143
SDO Code SubCluster Code SubCluster Name Substation Name No Of DTs in Substation DT Functional Code DT Capacity DT Meter No Monthly DT Input (MU) Monthly DT Sale (MU) Monthly FL Input (MU) Monthly FL Sale (MU) No Of DTs In SubCluster Monthly SubCluster Input (MU) Monthly SubCluster Sale (MU) Difference (MU) SubCluster Loss (%) 1110 990 19501527 0.34328 0.22792 1110 990 19005479 0.37598 0.21695 1110 FARASH KHANNA:PL 1 1SDLYPCTCDCCK0104LHR002 990 19501532 0.36698 0.22091 0.36698 0.22091 1110 990 19501626 0.32391 0.15677 1110 990 19505363 0.32986 0.14251 1110 GALI SAMOSA:PL 1 1SDLYPCTCDCCK0104LHR005 990 19501558 0.21434 0.19011 0.21434 0.19011 1110 GANESH ICE FACTORY:ID 1 1SDLYPCTCDCCK0104LHR006 990 19505065 0.20874 0.16044 0.20874 0.16044 1110 LAHORI GATE CHOWK:PL 1 1SDLYPCTCDCCK0104LHR009 990 19504375 0.10733 0.08034 0.10733 0.08034 1110 990 19501164 0.24744 0.18533 1110 990 19501535 0.17240 0.12970 1110 990 19501530 0.42682 0.16056 1110 630 19505377 0.01366 0.00556 1110 LAMBI GALI:PL 1 1SDLYPCTCDCCK0104LHR047 990 19501516 0.41216 0.21366 0.41216 0.21366 1110 990 19501648 0.51723 0.22372 1110 990 19501649 0.25925 0.20890 1110 ZAKIR HUSSAIN:PL 1 1SDLYPCTCDCCK0104LHR050 630 19501628 0.13198 0.12338 0.13198 0.12338 1110 990 19501494 0.20265 0.13005 1110 990 19501627 0.30471 0.14472 1110 990 19501608 0.32101 0.21875 1110 990 19501609 0.26105 0.09076 1110 990 19500259 0.41161 0.31989 1110 990 19503543 0.49799 0.22932 1110 GALI SHATARA:PL 1 1SDLYPCTCDCCK0104LHR059 990 19501528 0.50193 0.19748 0.50193 0.19748 1110 LAL QUAN:PL 1 1SDLYPCTCDCCK0104LHR017 990 19501571 0.35888 0.14189 0.35888 0.14189 1110 990 19501501 0.21224 0.17912 1110 990 19504042 0.20635 0.18284 1110 630 19501607 0.30364 0.18035 1110 990 19504961 0.30364 0.18923 BARSHABULLA:ID 2 1SDLYPCTCDCCK0104LHR018 0.41859 0.36196 CHARKHE WALAN:PL 2 1SDLYPCTCDCCK0104LHR019 0.60727 0.36958 RODH GRAM:K 2 1SDLYPCTCDCCK0104LHR053 0.58206 0.30951 MOTHER DAIRY:K 2 1SDLYPCTCDCCK0104LHR057 0.90960 0.54921 P.S HAUZ QUAZI:PL 2 1SDLYPCTCDCCK0104LHR048 0.77648 0.43262 NEW HAUZ QUAZI:ID 2 1SDLYPCTCDCCK0104LHR051 0.50736 0.27476 1SDLYPCTCDCCK0104LHR013 0.41984 0.31502 ZEENAT MAHAL:K 2 1SDLYPCTCDCCK0104LHR015 0.44048 0.16612 3.97772 2.97457 42.79 MOHALLA SHAHGANJ:K 2 1SDLYPCTCDCCK0104LHR003 0.65377 0.29928 S.N.MKT:K 2 DT & Substation wise Losses of August 2015 for Chandni Chowk Division CCKSC01 LAL QUAN DMS MOHALLA NIHARIYAN:K 2 1SDLYPCTCDCCK0104LHR001 0.71926 0.44487 23 6.95229

Upload: lecong

Post on 07-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1110 990 19501527 0.34328 0.227921110 990 19005479 0.37598 0.21695

1110

FARASH KHANNA:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR002 990 19501532 0.36698 0.22091 0.36698 0.22091

1110 990 19501626 0.32391 0.156771110 990 19505363 0.32986 0.14251

1110

GALI SAMOSA:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR005 990 19501558 0.21434 0.19011 0.21434 0.19011

1110

GANESH ICE FACTORY:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR006 990 19505065 0.20874 0.16044 0.20874 0.16044

1110

LAHORI GATE CHOWK:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR009 990 19504375 0.10733 0.08034 0.10733 0.08034

1110 990 19501164 0.24744 0.185331110 990 19501535 0.17240 0.129701110 990 19501530 0.42682 0.160561110 630 19505377 0.01366 0.00556

1110

LAMBI GALI:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR047 990 19501516 0.41216 0.21366 0.41216 0.21366

1110 990 19501648 0.51723 0.223721110 990 19501649 0.25925 0.20890

1110

ZAKIR HUSSAIN:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR050 630 19501628 0.13198 0.12338 0.13198 0.12338

1110 990 19501494 0.20265 0.130051110 990 19501627 0.30471 0.144721110 990 19501608 0.32101 0.218751110 990 19501609 0.26105 0.090761110 990 19500259 0.41161 0.319891110 990 19503543 0.49799 0.22932

1110

GALI SHATARA:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR059 990 19501528 0.50193 0.19748 0.50193 0.19748

1110

LAL QUAN:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR017 990 19501571 0.35888 0.14189 0.35888 0.14189

1110 990 19501501 0.21224 0.179121110 990 19504042 0.20635 0.182841110 630 19501607 0.30364 0.180351110 990 19504961 0.30364 0.18923

BARSHABULLA:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR018 0.41859 0.36196

CHARKHE WALAN:PL 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR019 0.60727 0.36958

RODH GRAM:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR053 0.58206 0.30951

MOTHER DAIRY:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR057 0.90960 0.54921

P.S HAUZ QUAZI:PL 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR048 0.77648 0.43262

NEW  HAUZ QUAZI:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR051 0.50736 0.27476

1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR013 0.41984 0.31502

ZEENAT MAHAL:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR015 0.44048 0.166123.97772 2.97457 42.79

MOHALLA SHAHGANJ:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR003 0.65377 0.29928

S.N.MKT:K 2

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

CCKSC01 LAL QUAN DMS

MOHALLA NIHARIYAN:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR001 0.71926 0.44487

23 6.95229

Page 2: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

1110

CHAMELI:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR020 990 19501606 0.24930 0.16801 0.24930 0.16801

1110

ROSHAN PURA:PM 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR021 630 19500242 0.13772 0.13039 0.13772 0.13039

1110

NAI SARAK PIAO:PM 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR022 630 19505408 0.13893 0.12026 0.13893 0.12026

1110 990 19501505 0.51073 0.216951110 990 19501520 0.34049 0.183181110 990 19503227 0.27636 0.261031110 990 19503236 0.09212 0.08290

1110

BATA:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR031 990 19500240 0.10512 0.09965 0.10512 0.09965

1110

HAVELI HYDERQULI:PM 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR032 630 19501575 0.20220 0.19538 0.20220 0.19538

1110

KATRA BARYIAN I/D:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR033 990 19504637 0.21651 0.20676 0.21651 0.20676

1110

KATRA BARYIAN PLINTH:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR034 630 19501572 0.18086 0.14129 0.18086 0.14129

1110

NAYA BANSH:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR041 990 19501519 0.11149 0.10128 0.11149 0.10128

1110

GADODIA I/D:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR042 630 19501497 0.07852 0.06112 0.07852 0.06112

1110

GADODIA KIOSK:K 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR043 990 19501496 0.16986 0.15686 0.16986 0.15686

1110

GADODIA PLINTH:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR044 990 19500238 0.15555 0.14098 0.15555 0.14098

1110

LAL QUAN DMS:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR045 990 19501610 0.32694 0.20280 0.32694 0.20280

1110 400 19501526 0.09546 0.037451110 400 19504892 0.08075 0.04977

LAL DARWAZA:PM 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR046 0.17622 0.08723

0.85122 0.40013

PANDIT BROS:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR024 0.36848 0.34393

31.20CCKSC02 FARASH KHANNA 28 6.36714 4.38070 1.98644

JOGIWARA:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR023

Page 3: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

1110 990 19501646 0.18930 0.109621110 990 19501647 0.21764 0.198671110 990 19501573 0.21824 0.156071110 990 19501574 0.40531 0.25576

1110

GALI HASHMUDDIN:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR056 990 19500694 0.48298 0.23108 0.48298 0.23108

1110 990 19501098 0.18755 0.172261110 990 19504567 0.26083 0.258391110 990 19500224 0.33266 0.296091110 990 19500225 0.25874 0.228631110 630 19503562 0.14785 0.076751110 990 19501181 0.23764 0.195631110 990 19501184 0.11882 0.088751110 990 19501217 0.23764 0.16562

1110

NEW LAJPAT RAI MKT:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL006 990 19500223 0.12214 0.11465 0.12214 0.11465

1110

MALIWARA : PL 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL007 630 19505462 0.14112 0.13576 0.14112 0.13576

1110 630 19501051 0.09835 0.085951110 630 19504779 0.04215 0.03596

1110

MAHARASHTRA BANK:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL015 990 19500561 0.26010 0.23754 0.26010 0.23754

1110 400 19503057 0.04675 0.044751110 400 19503058 0.14025 0.13435

1110

DTC:PACKAGE S/STN 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL023 990 19501055 0.09930 0.08993 0.09930 0.08993

1110

SHRI RAM:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL025 990 19501100 0.12043 0.11061 0.12043 0.11061

1110

KATRA PYARE LAL:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL027 990 19504716 0.08893 0.08626 0.08893 0.08626

1110

MOTI BAZAR:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL028 990 19501185 0.13341 0.12010 0.13341 0.12010

1110

GALI PARATHE:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL029 990 19501182 0.19709 0.18627 0.19709 0.18627

PARADE GROUND:PL 2 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL008 0.14050 0.12191

KINARI BAZAR:PM 2 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL019 0.18700 0.17910

11.92

KATRA KUSHAL RAI:ID 3 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL004 0.73925 0.60147

PAIWALLAN :ID 3 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL005 0.59411

0.44838 0.43066

22 3.65103 3.21591 0.43511

0.44999

GALI KASIM JAAN:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR055 0.62356 0.41183

CCKSC03 DARIBA KALA

GALI GULIYAN:PKG 2 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL002

OLD HAUZ QUAZI:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR052 0.40694 0.30829

Page 4: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

1110

ESPLANADE ROAD:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL030 630 19501054 0.04116 0.03781 0.04116 0.03781

1110

CHARHAT:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL035 990 19501855 0.33811 0.31386 0.33811 0.31386

1110

ANGURI BAGH:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL009 990 19500246 0.15840 0.13628 0.15840 0.13628

1110

MEENA BAZAR:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL013 400 19504137 0.02498 0.02279 0.02498 0.02279

1110

LIGHT & SOUND:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL031 100 19501853 0.00103 0.00096 0.00103 0.00096

1110

MONKEY BRIDGE:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM013 990 19500232 0.03707 0.03002 0.03707 0.03002

1110

LOHE WALA PULL (MAZAR) 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM00B 100 19504799 0.01168 0.01085 0.01168 0.01085

1110

ELECTRIC CREMATION:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM018 400 19505070 0.04073 0.03760 0.04073 0.03760

1110

PWD FLY OVER S/STN,CRPF CAMP SHANTI VAN

1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM032 400 19504569 0.07667 0.06599 0.07667 0.06599

1110 630 19501163 0.09942 0.075021110 990 19501165 0.25403 0.24249

1110

LAHORI GATE DIESEL:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR008 990 19501161 0.15018 0.13514 0.15018 0.13514

1110

NAYA BAZAR BOOSTER:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR010 990 19500228 0.26502 0.24833 0.26502 0.24833

1110

OPP NOVELTY CINEMA:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR011 990 19503759 0.12465 0.11073 0.12465 0.11073

1110 990 19502979 0.28410 0.226911110 990 19504365 0.25037 0.19055

0.31751

0.41746

LAHORI GATE DISPENSARY:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR007 0.35345

GHEE MANDI:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR012 0.53446

14.19

CCKSC05PWD FLYOVER SHANTI VAN

3 0.12908 0.11444 0.01464 11.34

CCKSC04 LAL QUILA 4 0.22147 0.19005 0.03142

Page 5: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

1110

KHARI BAOLI:PG 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR016 990 19505364 0.18469 0.17450 0.18469 0.17450

1110 990 19501166 0.31548 0.234701110 990 19501167 0.10516 0.08361

1110

OLD KRISHNA MARKET:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR026 990 19501852 0.16432 0.15765 0.16432 0.15765

1110

NEW KRISHNA MKT:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR027 990 19504835 0.16944 0.13937 0.16944 0.13937

1110 990 19501559 0.20510 0.154461110 630 19501560 0.14852 0.101901110 990 19503561 0.18569 0.168741110 990 19504938 0.15675 0.15309

1110

KUTCHA GHASI RAM:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR030 990 19500241 0.21232 0.18428 0.21232 0.18428

1110

BAGH DIVAR:PM 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR035 990 19501498 0.13328 0.11125 0.13328 0.11125

1110 990 19501169 0.18850 0.146781110 990 19501170 0.13464 0.104151110 990 19501451 0.12566 0.098921110 990 19503541 0.23350 0.229301110 990 19504833 0.19104 0.18267

1110

CLOTH MKT:K 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR038 990 19505344 0.11087 0.09256 0.11087 0.09256

1110

JAI PURIA BUILDING:K 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR039 990 19504640 0.15648 0.12680 0.15648 0.12680

1110

TILAK BAZAR:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR040 990 19501577 0.21334 0.19994 0.21334 0.19994

1110 990 19501097 0.14477 0.123821110 990 19501099 0.18882 0.171211110 990 19501761 0.16365 0.141951110 990 19503418 0.13218 0.119681110 990 19501177 0.10094 0.095701110 990 19501227 0.09980 0.090681110 990 19501230 0.11194 0.11114

1110

KUCHHA NALWA:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL010 990 19500239 0.17062 0.13276 0.17062 0.13276

OLD LAJPAT RAI MKT:ID 3 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL003 0.31267 0.29752

0.62942 0.55666

CHURCH MISSION:K 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR037 0.42454 0.41196

FOUNTAIN:ID 4 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL001

PNB:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR029 0.34243 0.32182

TOWN HALL:ID 3 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR036 0.44880 0.34985

CYCLE STAND:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR025 0.42064 0.31831

KATRA NEEL:PM 2 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR028 0.35362 0.25635

26 4.76256 4.07384 0.68872 14.46CCKSC06 FATEHPURI

Page 6: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

1110

THANA TOWN HALL:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL011 990 19501517 0.11959 0.09995 0.11959 0.09995

1110

KACHHA BAGH:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL012 990 19501851 0.25374 0.23132 0.25374 0.23132

1110

KUMAR CINEMA:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL014 990 19500231 0.17023 0.15476 0.17023 0.15476

1110

SUBHASH MARG:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL016 990 19504810 0.10858 0.09987 0.10858 0.09987

1110 990 19503075 0.12654 0.111951110 990 19003626 0.05423 0.051351110 400 19501179 0.11583 0.109941110 400 19501226 0.03861 0.034831110 400 19503325 0.03861 0.036421110 630 19501176 0.08254 0.063291110 990 19501180 0.12380 0.10203

1110

BATTERY BUS:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL022 990 19501178 0.04065 0.03878 0.04065 0.03878

1110

JUBILEE CINEMA:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL024 990 19501654 0.23459 0.19190 0.23459 0.19190

1110

KATRA ASHARFEE:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL026 990 19501216 0.15302 0.14514 0.15302 0.14514

1110

MORE SARAI KHATTA NO‐1:PM 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR049 630 19500251 0.06552 0.05541 0.06552 0.05541

1110

DOI:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM006 990 19500262 0.11555 0.10161 0.11555 0.10161

1110

PRIYADARSHANI:PG 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM007 990 19504800 0.14832 0.11779 0.14832 0.11779

1110 630 19500249 0.16312 0.154171110 630 19500250 0.08784 0.08077

1110

YAMUNA BAZAR GHAT DELHI 6 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM034 630 19505145 0.16687 0.16106 0.16687 0.16106

9.73

DELHI POLYTECHNIC:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM015 0.25096 0.23494

CCKSC08 YAMUNA BAZAR 5 0.68171 0.61539 0.06631

DIWAN HALL:PM 3 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL020 0.19306 0.18118

TIKONA PARK:PL 2 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL021 0.20634 0.16532

11.45

MORE SARAI KHATTA NO‐2:PKG 2 1S‐DL‐YP‐CTC‐DCCK‐0103‐THL018 0.18077

23 2.83880 2.51387 0.32492

0.16330

CCKSC07 CHANDNI CHOWK

Page 7: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Chandni Chowk Division 

1110

S.P.MUKERJI MARG:PM 1 1S‐DL‐YP‐CTC‐DCCK‐0104‐LHR014 990 19501578 0.11309 0.10711 0.11309 0.10711

1110 990 19500261 0.08709 0.081461110 990 19500266 0.12442 0.120671110 990 19500255 0.13635 0.131521110 990 19504175 0.25321 0.244261110 990 19500269 0.21667 0.147031110 990 19500270 0.10960 0.10250

1110

GANDA NALA:K 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM004 990 19504134 0.24698 0.19266 0.24698 0.19266

1110

GURU NANAK MKT:ID 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM005 990 19500263 0.11670 0.11130 0.11670 0.11130

1110

NICHOLSON ROAD:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM008 990 19500265 0.09843 0.08922 0.09843 0.08922

1110

CHABBI GANJ:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM009 990 19503476 0.15469 0.14969 0.15469 0.14969

1110

PUNJA SHAREEF:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM014 990 19500233 0.11120 0.10452 0.11120 0.10452

1110

BUBUNA MARKET:PKG 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM016 990 19501218 0.09194 0.08615 0.09194 0.08615

1110

KASHMERE GATE POLICE THANA:PL

1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM017 990 19500234 0.16131 0.12139 0.16131 0.12139

1110

KASHMERE GATE TAXI STAND:PL 1 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM019 990 19503468 0.11315 0.10928 0.11315 0.10928

0.32627 0.24953

11.06

NEW KASHMIRI GATE:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM001 0.21151 0.20213

MORI GATE:K 2 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM002 0.38956

CCKSC09 KASHMIRI GATE 15 2.13483 1.89876 0.23607

0.37578

HAMILTON ROAD STN:ID 2 1S‐DL‐YP‐CTC‐DCCK‐0105‐HAM003

Page 8: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1120 990 19500346 0.06086 0.056831120 990 19500361 0.09930 0.08733

1120

GIRDHARI LAL:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD007 630 19500378 0.07548 0.06897 0.07548 0.06897

1120

GIRDHARI LAL :PACKAGE  S/STN 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD008 990 19500363 0.03971 0.03611 0.03971 0.03611

1120

SHIVAJI PARK:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD027 630 19500337 0.09944 0.09344 0.09944 0.09344

1120

56  QTR:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD001 630 19500341 0.06920 0.06566 0.06920 0.06566

1120 630 19500321 0.15506 0.143951120 990 19500352 0.14313 0.127591120 630 19505239 0.03279 0.030881120 630 19504852 0.06089 0.056141120 630 19500339 0.09986 0.093641120 990 19500340 0.08170 0.07508

1120

ROUSE AVENUE:K 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD025 400 19500338 0.03310 0.03067 0.03310 0.03067

1120 630 19500345 0.11574 0.057551120 990 19500344 0.37832 0.12581

1120

MINTO ROAD GRID :ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD066 630 19503262 0.13897 0.13393 0.13897 0.13393

1120

MASS MAILING:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD015 630 19501669 0.19048 0.14187 0.19048 0.14187

1120 990 19505168 0.23189 0.112301120 990 19500336 0.34783 0.15508

1120

MATA SUNDARI I/D:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD017 990 19500362 0.29452 0.20189 0.29452 0.20189

1120

PANT QTR:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD023 630 19500376 0.10122 0.09650 0.10122 0.09650

1120

INDIAN HERITAGE D.D.U.MARG: 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD054 100 19002749 0.00390 0.00371 0.00390 0.00371

39.19

MATA SUNDARI GURUDWARA:PL 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD016 0.57972 0.26738

DRGSC03MATA SUNDARI GURUDWARA

6 1.16984 0.71135 0.45849

MIRDARD RD I/D:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD020 0.18156 0.16871

TAGORE RD HOSTEL:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD028 0.49406 0.18336

MINTO RD. COMPLEX:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD018 0.29819 0.27154

MINTO RD. HOSTEL:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD019 0.09367 0.08702

0.34269 0.03211 8.57

DRGSC02 MINTO ROAD 11 1.30874 0.94089 0.36785 28.11

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

DRGSC01 G B PANT HOSPITAL

DAG‐1:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD002 0.16016 0.14416

5 0.37480

Page 9: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

1120

DEEN DAYA UPADHAYA:PACKAGE S/STN 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD004 990 19501670 0.09648 0.08842 0.09648 0.08842

1120

KOTLA RD.:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD012 630 19500331 0.11986 0.10081 0.11986 0.10081

1120

MAHAWAT KHAN:K 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD014 630 19501681 0.18242 0.16998 0.18242 0.16998

1120 990 19501682 0.11473 0.106631120 630 19501692 0.03142 0.02863

1120

SHAKTI SADAN:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD026 630 19501695 0.02009 0.01913 0.02009 0.01913

1120

AZAD BHAWAN I/D:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY006 990 19501685 0.07859 0.07682 0.07859 0.07682

1120

CNG:PM 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY009 400 19500329 0.06248 0.06113 0.06248 0.06113

1120 990 19003805 0.09712 0.095781120 630 19504593 0.05229 0.05053

1120

IP GRID:K 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY021 990 19501684 0.15616 0.15006 0.15616 0.15006

1120

ANNA NAGAR DRG 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY072 990 19505442 0.21322 0.20411 0.21322 0.20411

1120

GANDHI NIDHI 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY017 630 19500351 0.12534 0.09817 0.12534 0.09817

1120 990 19501653 0.12315 0.106391120 990 19504086 0.10076 0.093691120 630 19504276 0.03551 0.034661120 400 19500354 0.02270 0.02150

1120

MILAP:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY025 990 19501657 0.10045 0.09683 0.10045 0.09683

1120

NEHRU HOUSE:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY027 990 19501691 0.15981 0.15171 0.15981 0.15171

1120 400 19501652 0.00723 0.00617 0 09041 0 08730

8.85

GULAB BHAWAN:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY018 0.22390 0.20007

MADINA LIBRARY:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY023 0.05821

DRGSC06AMBEDKAR STADIUM

12 1.13233 1.03211 0.10022

0.05616

PRATAP PRESS:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY028

3.25HANS BHAWAN:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY019 0.14941 0.14631DRGSC05 ITO 6 0.65987 0.63843 0.02144

9.10

RAJENDRA BHAWAN:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD024 0.14615 0.13525

DRGSC04 DDU MARG 6 0.56500 0.51360 0.05140

Page 10: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

1120 630 19501656 0.08318 0.08113

1120

ROSE GARDEN:PM 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY031 100 19500377 0.01315 0.01241 0.01315 0.01241

1120 990 19501689 0.35022 0.321561120 990 19505152 0.01083 0.007911120 990 19505473 0.00006 0.000041120 990 19504534 0.41656 0.26506

1120

HOTEL PRESIDENT:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS009 990 19500335 0.36790 0.17775 0.36790 0.17775

1120 630 19500559 0.12980 0.107811120 990 19505249 0.10620 0.070781120 990 19500330 0.44785 0.161841120 990 19500350 0.50922 0.184021120 990 19503512 0.13392 0.048401120 990 19505490 0.09563 0.03456

1120

OLD LNJP:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD021 630 19500382 0.10558 0.07793 0.10558 0.07793

1120

ORIENTAL INSURANCE:PKG 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD022 990 19500334 0.08363 0.08069 0.08363 0.08069

1120

NEW AMAR:PM 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY065 400 19500324 0.03996 0.03703 0.03996 0.03703

1120 990 19500381 0.56816 0.392021120 990 19501686 0.30991 0.268221120 630 19503790 0.15495 0.12283

1120

BASTI NARNAUL:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU002 990 19500207 0.18264 0.16653 0.18264 0.16653

1120 990 19501667 0.31757 0.042271120 990 19501668 0.26941 0.104991120 990 19501674 0.38492 0.082491120 630 19505108 0.02820 0.00406

1120

FHATAK  KIRORE:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU004 630 19500365 0.07027 0.06745 0.07027 0.06745

1120

GALI DAKOTAN:PM 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU006 400 19500348 0.13230 0.11133 0.13230 0.11133

1120

GALI KUNDEWALAN:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU007 400 19500325 0.09457 0.08717 0.09457 0.08717

1.00010 0.23382

22 5.50579 3.90122 1.60456 29.14

84 GHANTA:K 3 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU001 1.03302 0.78307

HOTEL BROADWAY:K 4 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD010 1.18662 0.42882

DRGSC08 CHAWRI BAZAR

DDA HOUSING COMP.TURKMAN GATE:ID 4 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU003

0.26509

11 2.39636 1.20887 1.18749 49.55

0.17859

DRGSC07 DELHI GATE

DELHI GATE TELEPHONE EXCHANGE PM:K 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS004 0.41662

DAG‐2:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD003 0.23600

0.09041 0.08730

VIKRAM NAGAR:PACKAGE S/STN 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY035 0.36106 0.32947

PRATAP PRESS:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY028

Page 11: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

1120

GALI SHANKAR:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU008 990 19003826 0.53952 0.40637 0.53952 0.40637

1120

HAMDARD:K 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU009 990 19500347 0.40230 0.30608 0.40230 0.30608

1120 990 19500332 0.22821 0.210371120 990 19500364 0.30251 0.247211120 990 19500218 0.24049 0.228441120 990 19504377 0.27103 0.25760

1120

NEW HAUZ QUAZI:ID DRG 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU015 990 19502903 0.34550 0.29449 0.34550 0.29449

1120 990 19500366 0.41586 0.284181120 630 19500367 0.05868 0.03512

1120

LAXMI INSURANCE:ID 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD013 990 19504170 0.14882 0.14496 0.14882 0.14496

1120 990 19500380 0.44758 0.127421120 990 19501700 0.44071 0.122341120 990 19505094 0.21841 0.023201120 990 19501664 0.41498 0.103501120 990 19503569 0.31670 0.035691120 630 19505203 0.14197 0.01606

1120

CHANDNI MAHAL [K]:K 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS003 990 19504749 0.53606 0.12489 0.53606 0.12489

1120

GANJ MEER KHAN:PM 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS006 990 19505263 0.59999 0.11016 0.59999 0.11016

1120

GANJ MEER KHAN‐2:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS007 990 19500134 0.37549 0.08956 0.37549 0.08956

1120 990 19505336 0.47469 0.124121120 630 19003829 0.51894 0.086791120 990 19504272 0.63588 0.08091

1120

MOHALLA QUABRISTAN:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS018 990 19501666 0.44314 0.08438 0.44314 0.08438

1120 990 19501661 0.40628 0.119731120 990 19501663 0.40764 0.07753

1120

GALI BAJRANG BALI:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU005 990 19500323 0.10238 0.09849 0.10238 0.09849

GIRDHAR PANNA:ID 3 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS008 1.62951 0.29182

SHEESH MAHAL:K 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS023 0.81392 0.19726

0.24976

20 7.77347 2.13941 5.63406 72.48

0.17845

DRGSC09 HAZ MANJIL

BULIBULI KHANA:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS001 0.88829

CHANDNI MAHAL:ID 4 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS002 1.09206

RAJ ENGINEERING:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU011 0.51152 0.48603

HAZ MANJIL:K 2 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD009 0.47454 0.31930

HAMMATGARH:K 2 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU010 0.53072 0.45759

Page 12: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

1120

SARAK PREM NARAIN:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU012 630 19501687 0.30308 0.15277 0.30308 0.15277

1120

SEEMA LODGE:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU013 990 19500385 0.36032 0.18752 0.36032 0.18752

1120

BARSHABULLA:ID DRG 1 1S‐DL‐YP‐CTC‐DDRG‐0106‐HAU014 990 19503477 0.32252 0.24590 0.32252 0.24590

1120

KHATTA P/M:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD011 990 19501659 0.30672 0.12845 0.30672 0.12845

1120 990 19500208 0.26431 0.211471120 990 19500210 0.21797 0.162411120 990 19502105 0.00694 0.00335

1120

URDU BAZAR TANGA STAND:PG  1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS00E 990 19505151 0.23430 0.05787 0.23430 0.05787

1120 990 19500094 0.37872 0.155781120 990 19500209 0.30589 0.182441120 990 19505361 0.04370 0.026641120 990 19500219 0.40941 0.119861120 990 19500220 0.19331 0.07901

1120

KASTURBA P/M:PM 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS013 990 19500206 0.29501 0.22228 0.29501 0.22228

1120 990 19505212 0.62482 0.179701120 630 19002918 0.19526 0.056551120 400 19500358 0.15621 0.046561120 990 19501672 0.43225 0.132541120 990 19003822 0.39604 0.07577

1120

MOTHER DAIRY:K 1 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS019 630 19500379 0.27920 0.08481 0.27920 0.08481

1120 990 19500201 0.51028 0.145431120 990 19500203 0.41290 0.113441120 990 19500204 0.47686 0.192121120 990 19505289 0.01831 0.005541120 990 19500202 0.46413 0.197721120 990 19500205 0.38268 0.097271120 990 19503567 0.46828 0.134591120 990 19500383 0.45161 0.162141120 990 19500384 0.52206 0.134561120 990 19500074 0.41122 0.171841120 990 19503516 0.33646 0.275431120 990 19500357 0.35723 0.133531120 990 19500359 0.41554 0.10433

TIRAHA BAIRAM KHAN:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS025 0.77278 0.23787

OLD DUJANA:K 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS022 0.97366 0.29670

SSA ROAD:PL:PG 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS024 0.74768 0.44727

KUCHA DAKHINI RAI:PL 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS017 0.82829 0.20830

NEW DUJANA HOUSE 8 PANEL:ID 7 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS021 2.73344 0.88612

KASTURBA HOSPITAL:ID 2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS012 0.60272 0.19886

KUCHA CHELAN‐1:PM 3 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS014 0.97628 0.28281

0.37723

0.36486

FOOTOVER BRIDGE:PKG 3 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS005 0.48922

JAMA MASJID:ID 3 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS010 0.72830

Page 13: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

1120 990 29006114 0.16732 0.099691120 990 19500081 0.41118 0.29906

1120

ANGLO SANSKRIT:PKG 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY002 990 19504433 0.11335 0.10225 0.11335 0.10225

1120 990 19501696 0.17074 0.166401120 990 19501698 0.17074 0.165791120 990 19503208 0.06504 0.061221120 990 19500132 0.20388 0.200031120 630 19504372 0.00416 0.00164

1120

BHARAT GENERAL 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY008 990 19500211 0.17754 0.15286 0.17754 0.15286

1120 990 19505274 0.21557 0.191951120 990 19504271 0.12660 0.11310

1120

DARYA GANJ KOTWALI:PL 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY011 630 19501677 0.10092 0.09443 0.10092 0.09443

1120

DARYA GANJ NO 8:PG 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY012 990 19500131 0.19843 0.16250 0.19843 0.16250

1120 990 19500212 0.20742 0.169241120 990 19500214 0.15252 0.124441120 990 19500215 0.18760 0.153071120 990 19505293 0.08629 0.070411120 990 19501651 0.06143 0.040231120 990 19501688 0.24573 0.20536

1120

EMCA HOUSE:PG 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY015 990 19500142 0.20752 0.17770 0.20752 0.17770

1120 990 19501676 0.08168 0.077741120 990 19501680 0.21004 0.188731120 990 19501697 0.29173 0.26856

1120

MAHAVIR VATIKA:K 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY024 990 19501678 0.10586 0.08795 0.10586 0.08795

1120

SARASWATI SCHOOL:PG 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY033 990 19500133 0.13558 0.12686 0.13558 0.12686

1120

GHATA MASJID:PG 1 1S‐DL‐YP‐CTC‐DDRG‐0107‐MRD006 990 19500136 0.19549 0.17266 0.19549 0.17266

DELHI GATE [K]:K 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY014 0.30716 0.24560

HINDI PARK:ID 3 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY020 0.58346 0.53502

COMMERCIAL SCHOOL:PKG 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY010 0.34217 0.30505

DARYA GANJ:ID 4 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY013 0.63384 0.51716

ANSARI RD:PKG 3 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY003 0.40653 0.39340

BACHHO KA GHAR:PKG 2 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY007 0.20804 0.20167

URDU BAZAR:PG  2 1S‐DL‐YP‐CTC‐DDRG‐0101‐JMS026 0.57850 0.39875

55 13.95526 7.33883 6.61643 47.41DRGSC10 DARYAGANJ

Page 14: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Darya Ganj Division 

1120

DRGSC11RAJGHAT POWER 

HOUSERPH STORE KANCHAN PURI:PACKAGE 

S/STN1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY032 990 19501683 0.04541 0.04376 0.04541 0.04376 1 0.04541 0.04376 0.00165 3.63

1120

MWK CLY 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY026 400 19505273 0.01625 0.01481 0.01625 0.01481

1120

DELHI SACHIVALYA 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY075 100 19504587 0.01727 0.01645 0.01727 0.01645

1120

LOK NAYAK SETU 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY076 400 19504557 0.03507 0.03119 0.03507 0.03119

1120

S/STN NO‐1 VELODROME ROAD 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY077 100 19504666 0.00231 0.00216 0.00231 0.00216

1120

S/STN NO‐2 VELODROME ROAD 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY078 100 19504964 0.00818 0.00766 0.00818 0.00766

1120

S/STN NO‐3 VELODROME ROAD 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY079 100 19504561 0.01837 0.01775 0.01837 0.01775

1120

CNG SHANTI VAN 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY082 100 19504590 0.00277 0.00255 0.00277 0.00255

1120

ROSE BIRD‐II 1 1S‐DL‐YP‐CTC‐DDRG‐0102‐DRY083 100 19504690 0.01307 0.01231 0.01307 0.01231

7.42DRGSC12 RAJGHAT 8 0.11328 0.10487 0.00841

Page 15: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1130 400 19500056 0.09543 0.091731130 400 19500078 0.11366 0.10006

1130

TOKARI WALAN OLD:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR011 630 19500060 0.23971 0.22499 0.23971 0.22499

1130

TOKARI WALAN NEW:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR012 400 19500048 0.05971 0.05641 0.05971 0.05641

1130

GALI NEEM WALI:K 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR016 990 19500079 0.34762 0.26675 0.34762 0.26675

1130

LIBRARY ROAD:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR025 630 19500077 0.11360 0.10227 0.11360 0.10227

1130

PATHAR WALAN P/M:PM 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐BGR026 400 19504933 0.08243 0.07631 0.08243 0.07631

1130 990 19500014 0.18685 0.137351130 990 29006116 0.20560 0.165431130 630 19500135 0.23736 0.225101130 630 29010511 0.03022 0.027821130 990 19500073 0.04828 0.040801130 990 19503552 0.18161 0.16694

1130

RUI MANDI P/M:PM 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ024 400 19500184 0.07457 0.06022 0.07457 0.06022

1130

CANE MARKET:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR001 990 19504890 0.20704 0.19156 0.20704 0.19156

1130

GALI BAHUJI: K 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR003 990 19500181 0.35905 0.32110 0.35905 0.32110

1130 990 19500047 0.27954 0.164441130 990 19503586 0.47704 0.171971130 990 19500574 0.33481 0.191511130 990 19502930 0.31383 0.23973

1130

CHOWK KISHAN GANJ:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR008 990 19504226 0.37982 0.23112 0.37982 0.23112

1130

SHIVAJI ROAD:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR009 990 19504814 0.33245 0.30847 0.33245 0.30847

BG ROAD DISP:PM 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR007 0.64864 0.43125

FIRE STATION:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ008 0.22989 0.20774

CHIMNI MIL PL/M:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR005 0.75658 0.33641

12 TOOTI CHOWK:PG 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ005 0.39245 0.30277

WEST END CINEMA:ID 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ006 0.26759 0.25292

0.84221 0.12751 13.15

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

PHGSC01 MITHAI PUL AZAD MARKET

GALI ZAMEER P/M:PM 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR002 0.20909 0.19179

6 0.96972

Page 16: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130

GALI BAHUJI:PM 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR010 990 19505001 0.16877 0.14831 0.16877 0.14831

1130

FOOTA ROAD KIOSK:K 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR013 990 19504867 0.23004 0.20673 0.23004 0.20673

1130

DEPUTY GANJ OLD:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR014 630 19505198 0.07384 0.06918 0.07384 0.06918

1130 400 19500097 0.10813 0.100991130 400 19504861 0.01908 0.015331130 990 19500059 0.24243 0.177241130 630 19503798 0.04965 0.04461

1130

DEPUTY GANJ KIOSK:K 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR018 990 19500099 0.17754 0.12426 0.17754 0.12426

1130

AJAD MKT:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR019 990 19500176 0.30141 0.24946 0.30141 0.24946

1130 990 19500084 0.41801 0.257071130 990 19500091 0.21736 0.101341130 990 19500092 0.16720 0.165961130 630 19505002 0.03344 0.01970

1130

TIKONA PARK:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR024 990 19500163 0.13543 0.12368 0.13543 0.12368

1130

JHABBAR MAL P/M:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR027 990 19504832 0.16666 0.15228 0.16666 0.15228

1130 400 19504817 0.09259 0.083631130 990 19504875 0.09420 0.08792

1130

TANGA STAND QUTAB ROAD:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ002 990 19500141 0.15562 0.14465 0.15562 0.14465

1130 990 19500124 0.05151 0.035051130 990 19500125 0.11447 0.076471130 400 19504631 0.12019 0.084891130 990 19500128 0.21339 0.107351130 990 19500173 0.22767 0.19339

1130

24 QUARTERS:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ009 990 19500004 0.20320 0.18614 0.20320 0.18614

1130 990 19500016 0.26826 0.196701130 990 19500019 0.26826 0.17008

CLOTH MARKET:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ004 0.44106 0.30074

AHATA KIDARA TANKI 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ00A 0.53651 0.36678

0.17155

0.19641

RAILWAY BOOKING P/M:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ001 0.18679

KHURSHEED MARKET:ID 3 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ003 0.28618

MATA WALI KIOSK:K 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR017 0.29208 0.22185

B. G. ROAD COMP CTR:ID 4 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR022 0.83602 0.54407

DEPUTY GANJ NEW:PM 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR015 0.12721 0.11632

PHGSC02 SADAR BAZAR 31 6.23948 4.67602 1.56346 25.06

Page 17: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130

PP QUARTERS:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ010 990 19500071 0.23872 0.18696 0.23872 0.18696

1130

SARAI KHALILA:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ011 990 19503754 0.20893 0.17214 0.20893 0.17214

1130 990 19500116 0.25458 0.169741130 990 19500117 0.24479 0.147891130 990 19500120 0.33292 0.193731130 400 19504724 0.14687 0.07950

1130

CHOOTI MASJID:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ013 990 19503745 0.31830 0.16661 0.31830 0.16661

1130 990 19500160 0.35100 0.301101130 990 19504632 0.38298 0.065321130 990 19503520 0.44072 0.267661130 630 19505486 0.09674 0.066941130 990 19503497 0.14882 0.133831130 400 19504142 0.09921 0.09345

1130

CHAMELIAN ROAD:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ017 990 19500049 0.38678 0.24163 0.38678 0.24163

1130

A. K. CHOWK:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ018 990 19503744 0.31825 0.19758 0.31825 0.19758

1130 400 19503570 0.19749 0.121931130 990 19504992 0.16158 0.12492

1130

NAWAB ROAD NO 1:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ020 990 19500012 0.19862 0.14545 0.19862 0.14545

1130 990 19500112 0.16646 0.145231130 400 19503568 0.04695 0.04553

1130

NAWAB ROAD NO. 2:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ022 990 19504963 0.32102 0.20086 0.32102 0.20086

1130 990 19504809 0.42428 0.262321130 630 19504968 0.01312 0.004361130 990 19500121 0.12580 0.106061130 400 19504846 0.05111 0.046681130 990 19505286 0.29050 0.27830

1130

SADAR DISPENSARY:K 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ026 990 19503785 0.36588 0.29963 0.36588 0.29963

NARIAN MARKET:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ023 0.43741 0.26669

CHOWK SINGHARA PL/M:ID 3 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ025 0.46742 0.43104

IDGAHA P/M:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ019 0.35907 0.24686

SADAR THANA:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ021 0.21340 0.19076

OLD QASAB PURA:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ015 0.53746 0.33460

4 POLS P. P. QUARTER:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ016 0.24803 0.22728

A K TANKI P/M:ID 4 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ012 0.97916 0.59086

NEW QASAB PURA:K 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ014 0.73398 0.36641

52 11.05200 7.63211 3.41989 30.94PHGSC03 POLICE QUARTERS 

Page 18: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130

BASTI HARPOOL SINGH:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ027 990 19500018 0.18628 0.12748 0.18628 0.12748

1130 990 19505006 0.13587 0.084041130 630 19504703 0.13076 0.104471130 400 19500144 0.01856 0.017411130 400 19504491 0.00407 0.003631130 990 19503047 0.27805 0.208621130 400 19503551 0.18537 0.119301130 990 19500185 0.42101 0.229661130 630 19504842 0.25977 0.15310

1130

AHATA KIDARA UNIT I:PM 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR020 400 19003801 0.16356 0.10319 0.16356 0.10319

1130

FILMISTAN:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR021 990 19505436 0.43418 0.40760 0.43418 0.40760

1130

GALI DARJIAN P/M:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0112‐PPQ007 990 19500095 0.34864 0.19653 0.34864 0.19653

1130 990 19504760 0.27525 0.191451130 400 19003818 0.06881 0.05400

1130

VARDHMAN COMPLEX:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM00A 990 19500002 0.02829 0.02634 0.02829 0.02634

1130

LOA MANDI:PM 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM017 990 19503753 0.14483 0.13090 0.14483 0.13090

1130

M.S.BLOCK NO.2:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM018 400 19500007 0.02604 0.02398 0.02604 0.02398

1130

M.S.BLOCK NO.5:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM019 400 19500003 0.02932 0.02835 0.02932 0.02835

1130 630 19500005 0.01707 0.013731130 630 19500008 0.19634 0.183831130 990 19500009 0.21144 0.198421130 630 19500010 0.08393 0.07716

1130

M.M ROAD BAJAJ AUTO:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM022 990 19500051 0.21040 0.17370 0.21040 0.17370

1130 990 19500149 0.21734 0.204221130 630 19504945 0.00220 0.00166

0.29537 0.27558

M.M ROAD KIOSK:K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM023 0.21953 0.20588

23 2.50711 2.07219 0.43492 17.35

C‐BLOCK MOTIA KHAN:ID 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM020 0.21341 0.19757

IDGAHA (K):K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM032 0.34407 0.24545

PHGSC04 MOTIA KHAN C BLOCK

D‐BLOCK MOTIA KHAN:ID 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM021

MODEL BASTI:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR004 0.46342 0.32792

CHIMNI MIL KIOSK:K 2 1S‐DL‐YP‐CTC‐DPHG‐0112‐BGR006 0.68078 0.38276

SLAUGHTER HOUSE:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ028 0.26663 0.18852

NEW SARAI KHALIL 2 1S‐DL‐YP‐CTC‐DPHG‐0111‐PPQ029 0.02264 0.02105

Page 19: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130

MOTIA KHAN P/M:PKG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM024 990 19500015 0.19902 0.16093 0.19902 0.16093

1130 990 19500107 0.35588 0.264211130 630 19501655 0.10038 0.088831130 630 19504649 0.16750 0.025821130 990 19504722 0.35911 0.32199

1130

R G COMPLEX:PKG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM036 990 19500001 0.04234 0.04058 0.04234 0.04058

1130 630 19504325 0.03291 0.030921130 630 19504361 0.01039 0.010071130 400 19505122 0.02751 0.026111130 400 19505128 0.01581 0.013521130 400 19505130 0.01164 0.010301130 400 19505129 0.01745 0.016611130 990 19500139 0.28125 0.271671130 630 19502877 0.07135 0.055261130 990 19504930 0.15834 0.144651130 990 19005256 0.10569 0.09644

1130

KILA KADAM SHARIF:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM003 990 19500294 0.35158 0.25905 0.35158 0.25905

1130 630 19500169 0.34253 0.294901130 630 19500170 0.11812 0.094721130 400 19504292 0.04725 0.025951130 400 19504876 0.02362 0.015331130 990 19505166 0.05906 0.042621130 990 19500166 0.26326 0.244681130 630 19504847 0.18717 0.175091130 990 19500110 0.43187 0.281471130 990 19500196 0.18509 0.140941130 990 19505319 0.48913 0.375661130 630 19504969 0.00494 0.003201130 990 19500021 0.25753 0.240841130 990 19500025 0.38629 0.282891130 400 19504836 0.21461 0.18608

1130

YOG MAYA:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM011 990 19504576 0.36003 0.28738 0.36003 0.28738

1130

PREM NAGAR:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM012 990 19500036 0.23530 0.20072 0.23530 0.20072

1130

TELL MILL:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM013 990 19505477 0.22430 0.20805 0.22430 0.20805

AMAR PURI:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM008 0.49407 0.37886

MCD PARK:PG 3 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM010 0.85842 0.70981

NABI KARIM KIOSK:K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM005 0.45043 0.41977

ASHOK BASTI:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM007 0.61696 0.42241

15.25

JHANDEWALAN (K):K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM002 0.26403 0.24109

PRADHAN CHOWK:PL 5 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM004 0.59058

0.35260 0.32693

38 8.66666 7.34500 1.32165

0.47352

MULTI STORIED BLK NO‐04, MOTIA KHAN 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM041 0.02909 0.02691

PHGSC05 NABI KARIM 

HANUMAN MANDIR:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM001

M.S BLOCK‐1 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM038 0.04330 0.04099

MULTI STORIED BLK NO‐03, MOTIA KHAN 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM040 0.04332 0.03963

CHARA MANDI:K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM025 0.45625 0.35304

ARP QUARTERS.:K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM027 0.52660 0.34782

Page 20: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130

HOTEL KABIR:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM014 990 19500086 0.28877 0.26720 0.28877 0.26720

1130 990 19500758 0.20265 0.189461130 990 19500067 0.29598 0.246741130 990 19500070 0.03466 0.023001130 990 19500054 0.52566 0.481221130 400 19505365 0.02647 0.024301130 990 19504529 0.15892 0.142771130 990 19504530 0.38908 0.333131130 630 19503751 0.31413 0.281651130 990 19505233 0.23634 0.22255

1130

JHANDEWALAN P/M:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM029 630 19503789 0.14864 0.12713 0.14864 0.12713

1130

KABIR BASTI:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM030 630 19504709 0.19822 0.15178 0.19822 0.15178

1130

GALI NO. 5 MULTANI DHANDA:PKG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM031 990 19504542 0.29576 0.26948 0.29576 0.26948

1130

LAXMAN PURI:PKG 1 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM033 990 19500293 0.25693 0.21405 0.25693 0.21405

1130 990 19500087 0.30512 0.277031130 990 19500088 0.19101 0.165911130 990 19500030 0.15390 0.145761130 990 19500062 0.13647 0.122111130 990 19504888 0.00701 0.005801130 990 19500055 0.13328 0.12406

1130

ARAM BAGH S/ST  NO. 3:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN003 990 19500089 0.22893 0.21361 0.22893 0.21361

1130

ARAM BAGH S/ST. NO. 4:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN004 990 19500090 0.10887 0.10183 0.10887 0.10183

1130

PAHAR GANJ POLICE STN:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN027 630 19500083 0.21120 0.19385 0.21120 0.19385

1130 990 19504672 0.44376 0.361031130 630 19505299 0.01921 0.016921130 990 19500028 0.17281 0.138911130 990 19505167 0.23864 0.208371130 990 19500027 0.49961 0.408051130 990 19500085 0.28866 0.280781130 990 19502770 0.03331 0.01486

CHUNA MANDI:ID 4 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN007 1.11024 0.96949

0.37795

0.34729

CHITRA GUPTA RD.:K 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN005 0.46297

XYZ QTR.:PG 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN006 0.41145

7.41

ARAM BAGH S/S NO. 2:ID 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN002 0.14030 0.12986

0.29037 0.26787

7 0.97966 0.90703 0.07264

AARAKASHA ROAD:PKG 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM035 0.49613 0.44294

PHGSC06 PAHARGANJ THANA

ARAM BAGH S/S NO. 1:ID 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN001

BAGICHI ALLUDDIN:K 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM026 0.54800 0.47590

SHYAM JI MAL LANE:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM028 0.55047 0.50420

RAM NAGAR COMP. CTR:ID 3 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM015 0.53330 0.45920

ST. ANTHONY SCHOOL:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0114‐RAM016 0.55214 0.50552

Page 21: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130 990 19504674 0.28866 0.26581

1130

GALI NALWA:K 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN008 990 19500138 0.42694 0.37631 0.42694 0.37631

1130

KRISHNA MKT. (K):K 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN009 990 19504727 0.51682 0.43486 0.51682 0.43486

1130

R. K. MISSION:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN010 630 19504702 0.06064 0.05675 0.06064 0.05675

1130

MOTHER DAIRY RATAN MKT:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN011 630 19504707 0.09762 0.07044 0.09762 0.07044

1130

RATTAN MKT.:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN012 630 19500032 0.09570 0.08833 0.09570 0.08833

1130

NEHRU BAZAR:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN013 400 19500061 0.07619 0.06582 0.07619 0.06582

1130 990 19500147 0.11063 0.096371130 990 19503747 0.07375 0.07022

1130

LADOO GHATI:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN015 630 19500137 0.21288 0.19731 0.21288 0.19731

1130 990 19501631 0.23458 0.200621130 990 19504706 0.35186 0.23935

1130

6: TOOTI:K 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN017 630 19500148 0.07008 0.06640 0.07008 0.06640

1130

KHANNA CINEMA:PL 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN018 630 19502881 0.20449 0.16440 0.20449 0.16440

1130

KHANNA CINEMA KIOSK:ID 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN019 990 19500022 0.23120 0.21474 0.23120 0.21474

1130

BASANT ROAD:K 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN020 990 19504708 0.31199 0.28432 0.31199 0.28432

1130

TANGA STAND KIOSK:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN021 990 19504704 0.30986 0.28580 0.30986 0.28580

1130 630 19500029 0.14634 0.14404

6: TOOTI PL/M:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN016 0.58644 0.43997

RAILWAY COLONY:ID 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN014 0.18438 0.16659

37 8.01453 6.93376 1.08077 13.49PHGSC07 NEW DELHI RAILWAY STATION

Page 22: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Pahar Ganj Division 

1130 630 19500035 0.20070 0.188991130 400 19504552 0.07108 0.062501130 990 19500167 0.36709 0.342171130 990 19502876 0.07342 0.063741130 630 19003816 0.17131 0.07732

1130

MOHALLA BAOLI:PM 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN024 630 19505359 0.10611 0.09707 0.10611 0.09707

1130 990 19504613 0.29368 0.268701130 990 19504675 0.29234 0.275301130 990 19504701 0.17530 0.162851130 990 19500026 0.28514 0.241371130 990 19504851 0.25215 0.20870

1130

BASANT ROAD MUNJHE CHOWK:PG 1 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN030 990 19503746 0.20998 0.19424 0.20998 0.19424

GALI SCHOOL WALI:PL 2 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN026 0.53729 0.45006

DARIBA PAN KIOSK:K 3 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN023 0.61182 0.48323

PHG DISP.:ID 3 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN025 0.76132 0.70686

GALI MANTOLA:PL 3 1S‐DL‐YP‐CTC‐DPHG‐0113‐CHN022 0.41812 0.39553

Page 23: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1140 990 19500312 0.15499 0.148301140 990 19500430 0.14057 0.137121140 630 19501358 0.06488 0.062531140 990 19500620 0.16401 0.147201140 990 19500417 0.13777 0.127241140 990 19500418 0.11808 0.111321140 630 19502004 0.09184 0.086891140 630 19502915 0.05904 0.054151140 630 19504510 0.08528 0.08155

1140

MCD CAR PARKING:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW019 990 19505069 0.16086 0.14727 0.16086 0.14727

1140 990 19503258 0.17482 0.167091140 630 19003815 0.15093 0.134451140 630 19505450 0.14571 0.134331140 990 19503766 0.06918 0.06441

1140

CHRISTIAN COLONY:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW022 990 19001272 0.15562 0.14470 0.15562 0.14470

1140 990 19505272 0.29445 0.284551140 990 19503365 0.30647 0.28536

1140

PYAUWALA H. S. ROAD:PM 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW029 400 19505483 0.12003 0.10881 0.12003 0.10881

1140

NALA WALA H. S. RD.:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW030 990 19503266 0.37968 0.34273 0.37968 0.34273

1140

26 BEEDEN PURA P.L RD.:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW037 990 19504238 0.31025 0.29257 0.31025 0.29257

1140

BACCHARUDDIN S/ST.:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW038 990 19500392 0.38564 0.35475 0.38564 0.35475

1140

40 REGER PURA P/M:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW039 990 19501490 0.38278 0.36022 0.38278 0.36022

1140 630 19503767 0.11460 0.105831140 990 19503768 0.07800 0.07354

1140

TIBBIA COLLEGE:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW036 630 19504501 0.13468 0.12921 0.13468 0.12921

1140

53 BLOCK RAMJAS ROAD:K 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW037 990 19500315 0.32448 0.30746 0.32448 0.30746

H.S.RD. KHATTAWAL K. BAGH:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW028 0.60092 0.56991

KHALSA COLLEGE S/ST:K 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW040 0.19260 0.17938

1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW020 0.32575 0.30154

PNB KAROL BAGH:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW021 0.21488 0.19874

5.22699 0.37208 6.65

H S ROAD BASEMENT:ID 6 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW018 0.65602 0.60834

39, BEEDEN PURA (W):PL 2

DT & Substation wise Losses of August 2015 for Shanker Road Division 

SRDSC01 KHALSA COLLEGE

POLICE QTR. K. BAGH:PL  3 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW010 0.36044 0.34795

32 5.59906

Page 24: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140

61 BLOCK RAMJAS ROAD PL/M:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW038 990 19504948 0.30746 0.29236 0.30746 0.29236

1140 990 19504499 0.29557 0.276241140 630 19505083 0.00359 0.00319

1140

KHALSA COLLEGE P/M 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW045 990 19505176 0.18898 0.16514 0.18898 0.16514

1140

CPWD HOSTEL:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW047 400 19500420 0.01047 0.01025 0.01047 0.01025

1140

53 BLK RAMJAS ROAD:PL\M 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW050 990 19500396 0.08835 0.08624 0.08835 0.08624

1140

NANAK HOTEL K. BAGH:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW001 990 19503278 0.22886 0.21195 0.22886 0.21195

1140

MASJID WALA K. BAGH.:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW002 990 19503343 0.24724 0.23747 0.24724 0.23747

1140 990 19503286 0.26111 0.253101140 990 19503288 0.14060 0.138331140 990 19500429 0.27029 0.231321140 990 19504500 0.23025 0.18888

1140

P.O. NO. 3 K. BAGH:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW011 990 19504498 0.09773 0.09300 0.09773 0.09300

1140

PO NO. 7 K. BAGH:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW012 990 19500422 0.18814 0.17660 0.18814 0.17660

1140 990 19500426 0.13596 0.120131140 990 19505447 0.15433 0.14683

1140

PO NO. 2 K. BAGH:PG 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW014 990 19503277 0.16574 0.15432 0.16574 0.15432

1140

PO NO. 4 K. BAGH:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW015 990 19500428 0.12675 0.11703 0.12675 0.11703

1140

PO NO. 6 K. BAGH :PKG 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW016 990 19503293 0.13210 0.12605 0.13210 0.12605

0.50054 0.42020

PO NO. 1 K. BAGH:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW013 0.29029 0.26696

27 4.72047 4.39591 0.32456 6.88

ELAHI BUX:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW003 0.40171 0.39143

RAMJAS ROAD KIOSK:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW039 0.29916 0.27943

SRDSC02 D.B. GUPTA ROAD

BIRLA FLATS K. BAGH:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW004

Page 25: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140

PO NO. 5 K. BAGH:PG 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW017 990 19503298 0.17488 0.16489 0.17488 0.16489

1140 630 19503536 0.06026 0.052061140 990 19503583 0.16224 0.158261140 990 19504559 0.24105 0.22928

1140

JOSHI ROAD P/M:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW031 990 19503300 0.21376 0.19892 0.21376 0.19892

1140

JOSHI ROAD KIOSK:K 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW032 990 19505008 0.32955 0.31832 0.32955 0.31832

1140 400 19502521 0.00227 0.001431140 990 19504950 0.22454 0.20856

1140

SUJAN SING AJMAL KHAN ROAD:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW034 990 19503760 0.16976 0.15822 0.16976 0.15822

1140 990 19500400 0.19094 0.165401140 400 19505173 0.08985 0.08520

1140

KHAJOOR ROAD PL/M 1 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW048 990 19505010 0.25550 0.24107 0.25550 0.24107

1140 630 19503544 0.13152 0.129601140 630 19504664 0.09524 0.089661140 990 19500387 0.24929 0.216861140 990 19500390 0.13423 0.105311140 990 19503297 0.30851 0.249161140 400 19503816 0.01624 0.01238

1140

FAIZ ROAD NO. 1:PM 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN031 630 19504505 0.12184 0.10949 0.12184 0.10949

1140

KHANNA ICE FACTROY JHANDENWALAN:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN032 630 19503344 0.10484 0.09342 0.10484 0.09342

1140

F. FACTORY G BLOCK:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN033 990 19500692 0.01082 0.01053 0.01082 0.01053

1140 990 19502919 0.02051 0.018361140 990 19503587 0.03809 0.03499

1140

F. FACTORY C BLOCK:PKG 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN035 990 19500412 0.05063 0.04607 0.05063 0.04607

F. FACTORY E BLOCK:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN034 0.05860 0.05335

0.32217

25 2.61486 2.32650 0.28835 11.03

0.26154

SRDSC03 JHANDEWALAN MANDIR

JHANDENWALAN NO. 3:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN029 0.38352

SP.MUKERJI MKT. FAIZ RD. P/M NO. 2:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN030 0.32474

AJMAL KHAN KIOSK 2 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW035 0.28079 0.25060

N JOSHI MEMORIAL HOSPITAL 2 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW049 0.22676 0.21926

CHAPPARWALA ZONAL OFFICE:ID 3 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW019 0.46355 0.43961

KHAJOORI ROAD  (K):K 2 1S‐DL‐YP‐CTC‐DSRD‐1404‐CPW033 0.22680 0.20999

Page 26: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140 990 19500705 0.02272 0.021531140 990 19503559 0.04220 0.037971140 990 19500411 0.10454 0.094381140 990 19500714 0.16650 0.156221140 990 19503558 0.11616 0.10572

1140

2E JHANDEWALAN(K):K 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN038 990 19503355 0.09661 0.08748 0.09661 0.08748

1140 630 19503560 0.03606 0.034011140 990 19503757 0.16426 0.14810

1140

DELHI PRESS:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN040 990 19503360 0.10134 0.09394 0.10134 0.09394

1140 990 19500386 0.16854 0.153971140 990 19504595 0.08301 0.074051140 630 19503271 0.25785 0.242561140 400 19504547 0.00260 0.000541140 990 19500402 0.09281 0.087591140 990 19500403 0.10466 0.091871140 990 19500011 0.29037 0.276531140 990 19500017 0.16691 0.15550

1140

SATBHRAWA (K) STN.:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW006 990 19503323 0.22637 0.20730 0.22637 0.20730

1140 990 19500106 0.06053 0.045241140 990 19503312 0.18158 0.155091140 990 19503317 0.46998 0.395041140 990 19503322 0.34839 0.318491140 990 19503352 0.08040 0.072381140 630 19505210 0.10720 0.09169

1140

E‐ZONE MALL PACKAGE S/STN 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW00A 990 19504623 0.04019 0.03915 0.04019 0.03915

1140

8 C WEA KAROL BAGH JASSA RAM 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW025 990 19503321 0.30496 0.29401 0.30496 0.29401

1140 990 19503330 0.23252 0.215151140 990 19503628 0.14252 0.14207

1140

LINK ROAD PACKAGE S/STN 1 1S‐DL‐YP‐CTC‐DSRD‐1402‐EPN001 990 19502079 0.14669 0.13383 0.14669 0.13383

1140 990 19504549 0.12430 0.112281140 990 19504607 0.22947 0.209441140 990 19504622 0.10517 0.092841140 630 19505207 0.01912 0.017271140 990 19504614 0.24247 0.232321140 990 19504636 0.21938 0.210205WEA K BAGH KIOSK:PACKAGE S/STN 3 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW032 0.57730 0.55315

0.47806 0.43183

6 WEA K BAGH (MOTHER):PACKAGE S/STN 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW045 0.37504 0.35722

13 BLK WEA K. BAGH:PACKAGE S/STN 4 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW031

9.19

SHASTRI PARK (INDOOR):ID 3 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW007 0.71210 0.59538

JESSA RAM HOSPITAL PACKAGE S/STN 3 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW008 0.53598

0.45728 0.43202

14 2.79860 2.54147 0.25713

0.48257

BHOOTH NATH (K):ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN063 0.19747 0.17947

SRDSC04 PUSA ROAD

SATBHRAWA :PACKAGE  S/STN 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW005

JHANDENWALAN NO. 1:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN041 0.25155 0.22802

JANTA MKT. JHANDEWALAN:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN042 0.26045 0.24310

2E JHANDEWALAN PL/M(PARK):PL 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN037 0.38720 0.35632

4E GURUDWARA:K 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN039 0.20032 0.18210

F. FACTORY A BLOCK:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN036 0.06492 0.05949

Page 27: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140 630 19003813 0.11546 0.11063

1140

ARYA SAMAJ RD. NO.1:PACKAGE S/STN 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW033 990 19501911 0.17974 0.16056 0.17974 0.16056

1140 990 19500395 0.24400 0.231381140 990 19504621 0.33695 0.31440

1140

HATHIWAL CHOWK A.S RD:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW035 990 19503318 0.28277 0.25829 0.28277 0.25829

1140 990 19503315 0.33510 0.279591140 990 19503332 0.34571 0.288451140 990 19503546 0.33236 0.277311140 630 19004962 0.12338 0.102941140 990 19504606 0.08064 0.076231140 990 19504620 0.39373 0.351891140 990 19502272 0.22441 0.207261140 990 19503345 0.11053 0.098341140 990 19504998 0.31959 0.293871140 990 19503292 0.39061 0.346041140 990 19503276 0.34278 0.301261140 990 19503319 0.24822 0.210641140 990 19503320 0.36251 0.362001140 630 19503375 0.18125 0.160891140 400 19505162 0.06042 0.05171

1140

RAMA ICE FACTORY:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW052 990 19503351 0.12342 0.11513 0.12342 0.11513

1140

8A K. BAGH WATER BOOSTER:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW053 990 19503357 0.27142 0.25149 0.27142 0.25149

1140

9A KAROL BAGH:PM 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW054 990 19503358 0.25744 0.23834 0.25744 0.23834

1140 990 19503316 0.17965 0.168121140 990 19503354 0.08454 0.075901140 990 19503327 0.20575 0.197161140 990 19503334 0.32181 0.29109

1140

14 A KAROL BAGH:PKG 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW057 990 19504665 0.22858 0.21485 0.22858 0.21485

1140

73 BEEDEN PURA:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW058 990 19503280 0.21651 0.20481 0.21651 0.20481

7A WEA (MOTHER DAIRY)PACKAGE S/STN 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW055 0.26419 0.24402

KARACHI SWEET 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW056 0.52755 0.48825

R.K.DASS‐1/2 K. BAGH:K 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW050 0.59101 0.51190

R.K.DASS NO 2 (5A WEA):K 3 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW051 0.60418 0.57461

12 WEA K. BAGH:PKG 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW048 0.33494 0.30560

R. K. DASS‐1 K. BAGH:K 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW049 0.71021 0.63991

PUSA RD. CAMP CENTRE:ID 4 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW046 1.13655 0.94828

21 WEA K. BAGH TIKONA PARK:PACKAGE S/STN 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW047 0.47437 0.42812

9.20

NALA (K) A.S. RD. S/ST.:PAVKAGE S/STN 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW034 0.58094

39 8.78269 7.97507 0.80762

0.54579

SRDSC05 KAROL BAGH

Page 28: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140

BAPU BHAWAN S/ST.:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW059 990 19504541 0.30426 0.27699 0.30426 0.27699

1140

3A WEA (SAT NAGAR DHOBHI GHAT) P/M 1 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW066 630 19503333 0.10010 0.09388 0.10010 0.09388

1140 990 19503305 0.13478 0.125041140 990 19503314 0.40435 0.36425

1140

39 BLK.  O R NAGAR:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1402‐EPN002 990 19503340 0.33581 0.30802 0.33581 0.30802

1140 990 19503328 0.27046 0.257811140 990 19503329 0.24642 0.229541140 990 19504344 0.08414 0.07540

1140

17 B BAZAR MARG (TAXI STAND):PL 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN005 990 19503337 0.42367 0.39049 0.42367 0.39049

1140

RAJENDER PARK:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN009 990 19503199 0.22749 0.21130 0.22749 0.21130

1140

RAJINDER PARK P/M:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN010 990 19503313 0.15536 0.14819 0.15536 0.14819

1140 630 19505433 0.03242 0.024221140 630 19504280 0.24637 0.225111140 990 19504346 0.01297 0.006211140 990 19504558 0.35659 0.333811140 990 19503377 0.41068 0.375561140 990 19504309 0.14129 0.124881140 990 19503379 0.47860 0.443301140 630 19504310 0.00541 0.005041140 630 19505206 0.05678 0.05541

1140

GULASHAN JOLLY 7‐B PUSHA ROAD:PKG 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN084 990 19504565 0.03796 0.03681 0.03796 0.03681

1140 990 19500711 0.15358 0.137491140 990 19500712 0.19547 0.180331140 990 19503331 0.28374 0.276581140 990 19504273 0.21405 0.208131140 990 19503764 0.23240 0.226221140 990 19503765 0.16268 0.150821140 630 19505362 0.06972 0.066541140 990 19502860 0.25520 0.237741140 990 19503361 0.31900 0.29717TIKONA PARK BAZAR MARG:PL 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN006 0.63800 0.59434 6 96

51‐52 BLOCK O. R. NGR:K 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN003 0.49779 0.48471

JANKI DEVI:ID 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN004 0.46480

0.34906 0.31782

18 3 36227 3 12836 0 23391

0.44358

HANDIWALA ORN : K 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN081 0.54079 0.50375

SRDSC07 GANGA RAM HOSPTAL

SINDHI PARK:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN002

0.64834 0.58935

SALWAN SCHOOL NEW:K 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN012 0.55197 0.50044

17 3.52241 3.25109 0.27132 7.70

21 BLK. O. R. NAGAR:K 3 1S‐DL‐YP‐CTC‐DSRD‐1402‐EPN003 0.60103 0.56275

5  BLOCK  WEA KAROL BAGH KIOSK 2 1S‐DL‐YP‐CTC‐DSRD‐1401‐KKW067 0.53914 0.48928

SRDSC06 SALWAN SCHOOL

SALWAN SCHOOL OLD:PL 4 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN011

Page 29: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140 630 19505136 0.06380 0.059431140 990 19503364 0.37667 0.343641140 630 19505084 0.00380 0.001381140 990 19503366 0.25147 0.228401140 990 19504653 0.07301 0.068221140 630 19502796 0.08112 0.074151140 990 19500413 0.36967 0.346601140 990 19504685 0.25062 0.222861140 630 19503046 0.00627 0.00265

1140

GANGA RAM HOSP.:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN001 990 19503339 0.29382 0.27847 0.29382 0.27847

1140

ST LT NO. 2 (WATER TANK):PM 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN069 100 19505350 0.01959 0.01779 0.01959 0.01779

1140

ST LT NO. 1 (BAPU ASHARAM ASHRAM):PM 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN070 100 19505387 0.00430 0.00411 0.00430 0.00411

1140 630 19500406 0.13647 0.130621140 630 19503372 0.11233 0.095321140 990 19500431 0.20068 0.181831140 990 19503384 0.19345 0.178231140 990 19503200 0.11446 0.108551140 400 19504385 0.07015 0.064321140 400 19503336 0.00752 0.007281140 400 19503386 0.00616 0.005961140 990 19500407 0.35992 0.333131140 630 19504386 0.05378 0.04463

1140

NPL MULTI STORIES:ID 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN023 630 19503308 0.14388 0.13842 0.14388 0.13842

1140 990 19500408 0.19167 0.178561140 630 19504502 0.22500 0.199871140 990 19500308 0.32105 0.298431140 990 19504774 0.17557 0.171791140 630 19505317 0.00502 0.00213

1140

MORELAND 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN026 630 19503380 0.12118 0.10922 0.12118 0.10922

1140 630 19502791 0.12361 0.121031140 630 19503367 0.15107 0.14793

1140

COMM. CENTRE.N. R. N:K 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN028 990 19503307 0.23424 0.21654 0.23424 0.21654

J. BLOCK (K) N. R. NGR.:K 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN025 0.50164 0.47235

ANDH MAHAVIDYALAYA:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN027 0.27468 0.26896

RAMNATH VIZ:K 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN022 0.41370 0.37776

DDA SHANKAR RD.:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN024 0.41667 0.37843

1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN017 0.18461 0.17287

NPL COLONY INSIDE:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN018 0.01368 0.01324

2.83192 0.21812 7.15

R. BLOCK N. R. NAGAR:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN015 0.39413 0.36006

NPL QTR. OUTSIDE P/M:PL 2

5.45

SRDSC09 RAJENDER NAGAR

DI KHAN:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN014 0.24880 0.22594

21 3.05003

SRDSC08 LINK ROAD 3 0.31770 0.30037 0.01733

AGGARWAL SWEET:K 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN008 0.40560 0.37078

SETHI PETROL PUMP:ID 3 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN013 0.62655 0.57211

BAZAR MARG (K):K 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN007 0.38047 0.34502

6.9618 3.36227 3.12836 0.23391SRDSC07 GANGA RAM HOSPTAL

Page 30: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Shanker Road Division 

1140

BOOSTER PUMP 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN083 630 19503284 0.10283 0.09811 0.10283 0.09811

1140 990 19503282 0.07968 0.074561140 990 19503296 0.19990 0.191511140 630 19500410 0.17252 0.168871140 990 19504560 0.17252 0.152181140 630 19500409 0.14854 0.140201140 630 19500415 0.16092 0.15417

1140

ST LT NO. 4 (POLICE POST):PM 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN067 100 19505306 0.01719 0.01675 0.01719 0.01675

1140

POLICE STATION NEW RAJINDER NAGAR 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN085 400 19002166 0.01741 0.01572 0.01741 0.01572

1140 990 19505087 0.23749 0.218271140 630 29006117 0.05937 0.05457

1140

MICROWAVE:PL 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN016 400 19503303 0.05607 0.05150 0.05607 0.05150

1140

MES ( ARMY WIRELESS) :PM 1 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN066 400 19503306 0.07462 0.07279 0.07462 0.07279

4.90SRDSC11 MES 2 0.13069 0.12429 0.00640

NEHRU PARK P/M:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN021 0.30946 0.29438

PUMPOSE ROAD:PL 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN092 0.29686 0.27283

0.26608

10 1.26556 1.18682 0.07874 6.22

0.32105

SRDSC10 SHANKAR ROAD

SRD BUILDING OFFICE:ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN019 0.27958

MANAVSTHALI (K):ID 2 1S‐DL‐YP‐CTC‐DSRD‐1403‐RJN020 0.34505

Page 31: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1141 990 19502606 0.15473 0.118831141 990 19502609 0.18317 0.150621141 990 19500102 0.23242 0.189531141 990 19500155 0.24341 0.214991141 990 19500190 0.31892 0.292021141 990 19500191 0.10631 0.10017

1141

39 BLOCK E.P. NAGAR:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR026 990 19500195 0.19168 0.17917 0.19168 0.17917

1141

EAST PATEL NAGAR MARKET:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR027 990 19505253 0.28559 0.25016 0.28559 0.25016

1141 990 19502604 0.22053 0.203791141 990 19003948 0.22053 0.198441141 990 19502626 0.40321 0.381561141 990 19504670 0.23796 0.223681141 630 19505103 0.01983 0.01949

1141

16 BLOCK E.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR033 990 19500103 0.31334 0.24103 0.31334 0.24103

1141 990 19500101 0.23670 0.220221141 990 19500105 0.23670 0.224671141 630 19500388 0.02374 0.021851141 630 19500389 0.02403 0.02185

1141

PUNJAB & SIND BANK:ID 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR072 630 19502479 0.04196 0.04060 0.04196 0.04060

1141

HOG MARKET:ID 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR073 630 19500193 0.01542 0.01446 0.01542 0.01446

1141 630 19504451 0.02996 0.027931141 630 19504452 0.06082 0.055831141 630 19502474 0.04156 0.041341141 630 19502478 0.06991 0.067541141 630 19502471 0.03460 0.031281141 630 19502476 0.04778 0.043771141 630 19504454 0.02516 0.023871141 630 19504460 0.02685 0.024621141 630 19502472 0.04163 0.039031141 630 19502473 0.05298 0.04916

1141

B/D OFFICE D SRD:PKG 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR079 990 19500281 0.11757 0.10900 0.11757 0.10900

1141 990 19502475 0.04586 0.043641141 990 19502480 0.04586 0.045121141 990 19503002 0.17602 0.169791141 630 19504535 0.03864 0.03684

VIKRANT TOWER 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR082 0.09171 0.08876

C &A OFFICE:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR083 0.21466 0.20663

PRAGATI TOWER:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR077 0.05201 0.04848

GOPALA TOWER:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR078 0.09461 0.08819

PADAM TOWER:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR075 0.11147 0.10887

HEMKUNT TOWER:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR076 0.08238 0.07505

PADAMA TOWER NO. 2:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR071 0.04777 0.04370

GAGAN DEEP:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR074 0.09078 0.08376

10 BLOCK E. P. NAGAR (K):PL 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR029 0.66099 0.62473

EAST PATEL NGR. ZONAL OFF.:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR034 0.47340 0.44489

1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR025 0.42522 0.39219

12 BLOCK E.P. NAGAR P/M:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR028 0.44105 0.40224

5.21968 0.52091 9.07

COMM. CENTRE EAST PATEL NAGAR:PM 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR024 0.47584 0.40451

47 BLOCK E.P. NAGAR:PL 2

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

PNRSC01 EAST PATEL NAGAR

POOJA PARK:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR023 0.33790 0.26945

48 5.74059

Page 32: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

PATEL AUTO:ID 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR084 990 19503741 0.25693 0.24031 0.25693 0.24031

1141

RACHNA CINEMA 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR085 630 19504533 0.07410 0.06860 0.07410 0.06860

1141 990 19502757 0.02471 0.023811141 990 19502786 0.08001 0.076141141 990 19502793 0.01294 0.011431141 630 19504392 0.05923 0.055801141 630 19504453 0.05691 0.053221141 990 19500295 0.04925 0.047091141 630 19505395 0.06019 0.057551141 630 19502794 0.04280 0.040751141 630 19502858 0.09986 0.09191

1141

35‐BLOCK EAST PATEL NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR132 990 19500187 0.18666 0.17608 0.18666 0.17608

1141

15‐BLK EAST PATEL NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR148 990 19504446 0.17165 0.16110 0.17165 0.16110

1141 990 19500283 0.23022 0.215441141 990 19503209 0.36835 0.344701141 630 19505391 0.16883 0.157991141 990 19503771 0.31575 0.293181141 990 19503773 0.29071 0.23006

1141

NEW VIJAY CHOWK 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR00C 990 19500300 0.42157 0.36220 0.42157 0.36220

1141 990 19500277 0.20359 0.171701141 630 19500279 0.22958 0.200391141 990 19500318 0.27423 0.264231141 990 19504426 0.24657 0.213121141 990 19500291 0.29649 0.259281141 990 19505172 0.32053 0.289201141 630 19505343 0.18431 0.15944

1141

TANK RD. BOOSTER PUMP OUTSIDE:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR014 990 19500309 0.29370 0.28049 0.29370 0.28049

1141 990 19500301 0.29395 0.268551141 990 19502800 0.23170 0.219731141 990 19503212 0.34680 0.335571141 630 19504459 0.15581 0.15169

1141

MOTHER DAIRY PRASAD NGR.:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR080 990 19500278 0.16657 0.15586 0.16657 0.15586

REGER PURA ZONAL OFF INDOOR S/ST:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR016 0.50260 0.48726

TANK RD .BOOSTER PUMP:PL 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR013 0.80133 0.70792

KRISHNA TIRATH DEV NAGAR 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR015 0.52565 0.48828

BAKARWALA INDOOR S/ST:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR011 0.43316 0.37208

TANK RD. KHATTA S/ST.:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR012 0.52080 0.47735

0.71813

20 5.23593 4.73079 0.50514 9.65

0.52325

PNRSC02 PRASAD NAGAR

SABZIWALA P.S RD. K. BAGH:PL 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR002 0.76741

11 B DEV NGR. A.S RD.:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR006 0.60646

VIKRAM TOWER OUTSIDE:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR089 0.10944 0.10464

PRABHAT KIRAN:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR090 0.14266 0.13266

RAJENDRA BHAWAN:ID 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR086 0.11765 0.11138

DEEP SHIKHA:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR087 0.11614 0.10902

Page 33: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

INSTITUTIONAL AREA:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR081 990 19500272 0.19667 0.15796 0.19667 0.15796

1141 990 19500285 0.46119 0.415281141 990 19504414 0.37734 0.339651141 630 19503772 0.31334 0.282881141 990 19504744 0.38297 0.31543

1141

13‐B DEV NAGAR K. BAGH:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR007 990 19504424 0.35955 0.32615 0.35955 0.32615

1141 630 19505037 0.01100 0.008921141 990 19500276 0.53879 0.43272

1141

MCD DEV NAGAR OFFICE:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR009 990 19504427 0.24474 0.22320 0.24474 0.22320

1141

ETYPE DEV NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR00D 400 19504730 0.08468 0.06699 0.08468 0.06699

1141 630 19003811 0.00041 0.000331141 630 19003820 0.01365 0.011201141 990 29006119 0.02317 0.021651141 630 29006111 0.00180 0.001681141 990 29006134 0.00513 0.00479

1141

LIBERTY (INDOOR):ID 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR124 990 19500302 0.24206 0.22352 0.24206 0.22352

1141

MILITARY ROAD S/ST. NO. 3:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR125 630 19504571 0.19021 0.15403 0.19021 0.15403

1141 630 19503770 0.23640 0.196971141 630 19504669 0.11644 0.094501141 630 19500313 0.13427 0.121141141 990 19504393 0.31329 0.31226

1141

MUFFATLAL:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR052 990 19502785 0.33165 0.29466 0.33165 0.29466

1141

J‐BLOCK W.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR053 990 19500161 0.17590 0.16218 0.17590 0.16218

1141

MTNL W. P. NAGAR:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR055 400 19502601 0.06577 0.06199 0.06577 0.06199

1141 990 19500164 0.32351 0.303671141 990 19500298 0.09125 0.083711141 990 19001773 0.36323 0.30523

F&G BLOCK W.P. NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR056 0.41475 0.38738

S‐ BLOCK W P NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR057 0 60538 0 53236

MILITARY RD. GURD. S/ST.:PM 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR126 0.35284 0.29147

MILITARY RD. P/M S/ST:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR127 0.44756 0.43340

PKG SSTN NEAR ETYPE DEV NAGAR 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR0A7 0.01406 0.01154

PKG SSTN NEAR ETYPE DEV NAGAR: SSTN NO ‐2 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR0A8 0.03010 0.02813

12.27

17 B DEV NGR. K. BAGH:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR005 0.69630 0.59831

14‐B MCD QTR. P.L. RD.:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR008 0.54978

0.83853 0.75493

20 4.05041 3.55331 0.49710

0.44165

PNRSC03 ANAND PARVAT

H.S. RD.P/M BAPA NGR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR003

Page 34: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141 990 19502608 0.24215 0.22713

1141

BALJIT NGR. NO. 1 (DOGWALA):PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR059 990 19502612 0.38970 0.30838 0.38970 0.30838

1141

NALA (K) W.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR062 990 19502808 0.39571 0.33806 0.39571 0.33806

1141

D‐BLOCK, W.P. NAGAR P/M:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR064 630 19500297 0.17538 0.15977 0.17538 0.15977

1141 990 19505313 0.32981 0.304191141 990 19505043 0.00166 0.001341141 630 19504734 0.10485 0.095461141 990 19504737 0.31454 0.27439

1141

26 BLOCK WEST PATEL NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR068 990 19502853 0.33971 0.31140 0.33971 0.31140

1141

O&M BLOCK, W.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR092 630 19502783 0.23264 0.21832 0.23264 0.21832

1141

H. BLOCK, W.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR093 630 19500165 0.26614 0.25335 0.26614 0.25335

1141 630 19503572 0.13438 0.132561141 990 19504444 0.21164 0.196151141 990 19502856 0.28143 0.265281141 630 19505320 0.00284 0.00137

1141

SHAKTI MANDIR W.P. NGR P/M:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR031 990 19500189 0.20826 0.19848 0.20826 0.19848

1141 990 19502782 0.35807 0.324711141 990 19502859 0.31652 0.299731141 990 19500162 0.30523 0.290621141 990 19504944 0.33066 0.31981

1141

Z‐BLOCK, W.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR063 990 19502755 0.28864 0.27023 0.28864 0.27023

1141 630 19501641 0.18973 0.181621141 990 19502857 0.26201 0.24298

1141

BALJIT NGR. (SAJNAY PARK)P/M:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR040 990 19502804 0.28547 0.24947 0.28547 0.24947

WEST PATEL NAGAR INDOOR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR066 0.45174 0.42460

5.84DAV MULTAN:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR051 0.67459 0.62444

22 BLOCK W.P. NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR058 0.63589

0.28427 0.26665

10 2.54339 2.39482 0.148570.61043

29 BLOCK W.P. NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR094 0.34602 0.32871

PNRSC05 SHAKTI MANDIR WEST PATEL NAGAR

12 BLOCK W.P. NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR030

0.33146 0.30552

30 BLOCK WEST PATEL NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR067 0.41938 0.36985

10.19

S‐ BLOCK W.P. NAGAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR057 0.60538

PNRSC04 WEST PATEL NAGAR BLOCK 1 TO 36 19 4.48960 4.03192 0.45767

0.53236

C&D BLOCK NALA P/M W.P.NGR:PM 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR065

Page 35: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

BALJIT NGR. AMBEDKAR PARK:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR041 630 19502581 0.25456 0.24194 0.25456 0.24194

1141

BALJIT NGR. BOOSTER PUMP KHATTA:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR042 990 19503003 0.27930 0.25404 0.27930 0.25404

1141 990 19505121 0.12912 0.107281141 990 19502619 0.51646 0.39515

1141

BALJIT NAGAR AGGARWAL SWEET P/M:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR044 400 19003808 0.15543 0.14856 0.15543 0.14856

1141

DMS STAFF QTRS. P/M:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR045 630 19504445 0.08932 0.07270 0.08932 0.07270

1141

DMS STAFF QTRS (K):K 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR046 400 19504379 0.03865 0.03520 0.03865 0.03520

1141

SHADI PUR DTC DEPOT:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR047 990 19502620 0.34522 0.31380 0.34522 0.31380

1141 990 19504947 0.24751 0.235981141 990 19502611 0.41118 0.37434

1141

BALJIT NAGAR JANTA PARK:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR049 990 19502781 0.47556 0.37852 0.47556 0.37852

1141

POLICE STN. W.P.NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR054 990 19502603 0.40832 0.38414 0.40832 0.38414

1141

AMBEDKAR PARK 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR00A 990 19501809 0.16739 0.15545 0.16739 0.15545

1141 990 19502583 0.30241 0.226581141 630 19502584 0.16284 0.127221141 990 19502582 0.23108 0.224361141 990 19502589 0.19596 0.15678

1141

PREM NAGAR PARKWALA:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR039 990 19502610 0.30163 0.25431 0.30163 0.25431

1141 630 19502588 0.16637 0.137031141 990 19502614 0.28742 0.236131141 990 19502807 0.26446 0.256361141 630 19502810 0.27525 0.25532

2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR050 0.45379 0.37316

BALJIT NAGAR ROAD NO. 2:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR060 0.53971 0.511692 79674 0 39215 12 30

PREM NAGAR PHATAK:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR037 0.46525 0.35380

PREM NAGAR GURUDWARA:PL 2

0.65869 0.61032

PNRSC07 BALJIT NAGAR 14 3 18889

1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR038 0.42704 0.38113

BALJIT NAGAR P/M J. WALAN CHOWK:PL

13 3.63610 3.19113 0.44496 12.24

BALJIT NGR. BARAT GHAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR043 0.64558 0.50243

PNRSC06 WEST PATEL NAGAR BLK A TO Z

BALJIT NAGAR SCHOOLWALA TR.1:PM 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR048

Page 36: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

HOLI CHOWK PATEL NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR131 990 19502792 0.26378 0.25160 0.26378 0.25160

1141

SHIV MANDIR BALJIT NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR133 990 19502797 0.26589 0.22129 0.26589 0.22129

1141

NEPALI MANDIR BALJIT NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR134 630 19502798 0.20784 0.20204 0.20784 0.20204

1141

BAJAJ COLONY BALJEET NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR144 630 19505031 0.09658 0.09227 0.09658 0.09227

1141 990 19501143 0.40382 0.380151141 990 19503573 0.08271 0.06887

1141

FARID PURI NO.1 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR019 400 19504872 0.07961 0.07030 0.07961 0.07030

1141

FARID PURI P/M NO. 2:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR020 990 19503407 0.33091 0.30483 0.33091 0.30483

1141 400 19003802 0.12185 0.109011141 400 19502740 0.19464 0.18341

1141

35 BLOCK W.P. NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR061 630 19500317 0.13365 0.12646 0.13365 0.12646

1141

RAMJAS SCHOOL P/M A.PBT.:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR103 400 19502600 0.08342 0.07868 0.08342 0.07868

1141

DUGGAL NO 1 P/M 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR00B 400 19502806 0.10788 0.10023 0.10788 0.10023

1141

POST OFFICE I/D 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR00E 630 19503410 0.08078 0.07601 0.08078 0.07601

1141 990 19505039 0.28924 0.237401141 990 19504865 0.35351 0.283471141 990 19504449 0.25561 0.227121141 990 19504492 0.21774 0.18506

1141

GALI NO. 6 P/M K. PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR096 990 19502624 0.15091 0.14095 0.15091 0.14095

MILITARY ROAD (K):PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR010 0.64275 0.52087

SSTN. NO. 15 G. NO. 8 K.PAHAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR095 0.47336 0.41218

0.44903

8 1.43061 1.32171 0.10890 7.610.29242

PNRSC08 FARID PURI

FARID PURI KIOSK:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR018 0.48653

RAJASTHANI COLONY P/M‐1:PM 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR021 0.31649

2.79674 0.39215 12.30PNRSC07 BALJIT NAGAR 14 3.18889

Page 37: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

DOOGARMAL G. NO. 6/7 A. PBT.:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR098 990 19502851 0.15098 0.13218 0.15098 0.13218

1141

K. PAHAR G. NO. 8 S/ST‐7:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR099 990 19502852 0.21930 0.20317 0.21930 0.20317

1141

K. PAHR G. NO. 9:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR100 990 19502627 0.21872 0.19824 0.21872 0.19824

1141

NAGARWALA GHATTI RD.:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR102 990 19504494 0.33600 0.30354 0.33600 0.30354

1141 630 19502593 0.24973 0.211971141 990 19502596 0.32068 0.26978

1141

SARAI ROHILLA:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR113 990 19503210 0.32956 0.30317 0.32956 0.30317

1141

KAMAL (K) K.PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR114 630 19504060 0.20040 0.18205 0.20040 0.18205

1141 990 19502591 0.18932 0.170001141 630 19504411 0.18932 0.171711141 630 19503397 0.11480 0.110871141 990 19503403 0.10354 0.09379

1141

GALI NO.5 K.PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR119 990 19502595 0.09363 0.09110 0.09363 0.09110

1141 630 19502618 0.04889 0.041741141 630 19503506 0.18858 0.177871141 630 19503574 0.11175 0.10258

1141

KHANNA S/STN, K.PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR121 990 19503204 0.21664 0.20152 0.21664 0.20152

1141

TIKONA PARK NEHRU NAGAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR122 990 19502625 0.36141 0.28974 0.36141 0.28974

1141

SUBZI MKT.P/M K.PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR123 630 19505042 0.19614 0.17073 0.19614 0.17073

1141

DUGGAL SUB STN:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR128 630 19502592 0.13216 0.12367 0.13216 0.12367

UPPER INDIA K.PAHAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR117 0.21834 0.20466

SOHAN SINGH K.PAHAR:PL 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR120 0.34922 0.32219

0.57041 0.48174

GALI NO.1 NANAKWALA:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR116 0.37864 0.34171

10.88PNRSC09 RAMJAS SCHOOL ANAND PARVAT 34 6.56069 5.84676 0.71393

ZONAL OFF. K. PAHAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR104

Page 38: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

GALI‐4 POST OFFICE ANAND PARBAT 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR129 990 19502933 0.23443 0.22707 0.23443 0.22707

1141

RIWA GALI NO‐4 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR138 990 19502594 0.19786 0.18774 0.19786 0.18774

1141

POST OFFICE P/M GALI NO‐2 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR139 630 19502809 0.10351 0.09249 0.10351 0.09249

1141

NALLA P/M STN GALI NO‐1 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR140 630 19502629 0.07324 0.07009 0.07324 0.07009

1141

TIKONA PARK GODODIA ROAD 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR141 630 19504825 0.27720 0.24260 0.27720 0.24260

1141 990 19505033 0.14339 0.130291141 990 19502622 0.10383 0.096851141 630 19505375 0.12668 0.115531141 990 19502586 0.15319 0.148021141 630 19505044 0.01473 0.01376

1141

NEHRU NAGAR P/M:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR036 990 19502585 0.22045 0.17655 0.22045 0.17655

1141

POLICE POST K. PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR105 990 19502802 0.24947 0.23397 0.24947 0.23397

1141 990 19502615 0.32056 0.305351141 630 19505104 0.03170 0.03020

1141

BANGALI DHABA K. PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR107 990 19502628 0.26719 0.25066 0.26719 0.25066

1141

GALI NO. 10 P/M:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR109 400 19501701 0.06026 0.05523 0.06026 0.05523

1141

G. NO. 11 BABU RAM K. PAHAR:PL 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR110 990 19502737 0.25066 0.23311 0.25066 0.23311

1141

GALI NO. 11 K. PAHAR:PM 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR111 990 19503401 0.12995 0.11893 0.12995 0.11893

1141 990 19503408 0.22306 0.197001141 990 19504425 0.22306 0.22030

7.27

TIN MKT. K. PAHAR:PL 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR106 0.35226 0.33554

ZAKHIRA U/B:ID 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR112 0.44611

0.29460 0.27732

20 3.25045 3.01419 0.23626

0.41730

DHAL ANAND PARBAT P/M 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR146 0.24722 0.22714

PNRSC10 ANAND PARVAT 1

NEHRU NAGAR (K) I/D:PL 3 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR035

Page 39: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Patel Nagar Division 

1141

TAULUI WALA PATEL NAGAR 1 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR130 990 19500311 0.24960 0.23345 0.24960 0.23345

1141 630 19505321 0.07548 0.072281141 630 19504450 0.06968 0.062311141 990 19502760 0.26340 0.252921141 630 19003833 0.07868 0.063231141 400 19505394 0.04125 0.037831141 630 19504684 0.20140 0.19358

HR. ROAD ANAND PARVAT 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR149 0.24266 0.23141

RUBYWALA GALI NO‐10 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR137 0.14516 0.13459

GUMADWALA BEHIND NEHRU NAGAR 2 1S‐DL‐YP‐CTC‐DPNR‐1451‐PNR142 0.34208 0.31614

Page 40: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1210

DAYANAND VIHAR:PG 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG041 990 19501001 0.20512 0.18476 0.20512 0.18476

1210

ARYA NAGAR:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG050 990 19504397 0.21085 0.20433 0.21085 0.20433

1210 990 19501081 0.28464 0.266841210 630 19501137 0.15199 0.142481210 630 19505437 0.05246 0.04918

1210

INSTITUTIONAL AREA:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG119 100 19504288 0.01694 0.01534 0.01694 0.01534

1210

KARKAR DOOMA VILLAGE:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG035 990 19501075 0.29734 0.25459 0.29734 0.25459

1210 630 19501085 0.14709 0.138901210 990 19501106 0.10652 0.102641210 990 19501077 0.05572 0.050221210 990 19503013 0.04479 0.041091210 400 19501046 0.01805 0.015281210 400 19501047 0.00634 0.005941210 990 19502985 0.39518 0.380361210 630 19502991 0.07271 0.066601210 990 19504048 0.16440 0.155871210 990 19501074 0.42755 0.370001210 990 19501110 0.43628 0.392741210 630 19503063 0.00873 0.002981210 990 19501003 0.19275 0.180491210 990 19501123 0.13957 0.133321210 630 19501084 0.22505 0.208701210 990 19501107 0.19171 0.178481210 630 19501004 0.06122 0.058161210 630 19505264 0.03444 0.033721210 630 19501005 0.00561 0.005231210 630 19501026 0.01192 0.011121210 990 19501538 0.01084 0.009581210 630 19501928 0.02200 0.01990

1210

INSTITUTIONAL AREA S/STN‐1 I/D 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG143 630 19003803 0.03552 0.03392 0.03552 0.03392

1210 630 19505385 0.01547 0.013831210 630 19505382 0.00939 0.00906

INSTITUTIONAL AREA S/STN‐2 I/D 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG144 0.02486 0.02288

S/S NUMBER 2, LSC KARKARDOOMA 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG136 0.01753 0.01634

18 KKD COMMERCIAL COMPLEX 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG137 0.03284 0.02947

DELHI ADMN FLATS:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG073 0.41677 0.38718

S/STN.1 LSC KARKARDOOMA NR PETROL PUMP 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG135 0.09566 0.09188

HARGOVIND ENCLAVE:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG071 0.87255 0.76572

KIRAN VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG072 0.33232 0.31381

LAW APTT.:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG057 0.02439 0.02122

AGCR ENCLAVE:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG070 0.63229 0.60283

SHANTI VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG046 0.25361 0.24154

GITANJALI APPARTMENT:ID

1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG103 0.48909 0.45850

2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG049 0.10051 0.09131

DT & Substation wise Losses of August 2015 for Karkardooma Division 

KKDSC01 DAYANAND VIHAR 6 0.92200 0.86293 0.05907 6.41

DAYANAND VIHAR 2:ID 3

Page 41: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

PLOT NO.14 DDA COMMUNITY CENTER KKD 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG145 990 19503694 0.02339 0.02115 0.02339 0.02115

1210

PLOT NO.13 DDA COMMUNITY CENTER KKD 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG146 990 19503695 0.02983 0.02771 0.02983 0.02771

1210

AGCR ENCLAVE:PKG STN 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG147 990 19501011 0.17808 0.16920 0.17808 0.16920

1210

PLOT NO 15 KARKARDOMA COMM COMP 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG149 990 19503700 0.02659 0.02416 0.02659 0.02416

1210

PLOT NO 16 KARKARDOMA COMM COMP 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG150 990 19501941 0.04429 0.04181 0.04429 0.04181

1210

PLOT NO 17 KARKARDOMA COMM COMP 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG151 990 19501929 0.02283 0.02176 0.02283 0.02176

1210 630 19003838 0.00508 0.004621210 630 19505291 0.02316 0.022161210 630 19501049 0.06648 0.058721210 630 19501050 0.15511 0.14912

1210

BAHUBALI ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG058 990 19501122 0.26989 0.25974 0.26989 0.25974

1210 990 19501121 0.08420 0.074211210 990 19501124 0.22244 0.200641210 990 19501021 0.26301 0.245181210 990 19503620 0.15141 0.143541210 990 19501023 0.27632 0.260221210 990 19501036 0.23269 0.222831210 990 19502911 0.21815 0.214921210 990 19502974 0.19698 0.186061210 990 19502975 0.18737 0.168341210 630 19503470 0.09609 0.08860

RAM VIHAR:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG078 0.48045 0.44300

SAINI ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG075 0.41442 0.38872

SURYA NIKETAN:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG076 0.72717 0.69797

0.20785

19 3.29321 3.10444 0.18877 5.73

0.27485

KKDSC03 LSC SAINI ENCLAVE

LSC MKT A‐BLK SURAJ MAL VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG012 0.22159

SHARAD VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG074 0.30664

KKD INSTITIONAL AREA  S/ST‐3 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG152 0.02825 0.02678

3.48945 3.20530 0.28415 8.14KKDSC02 INSTITUTIONAL AREA  34

Page 42: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210 630 19501086 0.09512 0.090921210 630 19501087 0.07783 0.073291210 990 19501138 0.24189 0.241721210 990 19501139 0.06047 0.052821210 990 19502994 0.27842 0.267211210 990 19504391 0.11932 0.10636

1210

ASHOKA NIKETAN:PG 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG019 990 19504456 0.18806 0.16597 0.18806 0.16597

1210 990 19501088 0.16305 0.159471210 990 19501089 0.22516 0.211721210 990 19502918 0.35488 0.300711210 990 19502925 0.29573 0.261971210 630 19504922 0.00657 0.003531210 990 19502988 0.41350 0.396661210 990 19502989 0.29017 0.257351210 630 19504618 0.02176 0.014901210 630 19501103 0.03501 0.031271210 400 19501104 0.00821 0.007341210 630 19501082 0.06886 0.066201210 630 19501105 0.02420 0.02269

1210

JAGRITI ENCLAVE EXTN.:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG063 990 19501156 0.22222 0.21395 0.22222 0.21395

1210 990 19502992 0.18262 0.173811210 990 19502995 0.14349 0.13569

1210

MANAK VIHAR:PG 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG080 990 19501002 0.19443 0.17118 0.19443 0.17118

1210 990 19501090 0.23536 0.207411210 990 19501125 0.30651 0.264311210 630 19505089 0.00547 0.00300

1210

ST.LIGHT SAI BABA MANDIR:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG096 630 19505487 0.15334 0.13515 0.15334 0.13515

1210 990 19501108 0.14098 0.136681210 630 19501109 0.09013 0.08486

1210

D BLOCK ANAND VIHAR 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG133 990 19501012 0.25952 0.25128 0.25952 0.25128

1210

JJ   CLUSTER   ANAND VIHAR  S/STN 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG138 400 19503660 0.15333 0.13920 0.15333 0.13920

1210 990 19501506 0.15416 0.150671210 990 19502999 0.15416 0.143581210 990 19501642 0.19233 0.185221210 990 19501643 0.25125 0.24552

0.29424

0.43074

VIGYAN VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG004 0.30832

SURAJ MAL VIHAR D‐BLOCK:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG047 0.44358

ANAND VIHAR A‐BLOCK:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG081 0.54735 0.47472

MANAK VIHAR (VIGYAN LOK) 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG131 0.23111 0.22154

GHRONDA APPARTMENT:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG055 0.09306 0.08889

SHRESTHA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG079 0.32611 0.30950

0.72544 0.66891

VIVEK APPARTMENT:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG054 0.04323 0.03861

8.76

ANAND VIHAR B‐BLOCK:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG040 0.38821 0.37119

JAGRITI ENCLAVE:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG045 0.65718

KKDSC04 ANAND VIHAR 25 4.18259 3.81629 0.36630

0.56620

ANAND VIHAR C‐BLOCK:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG053

LSC RISHABH VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG107 0.30237 0.29454

SURAJ MAL VIHAR A‐BLOCK:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG109 0.39774 0.37357

L.S.C SAINI ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG099 0.17295 0.16421

Page 43: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210 990 19502893 0.26953 0.254741210 990 19502894 0.33691 0.310781210 630 19504546 0.00613 0.00518

1210

PETROL PUMP OPP.VIVEK VIHAR P.S:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG069 630 19503609 0.03708 0.03567 0.03708 0.03567

1210

SURAJ MAL VIHAR B‐BLOCK:PG 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG115 990 19501029 0.23248 0.21362 0.23248 0.21362

1210

YOJNA VIHAR C‐BLOCK:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG002 630 19504191 0.15438 0.14627 0.15438 0.14627

1210 990 19501543 0.15003 0.133851210 990 19504746 0.17612 0.163321210 990 19505026 0.22012 0.181101210 990 19501555 0.10842 0.092071210 990 19503000 0.24486 0.237751210 400 19503016 0.07669 0.07508

1210

YOJANA VIHAR A BLOCK PKG 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI00A 990 19501013 0.24315 0.22485 0.24315 0.22485

1210 990 19501552 0.20797 0.201771210 990 19501645 0.16791 0.15916

1210

D‐BLK VIVEK VIHAR PLM:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI038 990 19501553 0.47685 0.45037 0.47685 0.45037

1210 990 19503696 0.09030 0.081171210 630 19504197 0.21070 0.19826

1210

JANTA QTR. VIVEK VIHAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI062 630 19501614 0.19076 0.18305 0.19076 0.18305

1210 990 19501541 0.19017 0.174101210 990 19505310 0.27167 0.266271210 630 19505455 0.08150 0.071691210 990 19501619 0.23823 0.207311210 630 19504307 0.11211 0.10680

1210

VIVEK VIHAR SUPER BAZAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI071 990 19000332 0.34632 0.32400 0.34632 0.32400

1210

ROAD NO.56 VIVEK VIHAR:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI079 100 19504831 0.00792 0.00768 0.00792 0.00768

1210 630 19501590 0.06626 0.065171210 630 19503448 0.02840 0.026751210 630 19501586 0.06926 0.05960

MTNL QTR. VIVEK VHR‐1:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI100 0.09466 0.09192

MTNL QTR VIVEK VHR‐2:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI101 0 09894 0 08612

D‐BLK VIVEK VIHAR:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI069 0.54334 0.51205

ABUDANA VIVEK VIHAR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI070 0.35033 0.31411

0.36093

18 2.97355 2.78658 0.18697 6.29

0.27943

KKDSC07 VIVEK VIHAR

B BLOCK VIVEK VIHAR PH‐1(MTD):ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI007 0.37587

C‐BLK VIVEK VIHAR(PARK WALA):PG 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI061 0.30100

0.32854 0.27316

YOJANA VIHAR B‐BLOCK:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG104 0.32156 0.31282

8 1.37378 1.25428 0.11950 8.70

SAVITA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG003 0.32614 0.29717

SURAJ MAL VIHAR C‐BLOCK:ID 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG048 0.61256 0.57070

KKDSC06 YOJANA VIHAR YOJANA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG039

9 1.63402 1.54498 0.08905 5.45KKDSC05 YOJANA VIHAR,SURAJMAL VIHAR

Page 44: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210 630 19501615 0.02968 0.02652

1210

A‐BLK VIVEK VIHAR NURSERY WALA:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI102 990 19505475 0.18755 0.17693 0.18755 0.17693

1210

ESI HOSPITAL:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI002 400 19501540 0.02038 0.01920 0.02038 0.01920

1210 630 19501598 0.10114 0.094331210 400 19501622 0.20111 0.16637

1210

POLICE STATION VIVEK VIHAR:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI040 630 19501612 0.03256 0.02746 0.03256 0.02746

1210

928 QTR. VIVEK VHR‐1(MOTHER DAIRY):ID) 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI041 630 19502872 0.12812 0.12272 0.12812 0.12272

1210 630 19501611 0.12171 0.116331210 630 19503596 0.13452 0.129121210 990 19502998 0.30893 0.251701210 990 19503691 0.16399 0.139201210 630 19505367 0.00236 0.00186

1210

MAHILA COLLEGE VIVEK VIHAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI063 990 19503019 0.36114 0.35008 0.36114 0.35008

1210 630 19501632 0.16416 0.160581210 400 19501038 0.04130 0.04014

1210

A‐BLK DSIDC JLM COLONY:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI072 400 19504212 0.08694 0.08520 0.08694 0.08520

1210

B‐BLK DSIDC JLM COLONY:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI073 400 19501083 0.08891 0.08308 0.08891 0.08308

1210

C‐BLK DSIDC JLM COLONY:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI074 400 19501508 0.10740 0.10478 0.10740 0.10478

1210

D‐BLK DSIDC JLM COLONY:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI075 400 19501597 0.01377 0.01318 0.01377 0.01318

1210

E‐BLK DSIDC JLM COLONY:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI076 400 19504700 0.12038 0.11320 0.12038 0.11320

0.47528 0.39276

SHIVA KHAND:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI064 0.20546 0.20072

8.19

PRATAP KHAND:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI039 0.30225 0.26070

928 QTR. VIVEK VHR‐2(SHIV MANDIR):ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI042 0.25624

KKDSC08 DSIDC JHILMIL COLONY 27 3.37843 3.10165 0.27678

0.24545

BATRA S/STN JLM COL.:K 3 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI047

MTNL QTR. VIVEK VHR‐2:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI101 0.09894 0.08612

Page 45: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

GOBIND KHAND:PG 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI078 990 19503614 0.19533 0.18679 0.19533 0.18679

1210

PRATAP KHAND EXTN:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI087 400 19504160 0.10174 0.09288 0.10174 0.09288

1210 990 19503615 0.19024 0.174801210 630 19504400 0.17583 0.16157

1210

SEWYAM SEWA SANSTHAN VIVEK VIHAR 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI099 630 19504220 0.13162 0.12654 0.13162 0.12654

1210 990 19505009 0.32329 0.285391210 400 19505428 0.04297 0.037931210 400 19504050 0.01218 0.011181210 400 19504196 0.00642 0.006031210 630 19502900 0.02054 0.019871210 100 19503151 0.00967 0.00893

1210

STREET LIGHT CBD:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG095 100 19504198 0.00354 0.00309 0.00354 0.00309

1210

TELEPHONE EXCHANGE (KARKARDOOMA):ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG127 400 19501119 0.04919 0.04777 0.04919 0.04777

1210

B BLK CBD GROUND I/D 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG141 630 19504282 0.08350 0.06879 0.08350 0.06879

1210

E‐BLK CBD GROUND 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG153 400 19504285 0.02240 0.02189 0.02240 0.02189

1210

C‐ BLK S/STN, CBD GROUND 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG164 400 19504738 0.00116 0.00109 0.00116 0.00109

1210

D‐Blk S/Stn Cbd Ground, Cbd Ground 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG167 400 19502325 0.00309 0.00284 0.00309 0.00284

1210

G Block  S/Stn Cbd, Cbd Ground 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG168 400 19504681 0.00738 0.00706 0.00738 0.00706

9.41

0.03021 0.02880

10 0.20619 0.18678 0.01941

I.T.I. STAFF QUATERS 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI135 0.01860 0.01721

KKDSC09 CBD GROUND AND NEAR KARKARDOOMA COURT

SHAKTI KIRAN BUILIDING KAKARDOMA GRID:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG044

E‐BLK JHILMIL COLONY:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI088 0.36607 0.33637

A‐BLK VIVEK VIHAR PH‐2 2 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI126 0.36626 0.32332

Page 46: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

UTCS STAFF QUARTER  1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG182 400 19505429 0.00572 0.00544 0.00572 0.00544

1210

CHITRAKOOT CGHS:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG001 630 19501008 0.02980 0.02720 0.02980 0.02720

1210

SANJAY AMAR COLONY :PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG023 990 19501129 0.26570 0.19397 0.26570 0.19397

1210 400 19501041 0.03435 0.031551210 400 19504047 0.02487 0.023581210 630 19501006 0.05130 0.048011210 630 19501010 0.04197 0.038811210 990 19501128 0.03479 0.032441210 630 19504925 0.04611 0.044541210 630 19501027 0.03148 0.030661210 990 19501130 0.05846 0.056931210 400 19501043 0.01899 0.018751210 400 19501045 0.00853 0.008031210 990 19501963 0.18011 0.161941210 990 19504883 0.27016 0.22901

1210

EAST ARJUN NAGAR:K 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG092 990 19502895 0.22360 0.21045 0.22360 0.21045

1210

JUDGE CLY, KKD COURT:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG114 400 19501037 0.05448 0.05127 0.05448 0.05127

1210

KARKARDOOMA COURT:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG122 630 19501039 0.02594 0.02033 0.02594 0.02033

1210

NAV RACHANA APPTT:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG148 630 19502382 0.05066 0.04951 0.05066 0.04951

1210

KKD Court New S/Stn 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG162 630 19502938 0.02620 0.01752 0.02620 0.01752

1210

Priyadarshni Working Women,Ymca Hostel 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG171 100 19504683 0.00823 0.00805 0.00823 0.00805

JEEVAN BIMA:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG056 0.02753 0.02678

BHIKAM SINGH COLONY SCHOOL WALA:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG091 0.45027 0.39095

ANUPAM APPARTMENT NO‐1:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG051 0.08090 0.07698

ANUPAM APPTT. NO‐2:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG052 0.08994 0.08759

1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG042 0.05922 0.05513

HANSA APTT. NO‐2:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG043 0.09328 0.08682

KKDSC10 KARKARDOOMA COURT 21 1.50824 1.32397 0.18426 12.22

HANSA APTT. NO‐1:ID 2

Page 47: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

Anand Vihar Police Sta on1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG181 400 19503847 0.02250 0.02143 0.02250 0.02143

1210 630 19501298 0.05703 0.044651210 630 19501315 0.04303 0.034841210 630 19504061 0.16402 0.155391210 630 19504731 0.13420 0.129171210 630 19504735 0.01289 0.011061210 630 19504739 0.20192 0.18829

1210

RAM GALI (NALA):PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG084 990 19503499 0.23619 0.19075 0.23619 0.19075

1210

YUDHISHTER GALI(NALA):PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG087 990 19501237 0.21859 0.20100 0.21859 0.20100

1210

GALI NO.6 NALA VISWAS NAGAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG088 990 19504778 0.22522 0.21218 0.22522 0.21218

1210 630 19505352 0.12914 0.115611210 630 19504068 0.21930 0.20240

1210

NAKUL GALI:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG093 990 19505067 0.06624 0.06106 0.06624 0.06106

1210

SANJAY AMAR COLONY (VEG. MARKET);PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG094 990 19501073 0.26467 0.21751 0.26467 0.21751

1210

BHIKAM SINGH COLONY P/M:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG101 630 19503004 0.12856 0.12149 0.12856 0.12149

1210

SUBHASH GALI (NALA):PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG102 630 19504402 0.16330 0.15508 0.16330 0.15508

1210

KARKARI MORE:K 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG105 990 19504837 0.14042 0.13154 0.14042 0.13154

1210

GALI NO‐4‐NALA VISHWAS NAGAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG110 990 19504250 0.14010 0.12584 0.14010 0.12584

SHASTRI GALI (NALA):PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG082 0.21481 0.19935

GALI NO‐8 VISHWAS NAGAR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG089 0.34844 0.31801

0.07949

21 2.91048 2.63498 0.27550 9.47

0.28457

KKDSC11 VISHWAS NAGAR NALA

SHIVAM ENCLAVE‐2:ID 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG062 0.10006

NEHRU GALI (NALLAHA SIDE):PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG066 0.29822

Page 48: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

BAZAR GALI(NALA):PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG113 990 19504878 0.25818 0.23303 0.25818 0.23303

1210

GALI NUMBER ‐ 3 (NALA) VISWAS NGR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG132 630 19504413 0.09136 0.08916 0.09136 0.08916

1210

EAST END CLUB 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG159 100 19501926 0.00912 0.00878 0.00912 0.00878

1210

A ‐ BLK S/STN, CBD GROUND 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG163 630 19503657 0.00701 0.00614 0.00701 0.00614

1210 990 19502917 0.26024 0.224041210 990 19502920 0.07981 0.068541210 990 19502922 0.21513 0.183141210 990 19502923 0.13879 0.11129

1210

KARAN GALI M.C.D. SCHOOL:PL/M 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG00B 630 19504768 0.10698 0.09084 0.10698 0.09084

1210 990 19504075 0.23344 0.173491210 990 19504838 0.46842 0.429761210 990 19501465 0.25253 0.229341210 990 19504921 0.25253 0.21837

1210

GALI NO‐5 V.NGR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG021 990 19504076 0.17366 0.15920 0.17366 0.15920

1210 400 19504249 0.18938 0.181301210 990 19504856 0.14287 0.136581210 990 19504199 0.27515 0.253431210 990 19504619 0.27515 0.25022

1210

NEHRU GALI:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG060 990 19504588 0.12233 0.10405 0.12233 0.10405

1210

SHIVAM ENCLAVE‐1:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG061 630 19501259 0.11920 0.11318 0.11920 0.11318

1210 990 19504069 0.22895 0.188661210 990 19504070 0.19079 0.135931210 630 19504605 0.34343 0.257911210 990 19503598 0.17813 0.146521210 990 19504347 0.45806 0.37312

HALKANA KUAN NO‐II:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG065 0.63619 0.51963

28/29 BLOCK VISHWAS NAGAR 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG059 0.55030 0.50365

HALKANA KUNA NO‐1:K 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG064 0.76318 0.58250

TASH FACTORY:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG020 0.50506 0.44770

GALI NO‐16 VISHWAS NAGAR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG024 0.33225 0.31788

0.58701

31 6.54774 5.75172 0.79602 12.16

0.60325

KKDSC12 VISHWAS NAGAR

SARVARIA MARKET:K 4 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG008 0.69397

COMMERCIAL BLOCK:K 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG014 0.70186

Page 49: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

18 QTR VISWAS NAGAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG067 990 19504231 0.11728 0.10978 0.11728 0.10978

1210 990 19504059 0.00151 0.000401210 630 19504118 0.30078 0.27135

1210

SHASTRI GALI (BAGILCHI):PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG077 990 19504159 0.15856 0.14286 0.15856 0.14286

1210

KARAM GALI:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG083 990 19502910 0.23718 0.22323 0.23718 0.22323

1210

RAM GALI 60ROAD:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG085 990 19502914 0.26326 0.25481 0.26326 0.25481

1210

YUDHISHTER GALI:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG086 990 19503610 0.09930 0.08898 0.09930 0.08898

1210 630 19500425 0.25987 0.247371210 990 19504211 0.28153 0.26622

1210

18 QTR P/M VISHNU GALI:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG097 990 19504234 0.12349 0.11781 0.12349 0.11781

1210 990 19504180 0.28817 0.261301210 990 19501310 0.20190 0.146481210 630 19505449 0.06467 0.050401210 990 19503502 0.36313 0.353941210 990 19503503 0.38379 0.374081210 990 19504190 0.29047 0.28312

1210

4‐POLE PANDAV ROAD:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG022 990 19505267 0.43900 0.40382 0.43900 0.40382

1210 400 19505298 0.09804 0.090391210 400 19504523 0.15335 0.14071

1210

DALAI MOHALLA:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG026 990 19504081 0.24504 0.21023 0.24504 0.21023

1210 990 19505353 0.33084 0.315461210 400 19505354 0.03874 0.037141210 990 19504686 0.49762 0.449371210 990 19504924 0.22357 0.20835

1210

IDGAH BHOLA NATH NAGAR:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG029 990 19501938 0.57155 0.49598 0.57155 0.49598

1210 990 19503074 0.36657 0.328971210 990 19504207 0.22467 0.20193

TEJAB MILL:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG031 0.59125 0.53090

SHALIMAR PARK:K 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG027 0.36957 0.35260

MANI RAM MANDIR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG028 0.72118 0.65773

8.65

BIHARI COLONY:K 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG013 1.03740 1.01113

MAHAVIR BLOCK:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG025 0.25139

0.55473 0.45818

22 5.94964 5.43487 0.51477

0.23110

GALI NO‐10 VISHWAS NAGAR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG090 0.54140 0.51359

KKDSC13 BHOLA NATH NAGAR

DCP OFFICE:K 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG006

PATEL GALI NALA:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG068 0.30229 0.27175

Page 50: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

DCP OFFICE PEELA MANDIR:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG034 990 19503010 0.13642 0.13000 0.13642 0.13000

1210 990 19501600 0.37515 0.364861210 990 19503515 0.23674 0.23024

1210

AGGARWAL BHAWAN:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG038 630 19501636 0.23884 0.20472 0.23884 0.20472

1210

BIHARI COLONY EXT.;PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG111 990 19502904 0.18138 0.15337 0.18138 0.15337

1210 990 19502912 0.09344 0.075281210 630 19502927 0.28031 0.219651210 990 19504090 0.09344 0.088141210 630 19501463 0.14989 0.145611210 990 19503651 0.23444 0.221631210 990 19501196 0.26506 0.206011210 990 19501248 0.34079 0.280121210 990 19503571 0.15146 0.12219

1210

TELEWARA GURUDWARA 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG00A 630 19501469 0.11840 0.11418 0.11840 0.11418

1210 990 19501265 0.25811 0.213311210 630 19504171 0.21118 0.181211210 990 19501297 0.27215 0.255021210 400 19504394 0.07676 0.071361210 630 19504538 0.10470 0.093541210 990 19504540 0.14079 0.129181210 990 19501198 0.16394 0.152661210 990 19501205 0.32124 0.244731210 990 19504777 0.39256 0.324221210 990 19504807 0.15266 0.13625

1210

TEL MILL:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG018 990 19504457 0.35866 0.32616 0.35866 0.32616

1210

TELEWARA:PM 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG030 400 19504455 0.13438 0.12016 0.13438 0.12016

1210

MAHA RAM MOHALLA:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG032 990 19004009 0.27586 0.26011 0.27586 0.26011

1210 990 19504136 0.25530 0.240401210 990 19504971 0.23566 0.22658

INDRA PARK:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG033 0.49095 0.46698

RAMLEELA GROUND JWALA NAGAR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG016 0.48518 0.39738

MUKESH NAGAR:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG017 0.54522 0.46047

DELHI GATE:K 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG011 0.34891 0.32638

SHAMSHAN GHAT:PL 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG015 0.24549 0.22272

TIKONA PARK JWALA NAGAR:K 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG009 0.75730 0.60833

ANAJ MANDI:K 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG010 0.46929 0.39452

0.38308

27 5.72727 5.03982 0.68745 12.00

0.36725

KKDSC14 KASTURBA NAGAR

SHAHDRA CITY:K 3 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG005 0.46719

RAMA BLOCK(BABU RAM SCHOOL):K 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG007 0.38432

BHOLA NATH NAGAR:K 2 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG036 0.61189 0.59510

Page 51: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karkardooma Division 

1210

PATHAN PURA:PL 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG037 990 19505282 0.29550 0.28052 0.29550 0.28052

1210

CIVIL HOSPITAL SHAHDARA S/STN 1 1S‐DL‐YP‐ETC‐DJLM‐2201‐VNG158 990 19501461 0.19102 0.15844 0.19102 0.15844

1210

KASTURBA NGR.COMPLAINT CENTRE:ID 1 1S‐DL‐YP‐ETC‐DJLM‐2203‐JHI043 990 19503707 0.15958 0.15313 0.15958 0.15313

Page 52: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1211

ZAFRABAD AE OFFICE 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN001 990 19501728 0.29989 0.21339 0.29989 0.21339

1211 990 19505244 0.33161 0.244861211 630 19505261 0.17785 0.168101211 990 19003920 0.21983 0.199291211 990 19501845 0.20292 0.18829

1211

GORAKH PARK NALA (ASHOK WALA) 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN004 630 19504422 0.16359 0.13772 0.16359 0.13772

1211

NEAR DWARKA PURI GRID:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN006 990 19504182 0.17961 0.15546 0.17961 0.15546

1211

ULDHAN PUR F‐BLOCK NAVEEN SHAHDRA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN007 990 19500682 0.19757 0.17984 0.19757 0.17984

1211

SUBHASH PARK CHAND RAM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN008 990 29006120 0.41450 0.34652 0.41450 0.34652

1211 990 19501795 0.18151 0.169991211 990 19501797 0.29169 0.27317

1211

K BLOCK PARK WALA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN00B 990 19003827 0.31843 0.29228 0.31843 0.29228

1211 990 19505472 0.32572 0.304431211 990 19501710 0.34431 0.321801211 990 19501704 0.25877 0.235621211 990 19501796 0.23502 0.208561211 990 19501828 0.23581 0.21631

1211

MOHAN PARK 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN012 990 19503207 0.21714 0.18957 0.21714 0.18957

1211

K BLOCK NAVEEN SHAHDRA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN013 630 19505438 0.16032 0.12571 0.16032 0.12571

1211

SHAHDARA THANA:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN015 400 19500593 0.01828 0.01777 0.01828 0.01777

1211

G.T.ROAD COMPLAINT OFFICE S/STN 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN016 630 19006008 0.04814 0.04651 0.04814 0.04651

H‐BLOCK NAVEEN SHAHDARA:PL 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN011 0.72960 0.66049

SUBHASH PARK ICE FACTORY 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN009 0.47320 0.44316

PANCH SHEEL PARK (JHULE WALA):K 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN010 0.67003 0.62623

1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN002 0.50946 0.41296

NAV DURGA MANDIR 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN003 0.42275 0.38758

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

GTRSC01 G T ROAD SHAHDRA 39 7.88850 6.92513 0.96337 12.21

ZAFRABAD CONSTRUCTION OFFICE:ID 2

Page 53: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211

RADHU KIOSK 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN017 990 19501824 0.20762 0.19717 0.20762 0.19717

1211

R. BLOCK NAVEEN SHAHDARA:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN018 990 19501725 0.29232 0.26707 0.29232 0.26707

1211 990 19501762 0.22545 0.198781211 630 19501794 0.15030 0.143531211 990 19501749 0.24832 0.231681211 990 19501765 0.25074 0.217631211 990 19504163 0.18954 0.166331211 630 19503146 0.02749 0.02495

1211

GORAKH PARK HANUMAN MANDIR PM  1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN024 400 19502520 0.14846 0.13374 0.14846 0.13374

1211 990 19501702 0.12707 0.115461211 990 19505226 0.38969 0.294351211 990 19504423 0.33039 0.27282

1211

BEHAL GALI 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN029 990 19504432 0.34253 0.30849 0.34253 0.30849

1211 990 19501763 0.08931 0.074421211 630 19504162 0.01576 0.01442

1211

WELCOME THANA NEW ZAFRABAD 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN0A1 630 19504908 0.02852 0.02679 0.02852 0.02679

1211 630 19501772 0.00007 0.000051211 630 19502940 0.00243 0.002261211 990 19504421 0.45491 0.360251211 630 19004958 0.00928 0.00505

1211

BALBIR NAGAR NALA GALI NO. 16:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN027 990 19505217 0.27168 0.23909 0.27168 0.23909

1211

BALBIR NAGAR NALA GALI.4 GORAKH PUR:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN028 990 19504183 0.28272 0.20921 0.28272 0.20921

1211 630 19505007 0.27893 0.251841211 990 19501748 0.30237 0.27299

1211

LONI ROAD KHATTEWALA:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN014 990 19504046 0.33606 0.30467 0.33606 0.30467

1211 630 19501829 0.14297 0.120041211 990 19502978 0.25605 0.21941

KABOOL NAGAR KIOSK 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN019 0.39902 0.33945

0.36530

6 1.59989 1.33843 0.26146 16.34

0.52483

GTRSC02 JYOTI NAGAR

BALBIR NAGA NALA GALI NO.14:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN026 0.46419

BALBIR NAGAR EXTN. 60 F ROAD:PM:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN030 0.58130

RANI JHANSI MARG KAILASH WALA 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN059 0.10507 0.08884

METRO STATION, SHAHDARA:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN186 0.00250 0.00230

SHAHI MOHALLA:K 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN022 0.71609 0.64059

GORAKH PARK KISOK:K 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN025 0.84715 0.68263

KABOOL NAGAR RAIN BASERA:PM 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN021 0.37575 0.34230

Page 54: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211 990 19505469 0.16297 0.139451211 630 19505195 0.17655 0.14234

1211

SHIVAJI PARK ARYA SAMAJ MANDIR 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN023 990 19501792 0.39008 0.35833 0.39008 0.35833

1211 630 19501716 0.19073 0.132331211 990 19501722 0.27697 0.236381211 990 19504165 0.16363 0.093681211 630 19505075 0.11346 0.096151211 630 19501789 0.09320 0.08791

1211

G.T.ROAD WATER WORKS S/STN 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN036 990 19004026 0.25587 0.18349 0.25587 0.18349

1211

RILWAY ROAD (COURT ROAD):PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN037 630 19501800 0.08939 0.07451 0.08939 0.07451

1211 990 19501729 0.39024 0.322551211 630 19505470 0.00695 0.00642

1211

NOVA:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN033 990 19505338 0.18793 0.17405 0.18793 0.17405

1211

LONI ROAD SEWAGE PUMP SUBSTATION 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN035 990 19505082 0.09866 0.08842 0.09866 0.08842

1211

JAISWAL MARG:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN044 990 19501798 0.33008 0.28613 0.33008 0.28613

1211 990 19501756 0.22737 0.194251211 990 19501758 0.28178 0.258411211 990 19501705 0.26606 0.236921211 630 19504949 0.12521 0.11149

1211

BHAGWANPUR KHERA NO‐1:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN047 990 19500681 0.29696 0.21228 0.29696 0.21228

1211

BHAGWANPUR KHERA NO‐2:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN048 990 19502743 0.28323 0.25433 0.28323 0.25433

1211

BHAGWANPUR KHERA NO‐3:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN049 990 19500683 0.28426 0.23573 0.28426 0.23573

1211 990 19501708 0.27246 0.245411211 990 19501709 0.16002 0.13235

0.39127 0.34841

MOTI RAM ROAD G.T.ROAD FLYOVER S/STN 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN038 0.43248 0.37775

10 2.38153 2.05200 0.32953 13.84MANDOLI ROAD:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN045 0.50915 0.45266

EAST ROHTAS NAGAR:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN053 0.39719 0.32897

GTRSC04 NATHU COLONY

RAM NAGAR SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN046

0.63133 0.46239

LONI ROAD TIKONA PARK:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN034 0.20666 0.18406

17.32

KABOOL NAGAR MOTHER DAIRY:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN020 0.33952

GTRSC03 NAVEEN SHAHDRA 15 3.04513 2.51765 0.52747

0.28179

BALBIR NAGAR SCHOOL:K 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN031

Page 55: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211 990 19000406 0.22438 0.206061211 990 29006140 0.43556 0.38351

1211

MANSAROVER PARK KHATTE WALA S/STN 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN040 990 19501703 0.13888 0.12737 0.13888 0.12737

1211 990 19500567 0.18328 0.169101211 400 19505041 0.07185 0.062541211 630 19505471 0.06181 0.048951211 630 19504544 0.11478 0.09812

1211

D S R MILL:K 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN043 990 19501805 0.38896 0.30683 0.38896 0.30683

1211

NEW MODERN SHAHDRA NO I GALI NO 13:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN050 990 19501846 0.30217 0.24976 0.30217 0.24976

1211 630 19505357 0.19305 0.171461211 990 19501779 0.20914 0.195311211 630 19501759 0.20435 0.186481211 990 19501799 0.24101 0.19325

1211

MSPARK J‐BLOCK DISPENCERY PACKAGE:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN054 990 19501019 0.21718 0.19866 0.21718 0.19866

1211 630 19501733 0.15716 0.135621211 990 19501743 0.09633 0.091211211 990 19501760 0.11167 0.101701211 630 19501804 0.12097 0.105301211 630 19501734 0.06652 0.065641211 990 19501742 0.05667 0.053661211 400 19501735 0.04604 0.042751211 630 19501745 0.06625 0.062141211 990 19504323 0.22540 0.207241211 990 19504327 0.00228 0.001851211 990 19501371 0.40204 0.352301211 990 19505452 0.28717 0.247081211 990 19003543 0.13128 0.117471211 990 19501352 0.18228 0.177111211 990 19501367 0.06174 0.059041211 400 19504201 0.04998 0.044981211 990 19501446 0.11849 0.115781211 990 19501447 0.19332 0.17529

1211

SARDAR ALUMINIUM:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN073 990 19501448 0.17651 0.16165 0.17651 0.16165

1211 990 19501787 0.38512 0.347441211 630 19504955 0.00097 0.00017

RAJ ENGG.COMPOUND 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN074 0.38609 0.34761

A‐BLOCK DSIDC SHED:ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN070 0.29399 0.28113

B‐BLK COMPLAINT CENTER JLM IND AREA:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN071 0.31181 0.29107

0.20909

0.71685

A‐BLK JLM IA FLATTED FACTORY:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN068 0.22768

A‐BLOCK JHILMIL INDILSHAD AREA:ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN069 0.82048

DDA FLAT M.S PARK THANEWALA:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN057 0.12319 0.11931

DDA FLAT M. S. PARK PIAUWALA;ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN058 0.11228 0.10489

DDA FLAT M. S. PARK MANDIR WALA:PG 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN055 0.25349 0.22682

DDA FLAT M. S. PARK MASJID WALA:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN056 0.23264 0.20699

NEW MODERN SHAHDARA NO 2 GALI NO7,8 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN051 0.40219 0.36677

SUBHASH MARG NEW MODERN SHAHDARA:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN052 0.44537 0.37973

2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN041 0.25514 0.23165

MOTI RAM PEER WALA S/STN 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN042 0.17659 0.14708

24 4.14049 3.63319 0.50730 12.25

MANSAROVER PARK MOTHER DAIRY 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN039 0.65994 0.58957

GTRSC05 MANSAROVER PARK

MOTI RAM UNWALA S/STN

Page 56: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211

PAPER PRODUCT 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN075 990 19504761 0.25325 0.22950 0.25325 0.22950

1211 630 19504247 0.13930 0.129821211 630 19505064 0.00176 0.001311211 990 19500679 0.45617 0.441121211 630 19004874 0.00695 0.00446

1211

GALI NO‐1 RAILWAY LINE FRIENDS COLONY 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN0A3 990 19504996 0.24083 0.22263 0.24083 0.22263

1211 630 19501353 0.15173 0.139081211 630 19501370 0.05058 0.046211211 630 19501356 0.20060 0.184271211 630 19501361 0.08358 0.073631211 630 19504773 0.05015 0.039271211 630 19501369 0.17148 0.155681211 630 19505489 0.23027 0.219551211 630 19501368 0.08819 0.075271211 990 19505392 0.35522 0.320601211 990 19505488 0.10397 0.101011211 990 19505434 0.40720 0.37953

1211

B BLK OPP SWAHNEY IND.:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN107 990 19505328 0.30085 0.27430 0.30085 0.27430

1211

IN FROPNT OF KC, B‐BLK IND AREA:PG 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN108 990 19503090 0.12704 0.12433 0.12704 0.12433

1211

B‐34 JLM INDUSTRIAL AREA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN109 630 19501836 0.10298 0.09300 0.10298 0.09300

1211 990 19503035 0.63565 0.612351211 990 19504262 0.07142 0.064411211 630 19505004 0.00714 0.004271211 990 19500623 0.09937 0.087921211 990 19504999 0.26500 0.240491211 990 19500654 0.29812 0.280181211 990 19501354 0.06476 0.041611211 630 19501406 0.38856 0.317281211 630 19505161 0.06476 0.052011211 990 19504958 0.12952 0.109231211 990 19501793 0.22145 0.204471211 990 19503629 0.33218 0.322161211 990 19501374 0.19939 0.183151211 990 19501387 0.07006 0.061661211 990 19500558 0.22286 0.207131211 990 19500650 0.27665 0.261401211 990 19504119 0.26896 0.25901

GALI NO.1B FRIENDS COLONY:PL 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN127 0.76847 0.72754

GALI NO.3 FRIENDS COLONY:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN120 0.55363 0.52662

B‐BLK DSIDC SHED JLM IA NO‐1:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN122 0.26945 0.24481

FRIENDS COLONY GALI NO.1 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN111 0.66250 0.60859

B‐BLK DSIDC SHED JLM IA NO‐2:ID 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN119 0.64760 0.52013

SHAMBU NATH COMP.(F.COL):ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN105 0.86638 0.80114

VERMA CASTLE:PL 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN110 0.71422 0.68103

A BLK TAHIRPUR(JLM IND AREA) S/STN‐1:ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN103 0.33433 0.29717

A BLK TAHIRPUR(JLM IND AREA) S/STN‐3:ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN104 0.48995 0.45051

SANSAR:K 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN077 0.46311 0.44558

B‐BLK DSIDC SHED JLM IA NO‐3:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN101 0.20230 0.18529

SSR MILL:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN076 0.14106 0.13113

64 11.97666 10.94567 1.03098 8.61GTRSC06 JHILMIL INDUSTRIAL AREA

Page 57: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211 990 19503739 0.41552 0.397141211 990 19504545 0.13404 0.128111211 990 19504943 0.33956 0.324541211 630 19505079 0.00447 0.004271211 990 19504318 0.12369 0.112451211 400 19504366 0.08246 0.077881211 630 19501719 0.14974 0.137611211 630 19504244 0.12252 0.118301211 990 19503413 0.37523 0.353201211 990 19504236 0.22895 0.208421211 630 19500158 0.03180 0.020831211 990 19502936 0.23339 0.178901211 990 19502937 0.30709 0.264161211 630 19504954 0.07370 0.04915

1211

MS PARK G‐BLK PKG NEAR RAILWAY LINE:PG 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN032 990 19501016 0.17779 0.14664 0.17779 0.14664

1211

KHERA VILLAGE:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN135 630 19503065 0.23548 0.20799 0.23548 0.20799

1211 630 19501777 0.02002 0.019711211 630 19504604 0.02765 0.02534

1211

P.S MS PARK PKG.S/STN 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN00M 990 19504795 0.02774 0.02625 0.02774 0.02625

1211 630 19505440 0.12572 0.110191211 990 19501424 0.14759 0.13641

1211

SHAKUN ENGG.:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN079 990 19501404 0.20663 0.19434 0.20663 0.19434

1211 630 19503174 0.28444 0.270111211 630 19504241 0.05689 0.056271211 630 19503631 0.05100 0.048771211 990 19501417 0.20639 0.196531211 990 19501423 0.39988 0.393071211 630 19504435 0.02580 0.020411211 630 19504966 0.01290 0.008011211 990 19501412 0.18961 0.178191211 630 19501414 0.14966 0.145351211 630 19503033 0.16707 0.151041211 990 19505369 0.14816 0.126811211 990 19501422 0.15667 0.152621211 990 19503414 0.16973 0.159621211 990 19504371 0.25195 0.217341211 990 19505439 0.28674 0.199361211 990 19502279 0.33515 0.264921211 630 19502634 0.21135 0.170631211 990 19504967 0.34120 0.309671211 400 19504294 0.14480 0.12538

DAMODAR PARK,DILSHAD GARDEN:PL 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN112 1.08518 0.85225

LOCAL SHOPPING CENTER DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN130 0.48600 0.43505

R.BLK DILSHAD GARDEN S/S NO‐1:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN083 0.31522 0.27786

R.BLK DILSHAD GARDEN S/S NO‐2:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN084 0.32640 0.31224

0.64496 0.61802

DILSHAD GDN S/STN‐5:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN082 0.33926 0.32354

10.23

B/D OFFICE DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN078 0.27331 0.24660

SITA FLATS,DILSHAD GARDEN:ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN080 0.39233

GTRSC08 R BLOCK DILSHAD GARDEN 26 4.38782 3.93887 0.44895

0.37516

DILSHAD GDN S/STN‐4:ID 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN081

13.29

HMT COLONY:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN136 0.04767 0.04505

GTRSC07DILSHAD GARDEN INDUSTRIAL. AREA

4 0.46095 0.39969 0.06125

HANSRAJ COMPOUND S/STN 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN178 0.63598 0.58244

GALI NO‐1A  FRIEDS COLONY NEAR METRO STATION 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN198 0.61418 0.49221

GALI NO‐1A FRIENDS COLONY:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN131 0.20615 0.19033

SATISH STEEL ROLLING MILL:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN147 0.27226 0.25591

FRIENDS COLONY GALI NO‐5‐6 NEAR RLY.LINE:PM 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN129 0.89358 0.85406

Page 58: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211

DEEPAK PETROL PUMP(NEAR SALIM COMND) 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN180 990 19504210 0.18835 0.18011 0.18835 0.18011

1211

Laxmi Narayan Mandir S/S‐1 R Blk Dilshad Garden 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN200 990 19504752 0.03946 0.03650 0.03946 0.03650

1211

Laxmi Narayan Mandir S/S‐2 R Blk Dilshad Garden 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN201 990 19504755 0.06295 0.06094 0.06295 0.06094

1211

SEEMAPURI POLICE STATION NEAR GURUDWARA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN00U 400 19504759 0.03662 0.03350 0.03662 0.03350

1211

PREM ICE FACTORY:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN072 990 19504326 0.22982 0.21003 0.22982 0.21003

1211 630 19503030 0.17230 0.144911211 990 19503064 0.11487 0.099321211 630 19504946 0.07966 0.068431211 630 19501403 0.10260 0.096081211 630 19503021 0.18452 0.180271211 630 19504434 0.07908 0.073581211 630 19501397 0.08714 0.079581211 630 19501399 0.15492 0.150261211 990 19503080 0.20607 0.163841211 990 19504962 0.34344 0.259331211 400 19504148 0.13738 0.08225

1211

POLICE STATION OLD SEEMAPURI:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN099 990 19503062 0.27462 0.22429 0.27462 0.22429

1211 990 19500063 0.12117 0.108091211 630 19002210 0.07789 0.070991211 630 19502268 0.08943 0.07679

1211

RED CROSS:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN115 630 19504524 0.02629 0.02460 0.02629 0.02460

OLD SEEMAPURI (BUS STOP):ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN098 0.68688 0.50541

JHULFE BENGAL S/S NO. 2:PL 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN114 0.28850 0.25586

0.26360 0.25385

J&K PKT DILSHAD GARDEN‐4 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN097 0.24206 0.22984

I‐PKT. DILSHAD GDN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN094 0.28717 0.24423

J&K PKT DILSHAD GARDEN‐1:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN095 0.18227 0.16452

J&K PKT DILSHAD GARDEN‐3:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN096

Page 59: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211

G.T ROAD SEEMA PURI BORDER:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN124 400 19503230 0.01851 0.01749 0.01851 0.01749

1211 990 19501433 0.12205 0.113061211 400 19503582 0.01356 0.013161211 990 19505295 0.57182 0.554921211 990 19504973 0.11712 0.106091211 990 19501372 0.19138 0.140871211 630 19503779 0.08699 0.059791211 990 19504194 0.43495 0.266501211 630 19504208 0.15658 0.12507

1211

LIC COLONY DILSHAD GARDEN:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN137 630 19504202 0.07732 0.07191 0.07732 0.07191

1211 990 19504839 0.27962 0.257331211 630 19504902 0.22370 0.213921211 990 19504905 0.35276 0.332931211 990 19501791 0.00430 0.00266

1211

AHINSA COMPOUND,GT RD,DILSHAD GARDEN 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN181 990 19504204 0.14466 0.13318 0.14466 0.13318

1211

DP PM AT SHAMSHAN GHAT OLD SEEMAPURI 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN182 100 19502668 0.00319 0.00307 0.00319 0.00307

1211

MEENA BAZAR SSTN NO.‐1:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN187 400 19503535 0.08946 0.08106 0.08946 0.08106

1211

MEENA BAZAR SSTN NO.‐2:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN188 400 19503540 0.01503 0.01358 0.01503 0.01358

1211

MEENA BAZAR SSTN NO.‐3:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN189 400 19504246 0.03000 0.02817 0.03000 0.02817

1211

SHANKAR KI DP ,A BLK.JLM  IA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN199 400 19501351 0.09499 0.08990 0.09499 0.08990

1211 990 19504360 0.12207 0.110841211 630 19501715 0.28482 0.21855

Oberai compound 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN225 0.40689 0.32939

B‐BLOCK OLD  SEEMAPURI :PL 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN133 0.86991 0.59224

F‐BLOCK DILSHAD COLONY:ID 4 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN162 0.86038 0.80684

J&K PKT DILSHAD GARDEN‐2:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN126 0.13561 0.12622

JULFE BENGAL S/S NO.I 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN128 0.68894 0.66101

14.89GTRSC09 J PKT DILSHAD GARDEN 41 6.18274 5.26188 0.92086

Page 60: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211

G Block Dilshad Colony ( Park Wala) 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN233 990 19505277 0.23001 0.16170 0.23001 0.16170

1211

D‐BLK DILSHAD COLONY S/STN 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN00L 630 19505334 0.28537 0.23487 0.28537 0.23487

1211 630 19501381 0.24534 0.229921211 630 19501390 0.10021 0.093911211 630 19501378 0.18044 0.135921211 990 19501384 0.17337 0.145411211 630 19501373 0.16408 0.144681211 630 19501376 0.00684 0.005081211 630 19504149 0.18322 0.168301211 630 19504150 0.07634 0.064751211 400 19504331 0.04580 0.036621211 400 19501360 0.05148 0.048281211 400 19501362 0.04752 0.047351211 630 19505297 0.15524 0.145201211 990 19505312 0.15524 0.124121211 630 19504485 0.15268 0.127521211 630 19503368 0.18793 0.162301211 630 19505410 0.10941 0.102651211 400 19505332 0.05636 0.056311211 630 19501388 0.17160 0.134471211 630 19505046 0.04840 0.042801211 990 19505238 0.25555 0.228071211 990 19505339 0.16339 0.15577

1211

LEPROCY COLONY S/STN‐1:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN102 990 19505159 0.13834 0.10844 0.13834 0.10844

1211

LEPROCY COLONY S/STN‐2:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN106 990 19503505 0.13107 0.11269 0.13107 0.11269

1211 400 19501363 0.17671 0.120461211 990 19503411 0.24403 0.186001211 990 19505340 0.29276 0.259931211 630 19505370 0.22086 0.210971211 630 19505464 0.03611 0.021101211 990 19505465 0.06501 0.063741211 990 19504132 0.26003 0.221601211 630 29006133 0.11653 0.094251211 990 29006138 0.19842 0.14681

1211

TAHIR PUR VILLAGE:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN121 990 19503461 0.26586 0.23066 0.26586 0.23066

A‐BLK NEW SEEMA PURI:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN118 0.31496 0.24106

E‐BLK NEW SEEMA PURI:PL 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN116 0.51362 0.47090

F‐BLK NEW SEEMA PURI:PL 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN117 0.36115 0.30645

C‐BLK NEW SEEMAPURI:K 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN100 0.41894 0.38384

DAL MILL,DILSHAD GARDEN:PM 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN113 0.42074 0.30647

Q‐POCKET DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN092 0.16578 0.15896

D‐PKT DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN093 0.22000 0.17727

M&N PKT DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN090 0.31049 0.26932

O&P PKT DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN091 0.34061 0.28982

L&H PKT DILSHAD GARDEN:ID 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN088 0.30536 0.26967

S&G PKT DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN089 0.09900 0.09562

0.35381 0.28133

R‐PKT DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN087 0.17091 0.14976

48 7.50613 6.44155 1.06458 14.18

A‐PKT,DILSHAD GDN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN085 0.34554 0.32383

GTRSC10 DILSHAD COLONY

B‐PKT,DILSHAD GDN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN086

Page 61: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Dilshad Garden Division 

1211

NEW SEEMAPURI DDA FLAT:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN125 990 19504891 0.32558 0.27490 0.32558 0.27490

1211 990 19504483 0.19732 0.177231211 990 19501450 0.23609 0.21661

1211

TAHIRPUR SARAI:PM 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN134 400 19504602 0.12714 0.10795 0.12714 0.10795

1211 400 19503029 0.22471 0.145891211 630 19503048 0.10751 0.074671211 630 19505164 0.01997 0.007551211 990 19004950 0.33609 0.311921211 990 19505287 0.23355 0.20715

1211

D‐PKT DILSHAD GARDEN STN‐2:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN157 630 19504781 0.08677 0.07979 0.08677 0.07979

1211

B & D POCKET,DILSHAD GARDEN:ID 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN161 400 19505276 0.05191 0.04914 0.05191 0.04914

1211

HANUMAN MANDIR LEPROSY SSTN‐3:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN183 630 19501435 0.10338 0.09853 0.10338 0.09853

1211

B‐BLK DILSHAD COLONY PARK WALA 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN190 630 19504330 0.15575 0.14783 0.15575 0.14783

1211

TAHIRPUR VILLAGE BEHIND NNG GRID:PL 1 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN191 630 19501810 0.13880 0.13141 0.13880 0.13141

C‐BLK DILSHAD CLY:PL 3 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN140 0.35219 0.22811

B‐BLK DILSHAD CLY:PM 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN141 0.56965 0.51907

E&F PKT. DILSHAD GARDEN:ID 2 1S‐DL‐YP‐ETC‐DDGN‐2251‐DGN132 0.43341 0.39384

Page 62: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1220

RADHEY SHYAM PARK NO‐2 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN00A 990 19504696 0.38969 0.35464 0.38969 0.35464

1220 990 19003799 0.32866 0.298051220 990 19504907 0.39745 0.372581220 630 19505113 0.03822 0.034951220 990 19501281 0.22499 0.214041220 990 19501290 0.27499 0.254861220 990 19500778 0.25514 0.234701220 990 19500780 0.08505 0.07823

1220

JAGAT PURI B BLK:ID 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG019 990 19505038 0.56556 0.52221 0.56556 0.52221

1220 990 19505027 0.33228 0.308951220 990 19500819 0.14241 0.135511220 990 19500805 0.13811 0.105981220 630 19504713 0.32225 0.269231220 990 19500789 0.20841 0.192371220 630 19505403 0.06947 0.064121220 990 19501276 0.30398 0.290851220 990 19503597 0.44577 0.40697

1220

SOUTH ANARKALI (NALAH):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG032 990 19505040 0.25590 0.23873 0.25590 0.23873

1220

JAGAT PURI G BLK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG034 990 19500858 0.38512 0.32678 0.38512 0.32678

1220 990 19504900 0.26219 0.228671220 630 19504245 0.17480 0.153241220 990 19504663 0.53396 0.479711220 630 19505280 0.07281 0.053301220 990 19505248 0.38829 0.310601220 990 19504341 0.25886 0.218941220 990 19501996 0.25298 0.224841220 630 19505285 0.07135 0.06342

1220

RADHEY PURI EXTN.‐2 (NALLA):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI037 990 19500764 0.26513 0.24403 0.26513 0.24403

1220

RADHA PURI NEW KRISHNA NAGAR:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI038 990 19501977 0.21024 0.19447 0.21024 0.19447

1220

RAM NAGAR L.N.MANDIR:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI041 990 19500864 0.27837 0.24135 0.27837 0.24135

1220 990 19500882 0.32565 0.306041220 630 19505114 0.08141 0.076511220 990 19500826 0.33740 0.30754WEST ARJUN NAGAR:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI051 0 41377 0 37967

RADHA PURI EXTN.(NALAH) NO. 1:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI036 0.32434 0.28826

RAM NAGAR PARK(PLM) 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI042 0.40707 0.38256

11.80

J‐BLOCK KRN:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI019 0.60677 0.53301

OLD ANARKALI:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI034 0.64715

0.43699 0.38191

16 3.77716 3.33143 0.44573

0.52954

SOUTH ANARKALI:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG031 0.74975 0.69783

KRNSC02 AZAD NAGAR

H‐BLOCK KRISHNA NAGAR (MOTHER DAIRY):K 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI018

JITAR NAGAR:K 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG022 0.46036 0.37521

MAUSAM VIHAR:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG024 0.27788 0.25649

GOVIND PARK 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG014 0.34019 0.31294

JAGAT PURI F BLK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG020 0.47469 0.44446

1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG008 0.76432 0.70559

GAGAN VIHAR EXT:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG009 0.49998 0.46890

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

KRNSC01 GAGAN VIHAR 19 5.16344 4.70378 0.45965 8.90

GAGAN VIHAR:ID 3

Page 63: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220 630 19505160 0.07637 0.07214

1220

JAGAT PURI RD NO.57:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG021 990 19505096 0.18734 0.15663 0.18734 0.15663

1220

AZAD NAGAR WATER TANK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI002 630 19503599 0.26804 0.23522 0.26804 0.23522

1220 990 19501902 0.38998 0.334551220 990 19501905 0.20999 0.18591

1220

D‐BLOCK KRISHNA NAGAR:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI011 990 19503662 0.28659 0.26360 0.28659 0.26360

1220

EAST AZAD NAGAR TIKONA PARK:ID 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI012 990 19500861 0.21421 0.19645 0.21421 0.19645

1220

F‐BLOCK KRISHNA NAGAR:K 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI013 990 19504056 0.43155 0.40131 0.43155 0.40131

1220

E‐BLOCK KRN (PARK) E 15,16:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI014 990 19501971 0.19933 0.18271 0.19933 0.18271

1220

E‐BLOCK KRN LAJ PAT RAI CHOWK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI015 990 19501862 0.43075 0.39624 0.43075 0.39624

1220

F‐BLOCK KRN:K 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI016 990 29502000 0.33818 0.30773 0.33818 0.30773

1220

F‐BLOCK KRN PLM:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI017 990 19504052 0.28166 0.25099 0.28166 0.25099

1220 990 19503670 0.31270 0.277131220 630 19505158 0.11871 0.09238

1220

SURYA HOSPITAL:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI049 990 19504772 0.31331 0.29226 0.31331 0.29226

1220

VAISH DHARAM SHALA:PM 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI050 400 19501912 0.09323 0.08824 0.09323 0.08824

1220 990 19501914 0.29105 0.244091220 630 19501972 0.12473 0.10603

0.43141 0.36951

BHAGAT SINGH PARK NO 1:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI006 0.41578 0.35013

14 3.88823 3.50470 0.38353 9.86

C‐BLOCK KRISHNA NAGAR NO 1:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI008 0.59997 0.52045

WEST ARJUN NAGAR:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI051 0.41377 0.37967

KRNSC03LAL QUARTER  

KRISHNA NAGAR

SCHOOL BLOCK KRN:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI043

Page 64: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220

CHHACHHI BUILDING:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI010 990 19500862 0.22989 0.20412 0.22989 0.20412

1220 630 19505187 0.13208 0.113941220 990 19501978 0.16143 0.147251220 990 19501976 0.29506 0.270641220 990 19005978 0.19671 0.191071220 990 19500881 0.23640 0.214661220 630 19504387 0.23640 0.226181220 990 19501881 0.23346 0.207801220 990 19501909 0.39726 0.33872

1220

WEST AZAD NAGAR (RASGULLA):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI052 990 19504952 0.22541 0.20780 0.22541 0.20780

1220 990 19501602 0.13937 0.132551220 990 19501973 0.32520 0.30139

1220

East Azad Nagar Primary School 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI066 630 19505252 0.24007 0.19406 0.24007 0.19406

1220

R. PURA GALI NO. 8:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN024 990 19504102 0.34707 0.32610 0.34707 0.32610

1220 990 19500930 0.28250 0.256891220 630 19500966 0.18088 0.17126

1220

KANTI NAGAR EXT. GALI NO. 5:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI026 990 19504956 0.26974 0.24974 0.26974 0.24974

1220 990 19505349 0.19076 0.173721220 630 19505347 0.33296 0.260581220 630 19504931 0.15974 0.135811220 630 19505458 0.10388 0.083881220 990 19503467 0.45080 0.389171220 630 19505157 0.01878 0.014851220 630 19501974 0.16067 0.141031220 630 19503425 0.08652 0.07439

1220

KANTI NAGAR(SATISH AGGARWAL):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI031 630 19504957 0.14586 0.12305 0.14586 0.12305

1220 400 19504522 0.00961 0.007841220 400 19501913 0.02734 0.024081220 990 19505156 0.35619 0.282011220 630 19003798 0.10046 0.070501220 990 19501882 0.30165 0.285731220 990 19501884 0.34183 0.323431220 630 19505228 0.11216 0.09850

SHANKAR NAGAR EXT.:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI044 0.45665 0.35251

WEST AZAD NAGAR SHD ROAD B&D BL NO. 1:ID 3 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI053 0.75564 0.70767

KANTI NAGAR MAIN ROAD:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI030 0.24719 0.21542

KRISHNA NAGAR POLICE STATION NO. 1:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI032 0.03695 0.03192

0.26361 0.21969

KANTI NAGAR KIOSK:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI029 0.46959 0.40402

KANTI NAGAR EXT. GALI NO. 9:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI027 0.52372 0.43430

SATSANG MARG:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN026 0.46338 0.42816

KANTI NAGAR EXT.(NALAH):PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI028

SHANKAR NAGAR MAIN ROAD SCHOOL NO 1:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI045 0.63072 0.54652

WEST AZAD NAGAR(KEHAR SINGH)RLG NO 1:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI055 0.46457 0.43394

2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI039 0.49177 0.46171

RAJGARH MOTHER DAIRY GALI NO 6:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI040 0.47280 0.44084

18 4.27497 3.85457 0.42041 9.83

JHEEL NO. 4 NO 1:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI023 0.29351 0.26119

KRNSC04 WEST AZAD NAGAR

RAJGARH EXTN.(MINI STADIUM):ID

Page 65: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220

WEST KANTI NAGAR:ID  1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI057 990 19504088 0.53201 0.44394 0.53201 0.44394

1220

DAV School Rajgarh Extension 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI067 630 19505185 0.15736 0.15016 0.15736 0.15016

1220

AHATA KARAM CHAND:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN001 990 19504087 0.31900 0.29702 0.31900 0.29702

1220 990 19505460 0.42412 0.315221220 630 19003931 0.07484 0.05530

1220

CHEMALI DEVI (INSIDE):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN005 990 19500172 0.16442 0.14382 0.16442 0.14382

1220

D.A.V. SCHOOL GANDHI NGR.:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN006 990 19504114 0.15163 0.14411 0.15163 0.14411

1220

KAUSHIK PURI KIOSK:K 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN017 990 19502029 0.24546 0.22367 0.24546 0.22367

1220 990 19500958 0.29880 0.193491220 630 19504747 0.15470 0.12648

1220

KAUSHIK PURI GALI NO. 4:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN019 990 19504627 0.14335 0.11614 0.14335 0.11614

1220

R.PURA GALI NO 6 (IN SIDE):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN025 990 19500935 0.35757 0.28654 0.35757 0.28654

1220 990 19505126 0.30348 0.254611220 990 19505127 0.32153 0.187331220 990 19505116 0.42429 0.288631220 990 19505099 0.31822 0.200151220 630 19505100 0.10607 0.082271220 630 19505119 0.21214 0.08227

1220

SEELAMPUR PHATAK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN029 990 19502642 0.59805 0.11997 0.59805 0.11997

1220

SHANTI MOHALL GALI NO. 7:K 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN030 990 19500931 0.23178 0.21027 0.23178 0.21027

SEELAMPUR DOUBLE STORY:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN027 0.62500 0.44194

SEELAMPUR OLD PR. SCHOOL NO. 1:K 4 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN028 1.06072 0.65331

AMAR MOHALLA:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN003 0.49897 0.37052

KAUSHIK PURI PARK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN018 0.45350 0.31996

47 11.02222 8.42739 2.59483 23.54KRNSC05 KANTI NAGAR

Page 66: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220

SHANTI MOHALLA WATER SUPP OFF JAL BD:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN031 990 19500960 0.30195 0.27883 0.30195 0.27883

1220 990 19502868 0.30480 0.264031220 990 19505386 0.30480 0.241231220 990 19505124 0.30480 0.220521220 630 19505135 0.10160 0.08649

1220

CHAMELI DEVI OUTSIDE:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN035 990 19504979 0.22470 0.18930 0.22470 0.18930

1220

SHANTI MOHALL WATER SUPP OFF INSIDE:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN038 990 19504601 0.23494 0.21705 0.23494 0.21705

1220 990 19505456 0.24745 0.085291220 630 19500795 0.11645 0.03655

1220

GALI NO.‐5 SHANTI MOHLLA 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN043 630 19505478 0.17294 0.14842 0.17294 0.14842

1220

AJIT NAGAR GALI NO 8:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN002 990 19505012 0.41235 0.33779 0.41235 0.33779

1220 990 19503044 0.11920 0.095741220 990 19504860 0.10430 0.082551220 630 19504871 0.02483 0.021371220 990 19502031 0.24126 0.198941220 990 19504110 0.41545 0.371781220 990 19504053 0.29181 0.271311220 990 19504107 0.47554 0.456531220 400 19504381 0.09727 0.056911220 400 29501985 0.21616 0.18589

1220

GANDHI NAGAR KIOSK:K 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN009 990 19504055 0.13380 0.12116 0.13380 0.12116

1220 990 19502022 0.22172 0.185851220 990 19502024 0.14781 0.11274

1220

HATHI WALA PARK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN011 990 19500936 0.24438 0.22032 0.24438 0.22032

1220 990 19500927 0.20891 0.193411220 990 19500928 0.28726 0.265941220 630 19505184 0.02611 0.02418

1220

KAILASH NAGAR (KHATTA):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN013 990 19501982 0.21920 0.18209 0.21920 0.18209

JANTA PARK NO. 1:PL 3 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN012 0.52228 0.48354

1.08078 0.97064

GANDHI NAGAR POLICE ST.:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN010 0.36954 0.29859

ASHOK GALI NO. 1:PL 3 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN004 0.24834 0.19967

DUDLELA CHOWK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN007 0.65670 0.57072

GALI GURDWARA NO. 2:ID 4 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN008

SUBHASH MOHALLA NO.1:PM 4 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN033 1.01601 0.81227

SEELAM PUR PULIA 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN042 0.36390 0.12185

Page 67: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220 990 19500216 0.31826 0.276111220 990 19501522 0.31841 0.282361220 990 19504927 0.28982 0.141141220 990 19504253 0.27903 0.244261220 630 19502962 0.27903 0.260711220 990 19505011 0.23916 0.22307

1220

KOTHI  BHAGWAN DASS (INSIDE):ID 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN020 990 19502028 0.17571 0.15787 0.17571 0.15787

1220 990 19502038 0.22701 0.208801220 990 19505315 0.18573 0.17592

1220

NEHRU GALI:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN022 990 19504382 0.24848 0.21519 0.24848 0.21519

1220 990 19504109 0.31079 0.219341220 630 19500096 0.07770 0.059321220 990 19505393 0.25455 0.220621220 990 19505090 0.20096 0.174171220 990 19505384 0.39522 0.342541220 990 19502033 0.20096 0.174171220 990 19505443 0.26794 0.232231220 990 19505140 0.02010 0.017421220 990 19500967 0.28952 0.273271220 990 19500969 0.30418 0.22754

1220

R.PURA GALI NO 6 (OUTSIDE):PM 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN037 630 19004376 0.14506 0.13152 0.14506 0.13152

1220

CHANDER PURI 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN039 990 19501981 0.24417 0.21105 0.24417 0.21105

1220

GYAN MOHLLA 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN040 990 19502011 0.29444 0.24608 0.29444 0.24608

1220

TAGORE GALI 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN041 990 19504104 0.23653 0.21336 0.23653 0.21336

1220

SJ/STN RATTEY WALA SUBHASH MOHALLA 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN045 990 19500940 0.22912 0.20800 0.22912 0.20800

1220 990 19501585 0.23286 0.205071220 630 19503396 0.16862 0.15041

0.40148 0.35548

AJIT NAGAR GALI NO 10:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN034 0.59370 0.50081

KAILASH NAGAR SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN016

PEEPAL WALA SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN023 0.38848 0.27866

SHIV KUTI R.L.G. NO. 1:ID 6 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN032 1.33972 1.16114

KAILASH NAGAR NO. 15:PL 3 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN015 0.79722 0.72803

MAHILA COLONY:K 2 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN021 0.41274 0.38472

KAILASH NAGAR NO. 1:PL 3 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN014 0.92650 0.69961

14.10KRNSC06 GANDHI NAGAR 43 9.91925 8.52055 1.39869

Page 68: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220

KOTHI BHAGWAN DAS OUTSIDE:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2102‐GAN036 990 19502027 0.24154 0.22061 0.24154 0.22061

1220 990 19505045 0.30109 0.268881220 990 19505050 0.07063 0.06182

1220

AMBEDKAR COLLEGE:PM 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL003 630 19505048 0.12888 0.12145 0.12888 0.12145

1220 990 19505189 0.31131 0.294381220 400 19504389 0.07456 0.06454

1220

DARBAR MARG:K 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL007 630 19503706 0.16090 0.14903 0.16090 0.14903

1220

GANDHI NGR PRIMARY SCHOOL:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL009 990 19504802 0.26380 0.24634 0.26380 0.24634

1220

GEETA COLONY,10, BLK:K 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL013 990 19001411 0.29430 0.26663 0.29430 0.26663

1220 630 19505057 0.26767 0.215071220 630 19504912 0.11471 0.09556

1220

GEETA COLONY,3, BLK:K 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL022 990 19505141 0.31558 0.29111 0.31558 0.29111

1220 990 19504348 0.10214 0.093321220 400 19503616 0.21706 0.191101220 630 19505112 0.02822 0.020641220 990 19500802 0.25395 0.23737

1220

SARASWATI BHANDAR:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL035 630 19503655 0.14938 0.13944 0.14938 0.13944

1220

SHYAM BLOCK NO. 1:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL039 990 19503701 0.17657 0.15513 0.17657 0.15513

1220

SHYAM BLOCK NO. 2:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL040 990 19504719 0.17715 0.16187 0.17715 0.16187

1220 990 19501872 0.22814 0.212501220 990 19501917 0.23637 0.211801220 990 19501919 0.19139 0.170141220 630 29006118 0.11034 0.10000

GEETA COLONY,8‐A,BLK:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL027 0.28217 0.25801

SUBASH ROAD, TIKONA PARK:K 4 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL041 0.76623 0.69444

GEETA COLONY,2,BLK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL021 0.38238 0.31063

GEETA COLONY,8,BLK;PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL026 0.31920 0.28442

9.71

9BLK, GEETA CLY:K 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL001 0.37171 0.33070

B.T.S MULTANI MOHOLLA:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL004 0.38588

28 5.13388 4.63542 0.49846

0.35892

KRNSC07 GEETA COLONY

Page 69: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220

SWARG ASHARM:PM 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL042 100 19504628 0.02103 0.02057 0.02103 0.02057

1220

MULTANI MOHALLA MASJID 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL053 400 19503702 0.09319 0.08455 0.09319 0.08455

1220

9 Block, Silai Center Geeta Colony 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL063 630 19505216 0.20250 0.18611 0.20250 0.18611

1220

A‐BLOCK KRN:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI001 990 19501861 0.50147 0.40651 0.50147 0.40651

1220

B‐BLOCK KRISHNA NAGAR 8/24:PM 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI003 400 19501998 0.18036 0.15841 0.18036 0.15841

1220

B ‐ BLOCK MEERA MANDAL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI005 990 19504858 0.36275 0.29097 0.36275 0.29097

1220

JHEEL NO. 1:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI020 630 19503581 0.22700 0.20507 0.22700 0.20507

1220

JHEEL NO. 2:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI021 990 19501871 0.42947 0.33137 0.42947 0.33137

1220

JHEEL NO. 3:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI022 630 19003794 0.16758 0.15170 0.16758 0.15170

1220

JHEEL NO. 5:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI025 630 19004882 0.24734 0.22642 0.24734 0.22642

1220 990 19500804 0.36431 0.331331220 400 19502214 0.04048 0.034831220 630 19503081 0.26833 0.231641220 400 19504342 0.02538 0.01743

1220

PANDIT PARK:PM 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI035 990 19500865 0.47242 0.29694 0.47242 0.29694

1220

SHASTRI PARK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI047 990 19502447 0.40787 0.25820 0.40787 0.25820

1220 990 19500863 0.57279 0.47427K BLK KRISHNA NAGAR:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI058 0 59665 0 48299

15.24

JHEEL (BHOOSA MANDI):PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL005 0.40479 0.36616

GEETA COLONY,POL.STATION 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL028 0.29372

KRNSC08 JHEEL 11 2.81448 2.38568 0.42880

0.24907

Page 70: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220 990 19504624 0.02387 0.00872

1220

ARAM PARK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG001 990 19500853 0.36496 0.33857 0.36496 0.33857

1220 990 19500787 0.29450 0.232831220 990 19500790 0.29450 0.26138

1220

CHANDU PARK:K 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG007 990 19500786 0.31370 0.28536 0.31370 0.28536

1220 990 19500776 0.31957 0.285571220 990 19505000 0.28339 0.232661220 990 19500817 0.21316 0.175331220 630 19502152 0.14211 0.130001220 990 19501481 0.43796 0.395471220 990 19504345 0.18770 0.161291220 630 19503257 0.22248 0.186601220 990 19504763 0.41318 0.320831220 990 19500856 0.39673 0.363751220 990 19505047 0.17003 0.156481220 630 19500777 0.26074 0.244451220 630 19003858 0.17382 0.15907

1220

SHIV PURI:PM 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG029 990 19004050 0.27828 0.25309 0.27828 0.25309

1220

SILVER PARK:ID 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG030 990 19505072 0.23437 0.21846 0.23437 0.21846

1220

LAXMAN PARK S/STN 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG036 990 19503326 0.24416 0.19718 0.24416 0.19718

1220 990 19001533 0.55422 0.423101220 990 19501604 0.41810 0.346401220 990 19500831 0.24824 0.202721220 990 19505023 0.16549 0.13979

1220

BALDEV PARK(PARK WALA):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG004 990 19504993 0.31344 0.25665 0.31344 0.25665

1220

BRIJPURI:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG005 990 19500854 0.38192 0.33696 0.38192 0.33696

1220 630 19500750 0.41751 0.347281220 990 19500851 0.04639 0.03773

1220

GOVIND PURA(NEW):ID 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG015 990 19504853 0.47382 0.44440 0.47382 0.44440

GANDHI PARK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG010 0.46390 0.38501

0.76950

16 5.40288 4.61318 0.78970 14.62

0.34251

KRNSC10 KHUREJI

BEDI MKT:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG002 0.97232

BALDEV PARK:K 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG003 0.41373

NEW LAYALPUR:K 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG025 0.56675 0.52023

RAM NAGAR EXT:K 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG028 0.43456 0.40351

GOPAL PARK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG013 0.62566 0.55677

JAGAT PURI A BLK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG018 0.63566 0.50743

0.60296 0.51823

GOLDEN PARK:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG012 0.35527 0.3053316.15

K BLK KRISHNA NAGAR:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2101‐KRI058 0.59665 0.48299

CHANDER NAGAR:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG006 0.58900

KRNSC09 KRISHNA NAGAR 23 6.72228 5.63649 1.08578

0.49421

GANESH PARK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG011

Page 71: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220

GOVIND PURA(OLD):ID 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG016 990 19503083 0.46938 0.40023 0.46938 0.40023

1220 990 19503528 0.34195 0.297191220 630 19504697 0.27978 0.251621220 990 19500834 0.17946 0.165271220 630 19500835 0.09663 0.09025

1220

RADHEY SHAYAM PARK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG027 990 19500832 0.53741 0.50361 0.53741 0.50361

1220

VIVEKANAND:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG033 990 19505080 0.47914 0.36997 0.47914 0.36997

1220

ALOK BHARTI 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL002 990 19503703 0.33699 0.30445 0.33699 0.30445

1220 400 19501457 0.01936 0.018151220 400 19501458 0.01584 0.014401220 630 19505199 0.03955 0.033171220 630 19505255 0.00220 0.001881220 400 19505196 0.00220 0.001841220 400 19501271 0.04280 0.041041220 400 19501288 0.01070 0.00963

1220

GEETA COLONY, 14 BLK:ID 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL011 990 19000775 0.20221 0.18403 0.20221 0.18403

1220 630 19500749 0.16419 0.148011220 630 19501601 0.09122 0.084811220 400 19503469 0.10946 0.09230

1220

GEETA COLONY,11, BLK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL014 630 19502875 0.18996 0.17199 0.18996 0.17199

1220 990 19503665 0.33894 0.258391220 630 19502441 0.06942 0.052571220 990 19501569 0.02195 0.021661220 990 19501566 0.23049 0.153191220 990 19501568 0.76829 0.750261220 630 19004968 0.07683 0.05958

1220

GEETA COLONY,15, BLK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL017 990 19501030 0.20035 0.18659 0.20035 0.18659

1220

GEETA COLONY,17, BLK COM CENTRE:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL018 630 19505190 0.18730 0.17435 0.18730 0.17435

1220 990 19501489 0.34922 0.34574

GEETA COLONY,13, BLK:ID 4 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL016 1.09755 0.98470

GEETA COLONY 17 BLK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL019 0 51739 0 48495

GEETA COLONY, 16 BLK:ID 3 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL012 0.36486 0.32512

GEETA COLONY,12, BLK:K 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL015 0.40836 0.31096

0.04394 0.03689

GEETA APPT.S/STAT.NO.1:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL010 0.05350 0.05067

EKTA APARTMENTS:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL008 0.03520 0.03255

PREET VIHAR POLICE STN:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG026 0.27610 0.25551

MAYUR DHAWZ CGHS 3 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL00C

KHUREJI:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2104‐JAG023 0.62173 0.54881

Page 72: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220 400 19504388 0.16817 0.13922

1220

GEETA COLONY,18, BLK:PG 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL020 990 19501033 0.22867 0.21671 0.22867 0.21671

1220

GEETA COLONY,5,BLK:ID 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL023 990 19501335 0.27814 0.25182 0.27814 0.25182

1220

GEETA COLONY,6, BLK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL024 990 19501947 0.34835 0.30758 0.34835 0.30758

1220

GEETA COLONY,7, BLK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL025 990 19501349 0.11504 0.10751 0.11504 0.10751

1220 400 19501459 0.01517 0.014381220 400 19501460 0.02095 0.02039

1220

NEW LAHORE (MUNSHI COLONY):PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL030 990 19501567 0.36260 0.33931 0.36260 0.33931

1220 630 19501582 0.36909 0.346681220 400 19504390 0.18249 0.112781220 990 19003792 0.46225 0.425721220 630 19505143 0.00943 0.004791220 630 19501570 0.33390 0.303301220 630 19505345 0.04023 0.036541220 400 19503526 0.02816 0.02558

1220

RANI GARDEN SWITCHING S/STN:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL034 630 19501456 0.17973 0.16721 0.17973 0.16721

1220

SAROJINI PARK:PL 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL036 630 19501593 0.28228 0.26049 0.28228 0.26049

1220

SHASTRI NAGAR, NO‐1:PKG 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL037 990 19500305 0.21066 0.19631 0.21066 0.19631

1220

SHASTRI PARK NAGAR, NO‐2:K 1 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL038 990 19501591 0.30570 0.28507 0.30570 0.28507

1220 630 19501525 0.04950 0.043501220 630 19501583 0.05363 0.043501220 630 19501521 0.04834 0.044601220 630 19501584 0.05908 0.048311220 400 19501277 0.02529 0.021251220 400 19501283 0.03091 0.028141220 400 19501342 0.12786 0.11145

GEETA APT SS 2:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL045 0.05620 0.04939

5 BLOCK GEETA COLONY INDOOR:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL049 0 17048 0 15085

TAJ SARTAJ, S/STAT, NO.1:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL043 0.10313 0.08700

TAJ SARTAJ, S/STAT, NO.2:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL044 0.10742 0.09291

RANI GARDEN NO.2,PARK WALA:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL032 0.47168 0.43051

RANI GARDEN SCHOOL;PL 3 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL033 0.40229 0.36542

KANCHAN APPT.:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL029 0.03612 0.03477

NEW LAHORE EXTENSION:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL031 0.55157 0.45945

GEETA COLONY,17,BLK:PL 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL019 0.51739 0.48495

51 7.93297 7.12866 0.80431 10.14KRNSC11 SHASTRI NAGAR

Page 73: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Krishna Nagar Division 

1220 400 19504383 0.04262 0.039391220 630 19504718 0.04725 0.045161220 630 19504720 0.03803 0.03392

SARWANGHI SOCIETY 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL052 0.08528 0.07908

5 BLOCK GEETA COLONY INDOOR:ID 2 1S‐DL‐YP‐ETC‐DKRN‐2103‐GCL049 0.17048 0.15085

Page 74: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1230

DP ANAND VIHAR:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR075 100 19002761 0.00932 0.00895 0.00932 0.00895

1230 630 19500599 0.01254 0.010831230 630 19505240 0.16660 0.15925

1230

S/STN. NO.3 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR028 990 19502419 0.14864 0.13571 0.14864 0.13571

1230

S/STN. NO.4 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR029 630 19504845 0.10360 0.10020 0.10360 0.10020

1230

S/STN. NO.5 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR030 630 19500815 0.03500 0.03230 0.03500 0.03230

1230

S/STN. NO.6 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR031 990 19502765 0.16406 0.15051 0.16406 0.15051

1230 630 19500812 0.13710 0.130511230 990 19505236 0.26613 0.24693

1230

S/STN. NO.10 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR033 630 19504880 0.06052 0.05822 0.06052 0.05822

1230 630 19500757 0.12545 0.116401230 630 19502953 0.18625 0.15739

1230

S/STN. NO.9 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR035 990 19504874 0.15280 0.14806 0.15280 0.14806

1230 630 19503810 0.03880 0.034201230 630 19504302 0.02810 0.024451230 990 19505476 0.05729 0.054181230 630 19505032 0.03981 0.037941230 400 19501454 0.04396 0.041471230 630 19505415 0.05595 0.05425

1230

S/STN. NO.14 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR039 630 19502417 0.20032 0.19578 0.20032 0.19578

1230 400 19504783 0.03333 0.028041230 990 19504935 0.18889 0.185411230 630 19502418 0.10716 0.103271230 630 19502874 0.02273 0.02267

1230

S/STN. NO.17 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR042 630 19504843 0.05452 0.05288 0.05452 0.05288

S/STN. NO.15 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR040 0.22222 0.21345

S/STN. NO.16 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR041 0.12989 0.12594

S/STN. NO.12 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR037 0.09711 0.09213

S/STN. NO.13 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR038 0.09991 0.09572

S/STN. NO.8 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR034 0.31170 0.27378

S/STN. NO.11 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR036 0.06690 0.05865

1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR027 0.17914 0.17008

S/STN. NO.7 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR032 0.40323 0.37744

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

LNRSC01 FIE PARPATGANJ INDUSTRIAL AREA 49 4.23855 3.99933 0.23922 5.64

S/STN. NO.2 F.I.E., PPG:ID 2

Page 75: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

S/STN. NO.18 F.I.E., PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR043 990 19500814 0.17613 0.16390 0.17613 0.16390

1230 630 19500709 0.05302 0.049441230 630 19505421 0.07512 0.067611230 630 19505034 0.28884 0.282591230 630 19505035 0.05055 0.042561230 400 19505036 0.02166 0.021361230 630 19504983 0.16222 0.154011230 630 19504984 0.09943 0.092511230 630 19501512 0.08460 0.080851230 630 19504981 0.06922 0.066611230 630 19501513 0.08233 0.079471230 630 19502896 0.04940 0.048401230 630 19501511 0.13199 0.129111230 400 19504633 0.01955 0.01761

1230

ROAD NO. 56, ST. LTG:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR050 100 19004401 0.00047 0.00046 0.00047 0.00046

1230

I.S.B.T. ANAND VIHAR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR052 400 19504989 0.01475 0.01416 0.01475 0.01416

1230 630 19502562 0.07084 0.065881230 630 19502569 0.01998 0.019641230 400 19504844 0.02445 0.023741230 400 19504887 0.08668 0.08423

1230

ROAD NO. 56 OPP.INDIAN OIL NEAR ANAND VIHER I.S.B.T

1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR0A1 100 19503059 0.01357 0.01289 0.01357 0.01289

1230

MADHU VIHAR S/STN‐II:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN051 630 19504516 0.16600 0.15777 0.16600 0.15777

1230

S/STN.NO‐2, GAZIPUR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN057 400 19501533 0.00992 0.00953 0.00992 0.00953

1230

S/STN.NO‐3, GAZIPUR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN058 400 19501786 0.02896 0.02519 0.02896 0.02519

1230

RISHABH IPEX MALL:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR073 400 19504488 0.00815 0.00779 0.00815 0.00779

1230 990 19505327 0.08066 0.07399SFS GAZIPUR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN028 0 13906 0 12632

DSIDC S/STN‐1 PPG COMPLEX:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR062 0.09083 0.08553

DSIDC S/STN‐2 PPG COMPLEX:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR063 0.11113 0.10798

S/STN. NO.23 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR048 0.13172 0.12787

S/STN. NO.24 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR049 0.15154 0.14672

S/STN. NO.21 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR046 0.26165 0.24653

S/STN. NO.22 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR047 0.15382 0.14746

S/STN. NO.19 F.I.E., PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR044 0.12814 0.11704

S/STN. NO.20 F.I.E., PPG:ID 3 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR045 0.36105 0.34652

Page 76: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19501937 0.05841 0.05233

1230

ST.LTG DP GAZIPUR:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN041 400 19504723 0.19655 0.12579 0.19655 0.12579

1230 630 19500432 0.03730 0.035661230 630 19500435 0.02896 0.02690

1230

HASANPUR VILLAGE:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN052 630 19504543 0.22972 0.22054 0.22972 0.22054

1230

GAZIPUR VILLAGE NEAR TEMPEL:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN053 990 19504850 0.37776 0.25863 0.37776 0.25863

1230

GAZIPUR VILLAGE NEAR SCHOOL:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN054 990 19502869 0.39571 0.30952 0.39571 0.30952

1230

GAZIPUR KIOSK:K 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN055 400 19501475 0.10910 0.09613 0.10910 0.09613

1230

S/STN.NO‐1, GAZIPUR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN056 400 19501531 0.09589 0.06168 0.09589 0.06168

1230 400 19501153 0.01690 0.015471230 400 19501188 0.01759 0.01592

1230

NEW GAZI PUR VAG MKT.S/STN 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN0B4 630 19504642 0.05260 0.04537 0.05260 0.04537

1230

ASHOK DAIRY NEAR SHIV MANDIR GAZIPUR 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN0B8 630 19504645 0.19420 0.16261 0.19420 0.16261

1230 400 19504827 0.02538 0.023461230 400 19505372 0.02749 0.026591230 400 19505335 0.03196 0.030861230 400 19505414 0.01721 0.016841230 630 19505424 0.06688 0.063801230 400 19505371 0.03762 0.035771230 400 19505411 0.02072 0.020191230 400 19501160 0.02637 0.024761230 400 19501175 0.01416 0.013681230 400 19501245 0.00944 0.00904

1230

SILVEROAK CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN166 630 19500773 0.03228 0.03123 0.03228 0.03123

1230 630 19501220 0.03238 0.03028AZAD APARTMENT PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN167 0 04982 0 04634

SAGAR CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN157 0.04709 0.04494

KAYMES VRINDAVAN,CGHS PPJ:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN158 0.02360 0.02272

KURMANCHAL CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN155 0.04916 0.04770

INDRA PRASTHA CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN156 0.10451 0.09957

0.03449 0.03138

VIDHI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN154 0.05287 0.05004

18.09

SFS GAZIPUR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN028 0.13906 0.12632

TAJMAN SINGH:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN046 0.06626

LNRSC02 CGHS AREA NEAR ARYANAGAR CGHS 35 2.54364 2.08360 0.46004

0.06256

VIDYUT CGHS,PPG :ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN081

Page 77: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19502514 0.01744 0.01606

1230

DTC DEPOT GAZIPUR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN216 100 19502566 0.02023 0.01907 0.02023 0.01907

1230

AZAD APPTT. S/S NO. 2 CGHS PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN234 630 19501219 0.05616 0.05233 0.05616 0.05233

1230

CNG PETROL PUMP:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN238 990 19503806 0.00745 0.00696 0.00745 0.00696

1230 630 19505423 0.05355 0.033821230 630 19503378 0.06039 0.03964

1230

INSTITUTIONAL AREA S/STN NO‐1 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN250 630 19504473 0.03637 0.03351 0.03637 0.03351

1230

INSTITUTIONAL AREA S/STN NO‐3 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN251 630 19504487 0.05067 0.04741 0.05067 0.04741

1230 630 19504480 0.02566 0.024381230 630 19504490 0.00724 0.006101230 630 19501273 0.11734 0.113031230 990 19501289 0.17601 0.165171230 990 19504514 0.34280 0.309921230 630 19504643 0.34280 0.309921230 630 19504811 0.17140 0.154961230 990 19503223 0.14781 0.132701230 990 19503675 0.26846 0.256421230 990 19503201 0.13342 0.120641230 990 19503206 0.13611 0.125941230 630 19505219 0.01957 0.016051230 630 19505149 0.01957 0.005941230 630 19501274 0.20058 0.196011230 630 19501275 0.24950 0.243651230 630 19501285 0.02903 0.027851230 630 19501286 0.03548 0.03272

1230

DISTRICT CENTER, L. NAGAR, NO3:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR023 630 19501287 0.01812 0.01660 0.01812 0.01660

1230 400 19501282 0.00941 0.008581230 400 19501284 0.00627 0.005931230 630 19505468 0.01313 0.012321230 400 19505451 0.00084 0.000761230 630 19503254 0.00089 0.000231230 630 19503273 0.01247 0.011151230 630 19503285 0.06413 0.06124

ADITYA TOWER DIST. CENTER LNR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR065 0.01397 0.01308

ROOT TOWER LAXMI NAGAR 4 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR066 0.08908 0.08378

L.S.C. NEW RAJDHANI:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR014 0.06451 0.06058

FIRE STN LAXMI NAGAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR064 0.01568 0.01451

DEFENCE ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR012 0.26953 0.24658

NEW RAJDHANI ENCLAVE:ID 4 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR013 0.48921 0.46166

EAST GURU ANGAD NAGAR:K 3 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR009 0.85700 0.77481

SHANKAR VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR010 0.41626 0.38912

0.03048

35 3.36110 3.10967 0.25143 7.48

0.27820

LNRSC03 DISTRICT CENTER LAXMI NAGAR

DDA BUILDING, LAXMI NAGAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR002 0.03290

SWASTHY VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR007 0.29336

AZAD APARTMENT, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN167 0.04982 0.04634

S/STN.NO‐4, GAZIPUR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN239 0.11394 0.07346

Page 78: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19505355 0.01158 0.011161230 630 19504801 0.07222 0.067901230 630 19502956 0.14664 0.141891230 630 19503203 0.18439 0.173221230 630 19503222 0.19207 0.183111230 630 19504816 0.00768 0.00564

1230

DISTT.CENT.2 LNR 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR069 400 19503211 0.00078 0.00075 0.00078 0.00075

1230 400 19504489 0.02676 0.023101230 400 19504512 0.02785 0.02404

1230

PARK END 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR085 630 19505358 0.14307 0.12061 0.14307 0.12061

1230

MANDAWALI SUBJI MANDI:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN021 990 19504821 0.42842 0.36426 0.42842 0.36426

1230 630 19501890 0.03714 0.035861230 630 19501932 0.05572 0.05160

1230

S/STN.NO‐6, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN063 400 19502391 0.01385 0.01348 0.01385 0.01348

1230

S/STN.NO‐7, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN064 400 19502395 0.03541 0.03056 0.03541 0.03056

1230

S/STN.NO‐19, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN072 400 19500775 0.00423 0.00401 0.00423 0.00401

1230 400 19500971 0.03871 0.036951230 400 19500972 0.03041 0.028521230 990 19500887 0.05193 0.051171230 990 19500888 0.04181 0.037021230 630 19500973 0.02059 0.018181230 630 19500976 0.04805 0.044311230 630 19500988 0.04425 0.041471230 630 19504822 0.02489 0.023051230 630 19500823 0.03425 0.031481230 630 19500977 0.04187 0.03876

1230

BHARAT CGHS, PPG, KOHINOOR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN115 630 19500978 0.04136 0.03931 0.04136 0.03931

1230 400 19500984 0.01930 0.018431230 400 19500994 0.01516 0.014501230 630 19500987 0.03628 0.033591230 630 19500995 0.02968 0.02760

AJANTA CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN117 0.06596 0.06118

KRIPAL CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN114 0.07612 0.07024

ORIENTAL CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN116 0.03446 0.03292

KARISHMA APTT. PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN112 0.06864 0.06249

KARISHMA APTT. PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN113 0.06914 0.06453

0.06912 0.06547

BATLA CGHS,PPG,S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN111 0.09374 0.08818

LSC‐II, MANDAWALI:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN035 0.09286 0.08746

SAGAR PLAZA D.C. LNR 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR078 0.05461 0.04714

BATLA CGHS,PPG,S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN110

Swasthya vihar kiosk Vikas Marg 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR067 0.21886 0.20980

CHITRA VIHAR:ID 3 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR068 0.38414 0.36197

Page 79: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

VANDANA CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN118 400 19500996 0.04727 0.04431 0.04727 0.04431

1230

MIRTRADEEP CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN119 630 19504367 0.03566 0.03305 0.03566 0.03305

1230 630 19501171 0.01870 0.017821230 630 19501241 0.02804 0.027161230 400 19501242 0.01657 0.015781230 400 19501243 0.02288 0.021041230 630 19505417 0.03427 0.032451230 630 19505398 0.02692 0.025291230 400 19501870 0.02843 0.027811230 400 19501988 0.02326 0.021921230 630 19505419 0.05862 0.057691230 630 19501995 0.02279 0.020631230 630 19500975 0.02267 0.021851230 630 19500986 0.05291 0.048701230 400 19500889 0.03714 0.033701230 400 19500890 0.01592 0.014051230 630 19503045 0.05363 0.048161230 630 19504181 0.03287 0.029931230 630 19501994 0.02463 0.021381230 630 19502528 0.05747 0.052311230 630 19501992 0.02403 0.021521230 630 19501693 0.06027 0.054371230 400 19500901 0.02773 0.025601230 400 19500905 0.02179 0.020801230 400 19501922 0.02288 0.021941230 400 19501986 0.01179 0.011181230 630 19502529 0.03659 0.036201230 630 19504324 0.03515 0.033441230 400 19003800 0.01707 0.016671230 400 19500993 0.02199 0.021531230 630 19500947 0.00670 0.006261230 630 19500948 0.05429 0.053051230 630 19500946 0.03902 0.038161230 630 19500949 0.01557 0.015151230 400 19500868 0.02325 0.020541230 400 19500869 0.01094 0.010121230 400 19500824 0.02226 0.021421230 400 19500870 0.00954 0.00923

1230

PARADISE CGHS PPG S/S‐1:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN200 630 19500877 0.03657 0.03480 0.03657 0.03480

1230

PARADISE CGHS PPG S/S‐2:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN201 630 19500822 0.05178 0.04849 0.05178 0.04849

SARANSH CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN197 0.03180 0.03066

ENGINEERS CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN195 0.05559 0.05331

SARANSH CGHS PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN196 0.03420 0.03066

PANCH MAHAL,PPG CGHS:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN168 0.03906 0.03820

ENGINEERS CGHS PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN194 0.05999 0.05931

VIJAY LAXMI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN160 0.03467 0.03312

JAI APARTMENT, JAI SANTOSHI PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN161 0.07174 0.06964

ARYANAGAR CGHS,S/S‐3,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN152 0.08430 0.07589

BROTHERS CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN153 0.04952 0.04640

ARYANAGAR CGHS,S/S‐1.PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN150 0.08650 0.07809

ARYANAGAR CGHS,S/S‐2,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN151 0.08210 0.07369

SAVARKAR CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN125 0.07558 0.07054

PRASHANT CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN126 0.05305 0.04776

SITA RAM CGHS,PPG,S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN123 0.05169 0.04973

SITA RAM CGHS,PPG,S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN124 0.08141 0.07832

ARUNA CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN121 0.03946 0.03682

KAILASH APARTMENT, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN122 0.06119 0.05775

KALLOL CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN120 0.04674 0.04498

66 2.51246 2.31199 0.20047 7.98LNRSC04 CGHS AREA NEAR VINOD NAGAR

Page 80: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

PARIWAR CGHS PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN202 630 19500867 0.06142 0.05661 0.06142 0.05661

1230 630 19500821 0.01919 0.017451230 630 19500866 0.05757 0.05346

1230

100KVA PMS NR KAPOOR PETROL PUMP NARVANA 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN244 100 19502745 0.04017 0.03666 0.04017 0.03666

1230

P.S MANDAWALI 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN275 630 19504630 0.03094 0.02820 0.03094 0.02820

1230

CSC PANKAJ PLAZA:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR074 630 19502764 0.03556 0.03363 0.03556 0.03363

1230 630 19504304 0.07400 0.062311230 630 19504305 0.22199 0.182101230 630 19504138 0.04121 0.038401230 630 19504776 0.03371 0.03215

1230

TAKSHILA S/STN MTNL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN00P 100 19504577 0.02316 0.02245 0.02316 0.02245

1230 630 19501921 0.29845 0.277731230 990 19505405 0.12791 0.11664

1230

S/STN.NO‐8, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN065 400 19501927 0.03330 0.02903 0.03330 0.02903

1230

S/STN.NO‐9, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN066 990 19500433 0.36134 0.31558 0.36134 0.31558

1230

S/STN.NO‐11, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN067 400 19504570 0.05814 0.05565 0.05814 0.05565

1230

S/STN.NO‐13, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN068 400 19502466 0.14488 0.13089 0.14488 0.13089

1230

S/STN.NO‐16, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN071 400 19500772 0.01594 0.01528 0.01594 0.01528

1230

ASHIRWAD CGHS,PPG S/STN‐1:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN093 400 19501341 0.03168 0.03045 0.03168 0.03045

0.42636 0.39437

S/ST NO 10 JOSHI COLONY:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR079 0.29598 0.24441

GAURAV APARTMENT, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN001 0.07492 0.07055

JOSHI COLONY:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN022

SHUBHAM CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN205 0.07676 0.07091

Page 81: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19501270 0.05388 0.051691230 630 19502811 0.04590 0.044221230 400 19501172 0.02573 0.023981230 400 19505401 0.01325 0.011981230 630 19501221 0.01460 0.013501230 630 19503809 0.03408 0.032411230 400 19505155 0.01787 0.017611230 400 19505412 0.03318 0.03180

1230

PLATO SCHOOL:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN098 100 19502763 0.00643 0.00626 0.00643 0.00626

1230

MEENA CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN099 630 19502563 0.05350 0.05069 0.05350 0.05069

1230 630 19501113 0.02807 0.026601230 630 19501293 0.02591 0.02490

1230

MITHILA CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN101 630 19501111 0.03793 0.03492 0.03793 0.03492

1230 400 19505397 0.03056 0.029221230 400 19501347 0.05141 0.049171230 630 19501062 0.06109 0.055641230 630 19501063 0.03744 0.034011230 630 19501473 0.04917 0.046961230 630 19501474 0.05586 0.052951230 630 19504826 0.05535 0.051781230 630 19500792 0.04528 0.043731230 400 19501069 0.03447 0.032811230 400 29006231 0.01149 0.011001230 400 19501133 0.02446 0.023331230 400 19501134 0.02649 0.025861230 400 19501131 0.03271 0.031581230 400 19501132 0.03143 0.030111230 630 19501968 0.03896 0.035961230 630 19003825 0.04958 0.045411230 630 19505399 0.04634 0.042581230 630 19505400 0.02781 0.024971230 630 19501189 0.04825 0.046971230 630 19501190 0.03303 0.032661230 630 19501333 0.02719 0.025301230 630 19501334 0.03755 0.036001230 400 19001235 0.03805 0.035941230 400 19501323 0.02140 0.021051230 630 19501174 0.03287 0.031241230 630 19501186 0.04017 0.038991230 630 19505300 0.03352 0.031651230 630 19501235 0.02642 0.024951230 400 19501231 0.04676 0.044011230 400 19501232 0.01169 0.011401230 630 19501856 0.03913 0.036971230 630 19501858 0.04783 0.04673

MAYUR DHWAJ CGHS,PPG,S/S‐3:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN133 0.05845 0.05541

PRINCE CGHS, PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN134 0.08697 0.08370

MAYUR DHWAJ CGHS,PPG,S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN131 0.07304 0.07022

MAYUR DHWAJ CGHS,PPG,S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN132 0.05993 0.05659

DELHI RAJDHANI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN129 0.06474 0.06131

ASSOCIATE CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN130 0.05945 0.05699

ASHIRWAD ENCLAVE, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN127 0.07415 0.06755

VARDAN CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN128 0.08128 0.07963

TAKSHSHILA CGHS, PPG S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN108 0.06414 0.06169

JAI LAXMI CGHS, PPG AVAS:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN109 0.08854 0.08137

BALCO CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN106 0.04596 0.04381

TAKSHSHILA CGHS, PPG S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN107 0.05095 0.04920

AGARSAIN CGHS, PPG S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN104 0.10503 0.09991

AGARSAIN CGHS, PPG S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN105 0.10063 0.09551

MAITRI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN102 0.08197 0.07839

SHRI GANESH CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN103 0.09854 0.08965

KAMAYANI KUNJ CGHS,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN097 0.05105 0.04941

POOJA CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN100 0.05398 0.05151

NATRAJ CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN095 0.03898 0.03596

SAH‐VIKAS CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN096 0.04868 0.04590

ASHIRWAD CGHS,PPG S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN094 0.09978 0.09591

7.10LNRSC05 CGHS AREA NEAR AGARSAIN CGHS 106 4.68638 4.35366 0.33272

Page 82: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19501966 0.03454 0.031171230 630 19502564 0.03894 0.035721230 630 19501331 0.04136 0.040141230 630 19501332 0.04136 0.039651230 400 19501321 0.02151 0.019381230 400 19501325 0.01059 0.009661230 400 19501316 0.02234 0.020981230 400 19501320 0.02623 0.024781230 630 19501064 0.04205 0.040631230 630 19501065 0.03881 0.037061230 630 19501857 0.02422 0.023101230 630 19501987 0.06550 0.061121230 630 19505271 0.04982 0.045821230 630 29006112 0.04418 0.039821230 630 19501318 0.05287 0.047531230 630 19501319 0.03674 0.033701230 630 19501187 0.03292 0.030871230 630 19505341 0.05150 0.049361230 630 19501066 0.01816 0.016621230 630 19501228 0.04238 0.039711230 400 19501067 0.01936 0.018091230 400 19501068 0.02273 0.021571230 630 19501897 0.03850 0.037131230 630 19501934 0.02166 0.02092

1230

NEW SURYA KIRAN CGHS,PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN147 630 19505366 0.03811 0.03657 0.03811 0.03657

1230 630 19505425 0.02128 0.020251230 630 19501962 0.04522 0.043541230 630 19501942 0.02683 0.025881230 630 19505413 0.03279 0.031551230 630 19501891 0.04929 0.046841230 630 19501895 0.02319 0.022601230 630 19501471 0.04145 0.039241230 630 19502549 0.00675 0.00640

1230

NEETHI (NIDHI) CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN164 630 19501925 0.05202 0.04953 0.05202 0.04953

1230 630 19501967 0.00821 0.007601230 630 19501970 0.03742 0.035341230 400 19501859 0.00065 0.000431230 400 19501879 0.03182 0.029331230 630 19502544 0.01242 0.010971230 630 19502511 0.06523 0.06215

1230

MILAN VIH SS II:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN210 630 19502545 0.08998 0.08476 0.08998 0.08476

1230 630 19501291 0.02462 0.023351230 630 19501346 0.04780 0.045911230 630 19502513 0.03852 0.03623MILAN VIHAR SUB STN 3:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN240 0 05503 0 05156

MILAN VIH SS I:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN209 0.07765 0.07311

SUDARSHAN,PPG.:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN211 0.07242 0.06926

MOON LIGHT CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN165 0.04564 0.04294

SHIVANI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN203 0.03247 0.02976

HIMVARSHA CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN162 0.07248 0.06944

SHIVALIK CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN163 0.04820 0.04564

DOOR SANCHAR CGHS,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN148 0.06650 0.06379

SIDH CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN149 0.05962 0.05742

HIMALAYA CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN145 0.04208 0.03966

AAKRITI CGHS,PPG,OKHLA:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN146 0.06016 0.05804

NAVNEETI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN143 0.08442 0.08023

KAKATYA, CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN144 0.06054 0.05632

AMAR PALI CGHS,S/S‐1,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN141 0.09401 0.08564

AMAR PALI CGHS,S/S‐2,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN142 0.08961 0.08124

UNESCO CGHS, S/S‐1,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN139 0.08086 0.07769

UNESCO CGHS,S/S‐2,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN140 0.08972 0.08422

SHIKA APARTMENT,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN137 0.03210 0.02903

HANUMAN MANGLA CGHS,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN138 0.04858 0.04577

PRINCE CGHS,PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN135 0.07348 0.06688

SUKH‐SAGAR CGHS,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN136 0.08272 0.07979

Page 83: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19502515 0.01651 0.015331230 630 19505346 0.00135 0.001321230 630 19502567 0.05128 0.050241230 990 19503213 0.26815 0.233811230 630 19503221 0.15083 0.137001230 990 19501149 0.19459 0.186161230 630 19501150 0.12973 0.124111230 630 19501093 0.27833 0.232071230 990 19504486 0.14987 0.136311230 630 19503374 0.18357 0.170621230 400 19505356 0.01227 0.01179

1230

E‐BLOCK NIRMAN VIHAR 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR00M 630 19505028 0.14062 0.13227 0.14062 0.13227

1230

E‐BLOCK PREET VIHAR:NEW 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR00N 630 19503740 0.16114 0.14996 0.16114 0.14996

1230 990 19501193 0.30588 0.291081230 990 19501194 0.34493 0.323571230 990 19501094 0.08653 0.081221230 990 19501147 0.05769 0.04945

1230

S/STN. NO. 3 PREET VIHAR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR017 990 19501092 0.08238 0.07724 0.08238 0.07724

1230 630 19501056 0.20336 0.185301230 630 19501148 0.23872 0.225641230 990 19501146 0.29468 0.281661230 990 19504881 0.32657 0.297051230 630 19505378 0.01868 0.01789

1230

NIRMAN VIHAR KIOSK:K 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR020 990 19503205 0.23391 0.22268 0.23391 0.22268

1230

BHARATI ARTIST COLONY:K 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR021 990 19501059 0.26806 0.25396 0.26806 0.25396

1230

E‐BLOCK, PREET VIHAR, KIOSK:K 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR025 990 19504629 0.16682 0.15248 0.16682 0.15248

1230

B‐BLOCK, PREET VIHAR, NEAR MKT.:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR026 630 19503229 0.16226 0.15573 0.16226 0.15573

1230 630 19501191 0.02527 0.022881230 630 19501195 0.05371 0.04821

PLOT NO.5 ADITYA TOWER LNR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR053 0.07898 0.07109

C‐BLOCK, PREET VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR018 0.44208 0.41094

NIRMAN VIHAR (NEAR MKT.):ID 3 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR019 0.63993 0.59660

G‐I, PREET VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR015 0.65082 0.61465

S/STN. NO. 1 PREET VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR016 0.14422 0.13067

DDA FLAT NIRMAN VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR008 0.42820 0.36838

F‐BLOK PREET VIHAR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR00J 0.19584 0.18241

0.37082

0.31027

G‐II, PREET VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR001 0.41898

B BLOCK, PREET VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR006 0.32432

MILAN VIHAR SUB STN 3:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN240 0.05503 0.05156

MILAN VIHAR SUB STN 4:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN241 0.05263 0.05156

Page 84: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

D‐ BLOCK, PREET VIHAR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR054 990 19501028 0.16214 0.15028 0.16214 0.15028

1230

MANDAWALI TRY POLE:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN020 630 19504828 0.11337 0.10459 0.11337 0.10459

1230 630 19502766 0.40586 0.326191230 630 19502768 0.26769 0.218431230 630 19504321 0.18998 0.158611230 630 19500843 0.40804 0.377561230 630 19500076 0.01384 0.012821230 630 19500845 0.25196 0.236841230 630 19504725 0.00514 0.00430

1230

ALLAH COLONY MANDAWALI:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN039 400 19500844 0.19398 0.16910 0.19398 0.16910

1230 990 19501061 0.33655 0.303281230 990 19501135 0.21238 0.19390

1230

S/STN.NO‐14, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN069 400 19501327 0.03860 0.03709 0.03860 0.03709

1230

S/STN.NO‐15, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN070 400 19501207 0.03090 0.02880 0.03090 0.02880

1230 400 19501292 0.02666 0.025361230 400 19501329 0.02461 0.02329

1230

NAVKRANTI CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN074 400 19501208 0.03649 0.03368 0.03649 0.03368

1230 400 19501210 0.03236 0.032021230 400 19501295 0.02542 0.02388

1230

TRILOKYA CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN076 630 19501330 0.08006 0.07505 0.08006 0.07505

1230 400 19501144 0.04873 0.047501230 400 19505416 0.05720 0.054791230 630 19502541 0.02379 0.021511230 630 19502546 0.03027 0.028141230 400 19505402 0.02235 0.020451230 400 19501142 0.01052 0.009931230 630 19501267 0.01550 0.014311230 630 19501268 0.05188 0.04882

1230

VIDISHA CGHS, PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN082 400 19501155 0.03934 0.03648 0.03934 0.03648

1230 630 19501876 0.05295 0.04896

FRIENDS CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN080 0.06738 0.06313

RAMA KRISHNA CGHS PPG S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN083 0 09628 0 08984

NEELKANTH CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN078 0.05406 0.04965

ANAMIKA CGHS,PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN079 0.03286 0.03038

VI‐KALP CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN075 0.05778 0.05590

PARSHWA NATH CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN077 0.10593 0.10229

MADHU VIHAR S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN049 0.54893 0.49717

MAY FAIR CGHS, PPG.:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN073 0.05127 0.04865

CHANDERVIHAR SS‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN024 0.42188 0.39038

CHANDERVIHAR SS‐II:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN025 0.25710 0.24115

UTTARY SCHOOL BLOCK:K 3 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN023 0.86353 0.70323

80 8.48430 7.75027 0.73402 8.65LNRSC06 PREET VIHAR

Page 85: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 630 19501878 0.04333 0.040881230 630 19501877 0.01564 0.013811230 630 19505396 0.06258 0.058871230 400 19501452 0.01754 0.016761230 400 19501455 0.01435 0.013711230 400 19501154 0.01310 0.011901230 400 19501294 0.03930 0.036591230 630 19501266 0.05906 0.055091230 630 19501269 0.03937 0.037141230 400 19501206 0.04258 0.040621230 400 19501209 0.00370 0.003531230 400 19501112 0.04207 0.040071230 400 19501152 0.00086 0.000711230 400 19501114 0.03252 0.031121230 400 19501115 0.05441 0.050771230 630 19501223 0.08705 0.076191230 630 19501225 0.00655 0.005301230 630 19501222 0.02003 0.018211230 630 19505422 0.05700 0.051981230 400 19504178 0.02745 0.026131230 400 19503056 0.01688 0.016011230 400 19502565 0.03158 0.030051230 400 19502952 0.00557 0.00432

1230

STORM W/PUMP STN. NR. MAYFAIR IP EXT.:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN246 400 19502754 0.00469 0.00442 0.00469 0.00442

1230 630 19502367 0.04793 0.045281230 630 19502370 0.03921 0.03705

1230

MOTHER DAIRY STAFF QUARTOR:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN005 630 19504306 0.02262 0.02194 0.02262 0.02194

1230 990 19501546 0.50512 0.470101230 990 19502779 0.21648 0.20089

1230

MANDAWALI DISPANSARY:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN014 630 19500810 0.24444 0.20322 0.24444 0.20322

1230

MANDAWALI ( POST OFFICE):PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN015 990 19504515 0.55590 0.51029 0.55590 0.51029

1230 990 19501549 0.60355 0.466131230 990 19501564 0.36992 0.27489

1230

SCHOOL KHATTA‐1, MANDAWALI:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN017 990 19500781 0.32902 0.30552 0.32902 0.30552

MANDAWALI A BLOCK SHIV MANDIR MARG:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN013 0.72160 0.67099

MANDAWALI PRIMARY SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN016 0.97347

0.08714 0.08233

0.74102

KANCHAN CHANGA  APPT:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN237 0.03715 0.03436

RAS VIHAR CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN002

NARWANA CGHS,PPG S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN092 0.07702 0.07019

NDMC (VIDYUT NIKUNJ),CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN159 0.04433 0.04214

RAJDHANI NI‐KUNJ CGHS PPG S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN090 0.08693 0.08189

NARWANA CGHS,PPG S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN091 0.09360 0.08148

PHARMA CGHS, PPG S/STN‐3:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN088 0.04628 0.04416

RAJDHANI NI‐KUNJ CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN089 0.04292 0.04078

PHARMA CGHS, PPG S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN086 0.05240 0.04849

PHARMA CGHS, PPG S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN087 0.09843 0.09223

RAMA KRISHNA CGHS, PPG, S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN084 0.07822 0.07268

SAHYADRI CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN085 0.03188 0.03046

RAMA KRISHNA CGHS, PPG, S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN083 0.09628 0.08984

Page 86: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

SCHOOL KHATTA‐II,MANDAWALI:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN018 990 19500784 0.32845 0.28764 0.32845 0.28764

1230

MANDAWALI UNCHEPAR;PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN019 990 19501990 0.45024 0.37264 0.45024 0.37264

1230 990 19500747 0.35354 0.324151230 990 19004615 0.33126 0.297351230 990 19501866 0.22081 0.199801230 630 19501868 0.28104 0.256581230 630 19501888 0.35511 0.309931230 990 19504659 0.36960 0.317861230 990 19004644 0.24484 0.226561230 990 19505463 0.26524 0.241861230 400 19504139 0.12703 0.100321230 990 19500785 0.36154 0.29337

1230

SONIYA VIHAR MANDAWALI:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN032 400 19502769 0.13573 0.12685 0.13573 0.12685

1230 990 19501931 0.32409 0.309131230 990 19003830 0.23469 0.205591230 990 19505260 0.28454 0.273781230 630 19501989 0.15322 0.13630

1230

SHANKAR MARG MANDAWALI:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN037 990 19502046 0.35226 0.31477 0.35226 0.31477

1230

KRISHNA PURI MANDAWALI:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN038 630 19504301 0.24738 0.22481 0.24738 0.22481

1230

S/STN.NO‐2, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN059 630 19501860 0.18662 0.15217 0.18662 0.15217

1230 400 19004732 0.01636 0.015601230 400 19004733 0.02454 0.023081230 630 19502427 0.02858 0.027031230 630 19502428 0.02934 0.02813

1230

CHETNA CGHS PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN186 400 19502426 0.03558 0.03413 0.03558 0.03413

1230

UTTRANCHAL CGHS PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN187 400 19502425 0.03314 0.03097 0.03314 0.03097

1230 400 19502422 0.01205 0.011831230 400 19502424 0.04273 0.04095

DEEPA CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN185 0.05792 0.05516

UNA CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN188 0.05478 0.05278

C BLOCK WESTVINOD NAGAR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN034 0.43776 0.41008

S/STN.NO‐3, PPG CGHS:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN060 0.04090 0.03868

MOHAN BABA MANDIR MANDAWALI:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN031 0.48856 0.39368

B BLOCK MANDAWALI:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN033 0.55878 0.51472

A BLOCK WESTVINOD NAGAR 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN029 0.72471 0.62778

E BLOCK WESTVINOD NAGAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN030 0.51008 0.46842

WESTVINOD NAGAR NEAR MANGLAM:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN026 0.68480 0.62151

WESTVINOD NAGAR D BLOCK:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN027 0.50185 0.45638

11.6452 9.85950 8.71204 1.14746LNRSC07 MANDAWALI VILLAGE

Page 87: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

DHARMA CGHS PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN189 630 19502423 0.05802 0.05627 0.05802 0.05627

1230 630 19502034 0.04084 0.038571230 630 19502035 0.03208 0.02986

1230

DESH BANDHU CGHS,PPG:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN191 630 19502369 0.05504 0.05376 0.05504 0.05376

1230 630 19502366 0.08814 0.081181230 630 19502430 0.02938 0.026841230 630 19500886 0.05486 0.052301230 630 19500979 0.03086 0.028201230 630 19502393 0.05521 0.053921230 630 19502394 0.02255 0.021431230 630 19502524 0.00868 0.008241230 400 19505138 0.03472 0.03195

1230

RAILWAY COLONY GALI NO. 2:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN212 990 19501550 0.31459 0.25842 0.31459 0.25842

1230

Budha marg Mandawali 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN247 630 19504474 0.27078 0.25262 0.27078 0.25262

1230 630 19503807 0.21456 0.202101230 990 19504728 0.20957 0.192891230 630 19504873 0.07485 0.06915

1230

S/STN.NO‐4, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN061 100 19504787 0.02384 0.02211 0.02384 0.02211

1230

S/STN.NO‐5, PPG CGHS:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN062 400 19504610 0.01011 0.00973 0.01011 0.00973

1230 630 19500902 0.03568 0.032951230 630 19500950 0.04024 0.037471230 630 19500903 0.02503 0.023421230 630 19500904 0.04649 0.042611230 630 19500951 0.04634 0.043991230 400 19500953 0.03791 0.036131230 630 19500952 0.02073 0.019381230 630 19500955 0.01765 0.015841230 630 19502053 0.03854 0.036771230 630 19502054 0.03688 0.032101230 630 19502055 0.06889 0.062421230 630 19502056 0.00213 0.002051230 630 19502057 0.05400 0.049781230 630 19502059 0.02524 0.022361230 400 19502058 0.00701 0.006151230 400 19502060 0.03970 0.036051230 400 19500914 0.05790 0.05240PRIYADARSHANI CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN177 0 06225 0 05607

TARANG CGHS PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN175 0.07923 0.07214

TARANG CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN176 0.04671 0.04221

RETREET CGHS PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN173 0.07542 0.06887

RETREET CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN174 0.07102 0.06447

AKASH BHARTI CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN171 0.08425 0.08012

PRESS APPARTMENT CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN172 0.03838 0.03522

6.86

SARASWATI KUNJ CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN169 0.07592 0.07042

SARSWATI KUNJ CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN170 0.07152

0.49897 0.46415

41 1.70622 1.58914 0.11708

0.06602

DVB COLONY, URJA VIHAR:K 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN207 0.04340 0.04019

LNRSC08 CGHS AREA NEAR MOTHER DAIRY PLANT

TRUCK MARKET PANDAV NGR.:PL 3 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN012

TECHNOLOGY CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN193 0.08572 0.08049

SUDH BHAWNA:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN206 0.07776 0.07535

NAVKALA CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN190 0.07292 0.06843

DHURVA CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN192 0.11752 0.10802

Page 88: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 400 19500915 0.00436 0.003671230 630 19500922 0.05282 0.050521230 630 19500923 0.03985 0.038081230 630 19500921 0.06267 0.060121230 630 19500924 0.02560 0.024081230 630 19500911 0.05939 0.055571230 630 19500912 0.02668 0.025081230 630 19500897 0.01980 0.018671230 630 19500899 0.01980 0.018491230 630 19500896 0.01592 0.015201230 630 19500913 0.01302 0.012841230 400 19502037 0.02417 0.022261230 400 19502039 0.01191 0.011201230 630 19500925 0.04004 0.038461230 630 19502429 0.05014 0.048331230 400 19500898 0.03173 0.030201230 400 19500900 0.03173 0.029081230 630 19500371 0.01906 0.017681230 630 19502036 0.02426 0.02174

1230

U BLK DHABA SHAKARPUR 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00A 990 19502818 0.65498 0.61125 0.65498 0.61125

1230

NEW S/STN NEHRU ENCLAVE 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00C 630 19504574 0.19622 0.14877 0.19622 0.14877

1230

STLT AKSHARDHAM FLYOVER 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00D 400 19505179 0.02703 0.02630 0.02703 0.02630

1230

VEER SAVARKAR BLOCK, VIKAS MARG 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00N 630 19504960 0.15926 0.14942 0.15926 0.14942

1230 990 19502830 0.46566 0.430731230 630 19505481 0.00470 0.003191230 630 19502945 0.09253 0.082681230 990 19504461 0.52432 0.459091230 990 19502943 0.50464 0.464421230 990 19502950 0.54758 0.496391230 630 19504770 0.02147 0.00805

1230

ARA MACHINE SHAKARPUR:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR023 990 19504764 0.07116 0.06671 0.07116 0.06671

1230 990 19502827 0.28359 0.266681230 990 19505154 0.34661 0.31765

1230

DALL MILL SHAKARPUR:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR025 990 19502941 0.33417 0.31280 0.33417 0.31280

1.07370 0.96886

SHAKARPUR SANJAY PARK 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR024 0.63020 0.58433

MASTER BLOCK SHAKARPUR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR020 0.47036 0.43392

G‐BLOCK SHAKARPUR:K 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR021 0.61685 0.54177

WB BLOCK SHAKARPUR:K 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR022

ANKUR CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN199 0.06347 0.05928

KONARK CGHS, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN204 0.04332 0.03942

ADITI CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN183 0.03608 0.03346

ANKUR CGHS PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN198 0.09018 0.08679

NAVKUNJ CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN181 0.03960 0.03716

LINK HOUSE CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN182 0.02894 0.02804

EKTA GARDEN CGHS PPG S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN179 0.08827 0.08420

NAVKUNJ CGHS PPG S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN180 0.08607 0.08066

PRIYADARSHANI CGHS PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN177 0.06225 0.05607

EKTA GARDEN CGHS S/S‐1, PPG:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN178 0.09267 0.08860

Page 89: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

POLICE BOOTH S. PUR, V. MARG:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR026 990 19502340 0.33414 0.31256 0.33414 0.31256

1230 990 19500974 0.41573 0.384491230 630 19504762 0.03615 0.029401230 990 19504463 0.41140 0.389781230 630 19503652 0.00416 0.00258

1230

SCHOOL BLOCK SHAKARPUR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR029 990 19505466 0.39918 0.36828 0.39918 0.36828

1230

N.GANESH NAGAR SHAKARPUR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR035 630 19502820 0.20518 0.17605 0.20518 0.17605

1230 990 19502522 0.28292 0.258821230 630 19504467 0.30649 0.27883

1230

NEHRU ENCLAVE SHAKARPUR:K 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR037 990 19502517 0.37914 0.35131 0.37914 0.35131

1230

V. SAVARKAR BLOCK, SHAKARPUR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR042 990 19500695 0.08705 0.07906 0.08705 0.07906

1230

SUNDER BLOCK, SHAKARPUR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR043 990 19502815 0.40749 0.37298 0.40749 0.37298

1230

N. ENCL. HARIZON BASTI, S PUR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR044 990 19004794 0.20163 0.18186 0.20163 0.18186

1230

INST. OF COMMERCIAL PRACTICE:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR045 400 19502816 0.03308 0.03008 0.03308 0.03008

1230 990 19504568 0.22367 0.212821230 630 19504448 0.03947 0.036451230 990 19501060 0.16502 0.152411230 990 19501091 0.18609 0.173491230 990 19501095 0.27010 0.250391230 990 19501192 0.20929 0.196741230 630 19501057 0.12145 0.113601230 630 19505003 0.00123 0.00105

1230

SOUTH GANESH NAGAR:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN003 400 19502747 0.14970 0.14041 0.14970 0.14041

1230 630 19500808 0.27553 0.220831230 630 19500809 0.21649 0.15519

MADHUBAN KIOSK:K 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR024 0.12268 0.11465

SOUTH GANESH NAGAR EXTN.:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN004 0.49202 0.37602

MADHUVAN:K 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR004 0.35110 0.32590

GHAI PALACE:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2502‐PVR005 0.47939 0.44713

SHIROMANI SCHOOL, SHAKARPUR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR036 0.58941 0.53765

R BLOCK SHAKARPUR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR049 0.26314 0.24927

U BLOCK SHAKARPUR, V. MARG:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR027 0.45188 0.41389

DDA PARK, SHAKARPUR:K 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR028 0.41556 0.39236

9.62LNRSC09 VIKAS MARG 54 14.08337 12.72809 1.35529

Page 90: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

PANDAV NAGAR D PARK:K 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN006 990 19502748 0.36393 0.33779 0.36393 0.33779

1230

PANDAV NAGAR S BLOCK:ID 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN007 990 19501803 0.45418 0.35878 0.45418 0.35878

1230

PANDAV NAGAR S BLOCK NEAR PETROL PUMP:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN008 990 19502767 0.25484 0.23858 0.25484 0.23858

1230

J PARK PANDAV NAGAR:K 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN009 990 19502964 0.31280 0.28969 0.31280 0.28969

1230

EW S/STN D‐BLK PANDAV NAGAR 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN00M 990 19504634 0.41688 0.29865 0.41688 0.29865

1230

GNPN COMPLEX PANDAV NAGAR 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN00N 630 19504788 0.15172 0.14030 0.15172 0.14030

1230 630 19500753 0.31705 0.305751230 990 19500754 0.43948 0.397641230 990 19500759 0.61896 0.570991230 990 19504615 0.20632 0.19496

1230

SOUTH GANESH NAGAR :NEW 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN0C1 630 19505316 0.20897 0.19217 0.20897 0.19217

1230 400 19501944 0.29703 0.282641230 990 19501945 0.34158 0.315841230 630 19502899 0.10396 0.090741230 990 19502462 0.16855 0.158781230 990 19502465 0.19786 0.182001230 990 19502357 0.37270 0.343081230 990 19502526 0.16346 0.150471230 990 19504436 0.11769 0.108341230 990 19502772 0.21732 0.199671230 990 19502774 0.23835 0.214771230 630 19502778 0.24536 0.221951230 990 19502351 0.45383 0.442531230 990 19502359 0.15924 0.127101230 990 19503585 0.18312 0.16219

1230

J&K BLOCK HALWAI WALA:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR006 990 19503405 0.19978 0.18724 0.19978 0.18724

1230 990 19502332 0.25903 0.225931230 990 19502353 0.21131 0.19341

KISHAN KUNJ:K 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR004 0.79619 0.73183

LALITA PARK:K 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR008 0.68165 0.61528

PNB BANK ENCLAVE:ID 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR002 0.65386 0.60189

LNR COMPLAINT CENTER:ID 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR003 0.70104

0.36641 0.34078

0.63639

PANDAV NAGAR D PARK (K):K 3 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN208 0.74257 0.68922

PRIYADARSHINI VIHAR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR001

GANESH NAGAR COM. E BLCK.:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN010 0.75652 0.70338

GANESH NAGAR COM. C BLCK.:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN011 0.82528 0.76594

Page 91: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 990 19505453 0.21131 0.195931230 990 19503006 0.25440 0.212071230 990 19503392 0.28688 0.24182

1230

SURANA DHARAMSHALA VIKAS MARG 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00M 990 19504131 0.35258 0.29762 0.35258 0.29762

1230

GYAN KUNJ PARK WALA NEAR COMPLAINT CENTER 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00R 630 19505137 0.25303 0.19265 0.25303 0.19265

1230

PRIYADARSHANI VIHAR O/H WATER TANK 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00T 630 19505222 0.15607 0.12575 0.15607 0.12575

1230 630 19503394 0.31909 0.296801230 630 19503400 0.02775 0.022531230 990 19502822 0.45317 0.402451230 990 19502825 0.32288 0.281521230 990 19505117 0.33421 0.301631230 630 19504472 0.02266 0.015531230 990 19502826 0.38909 0.353521230 990 19502829 0.23847 0.21533

1230

GURU NANAK PURA:PL:K 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR013 990 19502771 0.50701 0.40698 0.50701 0.40698

1230 990 19502942 0.37272 0.352391230 990 19504462 0.31948 0.310551230 630 19505467 0.19524 0.15918

1230

LAXMI NAGAR SCHOOL:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR015 990 19502944 0.27373 0.22894 0.27373 0.22894

1230

WEST GURU ANGAD NAGAR:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR016 990 19502464 0.27431 0.25778 0.27431 0.25778

1230 990 19503391 0.22186 0.195411230 990 19503398 0.08287 0.082751230 990 19504465 0.47239 0.435121230 990 19504830 0.26572 0.24022

1230

RAMESH PARK J & K BLOCK:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR019 990 19502336 0.35981 0.31848 0.35981 0.31848

1230 990 19503402 0.45445 0.423381230 630 19504644 0.00274 0.00233

D BLOCK KHATTA VIKAS MARG:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR018 0.73811 0.67534

BODH VIHAR LAXMI NAGAR:K 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR030 0.45719 0.42571

TIKONA PARK:ID 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR014 0.88744 0.82212

POLICE QTR SHAKARPUR:ID 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR017 0.30474 0.27816

JAGAT RAM PARK:K 4 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR011 1.13292 1.00114

GURU RAM DASS NAGAR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR012 0.62756 0.56885

RAMESH PARK AKHARA:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR009 0.54128 0.45388

RAMESH PARK NEAR V‐10:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR010 0.34684 0.31934

11.6766 17.38671 15.35730 2.02941LNRSC10 LAXMI NAGAR

Page 92: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230 990 19502775 0.34282 0.292291230 990 19504511 0.53586 0.455171230 990 19502461 0.39261 0.336691230 990 19502463 0.38425 0.331161230 630 19003640 0.05847 0.04230

1230

MOHAN PARK LAXMI NAGAR:K 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR034 990 19502470 0.30221 0.27833 0.30221 0.27833

1230

PWD KIOSK LAXMI NAGAR:K 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR038 990 19504464 0.34947 0.32634 0.34947 0.32634

1230

J EXTN. LAXMI NAGAR:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR040 990 19503409 0.47280 0.40868 0.47280 0.40868

1230

KUNDAN NAGAR, LAXMI NAGAR:K 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR041 990 19505457 0.27140 0.22006 0.27140 0.22006

1230 990 19502821 0.05035 0.046151230 990 19504599 0.28533 0.271901230 990 19502776 0.35781 0.320961230 990 19504513 0.31730 0.290931230 990 19502010 0.23188 0.206051230 630 19504765 0.15459 0.135661230 990 19004607 0.14162 0.128401230 990 19504589 0.26302 0.24383

1230

RAMESH PARK, JJ CLUSTER:PL 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR053 630 19501887 0.13776 0.10727 0.13776 0.10727

1230 990 19503404 0.12608 0.113411230 630 19503406 0.20571 0.18903

1230

GALI MASJID ANAR WALI 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR080 990 19504823 0.43824 0.37087 0.43824 0.37087

1230 990 19504438 0.41819 0.299251230 630 19504471 0.19679 0.141241230 990 19502002 0.31464 0.290431230 630 19505459 0.02598 0.024781230 990 19504745 0.01582 0.015651230 630 19504750 0.01055 0.00983

1230

PUSHTA NEAR POLICE QTR.:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR056 100 19504416 0.02887 0.02771 0.02887 0.02771

1230

RENNY WELL NO. V‐8:PM 1 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR057 400 19504466 0.04122 0.03954 0.04122 0.03954

3.88

0.02637 0.02548

4 0.09646 0.09272 0.00374

WALIA NURSHING HOME:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR088 0.34062 0.31520

LNRSC11 RENNY WELL

HOUSING COMPLEX (NEAR YAMUNA BANK METRO) 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR00J

KISHAN KUNJ ENTN.:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR054 0.33179 0.30244

EK MINAR MASID 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR083 0.61498 0.44048

H BLOCK LAXMI NAGAR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR051 0.38647 0.34171

RAMESH PARK, G NO.12, LN:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR052 0.40464 0.37224

VISHWAKARMA PARK:K 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR046 0.33568 0.31805

E BLOCK LAXMI NAGAR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR050 0.67510 0.61190

MANGAL BAZAR LAXMI NAGAR:PL 2 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR031 0.87869 0.74746

KULDEEP NURSING HOME LNG:K 3 1S‐DL‐YP‐ETC‐DLNR‐2501‐LGR032 0.83533 0.71014

Page 93: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Laxmi Nagar Division 

1230

SWAMINARAIN TEMPLE YAMUNA PUSTA 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN036 400 19001673 0.00574 0.00550 0.00574 0.00550

1230

100KVA PMS NR P‐4 RENNY WEL AKASHERDHAM 1 1S‐DL‐YP‐ETC‐DLNR‐2503‐MAN243 100 19504575 0.03302 0.03207 0.03302 0.03207

LNRSC12 NEAR AKSHARDHAM MANDIR 2 0.03876 0.03757 0.00119 3.08

Page 94: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1240

S/S NO.I EGG & FISH MKT.:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2029 630 19504794 0.03053 0.02774 0.03053 0.02774

1240

S/S NO. 2 EGG & FISH MKT.:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2030 630 19502509 0.05372 0.04240 0.05372 0.04240

1240

S/S NO. 3 EGG & FISH MKT.:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2031 630 19502510 0.06060 0.05550 0.06060 0.05550

1240

MURGA MKT GAZIPUR:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2032 400 19503732 0.09300 0.08141 0.09300 0.08141

1240 630 19502114 0.18548 0.068801240 400 19504476 0.13458 0.06495

1240

B BLK GAZIPUR:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2035 630 19503464 0.13068 0.10467 0.13068 0.10467

1240 990 19502496 0.27602 0.241401240 630 19502536 0.20701 0.13009

1240

D.P. NO.7 NH‐24:PM 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2042 100 19505175 0.02100 0.01881 0.02100 0.01881

1240

GAZI PUR KHARKAS S.STN 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2060 400 19504899 0.16470 0.14910 0.16470 0.14910

1240

MAT MARKET:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2040 990 19500724 0.16995 0.13952 0.16995 0.13952

1240 990 19502491 0.29221 0.263811240 400 19504469 0.03985 0.03703

1240

S/S ‐10 BLK KHP. COROM:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2043 990 19502493 0.43498 0.26479 0.43498 0.26479

1240

S/S 8 BLK KHP COLONY:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2045 630 19000486 0.33274 0.25390 0.33274 0.25390

1240

S/S 10 BLK KHP COLONY (OLD):PL 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2046 990 19502572 0.30339 0.25064 0.30339 0.25064

1240 630 19502492 0.38369 0.353411240 630 19502498 0.02019 0.01899

19.15

S/S NO. 1 KHR COLONY:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2041 0.33205 0.30084

S/S 2 BLK KHP COLONY:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2047 0.40388

MVRSC02 KHICHIRI PUR COLONY 10 2.08102 1.68254 0.39848

0.37240

1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2034 0.32006 0.13375

DDA JANTA FLAT GAZIPUR:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2036 0.48302 0.37149

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

MVRSC01 GAZIPUR FISH MARKET 11 1.35731 0.98489 0.37242 27.44D BLOCK GAZIPUR:ID 2

Page 95: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

S/S NO. 3 KHD COLONY:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2048 400 19500504 0.02872 0.02683 0.02872 0.02683

1240

CNG N H 24:PM 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2049 400 19504479 0.07531 0.07362 0.07531 0.07362

1240 990 19003831 0.03246 0.026171240 990 19502081 0.61669 0.50436

1240

A BLOCK V. NAGAR:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2009 990 19502531 0.38514 0.31440 0.38514 0.31440

1240 990 19502553 0.47819 0.420871240 630 19503465 0.05313 0.044951240 990 19502082 0.15322 0.144781240 990 19502090 0.00638 0.004991240 990 19004394 0.01466 0.011541240 990 19502084 0.27849 0.247761240 630 19502086 0.00889 0.006921240 630 19502087 0.21331 0.193661240 630 19502534 0.16606 0.132771240 400 19504399 0.04960 0.039301240 630 19502075 0.19133 0.177641240 630 19504216 0.00592 0.004841240 630 19500734 0.22770 0.202621240 630 19500735 0.07590 0.068911240 630 19502101 0.05547 0.048641240 630 19502104 0.10953 0.104461240 990 19502088 0.11222 0.104261240 630 19502089 0.01530 0.013691240 630 19505024 0.00391 0.003121240 630 19000887 0.12637 0.11854

1240

S/S ‐3 PKT B MVR‐II:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2022 400 19502555 0.01700 0.01616 0.01700 0.01616

1240 400 19502122 0.01437 0.012101240 630 19502123 0.22519 0.215041240 630 19500188 0.00821 0.005581240 630 19500601 0.15607 0.141221240 400 19502103 0.01613 0.014271240 630 19502109 0.18550 0.172351240 630 19502071 0.00605 0.004811240 630 19502072 0.19575 0.184371240 400 19502124 0.01129 0.009511240 400 19502129 0.12988 0.12133

1240

S/S NO. 5 PKT. D MVR‐II:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2028 630 19502102 0.09860 0.08914 0.09860 0.08914

S/S ‐2 PKT‐E MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2026 0.20181 0.18918

S/S NO. 3 PKT E MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2027 0.14117 0.13084

S/S NO. I PKT F MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2024 0.16428 0.14680

S/S NO. 4 PKT‐E MVR II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2025 0.20164 0.18662

S/S NO.I LSC MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2021 0.13028 0.12166

S/S NO.2 PKT E MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2023 0.23957 0.22714

L.SC‐II MVR PH‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2019 0.16500 0.15310

S/S NO. 4 PKT. B MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2020 0.12752 0.11796

L.S.C. S/S 3 MVR‐II:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2017 0.19725 0.18248

S/S NO. 5 PKT. B :ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2018 0.30360 0.27153

S/S NO. 7 PKT C:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2015 0.22220 0.20058

J BLK. V, NAGAR:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2016 0.21567 0.17208

SSNO. 6 PKT C MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2013 0.15961 0.14977

S/S NO. 8 PKT. C MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2014 0.29315 0.25930

0.53053

39 4.92094 4.36886 0.55208 11.22

0.46582

MVRSC03 MAYUR VIHAR PHASE II

R BLK V. NAGAR:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2008 0.64915

E BLOCK V. NAGAR:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2010 0.53132

Page 96: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

S/S NO. 1 PKT A MVR‐II:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2037 630 19502073 0.16826 0.15836 0.16826 0.15836

1240 400 19502121 0.01028 0.006181240 630 19502130 0.19535 0.18600

1240

S/S NO.6 PKT D MVR‐II:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2039 630 19502108 0.10310 0.09323 0.10310 0.09323

1240 990 19502969 0.32116 0.252201240 400 19504819 0.08537 0.064221240 630 19502085 0.23045 0.220361240 990 19504329 0.15288 0.093671240 990 19504863 0.23979 0.151791240 990 19504869 0.26021 0.151791240 990 19504166 0.34143 0.275931240 990 19000420 0.28721 0.225761240 630 19505073 0.10733 0.094411240 990 19502773 0.38052 0.32566

1240

KHP VILLAGE:K 1 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2006 990 19504994 0.35034 0.23382 0.35034 0.23382

1240 630 19503734 0.23802 0.148141240 400 19504866 0.15868 0.100541240 630 19505091 0.01298 0.011341240 630 19505209 0.11682 0.106211240 400 19500442 0.03077 0.028791240 400 19500505 0.00128 0.001101240 990 19505074 0.03093 0.020391240 990 19504578 0.52588 0.431651240 630 19504656 0.06187 0.048011240 630 19500521 0.09378 0.087051240 400 19500527 0.01401 0.011951240 990 19505097 0.40445 0.344591240 630 19503479 0.05515 0.04593

1240

8 BLOCK  TKP:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP004 990 19505331 0.27000 0.18735 0.27000 0.18735

1240 400 19504205 0.06998 0.046221240 630 19504673 0.20994 0.15784

1240

18 BLOCK TKP:PL:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP006 630 19504680 0.23316 0.20445 0.23316 0.20445

1240

16 BLOCK TKP:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP009 990 19504671 0.29000 0.19535 0.29000 0.19535

10 BLOCK TKP:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP005 0.27992 0.20406

20.12

DDA JANTA FLATS TKP:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP002 0.10779 0.09900

7 BLOCK TKP:K 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP003 0.45961

0.61868 0.50005

17 3.28236 2.62191 0.66044

0.39053

L.B.S. RESIDENCE:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2012 0.03206 0.02989

MVRSC05 TRILOKPURI

5 BLOCK TKP:ID 3 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP001

KHP VILLAGE MAIN ROAD:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2007 0.39669 0.24868

KALYAN VAS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2011 0.12980 0.11754

13 & 18 BLK,KALYANPURI 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2004 0.62864 0.50170

17 BLOCK KLP:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2005 0.48784 0.4200725.02

15 BLOCK KALYAN PURI:K 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2002 0.38333 0.31404

11 BLOCK KALYAN PURI:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2003 0.50000

0.40653 0.31641

17 3.31523 2.48572 0.82951

0.30357

S/S NO.II PKT. F MVR‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2038 0.20564 0.19218

MVRSC04 KHICHIRI PUR AND KALYAN PURI

19 BLOCK KALYAN PURI:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2302‐MV2001

Page 97: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

PS KALYAN PURI:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP022 400 19500441 0.05500 0.04075 0.05500 0.04075

1240 990 19502552 0.41955 0.403771240 630 19504351 0.23045 0.10236

1240

11&12 BLOCK TRILOK TRILOK PURI 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP027 630 19500525 0.31000 0.28740 0.31000 0.28740

1240

ST. LIGHT DP 18 BLK TRILOK PURI 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP028 100 19504626 0.00820 0.00686 0.00820 0.00686

1240 990 19504284 0.09396 0.080491240 990 19504354 0.68901 0.601651240 990 19502111 0.39956 0.341351240 630 19505279 0.09632 0.085341240 630 29006136 0.17559 0.163231240 630 19504742 0.00177 0.00018

1240

SOUTH OF LAKE S/5.2:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1015 400 19502532 0.07382 0.06072 0.07382 0.06072

1240

H.P. PETROL PUMP D/P:PM 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1016 400 19504218 0.03720 0.03588 0.03720 0.03588

1240 630 19502095 0.01114 0.008481240 630 19503001 0.26730 0.246711240 630 19502099 0.26693 0.239911240 630 19502100 0.01040 0.007361240 630 19003835 0.06933 0.06182

1240

S/S‐1 PKT‐1 MVR PH‐I:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1019 630 19502098 0.17738 0.16899 0.17738 0.16899

1240 630 19502489 0.01758 0.014141240 630 19504582 0.20214 0.18682

1240

S/S‐4 PKT‐1 MVR PH‐I:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1021 630 19503445 0.11894 0.11290 0.11894 0.11290

1240 630 19503444 0.04213 0.040451240 630 19503466 0.08750 0.082041240 630 19502096 0.26478 0.246151240 990 19503736 0.01394 0.010931240 630 19500700 0.01241 0.010661240 630 19504893 0.19441 0.188421240 990 19502118 0.06937 0.069181240 630 19504290 0.62437 0.51273

STN‐8 PKT‐1 MVR‐1(SWITCHING STN) 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1046 0.20682 0.19908

ADRESH MOHALLA:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1074 0.69375 0.58191

S/S‐3 PKT‐1 MVR PH‐I:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1022 0.12963 0.12249

S/S‐B PKT‐2 MVR PH‐I:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1023 0.27872 0.25708

S/S‐2 PKT‐I MVR PH‐I:ID 3 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1018 0.34666 0.30909

S/S‐7 PKT‐1 MVR PH‐I:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1020 0.21972 0.20096

S/S‐1 SOUTH OF LAKE:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1014 0.17736 0.16341

S/S‐A PKT‐II MVR PH‐I:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1017 0.27844 0.25519

0.68214

40 6.91380 5.97412 0.93968 13.59

0.42669

MVRSC06 TRILOKPURI AND KOTLA VILLAGE NEAR CHAND CINEMA 

ACHARYA NIKETAN:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1008 0.78297

SHASHI GARDEN PLM:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1009 0.49588

2 BLOCK TKP:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP024 0.65000 0.50613

Page 98: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

LSC I PKT I MVR I:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1094 630 19502484 0.10014 0.09316 0.10014 0.09316

1240

S/S‐3 PKT‐5 PH‐1:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1105 630 19502501 0.08390 0.08057 0.08390 0.08057

1240

S/S‐4 PKT‐5 PH‐1:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1106 400 19502538 0.10702 0.10404 0.10702 0.10404

1240 630 19502512 0.36822 0.297701240 630 19502516 0.15060 0.121761240 630 19500453 0.19931 0.179771240 990 19003842 0.41640 0.382011240 990 19504151 0.55710 0.437271240 630 19504155 0.12229 0.10018

1240

48 WORK CENTRE TKP:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP011 400 19504319 0.00728 0.00675 0.00728 0.00675

1240 990 19504356 0.32876 0.224851240 630 19505256 0.09273 0.05621

1240

DSIDC TKP:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP021 400 19500530 0.03401 0.03065 0.03401 0.03065

1240

15 BLOCK TKP:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP025 630 19502486 0.16878 0.13546 0.16878 0.13546

1240

KOTLA VILLAGE NEW 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP030 400 19504357 0.15998 0.14722 0.15998 0.14722

1240

S/S‐5 PKT III MVR PH‐1:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1025 400 19504320 0.14064 0.13202 0.14064 0.13202

1240 400 19504353 0.15336 0.146391240 630 19502485 0.00807 0.006311240 990 19501730 0.31443 0.296041240 630 19505202 0.07861 0.064551240 990 19501727 0.43245 0.338541240 990 19003575 0.09493 0.072561240 630 19504315 0.27632 0.216141240 630 19505258 0.09211 0.06953

1240

320 EWS CHILLA DDA FLAT,TKP 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP014 630 19502947 0.14824 0.14024 0.14824 0.14024

0.52738 0.41110

134 WORK CENTER:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP013 0.36843 0.28567

S/S‐6 PKT‐III MVR PH‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1026 0.16143 0.15269

19 BLOCK TKP:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP010 0.39303 0.36059

26 BLOCK TKP:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP012

23 BLOCK TKP:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP008 0.67939 0.53746

KOTLA VILLAGE:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP020 0.42148 0.28107

NEW S/S SHASHIGARDEN:PLM 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1107 0.51882 0.41946

13 BLOCK TKP:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP007 0.61571 0.56178

Page 99: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

30 EXTRA TRILOK PURI:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP015 990 19504651 0.24410 0.19950 0.24410 0.19950

1240 630 19504812 0.13133 0.084201240 990 19504813 0.52533 0.38697

1240

32 BLOCK TKP:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP017 990 19500524 0.40083 0.27214 0.40083 0.27214

1240 990 19504066 0.56518 0.475851240 990 19504189 0.14129 0.11816

1240

27 BLOCK TKP:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP019 990 19500513 0.17458 0.12088 0.17458 0.12088

1240

17 BLOCK TKP:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP023 990 19502505 0.47526 0.37782 0.47526 0.37782

1240 630 19503346 0.06894 0.067321240 630 19504820 0.00070 0.000131240 630 19504312 0.02437 0.022261240 630 19504313 0.04527 0.045191240 630 19504563 0.04039 0.038451240 630 19503241 0.02925 0.02900

1240

AMAR JYOTI CGHS S/S3:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1004 400 19500444 0.04355 0.04091 0.04355 0.04091

1240

BHAGAWAN CGHS:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1005 630 19500698 0.06500 0.06162 0.06500 0.06162

1240 400 19500443 0.00769 0.006941240 400 19500445 0.06917 0.06758

1240

ACHARYA NIKETAN PL/M:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1007 990 19502065 0.21891 0.18936 0.21891 0.18936

1240 630 19500466 0.00339 0.002761240 630 19500468 0.08134 0.075781240 630 19500469 0.03516 0.032111240 630 19500470 0.04957 0.046431240 990 19502483 0.44857 0.373721240 990 19502960 0.11924 0.10060

1240

S/S‐3 CGHS MVR PH‐I:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1013 400 19502494 0.07229 0.06724 0.07229 0.06724

1240

PARTAP NAGAR PLM:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1024 990 19500719 0.34228 0.29417 0.34228 0.29417

S/S‐2 CGHS MVR PH‐I:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1012 0.56781 0.47433

ANAND LOK CGHS S/S 1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1010 0.08473 0.07854

ANAND LOK CGHS S/S 2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1011 0.08473 0.07854

SUPREM CGHS S/S 3:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1003 0.06964 0.06745

FINE HOME CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1006 0.07686 0.07452

0.06745

0.06745

SUPREME CGHS S/S 1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1001 0.06964

SUPREME CGHS S/S 2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1002 0.06964

31 BLOCK TKP:K 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP016 0.65667 0.47116

28 BLOCK TKP:PL 2 1S‐DL‐YP‐ETC‐DMVR‐2304‐TKP018 0.70647 0.59401

20.00MVRSC07 TRILOKPURI 1 18 4.39705 3.51782 0.87923

Page 100: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

S/S‐3 PKT‐IV MVR PH‐1:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1031 630 19502064 0.11248 0.10472 0.11248 0.10472

1240 630 19500483 0.02230 0.021581240 630 19500485 0.03935 0.038361240 630 19500467 0.03699 0.035971240 630 19500484 0.02466 0.02398

1240

MAITRI CGHS:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1069 630 19502488 0.07408 0.06996 0.07408 0.06996

1240 400 19500446 0.00097 0.000781240 400 19500486 0.04761 0.044481240 630 19500518 0.04407 0.041321240 630 19500520 0.03035 0.028451240 630 19500497 0.00149 0.001311240 630 19500519 0.07293 0.068461240 630 19500498 0.01858 0.016401240 630 19500499 0.05574 0.050531240 990 19504676 0.04131 0.037281240 990 19504679 0.41314 0.372831240 630 19505147 0.06197 0.05592

1240

MUNNI BOARDS:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1076 990 19505235 0.21711 0.18854 0.21711 0.18854

1240 990 19502539 0.09680 0.076221240 990 19504556 0.54852 0.49981

1240

P.W.D. NIZAMUDDIN NH 24:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1078 400 19505030 0.04853 0.04409 0.04853 0.04409

1240 630 19500449 0.00085 0.000201240 630 19500450 0.08381 0.081741240 400 19500487 0.00065 0.000211240 400 19500488 0.06470 0.063841240 630 19500447 0.10088 0.099381240 630 19500448 0.00206 0.001491240 630 19500502 0.00066 0.000641240 630 19500503 0.06494 0.06341

1240

DELHI POLICE CGHS SS‐I:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1083 630 19500482 0.06219 0.05794 0.06219 0.05794

1240

DELHI POLICE CGHS SS‐II:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1084 990 19500481 0.09773 0.09105 0.09773 0.09105

1240 630 19502063 0.00140 0.000731240 630 19502070 0.06872 0.066861240 630 19502066 0.02968 0.029071240 630 19502069 0.04044 0.038531240 400 19500462 0.00168 0.00148

IFS CGHS SS‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1086 0.07012 0.06759

HINDUSTAN CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1087 0 08412 0 08146

GYANDEEP CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1082 0.06560 0.06405

IFS CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1085 0.07012 0.06759

UNA CGHS SS‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1080 0.06536 0.06405

UNA CGHS SS‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1081 0.10294 0.10088

PATPAR GANJ VILLAGE:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1077 0.64531 0.57603

AKASH DARSHAN CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1079 0.08466 0.08193

MAVILA CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1073 0.07432 0.06693

SAMASPUR VILLAGE:PL 3 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1075 0.51643 0.46604

MANU CGHS SS‐ I:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1071 0.07442 0.06977

MANU CGHS SS‐ II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1072 0.07442 0.06977

SAHYOG CGHS SS‐II:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1068 0.06165 0.05994

NAV BHARAT CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1070 0.04858 0.04526

SAHYOG CGHS SS‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1067 0.06165 0.05994

60 5.11991 4.59519 0.52472 10.25MVRSC08 ANANDLOK CGHS MAYUR VIHAR PHASE 1

Page 101: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240 400 19500463 0.08244 0.07997

1240

D.P. NO 1 NOIDA RD:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1088 100 19504373 0.01644 0.01573 0.01644 0.01573

1240 990 19502958 0.59524 0.498771240 400 19504660 0.00627 0.002831240 630 19002097 0.02506 0.01873

1240

DDA PUMP HOUSE PKT‐IV MVR PH‐1:PM

1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1027 400 19502574 0.03329 0.03146 0.03329 0.03146

1240 990 19502062 0.01171 0.010661240 630 19502067 0.28116 0.263171240 630 19502106 0.39394 0.348021240 630 19504757 0.02189 0.019121240 400 19505227 0.01313 0.009561240 630 19505278 0.00875 0.005741240 400 19502061 0.02391 0.021801240 400 19502068 0.09563 0.09000

1240

OCF NEAR CLUB CHILLA:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1032 400 19505247 0.02150 0.02030 0.02150 0.02030

1240 630 19500696 0.07134 0.066851240 630 19502115 0.00146 0.00123

1240

KIRTI CGHS S/S‐1:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1036 400 19500506 0.04975 0.04712 0.04975 0.04712

1240

KIRTI CGHS S/S‐2:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1037 400 19500508 0.04975 0.04712 0.04975 0.04712

1240 630 19500686 0.00078 0.000681240 630 19500727 0.07730 0.074021240 630 19500689 0.00094 0.000191240 630 19500690 0.09276 0.08686

1240

BASANT CGHS:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1040 400 19500471 0.05642 0.05098 0.05642 0.05098

1240 400 19500436 0.01857 0.016781240 400 19500437 0.02771 0.025171240 400 19500438 0.00370 0.002941240 400 19500439 0.04258 0.039021240 630 19500687 0.00062 0.000191240 630 19500688 0.06170 0.059011240 630 19500476 0.00082 0.000781240 630 19500477 0.08083 0.074271240 400 19505479 0.03475 0.032401240 400 19500479 0.01709 0.01525

SAMACHAR CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1044 0.08165 0.07504

SAMACHAR CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1045 0.05184 0.04765

DAROANACHARYA CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1042 0.04628 0.04195

ROSE WOOD CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1043 0.06232 0.05920

MEDHA CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1039 0.09370 0.08705

DAROANACHARYA CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1041 0.04628 0.04195

GLAXO CGHS S/S‐I MVR PH‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1035 0.07280 0.06808

OCS CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1038 0.07808 0.07471

0.43771 0.38244

STN‐5 PKT‐4 MVR‐1.ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1030 0.11954 0.11179

S/S‐2 PKT IV MVR PH‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1028 0.29287 0.27382

S.S 1 CGHS MVR PH 1:ID 3 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1092 0.62657 0.52034

S/S‐I PKT‐IV MVR PH‐1:ID 4 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1029

HINDUSTAN CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1087 0.08412 0.08146

Page 102: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240 630 19500516 0.00244 0.001571240 630 19500517 0.07888 0.075211240 630 19502120 0.06164 0.057301240 630 19502119 0.00062 0.000211240 400 19500495 0.04815 0.046841240 400 19500507 0.00049 0.000381240 400 19500493 0.02263 0.021981240 400 19500494 0.02600 0.025251240 630 19500500 0.00052 0.000471240 630 19500728 0.05134 0.047761240 630 19500456 0.00364 0.003471240 630 19500531 0.05696 0.055411240 630 19500532 0.00201 0.001861240 630 19500533 0.09831 0.094821240 630 19500534 0.00063 0.000221240 630 19500535 0.06201 0.05314

1240

S/S 2 CGHS CHILLA:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1055 400 19500693 0.03024 0.02875 0.03024 0.02875

1240

CHILLA VILLAGE DL/M SCHOOL WALA:PL

1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1056 990 19502537 0.26662 0.19459 0.26662 0.19459

1240

CHILLA VILLAGE D.P NEW:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1057 400 19502535 0.16579 0.11469 0.16579 0.11469

1240

CHILLA VILLAGE (OLD):PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1058 990 19505242 0.26500 0.17931 0.26500 0.17931

1240 630 19504470 0.06204 0.056311240 630 19504857 0.06204 0.05183

1240

S/S.I CGHS CHILLA PH‐1:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1060 400 19500490 0.04272 0.03915 0.04272 0.03915

1240 630 19500457 0.00164 0.000911240 630 19500458 0.08036 0.077481240 400 19003821 0.02846 0.026371240 400 19500480 0.03805 0.035331240 400 19500491 0.02099 0.019741240 400 19500492 0.04552 0.041951240 990 19500464 0.05080 0.047141240 990 19500465 0.05829 0.055341240 630 19500473 0.04764 0.043031240 630 19505049 0.03089 0.028091240 400 19500509 0.04088 0.037481240 400 19500510 0.00899 0.00768

NIRMAN CGHS S‐S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1066 0.04987 0.04516

MANAS VIHAR:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1064 0.10909 0.10248

NIRAMAN CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1065 0.07854 0.07113

PARWANA CGHS S/S1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1062 0.06651 0.06170

PARWANA CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1063 0.06651 0.06170

LSC CHILLA MVR PH‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1059 0.12409 0.10814

KALA VIHAR CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1061 0.08200 0.07839

UPKAR CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1053 0.10032 0.09668

SADARCGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1054 0.06264 0.05336

RIVER VIEW CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1051 0.05186 0.04823

SHEKHAR CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1052 0.06060 0.05889

UNITED CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1049 0.04864 0.04723

UNITED CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1050 0.04864 0.04723

 VARDHAMAN CGHS:ID  2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1047 0.08132 0.07678

LOVELY CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1048 0.06226 0.05751

78 4.21252 3.65581 0.55671 13.22MVRSC09 CHILLA VILLAGE

Page 103: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 1 & 2 Division 

1240

D.P. NO 2 NOIDA RD:PM 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1089 100 19500414 0.03127 0.03012 0.03127 0.03012

1240

D.P. NO 3 NOIDA RD:PM 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1090 400 19504654 0.02111 0.01926 0.02111 0.01926

1240

D.P. NO 4 NOIDA RD:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1091 400 19502543 0.00985 0.00917 0.00985 0.00917

1240

PARTAP NAGAR PLM:PL 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1093 990 19505088 0.25072 0.22684 0.25072 0.22684

1240

OCF PKT IV MVR PH‐1 SS‐4:ID 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1100 400 19504317 0.01982 0.01814 0.01982 0.01814

1240 630 19504281 0.05636 0.054531240 630 19504299 0.00057 0.000321240 630 19504256 0.01216 0.011521240 630 19504352 0.04477 0.043331240 630 19504261 0.02601 0.024951240 630 19504265 0.02199 0.02042

1240

 S.STN‐3 DISTT. CENTER MVR‐2 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1110 400 19505134 0.00196 0.00184 0.00196 0.00184

1240

S.STN‐4 DISTT. CENTER MVR‐2 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1111 400 19500328 0.00704 0.00676 0.00704 0.00676

1240

STN‐4 CHILLA VIL NR DDA FLAT 1 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1117 630 19502533 0.25187 0.15685 0.25187 0.15685

ASIANA CGHS S/S‐2:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1102 0.05693 0.05485

PUNJABI SAUDAGAR CGHS:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1103 0.04800 0.04537

ASIANA CGHS S/S‐1:ID 2 1S‐DL‐YP‐ETC‐DMVR‐2301‐MV1101 0.05693 0.05485

Page 104: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

S/S 6 SFS FLAT MVR PH 3 VASUNDH ENCL:ID 1 1S DL RP ETC DVSE 2351 VSE156 630 19502380 0 07396 0 06958 0 07396 0 06958

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241

S/S 6 SFS FLAT MVR PH‐3 VASUNDH ENCL:ID 1 1S‐DL‐RP‐ETC‐DVSE‐2351‐VSE156 630 19502380 0.07396 0.06958 0.07396 0.06958

1241 630 19502407 0.10168 0.099751241 630 19502409 0.01794 0.01728

1241

S/STN 3 A1 PKT MVR‐III:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE002 630 19502406 0.11380 0.11004 0.11380 0.11004

1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE001 0.11962 0.11703S/STN 1 A1 PKT MVR‐III:ID 2

1241 630 19502403 0.14731 0.138291241 400 19504338 0.01109 0.009271241 400 19503533 0.14010 0.136711241 400 19502384 0.02472 0.02247

1241

S/STN 6 A3 PKT MVR ‐ III:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE005 630 19502414 0.09854 0.09647 0.09854 0.09647

1241 400 19505077 0 02797 0 02569

S/STN 5 A2 PKT MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE004 0.16482 0.15918

S/STN 4 A2 PKT MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE003 0.15840 0.14756

1241 400 19505077 0.02797 0.025691241 400 19503534 0.22632 0.209661241 630 19502374 0.03563 0.032731241 630 19502410 0.10689 0.096741241 400 19505180 0.02722 0.024701241 630 19502404 0.19959 0.19722

S/STN 12 A3 PKT MVR‐III:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE009 400 19502411 0.04468 0.04299 0.04468 0.04299

S/STN 8 A2 PKT MVR ‐ III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE007 0.14252 0.12947

S/STN 9 A2 PKT MVR ‐ III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE008 0.22680 0.22192

S/STN 7 A3 PKT MVR ‐ III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE006 0.25429 0.23534

12411241 630 19502734 0.04532 0.045121241 630 19502735 0.20648 0.19840

1241

S/STN B5 DDA JANTA FLATE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE011 400 19003791 0.10241 0.09591 0.10241 0.09591

1241 400 19502420 0.16237 0.152421241 400 19503538 0 03564 0 03174

S/STN B1 DDA JANTA FLATE:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE010 0.25180 0.24353

S/STN 3 B‐7 DDA JANTA FLAT:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE012 0.19801 0.184161241 400 19503538 0.03564 0.031741241 400 19502375 0.01510 0.013521241 400 19503774 0.08557 0.08201

1241

S/STN C‐1 PKT DDA JANTA FLAT:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE014 630 19502939 0.16256 0.14127 0.16256 0.14127

S/STN C‐2 PKT DDA JANTA FLAT:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE015 630 19502405 0.19816 0.18501 0.19816 0.18501

S/STN 4 B‐8 DDA JANTA FLAT:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE013 0.10067 0.09553

1241

S/STN C 2 PKT DDA JANTA FLAT:ID 1 1S DL YP ETC DVSE 2351 VSE015 630 19502405 0.19816 0.18501 0.19816 0.18501

1241 400 19502731 0.02115 0.020241241 400 19502733 0.11985 0.114691241 400 19502832 0.01703 0.015271241 400 19502839 0.09652 0.090301241 630 19503311 0.08494 0.067581241 630 19504937 0.00944 0.007161241 630 19502527 0.06511 0.05707S/STN 2 SFS FLATE MVR III ID 2 1S DL YP ETC DVSE 2351 VSE019 0 14468 0 12954

S/STN D‐2 PKT DDA JANTA FLAT:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE017 0.11355 0.10557

S/STN 1 SFS FLATE MVR ‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE018 0.09438 0.07474

S/STN D‐1 PKT DDA JANTA FLAT:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE016 0.14100 0.13493

1241 630 19502390 0.07957 0.07247S/STN 2 SFS FLATE MVR ‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE019 0.14468 0.12954

Page 105: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241 630 19502386 0.06414 0.059531241 630 19505441 0.00713 0.00639

S/STN 3 SFS FLATE MVR ‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE020 0.07127 0.06593

1241

S/STN 4 SFS FLATE MVR ‐ III:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE021 630 19502467 0.07202 0.06698 0.07202 0.06698

1241 630 19502468 0.08411 0.080421241 630 19502469 0.00935 0.008541241 630 19502389 0.06588 0.057601241 630 19502415 0.00732 0.004761241 630 19502341 0.07567 0.07317S/STN 2 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE024 0 09117 0 08722

S/STN 5 SFS FLATE NVR ‐ III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE022 0.09346 0.08896

S/STN 7 SFS FLATE MVR ‐ III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE023 0.07320 0.06236

1241 630 19502347 0.01550 0.014051241 630 19502344 0.05141 0.048771241 630 19504848 0.00271 0.002551241 630 19502342 0.00781 0.006911241 630 19502434 0.03123 0.029041241 630 19502348 0.05463 0.051401241 630 19502381 0.00111 0.001031241 630 19502346 0.06648 0.062711241 630 19502438 0 01082 0 01002

S/STN 6 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE028 0.07730 0.07273

S/STN 4 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE026 0.03904 0.03595

S/STN 5 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE027 0.05574 0.05243

S/STN 2 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE024 0.09117 0.08722

S/STN 3 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE025 0.05412 0.05133

1241 630 19502438 0.01082 0.010021241 630 19502345 0.07327 0.070401241 630 19502437 0.01293 0.011821241 630 19502439 0.05851 0.053621241 630 19503038 0.01033 0.008771241 630 19502343 0.05893 0.053381241 990 19502440 0.33395 0.283201241 630 19502349 0.01312 0.012031241 630 19502433 0.07435 0.07132

S/STN 10 MIXED HOUSING MVR III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE032 0.08747 0.08335

S/STN 8 MIXED HOUSING MVR III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE030 0.06884 0.06239

S/STN 9 MIXED HOUSING MVR III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE031 0.39288 0.33658

S/STN 7 MIXED HOUSING MVR‐III:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE029 0.08620 0.08222

1241 630 19502954 0.00830 0.006151241 630 19504187 0.06227 0.057901241 630 19504803 0.34454 0.333231241 630 19502416 0.16370 0.153841241 630 19502435 0.17426 0.167941241 630 19504804 0.19010 0.183091241 400 19505444 0.02297 0.022271241 400 19503539 0.12061 0.111341241 990 19505314 0 14671 0 13445

S/STN C‐ BLK NEW KNODLI:ID 3 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE034 0.52806 0.50487

S/STN D‐BLK NEW KNODLI:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE035 0.14358 0.13360

S/STN B‐ BLK NEW KNODLI:ID 3 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE033 0.41510 0.39728

1241 990 19505314 0.14671 0.134451241 630 19504517 0.58684 0.54326

1241

KNODLI VILL. PANCHYAT GHAR:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE037 990 19502838 0.35798 0.27914 0.35798 0.27914

1241

KNODLI VILL. NEAR PR/SCHOOL:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE038 630 19504796 0.28792 0.22542 0.28792 0.22542

SUBJI MANDI HARIJAN BASTI KNODLI:K 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE036 0.73355 0.67770

VSESC01 DDA JANTA FLAT MAYUR VIHAR PHASE III 115 10.65236 9.44623 1.20613 11.32

1241

1241

KNODLI INDAL PUBLIC SCHOOL:PM 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE039 400 19502834 0.18389 0.14668 0.18389 0.14668

D‐BLK HARIJAN BASTI S. HOSP.:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE040 630 19504566 0.33054 0.29718 0.33054 0.29718

1241

Page 106: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241 630 19004844 0.02792 0.023631241 990 19505373 0.43749 0.370931241 990 19502732 0 31224 0 26792

A‐BLK RAJBIR COLONY:PL 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE041 0.46541 0.39456

1241 990 19502732 0.31224 0.267921241 630 19505311 0.06395 0.05441

1241

GHARAOLI VILL. OLD:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE045 400 19502849 0.19456 0.13141 0.19456 0.13141

GHARAOLI VILL. NEW:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE046 990 19502842 0.38394 0.26941 0.38394 0.26941

B‐BLK RAJBIR COLONY:PL 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE042 0.37619 0.32233

1241

1241

STAFF QUT. SEW. P/STN. KNODLI:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE047 400 19502836 0.02310 0.02022 0.02310 0.02022

1241 630 19504688 0.05773 0.048831241 630 19504733 0.02245 0.019951241 630 19502831 0.41997 0.350321241 400 19504841 0 10499 0 09085

STN 3 GHAROLI DAIRY CL MVR PH‐3:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE142 0.52496 0.44117

480 EWS QTRS GHAROLI 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE140 0.08017 0.06878

1241 400 19504841 0.10499 0.090851241 630 19502843 0.37092 0.298131241 990 19503159 0.15897 0.116641241 630 19502379 0.08455 0.079081241 630 19502432 0.01856 0.016681241 630 19502051 0.09486 0.088121241 630 19502383 0.00825 0.00764

STN 1 480 MIG  MVR PH‐3:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE144 0.10311 0.09576

STN 2 480 MIG  MVR PH‐3:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE145 0.10311 0.09576

STN 4 GHAROLI DAIRY CL MVR PH‐3:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE143 0.52989 0.41477

1241

S/S‐1 C‐BLK HARIZAN BASTI,MULLA CLY:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE157 630 19504818 0.22248 0.20310 0.22248 0.20310

1241

S/STN‐2  A1 PKT  MVR‐III:I/D 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE158 630 19502401 0.11160 0.10548 0.11160 0.10548

1241

S/S‐2 C‐BLK HARIZAN BASTI,MULLA CLY:PL 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE163 630 19503549 0.22637 0.20313 0.22637 0.20313

1241 400 19504792 0.00244 0.002301241 400 19504793 0.00216 0.00176

CNG STN‐1 (NAHAR) IFC PAPER MKT GAJIPUR. 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE182 400 19504753 0.06606 0.06382 0.06606 0.06382

S/STN NO‐1 IFC PAPER MARKET MVR III 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE176 0.00460 0.00406

12411241 400 19505059 0.00233 0.001961241 630 19505054 0.00066 0.000491241 400 19504977 0.00162 0.001311241 400 19505076 0.00069 0.00059

SS‐6 IFC PAPER MKT 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE185 630 19505058 0.00182 0.00150 0.00182 0.00150

SS‐5 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE184 0.00232 0.00190

SS‐2 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE183 0.00298 0.00245

1241

Page 107: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241 400 19504798 0.00162 0.001311241 400 19505214 0.00069 0.000591241 400 19504758 0 00089 0 00076

SS‐7 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE186 0.00232 0.00190

1241 400 19504758 0.00089 0.000761241 630 19005108 0.00209 0.00169

1241

SS‐9 IFC PAPER MKT 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE188 630 19504939 0.00298 0.00245 0.00298 0.00245

SS‐10 IFC PAPER MKT 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE189 400 19504829 0.00116 0.00095 0.00116 0.00095

SS‐8 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE187 0.00298 0.00245

12411241 400 19504791 0.00151 0.001221241 400 19505056 0.00081 0.000681241 400 19502846 0.00081 0.000681241 400 19502421 0.00151 0.001221241 400 19505060 0.00104 0.000871241 400 19505018 0.00127 0.001031241 630 19001838 0.01948 0.018901241 630 19000337 0 04139 0 04017

1350 EWS DDA QUARTER NEW KONDLI MVR‐‐3 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE198 0.06087 0.05907

SS‐13 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE192 0.00232 0.00190

SS‐14 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE193 0.00232 0.00190

SS‐11 IFC PAPER MKT 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE190 0.00232 0.00190

1241 630 19000337 0.04139 0.04017

1241

HPC,PETROL PUMP,IFC PAPER MKT.MVR‐3 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE203 100 19504756 0.00445 0.00405 0.00445 0.00405

1241 400 19004904 0.03863 0.033601241 400 19503852 0.01818 0.01509

0.05681 0.04869NAV JAGRITI CGHS VASUNDHARA ENCLAVE:ID 2 1S‐DL‐RP‐ETC‐DVSE‐2351‐VSE148

1241

S/STN 3 VASHUNDRA ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE051 400 19502368 0.00252 0.00247 0.00252 0.00247

S/STN 8 VASHUNDRA ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE055 400 19505281 0.04652 0.04319 0.04652 0.04319

1241

1241

INOD‐VERMAN PETROLIUM P/PUMP:PM 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE056 100 19504359 0.01782 0.01665 0.01782 0.01665

1241

BPS+ IOC P/PUMP NOIDA RD DALLUPURA:PL:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE057 400 19504536 0.02178 0.01994 0.02178 0.01994

1241 400 19502362 0.01617 0.015181241 400 19502365 0.01570 0.015181241 630 19502007 0.00587 0.005431241 630 19502017 0.09191 0.089551241 400 19502006 0.04335 0.04167DOCTORS S/STR 1 ID 2 1S DL YP ETC DVSE 2351 VSE073 0 04563 0 04363

DAINIK JANYAG CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE071 0.03187 0.03036

CAPITAL CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE072 0.09778 0.09498

1241 400 19502020 0.00228 0.00197DOCTORS S/STR 1:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE073 0.04563 0.04363

Page 108: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241 400 19502001 0.00639 0.005651241 400 19502009 0.03924 0.03799

DOCTORS S/S II CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE074 0.04563 0.04363

1241

NEW DELHI CGHS:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE075 630 19502043 0.06550 0.06372 0.06550 0.06372

1241 630 19500702 0.03741 0.036601241 630 19502399 0.00325 0.002831241 400 19502042 0.05194 0.050141241 400 19502049 0.00106 0.000981241 630 19502397 0.02166 0.02043ABHIMAYU S/STN 1 CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE078 0 04246 0 04086

HIGH LAND CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE076 0.04066 0.03943

MANSARA CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE077 0.05300 0.05112

1241 400 19502398 0.02081 0.020431241 400 19502454 0.00425 0.004091241 630 19502458 0.03822 0.036781241 400 19502451 0.00556 0.005171241 400 19502453 0.05001 0.048911241 630 19502457 0.03292 0.032031241 630 19502459 0.03566 0.034691241 630 19502452 0.13135 0.129441241 630 19502455 0 00876 0 00777

SOOCHANA:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE080 0.05557 0.05409

NEW PRAGATI SHEEL:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE081 0.06858 0.06672

ABHIMAYU S/STN 1 CGHS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE078 0.04246 0.04086

ABHIMANYU S/STR 2:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE079 0.04246 0.04086

4.4650 1.42904 1.36537 0.06367VSESC02 VASUNDHARA ENCLAVE

1241 630 19502455 0.00876 0.007771241 630 19502456 0.00292 0.002391241 630 19502460 0.00292 0.001421241 630 19504133 0.00113 0.001071241 630 19502400 0.03649 0.035121241 630 19502044 0.01341 0.013081241 630 19502050 0.02747 0.02655

CITY:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE085 630 19505426 0 08622 0 08118 0 08622 0 08118

FANCY:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE084 0.04088 0.03963

MANGAL:ID 4 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE082 0.14594 0.14102

SHANTI DOOT:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE083 0.03762 0.03620

1241

CITY:ID 1 1S DL YP ETC DVSE 2351 VSE085 630 19505426 0.08622 0.08118 0.08622 0.08118

1241

ABUL FAZAL:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE086 630 19502840 0.08432 0.08224 0.08432 0.08224

1241 400 19502376 0.02074 0.019731241 400 19502378 0.02580 0.024111241 400 19502835 0 02873 0 02696( )

ANEKANT:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE087 0.04654 0.04384

1241 400 19502835 0.02873 0.026961241 400 19502837 0.02448 0.023911241 630 19502048 0.03224 0.030281241 630 19502431 0.02314 0.021931241 630 19500374 0.00331 0.003031241 630 19502005 0.07937 0.07742

MCD SCHOOL VASUNDHARA ENCLAVE:PM 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE167 25 19504252 0.00588 0.00561 0.00588 0.00561

MANAVASTHALI S/STN:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE099 0.08268 0.08045

NDSE. (SRINIKETAN):ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE088 0.05321 0.05087

HINDON:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE089 0.05538 0.05221

1241

MCD SCHOOL VASUNDHARA ENCLAVE:PM 1 1S DL YP ETC DVSE 2351 VSE167 25 19504252 0.00588 0.00561 0.00588 0.00561

1241 630 19504991 0.02708 0.026141241 630 19504997 0.01217 0.01174

1241

Fire Station Dallupura MVR‐3 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE196 400 19001314 0.00431 0.00380 0.00431 0.00380

SS‐Vardhman Plaza Market V.Encl 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE194 0.03925 0.03788

Page 109: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

SHEED RAJGURUWOMENs COLLEGE V ENCL 1 1S DL YP ETC DVSE 2351 VSE197 400 19505243 0 01223 0 01012 0 01223 0 01012

1241

SHEED RAJGURU WOMENs COLLEGE V. ENCL. 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE197 400 19505243 0.01223 0.01012 0.01223 0.01012

1241

DALLUPURA VILL. DURGA PARK:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE048 990 19505213 0.60011 0.38375 0.60011 0.38375

1241 630 19502018 0.19706 0.086301241 400 19502052 0.16478 0.10582

S/STN 2 VASHUNDRA ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE050 0.36184 0.19212

1241 630 19500878 0.06230 0.057871241 630 19500880 0.05986 0.054441241 400 19500916 0.02953 0.027341241 400 19500919 0.00222 0.002011241 400 19500891 0.00279 0.002551241 400 19500917 0.03206 0.03043

SOMERRILLE SCHOOL:PM 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE070 400 19502361 0.03025 0.02878 0.03025 0.02878

0.03175 0.02934

INDIAN NAVAL:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE069 0.03485 0.03298

38.75

S/STN 6 VASHUNDRA ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE054 0.12216

VSESC03 KONDLI AND DALLUPURA VILLAGE 12 1.74813 1.07065 0.67748

0.11231

LAHORE:PKG 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE068

12411241 630 19500842 0.30827 0.077631241 630 19502371 0.25890 0.213741241 630 19504251 0.04161 0.039201241 630 19504257 0.03069 0.02838

S/STN 4 VASHUNDRA ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE052 400 19500981 0.00701 0.00654 0.00701 0.00654

0.07230 0.06758

DALLUPURA HARIZAN BASTI SUB STN. 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE172 0.56717 0.29137

HABITAT CGHS VASUNDHARA ENCLAVE:ID 2 1S‐DL‐RP‐ETC‐DVSE‐2351‐VSE153

1241

1241

S/STN 5 VASHUNDRA ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE053 400 19502617 0.00352 0.00337 0.00352 0.00337

1241 630 19500372 0.00512 0.003951241 630 19500373 0 09719 0 09235

MOD:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE090 0.10230 0.096311241 630 19500373 0.09719 0.092351241 400 19500909 0.03754 0.036361241 400 19500964 0.00561 0.005251241 630 19500908 0.00748 0.006931241 630 19500910 0.06048 0.05860

1241

CEL:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE093 400 19500895 0.06786 0.06367 0.06786 0.06367

LEIAH SISTR S/STN 1:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE092 0.06796 0.06553

LEIAH SISTR S/STN 2:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE091 0.04315 0.04160

1241

SAMARAT S/ST 1:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE094 630 19500999 0.05501 0.05263 0.05501 0.05263

1241

SAMARAT S/STN 2:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE095 630 19500990 0.05501 0.05263 0.05501 0.05263

1241 630 19500983 0.02663 0.02598ANUPAM ID 2 1S DL YP ETC DVSE 2351 VSE096 0 05759 0 05528

4.7629 0.90555 0.86241 0.04314VSESC04 NEW PROGRESSIVE APARTMENT MAYUR VIHAR PHASE III

1241 630 19500992 0.03096 0.02930ANUPAM:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE096 0.05759 0.05528

Page 110: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241 630 19500980 0.04271 0.041481241 630 19500997 0.00249 0.002411241 630 19500991 0 03607 0 03511

ABHINAV S/STN 1:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE097 0.04520 0.04389

1241 630 19500991 0.03607 0.035111241 630 19502934 0.00912 0.00878

1241

OVERSEES:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE100 400 19502019 0.03425 0.03285 0.03425 0.03285

1241 630 19502363 0.04086 0.039081241 630 19502364 0.03340 0.031981241 630 19500892 0.00441 0.00373

VISH WAKARMA ABH:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE134 0.07426 0.07106

NEW PROGESSIVE S/SM1:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE135 0 05509 0 05215

ABHINAV S/STN 2:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE098 0.04520 0.04389

1241 630 19500920 0.05068 0.048421241 630 19500893 0.00275 0.002471241 630 19500894 0.05234 0.049681241 400 19505245 0.03072 0.028701241 400 19502016 0.00095 0.00075

POLICE COMPUTER CGHS V.ENCL.:PACKAGE S/S 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE166 990 19504337 0.03310 0.03183 0.03310 0.03183

NEW PROGESSIVE S/SM2:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE136 0.05509 0.05215

VISHAL:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE137 0.03167 0.02944

NEW PROGESSIVE S/SM1:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE135 0.05509 0.05215

12411241 630 19500944 0.01674 0.013711241 630 19500945 0.09484 0.08824

1241

S/STN 1 VASHUNDRA ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE049 400 19504286 0.01018 0.00965 0.01018 0.00965

0.10195NIRAJ (PRYAG) CGHS VASHUNDRA ENCL:ID 2 1S‐DL‐RP‐ETC‐DVSE‐2351‐VSE154 0.11158

1241

S/S DALLUPURA GRID STREET LIGHT 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE058 100 19504358 0.00412 0.00397 0.00412 0.00397

1241 630 19500941 0.06128 0.058911241 630 19500942 0.00323 0.002971241 400 19500943 0.01205 0.011611241 400 19500954 0 04272 0 04053

TRIVENI CGHS VASHUNDRA ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE060 0.05476 0.05214

0.06188GOVIND(DELHI PUNJABI)VASHUNDRA ENCL.:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE059 0.06450

1241 400 19500954 0.04272 0.04053

1241

B‐4 PARYATEN VIHAR S/STN 1:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE061 630 19500879 0.08031 0.07865 0.08031 0.07865

1241

B‐4 PARYATEN VIHAR S/STN 2:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE062 630 19500876 0.08031 0.07865 0.08031 0.07865

1241

23 0.79059 0.74484 0.04575 5.79VSESC05 PARYATAN VIHAR CGHS MAYUR VIHAR PHASE III

1241 630 19500906 0.07078 0.064931241 630 19500907 0.00875 0.007721241 400 19500961 0.04292 0.039741241 400 19500965 0.00757 0.006391241 400 19500962 0.03222 0.030521241 400 19500963 0.00243 0.002411241 400 19500998 0.00215 0.002041241 400 19503084 0.05168 0.05001

ILA APPARTMENT VASHUNDRA ENCL.:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE066 0.05383 0.05205

DELUX S/STN 2:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE064 0.05050 0.04613

B‐6 PARVATYA VIAHR VASHUNDRA ENCL.:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE065 0.03464 0.03293

DELUX S/STN 1:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE063 0.07953 0.07266

Page 111: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

B8 PARYATAN VIHAR:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE067 400 19500918 0.06954 0.06553 0.06954 0.06553

12411241 400 19504687 0.03273 0.030311241 400 19504740 0.00172 0.001471241 630 19504287 0.01559 0.013761241 630 19504289 0.04676 0.043141241 990 19500836 0.42406 0.394681241 630 19500873 0.08077 0.076261241 630 19500874 0.54353 0.50217ABLK (LOOP) NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE104 0 67102 0 62600

0.50483 0.47094

MAHESH C.G.H.S. VASUNDHRA ENCLAVE :I/D 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE165 0.06234 0.05690

ABLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE103

PUNEET CGHS V. ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE146 0.03445 0.03178

1241 990 19504797 0.12749 0.123831241 400 19500837 0.07570 0.067451241 630 19500847 0.32274 0.299521241 400 19500848 0.05903 0.055211241 630 19500871 0.33450 0.324251241 630 19500755 0.41034 0.371151241 400 19505232 0.01269 0.011061241 630 19500846 0.10932 0.104171241 630 19500850 0 28112 0 25541

C5 BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE111 0.39044 0.35957

C3 BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE109 0.39352 0.37946

C4 BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE110 0.42304 0.38222

6.54

ABLK (LOOP) NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE104 0.67102 0.62600

C2 BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE108 0.39844

16 3.96816 3.70872 0.25943

0.36697

VSESC06 NEW ASHOK NAGAR 1241 630 19500850 0.28112 0.255411241 990 19005039 0.41652 0.397001241 400 19005027 0.10413 0.09925

1241

E1 BLK NEW ASHOK NAGAR:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE113 990 19505322 0.39854 0.37258 0.39854 0.37258

E2 BLK NEW ASHOK NAGAR:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE114 630 19500849 0 26768 0 25473 0 26768 0 25473

D BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE112 0.52064 0.49625

1241

E2 BLK NEW ASHOK NAGAR:ID 1 1S DL YP ETC DVSE 2351 VSE114 630 19500849 0.26768 0.25473 0.26768 0.25473

1241 990 19504254 0.43917 0.423611241 630 19505427 0.09640 0.074751241 990 19500797 0.49473 0.494511241 630 19500303 0.08731 0.06743

0.49836

5 1.13098 1.07301 0.05798 5.13

0.56195

VSESC07 NEW ASHOK NAGAR  1

B BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE105 0.53557

B2 BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE107 0.58204

1241

MCD TUBEWELL BLK NEW ASHOK NAGAR:PM 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE115 100 19505266 0.01337 0.01270 0.01337 0.01270

1241 630 19500875 0.39774 0.368631241 400 19505221 0.00812 0.004181241 630 19500782 0.06881 0.064661241 990 19500783 0.04830 0.045871241 630 19500741 0.00091 0.000511241

S/STN 2 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE117 0.09108 0.08596

0.37281

0.11053

B1 BLK NEW ASHOK NAGAR:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE106 0.40586

S/STN EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE116 0.11711

1241 630 19500745 0.09017 0.085451241 630 19505445 0.08926 0.084381241 630 19500806 0.00182 0.001591241 630 19500738 0.07105 0.068771241 630 19505186 0.02004 0.017191241 630 19002649 0.08744 0.082851241 630 19500799 0.00364 0.003111241 630 19500739 0.09017 0.085811241 630 19500841 0.00091 0.00016

S/STN 6 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE121 0.09108 0.08596

S/STN 4 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE119 0.09108 0.08596

S/STN 5 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE120 0.09108 0.08596

/

S/STN 3 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE118 0.09108 0.08596

22 1 34272 1 25702 0 08570 6 38VSESC08 EAST END APARTMENT1241 630 19500737 0.02930 0.02837S/STN 7 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE122 0 09108 0 08596

22 1.34272 1.25702 0.08570 6.38VSESC08 EAST END APARTMENT

Page 112: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Mayur Vihar Phase 3 Division 

1241 630 19500800 0.06178 0.057601241 630 19500771 0.08744 0.083001241 630 19505292 0 00364 0 00297

S/STN 8 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE123 0.09108 0.08596

S/STN 7 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE122 0.09108 0.08596

1241 630 19505292 0.00364 0.00297

1241

S/STN 9 EAST END 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE124 630 19505254 0.04554 0.04298 0.04554 0.04298

1241

S/STN 10 EAST END 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE125 630 19500736 0.04554 0.04298 0.04554 0.04298

1241 630 19500793 0.08926 0.084791241 630 19500794 0.00182 0.00117

1241

NAGARJUNA S/STR 1:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE127 400 19500766 0.05797 0.05378 0.05797 0.05378

NAGARJUNA S/STR 2:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE128 400 19500769 0.05797 0.05378 0.05797 0.05378

S/STN 11 EAST END 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE126 0.09108 0.08596

1241

1241

NAGARJUNA P/M:PM 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE129 100 19504283 0.00622 0.00571 0.00622 0.00571

S/STR 9 VASUNDHARA ENCLAVE:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE130 400 19500767 0.00699 0.00671 0.00699 0.006717.33VSESC09 NAGARJUN CGHS 8 0.26282 0.24356 0.01926

12411241 400 19500768 0.02490 0.024051241 400 19500791 0.00216 0.00202

1241

ALLAHABAD BANK CGHS:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE132 400 19500770 0.04662 0.04244 0.04662 0.04244

INDIAN EXPRESS:ID 2 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE131 0.02706 0.02606

1241

AIIMS:ID 1 1S‐DL‐YP‐ETC‐DVSE‐2351‐VSE133 400 19500746 0.06000 0.05508 0.06000 0.05508

Page 113: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1250

DDA FLATS SHASTRI PARK:ID 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM038 630 19504127 0.11952 0.09612 0.11952 0.09612

1250 630 19500937 0.22064 0.144671250 630 19504736 0.19844 0.12569

1250

KUNDAN LAL PETROL PUMP:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM049 100 19004035 0.00959 0.00916 0.00959 0.00916

1250

JANTA COLONY SHASTRI PARK:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM050 400 19503553 0.08459 0.06991 0.08459 0.06991

1250 630 19503429 0.16395 0.057041250 630 19504174 0.19102 0.06971

1250

HP PETROL PUMP SHASTRI PARK:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM083 100 19502266 0.00909 0.00858 0.00909 0.00858

1250

SHASTRI PARK LADY HOSTEL METRO 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM084 400 19502255 0.04634 0.03708 0.04634 0.03708

1250 630 19503218 0.05892 0.056451250 630 19503219 0.01296 0.00516

1250

DMRC NO.2 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM088 990 19503226 0.02141 0.02019 0.02141 0.02019

1250

DMRC‐No‐3 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM105 990 19503216 0.01523 0.01430 0.01523 0.01430

1250

DMRC NO.4 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM113 990 19504293 0.00810 0.00762 0.00810 0.00762

1250

POLICE BOOTH MARGINAL BANDH :PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM114 400 19505102 0.02824 0.01287 0.02824 0.01287

1250

BULAND MASJID SCHOOL WALA SHASTRI PARK :PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM118 400 19505101 0.11756 0.07745 0.11756 0.07745

1250 630 19500618 0.44289 0.309791250 990 19502886 0.20842 0.12739

0.65131 0.43719

DMRC NO 1 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM087 0.07188 0.06161

USMAN PUR KIOSK:K 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM001

1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM039 0.41908 0.27036

SHASTRI PARK RED LIGHT 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM064 0.35497 0.12675

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

YVRSC01BULAND MASJID SHASTRI 

PARK16 1.30561 0.81201 0.49360 37.81

BULAND MASJID SHASTRI PARK:ID 2

Page 114: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250

RAJU WALA SHASTRI PARK:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM034 990 19007509 0.35024 0.26204 0.35024 0.26204

1250

BELA FARM SHASTRI PARK:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM085 400 19505246 0.00037 0.00035 0.00037 0.00035

1250 630 19500333 0.27159 0.161511250 630 19504176 0.21305 0.13214

1250

II Pusta Usmanpur Village Khaddar 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO055 630 19504553 0.07088 0.05223 0.07088 0.05223

1250

OLD VILLAGE GARHI MANDU 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM00F 630 19505448 0.04769 0.03335 0.04769 0.03335

1250

A BLOCK BHAJANPURA GALI NO. ‐3:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO001 990 19504886 0.31677 0.27303 0.31677 0.27303

1250

4 PUSTA BHATI WALA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO004 630 19501822 0.16814 0.15692 0.16814 0.15692

1250

NANAKSAR GURUDWARA:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO030 100 19505142 0.00764 0.00710 0.00764 0.00710

1250

3.5 PUSTA PUMP HOUSE:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO034 630 19502277 0.18708 0.15262 0.18708 0.15262

1250

A BLOCK BHAJANPURA GALI NO. ‐2:P/M 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO056 400 19501747 0.11690 0.10825 0.11690 0.10825

1250

C‐4 YAMUNA VIHAR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM001 990 19503256 0.24749 0.22842 0.24749 0.22842

1250

C‐5 YAMUNA VIHAR:PG 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM002 990 19503727 0.23914 0.22099 0.23914 0.22099

1250 990 19503252 0.12983 0.121431250 990 19503253 0.27590 0.250961250 630 19500622 0.26908 0.234271250 990 19500657 0.08497 0.075711250 400 19500646 0.21407 0.187201250 630 19502948 0.01103 0.009891250 990 19503237 0.32005 0.30214

C‐7/2, YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM006 0.22510 0.19709

C‐8 YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM007 0 66677 0 61837

1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM003 0.40573 0.37239

C‐7, YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM005 0.35405 0.30998

13.38

C‐6, YAMUNA VIHAR:PG 2

YVRSC03 BHAJANPURA 6 0.84423 0.73126 0.11296

32.87

USMANPUR PUSTA NO‐2:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO018 0.48464 0.29365

7 1.55744 1.04546 0.51198YVRSC02 SHASTRI PARK RED LIGHT

Page 115: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250 990 19503239 0.34672 0.316221250 990 19500543 0.12481 0.106281250 630 19500554 0.17379 0.146771250 400 19505309 0.05408 0.050011250 990 19501815 0.19174 0.16944

1250

C‐3 YAMUNA VIHAR:PG 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM047 990 19505211 0.14975 0.14204 0.14975 0.14204

1250

C‐ 9 YAMUNA VIHAR:PG 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM048 990 19504378 0.36704 0.25879 0.36704 0.25879

1250

COMMUNITY CENTER, NEAR MTNL OFFICE 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM051 400 19503818 0.00574 0.00536 0.00574 0.00536

1250 630 19503272 0.24816 0.169751250 630 19505484 0.04040 0.027631250 990 19003796 0.48195 0.402661250 990 19501767 0.51339 0.463521250 630 19504179 0.05239 0.02853

1250

MOTHER DAIRY B BLOCK GAMRI:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO005 630 19505390 0.15153 0.12816 0.15153 0.12816

1250 990 19501814 0.29567 0.105861250 400 19505066 0.17718 0.06217

1250

D BLOCK GAMRI NALA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO033 990 19501835 0.47299 0.25848 0.47299 0.25848

1250 630 19502194 0.19723 0.166471250 990 19502226 0.23153 0.182981250 990 19503451 0.14462 0.130951250 990 19503454 0.25711 0.23281

1250

B‐2 YAMUNA VIHAR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM011 990 19503247 0.30566 0.26572 0.30566 0.26572

1250 990 19503453 0.23333 0.201111250 990 19003834 0.25278 0.19536

1250

B‐5 YAMUNA VIHAR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM013 990 19503244 0.27104 0.23240 0.27104 0.23240

1250

DTC DEPOT YAMUNA VIHAR NO‐2:ID 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM014 630 19503238 0.12024 0.11413 0.12024 0.11413

1250 400 19502185 0.02883 0.02689POLICE STATION BHAJAN PURA:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM016 0 03516 0 03280 21 44

B‐1 YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM010 0.40173 0.36376

B‐4 YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM012 0.48611

0.42877 0.34945

21 5 06017 3 97505 1 08512

0.39647

TIKONA PARK GAMRI:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO029 0.47285 0.16802

YVRSC06 GHONDA

SHAITAN CHOWK SUBHASH MOHALLA 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM00E

0.19738

9 2.43366 1.64675 0.78691 32.33

0.89471

YVRSC05 GARHI MANDU

VILLAGE GARHI MANDU (YAMUNA BED):K 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM046 0.28856

B BLOCK BHAJANPURA:K 3 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO002 1.04773

C‐11 YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM008 0.29860 0.25304

C‐12, YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM009 0.24582 0.21946

C‐8 YAMUNA VIHAR:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM007 0.66677 0.61837

YVRSC04 YAMUNA VIHAR 17 3.20523 2.82593 0.37930 11.83

Page 116: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250 400 19502193 0.00633 0.005901250 630 19502225 0.22669 0.203571250 990 19001566 0.27706 0.22709

1250

ABDUL HAMID MARG:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM022 990 19505062 0.43933 0.29452 0.43933 0.29452

1250 630 19505337 0.15378 0.102971250 630 19504376 0.25091 0.14498

1250

SUBHASH MOHALLA NO‐1:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM033 990 19502223 0.55484 0.45773 0.55484 0.45773

1250 990 19500611 0.33583 0.235171250 990 19502153 0.45459 0.338491250 400 19003553 0.02867 0.02438

1250

SUBHASH MOHALLA NO‐4:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM035 990 19501017 0.28976 0.19142 0.28976 0.19142

1250

PUMPING STATION BHAJAN PURA :ID 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM015 990 19504082 0.45418 0.39877 0.45418 0.39877

1250

C‐BLOCK GALI NO7 BHAJAN PURA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM017 990 19502144 0.38479 0.32373 0.38479 0.32373

1250 990 19503720 0.27423 0.218521250 630 19504322 0.25216 0.21598

1250

DISPENSERY BHAJAN PURA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM019 990 19502203 0.49805 0.43930 0.49805 0.43930

1250 990 19501785 0.17783 0.143791250 990 19503712 0.44457 0.296921250 630 19504884 0.36554 0.270161250 990 19502633 0.27893 0.171711250 630 19502639 0.24736 0.16657

1250

GAMRI KIOSK:K 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO008 990 19501753 0.36400 0.23224 0.36400 0.23224

1250

JAI PRAKASH  NO‐1:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO011 990 19501819 0.44336 0.30881 0.44336 0.30881

1250 990 19500192 0.38009 0.274251250 630 19502218 0.08688 0.075521250 990 19502220 0.61900 0.40300

1250

SCHOOL MOHAN PURI 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM024 630 19503718 0.23844 0.20412 0.23844 0.20412

0.52629 0.33828

NOOR‐E‐ILLAHI:K 3 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM021 1.08596 0.75277

23.86

K‐BLOCK GHONDA:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM018 0.52639 0.43450

D BLOCK BHAJANPURA:K 3 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO003 0.98794

YVRSC07GHONA AND GAMRI 

VILLAGE12 4.18500 3.18650 0.99849

0.71087

GAMRHI VILLAGE:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO007

GAMRI ROAD PUMP HOUSE:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM032 0.40469 0.24795

SUBHASH MOHALLA NO.‐2:PL 3 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM034 0.81909 0.59803

POLICE STATION., BHAJAN PURA:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM016 0.03516 0.03280

D‐BLOCK, SANJAY MOHALLA:K 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM020 0.50375 0.43066

21.4421 5.06017 3.97505 1.08512YVRSC06 GHONDA

Page 117: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250 990 19503250 0.35950 0.165231250 630 19503149 0.24319 0.221561250 990 19504714 0.42939 0.311731250 990 19502189 0.67524 0.487731250 990 19502235 0.39657 0.31355

1250

SUBJI MANDI‐1 MAUJ PUR 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM028 990 19503431 0.44266 0.24905 0.44266 0.24905

1250

SUBJI MANDI‐2 MAUJ PUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM029 990 19501764 0.32947 0.28669 0.32947 0.28669

1250 990 19502197 0.46157 0.275291250 990 19503728 0.21029 0.157851250 400 19502200 0.16519 0.151431250 990 19504239 0.30679 0.253751250 630 19502139 0.23911 0.133021250 630 19502141 0.23889 0.20183

1250

VIJAY PARK SHIV SADHAN MANDIR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM038 990 19505446 0.34383 0.24988 0.34383 0.24988

1250 630 19505323 0.20947 0.175161250 400 19005343 0.04869 0.04379

1250

VIJAY PARK ADARSH MOHALLA;PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM040 990 19504126 0.53360 0.41484 0.53360 0.41484

1250

NALA NO.4 MAUJPUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM041 990 19503438 0.35914 0.25872 0.35914 0.25872

1250

SETH BHAGWAN DAS MAUJ PUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM042 990 19505078 0.31891 0.28630 0.31891 0.28630

1250

C‐10 YAMUNA VIHAR:PG 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM049 990 19504274 0.14403 0.13262 0.14403 0.13262

1250 630 19504374 0.24158 0.192401250 400 19004529 0.06040 0.033951250 400 19505178 0.12337 0.105521250 990 19503034 0.43739 0.394421250 990 19501755 0.20317 0.134491250 990 19501821 0.25894 0.119551250 990 19505118 0.51659 0.357601250 990 19501769 0.43078 0.39510

GAUTAM VIHAR KIOSK:K 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO010 0.94737 0.75270

0.49994

0.25404

SOUTH GAMRI KIOSK:K 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO006 0.56075

ARVIND NAGAR PRIMARY SCHOOL GAUTAM VIHAR:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO009 0.46211

VIJAY PARK NEAR NURSARY:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM039 0.25816 0.21895

MOHANPURI NO‐2 OUTSIDE SCHOOL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM053 0.30198 0.22635

VIJAY PARK KIOSK:K 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM036 0.47198 0.40517

VIJAY PARK GALI NO‐14:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM037 0.47800 0.33485

2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM027 1.07181 0.80128

BABU RAM CHOWK MAUJ PUR:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM030 0.67186 0.43314

26 8.08191 5.95323 2.12868 26.34

GHONDA CHOWK:K 3 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM025 1.03208 0.69852

YVRSC08 MAUJPUR

CHET RAM MAUJ PUR:PL

Page 118: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250

JAI PRAKASH  NO‐2:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO012 990 19501752 0.46474 0.33283 0.46474 0.33283

1250

KARTAR NAGAR HOTEL WALA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO013 990 19501723 0.54235 0.33577 0.54235 0.33577

1250 630 19500552 0.17084 0.135341250 630 19504173 0.26902 0.25550

1250

VIJAY COLONY:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO017 990 19001864 0.45472 0.30618 0.45472 0.30618

1250

KHADDEY WALI MASJID:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO019 630 19001615 0.35606 0.26582 0.35606 0.26582

1250 990 19505305 0.26921 0.210111250 400 19505482 0.12669 0.10740

1250

BALLU KA TUBEWELL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO035 990 19504732 0.26598 0.24709 0.26598 0.24709

1250

PANJABI COLONY GAMRI 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO045 400 19504988 0.06876 0.05846 0.06876 0.05846

1250

GAUTAM PURI NO.1:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM005 990 19500703 0.55277 0.44448 0.55277 0.44448

1250 630 19500633 0.31658 0.214771250 400 19503148 0.05587 0.03373

1250

BHAGAT SINGH MOHALLA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM007 990 19504172 0.27674 0.24628 0.27674 0.24628

1250 990 19505389 0.84937 0.735681250 990 19502282 0.36402 0.34318

1250

3 RD JAGJEET NAGAR :PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO016 990 19502240 0.24418 0.22697 0.24418 0.22697

1250 990 19504129 0.53433 0.404851250 990 19504130 0.45863 0.25997

1250

R BLOCK BRAHAMPURI:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO021 990 19503180 0.27190 0.16924 0.27190 0.16924

1.21339 1.07886

MONI BABA MANDIR:K 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO020 0.99296 0.66482

GAUTAM PURI NO.2:K 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM006 0.37244 0.24850

MTNL 4 PUSTA:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO031 0.39589 0.31751

JAGJEET NAGAR KIOSK:K 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO015

3.5 PUSTA KARTAR NAGAR:K 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO014 0.43986 0.39084

16 4.95859 3.76118 1.19741 24.15YVRSC09 GAMRI

Page 119: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250

BRAMPURI NO‐6 NEAR MANDIR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO023 990 19502174 0.53248 0.33963 0.53248 0.33963

1250 990 19503177 0.32225 0.258181250 990 19503178 0.36338 0.27362

1250

X BL BRAHAMPURI KHATTEY WALA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO025 990 19503713 0.51963 0.33307 0.51963 0.33307

1250

X BL BRAHAMPURI BHISHAM WALA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO026 630 19504986 0.31535 0.27575 0.31535 0.27575

1250

BRAMPURI GALI NO‐1:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO027 990 19502175 0.22602 0.19779 0.22602 0.19779

1250

AMBEDKAR BASTI GHONDA:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO028 990 19502166 0.40246 0.30970 0.40246 0.30970

1250

MAIN BRAHMPURI RD GALI NO.7:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO038 990 19504532 0.36174 0.30097 0.36174 0.30097

1250

MAIN BRAHMPURI RD GALI NO.19:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO040 630 19504864 0.33216 0.27818 0.33216 0.27818

1250

MAIN BRAHMPURI RD GALI NO. 24 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO041 400 19003832 0.14570 0.12312 0.14570 0.12312

1250

MAIN BRAHMPURI RD GALI NO. 23:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO042 630 19500548 0.36586 0.25095 0.36586 0.25095

1250

C  BLOCK USHMANPUR   1 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO052 630 19505430 0.14019 0.11829 0.14019 0.11829

1250

RISHI KARDOM MARG:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM010 990 19503434 0.45430 0.28338 0.45430 0.28338

1250 400 19501477 0.13190 0.069611250 630 19503663 0.34715 0.203691250 990 19502308 0.52088 0.158441250 630 19504043 0.14701 0.11596

0.66790 0.27440

BRAHMPURI NO‐I:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM011 0.47905 0.27330

X BL BRAHAMPURI RAMNIWAS WALA:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2404‐GHO024 0.68563 0.53179

OUTSIDE KOTHI ZAFRABAD:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM013

22 7.95160 6.13840 1.81320 22.80YVRSC10 USMAN PUR

Page 120: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250 990 19503430 0.39604 0.241731250 630 19503729 0.22488 0.135971250 990 19500572 0.15920 0.090241250 990 19505407 0.18170 0.095481250 990 19503011 0.13067 0.091991250 990 19505093 0.22833 0.16073

1250

MERCURY CHOWK SEELAMPUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM032 990 19505201 0.36133 0.16512 0.36133 0.16512

1250 990 19502234 0.50647 0.395571250 990 19502301 0.37141 0.143221250 990 19505063 0.50647 0.068201250 990 19504045 0.10129 0.034101250 990 19505205 0.20259 0.04092

1250

OPP CHAUHAN BANGAR GALI NO 14:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM053 630 19505307 0.26503 0.11536 0.26503 0.11536

1250

CHAUHAN BANGAR GALI NO 5:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM057 990 19505374 0.44209 0.20339 0.44209 0.20339

1250

OPP CHUHAN BANGAR GALI NO.22:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM058 400 19502311 0.07639 0.06303 0.07639 0.06303

1250

INSIDE ZAFRABAD SCHOOL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM070 990 19504721 0.54732 0.27475 0.54732 0.27475

1250

ARORA BLDG GALI‐24 CHAUHAN 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM073 400 19502320 0.14314 0.07417 0.14314 0.07417

1250

BANARASHI CLINIC RISHI KARDAM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM074 630 19504177 0.29766 0.14820 0.29766 0.14820

1250

AGGRAWAL SWEET BHRAHPURI ROAD 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM075 400 19501442 0.12151 0.09453 0.12151 0.09453

1250

NALA NO 5 SEELAMPUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM076 630 19505111 0.06126 0.02823 0.06126 0.02823

1250 990 19504743 0.42714 0.322931250 400 19505485 0.02248 0.01700

CHAUHAN BANGAR GALI NO 10:PL 5 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM044 1.68822 0.68202

SANDHYA PUBLIC SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM031 0.44963 0.33993

E BLOCK SEELAMPUR:K 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM030 0.34090 0.18572

CHAUHAN BANGAR NO 2:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM031 0.35900 0.25272

INSIDE KOTHI ZAFRABAD:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM014 0.62092 0.37771

31 8.78366 4.89471 3.88895 44.27YVRSC11 ZAFRABAD

Page 121: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250

CRESENT PUBLIC SCHOOL MAUJ PUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM043 990 19503717 0.33597 0.30965 0.33597 0.30965

1250 990 19505148 0.41149 0.263501250 990 19505170 0.10287 0.07424

1250

VIJAY MOHALLA GALI NO 11:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM045 990 19503437 0.55770 0.41138 0.55770 0.41138

1250

MCD FLATS  NO 1 SHASTRI PARK:ID 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM002 400 19505284 0.08774 0.07228 0.08774 0.07228

1250

MCD FLATE NO.2 SHASTRI PARK:ID 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM003 400 19503422 0.06373 0.05920 0.06373 0.05920

1250

MCD FLATS  NO 3 SHASTRI PARK:ID 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM004 400 19503428 0.05573 0.04578 0.05573 0.04578

1250

ZERO PUSTA USMANPUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM033 400 19503721 0.04655 0.04265 0.04655 0.04265

1250 990 19504715 0.54271 0.430331250 400 19505237 0.01108 0.00813

1250

CPJ BLOCK SEELAMPUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM042 990 19503141 0.17974 0.15010 0.17974 0.15010

1250

PRIMARY SCHOOL GAUTAM PURI 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM047 990 19505461 0.17172 0.14600 0.17172 0.14600

1250

OPP OM SWEET BRAHAMPURI ROAD:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM055 630 19505120 0.18979 0.09510 0.18979 0.09510

1250

OPP  MAZAR  BRAHMPURI ROAD:PM 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM056 400 19004297 0.12743 0.11112 0.12743 0.11112

1250

DDA COMPLEX NO 6 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM065 400 19502258 0.00550 0.00523 0.00550 0.00523

1250 630 19503150 0.15575 0.120891250 630 19005103 0.21508 0.15157

0.37084 0.27246 24 2.30442 1.75579 0.54863 23.81

E‐BLOCK SHASTRI PARK 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM035 0.55379 0.43846

ZAMALO KA BAGH MAUJ PUR:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM044 0.51436 0.33774

YVRSC12 JANTA COLNY SEELAMPUR ENGG COLL GAUTAM PUR NO‐3:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM086

Page 122: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250

JANTA COLONY SEELAMPUR NO.9 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM094 400 19504854 0.03456 0.02575 0.03456 0.02575

1250 400 19503182 0.06185 0.039541250 400 19504995 0.02911 0.02037

1250

JANTA COLONY SEELAMPUR NO.2 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM096 400 19504123 0.01023 0.00584 0.01023 0.00584

1250

JANTA COLONY SEELAMPUR NO.3 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM097 400 19503184 0.04104 0.03373 0.04104 0.03373

1250

JANTA COLONY SEELAMPUR NO.4 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM098 400 19503160 0.04906 0.03066 0.04906 0.03066

1250

JANTA COLONY SEELAMPUR NO.1(THANA SIDE) 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM099 400 19505132 0.06435 0.04238 0.06435 0.04238

1250

JANTA COLONY SEELAMPUR NO.6 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM100 400 19503181 0.07990 0.04915 0.07990 0.04915

1250

JANTA COLONY SEELAMPUR NO.5 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM101 400 29006135 0.04614 0.03966 0.04614 0.03966

1250

JANTA COLONY SEELAMPUR NO.7 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM103 400 19503185 0.02952 0.02455 0.02952 0.02455

1250

FIRE BRIGADE SHASTRI PARK 1 1S‐DL‐YP‐ETC‐DYVR‐2402‐YAM00D 400 19502305 0.00612 0.00578 0.00612 0.00578

1250 990 19505169 0.19743 0.108861250 990 19505150 0.39977 0.10018

1250

OUTSIDE SCHOOL ZAFRABAD:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM016 990 19505290 0.53265 0.31453 0.53265 0.31453

1250 990 19503723 0.12364 0.058301250 990 19505092 0.43879 0.233201250 990 19500604 0.34436 0.323271250 990 19500699 0.35852 0.284971250 990 19505086 0.53312 0.207351250 990 19500676 0.21985 0.167331250 990 19500583 0.34256 0.271741250 630 19500595 0.15233 0.11646

Z‐2 BLOCK WELCOME:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM020 0.49489 0.38819

SBI WELCOME:ID 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM018 0.70288 0.60824

PHOTO CHOCK WELCOME:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM019 0.75296 0.37469

0.20905

0.29150

KHATTA ROAD NO 66 ZAFRABAD:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM015 0.59720

NALA NO 1 SEELAMPUR:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM017 0.56243

JANTA COLONY SEELAMPUR NO.8 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM095 0.09096 0.05991

Page 123: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250 990 19500609 0.22902 0.179461250 990 19504217 0.23354 0.233031250 630 19000407 0.16648 0.065161250 630 19503421 0.08925 0.040651250 990 19503704 0.29778 0.09131

1250

DOUBLE STOREY WELCOME:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM023 630 19501801 0.17103 0.11143 0.17103 0.11143

1250

DSIDC WELCOME:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM024 630 19502287 0.04208 0.04039 0.04208 0.04039

1250

DCP OFFICE WELLCOME:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM048 990 19502239 0.18502 0.15918 0.18502 0.15918

1250

JANTA COLONY NO‐1 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM059 630 19504855 0.23192 0.10848 0.23192 0.10848

1250

JANTA COLONY NO‐2 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM060 400 19503800 0.08536 0.05601 0.08536 0.05601

1250

JANTA COLONY NO‐3 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM061 400 19504520 0.14612 0.05233 0.14612 0.05233

1250

G.K.PATROL PUMP 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM072 100 19504295 0.00380 0.00354 0.00380 0.00354

1250

JANTA COLONY NO4:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM078 630 19505308 0.12578 0.06240 0.12578 0.06240

1250 400 19505406 0.12575 0.055481250 630 19505204 0.09881 0.05156

1250

JANTA COLONY NO‐6:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM080 630 19502862 0.18068 0.05402 0.18068 0.05402

1250 630 19502710 0.16768 0.050231250 630 19503242 0.08736 0.01583

1250

MCD OFFICE,KESHAV CHOWK 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM111 400 19505109 0.02647 0.02526 0.02647 0.02526

1250 990 19503152 0.17309 0.169591250 630 19503186 0.14664 0.098511250 630 19504705 0.08686 0.069991250 400 19504769 0.10230 0.044811250 990 19503638 0.18490 0.11989K BLOCK SEELAMPUR :PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM026 0 55251 0 34254

0.50888 0.38291

JANTA COLONY NO‐7:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM081 0.25504 0.06606

J BLOCK SEELAMPUR:K 4 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM025

BAGHWALI MASJID WELCOME:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM022 0.38702 0.13197

JANTA COLONY NO‐5:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM079 0.22456 0.10705

KABOOTER MARKET WELCOME:ID 3 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM021 0.62904 0.47765

30 6.33696 3.64196 2.69500 42.53YVRSC13 WELCOME

Page 124: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Yamuna Vihar Division 

1250 990 19504717 0.36761 0.222651250 990 19505107 0.34798 0.210921250 400 19505146 0.00263 0.00213

1250

DSIDC SEELAMPUR:PL 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM041 630 19502313 0.21594 0.17737 0.21594 0.17737

1250

POLICE STATION SEELAMPUR:ID 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM045 400 19504278 0.02045 0.01868 0.02045 0.01868

1250

TAJ COLONY 1 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM069 400 19505029 0.02672 0.02307 0.02672 0.02307

30.89

K BLOCK SEELAMPUR :PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM026 0.55251 0.34254

H BLOCK SEELAMPUR:PL 2 1S‐DL‐YP‐ETC‐DYVR‐2401‐SLM027 0.35061

11 1.67512 1.15761 0.51752

0.21305

YVRSC14 SEELAMPUR

Page 125: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

1251

D BL BRIJPURI GALI NO. 10:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL014 630 19500566 0.18110 0.16396 0.18110 0.16396

1251

A BLOCK BRIJ PURI:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL027 630 19500627 0.21234 0.19415 0.21234 0.19415

1251

B BLOCK BRIJ PURI:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL028 990 19505234 0.29503 0.25781 0.29503 0.25781

1251 630 19500982 0.14942 0.145301251 990 19504447 0.47242 0.413541251 990 19501736 0.62227 0.581021251 990 19503794 0.15557 0.140021251 990 19501818 0.53040 0.469081251 990 19503804 0.05893 0.05001

1251

A BLOCK GOKUL PURI:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL048 990 19000936 0.27064 0.23441 0.27064 0.23441

1251

B BLOCK GOKUL PURI:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL052 630 19503799 0.20128 0.17242 0.20128 0.17242

1251

FATMA NURSARY CHAND BAGH MRD WZB ROAD:PL

1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL061 990 19502590 0.31085 0.28310 0.31085 0.28310

1251 630 19500570 0.33382 0.261411251 990 19505139 0.14307 0.09607

1251

CHAND BAGH "F" BLK:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL071 630 19500630 0.33935 0.27199 0.33935 0.27199

1251

H BLOCK GANGA VIHAR GALI NO. 8:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL081 630 19502283 0.14945 0.11608 0.14945 0.11608

1251

HOTAL MAYUR BRIJPURI:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL082 400 19504507 0.11377 0.10610 0.11377 0.10610

1251

MAJOR MALHOTRA FARM HOUSE:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL103 100 19503260 0.02023 0.01899 0.02023 0.01899

GOKUL PURI COMPLAINT CENTER:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL047 0.58933 0.51909

B BLK GALI NO. 9, CHAND BAGH:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL070 0.47689 0.35747

1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL039 0.62185 0.55883

GANGA VIHAR NO‐2:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL040 0.77784 0.72104

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

KWLSC01 GANGA VIHAR 20 5.15836 4.45663 0.70173 13.60

GANGA VIHAR NO‐1:ID 2

Page 126: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

C BLOCK BRIJ PURI:ID  1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL246 990 19500628 0.34301 0.25398 0.34301 0.25398

1251

E BLOCK CHAND BAGH:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL292 630 19500569 0.25540 0.22721 0.25540 0.22721

1251 990 19502269 0.06948 0.055911251 630 19502329 0.27794 0.252301251 630 19502248 0.19459 0.154891251 990 19504694 0.39937 0.355911251 990 19502298 0.54323 0.466751251 990 19504481 0.13581 0.116691251 400 19500501 0.10420 0.078761251 990 19504600 0.31259 0.24302

1251

VILLAGE KHAJOORI NR.SCHOOL:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL072 630 19504805 0.23026 0.15485 0.23026 0.15485

1251

BIHARI PUR VILLNR. NLA KHJURI PUST RD:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL080 990 19500549 0.47488 0.31948 0.47488 0.31948

1251

C 1 KHAJOORI GALI NO. 24:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL115 400 19502314 0.19772 0.17088 0.19772 0.17088

1251

JELE SINGH KOTHI TUKMEERPUR VILLAGE:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL124 400 19504920 0.06495 0.06115 0.06495 0.06115

1251

A BLK KHAJOORI:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL251 630 19505294 0.16919 0.14132 0.16919 0.14132

1251

C 1 KHAJOORI NEAR GALI NO 21:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL294 990 19502304 0.25363 0.20833 0.25363 0.20833

1251

MAIN ROAD BANK OF BARODA:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL300 100 19504417 0.02320 0.02111 0.02320 0.02111

C BLOCK KHAJORI MAIN MARKET 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL060 0.67904 0.58344

SHERPUR CHOWK:PL 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL064 0.41679 0.32178

0.30821

15 3.45105 2.80134 0.64971 18.83

0.51080

KWLSC02 KHAJOORI

E BLOCK KHAJOORI GALI NO. 3:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL017 0.34742

F BLOCK KHAJOORI GALI NO. 11&13:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL018 0.59396

Page 127: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

B BLK PUSTA 1 SONIA VIHAR GALI NO 1 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL085 400 19500663 0.17344 0.15718 0.17344 0.15718

1251

WAZIRA BAD RAW WATER ST LT :PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL089 400 19504407 0.01472 0.01353 0.01472 0.01353

1251

D BLK 3RD PUSTA SONIA VIHAR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL0A1 100 19504896 0.00925 0.00844 0.00925 0.00844

1251

B BL SONIA VIHAR GALI 17:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL111 630 19500659 0.24874 0.21546 0.24874 0.21546

1251

SONIA VIHAR "B" BLK GALI NO‐27 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL113 400 19003839 0.16612 0.14695 0.16612 0.14695

1251

TRANSFORMER WORKSHOP KHAJOORI:PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL138 400 19503679 0.00807 0.00777 0.00807 0.00777

1251

E BLK RAMLILLA GROUND SHRI RAM CLY:PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL139 400 19504340 0.22039 0.18253 0.22039 0.18253

1251

SHRI RAM COLONY A BLK NALA:PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL142 630 19505474 0.21093 0.17467 0.21093 0.17467

1251

SHRI RAM COLONY B BLK RAMLILA GROUND 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL145 400 19504334 0.24455 0.21675 0.24455 0.21675

1251

C BLK SHRI RAM COLONY :PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL146 630 19504597 0.19982 0.16503 0.19982 0.16503

1251

SHRI RAM COLONY D BLK:PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL147 400 19504336 0.19693 0.16180 0.19693 0.16180

1251

SHRI RAM CLY E BLK GN 3 NR MASJID :PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL154 400 19504596 0.11506 0.10663 0.11506 0.10663

13.54KWLSC03 SHRI RAM COLONY 21 2.97499 2.57207 0.40292

Page 128: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

SONIA VIHAR B BL GALI NO‐10:PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL155 630 19500680 0.16163 0.13666 0.16163 0.13666

1251

B BLK SHRI RAM COLONY :PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL234 630 19504296 0.30132 0.24382 0.30132 0.24382

1251

A BLK SHRI RAM CLY NEAR GALI 26:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL235 400 19505324 0.19678 0.16417 0.19678 0.16417

1251

A BLOCK SHRI RAM CLY. NEAR SERVICE RD:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL249 400 19504699 0.17606 0.15914 0.17606 0.15914

1251

A BLOCK POCKET 6 SONIA VIHAR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL250 400 19504270 0.01678 0.01562 0.01678 0.01562

1251

CRPF CAMP SONIA VIHAR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL286 400 19504269 0.07661 0.07291 0.07661 0.07291

1251

B BLK SHRI RAM COLONY SAITAN CHOWK:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL297 630 19504333 0.22694 0.21319 0.22694 0.21319

1251

PWD TR. MAIN WAZIRABAD RD (STLT):PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL327 100 19501675 0.00660 0.00631 0.00660 0.00631

1251

KAUSHAL PURI, CHAUHAN PATTI Nr SCHOOL:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL338 100 19501595 0.00426 0.00353 0.00426 0.00353

1251

VILLAGE SABHAPUR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL063 630 19502302 0.42716 0.28276 0.42716 0.28276

1251

BALAJI TEMPLE SABHAPUR:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL088 100 19504363 0.00420 0.00386 0.00420 0.00386

Page 129: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

LAL FARM HOUSE SABHAPUR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL090 100 19501910 0.02412 0.02166 0.02412 0.02166

1251

CHAUHAN PATTI PUSTA VILL SONIA VIHAR:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL093 630 29006113 0.20500 0.14157 0.20500 0.14157

1251

CHAWLA FARM CHAUHAN PATI:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL094 400 19504335 0.07063 0.06127 0.07063 0.06127

1251

ANNPURNA MANDIR 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL151 400 19502316 0.15066 0.12351 0.15066 0.12351

1251

MILAN GARDEN:PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL236 630 19504268 0.19910 0.16692 0.19910 0.16692

1251

AMBEY COLONY SONIA VIHAR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL248 400 19504300 0.04817 0.04538 0.04817 0.04538

1251

GAS GODAM E‐2 SONIA VIHAR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL255 400 19504328 0.02186 0.02011 0.02186 0.02011

1251

BADARPUR KHADAR VILLAGE:O/D 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL301 400 19504583 0.02105 0.01866 0.02105 0.01866

1251

KWLSC05 SONIA VIHAR Delhi Police Training Center:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL298 400 19504298 0.12727 0.11916 0.12727 0.11916 1 0.12727 0.11916 0.00811 6.37

1251

MUKUND VIHAR "A" BLK:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL010 630 19500537 0.15010 0.13600 0.15010 0.13600

1251

B BLK MUKUND VIHAR :‐ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL012 990 19500661 0.16894 0.15737 0.16894 0.15737

1251

C BLK MUKUND VIHAR  GALI NO. 9:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL013 990 19504617 0.32378 0.30283 0.32378 0.30283

1251 990 19500582 0.34175 0.265691251 630 19501907 0.22783 0.19239

KARWAL NAGAR NO.‐1 DAL MILL:PL 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL056 0.56958 0.45808

KWLSC04 SONIA VIHAR 1 10 1.17195 0.88569 0.28626 24.43

Page 130: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

KARWAL NAGAR NO.‐3:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL057 630 19500180 0.19014 0.15287 0.19014 0.15287

1251 630 19503507 0.16055 0.132181251 990 19504901 0.33080 0.280881251 990 19500596 0.62227 0.506161251 990 19502963 0.10028 0.083921251 630 19505348 0.01370 0.01170

1251

SAHID BHAGAT SINGH CLY GALI NO 16:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL100 630 19500538 0.20826 0.17587 0.20826 0.17587

1251

SAHID BHAGAT SINGH  P/M 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL123 400 19504297 0.06541 0.05477 0.06541 0.05477

1251

SAHID BHAGAT SINGH  GALI NO 12:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL238 630 19500544 0.14220 0.12252 0.14220 0.12252

1251

WEST KAMAL VIHAR (HVDS) INDUT. AREA:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL264 400 19504291 0.05724 0.05412 0.05724 0.05412

1251

WEST KAMAL VIHR B BLK Gli No1IND AREA:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL284 400 19504264 0.01088 0.00996 0.01088 0.00996

1251

Village New Sabha Pur(Boys Sr.School):PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL285 100 19505115 0.00719 0.00659 0.00719 0.00659

1251

D Blk Mukund Vihar:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL293 630 19500655 0.18532 0.15271 0.18532 0.15271

1251

SAHID BHAGAT SINGH CLY GALI NO 6:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL296 990 19500671 0.28822 0.26815 0.28822 0.26815

1251

G& H BLK WEST KARAWAL NAGAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL299 630 19500673 0.11570 0.10970 0.11570 0.10970

0.73625 0.60179

14.40

KARWAL NAGAR NO.‐4:PL 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL058 0.49135

KWLSC06 MUKUND VIHAR 20 3.71057 3.17639 0.53418

0.41307

KARWAL NAGAR NO.‐5 SBI KWR:PL 3 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL059

Page 131: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

E & F BLOCK KARWAL NAGAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL015 630 19500644 0.08172 0.06853 0.08172 0.06853

1251 630 19500541 0.07117 0.067061251 630 19502243 0.07117 0.052511251 630 19504275 0.21352 0.17489

1251

A BL MAIN ROAD DAYALPUR:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL076 990 19500631 0.27078 0.23178 0.27078 0.23178

1251

B BLK SADAT PUR GALI NO. 8:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL079 400 19504409 0.09625 0.09121 0.09625 0.09121

1251

L BLK SADAT PUR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL083 630 19500560 0.21710 0.20851 0.21710 0.20851

1251 100 19505123 0.01672 0.013451251 100 19505125 0.00716 0.00639

1251

KAMAL VIHAR S/STN 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL114 400 19500667 0.09536 0.07758 0.09536 0.07758

1251

F BLK DAYAL PUR : ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL119 630 19503341 0.22104 0.18791 0.22104 0.18791

1251 630 19500551 0.17181 0.132661251 630 19500648 0.26415 0.19899

1251

NIKKA PLASTIC TUKMEERPUR VILLAGE:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL127 400 19505020 0.05807 0.04699 0.05807 0.04699

1251

MAMTA COOKER FACTORY TUKMEERPUR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL240 100 19504915 0.00877 0.00818 0.00877 0.00818

1251

K BLK SADAT PUR EXT. GALI NO. 51:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL295 630 19500647 0.37658 0.28368 0.37658 0.28368

1251 630 19501720 0.18619 0.168531251 630 19505231 0.07980 0.044931251 630 19500685 0.12024 0.108801251 990 19504420 0.33928 0.24094

MAHALAXMI ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL033 0.45953 0.34974

0.21346

2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL121 0.43597 0.33166

PREM NAGAR S/STN :ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL031 0.26599

1.85033 0.39105 17.45

DAYAL PUR 1 TANKI MAIN ROAD DAYAL PUR:PL 3 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL069 0.35586 0.29446

C BLOCK DAYALPUR GALI NO‐14,15 &18:ID 2

KWLSC08 KARWAL NAGAR 16 2.24139

1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL095 0.02388 0.01984

JEEVAN JYOTI SCHOOL SADAT PUR : ID

Page 132: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

BABU NGR S/STN NO 1 GALI NO. 4:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL042 630 19501717 0.27032 0.22580 0.27032 0.22580

1251

TELEPHONE EXCHANGE KWR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL043 100 19505053 0.01518 0.01453 0.01518 0.01453

1251 990 19500592 0.41099 0.375831251 990 19500664 0.01271 0.01059

1251

SADATPUR VILLAGE PANCHYAT GHAR:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL067 990 19504926 0.26968 0.23449 0.26968 0.23449

1251

SHAKTI VIHAR GALI NO. 8:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL118 630 19500581 0.24048 0.22091 0.24048 0.22091

1251

BABU NAGAR 1 GALI NO. 5:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL287 630 19503656 0.18104 0.12737 0.18104 0.12737

1251

ROSHAN VIHAR GALI NO. 5:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL329 400 19500641 0.01188 0.01145 0.01188 0.01145

1251

RAMA GARDEN:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL330 400 19500665 0.19548 0.13970 0.19548 0.13970

1251

RAJEEV GANDHI NAGAR GALI NO.‐3:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL001 630 19500670 0.30726 0.26317 0.30726 0.26317

1251

RAJEEV GANDHI NAGAR GALI NO.‐8:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL002 990 19502976 0.09361 0.08421 0.09361 0.08421

1251 990 19505388 0.19156 0.154911251 400 19504934 0.44698 0.393501251 630 19504951 0.26472 0.246411251 990 19504064 0.17648 0.13833

1251

CHANDU NAGAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL016 990 19500597 0.33523 0.29758 0.33523 0.29758

1251

A BLOCK NEHRU VIHAR GALI NO. 2:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL021 630 19500600 0.08374 0.07677 0.08374 0.07677

RAJEEV GANDHI NAGAR GALI NO.‐15:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL003 0.63854 0.54841

RAJEEV GANDHI NAGAR GALI NO.‐21:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL004 0.44120 0.38474

C C KARAWAL NAGAR S/STN. NO. 2:I/D 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL046 0.42370 0.38642

13 2.33327 1.92389 0.40938 17.55KWLSC09 ROSHAN VHR+CHAUHANPUR+SURYA VIHAR

Page 133: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

B‐II BLOCK NEHRU VIHAR GALI NO. 6:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL022 630 19500598 0.24428 0.21569 0.24428 0.21569

1251

E‐2, NEHRU VIHAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL025 990 19503158 0.53440 0.47804 0.53440 0.47804

1251

E‐1, NEHRU VIHAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL026 990 19505257 0.16616 0.15225 0.16616 0.15225

1251

MOONGA NAGAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL037 990 19500666 0.23677 0.18816 0.23677 0.18816

1251 990 19502319 0.24628 0.214641251 400 19504405 0.17834 0.143091251 630 19500617 0.22807 0.165581251 990 19504751 0.09775 0.062371251 630 19500563 0.28582 0.244701251 400 19505301 0.00879 0.00717

1251

B‐I, NEHRU VIHAR:ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL096 990 19500614 0.33034 0.31205 0.33034 0.31205

1251 400 19502198 0.17998 0.144251251 630 19503017 0.20937 0.176311251 630 19504531 0.17966 0.137311251 630 19504910 0.12797 0.09154

1251

E BLK DAYAL PUR 33 FEETA ROAD 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL116 630 19001942 0.22000 0.17734 0.22000 0.17734

1251 630 19504362 0.41570 0.332991251 630 19505019 0.10392 0.07817

1251

D‐3 NEHRU VIHAR : ID 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL158 990 19500584 0.30623 0.28101 0.30623 0.28101

1251 990 19504970 0.44974 0.362791251 400 19505368 0.03217 0.027551251 990 19504419 0.38813 0.352581251 630 19505215 0.19995 0.17074

1251

E BLOCK DAYAL PUR 33 FEETA ROAD:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL244 630 19504401 0.17314 0.14755 0.17314 0.14755

C‐1 NEHRU VIHAR : ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL160 0.48191 0.39034

G & H BLK MUSTAFABAD GALI NO. 18:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL243 0.58808 0.52333

AKBARI MASZID:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL102 0.30762 0.22885

D BLOCK GALI NO 2 DAYAL PUR 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL157 0.51962 0.41116

SAMPAT NAGAR 1:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL077 0.29461 0.25187

MANSINGH NAGAR GALI NO. 16:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL101 0.38935 0.32056

0.42462 0.35774

OLD MUSTFABAD GALI NO 6:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL045 0.32582 0.22794

15.10KWLSC11 DAYALPUR 32 7.44253 6.31876 1.12377

GALI NO.3 OLD MUSTAFABAD:ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL044

Page 134: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

D BLOCK BHAGRATHI VIHAR:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL005 630 19500546 0.29518 0.24374 0.29518 0.24374

1251

JOH. EXT & MATA WALI GALI NALAWALA:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL008 630 19505229 0.07497 0.06435 0.07497 0.06435

1251 630 19504408 0.11065 0.096931251 630 19504482 0.25819 0.24041

1251

JOHRIPUR SCHOOL WALA S/STN.:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL050 400 19502256 0.07475 0.06136 0.07475 0.06136

1251

JOHRIPUR DURGA FACTORY:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL051 630 19502299 0.13262 0.12774 0.13262 0.12774

1251

JOHARI PUR MAIN ROAD MCD SCHOOL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL0A3 400 19505304 0.08720 0.08058 0.08720 0.08058

1251

E BL BHAGIRATHI VIHAR(NALE WALA):PLM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL109 630 19504691 0.04532 0.03950 0.04532 0.03950

1251

CHAMAN PARK:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL245 100 19504894 0.00414 0.00384 0.00414 0.00384

1251

E BLK BHAGIRATHI VIHAR :PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL252 630 19500684 0.14998 0.14414 0.14998 0.14414

1251 990 19505025 0.17989 0.169411251 990 19504953 0.22331 0.20706

1251

JOHRIPUR GUJARMAL MOHALLA:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL107 990 19504161 0.33965 0.31833 0.33965 0.31833

1251

JAIN COMPLEX JOHIRIPUR:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL162 100 19504917 0.02115 0.01798 0.02115 0.01798

1251

SHANI BAZAR ROAD JOHRI PUR :PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL237 630 19505268 0.17402 0.14791 0.17402 0.14791

0.37647JAWHAR NAGAR NO.‐1:PL 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL053 0.40320

10.58

A BLK G N 2 BHAGIRATHI VIHAR NO‐II :ID 2 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL019 0.36884 0.33734

KWLSC12 GOKULPURI 10 1.23300 1.10258 0.13042

Page 135: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Karawal Nagar Division 

1251

JOHRI PUR TUNDA NAGAR:PL 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL241 400 19504974 0.02901 0.02691 0.02901 0.02691

1251

RAJU FLOUR MILL:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL253 630 19500243 0.16558 0.11667 0.16558 0.11667

1251

CHAMPI CHOWK:PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL254 400 19504648 0.00284 0.00263 0.00284 0.00263

1251

Opposite Durga Factory (BARELIA) :PM 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL257 400 19504918 0.05591 0.04624 0.05591 0.04624

1251

GALI NO.5 JAWAHAR NAGAR P/M 1 1S‐DL‐YP‐ETC‐DKWL‐2451‐KWL331 630 19504775 0.16196 0.14001 0.16196 0.14001

10 1.35332 1.19316 0.16015 11.83KWLSC13 JOHRIPUR

Page 136: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

FIRE SATION GOKULPUR 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO100C 100 19504695 0.00596 0.00565 0.00596 0.00565

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

12601260 990 19503249 0.22948 0.208811260 990 19502671 0.34421 0.278801260 990 19502720 0.34339 0.254471260 990 19503371 0.36576 0.292751260 990 19502707 0.28297 0.225611260 990 19502709 0.42445 0.366221260 630 19502865 0 16250 0 13057

C BLOCK KABIR NAGAR 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1012 0.70742 0.59183

1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1010 0.57369 0.48761

B‐BLOCK KABIR NAGAR:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1011 0.70915 0.54722

A BLOCK KABIR NAGAR:ID 2

1260 630 19502865 0.16250 0.130571260 630 19503388 0.16250 0.14035

1260

WEST JYOTI NAGAR NO.1(THAKUR WALA):K 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1014 630 19505191 0.11224 0.09479 0.11224 0.09479

1260 990 29006139 0.23136 0.21538W JYOTI NGR NO 2 BH G NURSING HOME:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1015 0 44061 0 41419

KARDAM MARG WEST JYOTI NAGAR:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1013 0.32500 0.27092

1260 990 19000462 0.20924 0.198811260 990 19502700 0.39363 0.318441260 400 19502702 0.05882 0.049341260 400 19502719 0.10005 0.060461260 400 19502724 0.20613 0.16563

KARDAMPUR SEWAGE PUMPING STN:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1037 400 19504771 0.00931 0.00798 0.00931 0.00798

HARIJAN BASTI WEST JYOTI NARAR:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1036 0.30618 0.22609

W JYOTI NGR NO.2 BH G. NURSING HOME:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1015 0.44061 0.41419

NORTH CHAJJUPUR:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1016 0.45244 0.36779

1260

1260

CNG STATION LONI ROAD:PM 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1038 100 19503385 0.01416 0.01363 0.01416 0.01363

RAGHUBIR SINGH GARDEN:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1039 990 19505095 0.26423 0.21024 0.26423 0.21024

12601260 990 19502713 0.33679 0.209801260 990 19502718 0.22452 0.17132

1260

NEW KARDAMPURI NO 1 GALI NO ‐4:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1051 630 19503390 0.20900 0.19019 0.20900 0.19019

KARDAMPURI EXT.:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1042 0.56131 0.38112

1260 630 19504441 0.09701 0.083881260 990 19504913 0.34396 0.224701260 400 19502662 0.11173 0.105321260 630 19502682 0.20751 0.158461260 630 19504221 0.26651 0.230071260 990 19504551 0.25231 0.21237

JYOTI COLONY NO.3:K 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2006 630 19504914 0.13751 0.12785 0.13751 0.12785

JYOTI COLONY/ BALBIR NGR NO.2:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2005 0.51882 0.44244

NEW KARDAMPURI NO 2  GALI NO‐8:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1052 0.44097 0.30858

JYOTI COLONY NO.1:K 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2004 0.31924 0.26379NNGSC01 KABIR NAGAR 46 9.63468 7.68365 1.95103 20.25

1260

Page 137: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

AMBEDKAR PARK:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2007 990 19502721 0.41811 0.36036 0.41811 0.36036

1260

1260

CHANAKYA MARG CHAJJUPUR:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2008 630 19504959 0.12662 0.09772 0.12662 0.09772

1260 990 19502649 0.25941 0.183261260 400 19503196 0.12353 0.12218

SHIV MANDIR 100 FT. RD:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2009 0.38294 0.30544

1260

KABRISTAN BABAR PUR MAIN ROAD:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2010 990 19502725 0.18717 0.14388 0.18717 0.14388

1260 990 19502670 0.15602 0.142681260 630 19505270 0.06686 0.051581260 630 19502729 0.24439 0.124591260 990 19504911 0.24919 0.187191260 630 19502715 0.19254 0.15670MAHA DEVI SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2013 0 39657 0 32647

CHAJJUPUR MAIN:K 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2011 0.22288 0.19426

BABAR PUR VILLAGE:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2012 0.49358 0.31177

1260 630 19502722 0.20403 0.16976

1260

SUDAMAPURI NO.1:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2014 990 19502717 0.23632 0.16324 0.23632 0.16324

1260

SUDAMA PURI NO.2:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2015 630 19502714 0.11290 0.09094 0.11290 0.09094

 MAHA DEVI SCHOOL:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2013 0.39657 0.32647

1260

1260

SUDAMA PURI NO.3:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2016 990 19502730 0.26748 0.24584 0.26748 0.24584

1260

SUDAMAPURI NO. 4:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2018 400 19502723 0.12376 0.10452 0.12376 0.10452

12601260 990 19503382 0.26044 0.226571260 630 19505296 0.29868 0.160751260 630 19502692 0.20334 0.170921260 630 19504693 0.15650 0.104231260 630 19502178 0.11661 0.103661260 990 19502206 0.33229 0.285061260 990 19504503 0.13409 0.129571260 630 19502204 0.09324 0.08549EAST OF LONI ROAD MIG S/STN‐1:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1018 0 18648 0 17224

0.27515

0.51829

D‐1 NAND NAGARI:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR017 0.35984

E JYOTI NAGAR BEHAIND JOYATI NURSING:ID 3 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1017 0.58299

D BLOCK KABIR NAGAR(SHAMSHAN GHAT) 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2021 0.55911 0.38732

1260 630 19502207 0.09324 0.086751260 630 19502212 0.07470 0.064371260 630 19502213 0.12720 0.113431260 630 19505380 0.07720 0.060381260 400 19505480 0.07720 0.064841260 400 19502172 0.03720 0.034031260 400 19502173 0.03434 0.032931260 400 19502897 0.08837 0.082921260 400 19504916 0 05891 0 05505

EAST OF LONI ROAD,MIG,S/STN‐5:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1022 0.14728 0.13798

EAST OF LONI ROAD,MIG,S/STN‐3:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1020 0.15439 0.12522

EAST OF LONI ROAD,MIG,S/STN‐4:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1021 0.07155 0.06695

EAST OF LONI ROAD,MIG,S/STN 1:ID 2 1S DL YP ETC DNNG 2902 LO1018 0.18648 0.17224

EAST OF LONI ROAD,MIG,S/STN‐2:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1019 0.20190 0.17780

1260 400 19504916 0.05891 0.055051260 400 19501770 0.00622 0.00592EAST OF LONI ROAD MIG S/STN‐6:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1023 0 06910 0 06602

Page 138: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

1260 400 19502156 0.06289 0.060101260 400 19502176 0.15832 0.142611260 400 19502202 0 03958 0 03661

EAST OF LONI ROAD,MIG,S/STN‐7:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1024 0.19790 0.17922

EAST OF LONI ROAD,MIG,S/STN‐6:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1023 0.06910 0.06602

1260 400 19502202 0.03958 0.03661

1260

BAGICHI NARULA LONI RD:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1025 400 19502902 0.12058 0.09003 0.12058 0.09003

1260

MTNL S/S,EAST OF LONI ROAD:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1026 400 19502165 0.02011 0.01906 0.02011 0.01906

, , /

12601260 990 19502133 0.16237 0.148931260 630 19004810 0.10824 0.094111260 990 19503018 0.27775 0.217841260 630 19503472 0.07407 0.055451260 990 19504095 0.26540 0.199301260 990 19501044 0.39965 0.347301260 630 19502179 0.18166 0.145471260 990 19502205 0.14533 0.13248

D‐BLOCK ASHOK NAGAR GALI NO‐3:ID 3 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1028 0.61721 0.47260

B‐BLOCK ASHOK NAGAR SCHOOL WALA:K 3 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1029 0.72663 0.62525

D‐BLOCK ASHOK NAGAR GALI NO‐13:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1027 0.27061 0.24304

1260

HARDEV PURI NO.1:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1031 630 19502158 0.20740 0.17437 0.20740 0.17437

1260

HARDEVPURI NO.2 ( JOSHI WALA):PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1032 990 19504766 0.21899 0.19923 0.21899 0.19923 43 6.77768 5.81179 0.96589 14.25NNGSC02 ASHOK NAGAR NAND NAGRI

1260

E‐1 BLK ASHOK NAGAR.KANCH WALA NR S BHAWAN:K

1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1033 630 19504098 0.22464 0.20214 0.22464 0.20214

1260 630 19505269 0.19658 0.170561260 630 19503619 0.14235 0.12901

ASHOK NAGAR NO EXTN NO 1 KACHCHI CLY:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1034 0.33893 0.299571260 630 19503619 0.14235 0.12901

1260

DURGAPURI EXT. OPP KALA NIKETAN SCHOOL:K 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1040 990 19502154 0.27838 0.25739 0.27838 0.25739

LALITA MANDIR ASHOK NAGAR D BLK:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1043 630 19502640 0.26082 0.21312 0.26082 0.21312

1260

1260

D‐1 ASHOK NAGAR WAZIRA BAD ROAD:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1047 630 19502908 0.22782 0.18962 0.22782 0.18962

Page 139: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

D 1/1 BLK ASHOK NAGAR  DP :PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1053 630 19005064 0.14324 0.13374 0.14324 0.13374

1260

/

1260 400 19502695 0.10071 0.069191260 630 19505223 0.46997 0.389411260 990 19504096 0.10071 0.08146

1260

JAG JIVAN NAGAR:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2003 990 19502728 0.23478 0.20396 0.23478 0.20396

DURGA PURI MAIN GALI ‐ 10:ID 3 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2002 0.67139 0.54006

1260

1260

CHANDER LOK:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2019 990 19003836 0.24470 0.22972 0.24470 0.22972

E‐1 NAND NAGARI PK WALA GAGAN CINEMA:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR016 630 19503197 0.18676 0.15391 0.18676 0.15391

12601260 630 19003823 0.25550 0.179191260 630 19003824 0.19162 0.146471260 630 19503450 0.19162 0.139661260 990 19502664 0.29249 0.230721260 990 19505342 0.30702 0.249431260 630 19504975 0.17754 0.143421260 990 19502143 0 29602 0 25422

E‐4 NAND NAGARI:ID 3 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR018 0.63874 0.46532

A‐4 NAND NAGARI:ID 3 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR021 0.77705 0.62358

1260 990 19502143 0.29602 0.254221260 630 19505435 0.23370 0.216791260 630 19503369 0.24928 0.190671260 630 19502635 0.18197 0.161891260 990 19502651 0.33644 0.275601260 990 19503605 0.39508 0.277151260 630 19505379 0.03590 0.027711260 630 19502137 0.14730 0.090291260 630 19503601 0.09028 0.05310

SCHOOL BLOCK NATHU COL.:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR024 0.23758 0.14339

0.77900 0.66168

C BLOCK COMPLAINT CENTRE NNG:ID 4 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR023 0.94938 0.74235

21 53NNGSC03 NAND NAGRI 24 4 55640 3 57535 0 98106

B‐4 NAND NAGARI  AKHADA WALA :ID 3 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR022

1260 630 19503601 0.09028 0.05310

1260

KACHHI PURA VILLAGE:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR025 630 19504237 0.06910 0.06412 0.06910 0.06412

1260

DSIDC NAND NAGRI:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR026 630 19503009 0.09828 0.08447 0.09828 0.08447

21.53NNGSC03 NAND NAGRI 24 4.55640 3.57535 0.98106

1260

A‐1NAND NAGRI:PM 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR040 630 19503387 0.13028 0.09494 0.13028 0.09494

1260

SAFAI KARAMCHARI NAND NAGARI‐E BLK:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR044 400 19503383 0.08592 0.07814 0.08592 0.07814

12601260 400 19502691 0.02699 0.02084D1 SAFAI KARMCHARI NNG‐1:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR052 0 03293 0 02567

Page 140: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

1260 400 19504785 0.00594 0.004831260 990 19504782 0.33917 0.249531260 990 19504786 0 23222 0 18824

NATHU COLONY:K 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1035 0.57139 0.43778

D1 SAFAI KARMCHARI NNG‐1:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR052 0.03293 0.02567

1260 990 19504786 0.23222 0.188241260 630 19502666 0.09994 0.094901260 630 19502677 0.10616 0.102811260 630 19502675 0.09376 0.089201260 630 19502681 0.10522 0.091141260 630 19505251 0.07509 0.069291260 630 19505183 0.11994 0.111221260 630 19003804 0.11451 0.109251260 630 19003807 0 09491 0 08938

LIG,S/STN NO‐5 POCKET‐E GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR004 0.20942 0.19863

960 MIG S/S NO.3 PKT F GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR002 0.19898 0.18034

LIG,S/STN‐4 POCKET E GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR003 0.19503

0.20610 0.19771

0.18050

960 MIG ,S/STN‐2 POCKET F GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR001

1260 630 19003807 0.09491 0.089381260 630 19503482 0.03669 0.034091260 630 19504985 0.13007 0.121841260 990 19003810 0.25756 0.228561260 630 19003809 0.20236 0.187251260 630 19003806 0.11563 0.109561260 630 19502799 0.22447 0.206381260 990 19505360 0.21881 0.176551260 990 19505177 0.21881 0.18376

JANTA FLAT S/S NO.3 GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR008 0.43763 0.36031

JANTA FLAT S/S NO.1 GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR006 0.45992 0.41581

JANTA FLAT S/S NO.2 GTB ENCLAVE:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR007 0.34010 0.31594

240 MIG PKT A S/STN:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR005 0.16676 0.15593

1260

GTB HOSPITAL:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR009 630 19502673 0.12400 0.10469 0.12400 0.10469

1260

JAGAT PURI EXT.NO.1:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR019 990 19502690 0.18076 0.14622 0.18076 0.14622

11.3224 3.22566 2.86048 0.36518NNGSC04 JANTA FLAT NAND NAGRI

1260

JAGAT PURI EXT.NO.2:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR020 630 19502686 0.22458 0.17565 0.22458 0.17565

1260

POCKET‐C  GTB ENCLAVE:PM 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR041 400 19503193 0.06912 0.06405 0.06912 0.06405

1260 630 19502663 0.03799 0.03564MIG S/STN NO 1 GTB ENCLAVE F POCKET ID 2 1S DL YP ETC DNNG 2901 NGR042 0 12664 0 118621260 630 19502663 0.03799 0.035641260 630 19502669 0.08865 0.082981260 630 19503370 0.13587 0.108951260 630 19503373 0.15075 0.137121260 400 19503192 0.07529 0.038081260 990 19504116 0.37643 0.219661260 630 19505262 0.05019 0.035151260 990 19502694 0.14731 0.109671260 400 19502703 0.04018 0.03168H‐BLOCK SUNDER NAGRI:PL 3 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR011 0.33479 0.24372

0.50190 0.29289

JAGAT PURI MAIN:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2903‐LO2001 0.28661 0.24607

WEAVER,S COMPLEX SDM OFFICE NNG:ID 3 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR010

MIG S/STN NO‐1 GTB ENCLAVE F POCKET:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR042 0.12664 0.11862

1260 990 19502704 0.14731 0.102361260 990 19503246 0.14315 0.101521260 630 19503508 0.14315 0.101891260 990 19502685 0.30588 0.148561260 990 19502697 0.31994 0.230001260 990 19502674 0.31468 0.239281260 990 19502680 0.37329 0.286501260 630 19502650 0.10622 0.085131260 630 19502656 0 20125 0 16657MN BLOCK SUNDER NAGARI:K 3 1S DL YP ETC DNNG 2901 NGR015 0 44680 0 37015

F‐1 SUNDER NAGARI:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR013 0.62582 0.37856

I.J K BLOCK SUNDER NAGARI:K 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR014 0.68797 0.52579

O‐BLOCK SUNDER NAGARI:PL  2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR012 0.28630 0.20340

1260 630 19502656 0.20125 0.166571260 630 19502676 0.13932 0.11845

MN BLOCK SUNDER NAGARI:K 3 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR015 0.44680 0.37015

Page 141: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

ST LTG GAGAN CINEMAWAZIRABAD RD PM 1 1S DL YP ETC DNNG 2901 NGR039 400 19505418 0 02657 0 02423 0 02657 0 02423 29 6819 3 02876 2 12991 0 89885NNGSC05 SUNDER NAGRI

1260

ST LTG GAGAN CINEMA WAZIRABAD RD:PM 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR039 400 19505418 0.02657 0.02423 0.02657 0.02423

1260

SAFAI KARA. SUNDER NAGRI‐L BLOCK: ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR043 400 19505409 0.03748 0.03003 0.03748 0.03003

29.6819 3.02876 2.12991 0.89885NNGSC05 SUNDER NAGRI

1260

JAIL ROAD PWD(WAZIRABAD ROAD):PM 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR050 400 19504430 0.02042 0.01754 0.02042 0.01754

K BLOCK SAFAI KARAMCHARI SUNDERI NAGARI 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR051 630 19504767 0.06071 0.04361 0.06071 0.04361

1260

1260

MANDOLI  S/S‐2 (RATAN WALA) :PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR028 990 19505303 0.28806 0.17657 0.28806 0.17657

1260

MANDOLI  S/S‐4 (PANI KI TANKI) :PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR030 990 19502708 0.44068 0.25779 0.44068 0.25779

12601260 990 19502138 0.23630 0.176911260 400 19502142 0.17991 0.14671

1260

MANDOLI EXT.NO1 GALI NO 12:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR036 990 19503973 0.40701 0.28654 0.40701 0.28654

6 1.78472 1.23742 0.54731 30.67MANDOLI EXTN.NO.1,GALI NO.‐9:ID 2 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR035 0.41621 0.32361NNGSC06 RAJIV NAGAR

1260

BANK OF BARODA 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR054 990 19502442 0.23277 0.19291 0.23277 0.19291

1260

HARIJAN BASTI BURFKHANA:K 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1004 630 19503452 0.27162 0.19171 0.27162 0.19171

1260 990 19505259 0.14737 0.136371260 990 19504093 0.34387 0.30851

13.12GOKUL PUR VILLAGE NO.2(NEHAR WALA):K 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1008 0.49124 0.44488

NNGSC07 EAST GOKULPUR 5 1.16460 1.01181 0.15279

1260 630 19500607 0.08437 0.078801260 990 19503604 0.31737 0.29642

1260

A‐BLOCK MEET NAGAR:ID 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1001 990 19502169 0.36041 0.28886 0.36041 0.28886

GOKUL PUR VILL NO.KAPOOR WALA PETROL:PL 2 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1009 0.40174 0.37522

Page 142: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

HARIJAN BASTI AMAR CLY BHUSA WALA PL 1 1S DL YP ETC DNNG 2902 LO1003 630 19502170 0 05483 0 05217 0 05483 0 05217

1260

HARIJAN BASTI AMAR CLY  BHUSA WALA:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1003 630 19502170 0.05483 0.05217 0.05483 0.05217

1260

HARIJAN BASTI G PUR(BHAWANI  WALA):PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1005 630 19504495 0.02466 0.02232 0.02466 0.02232

1260

D.P. NEAR KUNDAN LAL PETROL PUMP 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO100B 400 19505021 0.05388 0.05154 0.05388 0.05154

HARIJAN BASTI, AKHADA EAST GOKAL PUR:PL 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1045 990 19502901 0.41869 0.26508 0.41869 0.2650829.90NNGSC08 MEET NAGAR 9 1.44911 1.01586 0.43325

1260

1260

HARNAM PALACE MEET NAGAR 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1054 400 19503627 0.06210 0.05928 0.06210 0.05928

LONI BORDER S/S NO‐1 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1055 630 19505051 0.19733 0.11892 0.19733 0.11892

1260

1260

LONI BORDER S/S NO‐2 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1056 630 19503678 0.23540 0.12367 0.23540 0.12367

PRIMARY SCHOOL EAST GOKUL PUR 1 1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1058 990 19502161 0.04181 0.03401 0.04181 0.03401

1260

PRIMARY SCHOOL EAST GOKUL PUR 1 1S DL YP ETC DNNG 2902 LO1058 990 19502161 0.04181 0.03401 0.04181 0.03401

1260

NNGSC09 MANDOLI EXTENSION SABOLI VILL S/S NO.2( NATHU PRADHAN):PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR032 630 19502968 0.16013 0.11602 0.16013 0.11602 1 0.16013 0.11602 0.04410 27.54

1260

MANDOLI  S/S‐1 (KIOSK) :K 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR027 630 19503602 0.07306 0.06657 0.07306 0.06657

1260

MANDOLI S/S‐3 (SHANTI LAL) :PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR029 990 19502701 0.07469 0.06772 0.07469 0.06772

NNGSC10 MANDOLI 5 0 99668 0 75851 0 23817 23 90

Page 143: BYPL DT LOSS AUG 2015 - :: BSES Delhi€¦ · dtc: package s/stn 1 1s ... kinari bazar:pm 2 1s‐dl‐yp‐ctc‐dcck‐0103‐thl019 0.18700 0.17910 11.92 katra kushal rai:id 3 1s

SDO CodeSub‐

Cluster Code

Sub‐Cluster Name Substation NameNo Of DTs 

in Substation

DT Functional CodeDT 

CapacityDT Meter 

No

Monthly DT Input(MU)

Monthly DT Sale(MU)

Monthly FL Input (MU)

Monthly FL Sale (MU)

No Of DTs In Sub‐Cluster

Monthly Sub‐

Cluster  Input(MU)

Monthly Sub‐

Cluster  Sale(MU)

Difference(MU)

Sub‐Cluster Loss (%)

DT & Substation wise Losses of August 2015 for Nand Nagri Division 

NNGSC10 MANDOLI 5 0.99668 0.75851 0.23817 23.90

1260

SABOLI VILL S/S NO.1(RAILWAY PHATAK):PL 1 1S‐DL‐YP‐ETC‐DNNG‐2901‐NGR031 990 19502637 0.39757 0.24844 0.39757 0.24844

1260 630 19502162 0.18054 0.152821260 630 19502163 0.27082 0.22296

1S‐DL‐YP‐ETC‐DNNG‐2902‐LO1002 0.45136 0.37578B‐BLOCK MEET NAGAR:ID 2