c 09_r0 los angeles abrasion_barka batching plant.xls

5
 Name of P roject Barka Ba tching Plan t Contract / Job No : L0120015 Client : General Contractor : Larsen & Toubro (Oman) LLC Sample Description :10mm Agg Date of Sampling :06.07.13 Sampling Method :ASTM C702 Date of Testing :09.07.13 Source : AFI Enterprises, Barka Test Method : ASTM C 131 / ASTM C 535 Location : LTO BBP Laboratory Sample Number :BBP-02 Mix Type : Equipment Asset No. Specification Limits : 25% Remarks: LTO LTO LTO Lab-Technician QA/QC - Engineer Material Engineer  Date: Date: Date: LOS ANGELES ABRASION TEST Grading Type B  Number of B alls 8 Mass of Balls(g) 390-445  Number of R evolutions 500 Mass of Sample before test (g) 5000 Mass of Sample after test (g) 4997 Mass of sample retained on 1.7 mm sieve (g) 4130 Percentage Loss 17.4 Los Angeles Abrasion Value (%) 17%

Upload: utpal-mondal

Post on 14-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

7/27/2019 C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

http://slidepdf.com/reader/full/c-09r0-los-angeles-abrasionbarka-batching-plantxls 1/5

 Name of Project Barka Batching Plant

Contract / Job No : L0120015

Client : General

Contractor : Larsen & Toubro (Oman) LLC

Sample Description :10mm Agg Date of Sampling :06.07.13

Sampling Method :ASTM C702 Date of Testing :09.07.13

Source : AFI Enterprises, Barka Test Method : ASTM C 131 / ASTM C 535

Location : LTO BBP Laboratory Sample Number :BBP-02

Mix Type :

Equipment Asset No.

Specification Limits : 25%

Remarks:

LTO LTO LTO

Lab-Technician QA/QC - Engineer Material Engineer  

Date: Date: Date:

LOS ANGELES ABRASION TEST

Grading Type B

 Number of Balls 8

Mass of Balls(g) 390-445

 Number of Revolutions 500

Mass of Sample before test (g) 5000

Mass of Sample after test (g) 4997

Mass of sample retained on 1.7 mm sieve (g) 4130

Percentage Loss 17.4

Los Angeles Abrasion Value (%) 17%

Page 2: C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

7/27/2019 C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

http://slidepdf.com/reader/full/c-09r0-los-angeles-abrasionbarka-batching-plantxls 2/5

 Name of Project Barka Batching Plant

Contract / Job No : L0120015

Client : General

Contractor : Larsen & Toubro (Oman) LLC

Sample Description :10mm Agg Date of Sampling :06.07.13

Sampling Method :ASTM C702 Date of Testing :09.07.13

Source : AFI Enterprises, Barka Test Method : ASTM C 131 / ASTM C 535

Location : LTO BBP Laboratory Sample Number :BBP-02

Mix Type :

Equipment Asset No.

Specification Limits : 25%

Remarks:

LTO LTO LTO

Lab-Technician QA/QC - Engineer Material Engineer  

Date: Date: Date:

LOS ANGELES ABRASION TEST

Grading Type B

 Number of Balls 8

Mass of Balls(g) 390-445

 Number of Revolutions 100

Mass of Sample before test (g) 5000

Mass of Sample after test (g) 4997

Mass of sample retained on 1.7 mm sieve (g) 4780

Percentage Loss 4.4

Los Angeles Abrasion Value (%) 4%

Page 3: C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

7/27/2019 C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

http://slidepdf.com/reader/full/c-09r0-los-angeles-abrasionbarka-batching-plantxls 3/5

 Name of Project Barka Batching Plant

Contract / Job No : L0120015

Client : General

Contractor : Larsen & Toubro (Oman) LLC

Sample Description :20mm Agg Date of Sampling :06.07.13

Sampling Method :ASTM C702 Date of Testing :09.07.13

Source : AFI Enterprises, Barka Test Method : ASTM C 131 / ASTM C 535

Location : LTO BBP Laboratory Sample Number :BBP-02

Mix Type :

Equipment Asset No.

Specification Limits : 25%

Remarks:

LTO LTO LTO

Lab-Technician QA/QC - Engineer Material Engineer  

Date: Date: Date:

Mass of sample retained on 1.7 mm sieve (g) 4790

Percentage Loss 4.2

Los Angeles Abrasion Value (%) 4%

 Number of Revolutions 100

Mass of Sample before test (g) 5000

Mass of Sample after test (g) 4997

LOS ANGELES ABRASION TEST

Grading Type B

 Number of Balls 11

Mass of Balls 440

Page 4: C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

7/27/2019 C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

http://slidepdf.com/reader/full/c-09r0-los-angeles-abrasionbarka-batching-plantxls 4/5

 Name of Project Barka Batching Plant

Contract / Job No : L0120015

Client : General

Contractor : Larsen & Toubro (Oman) LLC

Sample Description :20mm CA Date of Sampling : 06.07.2013

Sampling Method :ASTM C702 Date of Testing : 10.07.2013

Source : AFI Enterprises, Barka Test Method : ASTM C 131 / ASTM C 535

Location :LTO BBP Laboratory Sample Number :BBP-02

Mix Type :

Equipment Asset No.

Specification Limits : 25%

Remarks:

LTO LTO LTO

Lab-Technician QA/QC - Engineer Material Engineer  

Date: Date: Date:

LOS ANGELES ABRASION TEST

Grading Type B

 Number of Balls 11

Mass of Balls 440

 Number of Revolutions 500

Mass of Sample before test (g) 5000

Mass of Sample after test (g) 4994

Mass of sample retained on 1.7 mm sieve (g) 4120

Percentage Loss 17.6

Los Angeles Abrasion Value (%) 18%

Page 5: C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

7/27/2019 C 09_R0 Los Angeles Abrasion_Barka Batching Plant.xls

http://slidepdf.com/reader/full/c-09r0-los-angeles-abrasionbarka-batching-plantxls 5/5

 Name of Project : Barka Batching Plant

Contract / Job No. : L0120015

Client :

Consultant: :

Contractor : Larsen & Toubro (Oman) LLC

Sample Description : Date of Sampling :

Sampling Method : Date of Testing :

Source : Test Method : ASTM C 131 / ASTM C 535

Location : Sample Number :

Mix Type :

Equipment Asset No.

Specification Limits :

Remarks:

LTO LTO Engineer Engineer

Lab-Technician QA/QC - Engineer Material Inspector Material Engineer  

Date: Date: Date: Date:

SF / BBP / C09, Rev 00 - Date:

Los Angeles Abrasion Value (%)

Grading Type

 Number of Balls

Mass of Balls

 Number of Revolutions

LOS ANGELES ABRASION TEST

Mass of sample retained on 1.7 mm sieve (g)

Mass of Sample before test (g)

Mass of Sample after test (g)

Percentage Loss