business case stolt tankers – project update ron vollenga outsource-it management digital ship...

14
Business Case Stolt Tankers – Project Update Ron Vollenga Outsource-IT Management Digital Ship Conference Hamburg 18 March 2015

Upload: imogen-george

Post on 30-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Business CaseStolt Tankers – Project Update

Ron Vollenga

Outsource-IT Management

Digital Ship Conference Hamburg 18 March 2015

AGENDA

• Introduction

• Stolt Business Case

• Solution

• Project Benefits

• Roadmap

INTRODUCTION

Outsource-IT ManagementStolt Tankers Platform Broadband@Sea

STOLT-NIELSEN OVERVIEW

• Total Operating – 130 Ships

• Total Shipmanagement – 85 Ships

• Total Inland Tankers – 37 Barges

• Total Manning – 94 Ships

• Shipowning Global presence in:

Rotterdam; Singapore; Manila; Houston

BUSINESS CASE – PROBLEM AREAS

Year-on-YearCost Increase

BandwidthCapacity

Regulations

Crew AttractionFacilities

ConditionBased Monitoring

• Annual increase airtime• Shock bills

• Roll-out time 3 months• Increased need for

online data exchange

• Crew retention ratio• Unmanaged initiatives

• More complicated systems

• Skills onboard

• ECDIS obligations

BUSINESS CASE – COST

Year-on-YearCost Increase

BandwidthCapacity

Regulations

Crew AttractionFacilities

ConditionBased Monitoring

• Requirements:

• Hybrid Communications (VSAT + Backup)

• Managed services for ship-shore communication

• Service Level Agreement

• Cost Management (fixed fee)

• Standardization

BUSINESS CASE – BANDWIDTH

Year-on-YearCost Increase

BandwidthCapacity

Regulations

Crew AttractionFacilities

ConditionBased Monitoring

• Requirements:

• Hybrid Communications (VSAT + Backup)

• CIR (VSAT)

• No data limitation

• Allow online update of applications

BUSINESS CASE – CREW WELFARE

Year-on-YearCost Increase

BandwidthCapacity

Regulations

Crew AttractionFacilities

ConditionBased Monitoring

• Requirements:

• Introduction of formal Crew Welfare services

• Managed services

• Centralized + automated account administration

BUSINESS CASE – CBM & REGULATION

Year-on-YearCost Increase

BandwidthCapacity

Regulations

Crew AttractionFacilities

ConditionBased Monitoring

• Requirements:

• Enable remote systems monitoring

• Segregation of onboard networks

• Standardization

SOLUTION - INFRASTRUCTURE

SOLUTION – CREW WELFARE• X-Change box with 2 Wi-Fi Access Points

• 3 hours per day internet access via VSAT

• Internet access based on BYOD

• All crew same allowance and security rights

• Central administration of crew accounts

• Social media allowed

• Content filtering, video streaming and

ftp downloads blocked

PROJECT BENEFITS

Year-on-YearCost Increase

BandwidthCapacity

Regulations

Crew AttractionFacilities

ConditionBased Monitoring

• Cost Benefit visible in 2015 Budget

• Reduction in Suppliers• Automated billing process• KPI report over performance

• Bandwith agreed : CIR & MIR

• Examples of data usage over VSAT:• December 2014 :

168Gb (17 vsl > 100Gb)

• November 2014 : 223Gb (13 vsl > 100Gb)

• Crew Welfare availableafter commissioning

• No additional cost for Crew

• Remote monitoring

• Possibility of paperless navigation

ROADMAP• Project Update:

• 78 Installations completed

• 4 vessels remaining, completion scheduled

for April 2015

• Roll-out of managed vessel IT-Network (Palantir)

• Automatic Crew account administration interface (Marlink)

• Intranet/Internet caching (iOra)

• Review/Expand Crew Welfare availability onboard

• Navigation & Engineering network development

• Wi-Fi/3G service

THANK YOU!

Questions?

Ron Vollenga

Outsource-IT Management

[email protected]

+31 6 22240062