- 1 - EASTERN AND SOUTHERN MANAGEMENT INSTITUTE EXECUTIVE MBA PROGRAMME LEADING CHANGE AND RESTRUCTURIND ED 502 – PROJECT PROJECT TOPIC Choose any one Transformation Model to analyse and effect improvements in service delivery in your organization or one that you are familiar with. Case study Exim Bank SUPERVISOR’S NAME: Prof. Munkumba Prepared by: FRED RAPHAEL Reg. No. 19EDA10107

Upload: fred-raphael-ilomo

Post on 21-Jan-2016

75 views

Category:

Documents


0 download

DESCRIPTION

Business process re engineering at Exim Bank Ltd

TRANSCRIPT

Page 1: Business process re engineering at Exim Bank Ltd

- 1 -

EASTERN AND SOUTHERN MANAGEMENT INSTITUTE

EXECUTIVE MBA PROGRAMME

LEADING CHANGE AND RESTRUCTURIND

ED 502 – PROJECT

PROJECT TOPIC Choose any one Transformation Model to analyse and effect

improvements in service delivery in your organization or one that you are familiar with. Case study Exim Bank

SUPERVISOR’S NAME: Prof. Munkumba

Prepared by: FRED RAPHAEL

Reg. No. 19EDA10107

Page 2: Business process re engineering at Exim Bank Ltd

- 2 -

Introduction This project aims to identify lapses in process of MoneyGram Services at the EXIM

Bank (T) Ltd. using one of the transformational tools discussed in class. The project will

further discuss how to simplify the process in terms of time effectiveness and other

attributes where necessary so as to increase MoneyGram Services performance at

EXIM Bank .The case study in this aspect is therefore EXIM Bank (T) Ltd. It is therefore

imperative to briefly know what this organization is all about by looking at its background

and products in brief.

Background of Exim Bank Tanzania Limited. Exim Bank is a locally established and privately owned commercial bank. Operations

began in August 1997 as a result of the liberalization of the banking and financial sector

in Tanzania. The Bank broke even within its first 5 months of operations, which is a rare

occurrence in any banking sector.

Since its inception, Exim has enjoyed year to year growth in profits, assets and

deposits. Exim is now ranks among the top ten Banks in Tanzania.

Exim Bank Tanzania Ltd network Exim Bank started its operations back in 1997 with only one branch that is Dar es

Salaam main branch. Today the bank has expanded its branch network to seventeen

fully fledged branches which are;

• In Dar es Salaam:

Samora, Clock Tower, Hillpark, Namanga, Nyerere Road and Temeke.

• In Arusha: Arusha Branch, Mount Meru branch

• Other Upcountry branches are:

Tanga, Mtwara, Morogoro, Mwanza, Moshi, Mbeya, Zanzibar, Iringa and Karatu.

These branches are online connected to one another and are all operating with profits.

Page 3: Business process re engineering at Exim Bank Ltd

- 3 -

Exim Bank (T) Ltd Product/Services

Current account

Fixed deposit

Investment Schemes

• Treasury Bills and Bonds

• Trust Accounts

International Banking

Savings account

Nyota Children’s Plan

MoneyGram

Credit Cards

Express Cash Cards

Salary Cards

Tumaini Accounts

Women Entrepreneurs Finance program (WEF)

Overdraft

Term Loan

Trade Finance products

Page 4: Business process re engineering at Exim Bank Ltd

- 4 -

CHAPTER ONE

BUSINESS PROCESS REENGINEERING

OVERVIEW

Business process reengineering (BPR) is, in management, an approach aiming at

improvements by means of elevating efficiency and effectiveness of the business

process that exist within and across organizations. The key to BPR is for organizations

to look at their business processes from a "clean slate" perspective and determine how

they can best construct these processes to improve how they conduct business.

Business Process Reengineering Cycle. (Source: Wikipedia encyclopedia)

Business process reengineering is also known as BPR, Business Process Redesign,

Business Transformation, or Business Process Change Management. Reengineering is

a fundamental rethinking and radical redesign of business processes to achieve

dramatic improvements in cost, quality, speed, and service. BPR combines a strategy of

promoting business innovation with a strategy of making major improvements to

Page 5: Business process re engineering at Exim Bank Ltd

- 5 -

business processes so that a company can become a much stronger and more

successful competitor in the marketplace.

The main proponents of reengineering were Michael Hammer and James A. Champy.

In a series of books including Reengineering the Corporation, Reengineering

Management, and The Agenda, they argue that far too much time is wasted passing-on

tasks from one department to another. They claim that it is far more efficient to appoint

a team who are responsible for all the tasks in the process. In The Agenda they extend

the argument to include suppliers, distributors, and other business partners.

Re-engineering is the basis for many recent developments in management. The cross-

functional team, for example, has become popular because of the desire to re-engineer

separate functional tasks into complete cross-functional processes. Also, many recent

management information systems developments aim to integrate a wide number of

business functions. Enterprise resource planning, supply chain management,

knowledge management systems, groupware and collaborative systems, Human

Resource Management Systems and customer relationship management systems all

owe a debt to re-engineering theory.

Business process reengineering (BPR) began as a private sector technique to help

organizations fundamentally rethink how they do their work in order to dramatically

improve customer service, cut operational costs, and become world-class competitors.

A key stimulus for reengineering has been the continuing development and deployment

of sophisticated information systems and networks. Leading organizations are

becoming bolder in using this technology to support innovative business processes,

rather than refining current ways of doing work.

Business process reengineering is one approach for redesigning the way work is done

to better support the organization's mission and reduce costs. Reengineering starts with

a high-level assessment of the organization's mission, strategic goals, and customer

needs. Basic questions are asked, such as "Does our mission need to be redefined?

Are our strategic goals aligned with our mission? Who are our customers?" An

Page 6: Business process re engineering at Exim Bank Ltd

- 6 -

organization may find that it is operating on questionable assumptions, particularly in

terms of the wants and needs of i ts customers. Only after the organization rethinks what

it should be doing, does it go on to decide how best to do it.

Within the framework of this basic assessment of mission and goals, reengineering

focuses on the organization's business processes--the steps and procedures that

govern how resources are used to create products and services that meet the needs of

particular customers or markets. As a structured ordering of work steps across time and

place, a business process can be decomposed into specific activities, measured,

modeled, and improved. It can also be completely redesigned or eliminated altogether.

Reengineering identifies, analyzes, and redesigns an organization's core business

processes with the aim of achieving dramatic improvements in critical performance

measures, such as cost, quality, service, and speed.

Reengineering recognizes that an organization's business processes are usually

fragmented into sub processes and tasks that are carried out by several specialized

functional areas within the organization. Often, no one is responsible for the overall

performance of the entire process. Reengineering maintains that optimizing the

performance of sub processes can result in some benefits, but cannot yield dramatic

improvements if the process itself is fundamentally inefficient and outmoded. For that

reason, reengineering focuses on redesigning the process as a whole in order to

achieve the greatest possible benefits to the organization and their customers. This

drive for realizing dramatic improvements by fundamentally rethinking how the

organization's work should be done distinguishes reengineering from process

improvement efforts that focus on functional or incremental improvement

Page 7: Business process re engineering at Exim Bank Ltd

- 7 -

BUSINESS PROCESS REENGINEERING METHODOLOGY

STEP 1

Preparation

n Establish objectives of quick-wins e.g. speed ,quality, effectiveness, efficiency,

responsiveness, others

n Define parameters for change – scope, time, risk, cost

n Select and train a cross – functional team and train them in BPR.

n Prepare a change plan and discuss it with stakeholder

STEP 2 Identification and Visioning

n Identify the tasks to be re-engineered

n Identify a few 4-5 critical core processes (value – adding and critical to achieving

organisational objectives)

n Identify major steps in the process

n Identify individuals, institutions involved in each process or sub-process

n Identify type and number of documents needed in each phase of the process.

n Identify the critical points in the process where failures are most frequently

experienced

n Identify the relevant legal and or regulatory requirements that govern each

process

n Identify inspection points in the process where someone just checks for

signatures, checks that necessary documents have been attached (photos,

certificates) but does not change anything to the document as such.

n Flow Chart and process map the sub-processes described above. Flow charts

trace the “service journey” undertaken by customers as they seek service from

your organisation.

Page 8: Business process re engineering at Exim Bank Ltd

- 8 -

STEP 3 Process Mapping

n Process maps, use arrows to indicate the direction in which the process or sub-process is moving.

n They also use boxes to indicate the office or person handling the process or sub-process.

n Beside each box, you indicate process measures such as total time elapsed, frequency of errors, quality losses, capacity or lack of it to undertake activities, cost of producing the service and other similar process measures.

. STEP 4 Upfront Analysis

n Undertake UPFRONT ANALYSIS by asking the following questions:

WHAT? WHEN? WHY? WHO? WHERE? and HOW?

1. WHAT is being done at each step of the process? What else can be done?

2. WHEN is it being done? When else can it be done?

3. WHY is it done that way? Why not do it in another way?

4. WHO is doing it? Who else can do it?

5. WHERE is the task being done? Where else can it be done?

6. HOW long does it take to complete the task? How long should it take to complete the task?

The end result of Process Analysis is achieving the following:

n ELIMINATE – non-value adding or unnecessary processes and sub-processes

n SIMPLIFY – documentation in terms of number and language used

n AMALGAMATE – processes which were duplicating

n MODIFY – laws, regulations governing the process, the sequence in which the tasks are being performed and

n INNOVATE – by creating new, simpler and cost effective processes

Page 9: Business process re engineering at Exim Bank Ltd

- 9 -

STEP 5 Re-engineer Processes

n Draw new process maps i.e. re-engineered processes, and confirm with authoritative sources that you have the “Correct “and “Official” processes.

n Prepare for pilot testing. Use results of piloting to further improve upon the processes.

n Redesign jobs as demanded by re-engineering and re-examine incentive systems.

STEP 6 Implementation

n Identify resources needed to implement the re-engineered processes i.e. tools, facilities, staff, office accommodation and the associated costs.

n Identify any training that is required in order to implement the new processes. Development a curriculum for the identified training needs.

n Develop Action Plans to implement the Quick-Wins and Institute a Monitoring and Evaluation mechanism.

SUCCESS OF BPR BPR, if implemented properly, can give huge returns. BPR has helped giants like

Procter and Gamble Corporation and General Motors Corporation succeed after

financial drawbacks due to competition. It helped American Airlines somewhat get back

on track from the bad debt that is currently haunting their business practice. BPR is

about the proper method of implementation.

General Motors Corporation

General Motors Corporation implemented a 3-year plan to consolidate their

multiple desktop systems into one. It is known internally as "Consistent Office

Environment" (Booker, 1994). This reengineering process involved replacing the

numerous brands of desktop systems, network operating systems and

application development tools into a more manageable number of vendors and

technology platforms. According to Donald G. Hedeen, director of desktops and

deployment at GM and manager of the upgrade program, he says that the

Page 10: Business process re engineering at Exim Bank Ltd

- 10 -

process "lays the foundation for the implementation of a common business

communication strategy across General Motors." Lotus Development Corporation

and Hewlett-Packard Development Company, formerly Compaq Computer

Corporation, received the single largest non-government sales ever from General

Motors Corporation. GM also planned to use Novell NetWare as a security client,

Microsoft Office and Hewlett-Packard printers. According to Donald G. Hedeen,

this saved GM 10% to 25% on support costs, 3% to 5% on hardware, 40% to

60% on software licensing fees, and increased efficiency by overcoming

incompatibility issues by using just one platform across the entire company.

DELL Incorporated

Michael Dell is the founder and CEO of DELL Incorporated, which has been in

business since 1983 and has been the world's fastest growing major PC

Company. Michael Dell's idea of a successful business is to keep the smallest

inventory possible by having a direct link with the manufacturer. When a

customer places an order, the custom parts requested by the customer are

automatically sent to the manufacturer for shipment. This reduces the cost for

inventory tracking and massive warehouse maintenance. Dell's website is noted

for bringing in nearly "$10 million each day in sales."(Smith, 1999). Michael Dell

mentions:

"If you have a good strategy with sound economics, the real challenge is to get

people excited about what you're doing. A lot of businesses get off track because

they don't communicate an excitement about being part of a winning team that

can achieve big goals. If a company can't motivate its people and it doesn't have

a clear compass, it will drift."

Dell's stocks have been ranked as the top stock for the decade of the 1990s,

when it had a return of 57,282% (Knestout and Ramage, 1999). Michael Dell is

now concentrating more on customer service than selling computers since the

PC market price has pretty much equalized. Michael Dell notes:

Page 11: Business process re engineering at Exim Bank Ltd

- 11 -

"The new frontier in our industry is service, which is a much greater differentiator

when price has been equalized. In our industry, there's been a pretty huge gap

between what customers want in service and what they can get, so they've come

to expect mediocre service. We may be the best in this area, but we can still

improve quite a bit—in the quality of the product, the availability of parts, service

and delivery time."

Michael Dell understands the concept of BPR and really recognizes where and

when to reengineer his business.

Ford Motor Company Ford reengineered their business and manufacturing process from just

manufacturing cars to manufacturing quality cars, where the number one goal is

quality. This helped Ford save millions on recalls and warranty repairs. Ford has

accomplished this goal by incorporating barcodes on all their parts and scanners

to scan for any missing parts in a completed car coming off of the assembly line.

This helped them guarantee a safe and quality car. They have also implemented

Voice-over-IP (VoIP) to reduce the cost of having meetings between the

branches.

Procter and Gamble Corporation A multi-billion dollar corporation like Procter and Gamble Corporation, which

carries 300 brands and growing really has a strong grasp in re-engineering.

Procter and Gamble Corporation's chief technology officer, G. Gil Cloyd, explains

how a company which carries multiple brands has to contend with the "classic

innovator's dilemma — most innovations fail, but companies that don't innovate

die. His solution, innovating innovation..." (Teresko, 2004). Cloyd has helped a

company like Procter and Gamble grow to $5.1 billion by the fiscal year of 2004.

According to Cloyd's scorecard, he was able to raise the volume by 17%, the

organic volume by 10%, sales are at $51.4 billion up by 19%, with organic sales

up 8%, earnings are at $6.5 billion up 25% and share earnings up 25%. Procter

and Gamble also has a free cash flow of $7.3 billion or 113% of earnings,

dividends up 13% annually with a total shareholder return of 24%. Cloyd states:

Page 12: Business process re engineering at Exim Bank Ltd

- 12 -

"The challenge we face is the competitive need for a very rapid pace of

innovation. In the consumer products world, we estimate that the required pace

of innovation has double in the last three years. Digital technology is very

important in helping us to learn faster." G. Gil Cloyd also predicts, in the near

future, "as much as 90% of P&G's R&D will be done in a virtual world with the

remainder being physical validation of results and options

CRITIQUE OF BPR MODEL Reengineering has earned a bad reputation because such projects have often resulted

in massive layoffs. This reputation is not altogether unwarranted, since companies have

often downsized under the banner of reengineering. Further, reengineering has not

always lived up to its expectations. The main reasons seem to be that:

• Reengineering assumes that the factor that limits an organization's performance

is the ineffectiveness of its processes (which may or may not be true) and offers

no means of validating that assumption.

• Reengineering assumes the need to start the process of performance

improvement with a "clean slate," i.e. totally disregard the status quo.

• According to Eliyahu M. Goldratt (and his Theory of Constraints) reengineering

does not provide an effective way to focus improvement efforts on the

organization's constraint.

There was considerable hype surrounding the introduction of Reengineering the

Corporation (partially due to the fact that the authors of the book reported bought

numbers of copies to promote it to the top of bestseller lists).

Abrahamson (1996) showed that fashionable management terms tend to follow a

lifecycle, which for Reengineering peaked between 1993 and 1996 (Ponzi and Koenig

2002). They argue that Reengineering was in fact nothing new (as e.g. when Henry

Ford implemented the assembly line in 1908, he was in fact reengineering, radically

changing the way of thinking in an organization). Dubois (2002) highlights the value of

signaling terms as Reengineering, giving it a name, and stimulating it. At the same there

Page 13: Business process re engineering at Exim Bank Ltd

- 13 -

can be a danger in usage of such fashionable concepts as mere ammunition to

implement particular reform. Read Article by Faraz Rafique. The most frequent and

harsh critique against BPR concerns the strict focus on efficiency and technology and

the disregard of people in the organization that is subjected to a reengineering initiative.

Very often, the label BPR was used for major workforce reductions. Thomas Davenport,

an early BPR proponent, stated that:

"When I wrote about "business process redesign" in 1990, I explicitly said that using it

for cost reduction alone was not a sensible goal. And consultants Michael Hammer and

James Champy, the two names most closely associated with reengineering, have

insisted all along that layoffs shouldn't be the point. But the fact is, once out of the

bottle, the reengineering genie quickly turned ugly."

Michael Hammer similarly admitted that:

"I wasn't smart enough about that. I was reflecting my engineering background and was

insufficient appreciative of the human dimension. I've learned that's critical." ]

Other criticism brought forward against the BPR concept include

• It never changed management thinking, actually the largest causes of failure in

an organization

• Lack of management support for the initiative and thus poor acceptance in the

organization.

• Exaggerated expectations regarding the potential benefits from a BPR initiative

and consequently failure to achieve the expected results.

• Underestimation of the resistance to change within the organization.

• Implementation of generic so-called best-practice processes that do not fit

specific company needs.

• Overtrust in technology solutions.

• Performing BPR as a one-off project with limited strategy alignment and long-

term perspective.

• Poor project management.

Page 14: Business process re engineering at Exim Bank Ltd

- 14 -

CHAPTER TWO

BUSINESS PROCESS REENGINEERING METHODOLOGIES

• IDENTIFICATION VISIONING

MoneyGram Service Overview MoneyGram Service is offered at all Exim Bank Branches whereby a customer is able

to send money and receive money anywhere in the world. Exim Bank acts as an agent

in providing MoneyGram Service. In the MoneyGram process it is observed that the

whole process of sending, receiving money takes a lot of time hence frustrates

customers who need the service.

One customer can be served up to 10 minutes which is a very bad remark for a service.

• PROCESS MAPPING

MoneyGram Process at Exim bank Tanzania Ltd

The process is shown from the diagram below

CUSTOMER POPS IN AND GOES TO MONEYGRAM COUNTER FOR ENQUIRY OR START FILLING RECEIVING/SENDINGFORMS IF HE/SHE KNOWS THE PROCEDURE .

RECEIVING:CUSTOMER GOES TO MONEYGRAM OFFICER FOR TRANSACTION CHECKING. (1 TO 2 MINS)

SENDING:CUSTOMER GOES TO TELLER (CASHIER) AND PAY CASH + COMMISSION (2 TO 3 MINS)

RECEIVING: MONEYGRAM OFFICER COLLECTS IDENTIFICATIO DOCUMENTS AND OTHER SUPPORTING DOCS FOR VERIFICATION. (1 TO 2 MINS)

SENDING: TELLER IDENTIFICATIO DOCUMENTS AND OTHER SUPPORTING DOCS FOR VERIFICATION. (1 TO 2 MINS)

Page 15: Business process re engineering at Exim Bank Ltd

- 15 -

• UPFRONT ANALYSIS FINDINGS

From the diagram above we can see that the customer has to take some routes either from MoneyGram officer to teller or from teller to MoneyGram officer.

We can also note that the process takes a lot of time when it goes for approval to a manager.

The process involves more than two personnel but in actual sense only one person can handle the whole process. This situation increase time lapse of the whole process.

RE-ENGINEERING THE PROCESS In order to reduce time lapses we should opt to do the following:

1. Putting only one personnel in MoneyGram service process:

From the diagram, if we can assign only a teller to perform MoneyGram process, time lapse will be reduced up to 5 to 7 minutes time.

2. Since a Manager has lots of things to do, we can allow teller to verify and then the report is to be produced that a manager will be able to verify at the end of business day. This will also reduce time lapse as sometimes it takes more than ten minutes for request to be in managers hand.

If we will implement the solution, the diagram will be as follows:

RECEIVING: MONEYGRAM OFFICER CHECKS VALIDITY OF TRANSACTION AND SEND REQUEST FOR APROVAL TO A MANAGER (4 TO 10 MINS DEPENDING ON MANAGER AVAILABILITY)

SENDING: TELLER APPROVES PAYMENT AND CUSTOMER IS SENT TO MONEYGRAM OFFICER FOR TRANSACTION PROCESSING (2 TO 3 MINS)

RECEIVING: MANAGERAPROVES THE TRANSACTION AND MONEYGRAM OFFICER SEND CUSTOMER TO TELLER (CASHIER) FOR PAYMENT.

SENDING: MONEYGRAM OFFICER PROCES TRANSACTION AND PROVIDE ALL NECESSARY INFORMATION TO SENDER TO IN FORM DESTINED RECEIVER

Page 16: Business process re engineering at Exim Bank Ltd

- 16 -

CONCLUSION

From the diagram, we can see that process has been reduced therefore time span is reduced and increase capacity of serving more customers.

CUSTOMER POPS IN AND GOES TO CUSTOMER SERVICE DESK FOR ENQUIRY OR START FILLING RECEIVING/SENDINGFORMS IF HE/SHE KNOWS THE PROCEDURE.

RECEIVING:CUSTOMER GOES TO TELLER FOR TRANSACTION CHECKING. (1 TO 2 MINS)

SENDING:CUSTOMER GOES TO TELLER (CASHIER) AND PAY CASH + COMMISSION (2 TO 3 MINS)

RECEIVING: MONEYGRAM OFFICER COLLECTS IDENTIFICATIO DOCUMENTS AND OTHER SUPPORTING DOCS, VERIFY TRANSACTION AND PAY THE CUSTOMER. (1 TO 3 MINS)

SENDING: TELLER COLLECT IDENTIFICATION DOCUMENTS AND OTHER SUPPORTING DOCS FOR VERIFICATION AND PROCESS THE TRANSACTION. (2 TO 3 MINS)

Page 17: Business process re engineering at Exim Bank Ltd

- 17 -

RECOMENDATION

From the project above we can see that Business Process Re-engineering Transformation Model is very essential to our organization to improve organization efficiency and performance in general. The process was recommended to be put in place to improve various processes for service delivery at Exim Bank (T) Ltd

REFERENCES

• http://en.wikipedia.org/wiki/Business_process_reengineering

• Prof Munkumba Lecture Notes

• Making Sense of Change Management: A Complete Guide to the Models Tools and Techniques of Organizational Change Esther Cameron and Mike Green