By Teresita B. RobertoOIC, Systems and Infrastructure Development
TERESITA B. ROBERTOHead, Applications and Data Services Development
eBPLS Project Manager
Rationale
President Rodrigo Duterte, in his speech on 30
June 2016 and in the State of the Nation
Address (SONA) on 25 July 2016
“all government agencies must
reduce the requirements and
processing time of all government
transactions”.
“Corruption must stop now.”
JMC O1 Series of 2016BPLS REVISED STANDARDS
Rationale
1. Organize a DICT Project Team that will be responsible for undertaking all the project-related activities.
2. Provide system installation service which shall be limited to the loading of the application software to the required ICT devices such as the servers.
3. Provide IT support in the configuration, set-up, and testing of the eBPLSsoftware.
4. Conduct one (1) session of formal/classroom users training and one (1) session on-the-job training for systems users and system administrator. The training shall be limited to education and instructing the users on how to use, implement, and operate the software.
5. Provide technical support during the database build-up and pilot stages.6. Provide support during implementation of the system.
DICT’s RESPONSIBILITIES
Along this line, the DICT share the importance of automationand computerization:
• to facilitate compliance to the service standards on BPLS
• to contribute to the improvement of the ranking of the Philippines in the Ease of Doing Business
DICT’s RESPONSIBILITIES
Doing Business 2017 ranks 190
economies on their ease of
doing business, with a high ease
of doing business ranking, i.e.
the regulatory environment is
more conducive to starting and
operating a business.
The PHILIPPINES ranked113th out of 190economies in the DoingBusiness ranking of theWorld Bank
PH EODB RANKING
E-BPLS Summit, 18 July 2017
➢ Official launching of the cloud
based eBPLS Software
➢ MOA signing with LGUs
adopting the eBPLS
➢ E-Readiness Leadership Awards
to Top 10 Cities and Top 10
Municipalities
DICT’s ROLE & COMMITMENT
DICT’s ROLE & COMMITMENT
DICT BPLS Coaches Training March 13-17 2017
DICT’s ROLE & COMMITMENT
SOFTWARE OVERVIEW
EBPLS KEY PLAYERS
KEY PLAYERS
1. Mayor / Local Chief Executive
2. Business Permit and Licensing Officer (BPLO) and BPLO Staff
3. Treasurer
4. MIS Office
5. Endorsing Offices
• Office of the Building Official
• Health Office
• Local Bureau of Fire Protection
• Other LGU Endorsing Office
SOFTWARE OVERVIEW
SOFTWARE OVERVIEW
SOFTWARE OVERVIEW
Electronic Official ReceiptElectronic Business Permit
SOFTWARE OVERVIEW
• System requirements and business rules are
defined and set by the LGU in the system;
therefore the eBPLS can be adopted by various
LGUs
• eBPLS is deployed via cloud; system deployment
and maintenance requires less resources
SOFTWARE OVERVIEW
IMPACT TO LGUs
• Accessibility to government services 24/7• Fast delivery of services• Real-time availability of information• Increased efficiency and productivity rate• Generate cost savings
https://www.nationwide.com/insurance-member-services.jsp, http://www.itc.dauniv.ac.in/
CHALLENGES
• Low bandwidth subscription/ slow internet connectivity
• Complexity and variation in the business rules of LGUs• ICT Office/staff in LGUs are not mandated offices
and positions• Lack of ICT resources
Status of Implementation
The DICT in partnership with the DILG, conducted eBPLS Coaches Training to
facilitate nationwide roll-out of the system to the LGUs:
• Total Number of eBPLS Coaches Trained : 155 (these are the focal persons
coming from DICT, DILG, Academe/State Universities and Colleges, ICT
Councils, Bureau of Fire Protection)
The DICT, in support of the cloud first policy, provided cloud-based facility for the
LGUs to host their eBPLS system and real-time data:
• LGUs fully implementing the eBPLS : Baler-Aurora, Taal-Batangas, Paete-
Laguna, Talisay-Camarines Norte
Status of Implementation
No. of LGUs
Luzon 96
Visayas 33
Mindanao 28
Total 157
EBPLS DEPLOYMENT
26 LGUs with MOA
Status of Implementation
Banna-Ilocos Norte Trento-Agusan Del Sur
Paete-Laguna Pozorrubio-Pangasinan
Maydolong-Eastern Samar
Cagwait-Surigao Del Sur
Tayabas-Quezon Maddela-Quirino
Angadanan-Isabela Lemery-Batangas Mina-Iloilo Jasaan-MisamisOriental
Iriga-Camarines Sur Laoac-Pangasinan Catbalogan-Samar Dasol-Pangasinan
Gamu-Isabela Alubijid-MisamisOriental
San Guillermo-Isabela
Catarman-Northern Samar
Taal-Batangas Gamu-Isabela Diffun-Quirino
Guiguinto-Bulacan Taal-Batangas Castillejos-Zambales
LGUs with ongoing database build-up:
• Dipaculao
• Castillejos
• Dasol
• Pozorrubio
• Mina
Status of Implementation
a. Sanggunian Bayan Resolution or Ordinance
1. Authorizing the Mayor to enter into a Memorandum of Agreement with the DICT
2. Adoption/implementation of the eBPLS Software
b. MOA with DICT (and DILG)
1. MOA with QR code
2. Provide information to DICT (complete name of Mayor, legal basis and address of LGU, name and position of witness, Mayor’s valid ID number and date of issuance)
3. 3 duly signed original copies (with initials at every page)
4. Attach photocopy of Mayor’s ID and 1 original copy of Resolution/Ordinance
c. Designation of the following:
1. BPLS Focal Person (Primary and Alternate)
2. System Administrator
3. Data Protection Officer
How to Avail of DICT’s EBPLS
NEXT STEPS
e-Readiness Framework
• ICT Capability
• ICT Environment
• Web Presence
E-Readiness Framework
ICT Capability• ICT Office
• ICT Personnel • ICT Training
E-Readiness Framework
ICT Environment
• ICT Plan or ISSP • Internet Connectivity
• Internet Penetration • ICT Infrastructure
E-Readiness Framework
Web Presence
Stage 1: Emerging
Stage 2: Enhanced
Stage 3: Interactive
Stage 4: Transactional
Stage 5: Fully-integrated
29
JMC O1 Series of 2018Guidelines in Streamlining the Processes
For the Issuance of Building Permits and Certificates of Occupancy
• Develop a web-based system software• Program training programs to LGUs • Encourage the LGUs in formulating ISSP• Organize pool of trainers to assist LGUs on
the eBuilding Permitting System
NEXT STEPS
Integrated Business Permits and Licensing System (iBPLS)
Objective:
To integrate the Barangay Clearance, the Building Construction Permits and Sanitary Permits Processing System into the Business Permitting Process of the LGUs so as to further streamline and facilitate the issuance of the Business Permit.
NEXT STEPS