Report Actions of State Organization of Schools Renovation in the fourth Development Program of I.R. of Iran. By : M. Raeisi. Table of Content. Part 1 : Seismic Hazard in Iran Part 2 : Budget Legislated by Parliament for Schools Part 3 : Brief Report on Activities in Renovation Schools - PowerPoint PPT PresentationTRANSCRIPT
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 1
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 2
Report Actions of State Organization
of Schools Renovation in the fourth
Development Program of I.R. of IranBy : M. Raeisi
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 3
Part 1 : Seismic Hazard in Iran
Part 2 : Budget Legislated by Parliament for Schools
Part 3 : Brief Report on Activities in Renovation Schools
Part 4 : Brief Report on Activities in Rehabilitation
Part5 : Brief Report on Other Activity
Table of Content
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 4
Part 1
Seismic Hazard in Iran
Part 1
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 5
Kind of Hazard
Part 1
• Flood Hazard• Tropical Cyclone Hazard• Land Sliding Hazard• Climate Change Hazard• Fire Hazard• Earthquake Hazard
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 6Part 1
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 7Part 1
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 8
• the most devastating earthquake occurred in the word have been in Asia.
• more than 500,000 people are killed in the earthquake and related hazards at Asia.
Between 1990 - 2008
40 strong
earthquake
in district
14 strong
earthquake
in Iran
75000 Person
were killed
in Iran
Part 1
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 9Part 1
Date Epicenter Magnitude deaths Financial and structural damage
1278 Silakhor 7.4 8000 64 villages were completely destroyed
1309 Salmas 7.2 2500 60 villages were completely destroyed
1336 Gharsinch 7.2 1100 200 villages were completely destroyed
1341 Boien Zahra 7.2 10000 Large part of the city destroyed
1347 Dashte Bayaz 7.3 10500 61 villages were completely destroyed
1351 Ghir and Kazerun 7 4000 Large damage
1353 Bandar Abbas 6 6000 365 building collapsed
1357 Tabas 7.7 20000 61 villages were completely destroyed
1360 Golbaf(Kerman) 6.7 1000 Some villages were completely destroyed
1360 Siraj(Kerman) 7.3 1300 Some villages were completely destroyed
1369 Rudbar(Manjil) 7.7 40000 Large damage in Manjil,Rudbar and other villages
1375 Nir( Ardebil) 6.1 1200 130 villages were completely destroyed
1376 Ghaen 7.3 1560 147 villages were completely destroyed
1382 Bam 6.5 31728 Large Damage in Bam and Baravat
1383 Dahuie 6.4 612 7000 Buildings were damaged
Important earthquakes in Iran
Important earthquakes in Iran in the last Century
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 10
Why School and Student?
Part 2
Children are amongst the most vulnerable group
High capacity of learning and transferring knowledge
Schools can be used as an shelters and relief center shelters
center after disasters.
Schools and Students are the Future
They are important institutions in forming the safety culture
of a society.
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 11
All school in IRAN were investigated (about 90,000 school)
The information registered include
The school Staff
The school students
The school buildings
The installation of school buildings
The hazard in the region schools located
Technical Identification of school
2004
• Earthquake• Landslide• Flood,
storm• Fire
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 12
The school where divided in to 3 categoriesStrong
Renovating
Rehabilitating
Technical Identification of school
2004
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 13
Stability & solidity Status of School buildingsRehabilitative
26%
Strong(solid) 44%
Renovative 30%
Strong
Renovative
Rehabilitative
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 14
The law on destruction and renovation2006
Enactment parliament
3 billion$ For Renovation school ( with out adjustment)
1 billion$ For Rehabilitation school
( with out adjustment)
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 15
Allocation by the government
2.5 billion$ For Renovation
school
0.28 billion$ For Rehabilitation
school
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 16
Part 3
Brief Report on Activities in
Renovation Schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 17
Renovation Projects according to Act of the Parliament
The area of schools needed to be reconstructed (m²)
13193500
schools finished (m²) 5300000
schools under reconstructed (m²) 1200000
Total (m²) 6500000
Achieve to goal 49%
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 18
(the area equal 6,500,000 square meters)
Achievement of Program
The Islamic Republic of Iran has upgraded seismic safety of more than 46000 Classroom in the form demolition and reconstructing and Spend More than 2.5 billion Dollar for Purpose
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 19
Part 3
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 20
Part 3
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 21
Part 3
New Approache in Construction of Schools
A. StructureB. ArchitectureC. FacilitiesD. Educational equipment ( workroom-lab-
computer site)E. Marginal equipment (sport spaces-prayer
room)
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 22
Part 3
A) Industrialisation of Building StructureB) using Light and safe materials
• Insulated Concrete Forms (ICF) • Light Gauge Steel Frame (Cold-Formed Steel)
New Approach in Construction of Schools
Structure
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 23
New School Construction Approach
A) Industrialisation of Building Structure
- Quality Control- Rapid Construction- Precise Construction- Mass production of frame elements- Omission of extra non-useful elements & lightening
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 24
New School Construction Approach
B) using Light and safe materials (Cold-Formed Steel) Decrease of dead surcharge
High ratio of resistance to weight (R/W)Variety of form & feature of cold-formed elements Easy quality control through using bolted jointsDesign of lateral loads resisting structureNonstructural elements could be attached easily No heavy and bulky elementsSeveral bearing parts availablePrefabricated in high quantityFast constructionModular constructionEasy transportation Easily connection of jointsDry and wet construction
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 25
New School Construction Approach
A) Industrial Construction of Building Frames
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 26
New School Construction Approach
A) Industrial Construction of Building Frames
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 27
Part 3
New School Construction Approach
A) Reinforced Concrete Frames
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 28
New School Construction Approach
Insulated Concrete Forms (ICF)
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 29
New School Construction Approach
Light Steel Frame (Cold-Formed Steel)
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 30
Part 3
• The population of Iran has increased dramatically in the past decades, so providing the educational places is one of the main priorities of State Organization of School Renovation
• the passing the demolish-reconstruction and retrofitting of the unsafe school buildings made an opportunity for State Organization of School Renovation
• For this purpose was prepared in this organization with the title of design of educational places (Bulletin 232). This bulleting contains all the issues in designing the framework of school buildings
New Approach in Construction of Schools
Architecture
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 31
Part 3
New Approach in Construction of Schools
Holding five National Conference
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 32
photos of the outdoor view of some demolished-
reconstructed schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 33
photos of the outdoor view of some demolished-
reconstructed schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 34
photos of the outdoor view of some demolished-
reconstructed schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 35
photos of the outdoor view of some demolished-
reconstructed schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 36
photos of the outdoor view of some demolished-
reconstructed schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 37
Part 3
• The evaluation of the technical office of the organization showed, although with the cheap energy, investment in the reduction in energy consumption will be economical
• So from the initiation of the project social attention was given to this issue. School’s engine rooms were equipped with the intelligent systems and the layers of the windows’ glassing were doubled and also the walls were insulated. From the start of the objective subsidies plan and the releasing prices the methods for reduction in energy consumption were accelerated.
New Approch in Construction of Schools
Facility
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 38
Part 3
New Approch in Construction of Schools
Facility
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 39
Part 3
New Approach in Construction of Schools
Educational Equipment• Schools are the places where students learn the
techniques of life besides the new knowledge. Getting to know these techniques is very important in high school education
• This goal is not usually reached in the classroom space; since the activity options of each student is very limited in this space
• There are numerous students who have learned these techniques in workshops and laboratories.
• The importance of this issue is that State Organization of School Renovation, has dedicated 12% of its budget to educational equipment of schools.
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 40
Part 3
New Approach in Construction of Schools
Educational Equipment
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 41
Part 3
New Approach in Construction of Schools
Marginal equipment • Consideration of library, Indoor and outdoor sport courts,
constructing prayer room besides the educational places have been the priorities of State Organization of School Renovation, Development and Mobilization of Iran in the demolish-reconstruction project.
• It can be said that this organization does not give any schools to ministry of education without prayer room. Moreover, there are more than 2600 sport spaces constructed by this organization
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 42
Part 3
New Approach in Construction of Schools
Marginal equipment
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 43
Part 3
Brief Report on Activities in
Retrofit Schools
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 44
Rehabilitation Projects according to Enact of the Parliament
Schools needed to be rehabilitated (m²) 12,600,000
Evaluation and design for rehabilitation (m²)
4,600,000
Executed (m²) 1,000,000
Number of class room base on program 10,000
Allocated budget 0.28 billion $
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 45
Rehabilitation Projects according to government performance
2006 2007 2008 2009 20100
5000
10000
15000
20000
25000
523 1359
5981
20193
8453
Year
Nu
mb
er o
f C
lass
roo
m
number of studied classrooms from 2006 to 2010
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 46
Rehabilitation Projects according to government performance
number of Retrofitted classrooms from 2006 to 2010
2006 2007 2008 2009 20100
1000
2000
3000
4000
5000
6000
0 119
1267
2138
5344
Year
Nu
mb
er
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 47
(the area equal 1,000,000 square meters)
Achievement of Program
According to statistics, The Islamic Republic of Iran has upgraded seismic
safety of more than 10000 Classroom By rehabilitation Method
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 48
Some pictures of projects
BeforeAfter
Concrete Shear Wall
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 49
Some pictures of projects
The Strong Core out of building
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 50
Some pictures of projects
Braced Frame
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 51
Some pictures of projects
Shotcrete the inter wall Integrity of wall
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 52
Some pictures of projects
Bracing the masonry wall Bracing the masonry wall
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 53
Some pictures of projects
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 54
Some pictures of projects
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 55
Some pictures of projects
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 56
Part 3
Brief Report on Other
Activities
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 57
Utilizing IT in State Organization of School Renovation
• Project management platform
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 58
Utilizing IT in State Organization of School Renovation
• The technical certificate of the educational bases of Iran
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 59
Utilizing IT in State Organization of School Renovation
• Public contributions system
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 60
Utilizing IT in State Organization of School Renovation
• Project management platform• The technical certificate of the educational bases of Iran • Plan archiving system• Public contributions system • The organization portal based on sharepoint technology• Official automation platform
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 61
Utilizing IT in State Organization of School Renovation
• The organization portal based on sharepoint technology
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 62
Managing Public contribution in school building
• Creating the charity construction groupsHolding provincial ceremonies for tribute of charity contributors• Holding national ceremonies for tribute of charity
contributors• Holding 3 ceremonies for the Iranian residents outside
the country• Preparation and broadcasting of TV programs like TV
series
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 63
Managing Public contribution in school building
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 64
Managing Public contribution in school building
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 20100.0
100.0
200.0
300.0
400.0
500.0
600.0
700.0
800.0
16.9 27.0 36.7 46.9 72.0
173.2
267.9 259.9325.5
613.5
733.1 744.2
Mil
lio
n U
S D
oll
ar (
1,00
0,00
0$)
oaths of the charity school builders
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 65
Revival Enact of the Demolish and reconstruction law in the Fifth
Development Program
Debut 2011
Duration 3 years
Budget for reconstruction 2.2 billion $
Budget for retrofit 1.0 billion $
Total 3.2 billion $
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 66
All Schools of Islamic Republic of Iran have been seismically
retrofitted by spending 6.0 billion Dollar budget for past five years
and three years to come
An International Workshop On Seismic Retrofitting of Schools I.R. of IRAN
16 May 2011 Page 67