1 By E-mail PRASAR BHARTI (BROADCASTING CORPORATION OF INDIA) DOORDARSHAN MAINTENANCE CENTRE FAIZABAD DDMC: FAIZABAD Phone/Fax: 05278-222093 E-mail: [email protected] Month : JULY-2011 Date: 08-08-2011 No. 3(2)/2011-2012/TMT/DMC/FZD/ The Chief Engineer (NZ), (Kind Attn.Smt. Pinki Munsi, DE) Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, New Delhi-110001. Sub : CONCISE MONTHLY REPORT on the working of LPT under DMC FAIZABAD. Sir, Kindly find enclosed the technical monthly report of DMC Faizabad as mentioned above in respect of following relay centres. 1. SULTANPUR DD-I 2. SULTANPUR DD-II 3. RAEBAREILY 4. GAURIGANJ 5. JAGDISHPUR 6. LALGANJ (PRATAPGARH) DD-II 7. RUDAULI 8. MANAKAPUR (VLPT) Yours Faithfully (K.K. Gupta) Station Engineer

Upload: vudat

Post on 07-Sep-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

1

By E-mail

PRASAR BHARTI (BROADCASTING CORPORATION OF INDIA)

DOORDARSHAN MAINTENANCE CENTRE FAIZABAD DDMC: FAIZABAD Phone/Fax: 05278-222093 E-mail: [email protected] Month : JULY-2011 Date: 08-08-2011 No. 3(2)/2011-2012/TMT/DMC/FZD/ The Chief Engineer (NZ), (Kind Attn.Smt. Pinki Munsi, DE) Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, New Delhi-110001.

Sub: CONCISE MONTHLY REPORT on the working of LPT under DMC FAIZABAD. Sir, Kindly find enclosed the technical monthly report of DMC Faizabad as mentioned above in respect of following relay centres. 1. SULTANPUR DD-I 2. SULTANPUR DD-II 3. RAEBAREILY 4. GAURIGANJ 5. JAGDISHPUR 6. LALGANJ (PRATAPGARH) DD-II 7. RUDAULI 8. MANAKAPUR (VLPT)

Yours Faithfully (K.K. Gupta)

Station Engineer

Page 2: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

2

MONTHLY REPORT

OF DMC FAIZABD

for the month of… JULY -2011…

1. GENERAL

1.1 DETAILS OF IMPORTANT TECHNICAL WORK DONE AT LPTs / VLPTs

DURING THE MONTH

Name of Station Details of the important technical work done

REMARKS

LPT SULTANPUR

DD I 1. 2. 3.

DD II 1. 2. 3.

LPT RAIBARELY

1. 2. 3.

LPT GAURIGANJ

1. 2. 3.

LPT JAGDISHPUR

1. 2. 3.

LPT LALGANJ,

(Pratapgarh)

1. 2. 3.

LPT RUDAULI

1. 2. 3.

VLPT MANKAPUR

1. 2. 3.

Page 3: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

3

1.2 DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT

DURING THE MONTH

DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTH

Name Designation

Emp. No.

Relieved from

Station

Relieving Date

Joined at Joining date

Transfer order No. and Date

Sh. S.C. Jaiswal Sr. Tech. 22004 HPT Faizabad 15.07.2011 LPT Rudauli 26.07.2011 21/2011/A-19/15(2)/2011 EPC dt 09.05.2011

Sh. B.P. Tiwari Sr. Tech. 21932 LPT Raebareli 30.06.2011 LPT Gauriganj 01.07.2011 21/2011/A-19/15(2)/2011 EPC dt 09.05.2011

Sh. Ram Pratap Sr. Tech. 22181 LPT Gauriganj 30.06.2011 LPT Raebareli 01.07.2011 21/2011/A-19/15(2)/2011 EPC dt 09.05.2011

DETAILS OF OFFICERS / STAFF RELIEVED DURING THE MONTH

Name Designation Emp. No.

Relieved from Station

Relieving Date

To join at Transfer order No. and Date

Sh. Abrar Ahmad Sr. Tech. - LPT Rudauli 15.07.2011 HPT Faizabad 25/2011/A-19/15(2)/2011 EPC dt 10.06.2011

1.3 TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE / CONTROLLING OFFICERS DURING THE MONTH

NAME OF OFFICER

TOUR DETAILS PERIOD OF E.L. / MEDICAL LEAVE ALONGWITH ITS NATURE PERIOD PLACE

1.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF DURING THE MONTH

NAME OF OFFICER / STAFF

DESIGNATION PERIOD PLACE NAME OF COURSE

From To

Page 4: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

4

1.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / LPTs / VLPTs

DURING LAST SIX MONTHS

Name of Station

Name of equipment

Date of receipt of equipment

Received from

Whether put in to circuit

Performance of equipment

Remarks

SULTANPUR 1. Surge-protection System

RAEBARILY GAURIGANJ 1. Surge-protection

System

JAGDISHPUR

1. Agile Modulator make sharp vision

2. Automatic Gain Control Amplifier, Sharp

3. Surge-protection System

LALGANJ RUDAULI VLPT MANKAPUR

1.6 DETAILS OF SCROLLER

Name of Station

Working Status of Scroller-1

Working Status of Scroller-2

Revenue generated in

current month

Progressive revenue generated in current

financial year LPT

SULTANPUR Ok Diverted to

HPT Faizabad Nil Nil

LPT RAEBARILY

Ok Def 596 596

1.7 ELECTRIC CONNECTION DETAILS

Name of Station

Availability of Electricity

Whether Single Phase / Three

Phase

Sanctioned Load

Power Factor

SULTANPUR Yes 3Ø 20 KVA RAEBARILY Yes 3Ø 10 KVA 0.85 GAURIGANJ Yes 3Ø 08 KVA 0.87 JAGDISHPUR Yes 3Ø 14 KVA 0.88 LALGANJ Yes 3Ø 11 KVA RUDAULI Yes 3Ø 26.9 KVA 0.85 VLPT MANKAPUR

Yes Provided free of cast by ITI Mankapur

Page 5: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

5

1.8 LAND / BUILDING DETAILS

Station

Name of Owner

of Land

Category of Owner (Deptt. / Govt. / Private)

Type of Building

(Porta Cabin / Permanent)

Is Buildin

g / Porta Cabin constructed

departmentally

Rent of Setup

(Rs. p.m.)

Availability of

Lease Deed

Due Date of

Renewal of Lease

Deed

Due Date of

Revision of Rent

Remarks

SULTANPUR GOVT GOVT PERMANENT - Rent free No - - -

RAEBARILY GOVT GOVT PERMANENT - Rent free No - - -

GAURIGANJ GOVT GOVT PERMANENT - Rent free No - - -

JAGDISHPUR GOVT GOVT PERMANENT - Rent free No - - -

LALGANJ GOVT GOVT PERMANENT - Rent free No - - -

RUDAULI PRIVATE PRIVATE PERMANENT - 7000/- Yes 15/02/12 16/02/07 -

VLPT MANKAPUR

GOVT ITI Ltd. MANKAPUR GONDA

PERMANENT - Rent free No - - -

Page 6: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

6

2. TECHNICAL 2.1 DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH – JULY 2011

LPT SULTANPUR

LPT RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

DD II

LPT RUDAULI

VLPT MANKAPUR

DD I DD II 1 Test Hours 15.50 15.50 15.50 5.17 5.20 5.16 5.17 0

2 Scheduled Prog. Hours

580.70 558 580.32 580.21 581.32 559.58 580.85 744

3 Gear Breakdown Hrs.

- - - - - - - 0

4 Power Supply Breakdown Hrs.

1.11 1.11 1.55 1.33 1.55 1.58 0.65 0

5 Other Causes Breakdown Hrs.

- - - - - - - 0

6 Total Breakdown Hrs. (3+4+5)

1.11 1.11 1.55 1.33 1.55 1.58 0.65 0

7 Prog. Hours Radiated (2-6)

579.59 556.89 578.77 578.88 579.77 558 580.20 744

8 Total Hours of Working (1+7)

595.09 572.39 594.27 584.05 584.97 563.16 585.37 744

9 % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}

0.19% 0.20% 0.27% 0.23% 0.27% 0.28% 0.11% 0

10 Year of Commissioning XTR Make/ Power XTR Type Channel of operation

05/10/2005 BEL-500W MUV 199 CH#34(+) 45M.-SS

31/3/2002 BEL-500W MUV 199 CH#28(-) 45M.-SS

28/7/2005 GCEL-500W 12U 500 CH#31(-) 45M.-SS

9/10/2002 BEL-500W MUV 199 CH#26 45M.- SS

Sept./1989 BEL -100W MUV 150 CH#25(+) 45M.- SS

28-01-2011 WML-12U 500W 11-V.2 UHF CH#30(.) 45M.- SS

13/81998 GCEL 300W UHF300 CH#22 45M. - SS

10/3/1988 GCEL -126 10W CH# 12 30M. gaiye

Page 7: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

7

2.2 PROGRESSIVE TOTAL FROM APRIL OF CURRENT FINANCIAL YEAR 2011-2012

LPT

SULTANPUR LPT

RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Test Hours 61.00 61.00 60.67 20.34 22.90 20.32 20.34 0

2 Scheduled Prog. Hours 2297.66 2196.02 2296.63 2295.25 2297.84 2197.58 2296.52 2928

3 Gear Breakdown Hrs. - - - - - - - 0

4 Power Supply Breakdown Hrs. 1.11 1.11 1.55 1.33 1.55 1.58 0.65 0

5 Other Causes Breakdown Hrs. - - - - - - - 0

6 Total Breakdown Hrs. (3+4+5) 4.87 4.84 7.34 4.37 8.51 1.58 0.65 0

7 Prog. Hours Radiated (2-6) 2292.79 2191.18 2289.29 2290.88 2288.33 2196 2295.87 2928

8 Total Hours of Working (1+7) 2353.79 2252.18 2349.96 2311.22 2311.23 2216.32 2316.21 2928

9 % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}

0.21% 0.22% 0.32% 0.19% 0.37% 0.07% 0.03% 0

Page 8: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

8

2.3 DETAILS OF POWER OF TRANSMITTER FOR THE MONTH – JULY 2011

LPT SULTANPUR

LPT RAIBAREL

Y

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Rated Power of Transmitter (in KW / Watts)

500 Watt

500 Watt 500 Watt 500 Watt 100 Watt 500 Watt 300 Watt 10 Watt

2

Forward Peak Power of Transmitter

Video 500 Watt

500 Watt 500 Watt 500 Watt 100 Watt 117 Watt 300 Watt 10 Watt

Audio

3

Reflected Power

Video 3 Watt 3 Watt 3 Watt 3 Watt 1 Watt 2 Watt 1 Watt 0 Audio

4 Since when Transmitter is on less than rated power (if applicable)

5 Reasons for less than rated power

6 Reasons for high reflection, if any

Page 9: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

9

2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER (Sync Peak Video Power less than rated power)

LPT

SULTANPUR LPT

RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Dates

29.03.11

2 Duration

558 Hrs.

3 Power (Radiation)

117 W

4 Reasons Both the P.A. has

gone to Low Power

5 Total duration of

Low Power in hours during

the month

558 Hrs.

6 No. of occurrences

1

7

Progressive total of

occurrences of Low Power Radiation

1

8 Progressive

total of duration of Low

Power Radiation

2246 Hrs.

9 Complaints of

reception, if any & Reason of complaints

NO

Page 10: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

10

2.5 DETAILS OF MAJOR BREAKDOWN DURING THE MONTH (More than 15 minutes)

LPT ‘S Date Duration Period Reasons

for B/D Action

taken to solve the

B/D

Preventive action taken to avoid such breakdown in future From To

VLPT-MANKAPUR

Date Duration Period Reasons for B/D

Action taken to solve the

B/D

Preventive action taken to avoid

such breakdown in future

From To

2.6 CATEGORY-WISE BREAKDOWN DURING THE MONTH- JULY 2011

LPT’S

NAME OF LPT

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

SULTANPUR

DD I - - - - - - 67 1.11 - - - -

DD II -

-

-

-

-

- 67 1.11 -

-

-

-

RAEBAREILY -

-

-

-

-

- 98 1.55 -

-

-

-

GAURIGANJ - - - - - - 80 1.33 - - - - JAGDISHPUR -

-

-

-

-

- 93 1.55 -

-

-

-

LALGANJ -

-

-

-

-

- 95 1.58 -

-

-

-

RUDAULI - - - - - - 39 0.65 - - - -

Page 11: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

11

VLPT - MANAKAPUR

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. 0 0 0 0 0 0 0 0 0 0 0 0

2.7 CATEGORY-WISE PROGRESSIVE BREAKDOWN FROM JULY OF

CURRENT FINANCIAL YEAR 2011-2012

LPT’S

NAME OF LPT GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

SULTANPUR DD I -

-

-

-

-

-

292

4.87

-

-

-

-

DD II -

-

-

-

-

-

290

4.84

-

-

-

-

RAEBAREILY -

-

-

-

-

-

442

7.34

-

-

-

-

GAURIGANJ -

-

-

-

-

-

263

4.37

-

-

-

-

JAGDISHPUR -

-

-

-

-

-

512

8.51

-

-

-

-

LALGANJ -

-

-

-

-

-

95

1.58

-

-

-

-

RUDAULI -

-

-

-

-

-

39

0.65

-

-

-

-

Page 12: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

12

VLPT-MANKAPUR

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. 0 0 0 0 0 0 0 0 0 0 0 0

2.8 PERFORMANCE FIGURES OF TRANSMITTER LPT

SULTANPUR

LPT REBAREILY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR Remark

DD I DD II

Frequency of Vision Carrier

Frequency of Aural Carrier

K Factor

(1) K-Bar

(2) K Pulse to Bar

(3) K2T

Differential Gain

Differential Phase

Signal to Noise Ratio

Vision Peak Power

Page 13: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

13

2.9 VIDEO FREQUENCY RESPONSE

NAME OF LPT Freq (MHz) Gain in dB

-1.25 -0.75 0.0 1.0 1.5 2.0 3.0 4.43 5.0 5.30 5.50

SULTANPUR DD I

DD II

RAEBAREILY

GAURIGANJ

JAGDISHPUR

LALGANJ

RUDAULI

VLPT- MANKAPUR

2.10 AUDIO PERFORMANCE FIGURES

LPT

SULTANPUR

LPT

RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR DD I DD II

Aural Carrier

Frequency response 50 Hz to 15 KHz

Distortion

Factor

F.M. Noise level

Frequency Deviation at 100% Modulation

Page 14: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

14

2.11 WORKING STATUS OF 500W AUTO MODE TRANSMITTERS

(Wherever applicable)

S.No. Name of LPT Xtr. Make, Model,

Channel Whether

Operating on Auto / Manual Mode

Details of Fault

occurred

Current Working Status

(in detail)

Remarks

2.12 WORKING STATUS OF VLPTs (Wherever applicable) Sr. No.

Name of VLPT

Ch. No.

Type of Transmitter

Rated Power

O/P Power

Reflected Power

Ex-1

Ex-2

PA1 PA2 ASU

Sr. No.

Name of VLPT

Batteries (In circuit)

Solar Panel Battery Charger

Charge Controller

Installed Damaged Remark Installed Damaged Remark

2.13 EARTH RESISTANCE (in Ohms)

Station TX

EARTH PS

EARTH DG Set PDA-1 PDA-2 TOWER

Date of measurem

ent

Make, Model and type of Instrument

used for measurement

SULTANPUR 0.78 3.53 4.43 1.48 - 0.81 10.09.09 Waco

Digital earth Resistance Meter

RAEBARILY 0.86 1.1 - - - 1.0 15.09.09 Waco

Digital earth Resistance Meter

GAURIGANJ 0.84 1.4 1.6 - - 2.4 20.09.09 Waco

Digital earth Resistance Meter

JAGDISHPUR 0.48 0.46 0.41 0.39 0.47 0.49 12.07.09 Waco

Digital earth Resistance Meter

LALGANJ 0.74 0.68 1.24 0.92 1.73 0.51 11.08.09 Waco

Digital earth Resistance Meter

RUDAULI 0.78 - 1.6 1.0 1.0 - 25.09.09 Waco

Digital earth Resistance Meter

VLPT MANKAPUR - - - - - - - -

Page 15: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

15

3. EQUIPMENTS & SPARES

3.1 REQUIREMENT OF SPARE COMPONENTS

Station Name of LPT

Name of Compon

ent

Part No. Name of Unit of

transmitter for which required

Quantity Required

Qty available

at Station

Qty issued to Station during

last six months

Justification for

requirement

SULTANPUR DD I TPV 8100B - PA 06 0 0 DD II

RAEBARILY GAURIGANJ TPV 8100B PA 06 0 0 JAGDISHPUR LALGANJ RUDAULI VLPT MANKAPUR

3.2 REQUIREMENT OF SPARE EQUIPMENTS / CARDS / MODULES

Station Name of LPT

Name of Equirpm

ent /Card/

Module

Part No. Name of Unit of

transmitter for which required

Quantity Required

Qty available

at Station

Qty issued to Station during

last six months

Justification for

requirement

SULTANPUR DD I DD II

RAEBARILY GAURIGANJ JAGDISHPUR LALGANJ RUDAULI VLPT MANKAPUR

Page 16: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

16

3.3 AVAILABILITY OF SPARE -- COMPONENTS / MODULES /

TRANSMITTER UNITS

Spare Components

Station Name of LPT

Name of Spare Component

Qty. in Stock Working Status

SULTANPUR DD I DD II

RAEBARILY GAURIGANJ

JAGDISHPUR LALGANJ RUDAULI

VLPT MANKAPUR

Spare Transmitter Modules

Station Name of LPT

Name of Spare Component

Qty. in Stock Working Status

SULTANPUR DD I DD II

RAEBARILY GAURIGANJ

JAGDISHPUR LALGANJ RUDAULI

VLPT MANKAPUR

Spare Transmitter Units

Station Name of LPT

Name of Spare Component

Qty. in Stock Working Status

SULTANPUR DD I DD II

RAEBARILY GAURIGANJ

JAGDISHPUR LALGANJ RUDAULI

VLPT MANKAPUR

Page 17: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

17

3.4 DETAILS OF DEFECTIVE TRANSMITTER EQUIPMENT

STATION Make &

Model of Transmitt

er

Name of defective

Tx equipment

Since when it is

defective

Action taken by Station for the repair

Shortcoming if any, being

faced by station for the repair

Remarks

SULTANPUR DD I

DD II RAEBARILY GAURIGANJ

JAGDISHPUR LALGANJ RUDAULI

VLPT MANKAPUR

3.5 WORKING STATUS OF AVR FOR TRANSMITTER

Station Capacity

of AVR Make and Type Working

Condition ( Auto/Manual/def)

Action Taken for repair, if defective

SULTANPUR DD I 10 KVA Sylvan o2 Auto - DD II 10 KVA Stabline 01 XDEL01 Auto -

RAEBARILY 10 KVA Delta Power 01 AutoGAURIGANJ 10 KVA Toshniwal 02 Auto

JAGDISHPUR 10 KVA Cybox 01 AutoLALGANJ 10 KVA Sylvan AutoRUDAULI - - -

VLPT MANKAPUR

3.6 WORKING STATUS OF DIESEL / PETROL / KEROSENE GENERATOR

SETS AT LPTs / VLPTs

Station Capacity of

Generator Make, Model and

Type Working Condition

Action

Taken for repair, if defective

SULTANPUR DD I 15 KVA, 10 KVA Kilosker HA294 OK

DD II 15 KVA Kilosker HA294 OK RAEBARILY 15 KVA 02 No. Kilosker HA294 OK GAURIGANJ 15 KVA, 10 KVA Kilosker HA294 OK JAGDISHPUR 12.5 KVA, 10 KVA Kilosker HA294 OK

LALGANJ 10 KVA Kilosker HA294 OK RUDAULI 15 KVA 02 No. Kilosker HA294 OK

VLPT MANKAPUR

- - -

Page 18: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

18

3.7 TVRO ELECTRONICS

Station Make & Type

of IRDs Total No. available

Total No. Defective

Action taken by

Station for repair

Remarks

SULTANPUR DD I Scopus 2800 04 02

DD II

RAEBARILY Scopus 2800

Thamson DSR100T

0301 0

GAURIGANJ Scopus 2800 03 JAGDISHPUR Scopus 2800 03 01 LALGANJ Thamson

DSR100T 01 0

RUDAULI Scopus 2800 Thamson DSR100T

0301 0

VLPT MANKAPUR Scopus 2800 01

3.8 UPS

Station Make, Model and Rating of

UPS

Total No. available

Total No. Defective

Action taken by

Station for repair

Remarks

SULTANPUR DD I

DD II RAEBARILY GAURIGANJ JAGDISHPUR LALGANJ RUDAULI UPS - 6KVA Def. Communicate

to CE (NZ) VLPT MANKAPUR

Page 19: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

19

3.9 AIRCONDITIONERS & AVRs

Station Total

No. at Station

Defective Nos.

Make and Model of defective

Date from

which defective

Reason for

Being defective

Action taken

by Station for the repair

Airconditioner

SULTANPUR 07 01 - - - Under

rep.

RAEBARILY 04

Split 02 - - - - -

GAURIGANJ 02

Split 02 - - - - -

JAGDISHPUR 03 - - - - -

LALGANJ 03 - - - - -

RUDAULI 04 01 - - - -

VLPT MANKAPUR

01 - - - - -

AVRs for ACs

SULTANPUR 06 - - - - -

RAEBARILY 05 - - - - -

GAURIGANJ 03 - - - - -

JAGDISHPUR

02 - - - - -

LALGANJ 03

-

-

-

-

-

RUDAULI 02 - - - - -

VLPT MANKAPUR

- - - - - -

Page 20: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

20

3.10 DETAILS OF DEFECTIVE INPUT / MONITORING AND MEASURING EQUIPMENTS

Station Name of defective

equipment

Make and model of defective

equipment

Date from which

defective

Action taken by Station for the repairing

SULTANPUR

RAEBARILY

GAURIGANJ

JAGDISHPUR

LALGANJ

RUDAULI

VLPT MANKAPUR

3.11 WORKING FIGURES OF DIESEL GENERATORS

For LPTs only LPT

SULTANPUR

LPT REBAREILY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

DD I

DD II

Make Kirloskar HA294 HA294 HA294 HA294 HA394 HA294 HA294 HA294

Capacity 15 KVA 15 KVA 15 KVA 15 KVA

15 KVA 10 KVA

12.5 KVA 10 KVA 25 KVA 15 KVA

15 KVA Utilization for transmission during the month 96.07 95.92 124.14 295.35 173.30 200.84 281.81

Test Hrs. for the month 2.58 2.58 5.67 - 8.0 5.16 5.16

Total Working Hrs. for the month 98.65 98.50 129.81 295.35 181.30 206 286.97

Progressive utilization 509.61 507.38 549.53 1470.71 1239.48 800.03 1183.23

Occasion of utilization during the month 67 67 105 119 93 127 122

Progressive Utilization 293 291 494 478 512 1053 485

Breakdown in service due to failure of D/G during the month

- - - - - - -

Average consumption of Diesel 2.10L/H 1.97 L/H 2.10L/H

2. 07L/H 2.29L/H 2.67L/H

2.0L/H 2.20L/H 2.25L/H 2.45L/H

3.03L/H Date of commissioning of DG set

Total Hours of working since date of commissioning

Reading of Hour Meter installed at DG Set at the end of month

Reading of Hour Meter installed at LT Panel at the end of month

Page 21: By E-mail PRASAR BHARTI (BROADCASTING … · monthly report of dmc faizabd ... mankapur 1. 2. 3. 3 1.2 details of officers / staff relieved / joined from / at ... 1.4 training details

21

4. CABLE OPERATORS MONITORING REPORT

MONITORING REPORT FOR THE IMPLEMENTATION OF CABLE TV NETWORK REGULATION ACT ZONE: NORTH ZONE DMC: FAIZABAD MONTH: JULY -2011

S.N

o

State & Name of

Monitoring Station

Name & Address of

MSOs

DD CHANNELS TO BE CARRIED ON CABLE NETWORK Remarks/ Action Taken

(Identifying defaulter MSOs, Details about

complaints lodged with law enforcing agencies etc.)

Prime Band Channels

NON Prime Band Channels

DD

-Nat

iona

l

DD

-New

s

DD

-Reg

./ B

h art

i D

D-S

port

s

DD

-Urd

u

DD

-RS

Gay

an

Dar

shan

DD

-Bha

rti (

if no

t cov

erd

in P

rime

Ban

d)

1 U.P.

Faizabad Central Shakti Cable Network

YES YES NO YES YES NO NO NO Both the cable operators are going to increase their channel capacity shortly then they will provide other channel also.

2 U.P. Faizabad

Central Cable Network

YES YES NO YES NO NO NO NO

3

♣♣♣♣♣♣