C. Barbieri
Schedule 2008
Bled, March 28 2008
26/03/2008 1
Main Events 2008 - 1• 2008, March 28, submission of NTT proposal
Urgent, see comments by D’OdoricoAction for Claudia: send to Paradis all dates of observations of Crab
• 2008, Apr. 4- 6 Aqueye at the 182 cm (new Moon the 6th)Observing Schedule:Pulsar Crab, no filter, main purposes check clock, check acquisition
software, 2 h Orion Nebula, main purpose HBTII, narrow band filters, 1 hA bright (6th) single star (no filter), main purpose check acquistion
software, check guiding and seeing, 0.5 hA bright (1th) star (betelgeuse), narrow band filters, main purpose check
HBTI, a planet?? check seeing, 0.5 hQuasar 3C273, 13th mag) main purpose check variability, check g(2), 1h1 variable star with know long period (say 100-200 second) plus high
frequency flickering, 3 h
Total: 2+1+0.5+0.5+1+3 = 8 h, not necessarily all same night
26/03/2008 2
Main events 2008 - 2• Apr. 5: start of IQuEye design• Apr. 12: submission of 182cm proposal, not for TNG, wait for next
application time (summer time)• April 14: start of joint discussion UPd Ljubljana, main topics: timing,
continous vs trigger mode (Occhipinti, Facchinetti, Capraro, Zoccarato) (Paradiz, Ponikvar, Lautar) (Centro)
• April 21, delivery of SPADs• May 9: Decision on best acquistion mode• May 9: Decision on final precision we can promise for Harrison (500
ns, based of the width of pulses and expected numbers of photon per pulse)
• Jun. 5-6: Harrison Meeting (Nottingham, final document on design of instrument)
• June 16-17: end of IQuEye design, critical review, start of construction, intervention of Lujbljana in the decision.
• Jun. 23- Jul 3: SPIE + OSIRIS Marseille• July 18: final decisions on UPd and Ljubljana systems for October
runs.• Sept. 19: Dedication of MAGIC II (important for political reasons)
Main events 2008 - 3• Oct. 9 -12 Aqueye at 182 (Harrison) (first quarter the 7th)*Revise the observing schedule, but Crab Pulsar has highest priority
• Oct. 14-15 tbc Harrison Workshop (full Moon the 14th)**
• Oct. 23-28 Aqueye at 182 (Harrison) (last quarter the 21st)*
• Oct. 30-31, Harrison Meeting Rome
• November, end of IQuEye construction, assembly, testing• Dec. 5, Harrison closing meeting Torino• Dec. 19 end of IQuEye tests, readiness
*Preliminary agreement with OAPd, dates to be confirmed** is it necessary? To be discussed
26/03/2008 4
Critical and Lacking elementsList to be revised and completed at end of
meeting:• TV camera !!• Polarizing filters• Other narrow band filters
• Software for g(2) and HBTII• Delivery time for SPADs• Delivery time for Pyramid
26/03/2008 5