7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
1/8
: Barka Batching Plant
Contract / Job No.: : LO120015
: General
: Larsen & Toubro (Oman) LLC
Sample No. : BBP-0 Date of Sampling : 12.08.13
Sample Descript. : Dune Sand Date of Testing : 12.08.13
Location : Barka Batching Plant Test Method : BS 1377 Part 2
Source : Baushar Sampled By : LTO
Sampling Method : BS 812 Part 102 Weight of Sample: 600 gms
0.600 0 0 100
0.300 30.5 5.1 5.1 94.9
0.150 505.0 84.2 89.3 10.8
Pan 64.5 10.8 100.0 0
Remarks:
LTO LTO LTO
Lab-Technician QA/QC - Engineer Material Engineer
Date: Date: Date:
SF / BBP / C03, Rev 00 - Date:
SIEVE ANALYSISName of Project
Client
Contractor
Sieve size (mm)Wt. retained in
gms% Retained
Cumulative
% Retained% Passing (PA) Specification Limits
-
7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
2/8
-
7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
3/8
: Barka Batching Plant
Contract / Job No.: : LO120015
: General
: Larsen & Toubro (Oman) LLC
Sample No. : BBP-0 Date of Sampling : 17.08.13
Sample Descript. :Natural Washed Sand Date of Testing : 17.08.13
Location : Barka Batching Plant Test Method : BS 1377 Part 2
Source : Oman Rocks Sampled By : LTO
Sampling Method : BS 812 Part 102 Weight of Sample: 800 gms
10.0 NIL 0 0 100
5.0 8.5 1.0625 98.9375
2.36 333.5 42.8 57.3 60- 100
1.18 230.5 71.6 28.4 30- 90
0.600 100.0 84.0625 15.9375 15- 54
0.300 67.5 92.5 7.5 5- 40
0.150 54.0 99.25 0.75
Pan 6 100 0
Remarks:
LTO LTO LTO
Lab-Technician QA/QC - Engineer Material Engineer
Date: Date: Date:
SF / BBP / C03, Rev 00 - Date:
100
100
-
SIEVE ANALYSISName of Project
Client
Contractor
Sieve size (mm)Wt. retained in
gms% Retained
Cumulative
% Retained% Passing (PA) Specification Limits
-
7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
4/8
-
7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
5/8
: Barka Batching Plant
Contract / Job No.: : LO120015
: General
: Larsen & Toubro (Oman) LLC
Sample No. :BBP-02 Date of Sampling : 12.08.13
Sample Descript. : 10MM Date of Testing : 12.08.13
Location : Barka Batching Plant Test Method : BS 1377 Part 2
Source :AFI Sampled By :LTO
Sampling Method : BS 812 Part 102 Weight of Sample: 2510 gms
14.0 NIL 0 0 100
10.0 17.6 0.7 0.7 99.3 85- 100
5.0 2395.4 95.3 96.0 4.0 0- 25
2.36 75.4 3.0 99.0 1.0 0- 5
Pan 21.4
Remarks:
LTO LTO LTO
Lab-Technician QA/QC - Engineer Material Engineer
Date: Date: Date:
SF / BBP / C03, Rev 00 - Date:
100
SIEVE ANALYSISName of Project
Client
Contractor
Sieve size (mm)Wt. retained in
gms% Retained
Cumulative
% Retained% Passing (PA) Specification Limits
-
7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
6/8
-
7/27/2019 C 01_R0 Common Grading sheet_Barka Batching Plant.xlsx
7/8
: Barka Batching Plant
Contract / Job No.: : LO120015
: General
: Larsen & Toubro (Oman) LLC
Sample No. :BBP-02 Date of Sampling : 12.08.13
Sample Descript. : 20MM Date of Testing : 12.08.13
Location : Barka Batching Plant Test Method : BS 1377 Part 2
Source :AFI Sampled By :LTO
Sampling Method : BS 812 Part 102 Weight of Sample: 5005 gms
37.5 0 0 0 100
20.0 26.2 5.0 0.5 99.5 85- 100
14.0 1862.2 35.5 36.0 64.0 0- 70
10.0 2617.5 49.9 85.9 14.1 0- 25
5.0 692.4 13.2 991 9.0 0- 5
Pan 193.3
Remarks:
LTO LTO LTO
Lab-Technician QA/QC - Engineer Material Engineer
Date: Date: Date:
SF / BBP / C03, Rev 00 - Date:
100
SIEVE ANALYSISName of Project
Client
Contractor
Sieve size (mm)Wt. retained in
gms% Retained
Cumulative
% Retained% Passing (PA) Specification Limits
-