WORKSHOP GUIDE WORDS
THREAT IDENTIFICATION
Rev 0 R-PI-453 2
External Interference Natural Events
Blasting Cyclone*
Bogged Vehicles* Earthquake*
Cable Installation ‐ Plough Erosion Of Cover Or Support
Deep Ripping To 900mm Floods* (Erosion Or Impact Damage)
Deep Ploughing To 600mm Ground Movement*
Ploughing To 300mm Inundation Leading To Floatation
Excavation – Drainage / Ditch Maintenance Lightning*
Excavation Rail Maintenance Wind*
Excavation Road Maintenance Fire*
Excavation Installation Of New Services Other
Horizontal Boring / Drilling Electrical Effects
Marine Anchors Fault Voltages (From Nearby Electricity Towers)
Post Driving – Fence Construction / Maintenance
Induced Voltages (From Parallel Power Lines)
Vertical Boring ‐ Posthole Augers Operational And Maintenance Activities
Trench Excavation ‐ Other Services Bypass Control System Logic*
Other Exceeding MAOP*
Grading Inaccurate Test Equipment* (Leading To Incorrect Control And Safety Equipment Settings)
Pipeline Maintenance Activities Inadequate Servicing Of Equipment*
Vehicle Loads Inadequate / Incomplete Maintenance Procedures*
Vehicle Impact (Road, Rail, Aircraft) Incorrect Operation Of Control And Protective Equipment*
Excessive Backfill (External Load) Incorrect Pigging Operation*
Corrosion Incorrect Valve Operating Sequence*
Bacterial Corrosion Maintenance Actions Contrary To Procedures*
Environmental SCC Fatigue From Pressure Cycling
External Corrosion Construction Defects
Internal Corrosion Undetected Or Unreported Damage To The Pipe, Coating Or Equipment*
Stray Current Corrosion Undetected Or Unreported Critical Weld Defects*
Stress Corrosion Cracking Failure To Install The Specified Materials Or
Equipment*
Internal Erosion Failure To Install Equipment Using The Correct Procedures Or Materials*
Other Failure To Install Equipment In Accordance With Specified Design*
Failure To Install Pipeline In Specified Location Or In A Specified Manner*
Inadequate Testing Of Materials To Ensure Defects Have Been Detected Prior To Hand Over*
* Most likely will be non‐locational threats
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AS2885 SMS WORKSHOP GUIDE WORDS
THREAT IDENTIFICATION
Rev 0 R-PI-453 3
Design Defects Material Defects
External Loads – Rail Incorrectly Identified Components*
External Loads – Vehicle Manufacturing Defect*
Temperature Exceeds Design* Under Strength Pipe*
Temperature Less Than Design* Insufficient Inspection And Testing To Confirm Acceptability Of Material And Equipment
Specify Incorrect Test Procedures* Incorrect Specification, Supply, Handling, Storage Or Installation Which Allows Faults To Remain Undetected Or Damages The Item
Stresses Exceed Allowable* Other
Inadequate ITP Plan To Confirm Acceptability Of Material*
Intentional Damage
Failure To Specify Required Material Characteristics*
Malicious Damage*
Incorrect Material Specified* Sabotage*
Incorrect Diameter* Terrorism*
Design Pressure Incorrect* Other
Failure To Define Correct Range Of Operating Conditions*
Other Threats
Other Mine Subsidence
Seismic Surveys*
* Most likely will be non‐locational threats
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
JDSI | BURGESS DESIGN GROUP
BROOKLANDS DEVELOPMENT APA GROUP PGP AS2885 SMS
WORKSHOP REPORT
Rev 1a R-BDG-1336 23
APPENDIX E: RISK ASSESSMENT MATRIX
AS2885.6-2018 Risk Assessment Matrix
Version: 1, Version Date: 10/02/2021Document Set ID: 6210764Version: 2, Version Date: 13/08/2021Document Set ID: 6828932
AS2885.6‐2018 RISK MATRIX
Catastrophic Major Severe Minor Trivial
Multiple fatalities result
One or two fatalities; or several
people with life-threatening injuries
Injury or illness requiring hospital
treatment
Injuries requiring first aid treatment
Minimal impact on health & safety
Fre
qu
ent
Expected to occur once per year or more.
Extreme Extreme High Intermediate Low
Occ
asio
nal
May occur occasionally in the life of the pipeline
Extreme High Intermediate Low Low
Un
like
ly
Unlikely to occur within the life of the pipeline, but possible.
High High Intermediate Low Negligible
Rem
ote Not anticipated for this
pipeline at this location.High Intermediate Low Negligible Negligible
Hyp
oth
etic
al
Theoretically possible but would only occur under extraordinary circumstances
Intermediate Low Negligible Negligible Negligible
No loss or restriction of
pipeline supply
Environment
Widespread or significant societal
impact, such as complete loss of supply to a major
city for an extended time
(more than a few days)
Widespread societal impact such as loss of
supply to a major city for a short time (hours to days) or to a localized area for a longer time
Localized societal impact or short-
term supply interruption (hours)
Interruption or restriction of supply
but shortfall met from other sources
Intermediate Repeat threat identification and risk evaluation processes to verify the risk estimation; determine the accuracy and uncertainty of the
estimation. Where the risk rank is confirmed to be "intermediate", where reasonably practicable modify the threat, the frequency or the
consequence to reduce the risk rank to "low" or "negligible".
Where it is not reasonably practicable to reduce the risk rank to "low" or "negligible", action shall be taken to:
(a) remove threats, reduce frequencies and/or reduce severity of consequences to the extent practicable; and
(b) Formally demonstrate ALARP
For an in‐service pipeline, the reduction to "low" or "negligible" or demonstration of ALARP shall be completed as soon as possible. Risk
reduction or demonstration of ALARP should be completed within a few months.Low
Impact widespread; viability of
ecosystems or species affected; or
permanent major changes
Major impact well outside Pipeline
Corridor or site; or long-term severe
effects; or rectification difficult
Localised impact, substantially
rectified within a year or so
Impact very localized and very
short-term (weeks), minimal
rectification
No effect; or minor impact rectified
rapidly (days) with negligible residual
effect
FR
EQ
UE
NC
YC
ON
SE
QU
EN
CE
S
Typical Severity Classes
People
Supply
NOTE: Appendix G in AS2885.6:2018 provides guidance on assessment of consequence severities
Risk Rank Risk Treatment Actions
Extreme Modify the threat, the frequency or the consequences so that the risk rank is reduced to Intermediate or lower.
For an in‐service pipeline, the risk shall be reduced immediately.
High Modify the threat, the frequency or the consequences so that the risk rank is reduced to Intermediate or lower.
For an in‐service pipeline, the risk shall be reduced as soon as possible. Risk Reduction should be completed within a timescale of not more than
a few weeks.
Determine the management plan for the threat to prevent occurrence and to monitor changes that could affect the classification
Negligible Review at the next relevant SMS (for periodic operational review, Land Use Change, Encroachment, or change of operating conditions)