business continuty planning and disester recovry planning

14
BCP & DRP Presented by Mohammad Ashfaqur Rahman Compliance Professional www.linkedin.com/in/ashfaqsaphal [email protected]

Upload: mohammad-ashfaqur-rahman

Post on 08-Apr-2017

258 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Business Continuty Planning and Disester Recovry Planning

BCP & DRP

Presented by

Mohammad Ashfaqur Rahman

Compliance Professional

www.linkedin.com/in/ashfaqsaphal

[email protected]

Page 2: Business Continuty Planning and Disester Recovry Planning

Objectives

Idea of business continuty planning – BCP

Relationship between BCP and DRP

BCP implementation as per need

Execution of DRP and BCP

Page 3: Business Continuty Planning and Disester Recovry Planning

Busines Continuty Planning

Business continuity planning (BCP) addresses

– the preservation and

– recovery of business

– in the event of outages to normal businessoperations.

BCP counteracts

– interruptions to business activities and

– should be available to protect critical businessprocesses from the effects of major failures ordisasters.

Page 4: Business Continuty Planning and Disester Recovry Planning

Disaster Recovery Plans

Contains procedures for

– emergency response

– extended backup operation

– and post-disaster recovery

The primary objective of the disaster recovery plan is to provide

– the capability to process mission-essential applications, in a degraded mode,

– and return to normal mode of operation within a reasonable amount of time.

Page 5: Business Continuty Planning and Disester Recovry Planning

BCP Domains Cyber incident response plan

Disaster recovery planning

Recovery of a damaged facility or components

Occupant emergency plan (OEP)

Page 6: Business Continuty Planning and Disester Recovry Planning

BCP Domains Occupant emergency plan (OEP)

– provides the response procedures for occupants of a facility in the event of a situation

– posing a potential threat to the health and safety of personnel, the environment, or property.

Page 7: Business Continuty Planning and Disester Recovry Planning

BCP in Action Equipment failure (such as disk crash).

Disruption of power supply or telecommunication.

Application failure or corrupton of database.

Human error, sabotage or strike.

Malicious Software (Viruses, Worms, Trojan horses)

attack.

Hacking or other Internet attacks.

Social unrest or terrorist attacks

Naturala Disester

Evernenal deradation (Heat, Fire, water etc)

Page 8: Business Continuty Planning and Disester Recovry Planning

BCP Life Cycle

Page 9: Business Continuty Planning and Disester Recovry Planning

Diseter Rocovery Practices

Page 10: Business Continuty Planning and Disester Recovry Planning

Data Recovery

Hot Site

Warm Site

Cold Site

Mirror Site or Multiple Processing Centers

Mobile Site

Page 11: Business Continuty Planning and Disester Recovry Planning

DR Sites

Full volume backup

Differential backup

Incremental backup

Page 12: Business Continuty Planning and Disester Recovry Planning

Site Switch Over

Understand the severity of “disaster”

Coordinate the BCP (/ crisis) team

Execute the BCP according to the “disaster”

Communicate the crisis

Secure the primary site

Page 13: Business Continuty Planning and Disester Recovry Planning

Return to Home

Reactivate physical perimeter security systems (fire, IDS,

water, etc.)

Implement and test the IT infrastructure. (i.e. networks,

DNS, e-mail, etc.)

Certify the system is ready for operations.

Page 14: Business Continuty Planning and Disester Recovry Planning

It's Your Turn