burwood landfi ll resource recovery park...

2
have your say www.ccc.govt.nz/haveyoursay Burwood Landfill Resource Recovery Park Redevelopment Reintegration with Bottle Lake Forest Park have your say June 2014 Christchurch City Council recognises that Bottle Lake Forest Park (BLFP) is a unique and very popular site with recreationists. We would therefore like to seek your thoughts on how the landfill area is best integrated back into BLFP. Burwood Landfill within BLFP has been used for disposal of Christchurch’s refuse since 1984. Following the Canterbury earthquakes the landfill was reopened as the Burwood Resource Recovery Park for the sorting and disposal of demolition material. It is due to be closed at the end of 2017 and rehabilitated for integration back into BLFP. The Landfill area to be rehabilitated is approximately 69 ha and 25m high. An informal drop in session was held on Saturday 3rd May 2014 for stakeholders and BLFP users to provide feedback on possible recreation developments for the landfill area. Feedback from that session has assisted us in developing this draft landscape plan. Please ensure that your comments reach us by 5pm on Wednesday 25 June 2014. You can comment by: Returning the enclosed freepost form Visiting the Christchurch City Council’s ‘Have Your Say’ website: www.ccc.govt.nz/ haveyoursay If you wish to discuss any aspect of this plan or process please contact: Kim Swarbrick, Project Consultation Leader Phone (03) 941 5176 Email [email protected] ELEC08/4598 Existing pond area have your say www.ccc.govt.nz/haveyoursay Kim Swarbrick Project Consultation Leader Christchurch City Council PO Box 73011 Christchurch Mail Centre Christchurch 8154 Phone (03) 941 5176 Email [email protected] The key issues regarding this project are: A closure plan is required for this site by September 2014. Physical closure will not take place until 2017. The redevelopment work will be programmed as a staged approach over several years 2018-2021. The objective is to integrate the area into the surrounding BLFP landscape and with other park activities. The landfill cap is only 1.5m deep which limits tree planting and structures. The gas plant and infrastructure will remain in place. If any future significant earthquake events were to occur it is possible the landfill could be re-opened. The key features of this proposed concept plan are: Improved links to beach access. It will incorporate viewing areas and picnic tables. Installation of interpretation panels. A nature trail to view ponds and wildlife. Extensions of the existing walk, run, cycle and horse trails. Implementation of a mountain bike dual slalom and trail area. 67 If you wish to comment on the plan, please complete the enclosed freepost form and return by 5pm on Wednesday 25 June 2014. Capping in progress Illustration of shared use pathway

Upload: phungdiep

Post on 12-Feb-2018

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Burwood Landfi ll Resource Recovery Park Redevelopmentresources.ccc.govt.nz/haveyoursay/14-21LeafletBurwoodLandfill.pdf · Burwood Landfi ll Resource Recovery Park Redevelopment

have your saywww.ccc.govt.nz/haveyoursay

Burwood Landfi ll Resource Recovery Park RedevelopmentReintegration with Bottle Lake Forest Park

have your say June 2014

Christchurch City Council recognises that Bottle Lake Forest Park (BLFP) is a unique and very popular site with recreationists. We would therefore like to seek your thoughts on how the landfi ll area is best integrated back into BLFP. Burwood Landfi ll within BLFP has been used for disposal of Christchurch’s refuse since 1984. Following the Canterbury earthquakes the landfi ll was reopened as the Burwood Resource Recovery Park for the sorting and disposal of demolition material. It is due to be closed at the end of 2017 and rehabilitated for integration back into BLFP. The Landfi ll area to be rehabilitated is approximately 69 ha and 25m high.

An informal drop in session was held on Saturday 3rd May 2014 for stakeholders and BLFP users to provide feedback on possible recreation developments for the landfi ll area. Feedback from that session has assisted us in developing this draft landscape plan.

Please ensure that your comments reach us by 5pm on Wednesday 25 June 2014.

You can comment by:

• Returning the enclosed freepost form

• Visiting the Christchurch City Council’s ‘Have Your Say’ website: www.ccc.govt.nz/haveyoursay

If you wish to discuss any aspect of this plan or process please contact:

Kim Swarbrick, Project Consultation LeaderPhone (03) 941 5176 Email [email protected]

ELEC

08/4

598

Existing pond area

have your saywww.ccc.govt.nz/haveyoursay

Kim SwarbrickProject Consultation LeaderChristchurch City CouncilPO Box 73011Christchurch Mail Centre Christchurch 8154Phone (03) 941 5176Email [email protected]

The key issues regarding this project are:

• A closure plan is required for this site by September 2014.

• Physical closure will not take place until 2017.

• The redevelopment work will be programmed as a staged approach over several years 2018-2021.

• The objective is to integrate the area into the surrounding BLFP landscape and with other park activities.

• The landfi ll cap is only 1.5m deep which limits tree planting and structures.

• The gas plant and infrastructure will remain in place.

• If any future signifi cant earthquake events were to occur it is possible the landfi ll could be re-opened.

The key features of this proposed concept plan are:

• Improved links to beach access.

• It will incorporate viewing areas and picnic tables.

• Installation of interpretation panels.

• A nature trail to view ponds and wildlife.

• Extensions of the existing walk, run, cycle and horse trails.

• Implementation of a mountain bike dual slalom and trail area.

67

If you wish to comment on the plan, please complete the enclosed freepost form and return by 5pm on

Wednesday 25 June 2014.

Capping in progress

Illustration of shared use pathway

Page 2: Burwood Landfi ll Resource Recovery Park Redevelopmentresources.ccc.govt.nz/haveyoursay/14-21LeafletBurwoodLandfill.pdf · Burwood Landfi ll Resource Recovery Park Redevelopment

Check and conf irm for utilities and services before any on-site construction starts A3

Sheet:

Date : 7 / 5 / 2014Drawn by. Damian StonesJob Ref. 0060Burwood Resource Recovery Park Redevelopment Plan Title.

Email: [email protected]: 021 1040 007Off ice: 03 526 8116www.bikeworks.co.nzCOPYRIGHT 2009 BIKEWORKS LTD

For Consultation Landscape concept plan

1

3

38.03

38.0

00 100 200 300 400 500 m

Flow and beginner downhill jump trail Grade 3 - 2 Progressive MTB skills valley. As you increase in height of the hill the trails grade increases

Southern Pegasus Track.

Southern Pegasus Bay Track. Upgrade to a consistent Grade One cycle trail.

Rothesay Reserve Gateway Entrance to Burwood Park. Existing orientation signage, carpark, toilets and playground. Potential for junior bike skills area, shade structures, landscaping

Sand dune systems

Interpretation hub and bird viewing tower

Short loop Nature walk

Longer Nature trail with interpretation features

Coastline veiw point

Major viewing point, interpretation panels, terraced landscape feature to form sheltered areas

Revegetation area

Beach access Beach access

Oneway downhill grade 2 MTB flow trail, 2m wide, trail side skills features

Oneway hill climb grade 2 MTB trail

Sculptureinstallation

Dual slalom MTB trail

Existing Grade 2 MTB trail

Land

fill A

venu

e

Lima Road

to Broad Park Gateway

to Spencer Park

20th

Aven

ue

Whiskey Road

Hill climb trail for skills area valley

North

Wetland and lakes

Integrating coastal track into Burwood Landfill site. Trail placement to highlight focal points. Improve access to beach. Opportunities range from Grade 1 cycleways to Grade 3 - 2 MTB dual slalom and flow trails through to interpretation, nature walks, planting, seating and picnic areas.

Shared trail - Grade 1

MTB trail - Grade 2

Walking and running trail

Nature trail

MTB trail - Grade 3

Existing Pine forest

Existing Native

Proposed Native planting

Interpretation sites

Focal points

Decision points

Gateway entrance

Horse trail

Dual Slalom MTB trail - Grade 3

Consultation processYour views on this proposal are important to us. Please take the time to complete the attached freepost form and return by 5pm Wednesday 25 June 2014. Once the consultation is complete and reviewed by a consultant, the concept plan will be fi nalised and amended to refl ect community views, where appropriate. A report, which includes the proposal and the outcome of this community consultation, will be presented to the Burwood Pegasus Community Board for approval to proceed to detailed design and construction.

At this stage it is anticipated that the Board will consider this proposal early September 2014. All respondents who supply contact details with their feedback will receive a letter letting them know the outcome of this proposal. Construction would then be scheduled to begin in 2018 and staged over the following 2-3 years.