Page 1: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 1/123

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

JOB. NO. : PD - 07503

DOC. NO. :

DOC. TYPE : CALCULATION

CLIENT :

PROJECT TITLE :

LOCATION : ARZEW, ALGERIA

0 26-Oct-07 Issue for Review FY SWD

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

Page 2: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 2/123

REV DATE DESCRIPTIO Pre!"# C$ec%"# A!!r"#

&' D(te

C)ie*t A!!rov()

Page 3: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 3/123

  2 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

1. GENERAL

1.1 SCOPE

T$is c()cu)(tio* s$eet is !ur!ose# to !erfor/ !re)i/i*(r' c()cu)(tio* of Fie)# I*stru/e*t Roo/ (*#

fou*#(tio* for (ssi Toui) 1 Proect3

1. CODES AND STANDARD

+323+ A/eric(* Co*crete I*stitute

+3232 A/eric(* Societ' of Civi) E*.i*eers4 ASCE 7 - 02

+3235 A/eric(* We)#i*. Societ'

+323 A/eric(* I*stitute of Stee) Co*structio*

+323, A/eric(* Societ' for Testi*. (*# (teri()s

1.3 REFERENCES

+353+ 8-9D-6578 S!ecific(tio* for Structur() Desi.*

+3532 8-D-6578 S!ecific(tio* for Desi.* Re:uir/e*ts for Wi*# 1o(#s

+3535 8-+,D-65378 S!ecific(tio* for Desi.* Re:uire/e*ts for E(rt:u(%e 1o(#s

for 1 F(ci)ities

+353 C+,-+F-6578 F(;ric(te# Rei*forci*. Stee)

+353, 8-+2D-6578 &(sis Fou*#(tio* Desi.*

1.! DESIGN BASIS

1.!.1 "#$%&'#(

 A3 Stee)

- Stee) s$(!es AST A56 or <IS 5+0+ SS 00

F' = 25, P( /i*3 'ie)# stre*.t$

Fu = 00 P( /i*3 te*si)e stre*.t$

- >i.$ stre*.t$ ;o)t AST A52,

Fv; = +70 %.?c/2

Ft; = 5080 %.?c/2

&3 Co*crete

- Co*crete

I$%)C*+&%$% C(#

C(# C

Desi.* stre*.t$ 500 %.?c/2 @50 !(

Ce/e*t T'!e V @AST C+,0

(B3 sie of co(rse + +? i*c$es @50 //

/(B3 w(ter ce/e*t r 03,

s)u/! /(B +00 //

 

Page 4: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 4/123

  5 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

/i* 7, //

- Rei*force/e*t AST A6+,4 f' = 200 %.?c/2

1.!.. L*#'+ #$#

E:ui!/e*t 1o(#i*. #(t( s$()) ;e refer to )o(#i*. #(t( i*for/(tio* i*#ic(te# i* Doc o3 8-9D-6578 for

e:ui!/e*t erectio*4 !rovi#e# ;' st(tic .rou!3De(#4 1ive (*# Wi*# 1o(# s$()) ;e refere# to !roect #ocu/e*ts /e*tio*e# i* sectio* 2

1.!..1 D%# L*# D

T(;)e-+

D%# L*# *2 "#*& "#$%&'#(

(teri() De(# 1o(#

Rei*force# Co*crete 23 to*?/5P)(i* Co*crete 235 to*?/5

Structur() Stee) 739, to*?/5

Soi) +39 to*?/5

r(ti* ,0 % ?/2

E)ectric() I*stru/e*t C(;)e Tr(' 90 %.?/2   @(ssu/e#

1.!... L'4% L*# L

1ive )o(#s (re t(%e* (s s!ecifie# v()ues i* #ocu/e*t *o 8-9D-6578

For t$is c()cu)(tio*4 )ive )o(# is #efi*e# (s @see (tt(c$/e*t for #et(i)

- W()%w('s Access P)(tfo +80 %.?/2

- Roof 1ive )o(#s (re t(%e* ;(se# o* t(;)e +6-C = +00 %.?/2

1.!..3. P''+ L*# 6P 8 PE, PO, #+ PT 9

T$is )o(# is *e.)ecte#

1.!..!. W'+ L*# W

Wind load be calculated in accordance with the formula as given in ASCE 7-02,

in general :

asic wind s!eed "#$ % &0 m's "from (ocument )o* +-&(-7+$

E.!osure Categor/ % E.!osure C "from section ***2 of ASCE 7-02 for o!en terrain with scattered

obstructions having heights generall/ less than +*1m$

Classification of uildings % "from table 1*1 of ASCE 7-02$

m!ortance 3actor "$ % 1*1 "from 4able -1 of ASCE 7-02 for hurricane !rone regions with

#5100m!h 6 categor/ $

ust 3actor "$ % 0*8 "from section **8 of ASCE 7-02 for rigid structure$

T$e De(# 1o(# is t$e )o(# of t$e structure itse)f @c()cu)(te# ;' STAAD-PRO (*# soi) (;ove footi*.s@for fou*#(tio* ;ut eBc)u#es e:ui!/e*t4 /(c$i*er'4 (*# !i!i*. )o(#s3 T$is structure is *ot fire-!roofe#@(s !er Fire Proofi*. o*e i*fo fro/ >SE .rou!

Page 5: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 5/123

  of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

4he wind force shall be calculated using this formula :

")$ "from e9* -17 of ASCE 7-02$

where,

"from e9* -1 of ASCE 7-02$

"from table * of ASCE 7-02 for e. !osure C$

1 "from e9* -1 of ASCE 7-02$

"from table * of ASCE 7-02 for buildings, i*e* main wind

force resisting s/stem$

4able of velocit/ !ressure at height above ground

;eight

"m$

0 < &* 0*8 1 1*1 0*8 100 81&*+22 8*071 1*2

&* < *1 0*+ 1 1*1 0*8 100 82*8+ 87*+7 1*2+

*1 < 7* 0*+& 1 1*1 0*8 100 +01*208 +1*8 1*277* < +*1 0*+8 1 1*1 0*8 100 ++*7 +*77 1*2

+*1 < 12*2 1*0& 1 1*1 0*8 100 ++7*081 101*+ 1*2

12*2 < 1*2 1*0+ 1 1*1 0*8 100 10&*018 10*2 1*21

1*2 < 18 1*1 1 1*1 0*8 100 108*7 110*& 1*20

18 < 21* 1*17 1 1*1 0*8 100 1121*71 11&*&& 1*1+

21* < 2&*& 1*21 1 1*1 0*8 100 110*0 118*2 1*18

=arameters :

> % *1 m h % * m

% &*1 m 0

so that :

>' 0*118 "0 < 1$

h'> 0*200+ "5% 1$

;ori?ontal distance from windward edge %

Surface >' @se with

Windward wall All values 0*8

>eeward wall

0 < 1 -0*

2 -0*

%5& -0*2

 % 9 . . ! - 9 ! .f 

9 % 0*1 .  ? .  

?t .  

d . . #2 ")'m2$

9 % 9? "velocit/ !ressure$ for windward walls evaluated at height ? above the ground*

9 % 9h "velocit/ !ressure$ for leeward walls, side walls, 6 roofs, evaluated at height h*

9i % 9h "velocit/ !ressure$ for windward, side, leeward walls and roofs and for internal !ressure evaluation

? % ve oc t/ !ressure e.!osure coe c ent

?t % t e to!ogra! c actor :

d % w n rect ona t/ actor

 ?

 ?t

 d #2 9

?, 9

h ?,

h"m's$2 ")'m2$ "Bg'm2$

θ % o

nternal Coefficient, Cf 

A. External Pressure Coefficient , Cp

4able of Wall =ressure Coefficient, C !

C !

9?

9h

Page 6: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 6/123

  , of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

Sidewalls All values -0*7

so that got C! for wall is :

0*8 % wall !ressure coefficient for windward

-0* % wall !ressure coefficient for leeward

-0*7 % wall !ressure coefficient for sidewall

Windward >eeward

h'>10 1 20 2 0 & 5%0 10 1 5%20

% 0*2-0*7 -0* -0* -0*2 -0*2

0*&-0* -1 -0*

 )ormal -0*18 0*2 0* 0* 0*&

to ridge for 0*

-0*+ -0*7 0*& -0* -0*2 -0*2-0* -1 -0*

-0*18 -0*18 0*2 0*2 0* 0*&

5% 1

-1 -0*7 -0* -0* -0*2

-0*7 -1 -0*-0*18 -0*18 -0*18 0*2 0*2 0*

% 0*

;ori?* distance fromC!

 )ormal windward edge

to ridge for  0 to h'2 -0*+ ,-0*18 !ur!oses*

h'2 to h -0*+ ,-0*18

and h to 2h -0* ,-0*18 over which it is a!!licable as follows !arallel 52h -0* ,-0*18

to ridge for 

5%1

0 to h'2 ,-0*18Area "s9 ft$ Deduction 3actor  

% 100 "+*2+ s9 m$ 1*00

52h -0*7 ,-0*18200 "2*2 s9 m$ 0*+0

5% 1000 "+2*+ s9 m$ 0*80

 )otes :

1* 3or fle.ible building use a!!ro!riate as determined b/ rational anal/sis*

2* =lus 6 minus signs signif/ !ressures acting toward 6 awa/ from the surface, res!ectivel/*

&* Where two values of C! are listed, this indicates that the windward roof slo!e is subected to either

 !ositive or negative !ressures and the roof structure shall be designed for both conditions*

* )otation :

? % height above ground "m$

h %

%

% gust effect factor  

% hori?ontal dimension of building, measured normal to wind direction "m$

> % hori?ontal dimension of building, measured !arallel to wind direction "m$

θ %

9h

C !,ww

 %

C !,lw

 %

C !,sw

 %

4able of Doof =ressure Coefficient, C ! for @se with 9

h

Wind(irection

Angle θ "o$ Angle θ "o$

0*0F

0*01θ0*0F

0*0F

0*01θθ 5% 10o 0*0F

-1*FF 0*0F

0*01θ

0*0F

F #alue is !rovided for inter!olation

θ  10o FF #alue can be reduced linearl/ with area

-1*FF

all θ 

* >inier inter!olation is !ermitted for values of >', h'>, 6 θ other than show*

mean roof height, e.ce!t that eave height shall be used for θ  10o "m$

9?, 9

h velocit/ !ressure, evaluated at res!ective height "Bg'm2$

angle of !lane of roof from hori?ontal " o $

Page 7: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 7/123

  6 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

-0*2 % roof !ressure coefficient for windward

-0*2 % roof !ressure coefficient for leeward

B. Internal Pressure Coefficient , GCpi

4able of nternal =ressure Coefficient, C!i

Enclosure Classification C!i

G!en uildings 0*00

=artiall/ Enclosed uildingsH0*

-0*

Enclosed uildingsH0*18

-0*18

 )otes:

1* =lus 6 Iinus signs signif/ !ressures acting toward and awa/ from the internal surfaces

C. Wind Acting Wall in Z-Direction

- Acting on Siding

> % distance between columns

3or ? % &*1 m, so that : +1*87

1*27

0*18

!ra"e #ine $ % $& >1 % *7 mFWindward

 @) J 0*288 % 0*288 ton'm

F>eeward @) J 0*17 % -0*17 ton'mFSide wall

 @) K 0*122 % -0*122 ton'm

!ra"e #ine ' >2 % * mFWindward

 @) J 0*&++ % 0*&++ ton'mF>eeward

 @) J -0*272 % -0*272 ton'm

FSide wall

 @) K 0*211 % -0*212 ton'm

!ra"e #ine ( % ) > % *7 mFWindward

 @) J 0*&&2 % 0*&&2 ton'm

C !,wr 

 %

C !,lr 

 %

9? % Bg'm2 

? %

C !i

 %

Page 8: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 8/123

  7 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

F>eeward

 @) J -0*2& % -0*2&0 ton'm

FSide wall

 @) K 0*187 % -0*188 ton'm

!ra"e #ine * >& % &*+7 m

FWindward @) J 0*82 % 0*82 ton'mF>eeward

 @) J -0*208 % -0*208 ton'mFSide wall

 @) K 0*12 % -0*12 ton'm

!ra"e #ine + > % 7*27 mFWindward

 @) J 0*+ % 0*+ ton'mF>eeward

 @) J -0*0& % -0*0& ton'm

FSide wall

 @) K 0*27 % -0*27 ton'm

!ra"e #ine > % 8*8 mFWindward

 @) J 0*7 % 0*7 ton'mF>eeward

 @) J -0*8 % -0*8 ton'mFSide wall

 @) K 0*28 % -0*287 ton'm

!ra"e #ine >7 % 7* mFWindward

 @) J 0*7 % 0*7 ton'm

F>eeward

 @) J -0*1& % -0*1& ton'mFSide wall

 @) K 0*2&& % -0*2& ton'm

D. Wind Acting Wall in -Direction

- Acting on Siding

> % distance between columns

3or ? % *1 m, so that : +1*87

1*270*18

!ra"e #ine A % / >1 % 1* m

FWindward

9? % Bg'm2 

? %C

 !i %

Page 9: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 9/123

  9 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

@) K 0*11+ % 0*11+ ton'mF>eeward

 @) K 0*0 % -0*0 ton'mFSide wall

 @) J 0*00 % -0*01 ton'm

!ra"e #ine B % G >2 % 2*22 mFWindward

 @) K % ton'mF>eeward

 @) K -0*0+ % -0*0+ ton'm

FSide wall

 @) J 0*072 % -0*07 ton'm

!ra"e #ine C > % *22 m

FWindward

 @) K 0*&01 % 0*&01 ton'm

F>eeward

 @) K -0*218 % -0*218 ton'mFSide wall

 @) J 0*17 % -0*170 ton'm

!ra"e #ine D >& % *27 mFWindward

 @) K 0*&82 % 0*&82 ton'mF>eeward

 @) K -0*22 % -0*22 ton'm

FSide wall

 @) J 0*20& % -0*20 ton'm

!ra"e #ine E > % mFWindward

 @) K 0*&1 % 0*&1 ton'm

F>eeward

 @) K -0*21 % -0*21 ton'mFSide wall

 @) J 0*1+ % -0*1+ ton'm

!ra"e #ine ! > % mFWindward

 @) K 0*8& % 0*8& ton'm

F>eeward @) K -0*20+ % -0*20+ ton'mFSide wall

 @) J 0*1 % -0*1 ton'm

Page 10: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 10/123

  8 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1.!..5 S%')' L*# S

Seis/ic )o(# wi)) ;e c()cu)(te# ;' st((#!ro

1.!.. B(#$ L*# BL

P#A0 1! B2I#DI0G

SEC3I10 1! B2I#DI0G

=so % ncident "side on$ over!ressure

=r % Deflected !ressure

=a % Averaged over!ressure

=b % acB-face over!ressure

S % Clearing distance "lesser of '2 or ;$

4he !rinci!al !arameter of blast wave below shall be defined :

a* =eaB side !ositive over!ressure, =so

 b* =ositif !hase duration, td

 )egatif !hase !ressure are relativel/ small hence ignored for design*

=arameter below shall be determined :

a* =eaB reflected !ressure , =r 

 b* =eaB d/namic "blast wind$ !ressure, 9o

Pr P(P;

lastWave>oadCase

ShocB frontW(ve

1

&

Pso

>

last Wave>oad Case A

J

K

Page 11: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 11/123

  +0 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

c* ShocB front velocit/, @

d* last wave length, >w

=eaB reflected !ressure :

=r % Cr * =so

Cr % reflection coefficient

ShocB front velocit/ :

@ % 110 "1 H 0*0 "ft'sec$, =so in !si

@ % & "1 H 0*008 "m'sec$, =so in B=a

>ength of !ressure wave :

>w % @* td

$.).'.*.$ !ront Wall #oadings

4he wall facing the e.!losion source will e.!erience a reflected over!ressure

with am!lif/ing ratio of incident !ressure

=

0 "msec$

Sim!le e9uation formula from )ewmarB for the blast wave reflection coefficient at

Cr % =r ' =so

% "2 H 0*0 =so$ "=so in !si$

% "2 H 0*007 =s "=so in B=a$

cular to surface$ and for !eaB over!ressure u! to about times atm,os!heric !ressure can be

defined from curves at figure *2 of ASCE De!ort*

(uration of reflected over!ressure effect, tc :

tc % S ' @ td

m!ulse, w :

w % 0* "=r - =s$ * tc H 0* * =s * td

4he duration of e9uivalent loading, te :

normal 0o incidence :

3or angle incidence var/ing from 0o "wave front !arallel to surface$ to +0o "wave front !er!endi-

E9uivalent loading

Ps

Pr 

tc te t#

Page 12: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 12/123

  ++ of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

te % 2 * w ' =r 

% "td - tc$ =s ' =r H tc

$.).'.*.' Side Wall #oadings

4he side wall will e.!erience less blast loading than the front wall,

due to lacB of over!ressure reflection*

t1 % > ' @

t2 % > ' @ H td

Effective side-on over!ressure, =a :

=a % Ce * =so H Cd * 9o

=a % effective side-on over!ressure for side wall

Ce % reduction factor "de!endent on length of structural element, see figure *+ of 

ASCE De!ort L(esign of last Desistant uildings in =etrochemical 3acilitiesL

Cd % drag coefficient

% "H1$ for front of rectangular building

% "-0*&$ for side, rear 6 roof of rectangular building

$.).'.*.( 4oof #oadings

 blast wave travels hori?ontall/, hence the roof onl/ e.!erience the side-on over!ressure

similar with the side wall*

4he e9uation for effective over!ressure similar to the side wall*

3or !icth of roof less than 10o, it is normall/ assume no reflection will occur when the

P

P(

t+   t2

Page 13: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 13/123

  +2 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

$.).'.*.) 4ear Wall #oadings

4he effective over!ressure is similar to side wall 6 calculated using e9uation as below :

=b % Ce * =so H Cd * 9o

=b % effective side-on over!ressure for rear wall

Ce % reduction factor "de!endent on length of structural element, see figure *+ of 

ASCE De!ort L(esign of last Desistant uildings in =etrochemical 3acilitiesLCd % drag coefficient

% "H1$ for front of rectangular building

% "-0*&$ for side, rear 6 roof of rectangular building

$.).'.*.+ Design Data

- Wi#t$ of ;ui)#i*.4 & =   553+ /

- 1e*.t$ of ;ui)#i*.4 1 = ,3+ /

- W()) $ei.$t ;etwee* roof = 636, /

- W()) $ei.$t ;etwee* f)oor = 0 /

- w()) !(*e) sie = 636, /

- Roof !(*e) sie = , /

B(#$ L*# D%$%&)'+#$'*+

- Pe(% si#e-o* over!ressure3 Pso

Pso = +3, !si @Assu/e

= +035 %P(

- #ur(tio*4 t# = 03059 sec "% 8 msec$

S;*< 2&*+$ 4%(*'$=, UG = 5,B@+H030095BPso03,

= 5, B @+ H 030095 B +0355,03,

= 5,83, /?sec

P

P;

t2

t5

Page 14: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 14/123

  +5 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

L%+$; *2 &%>&% ?#4%, L?

1w = G B T#

= 5,8385 B 03059

= +5366 /

P%#< =+#)' ?'+ &%>&%, @*

:o == 030052 B +0355,2

= 03 %P(

F&*+$ W#(( L*#'+

Desi.* for w()) se./e*t t'!ic())' for + / wi#e

Rise ti/e4 tr

tr = 0 sec

C)e(ri*. #ist(*ce4 S

S = /i*i/u/ of > or &?2

= 636, /

Ref)ecte# over!ressure c)e(ri*. ti/e4 tc

tc = 5 @S ? G

= 5 @636, ? 5,8385

= 030,6 sec

Dr(. coefficie*t4 C#

C# =   + @sect3 53535 of ASCE re!ort

St(.*(tio* !ressure4 Ps

Ps = Pso H C#3 :o

= +0355, H + B 03

= +037 %P(

Deflected over !ressure :

as )ewmarBMs e9uation on ASCE De!ort - e9* * :

 )ewmarB e9uationMs, =r1 :

Pr = @2 H 030075 P 4@Pso i* %P(

= @2 H 030075 B +0355, B +0355,

= 2+3, %P(

030052 B Pso2

3or design !ur!ose, the normal shocB reflection condition α % 0o, tr % 0 will be assume

Consider reflected over!ressure for angle of incidence var/ing from 0o to +0o

Page 15: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 15/123

  + of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

Average ambient atmos!heric !ressure, =o % 7& mm ;g

% 100 B=a

 

=s ' =o % "10*7 ' 100$

% 0*107&

3rom figure *2 of ASCE De!ort, ma.imum value of reflection coefficient Cr for shocB waves t/!e :Cr % 2*2

=r-2 % Cr * =so

% 2*2 . 10*

% 22*77 B=a "govern$

Fro*t w()) i/!u)se4 Iw

Iw = 03, @Pr - Ps 3 tc H 03, 3 Ps 3 t#

= 03, @223757 - +0375, B 030,6 H 03, B +0375, B 03059

= 03,5 %P(3sec

Effective #ur(tio*4 te

te = 2 3 Iw?Pr 

= 2 . "0* ' 22*77$

= 0*0&7 sec

Pe(% )o(#4 Po

Po = * . 1 . 22*77 . 102 Bg'm2

= 1&2  %.

= 1*&2 to*

Po

+,32

to*

0307 sec

For Fro*t w()) 1o(#i*. wi)) ;e su/(rie# (s t(;)e ;e))ow

&= 553+ /

>= 636, /A%   220 /2

N%   03070 to*?/2

for &7o angle

Page 16: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 16/123

  +, of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1o(#s (!!)ie# o* oi*t @to*

$?;   2322, 5377, 387, 6 632, ,322,

23,7,   030 0369 0380 +309 +3+5 038

TYPE + FORCE SAVE

0 0369 0307 0

TYPE 2 FORCE SAVE0 0380 0307 0

TYPE 5 FORCE SAVE

0 +309 0307 0

TYPE FORCE SAVE

0 +3+5 0307 0

TYPE , FORCE SAVE

0 038 0307 0

S'% W#(( L*#'+

e.!erience load similar with front wall load*

=o

1*&2

ton

0*0&7 sec

Desi.* for si#e w()) se./e*t 1+ t'!ic())' for + / wi#e

Dr(. coefficie*t4 C#

C# = -03 @sect3 53535 of ASCE re!ort

E:uiv()e*t )o(# coefficie*t

1w?1+ = +5366075 ? +

= +5366

--Jt$e Ce =   038 @see fi.ure 538 of ASCE Re!ort

E:uiv()e*t !e(% over!ressure4 P(

P( = Ce 3 Pso H C#3 :o= 038 B +0355, H @-03 B 03

= 83+2 %P(

Since the e.!losion incidence have obli9ue reflection "&7o angle$, side walls loading will

Page 17: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 17/123

  +6 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

Rise ti/e4 tr

tr = 1+?G sec

= + ? 5,8385

= 03005 sec

K 0 sec

Dur(tio*4 t# t# = tr H t# sec

= 03059 sec

Pe(% )o(#4 Po

Po = 636, B + L 83++, B +02 %.?/2

= 620+ %.

= 6320 to*

Po

6320+

to*

03059 sec

For Si#e w()) 1o(#i*. wi)) ;e su/(rie# (s t(;)e ;e))ow

1=   ,3+ /

>= 636, /

A%   560 /2

N%   030+7 to*?/2

1o(#s (!!)ie# o* oi*t @to*

$?;   5377, 63,2, ,37, 387, 7327, 93900 73,00

23,7,   03+7 0328 0326 0322 0352 0358 0355

TYPE 6 FORCE SAVE

0 03+7 03059 0

TYPE 7 FORCE SAVE

0 0328 03059 0

TYPE 9 FORCE SAVE

0 0326 03059 0TYPE 8 FORCE SAVE

0 0322 03059 0

TYPE +0 FORCE SAVE

0 0352 03059 0

Page 18: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 18/123

  +7 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

TYPE ++ FORCE SAVE

0 0358 03059 0

TYPE +2 FORCE SAVE

0 0355 03059 0

For Roof w()) 1o(#i*. wi)) ;e su/(rie# (s t(;)e ;e))ow

1o(#s (!!)ie# o* oi*t @to*

$?;   5377, 63,2, ,37, 387, 7327, 93900 73,00

2322,   03+ 032, 0322 03+8

5377,   032, 037 03,7 038

63,2,   0392 0388 039

387,   0352 03,6 038 035

6300   0358 0367 03,8 03,+ 037, 038+ 0379

632,   03+ 0370 0362 03, 0379 038, 039+

,322,   035 03,8 03,2 03, 0366 0378 0369

TYPE +5 FORCE SAVE TYPE 2, FORCE SAVE TYPE 57 FORCE SAVE

0 03+ 03059 0 0 03,6 03059 0 0 0362 03059 0

TYPE + FORCE SAVE TYPE 26 FORCE SAVE TYPE 59 FORCE SAVE

0 032, 03059 0 0 038 03059 0 0 03, 03059 0

TYPE +, FORCE SAVE TYPE 27 FORCE SAVE TYPE 58 FORCE SAVE

0 0322 03059 0 0 035 03059 0 0 0379 03059 0

TYPE +6 FORCE SAVE TYPE 29 FORCE SAVE TYPE 0 FORCE SAVE

0 03+8 03059 0 0 0358 03059 0 0 038, 03059 0

TYPE +7 FORCE SAVE TYPE 28 FORCE SAVE TYPE + FORCE SAVE

0 032, 03059 0 0 0367 03059 0 0 039+ 03059 0

TYPE +9 FORCE SAVE TYPE 50 FORCE SAVE TYPE 2 FORCE SAVE

0 037 03059 0 0 03,8 03059 0 0 035 03059 0

TYPE +8 FORCE SAVE TYPE 5+ FORCE SAVE TYPE 5 FORCE SAVE

0 03,7 03059 0 0 03,+ 03059 0 0 03,8 03059 0

TYPE 20 FORCE SAVE TYPE 52 FORCE SAVE TYPE FORCE SAVE

0 038 03059 0 0 037, 03059 0 0 03,2 03059 0

TYPE 2+ FORCE SAVE TYPE 55 FORCE SAVE TYPE , FORCE SAVE

0 0392 03059 0 0 038+ 03059 0 0 03, 03059 0

TYPE 22 FORCE SAVE TYPE 5 FORCE SAVE TYPE 6 FORCE SAVE

0 0388 03059 0 0 0379 03059 0 0 0366 03059 0

TYPE 25 FORCE SAVE TYPE 5, FORCE SAVE TYPE 7 FORCE SAVE

0 039 03059 0 0 03+ 03059 0 0 0378 03059 0TYPE 2 FORCE SAVE TYPE 56 FORCE SAVE TYPE 9 FORCE SAVE

0 0352 03059 0 0 037 03059 0 0 0369 03059 0

R%#& W#(( L*#'+

Page 19: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 19/123

  +9 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

Desi.* for re(r w()) se./e*t t'!ic())' for + / wi#e

Dr(. coefficie*t4 C#

C# = -03 @sect3 53535 of ASCE re!ort

E:uiv()e*t )o(# coefficie*t 1w?S = +5366075 ? 636,

= 2306

-Jt$er Ce =   036 @see fi.ure 538 of ASCE Re!ort

E:uiv()e*t !e(% over!ressure4 P;

P; = Ce 3 Pso H C#3 :o

= 036 B +0355, H @-03 B 03

= 630+ %P(

Ti/e of (rriv()4 t(

t( = 1?G sec

= ? 5,8385= 03+,0 sec

 

Rise ti/e4 tr @T ,-+500 criteri(

tr = S ? G

= 636, ? 5,8385

= 030+8 sec

Dur(tio*4 t#

t# = 03059 sec

Tot() !ositive !$(se #ur(tio*4 to

to = tr H t#

= 030,7 sec

Fro/ fi.ure 5394

t+ = t( = 03+,0 sec

t2 = H tr = 03+68 sec

t5 = H t# = 03207 sec

Pe(% )o(#4 Po

Po = 636, B + B 630+ B +02 %.?/2

= 089 %.

= 3089 to*Po

3089

Page 20: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 20/123

  +8 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

to*

03+, 03+6, 03205

For Re(r w()) 1o(#i*. wi)) ;e su/(rie# (s t(;)e ;e))ow

&=   553+ /

>= 636, /

A%   220 /2

N%   030+8 to*?/2

1o(#s (!!)ie# o* oi*t @to*

$?;   2322, 5377, 387, 6300 632, ,322,

23,7,   03+07 03+9+ 03258 03299 03500 032,0

TYPE 8 FORCE SAVE03+, 0 03+6, 03+07 03205 0

TYPE ,0 FORCE SAVE

03+, 0 03+6, 03+9+ 03205 0

TYPE ,+ FORCE SAVE

03+, 0 03+6, 03258 03205 0

TYPE ,2 FORCE SAVE

03+, 0 03+6, 03299 03205 0

TYPE ,5 FORCE SAVE

03+, 0 03+6, 03500 03205 0

TYPE , FORCE SAVE

03+, 0 03+6, 032,+ 03205 0

Page 21: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 21/123

  20 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

&)(st 1o(# @&1

1.!.3 D%2(%$'*+

&e(/ wit$ #e(# )o(# (*# )ive )o(# 1?20

W$ere 1 re!rese*ts t$e s!(*3

;3 T$e )i/iti*. !er/issi;)e $orio*t() #ef)ectio* for !ort() fr(/es s$()) ;e $ei.$t?200

1.!.! C*+%$ *2 C#(>(#$'*+

(3 T$e c()cu)(tio* wi)) ;e #esi.*e# (s structur() s!(ce ;(se# o* (ssu/!tio*

Tr(*svers() (*# )o*.itu#i*() #irectio* wi)) resisti*. /o/e*t fr(/e

;3 Co**ectio*

Co**ectio* ;etwee* co)u/* ;(se !)(te (*# !e#est() is #esi.*e# (s !i**e# i* ;ot$ #irectio*3

@if #esi.*e#

c3 T$e structure wi)) ;e (*()'e# wit$ STAAD PRO structur() (*()'sis co/!uter !ro.r(//i*.

(*# (s s!(ce fr(/e (*()'sis3

. PLAN, FRA"ING ELEATION AND DETAIL

.1 3D-IEW

. JOINT ID

(3T$e )i/iti*. !er/issi;)e vertic() #ef)ectio* for structur() stee) /e/;ers s$()) ;e (ss!ecifie# ;e)ow (s !er ACI 5+9-02

 

Page 22: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 22/123

  2+ of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

.3 FRA"E DI"ENSION

 )o ((imension

4/!e "mm$ ;"mm$

1 D1 - 10 Slab ' =late

2 D2 &00 &00 Column

D 00 0 eam

& D& 200 00 eam

Page 23: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 23/123

  22 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

D 200 &00 4ie eam

3. LOADINGS

3.1 DEAD, LIE LOAD, ROOF LIE LOAD

4he Doof >ive load is taBen based on technical s!ecification % 100*0 Bg'm2

3. WIND LOAD

J - (irection

4he (ead >oad "(>$ is the weight of the structure itself "calculated b/ staad!ro$ with command selfweight -1*00*

Page 24: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 24/123

  25 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

K - (irection

3.3 SEIS"IC LOAD

J - (irection

K - (irection

Page 25: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 25/123

  2 of +,

   

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

Page 26: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 26/123

  2, of +25

 

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

). DESIG0 C10C4E3E S342C324E

!.1 DE!#EC3I10 C/EC5 

Calculation of deflection is based on S4AA( out!ut and actual deflection is obtained from :

for beam : ( % ma. dis!l* "cm$ or  

( % -trans*

for column : ( % ma. dis!l* "cm$ or  

( % O"J-trans*$P2 H "K-trans*$P2QP0*

).$.$ C6ec7 Colu"n Deflection

Roint dis!lacement ma.imum, "See Attach- 2 (is!l$

RG)4 >GA(; J-4rans* -4rans* K-4rans* lobal

"cm$ "cm$ "cm$ "cm$ "cm$

118 1& 1 0*0& -0*7 -0*001 0*0& allow % ; ' 200 % 2*7 cm 8 17 

).$.' C6ec7 Bea" Deflection

Actual Roint dis!lacement ma.imum, "See Attach-2$

a. #ongitudinal Bea"

2&0

IEIED >C CeB  

2&1 && 1 0*1+7 1*8& G T

c. 3ran9ersal Bea"

2&0

IEIED >C CeB  

22 1100 1 0*0 &*8 G T

  o a

 ∆ - dis!l allow % > '

>ength ">$cm

ma. actualdis!l "cm$

-dis!lallw*

 ∆ - dis!l allow % > '

>ength ">$cm

ma. actualdis!l "cm$

-dis!lallw*

 

Page 27: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 27/123

26 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

!. S2PP143 4EAC3I10

).'.$ Support 4eaction to #oading Co":ination for !oundation Sta:ilit;

3a:le Support !orce 4eaction to #oading Co":ination for !oundation Sta:ilit;

Su!!ort Deaction

Roint >C 3J 3 3K IJ I IK"4G)$ "4G)$ "4G)$ "4*m$ "4*m$ "4*m$

1 11 1*0 2* 1*&7 0 0 0

12 18*7 70*18 1*01 0 0 0

1 1+*11 70*+ 1*70& 0 0 0

1& 17*& 71*007 1*8+7 0 0 0

1 -10*1+ 1*7& 2*&0+ 0 0 0

1 8*8 +*8 -1*8+ 0 0 0

17 -12*+ *+1 2&*+2 0 0 0

18 *88 1*72 -17*7 0 0 0

1+ &&*81& 70*7++ 2*17 0 0 0

20 -*71 +*1+ &&*&& 0 0 0

21 17*117 *12 1&*22 0 0 0

22 1*0&+ *1+2 1*&12 0 0 02 1*00+ 1*1 12*87 0 0 0

2& 17*077 1*8 11*82 0 0 0

2 18*&& 70*12& 1*00 0 0 0

2 11 8*077 0*&&8 &*+8 0 0 0

12 +*20 *&& *8 0 0 0

1 10*&+& *&& *1+1 0 0 0

1& 7*07 *27 *+ 0 0 0

1 -*+ *8+& *+7 0 0 0

1 &*82 0*18 *&02 0 0 0

17 -8*08 &8*+8 &*++8 0 0 0

18 &*7 *21 &*802 0 0 0

1+ &*22+ 2*1+8 &*++ 0 0 0

20 -2+*8 &*7 *1& 0 0 021 +* 0*&&8 *+2 0 0 0

22 *78 0*11 *7+1 0 0 0

2 *788 0*&&8 &*7 0 0 0

2& +*77 0*7 &*17 0 0 0

2 +*1+ *2 *8 0 0 0

11 *17 &2*28 &*&1 0 0 0

12 7*+02 &*8& *0&1 0 0 0

1 +*12 &*78& *01 0 0 0

1& *& &*+2 *7& 0 0 0

1 -0*02 &8*81 *0 0 0 0

1 8*0&& &7*2 &*+8 0 0 0

17 -1* &&*+ &*&07 0 0 0

18 *&+ &*12 &* 0 0 0

1+ &&*27 &0*18 &*&22 0 0 0

20 -2*8 &1* &*&7 0 0 0

21 7*& &2*272 &*+7 0 0 0

 

Page 28: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 28/123

27 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

22 &*77+ &2*18 *118 0 0 0

2 *0+& &2*8& *8& 0 0 0

2& 7*8 &2*&7 *711 0 0 0

2 7*887 &*8& *0&2 0 0 0

& 11 -0*228 2*101 &*81+ 0 0 0

12 -0*21+ 2*+& *1& 0 0 0

1 0*+7+ 2&*8& *& 0 0 01& -1*&7 28*0& 7*02 0 0 0

1 -22*8 0*+7+ 1*27 0 0 0

1 21*17 -+*+ -2+* 0 0 0

17 -22*+ 8*8 12*72 0 0 0

18 21*08 -&2*& -0* 0 0 0

1+ 22*21 -12*18 -2*+ 0 0 0

20 -21*77 88*7& +*+& 0 0 0

21 0*+7 22*2& &*+ 0 0 0

22 -1*&7 2*711 *7 0 0 0

2 -1*&2 2*+&+ &*88 0 0 0

2& 1*01+ 20*&+2 *281 0 0 0

2 -0*22+ 2*70+ *18 0 0 017 11 0*18& &1* -0*02 0 0 0

12 0*171 &*02 -0*0& 0 0 0

1 0*1+ &*12 -0*0 0 0 0

1& 0*1 &*881 -0*027 0 0 0

1 0*10 &*&0 -0*0 0 0 0

1 0*211 &*0+ -0*222 0 0 0

17 0*117 &1*+1+ -0*01 0 0 0

18 0*22& &+*0 -0*22 0 0 0

1+ 0*21 &1*1&8 -0*01 0 0 0

20 0*1&& *& 0*1 0 0 0

21 0*18 &1*7 -0*01 0 0 0

22 0*18 &1*+& -0*02 0 0 02 0*18 &1*& -0*0 0 0 0

2& 0*18+ &1*72 -0*08 0 0 0

2 0*1+ &*08 -0*0 0 0 0

20 11 -2*172 &*++ -*0+ 0 0 0

12 -2*& &+*017 -*07+ 0 0 0

1 -1*07 &+*11 -*072 0 0 0

1& -2*81 &+*12 -&*&2 0 0 0

1 -2* &*8+1 -1*1 0 0 0

1 -2*& &*0+ -&*22 0 0 0

17 -2*27+ &1*8& -0*12 0 0 0

18 -2*1 8*&82 -*2 0 0 0

1+ -2*0 &*11 -10*0& 0 0 020 -2*18+ &+*&+7 &*0& 0 0 0

21 -1*2 &&*08+ -*088 0 0 0

22 -2*& &&*0+8 -*&&8 0 0 0

2 -*018 &*8+ -*10 0 0 0

Page 29: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 29/123

29 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

2& -1*81 &*881 -*7& 0 0 0

2 -2*&2 &+*008 -*077 0 0 0

2 11 0* &2*8+7 0*0& 0 0 0

12 0*82 &7*& 0*0& 0 0 0

1 0*8& &7*0 0*0& 0 0 0

1& 0*8 &7*7 0*01 0 0 0

1 0*0 &*17 0*08 0 0 01 0*+ &8*727 -0*1 0 0 0

17 0*278 8*+ 0*0& 0 0 0

18 0*+ &&*1+& -0*17 0 0 0

1+ 0*&2 &7*1& 0*0&7 0 0 0

20 0*&1 &1*++ 0*28 0 0 0

21 0*7 &2*++ 0*0& 0 0 0

22 0* &2*8& 0*0& 0 0 0

2 0* &2*82& 0*0&1 0 0 0

2& 0*& &2*++ 0*0 0 0 0

2 0*81 &7*02 0*0&& 0 0 0

28 11 -2*1 &&*702 -2*& 0 0 0

12 -2*7 0*028 -2*2 0 0 01 -1*& 0*21 -2*77 0 0 0

1& -*1 &+*++ -0*7& 0 0 0

1 -2*82+ &&*017 0*+& 0 0 0

1 -2*88 &+*117 -7* 0 0 0

17 -2*&8 8*+ 0*&1 0 0 0

18 -2*8 &*7+ -7* 0 0 0

1+ -2*221 0*71 -*&++ 0 0 0

20 -2* &*1& 2*&+ 0 0 0

21 -1*1 &&*+0 -2*8 0 0 0

22 -2*78 &&*1 -0*727 0 0 0

2 -*8 &&*&++ -2*28 0 0 0

2& -1*+18 &&*7+1 -&*8 0 0 02 -2*7 0*018 -2* 0 0 0

11 0*221 +*707 -0*01 0 0 0

12 0*22+ &&* -0*0 0 0 0

1 0*22 &&*0& -0*0 0 0 0

1& 0*22 &&*7 -0*01 0 0 0

1 0*1& &0*1 -0*0&+ 0 0 0

1 0*218 &*&2 -0*21 0 0 0

17 0*1& *18 -0*0&& 0 0 0

18 0*21 8*72 -0*2& 0 0 0

1+ 0*2+ &&*0+ -0*08 0 0 0

20 0*22 &0*8&2 0*1&& 0 0 0

21 0*22& +*7 -0*01 0 0 022 0*218 +*71+ -0*0& 0 0 0

2 0*218 +*7 -0*01 0 0 0

2& 0*22& +*+& -0*07 0 0 0

Page 30: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 30/123

28 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

2 0*228 &&*2 -0*07 0 0 0

& 11 -0*7 +*+71 -1*188 0 0 0

12 -0*887 8* -1*&1 0 0 0

1 -0*888 8*1 -1*&2 0 0 0

1& -0*88 8*+ -1*& 0 0 0

1 -0*++8 8*&& -1*+ 0 0 0

1 -0*887 8*227 -1*71 0 0 017 -0*811 +*88+ -1*18 0 0 0

18 -0*7 +*2 -1*&17 0 0 0

1+ -0*88 0*02 -1*1+ 0 0 0

20 -0*++ 0*28 -0*++ 0 0 0

21 -0*701 +*+8 -1*18+ 0 0 0

22 -0*++ 0*0 -1*18 0 0 0

2 -0*++ +*+ -1*187 0 0 0

2& -0*7 +*+12 -1*1+ 0 0 0

2 -0*888 8*&++ -1*& 0 0 0

11 -0*1+ &*0 -1*&+ 0 0 0

12 -0*102 0*00 -1*77 0 0 0

1 -0*0+8 &+*8+ -1*7 0 0 01& -0*10 0*0+& -1*7 0 0 0

1 -0*22 &+*+ -1*78 0 0 0

1 -0*108 &+*82 -1*721 0 0 0

17 -0*21 &*007 -1* 0 0 0

18 -0*1+7 &2*8+ -1*&+ 0 0 0

1+ -0*0 &*0+ -1*&8 0 0 0

20 -0*18& &*20& -1*20 0 0 0

21 -0*187 &2*+0 -1*&7 0 0 0

22 -0*1+2 &*18 -1*& 0 0 0

2 -0*1+& &*1+7 -1*1 0 0 0

2& -0*18+ &2*+2 -1*& 0 0 0

2 -0*1 &+*++1 -1*7 0 0 0 11 -1*87 7*+ -0*++& 0 0 0

12 -2*27+ &2*81 -1*28+ 0 0 0

1 -1*18+ &2*82 -1*2&2 0 0 0

1& -2*72+ &2*1 0*8& 0 0 0

1 -2*8 *7&2 -&*02 0 0 0

1 -2*281 &&*8+ -7*8& 0 0 0

17 -1*+82 1*++& -&*20 0 0 0

18 -1*877 &0*111 -7* 0 0 0

1+ -1*7+ &*872 2*21+ 0 0 0

20 -1*87& *7 * 0 0 0

21 -0*78 8*11& -0*+&7 0 0 0

22 -2*2 7*8 0*87+ 0 0 02 -2*+ 7*71 -1*0&1 0 0 0

2& -1*&2 8 -2*8 0 0 0

2 -2*28 &2*78 -1*287 0 0 0

Page 31: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 31/123

50 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

&1 11 0*08 *82 -0*00 0 0 0

12 0*01 8*821 -0*01 0 0 0

1 0*01 8*8+ -0*01 0 0 0

1& 0*07 8*88 -0*00 0 0 0

1 -0*001 +*28 0*008 0 0 0

1 0*02& 0*1& -0*1+8 0 0 0

17 0*02& *8&7 0*017 0 0 018 0*0&+ 27*07 -0*18+ 0 0 0

1+ 0*1&8 &*+18 -0*02 0 0 0

20 0*12 &*+ 0*17+ 0 0 0

21 0*08 *& -0*00 0 0 0

22 0*0+1 *&&1 0*00 0 0 0

2 0*08 *08 -0*00& 0 0 0

2& 0*081 *2& -0*01 0 0 0

2 0*0 8*88 -0*01& 0 0 0

&2 11 -0*7 &&*08 0*2 0 0 0

12 -0*8+1 &+*8+1 0*+1 0 0 0

1 -0*8+1 0*0 0*8+ 0 0 0

1& -0*8+ &+*0 0*0 0 0 01 -0*+8 &+*88+ 0*+ 0 0 0

1 -0*8+ &+*71+ 0*27+ 0 0 0

17 -0*8 &&*0 0* 0 0 0

18 -0*77 &*87 0*21+ 0 0 0

1+ -0*+ &&*0&1 0*28 0 0 0

20 -0*72 &&*21 0*8&& 0 0 0

21 -0*7 &&*18 0*2+ 0 0 0

22 -0*7& &*7 0*&7 0 0 0

2 -0*7& &*8+& 0*& 0 0 0

2& -0*7 &&*2& 0*17 0 0 0

2 -0*8+ &+*87 0*+2 0 0 0

& 11 -0*1& *77 0*7 0 0 012 -0*10 &0* 0*8&1 0 0 0

1 -0*102 &0* 0*8& 0 0 0

1& -0*102 &0*&8 0*8&7 0 0 0

1 -0*20+ &0*18 0*8 0 0 0

1 -0*12 &0*2 0*2 0 0 0

17 -0*2&+ * 0*72 0 0 0

18 -0*1 *7& 0*21 0 0 0

1+ -0*08 *72& 0*7 0 0 0

20 -0*121 *81 0*+& 0 0 0

21 -0*1&2 *& 0*72 0 0 0

22 -0*1&2 *+1 0*7 0 0 0

2 -0*1& *70+ 0*728 0 0 02& -0*1& *7 0*72 0 0 0

2 -0*102 &0*7 0*8& 0 0 0

&& 11 -1*& &*10+ *&7 0 0 0

Page 32: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 32/123

5+ of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

12 -1*71+ *8& *& 0 0 0

1 -0*81 *8+ *&&1 0 0 0

1& -2*0+7 *707 *217 0 0 0

1 -1*7+ &*722 -2*2+ 0 0 0

1 -1*72 &2*2 -&*7 0 0 0

17 -1*+ 1*++7 -2*27 0 0 0

18 -1*&72 +*7+8 -&*81 0 0 01+ -1*+2 *221 +*021 0 0 0

20 -1*&+ 28*&2 2*08 0 0 0

21 -0*2 &*17 * 0 0 0

22 -1*8& *+8 *12+ 0 0 0

2 -2*+ &*0&8 *&2 0 0 0

2& -1*088 &*2 1* 0 0 0

2 -1*72 *82 *& 0 0 0

7 11 1*70+ 8*1 -1*17 0 0 0

12 1*72 *+ -1&*7 0 0 0

1 1*7& &* -1*7 0 0 0

1& 1*0+ 2*7 -12*07 0 0 0

1 -11*&+1 *&1& -2*72 0 0 01 -&*1+ +&*2+& -&*& 0 0 0

17 -1*1 0*++ -2&*1+ 0 0 0

18 -*18 88*87& -&*8+ 0 0 0

1+ &0*+2 *0 -2*1 0 0 0

20 *01 28*1 17*&+ 0 0 0

21 1&*71+ +*21 -1*8 0 0 0

22 1&*2+& 7*118 -10* 0 0 0

2 12*+8 7*81& -12*11 0 0 0

2& 1*12 +*+1 -1*811 0 0 0

2 1*708 *878 -1&*8 0 0 0

8 11 * &2*7 -1*+& 0 0 0

12 8*111 &*+81 -2*18 0 0 01 +*1 &*+8& -2*782 0 0 0

1& 8*+&8 &*2 -0*& 0 0 0

1 -*& &&*0 -2*17 0 0 0

1 -2+*7 &1*&71 -2*&7 0 0 0

17 -*+& &0*+++ -1*+ 0 0 0

18 -1*0 8*1& -2*2 0 0 0

1+ 0*20+ &&*&8 -1*+ 0 0 0

20 &&*1+ &7*18 -1*28 0 0 0

21 7*88 &2*77 -2*+ 0 0 0

22 7*&72 &2*+& -0*&22 0 0 0

2 *8& &2*7 -1*21 0 0 0

2& *7+7 &2*&01 -*&+ 0 0 02 8*0+ &*+71 -2*1 0 0 0

+ 11 *1 *01 -2*0 0 0 0

12 7*&2 8*+ -2*1& 0 0 0

Page 33: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 33/123

52 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1 8*2 8*7 -2*8+ 0 0 0

1& 8*0 8*71+ -0*+7 0 0 0

1 -28*2 &0*& -2*12 0 0 0

1 -22*+& 7*77& -2*& 0 0 0

17 -2+* 8*08+ -2*08 0 0 0

18 -2&*2& *22 -2*211 0 0 0

1+ &1*81 *+&1 -2*02 0 0 020 *&+ *81 -1*+08 0 0 0

21 7* *+8& -2*&1 0 0 0

22 *7 *1 -0*702 0 0 0

2 &*+ *0&7 -1*&78 0 0 0

2& *&1 *8 -*&17 0 0 0

2 7*&8 8* -2*12 0 0 0

0 11 0*1&+ 21*21+ -*&7 0 0 0

12 0*7 21*21 -*11 0 0 0

1 1*7 20*&+ -*2& 0 0 0

1& 0*8& 1+* -1*7 0 0 0

1 -20*2 *082 -11*2+ 0 0 0

1 -20*+2 8*+8 -7*& 0 0 017 -21*0& &*+8 -11*20 0 0 0

18 -21*& 8*&+ -7*+ 0 0 0

1+ 21*8 -12*& &*22 0 0 0

20 21*7 -&*0 0*&& 0 0 0

21 1*&7 20*7 -*88 0 0 0

22 0*&22 1+*22 -1*7 0 0 0

2 -1*0&+ 22*08 -* 0 0 0

2& -0*12& 2*17 -*221 0 0 0

2 0*8 21* -*1 0 0 0

11 1*2 *& *+0 0 0 0

12 1&*8 &0*1 7*712 0 0 0

1 1*+7 &1*27+ 8*0& 0 0 01& 1*+ &*&7 8*+28 0 0 0

1 -&*288 12*2&1 2*+1 0 0 0

1 -1&*8& -2+*2 -1&* 0 0 0

17 -*7+ 8*2& 2*10 0 0 0

18 -1*2+ -2*8& -1* 0 0 0

1+ 2*20& &*&7 11*70& 0 0 0

20 &2*7& 10*+& 2+*1+ 0 0 0

21 1&*1& 7*2 7*2& 0 0 0

22 1*08+ &0*0 8*122 0 0 0

2 12*1+ *&2+ *71 0 0 0

2& 11*77 *01 *88 0 0 0

2 1&*0 +*+7& 7*8 0 0 0 11 -1*&2+ *81 0*01 0 0 0

12 -1*&7 *7++ 0*08 0 0 0

1 -0*++1 *&0+ 0*18 0 0 0

Page 34: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 34/123

55 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1& -0*07+ *2 0*82 0 0 0

1 -*1& -1*01 0*10 0 0 0

1 -*77 7*212 -0*07 0 0 0

17 -*0 -1 0*08 0 0 0

18 -* +*22 -0*0+ 0 0 0

1+ 2*17 2&*2 0*01 0 0 0

20 0*7+ 2*+7 0*1+& 0 0 021 -0*87 *&2 0* 0 0 0

22 0*0& *2& 0*802 0 0 0

2 -1*+8 *2 -0*&++ 0 0 0

2& -2*8+8 * -0*701 0 0 0

2 -1*0 &*011 0*07 0 0 0

7 11 -1*&8 17*+78 -0*0 0 0 0

12 -18*7 17*2 -0*& 0 0 0

1 -18*& 17*&82 0*22& 0 0 0

1& -17*+ 17*&1 0*8 0 0 0

1 -0*8 +*++8 -0*1 0 0 0

1 -*+ 1&*&+8 -0*&+ 0 0 0

17 -&8*&& 10*1& -0*2+ 0 0 018 -&*72 1&*81& -0*&& 0 0 0

1+ 1*&7 2*& -0*21 0 0 0

20 1*7 21*1&2 -0*1 0 0 0

21 -1*22 17*7+8 0*2 0 0 0

22 -1*72 17*777 0*&21 0 0 0

2 -1*7 18*18 -0*87 0 0 0

2& -17*2 18*17+ -1*01 0 0 0

2 -18* 17*71 -0*+ 0 0 0

8 11 -1*+7 21*2+ -0*&1 0 0 0

12 -1*2& 21*11 -0*1& 0 0 0

1 -1*1 21*&8 0*0& 0 0 0

1& -1*72 21*182 0*222 0 0 01 -*1 2*+ -0*1+ 0 0 0

1 -1*77 28*82 -0*+ 0 0 0

17 -1*& 2*218 -0*& 0 0 0

18 -2+*&+ 28*1 -0*27 0 0 0

1+ 2*+2 1+*01 -0*&& 0 0 0

20 1*&7 1&*188 -0*27 0 0 0

21 -1*82 21*12 0*127 0 0 0

22 -1*& 20*81 0*28 0 0 0

2 -1&*12 21*87 -1*02+ 0 0 0

2& -1&* 21*88 -1*187 0 0 0

2 -1*18 21*7 -0*0 0 0 0

+ 11 -8*18& 8*7+8 0*002 0 0 012 -+*+ &1*&11 0*00 0 0 0

1 -+*+& &0*++ 0*&78 0 0 0

1& -10* +*2 0*& 0 0 0

Page 35: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 35/123

5 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1 -* +*20& 0*012 0 0 0

1 *78 +7*7 -0*2&7 0 0 0

17 -&*7 *+1 0*00+ 0 0 0

18 8*&&& +*1& -0*2 0 0 0

1+ 18*1 11*00 -0*00& 0 0 0

20 -2&*81 -17*& 0*2 0 0 0

21 -8*1+8 8*8 0*&7 0 0 022 -8*71 *7+ 0*1 0 0 0

2 -8*17 +*21 -0*&7 0 0 0

2& -7*07 &0*8 -0*2 0 0 0

2 -+*+02 &1*+ 0*01 0 0 0

87 11 0*712 2*7+ 1*+2 0 0 0

12 0*+ 27*&7 2*1 0 0 0

1 1*&28 27*8& 2*+ 0 0 0

1& 1*+ 27*7 *722 0 0 0

1 0*8+& 2*&8 1*07 0 0 0

1 0*+ 17*+8 -2+*0 0 0 0

17 0*& 2&*7+& 0*&+ 0 0 0

18 0*70& 1*0+ -2+*78 0 0 01+ 0*782 2*7+7 2*8 0 0 0

20 0*721 *282 2*+ 0 0 0

21 1*177 2*70+ 1*818 0 0 0

22 1*108 2*0+1 *001 0 0 0

2 0*2&8 2*882 1* 0 0 0

2& 0*17 2* 0*18 0 0 0

2 0*+2 27*&7 2*281 0 0 0

+8 11 1*2&8 2&*88 *11 0 0 0

12 1*7 2*+7& &*17 0 0 0

1 2*28 2*& &*08 0 0 0

1& 2*1& 2*7 *2+ 0 0 0

1 1*77 2*10+ 1*11 0 0 01 1* 2*7& -&8* 0 0 0

17 1*12 0*2& 0*7 0 0 0

18 1*2& 2&*788 -&+*21 0 0 0

1+ 1*& 18*22 * 0 0 0

20 1*2 2*+88 *&2+ 0 0 0

21 1*88 2&*08 *7 0 0 0

22 1*718 2&*1 *7&+ 0 0 0

2 0*7 2&*708 *& 0 0 0

2& 0*777 2&*2 1*&7 0 0 0

2 1*+ 2*027 &*127 0 0 0

10+ 11 1*2 2&*+ -*21 0 0 0

12 1*+ 2*1 -*781 0 0 01 2*28 2*28+ -*+11 0 0 0

1& 2*1&1 2*&+ -1*70& 0 0 0

1 1*+8 2*+8 -0*18 0 0 0

Page 36: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 36/123

5, of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1 1*70 2*2& -8*7 0 0 0

17 1*1+ 1* -0*0+ 0 0 0

18 1*27& 2&*08 -8*2+ 0 0 0

1+ 1* 18*+& -*8& 0 0 0

20 1*28 2*1+ 1*& 0 0 0

21 1*8& 2&*&2 -*&2 0 0 0

22 1*712 2&*7+ -1*2& 0 0 02 0*78 2*28 -*1+ 0 0 0

2& 0*82 2*1& -*+8 0 0 0

2 1*+1 2* -*71 0 0 0

120 11 0*72 2*722 -2* 0 0 0

12 0*+7+ 28*&7 -* 0 0 0

1 1*&&2 28*7& -*81 0 0 0

1& 1* 28*11+ -1*8 0 0 0

1 0*+08 27* -1*87& 0 0 0

1 0*+87 7*+0 -*+& 0 0 0

17 0* 2*+02 -1*071 0 0 0

18 0*71 *18 -*1 0 0 0

1+ 0*7+& 27*&2 -&*0 0 0 020 0*71 17*28 1*027 0 0 0

21 1*187 2*27 -2*778 0 0 0

22 1*081 2*72 -1*027 0 0 0

2 0*2 2*817 -2*2+ 0 0 0

2& 0* 27*072 -&*08 0 0 0

2 0*+78 28*&7 -*2 0 0 0

11 11 1*27 7*0&8 -*+1 0 0 0

12 1*08 &0*87 -7*7 0 0 0

1 1*+1 &1*2 -8*02 0 0 0

1& 1&*118 8*&7 -*2+ 0 0 0

1 -&*0+ 12*0 -2*80& 0 0 0

1 &&*81 10+*++ -2+*++ 0 0 017 -* 8*7 -2*01+ 0 0 0

18 &*1 10*& -2+*21 0 0 0

1+ 2*7& *1 -11*88 0 0 0

20 -1*+ -2* 1*07 0 0 0

21 1&*21 8*12 -7*277 0 0 0

22 12*87 &*+1 -*7&& 0 0 0

2 12*7& *+7 -*2 0 0 0

2& 1&*7 +*1& -8*18 0 0 0

2 1&*+7+ &0*+ -7*+2 0 0 0

12 11 -0*+1 *8+ -0*0 0 0 0

12 -1*1& &*+7& -0*07+ 0 0 0

1 -0*+ &*07 -0*28 0 0 01& -1* &*8 1*0& 0 0 0

1 -&*+8 -1*88 -0*11& 0 0 0

1 1*08+ 1*+ -0*22 0 0 0

Page 37: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 37/123

56 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

17 -&*81 -11*+ -0*0+ 0 0 0

18 1*2 *&8 -0*20& 0 0 0

1+ 2*88& 2*7&7 -0*02 0 0 0

20 -*18 10*1 0*08 0 0 0

21 -0*&2 *28 -0*0+ 0 0 0

22 -1* *71 1*2 0 0 0

2 -1*01 7*22 0*&8+ 0 0 02& -0*2 7*0& -1*&&& 0 0 0

2 -1*1+ *18 -0*081 0 0 0

1 11 -1*11 18*2 0*28+ 0 0 0

12 -17*7 17*++ 0* 0 0 0

1 -17*& 17*82 -0*21 0 0 0

1& -18*&1 18*27 1* 0 0 0

1 -&+*+ 10*2 0*1 0 0 0

1 0*&78 21*12+ 0*181 0 0 0

17 -&7*7 10*+ 0*27& 0 0 0

18 2*7 21*&+ 0*1& 0 0 0

1+ 1* 2*0 0*0& 0 0 0

20 -*72 1*187 0*&8 0 0 021 -1*2& 18*1 -0*21 0 0 0

22 -1*1+ 18* 1*1 0 0 0

2 -1*78 18*&+ 0*82+ 0 0 0

2& -1&*8 18*0& -1*07 0 0 0

2 -17*7 18*08 0*2 0 0 0

1& 11 -1*0 21*21 0*&7 0 0 0

12 -1*7 21*8 0*02 0 0 0

1 -1*22 21*&&1 -0*0& 0 0 0

1& -1*77 22*00+ 1*8&7 0 0 0

1 -2*+2 2*+ 0*08 0 0 0

1 0*171 1&*&+ 0*27 0 0 0

17 -0*7 2*2 0*&& 0 0 018 2*2 1&*2 0*22 0 0 0

1+ 2&*1+ 1+*2 0*&1 0 0 0

20 -28*7 28*8 0*1 0 0 0

21 -12*87 21*20& -0*111 0 0 0

22 -1*&2 21*772 1*782 0 0 0

2 -1*18 21*&+ 0*+8 0 0 0

2& -12* 20*871 -0*+07 0 0 0

2 -1*1 21*2 0*&+& 0 0 0

1 11 -8*17 *2 0*0 0 0 0

12 -10*21 8*8 0*077 0 0 0

1 -10*22 8*&18 -0*+& 0 0 0

1& -+*&&& &1*1 1*207 0 0 01 -* 7*2++ 0*07& 0 0 0

1 -2* -17*0 -0*177 0 0 0

17 -&*2 *08 0*0 0 0 0

Page 38: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 38/123

57 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

18 -2&*1 -1+*27 -0*1+ 0 0 0

1+ 18*177 8*1 0*0 0 0 0

20 8*1 +2*1 0*17 0 0 0

21 -8*177 *20 -0*&08 0 0 0

22 -7*&0& 8*+&1 1*1+ 0 0 0

2 -8*17 7*08 0* 0 0 0

2& -8*+& &* -1*07 0 0 02 -10*17 8*81+ 0*072 0 0 0

1&2 11 -0*27 70*01 2*71& 0 0 0

12 -0*287 81*1 *077 0 0 0

1 -0*28 81*17 *081 0 0 0

1& -0*2+1 81*08 *088 0 0 0

1 -0*+& 81*08+ *072 0 0 0

1 -0*2& 81*07 2*8+ 0 0 0

17 -0*82 +*+7 2*71 0 0 0

18 -0*22 +*+1 2*27 0 0 0

1+ -0*18 70*0+ 2*71+ 0 0 0

20 -0*2+8 70*1&7 2*+01 0 0 0

21 -0*271 70*01 2*718 0 0 022 -0*27+ 70*18 2*72 0 0 0

2 -0*27+ 70*0&7 2*71 0 0 0

2& -0*272 +*87 2*70 0 0 0

2 -0*287 81*1 *07 0 0 0

1& 11 -0*21 *&+ -2* 0 0 0

12 -0*221 7*72 -2*+ 0 0 0

1 -0*217 7*1+ -2*+01 0 0 0

1& -0*22 7*777 -2*8+7 0 0 0

1 -0*7 7*1& -2*8++ 0 0 0

1 -0*227 77*12+ -*0+& 0 0 0

17 -0*1 *8 -2*+ 0 0 0

18 -0*221 *+01 -2*7& 0 0 01+ -0*0++ *07 -2*1 0 0 0

20 -0*20+ *0+2 -2* 0 0 0

21 -0*21 *+1 -2*1 0 0 0

22 -0*217 *&+ -2* 0 0 0

2 -0*21+ *02 -2*+ 0 0 0

2& -0*21 *&&& -2* 0 0 0

2 -0*222 7*701 -2*8++ 0 0 0

88 11 0*2 28*8 0*1 0*2&8 -0*02 -0*82

12 0*8 +*108 0*1+ 0*8 -0*08 -0*70&

1 0* +*0+ 0*201 0*7 -0*08 -0*71

1& 0*& +*08+ 0*20+ 0*+0 -0*0+ -0*71

1 0*27 &0*&7+ 0*207 0*7& -0*0&11 -0*&71 0*1 8*7 0*02 -0*1 -0*02+ -0*88

17 0*18 0*227 0*1& 0*21 -0*02+ -0*22

18 0*17 28*&78 -0*00+ -0*2&2 -0*017 -0*2

Page 39: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 39/123

59 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

1+ 0*21 27*&8 0*12& 0*228 -0*02& -0*8

20 0*2&2 2+*2& 0*28 0*7& -0*0 -0*&+8

21 0*20& 28*8&1 0*1& 0*22 -0*02 -0*+1

22 0*20 28*87 0*1&8 0*2782 -0*027 -0*+&

2 0*1+ 28*871 0*11 0*2 -0*027 -0*72

2& 0*1+& 28*87 0*122 0*21 -0*02 -0*+

2 0* +*08+ 0*1+ 0*+ -0*08 -0*++8+ 11 0*& &0*+2 2*07+ &*&81 -0*011+ -0*+

12 0*&7 *1& 2*88 *18 -0*017 -1*108

1 0*&7 *28 2*81 *1701 -0*017 -1*108

1& 0*&7 *2& 2*8 *1808 -0*017 -1*11

1 0*&1 *2 2*87 *1+& -0*01+ -0*8

1 0* *22 2* *1+8 -0*00+ -1*0

17 0*78 &0*77& 2*08 &*&+2 -0*01& -0*7

18 0*&2 &0*+71 1*87& *8172 -0*00 -0*+01

1+ 0*&8 &0*&0+ 2*07& &*&7&1 -0*01 -1*22

20 0*&7& &0*212 2*28& *1&8+ -0*021 -0*++8

21 0*& &0*87 2*071 &*&7 -0*0118 -0*+

22 0*&& &0*70 2*07& &*&78 -0*0118 -0*+12 0*& &0*&+ 2*08 &*&+8 -0*012 -0*+&+

2& 0*& &0*&81 2*08& &*&87+ -0*012 -0*+&8

2 0*8 *877 2*8+ *1228 -0*017 -1*08+

+0 11 -0*01 &0*08& 2*0+ &*178 -0*008 1*&8

12 -0*7& *& 2*888 *2&2 -0*012 1*1

1 -0*7& *+ 2*881 *228 -0*012 1*2&

1& -0*7 *7& 2*88& *2&1 -0*012 1*1

1 -0*80& *1 2*8+1 *21 -0*01 1*+08

1 -0*77 *02 2*& *&80 -0*00 1*7+1

17 -0*72 &0*071 2*0+ &*2 -0*00+ 1*+7

18 -0*2& &0*&7 1*8 *7 0*0012 1*&08

1+ -0*1 &0*0+7 2*088 &*0+1 -0*007 1*112220 -0*7+ +*21 2*2 *2801 -0*018 1*278+

21 -0*01 &0*17+ 2*08 &*02 -0*008 1*&1

22 -0*01 &0*1+& 2*087 &*12 -0*008 1*

2 -0*02 +*+8+ 2*0+8 &* -0*008 1*

2& -0*02 +*+7& 2*0+& &*1+& -0*008 1*

2 -0*72& *01 2*8+ *17+7 -0*012 1*&21

+1 11 -0*1+ 22*28 0*27 0*08 -0*008 0*&788

12 -0* *18 0*&&1 0*+&+ -0*01 0*8&7

1 -0*1 *2&+ 0*& 0*++ -0*01 0*87

1& -0* *28 0*&& 0*+&8 -0*012 0*8

1 -0*&2 *22+ 0*&&1 0*+2 -0*012 1*07+1

1 -0*71 *27 0*17 0*0+87 -0*002 0*+08+17 -0*2 22*77 0*2 0*2 -0*008 0*722

18 -0*217 22*+7 -0*011 -0* 0*002 0*

1+ -0*12 22*&7+ 0*27 0*&8& -0*00+ 0*2&

Page 40: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 40/123

58 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

20 -0*17& 22*081 0*2 1*&017 -0*01+ 0*&0&

21 -0*1+7 22*+7 0*22 0*&01 -0*00+ 0*&81

22 -0*1+ 22*1 0*2 0* -0*008 0*&7+

2 -0*1+& 22*&+ 0*22 0*1& -0*008 0*&7

2& -0*1+ 22*&& 0*28 0*& -0*00+ 0*&77+

2 -0*&7 *17 0*&+ 0*+&&+ -0*01 0*827

++ 11 1*+02 2*+&7 0*07 0*1+ -0*01 -&*02812 2*+8 72*8 0*10 0*1+&2 -0*02 -*28

1 2*+8 72*2 0*107 0*1+7 -0*02 -*

1& 2*+8 72* 0*117 0*222 -0*02 -*&

1 2*+12 7*&+ 0*107 0*1+ -0*022 -*0

1 2*++ 72*71+ -0*0& -0*27 -0*012 -*287

17 1*81 *+11 0*077 0*1&07 -0*01 -*71

18 1*888 *081 -0*08& -0*82 -0*00 -*+87

1+ 1*+7& &8*+82 0*07 0*182 -0*01 -&*2+

20 1*+17 2*81 0*2 0*1 -0*02 -&*0+

21 1*+0 2*+2 0*077 0*1&1+ -0*01 -&*0&

22 1*+0 2*+28 0*087 0*18& -0*01 -&*0&

2 1*+ 2*++ 0*07 0*17 -0*01 -&*0222& 1*+ 2*+ 0*0 0*110 -0*01 -&*022

2 2*+7 72*&&+ 0*10 0*1+ -0*022 -*2++

110 11 1*+1 &*71 -0*07 -0*1& 0*01 -&*0&&

12 2*+ 7*0&2 -0*102 -0*1+ 0*021& -*22

1 2*+ 7*01+ -0*10 -0*1+ 0*021& -*28

1& 2*+7 7*02 -0*08+ -0*1 0*021 -*27

1 2*881 7+*12& -0*101 -0*188 0*020 -*++2

1 2*+ 7&*+8 -0*21 -0*71 0*021 -*2+8

17 1*88 8*82 -0*07& -0*1+ 0*01&1 -*77

18 1*+2 &* -0*2& -0* 0*02 -&*08

1+ 1*+82 0*+ -0*07 -0*1&8 0*018 -&*1

20 1*8+7 &*8 0*08 0*77 0*00& -&*00821 1*+12 &*727 -0*07 -0*1& 0*01&+ -&*0

22 1*+1& &*7&1 -0*02 -0*110& 0*01&8 -&*0

2 1*+07 &*77& -0*07& -0*1& 0*01 -&*08

2& 1*+0 &*71 -0*088 -0*17 0*011 -&*0

2 2*++ 7&*8++ -0*101 -0*1+1 0*021 -*22

121 11 0*20 2+*8 -0*1& -0*271 0*0271 -0*+1

12 0*& &0*&7 -0*20+ -0*8+ 0*0+ -0*71+

1 0*8 &0*&8 -0*21& -0*++ 0*08+ -0*728

1& 0* &0*&+ -0*1+1 -0*& 0*0+2 -0*718

1 0*2 &1*+ -0*22 -0*&0 0*0&12 -0*1

1 0*&07 &0*81 -0* -0*87 0*0&8 -0*8

17 0*171 1*0+ -0*1 -0*28 0*02+ -0*2&18 0*2& 0*187 -0*28+ -0*77 0*07 -0*08

1+ 0*2 28*+ -0*1 -0*2 0*02 -0*&+

20 0*1 2+*12 -0*001 0*21 0*017 -0*27

Page 41: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 41/123

0 of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

21 0*207 2+*8 -0*1 -0*28 0*027 -0*&01

22 0*20 2+*8 -0*127 -0*22 0*027 -0*+

2 0*1++ 2+*8 -0*1&1 -0*21 0*0272 -0*82

2& 0*20& 2+*8& -0*1 -0*1 0*02+ -0*+

2 0*2 &0*&1 -0*20+ -0*88 0*08+ -0*71&

122 11 0*&&+ &0*7 -2*0&& -&*&1& 0*0128 -0*+21

12 0* *887 -2*88 -*127 0*018 -1*0821 0* *+77 -2*81 -*112 0*017+ -1*082

1& 0*1 *70 -2*82 -*11 0*0182 -1*077

1 0*&&8 *072 -2*8&2 -*12 0*01+8 -0*807

1 0*&& *08 -*0& -*7+ 0*02 -1*1

17 0* &0*2 -2*0&8 -&*&1+ 0*01& -0*&7

18 0*& +*+88 -2*2&+ -*08 0*021 -0*+7

1+ 0*& &0*182 -2*0&1 -&*&1 0*011 -1*1+

20 0*&8 &0*7& -1*8& -*7&8 0*00& -0*87

21 0*&&+ &0*&8 -2*07 -&*& 0*012 -0*+211

22 0*&&7 &0*18& -2*08 -&*&8 0*012+ -0*+1

2 0*&&+ &0*277 -2*01 -&*&2+ 0*012+ -0*+21

2& 0*&1 &0*1 -2*01 -&*+1 0*012 -0*+22 0*2 * -2*81 -*0 0*018 -1*0&

12 11 -0*7 +*+8 -2*0& -&*&&7 0*00+ 1*2+71

12 -0*70 *&21 -2*8& -*178 0*01 1*++2

1 -0*70 *12 -2*8&7 -*1 0*01 1*+8

1& -0*70 *21 -2*8 -*1+7 0*017 1*01

1 -0*77 *&17 -2*8 -*181 0*01& 1*8&1

1 -0*8 &*+ -*08+ -*+&1 0*0228 1*22&

17 -0*& +*+& -2*0 -&*& 0*010 1*+&

18 -0* +*&82 -2*28+ -*21 0*0187 1*2202

1+ -0*0 +*+& -2*0 -&*&&& 0*008 1*0&7

20 -0*++ &0*+ -1*81+ -*8& 0*000 1*7&

21 -0*7 &0*02+ -2*0&7 -&*&2 0*00+ 1*2+222 -0*77 +*72 -2*0 -&*& 0*00+7 1*2++1

2 -0*7 +*8&8 -2*01 -&*&2 0*00+ 1*2+8

2& -0*7 &0*1& -2*0&2 -&*&28 0*00+& 1*2+1

2 -0*+7 *17 -2*82 -*117 0*01 1*7+2

12& 11 -0*21 2*+&& -0* -0*77 0*00+ 0*2

12 -0*+& *&1 -0*0 -1*18 0*01&1 0*+2+

1 -0*+ *&7 -0* -1*07 0*01&1 0*+2+

1& -0*+2 *21 -0*12 -1*2 0*01&2 0*+22

1 -0*&7 *&2 -0*02 -1*11 0*01 1*177

1 -0*7 &*+2 -0*872 -2*17 0*02& 0*871

17 -0*0& 2*++ -0*2 -0*7+ 0*00+1 0*80

18 -0*212 2*& -0*2 -1*2 0*01+ 0*&821+ -0*18 2*+28 -0* -0*78& 0*0101 0*017

20 -0*2 2&*&22 -0*08+ 0*0728 0 0*221

21 -0*22 2&*01 -0*1 -0*7 0*00+ 0*&+

Page 42: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 42/123

+ of +25

$; GAS SEPARATION PLANT PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORY BUILDING

P(.e

 

22 -0*22+ 2*78 -0*2 -0*78 0*00+7 0*&81

2 -0*2 2*877 -0*1 -0*787 0*00+ 0*&+7

2& -0*2 2&*102 -0* -0*77 0*00+ 0*

2 -0*+ *&2 -0*0+ -1*2 0*01&1 0*+18

1& 11 -2*11 *108 0*& 1*+12 -0*00 *07

12 -*01 77*0 0*87 1*8818 -0*00 7*8+&1

1 -*01 77*0& 0*87& 1*88&2 -0*00 7*8+&1& -*01 77*07 0*88 1*+0 -0*00 7*8+1

1 -*71 77*0& 0*87 1*88 -0*00 8*2&0

1 -*11 7*+ 0*8 1*1&2 0*00 7*+278

17 -2*&2 *08+ 0*& 1*+&7 -0*00 *&1+

18 -2*21 2*+7& 0*&1 0*1+ 0*007 *107

1+ -2*202 *12 0*& 1*877 -0*00& &*72

20 -2*01 *2&1 0*8 2*10& -0*01 *0+&

21 -2*11 *088 0*&7 1*+ -0*00 *072

22 -2*11 *101 0* 1*&12+ -0*00 *072

2 -2*11 *127 0*& 1*888 -0*00 *0728

2& -2*12 *11& 0*+ 1*+ -0*00& *07&

2 -*8& 7*8& 0*8& 1*82 -0*00 7*87+1&7 11 -2*&2 &*1& -0*02 -1*08 0*00& *1+

12 -*+8 78*1& -0*78 -1*701 0*00 7*888&

1 -*+8 78*+ -0*78& -1*70& 0*00& 7*888

1& -*01 78*7 -0*77 -1*77 0*00 7*8++

1 -*70+ 78* -0*78 -1*7 0*00+ 8*2+

1 -*+ 78*72+ -0*++8 -2*&& 0*01 7*801

17 -2*& &*2 -0*02 -1*0 0*00&2 *&+07

18 -2*& &*&28 -0*817 -2*0&7 0*017 *1112

1+ -2*21 &*2 -0*02 -1*0+ 0*00 &*788&

20 -2* &*1++ -0*87 -0*+ -0*00 *178

21 -2*&2 &*2+ -0*0 -1*1 0*00& *1+7

22 -2*&& &*7 -0*+& -1*28& 0*00&8 *1&2 -2*&2 &*2 -0*01 -1*0 0*00& *1+

2& -2*& &*27 -0*1 -1*2 0*00&& *1&

2 -*81 78*8 -0*77 -1*8 0*00 7*802

Page 43: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 43/123

CONCRETE FOUNDATION DESIGN CENTRAL CONTROL / LABORATORY BUILDING

Foundation Design

@f-!?2 L$f 

&f = 30 /   +390 2300 O

1f = 30 / Foundation Weight Resistant Moment    +390 2300 O

&! = 03 /   +8320 to*

1! = 03 /   035, to*

&OF E) = +3 /   +830 to* 10.7

>f = 03, / 3.5 $*+ 10.7

>s = 037 /

>! = 038 /

Soil Pressure Check 

to ;e c$ec%e# (.(i*st

 A))ow3 Soi) &e(ri*. C(!(cit' = +7

 A))ow3 Soi) &e(ri*. C(!(cit' = 22367

  FM" = FM

Wft.

= B = +?6 &

f  1

f 2

W!e#

=  = +?6 1

f  &

f 2

Wsoi) = Z )3

W2+

ZZ  )3

SH = FY" ? @&f  B 1

f  H M" ?

B H " ?

S- = FY" ? @&f  B 1

f  H M" ?

B H " ?

  t?/2 @!er/(*e*t )o(# co*#itio*

wit$ FY" = FY H Wf#*   t?/2 @te/!or(r' )o(# co*#itio*

1f 

&f 

&!

1!

>f 

>s

200

&3O3F E)3

>!

Z

Page 44: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 44/123

  F" = F

Foundation Stability Check 

+3, 236

+3, @Erectio*

  = +39 @O!er(ti*.Test

+3, @Erectio*

  = +39 @O!er(ti*.Test

JOINT LOADSUPPORT REACTION FRO" STAAD PRO "TON FORCES AT BOTTO" OF FOOTING "TON

F FY FZ " "Y "Z FH FYH FZH "H "ZH

+ 5++ +63065 62356, +53,7 0 0 0   +63065 +0+35+ +53,, 2+369 2,370 +0377

5+2 +93,,7 703+9 +,305+ 0 0 0   +93,,7 +083+5 +,305 230, 28368 ++396

5+5 +836++ 70385, +,370 0 0 0   +836++ +08399 +,370 2,3+5 5+359 +23+7

5+ +73,5 7+3007 +63987 0 0 0   +73,5 +08386 +6380 2730 29307 +230

5+, -+03+8 6+376 26308 0 0 0   +03+8 +00370 263+ 232, +635+ ++379

5+6 59359 583596 -+,399, 0 0 0   59359 7935 +,398 2,32 6+3+ +530

5+7 -+23698 ,5385+ 2382, 0 0 0   +23698 82399 2385 58399 20350 ++3,

5+9 5,3996 5+3,72 -+73568 0 0 0   5,3996 703,2 +7357 27378 ,732 +230

5+8 39+ 703788 23+7 0 0 0   39+ +0837, 23+7 537 7+370 +538+

520 -5376+ 853+,8 36 0 0 0   5376+ +523++ 36 7+3+ 6302 +,38

52+ +73++7 653+2 +322 0 0 0   +73++7 +02307 +322 2237, 27358 ++309

522 +,308 653+82 +,3+2 0 0 0   +,308 +023+ +,3+ 2366 2309 +038,

525 +,3008 6+36+ +2397, 0 0 0   +,3008 +003,6 +2399 20360 230+ +037

52 +73077 6+3,59 ++3692 0 0 0   +73077 +0038 ++369 +9368 27352 +03,8

52, +93, 703+2 +,300, 0 0 0   +93, +08307 +,30+ 230+ 28367 ++39,

2 5++ 93077 ,039 3895 0 0 0   93077 9830 389 7387 +2382 73,,

5+2 83206 ,,36 ,3,95 0 0 0   83206 83,8 ,3,9 9385 +375 93+5

5+5 +038 ,,36 63+8+ 0 0 0   +038 83,8 63+8 838+ +6378 93+

5+ 73,07 ,,3527 6358 0 0 0   73,07 8329 6358 +0322 +230+ 7389

5+, -56387 ,5398 ,3,87 0 0 0   56387 8239 ,360 9386 ,83+2 +23+9

5+6 63962 603,+9 ,302 0 0 0   63962 8837 ,30 936 7389 +306

5+7 -593076 93689 3889 0 0 0   593076 9736, ,300 9300 60382 ++38

SFs)#

 = 03,FY"?@FM"2HF"203,  --J i*i/u/ v()ue of SFs)i#i*.

 =

SFOT

-M = 03,1f  FY" ? N @&OFH032 F" --J i*i/u/ v()ue of SF

overtur*i*. =

SFOT

- = 03,&f  FY" ? N @&OFH032 FM" --J i*i/u/ v()ue of SF

overtur*i*. =

S*'( P&%

S

Page 45: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 45/123

5+9 ,3755 ,,352+ 3902 0 0 0   ,3755 8327 390 7369 753+7 +

5+8 ,3228 ,23+89 3868 0 0 0   ,3228 8+3+, 387 738, 96377 +

520 -283,9 ,3,7, ,3+6 0 0 0   283,9 93,2 ,3+6 9326 7355 +

52+ 8356, ,039 ,3,82 0 0 0   8356, 9830 ,3,8 938, +389

522 63579 ,03+5+ ,378+ 0 0 0   63579 98309 ,378 8327 +0320

525 63799 ,039 357, 0 0 0   63799 9830 359 7300 +0396

52 8377, ,0376, 3+76 0 0 0   8377, 9837+ 3+9 6369 +,36

52, 83+8 ,,36,2 ,3,9, 0 0 0   83+8 8360 ,3,8 938 +370

5 5++ 635+7 23529 3+, 0 0 0   635+7 9+329 32 7306 +03++

5+2 73802 639 ,30+ 0 0 0   73802 9,378 ,30 9307 +236

5+5 83+26 6379 ,360+ 0 0 0   83+26 9,375 ,360 9386 +360

5+ 6356 63682 ,37, 0 0 0   6356 9,36 ,37, 83+8 +03+9

5+, -5030+9 939,+ ,3055 0 0 0   5030+9 97390 ,305 930, 9305 +

5+6 5930 73652 389 0 0 0   5930 963,9 389 7387 60397 +

5+7 -5+3605 3558 307 0 0 0   5+3605 95328 3+ 730, ,03,6 +

5+9 563,8 53+2 35,5 0 0 0   563,8 92307 35, 6386 ,9355 +

5+8 3257 035+9 322 0 0 0   3257 78327 32 7309 70379 +

520 -25392, +3,56 376 0 0 0   25392, 9038 39 73+6 593+2

52+ 73, 23272 387, 0 0 0   73, 9+322 389 7386 +2306

522 3778 23+9 ,3++9 0 0 0   3778 9+3+5 ,3+2 93+8 736,

525 ,308 2359 539, 0 0 0   ,308 9+355 539, 63+7 93+,

52 739,, 2376 537++ 0 0 0   739,, 9+35 537+ ,38 +23,7

52, 73997 639, ,302 0 0 0   73997 9,378 ,30 9307 +2362

5++ -03229 253+0+ 39+8 0 0 0   03229 6230, 392 737+ 0356

5+2 -032+8 2,368 ,3,+ 0 0 0   032+8 636 ,3,+ 9392 035,

5+5 03878 2396 ,36, 0 0 0   03878 65390 ,36, 8305 +3,7

5+ -+367 29350 730,2 0 0 0   +367 6732, 730, ++329 235,

5+, -223679 603878 +53267 0 0 0   223679 88385 +5327 2+325 56329 +

5+6 2+35+7 -58389 -28365+ 0 0 0   2+35+7 -+300 28365 73+ 53++

5+7 -223697 ,93596 +23,72 0 0 0   223697 8735 +23,7 203+2 56350 +5+9 2+3509 -23, -503526 0 0 0   2+3509 -53,8 50355 93,2 5308

5+8 22325+ -+23+9 -2385, 0 0 0   22325+ 26377 238 370 5,3,7

520 -2+376, 99375 58386 0 0 0   2+376, +27368 58386 6538 5392 +

52+ 0387 2232, 38, 0 0 0   0387 6+320 38, 7382 +3,,

522 -+37, 2,37++ 635,7 0 0 0   +37, 6366 6356 +03+7 2356

Page 46: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 46/123

525 -+326 25388 3699 0 0 0   +326 62380 368 73,0 2329

52 +30+8 20382 5329+ 0 0 0   +30+8 ,83 5329 ,32, +365

52, -03228 2,3708 ,3,+9 0 0 0   03228 6366 ,3,2 9395 0357

+7 5++ 03+9 +3,55 -03052 0 0 0   03+9 9039 0305 030, 0328

5+2 03+7+ 6302 -0305 0 0 0   03+7+ 9387 0305 030, 0327

5+5 03+68 63+25 -03055 0 0 0   03+68 9,307 0305 030, 0327

5+ 03+66 ,399+ -03027 0 0 0   03+66 9395 0305 030 0327

5+, 03+05 630, -030,5 0 0 0   03+05 9,35, 030, 0309 03+6

5+6 032++ ,3085 -03222 0 0 0   032+ 8530 0322 0356 035

5+7 03++7 +38+8 -030,+ 0 0 0   03+2 90397 030, 0309 03+8

5+9 0322 83606 -0322 0 0 0   0322 993,6 0322 035, 0356

5+8 032,+ +3+9 -030+5 0 0 0   032,+ 903+0 030+ 0302 030

520 03+ 5536 03+,6 0 0 0   03+ 723+ 03+6 032, 0325

52+ 03+95 +3657 -0305+ 0 0 0   03+95 903,8 0305 030, 0328

522 03+9 +358 -0302, 0 0 0   03+9 9035 0305 030 0328

525 03+96 +35 -03055 0 0 0   03+96 90359 0305 030, 0350

52 03+98 +3672 -03059 0 0 0   03+98 90362 030 0306 0350

52, 03+68 630,9 -03055 0 0 0   03+68 9,30+ 0305 030, 0327

20 5++ -23+72 5388 -,3086 0 0 0   23+72 9238 ,3+0 93+, 539

5+2 -23,5 830+7 -63078 0 0 0   23,5 97387 6309 8375 5382

5+5 -+3607 83++6 -63072 0 0 0   +3607 99307 6307 8372 23,7

5+ -239+, 83+2, -352 0 0 0   2392 99307 35 7308 3,0

5+, -23,6 6398+ -+3+56 0 0 0   23,6 9,39 +3+ +392 3+0

5+6 -2356 53,08 -,32+9 0 0 0   2356 9236 ,322 9637, 5380 +

5+7 -23278 +396 -03+,2 0 0 0   23278 9039+ 03+, 032 536,

5+9 -23+,, 59392 -,5325 0 0 0   23+,, 7735 ,5325 9,3+7 53, +

5+8 -2306, 63++, -+03058 0 0 0   2306, 9,306 +030 +6306 5350

520 -23+98 8387 5305 0 0 0   23+98 993, 530 69397 53,0 +

52+ -+3526 3098 -,3099 0 0 0   +3526 9530 ,308 93+ 23+2

522 -23,5 3089 -539 0 0 0   23,5 9530, 53, ,3,2 30, 525 -530+9 5398 -,3+05 0 0 0   530+9 9239 ,3+0 93+6 395

52 -+39+ 5399+ -6375 0 0 0   +39+ 92395 637 +0378 2380

52, -23,2 83009 -63077 0 0 0   23,2 97386 6309 8372 5382

2, 5++ 035,, 23987 030 0 0 0   035,, 9+39, 030 0306 03,7

5+2 03592 735 030, 0 0 0   0359 96359 030, 0307 036+

Page 47: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 47/123

5+5 0359 73,05 030, 0 0 0   0359 963, 030, 0307 036+

5+ 03595 73567 030,+ 0 0 0   03595 96352 030, 0309 036+

5+, 0350, 53+75 03059 0 0 0   0350, 923+2 030 0306 038

5+6 03586 93727 -03+,5 0 0 0   03586 97369 03+, 032 0365

5+7 03279 593658 0305 0 0 0   03279 773,8 0305 030, 03

5+9 03568 3+8 -03+,7 0 0 0   03568 953+ 03+6 032, 03,8

5+8 0352 73+, 0307 0 0 0   0352 963+0 030, 0309 0368

520 035+ +3,88 03259 0 0 0   035+ 903,, 032 0359 03,,

52+ 035,7 23868 030 0 0 0   035,7 9+382 030 0306 03,7

522 035,6 2395 0306 0 0 0   035,6 9+379 030, 0307 03,7

525 035,5 2392 030+ 0 0 0   035,5 9+377 030 0307 03,6

52 035, 238,8 0305, 0 0 0   035, 9+38+ 030 0306 03,7

52, 0359+ 73,02 030 0 0 0   0359+ 963, 030 0307 036+

29 5++ -235,+ 3702 -23,5 0 0 0   235, 9536, 23, 307 5376

5+2 -237 ,03029 -23,62 0 0 0   2370 99389 23,6 3+0 352

5+5 -+366 ,0325+ -23,77 0 0 0   +366 983+9 23,9 3+2 2366

5+ -53+55 83858 -0376 0 0 0   53+55 99398 037, +3+8 ,30+

5+, -23928 30+7 0358 0 0 0   23928 92387 0358 0365 3,5

5+6 -23699 83++7 -,73,6 0 0 0   23699 99307 ,73,6 823+0 350 +

5+7 -239 59368 03+5 0 0 0   239 7736 03+ 0366 5387

5+9 -23559 5378 -,73,, 0 0 0   23559 9237 ,73,, 82307 537 +

5+8 -2322+ ,037+5 -,388 0 0 0   2322+ 98366 ,3,0 9390 53,,

520 -23565 ,36+ ,23,8 0 0 0   23565 93,6 ,236 95385 5379 +

52+ -+35+, 380, -23,,9 0 0 0   +35+, 9539, 23,6 308 23+0

522 -23795 36+5 -03727 0 0 0   23795 953,6 0375 +3+6 3,

525 -53596 388 -23,29 0 0 0   53596 953, 23,5 30 ,32

52 -+38+9 378+ -35,9 0 0 0   +382 9537 356 6387 5307

52, -237 ,030+9 -23,6 0 0 0   2370 99387 23,6 3+0 352

55 5++ 0322+ 583707 -030,+ 0 0 0   0322+ 79366 030, 0309 035,

5+2 03228 3,,, -030,6 0 0 0   03228 953,0 0306 0308 0357 5+5 03252 360 -030,6 0 0 0   03252 953,, 0306 0308 0357

5+ 03226 3,67 -030,+ 0 0 0   03226 953,2 030, 0309 0356

5+, 03+, 03+66 -0308 0 0 0   03+, 783+2 030, 0309 032,

5+6 032+9 532 -032,+ 0 0 0   032+9 92357 032, 030 035,

5+7 03+6 5,35+9 -030 0 0 0   03+6 7327 030 0307 0325

Page 48: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 48/123

5+9 032+ 593,72 -0326 0 0 0   032+ 773,2 032, 0358 035

5+8 03286 3086 -030,9 0 0 0   03286 9530, 0306 0308 037

520 03252 0392 03+ 0 0 0   03252 78378 03+ 0325 0357

52+ 0322 5837,6 -030,+ 0 0 0   0322 7937+ 030, 0309 0356

522 032+9 5837+8 -030, 0 0 0   0322 79367 030, 0307 035,

525 032+9 5836,7 -030,+ 0 0 0   0322 7936+ 030, 0309 035,

52 0322 58368 -030,7 0 0 0   0322 7936 0306 0308 0356

52, 03229 362, -030,7 0 0 0   03229 953,7 0306 0308 0356

5 5++ -037 ,8387+ -+3+99 0 0 0   037 89382 +3+8 +380 +3+2

5+2 -03997 693,56 -+35+ 0 0 0   03997 +0738 +35 23+, +32

5+5 -03999 693,,+ -+352 0 0 0   03999 +073,0 +35 23+, +32

5+ -03996 693,8, -+355 0 0 0   03996 +073, +355 23+5 +32

5+, -03889 693, -+3558 0 0 0   03889 +0730 +35 23+ +360

5+6 -03997 693227 -+3,7+ 0 0 0   03997 +073+9 +3,7 23,+ +32

5+7 -039++ ,83998 -+3+96 0 0 0   039++ 8939 +3+8 +380 +350

5+9 -037 ,83662 -+3+7 0 0 0   037 8936+ +32 2327 +3+2

5+8 -03,99 6030,2 -+3+8 0 0 0   03,99 88300 +3+8 +380 038

520 -03688 60329 -038,8 0 0 0   0370 88325 0386 +3,5 +3+2

52+ -0370+ ,83896 -+3+98 0 0 0   0370 8938 +3+8 +380 +3+2

522 -03688 60305 -+3+9 0 0 0   03688 89389 +3+9 +398 +3+2

525 -03688 ,838,, -+3+97 0 0 0   03688 89380 +3+8 +380 +3+2

52 -037 ,838+2 -+3+86 0 0 0   037 89396 +320 +38+ +3+2

52, -03999 69388 -+355 0 0 0   03999 +073, +35 23+, +32

5, 5++ -03+8 530, -+358 0 0 0   03+8 92300 +35, 23+6 0350

5+2 -03+02 ,03006 -+3,77 0 0 0   03+02 99386 +3,9 23,2 03+6

5+5 -03089 839,8 -+3,7, 0 0 0   03089 9939+ +3,9 23,2 03+6

5+ -03+05 ,0308 -+3,75 0 0 0   03+05 9830 +3,7 23,2 03+6

5+, -03252 83865 -+3,79 0 0 0   03252 9938+ +3,9 23,2 0357

5+6 -03+09 839,2 -+372+ 0 0 0   03+09 99390 +372 237, 03+7

5+7 -0352+ 53007 -+35, 0 0 0   0352+ 9+386 +35, 23+6 03,+ 5+9 -03+87 23986 -+385 0 0 0   0320 9+39, +38 2358 0352

5+8 -0306 53085 -+359 0 0 0   0306 9230 +35, 23+6 03+0

520 -03+9 5320 -+3206 0 0 0   03+9 923+, +32+ +385 0328

52+ -03+97 23805 -+357 0 0 0   03+97 9+39, +35, 23+6 0350

522 -03+82 53+59 -+35, 0 0 0   03+82 92308 +35, 23+, 035+

Page 49: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 49/123

525 -03+8 53+87 -+35,+ 0 0 0   03+8 923+, +35, 23+6 035+

52 -03+98 23862 -+35, 0 0 0   03+98 9+38+ +35, 23+7 0350

52, -03+ 8388+ -+3,76 0 0 0   03+ 9938 +3,9 23,2 03+6

56 5++ -+397, 573855 -0388 0 0 0   +397, 76399 0388 +3,8 5300

5+2 -23278 2369+ -+3298 0 0 0   23278 9+365 +328 2306 536,

5+5 -+3+98 23962 -+322 0 0 0   +3+98 9+39+ +32 +388 +380

5+ -23728 236+5 03,9 0 0 0   23728 9+3,6 03,9 0385 357

5+, -2359, 56372 -3,02 0 0 0   2359, 7,368 3,0 7320 5392

5+6 -2329+ 39,8 -,7392 0 0 0   2329 9539+ ,739 823,, 536, +

5+7 -+3892 5+388 -3206 0 0 0   +389 7038 32+ 6375 53+7

5+9 -+3977 03+++ -,73,7 0 0 0   +3977 78306 ,73,, 82309 5300 +

5+8 -+3768 53972 232+8 0 0 0   +3768 92392 2322 53,, 2395

520 -+397 5,37,, ,,3,6 0 0 0   +397 7370 ,,3,6 99380 5300 +

52+ -0379, 593++ -0387 0 0 0   0379, 77306 038, +3,2 +326

522 -2352, 57396, 03978 0 0 0   2352, 7639+ 0399 +3+ 5372

525 -2386, 5737,+ -+30+ 0 0 0   2386, 76370 +30 +367 37

52 -+32, 59 -23966 0 0 0   +32, 7638, 2397 3,8 2329

52, -2329 23679 -+3297 0 0 0   2329 9+365 +328 2306 536,

+ 5++ 03096 5,3592 -0300, 0 0 0   03096 7355 030+ 030+ 03+

5+2 0306+ 59392+ -030+5 0 0 0   0306+ 77377 030+ 0302 03+0

5+5 0306+ 59398, -030+, 0 0 0   0306+ 7739 0302 0302 03+0

5+ 03067 59399 -03006 0 0 0   03067 77395 030+ 030+ 03++

5+, -0300+ 583296 03009 0 0 0   0300 7932 030+ 030+ 0300

5+6 0302 503,+ -03+89 0 0 0   0302 6836 0320 0352 030

5+7 0302 5,397 030+7 0 0 0   0302 7390 0302 0305 030

5+9 0308 27307, -03+98 0 0 0   0308 66302 03+8 0350 0309

5+8 03+9 538+9 -03026 0 0 0   03+9 75397 0305 030 032

520 03+25 5368 03+78 0 0 0   03+25 9236 03+9 0328 0320

52+ 03096 5,3,6 -03006 0 0 0   03096 73+ 030+ 030+ 03+

522 0308+ 5,3+ 03005 0 0 0   0308+ 7358 0300 0300 03+, 525 03096 5,3509 -0300 0 0 0   03096 7326 0300 030+ 03+

52 0309+ 5,352 -030+5 0 0 0   0309+ 7327 030+ 0302 03+5

52, 0306 5939,9 -030+ 0 0 0   0306 7739+ 030+ 0302 03+0

2 5++ -0375, 3059 03,52 0 0 0   0375, 92388 03,5 039, +3+9

5+2 -0398+ 8398+ 03,8+ 0 0 0   0398+ 9939 03,8 038, +35

Page 50: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 50/123

5+5 -0398+ ,0305, 03,98 0 0 0   0398 99389 03,8 038 +35

5+ -0398 8360, 03606 0 0 0   0398 993,, 036+ 0387 +32

5+, -03896 83998 03,8, 0 0 0   03896 9939 0360 038, +3,9

5+6 -03985 837+8 03278 0 0 0   03985 99367 0329 03, +35

5+7 -0395 3056 03,5, 0 0 0   0395 92388 03, 0396 +355

5+9 -03757 53967 032+8 0 0 0   03757 92392 0322 035, +3+9

5+8 -03658 30+ 03,29 0 0 0   03658 92388 03,5 039 +302

520 -03752 32+ 039 0 0 0   03752 953+6 039 +35, +3+7

52+ -0375, 3+95 03,28 0 0 0   0375, 953+5 03,5 039, +3+9

522 -0375 537,5 03,7 0 0 0   0375 92370 03,, 0399 +3+7

525 -0375 5398 03,5 0 0 0   0375 9239 03,5 039, +3+7

52 -03756 352 03,+7 0 0 0   03756 95327 03,2 0395 +3+9

52, -0398 83967 03,82 0 0 0   0398 99392 03,8 038, +32

5 5++ -03+5 5,3677 0375 0 0 0   03+ 7365 0375 +3+7 0325

5+2 -03+05 03,66 039+ 0 0 0   03+0 783,2 039 +35, 03+6

5+5 -03+02 03,55 0395 0 0 0   03+02 7839 039 +35, 03+6

5+ -03+02 039 0397 0 0 0   03+02 7835 039, +356 03+6

5+, -03208 03,+9 03956 0 0 0   03208 7837 039 +35 0355

5+6 -03+26 03,62 03652 0 0 0   03+26 783,+ 0365 +30+ 0320

5+7 -0328 5,365 0372, 0 0 0   0328 73,9 0375 +3+6 030

5+9 -03+66 5,367 03,2+ 0 0 0   03+66 7362 03,2 0395 0327

5+8 -03059 5,372 0375, 0 0 0   03059 7367 037 +3+9 0306

520 -03+2+ 5,369+ 038 0 0 0   03+2+ 7365 038 +3,0 03+8

52+ -03+2 5,36, 03752 0 0 0   03+2 73,8 0375 +3+7 0325

522 -03+2 5,3,8+ 03756 0 0 0   03+2 73, 037 +3+9 0325

525 -03+, 5,3708 03729 0 0 0   03+, 7366 0375 +3+6 0325

52 -03+, 5,3765 0372, 0 0 0   03+, 737+ 0375 +3+6 0325

52, -03+02 03,7, 039 0 0 0   03+0 783,2 039 +35 03+6

5++ -+36, 53+08 5357 0 0 0   +37 75306 535, ,356 235

5+2 -+37+8 56395 535, 0 0 0   +372 7,379 53 ,3,0 237, 5+5 -039+6 56398, 53+ 0 0 0   039+6 7,39 53 ,3,+ +35+

5+ -23087 563707 ,32+7 0 0 0   23087 7,366 ,322 935, 5356

5+, -+3785 53722 -23258 0 0 0   +3785 75367 232 53,9 2397

5+6 -+372, 23,25 -,372, 0 0 0   +372, 9+37 ,375 753+6 2376 +

5+7 -+3,58 5+3887 -23527 0 0 0   +3,58 7038, 2355 5372 236

Page 51: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 51/123

5+9 -+372 583789 -,39+5 0 0 0   +372 7937, ,39+ 75350 2356 +

5+8 -+3582 56322+ 8302+ 0 0 0   +3582 7,3+7 8302 +35 2325

520 -+3,8 2932 ,23,09 0 0 0   +3,8 67357 ,23,+ 930+ 2355 +

52+ -03,62 53+7 535,5 0 0 0   03,62 753+2 535, ,356 0380

522 -+395 553895 ,3+28 0 0 0   +395 72385 ,3+5 932+ 238,

525 -23568 5309 5352 0 0 0   23568 75300 535 ,35, 5378

52 -+3099 53256 +3,66 0 0 0   +308 753+8 +3,7 23,+ +37

52, -+372 563952 535 0 0 0   +372 7,379 535 ,38 237,

,7 5++ +53708 ,93,+, -+53+72 0 0 0   +537+ 8736 +53+7 2+309 2+385 +

5+2 +,3725 65385, -+3705 0 0 0   +,372 +02399 +370 253,2 2,3+6 +

5+5 +6375 63656 -+,356, 0 0 0   +6375 +053,8 +,357 23,9 26377 +

5+ +63508 623,57 -+2306, 0 0 0   +63508 +0+38 +2307 +8350 26308 +

5+, -++38+ ,63+ -2,3725 0 0 0   ++38+ 8,356 2,372 +3+6 +9358 +

5+6 -3+68 8328 -,32, 0 0 0   3+68 +5532 ,35 72369 6367 +

5+7 -+53,06 ,0388, -23+82 0 0 0   +53,06 9838 23+8 5937+ 2+36+ +

5+9 -63+95 99397 -5398 0 0 0   63+95 +27392 5398 70325 8398 +

5+8 03825 663056 -23+,5 0 0 0   03825 +0388 23+, 53 6,39 +

520 55360+ 293+,6 +73,8 0 0 0   55360+ 673++ +73,, 29309 ,5376 +

52+ +37+8 ,832+6 -+5395 0 0 0   +37+8 893+7 +5395 223+5 253,, +

522 +328 ,73++9 -+03,55 0 0 0   +328 86307 +03,5 +639, 22397

525 +23689 ,739+ -+23,++ 0 0 0   +23689 86376 +23,+ 20302 20352

52 +53+25 ,838+5 -+,39++ 0 0 0   +53+2 89396 +,39+ 2,350 2+300 +

52, +,3709 653979 -+3677 0 0 0   +,37+ +02395 +369 2539 2,3+5 +

,9 5++ 6365, 23675 -+38, 0 0 0   636 9+362 +38, 53++ +0362

5+2 93+++ ,389+ -23+,9 0 0 0   93++ 9385 23+6 53, +2389

5+5 8356+ ,389 -23792 0 0 0   8356+ 9385 2379 3, +389

5+ 9389 632,5 -0365 0 0 0   9389 9,320 0365 +30+ +352

5+, -5,36 3506 -23+67 0 0 0   5,36 95326 23+7 537 ,637 +

5+6 -283,7 +37+ -237, 0 0 0   283,7 9032 239 5386 7352

5+7 -5638 03888 -+38,, 0 0 0   5638 7838, +386 53+5 ,83+0 +5+9 -5+30, 593+6 -23265 0 0 0   5+30, 773++ 2326 5362 8369

5+8 ,03208 359 -+3856 0 0 0   ,03208 95350 +38 53+0 90355 +

520 35+8 73+95 -+3629 0 0 0   35+8 963+5 +365 2360 7038+ +

52+ 7399, 23677 -23,68 0 0 0   7399, 9+365 23,7 3++ +2362

522 7372 2386 -0322 0 0 0   7372 9+380 032 0369 ++386

Page 52: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 52/123

525 ,359 2367 -+352+ 0 0 0   ,359 9+362 +352 23++ 936+

52 ,3787 230+ -5368 0 0 0   ,390 9+35, 537 ,3,, 8329

52, 93085 ,387+ -23+,6 0 0 0   9308 9382 23+6 53, +238,

,8 5++ 63+,5 5630+, -2306 0 0 0   63+, 7386 2306 5350 839

5+2 73,2 593,68 -235+ 0 0 0   73, 773,2 235+ 5370 ++382

5+5 936,2 593,57 -2398, 0 0 0   936,2 7738 2380 365 +539

5+ 9306, 5937+8 -038,7 0 0 0   9306, 77367 0386 +3,5 +2380

5+, -2932,6 0365 -235+2 0 0 0   2932,6 783,8 235+ 5370 ,32+

5+6 -22385 57377 -236, 0 0 0   22385 76372 237 538 5637+

5+7 -283,,, 593098 -230,9 0 0 0   283,,, 7730 2306 5328 7328

5+9 -2322 5,322 -232++ 0 0 0   2322 73+7 232+ 53, 59378

5+8 +396+ 5538+ -23062 0 0 0   +396+ 72398 2306 5350 66389 +

520 563,8 5639+ -+3809 0 0 0   563,8 7,376 +38+ 530, ,939 +

52+ 735,5 5,389 -236+ 0 0 0   735,5 7385 236 325 ++376

522 63766 563+66 -03702 0 0 0   63766 7,3+2 0370 +3+2 +0395

525 38,5 56307 -+379 0 0 0   38,5 7,300 +39 2356 7382

52 ,3,+ 5,396, -53+7 0 0 0   ,3, 739+ 532 ,37 9397

52, 7359 593,65 -235+2 0 0 0   73 773,+ 235+ 5370 ++380

60 5++ 03+8 2+32+8 -537, 0 0 0   03+, 603+7 539 ,3,6 032

5+2 03,67 2+352+ -53,++ 0 0 0   03,7 60327 53,+ ,362 038+

5+5 +376, 203,8 -5362 0 0 0   +376, ,83+ 5362 ,390 2392

5+ 039 +83565 -+3766 0 0 0   039 ,935+ +377 2395 +35

5+, -20362+ ,,3092 -++3258 0 0 0   20362+ 8305 ++32 +7389 52388 +

5+6 -20382+ 9,3,89 -57327 0 0 0   20382+ +23,, 5735 ,8399 5537 +

5+7 -2+3058 ,389 -++3205 0 0 0   2+3058 85385 ++320 +7382 55366 +

5+9 -2+3558 9,386 -57358+ 0 0 0   2+3558 +23, 57358 ,8395 53+ +

5+8 2+3559 -+23,5 32,2 0 0 0   2+3559 263+ 32, 6390 53+

520 2+3657 -530,8 503 0 0 0   2+3657 -3++ 503 9370 5362

52+ +357 2035,7 -53,99 0 0 0   +357 ,835+ 53,8 ,37 23+6

522 0322 +83262 -+375 0 0 0   0322 ,932+ +375 2377 0369 525 -+308 22309 -53565 0 0 0   +308 6+305 5356 ,359 +369

52 -03+2 253+76 -,322+ 0 0 0   03+2 623+5 ,322 935, 0320

52, 03,,9 2+3556 -53,+6 0 0 0   03,6 60328 53,2 ,365 0398

6, 5++ +53255 563,, 6380, 0 0 0   +5325 7,38 638+ ++30, 2+3+7

5+2 +3695 03+65 737+2 0 0 0   +369 783++ 737+ +235 2538

Page 53: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 53/123

5+5 +,3,87 +3278 9306 0 0 0   +,3,87 90325 930, +2397 2386

5+ +63,58 5367 93829 0 0 0   +63,58 92360 9385 +329 2636

5+, -3299 +232+ 238+5 0 0 0   3299 ,+3+8 238+ 366 6396

5+6 -+3959 -283227 -+3,,2 0 0 0   +3959 8372 +3,, 25329 2537

5+7 -,3758 9362 23+06 0 0 0   ,3758 73,7 23++ 5357 83+9

5+9 -+63298 -5239 -+,35,8 0 0 0   +63298 63++ +,356 23,7 26306

5+8 52320 6367 ++370 0 0 0   52320 +0532 ++370 +9375 ,+3,5 +

520 237, +0,385, 283+68 0 0 0   237, +399 283+7 6367 693+ +

52+ +3+6 573662 732 0 0 0   +3+6 7636+ 732 ++3,9 22365

522 +,3098 0305 93+22 0 0 0   +,3098 79389 93+2 +5300 23+

525 +235+8 5,328 63,7+ 0 0 0   +235+8 7359 63,7 +03,+ +837+

52 ++3577 55306+ ,3699 0 0 0   ++359 7230+ ,368 83+0 +9320

52, +3606 58387 73669 0 0 0   +36+ 79382 7367 +2327 25357

66 5++ -+328 ,39+ 030,+ 0 0 0   +35 376 030, 0309 2328

5+2 -+3,7 53788 03069 0 0 0   +3,, 237, 0307 03++ 239

5+5 -0388+ 5308 036+9 0 0 0   0388+ 2356 0362 0388 +3,8

5+ -03078 532,5 0392 0 0 0   03078 2320 0392 +35+ 03+5

5+, -5,3+5 -+,30+ 03+05 0 0 0   5,3+5 2538 03+0 03+6 ,6325

5+6 -55377 732+2 -0307, 0 0 0   55377 63+6 0309 03+2 ,305

5+7 -5,302, -+53005 0309, 0 0 0   5,302, 2,38, 0308 03+ ,630

5+9 -5536,+ 83225 -03085 0 0 0   5536,+ 93+7 0308 03+, ,539

5+8 523+67 23625 030+6 0 0 0   523+67 653,7 0302 0305 ,+37

520 503785 23587 03+8 0 0 0   503785 +35, 03+8 035+ 8327

52+ -03975 ,32 036 0 0 0   03975 357 0360 0386 +30

522 030 ,326 03902 0 0 0   030 32+ 0390 +329 0306

525 -+389, 632 -0388 0 0 0   +389, ,3+, 03,0 0390 53+9

52 -23989 635,6 -0370+ 0 0 0   2380 ,35+ 0370 +3+2 36

52, -+360, 30++ 0307 0 0 0   +36+ 2386 0307 03++ 23,7

67 5++ -+639 +73879 -0350, 0 0 0   +639 ,6385 035+ 038 26357

5+2 -+9372, +73662 -0356 0 0 0   +9375 ,636+ 035, 03,, 28386 5+5 -+936+ +7392 0322 0 0 0   +936+ ,635 0322 0356 283,

5+ -+738,7 +736+ 0359 0 0 0   +738,7 ,63+ 0359 036+ 29375

5+, -,03695 83889 -0355+ 0 0 0   ,03695 938, 0355 03,5 9+308 +

5+6 -5638,8 +389 -038, 0 0 0   5638,8 ,53, 03,0 0378 ,83+5

5+7 -932 +035+ -0328 0 0 0   932 8326 0328 036 773,+ +

Page 54: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 54/123

5+9 -537+9 +39+ -03, 0 0 0   537+9 ,5376 03, 0375 ,,3,,

5+8 +,375 2,365 -0352+ 0 0 0   +,375 63,8 0352 03,+ 2376

520 +37, 2+3+2 -03+,6 0 0 0   +37, 60308 03+6 032, 2390

52+ -+6322 +73789 0326, 0 0 0   +6322 ,637, 0327 032 2,38,

522 -+,37+6 +73777 032+ 0 0 0   +,37+6 ,6375 032 0367 2,3+,

525 -+6379 +93+,9 -0397, 0 0 0   +6379 ,73++ 0399 +30 26390

52 -+732,2 +93+78 -+305+ 0 0 0   +732, ,73+5 +305 +36, 27360

52, -+936,8 +737,+ -03558 0 0 0   +9366 ,6370 035 03, 2839,

69 5++ -+53875 2+32,8 -03,+ 0 0 0   +5387 6032+ 03, 0372 22356

5+2 -+632 2+36++ -03,+ 0 0 0   +632 603,6 03,+ 0392 2,388

5+5 -+6308, 2+395 0306 0 0 0   +6308, 6035 0306 03+0 2,37,

5+ -+,37+9 2+3+92 03222 0 0 0   +,37+9 603+5 0322 0356 2,3+,

5+, -,536+ 253,68 -03,+8 0 0 0   ,536+ 623,2 03,2 0395 9,379 +

5+6 -5+376, 293692 -0368 0 0 0   5+376, 67365 0368 +3+0 ,0392

5+7 -,+3558 2532+9 -03,6 0 0 0   ,+3558 623+7 036 0375 923+ +

5+9 -2838 29355+ -03627 0 0 0   2838 67329 0365 +300 73+8

5+8 253582 +8350+ -036 0 0 0   253582 ,932, 03, 037+ 5735

520 +3,7 +3+99 -0327, 0 0 0   +3,7 ,53+ 0329 03 239

52+ -+5392 2+3+52 03+27 0 0 0   +5392 60309 03+5 0320 223+2

522 -+537 20395+ 0329, 0 0 0   +537 ,8379 0328 036 2+3,2

525 -+3+25 2+3597 -+3028 0 0 0   +3+25 6035 +305 +36, 22360

52 -+3, 2+3699 -+3+97 0 0 0   +3,0 6036 +3+8 +380 25320

52, -+63+78 2+3676 -03,06 0 0 0   +63+9 60365 03,+ 039+ 2,398

68 5++ -93+9 593789 03002 0 0 0   93+9 7737, 0300 0300 +5308

5+2 -838, +3++ 0300, 0 0 0   838, 90356 030+ 030+ +,382

5+5 -8386 03885 0379 0 0 0   8386 7838 039 0376 +,38

5+ -+03,27 5835,2 0365 0 0 0   +03,27 79350 0365 +30+ +639

5+, -5638, 68320 030+2 0 0 0   5638, +093+, 030+ 0302 ,9358 +

5+6 63679 8737,5 -0327 0 0 0   63679 +56370 032, 030 +0369

5+7 -53728 663,8+ 03008 0 0 0   53728 +0,3, 030+ 030+ ,,3,7 +5+9 93 8,3+ -032, 0 0 0   93 +5308 032, 030 +53,+

5+8 +9356+ ++300, -0300 0 0 0   +9356+ 838, 0300 030+ 28359

520 -239+2 -+73, 032,, 0 0 0   239+2 2+3+ 0326 03+ 58370

52+ -93+89 59359 037, 0 0 0   93+89 77355 039 0376 +53+2

522 -9376+ 563758 0365+ 0 0 0   9376+ 7,368 0365 +30+ +302

Page 55: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 55/123

525 -93+7 5832+6 -037 0 0 0   93+7 793+7 037 037, +5307

52 -73607 039,6 -03626 0 0 0   736+ 7839+ 0365 +300 +23+7

52, -83802 +358, 030+ 0 0 0   8380 9035 030+ 0302 +,39

97 5++ 037+2 2,378, +3,82 0 0 0   037+ 637 +3,8 23,, +3+

5+2 03865 2737 235+5 0 0 0   0386 6632 235+ 5370 +3,

5+5 +329 27359 23,58 0 0 0   +329 66355 23, 306 2329

5+ +35,8 273766 53722 0 0 0   +35,8 66372 5372 ,386 23+7

5+, 0398 26369 +307 0 0 0   0398 6,32 +307 +37+ +35

5+6 038,, +73895 -2830,9 0 0 0   038,, ,6385 28306 638 +3,5

5+7 0365 2378 0358 0 0 0   0365 6537 035, 03,6 +305

5+9 0370 +63508 -283779 0 0 0   0370 ,,326 28379 736 +3+5

5+8 03792 263787 2395, 0 0 0   03792 6,37, 239 3, +32,

520 0372+ 5,3292 523865 0 0 0   0372+ 7325 52386 ,237 +3+,

52+ +3+77 2,3708 +39+9 0 0 0   +3+77 6366 +392 238+ +399

522 +3+09 26308+ 5300+ 0 0 0   +3+09 6,30 5300 390 +377

525 0329 2,3992 +3566 0 0 0   0329 6395 +357 23+8 030

52 035+7 2,3, 03+95 0 0 0   0352 63, 03+9 0328 03,+

52, 03862 27375 2329+ 0 0 0   0386 6632 2329 536, +3,

89 5++ +329 23599 536++ 0 0 0   +32, 6535 536+ ,379 2300

5+2 +3675 2,387 3+,7 0 0 0   +367 6382 3+6 636, 2369

5+5 23295 2,36, 3509 0 0 0   23295 6360 35+ 6398 536,

5+ 23+5 2,3756 6328, 0 0 0   23+5 6368 6350 +0307 535

5+, +3,77 523+08 +3++5 0 0 0   +3,77 7+306 +3++ +379 23,2

5+6 +366, 26357 -9366+ 0 0 0   +366, 6,352 9366 77396 2366 +

5+7 +3+,2 503,2 03,67 0 0 0   +3+,2 6837 03,7 038+ +39

5+9 +32 23799 -83207 0 0 0   +32 6537 832+ 79375 +389 +

5+8 +355 +932,2 636,, 0 0 0   +355 ,7320 6366 +036, 23+,

520 +32,, 253899 ,6328 0 0 0   +32,, 6238 ,635 80328 230+ +

52+ +39,9 23069 53765 0 0 0   +39,9 65302 5376 6302 2387

522 +37+9 23+, ,378 0 0 0   +37+9 653+0 ,37, 8320 237, 525 03657 23709 536 0 0 0   03657 65366 536 ,3, +302

52 03777 2362, +375 0 0 0   0379 653,7 +37 2356 +32

52, +3668 263027 3+27 0 0 0   +367 6389 3+5 6360 2367

+08 5++ +3266 23865 -5352+ 0 0 0   +327 6538+ 5352 ,35+ 2305

5+2 +368, 2636+ -5379+ 0 0 0   +370 6,3,6 5379 630, 237+

Page 56: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 56/123

5+5 23295 263298 -538++ 0 0 0   23295 6,32 538+ 6326 536,

5+ 23++ 26358 -+370 0 0 0   23++ 6,358 +370 2375 535

5+, +3,89 52389 -03,+9 0 0 0   +3,89 7+385 03,2 0395 23,6

5+6 +3705 2632, -,9379 0 0 0   +3705 6,320 ,937, 8300 2372 +

5+7 +3+68 5+3555 -030,8 0 0 0   +3+68 70329 0306 0308 +397

5+9 +327 23609 -,93298 0 0 0   +327 653,6 ,9328 85326 230 +

5+8 +3565 +93,8 -63,9 0 0 0   +3565 ,73, 63,9 +03,5 23+9

520 +32,9 2,35+8 ,+366 0 0 0   +32,9 6327 ,+36, 92365 230+ +

52+ +39, 2362 -53,2 0 0 0   +39, 653,8 53, ,3,2 2387

522 +37+2 23785 -+32, 0 0 0   +37+2 6537 +32, +388 237

525 03679 2,329, -53+8 0 0 0   03679 6325 53+8 ,3+0 +309

52 0392 2,3+5 -,3589 0 0 0   0392 6309 ,30 936 +35+

52, +368+ 263666 -537,+ 0 0 0   +368 6,362 537, 6300 237+

+20 5++ 03725 263722 -23,,5 0 0 0   0372 6,367 23,, 309 +3+6

5+2 03878 2937 -535,6 0 0 0   0389 6732 5356 ,357 +3,7

5+5 +32 29357 -53,9+ 0 0 0   +32 67352 53,9 ,375 235+

5+ +3556 293++8 -+395 0 0 0   +3556 67307 +395 2385 23+

5+, 03809 2736, -+397 0 0 0   03809 66360 +397 5300 +3,

5+6 03897 57380, -563856 0 0 0   03897 7639, 5638 ,83+0 +3,9 +

5+7 036,5 2,3802 -+307+ 0 0 0   036,5 639, +307 +37+ +30

5+9 0375+ 563+,9 -563+5 0 0 0   0375+ 7,3++ 563+5 ,739+ +3+7 +

5+8 0378 273,2 -305, 0 0 0   0378 6638 30 636 +327

520 037+, +73296 5+3027 0 0 0   037+, ,632 5+305 836 +3+

52+ +3+97 263627 -23779 0 0 0   +3+97 6,3,9 2379 3 +380

522 +309+ 263572 -+3027 0 0 0   +309+ 6,352 +305 +36 +375

525 0326 2639+7 -23528 0 0 0   0326 6,377 2355 5375 032

52 03566 273072 -309 0 0 0   0357 66302 309 63,5 03,8

52, 03879 2937, -5352, 0 0 0   0389 6732 5355 ,352 +3,6

+5+ 5++ +53627 57309 -638,+ 0 0 0   +5365 76300 638, ++3+2 2+390

5+2 +,30,9 03,97 -7375, 0 0 0   +,306 783, 737 +2359 2308 5+5 +,38,+ +3662 -93062 0 0 0   +,38,+ 9036+ 9306 +2380 2,3,2

5+ +3++9 5937 -63,28 0 0 0   +3++9 7732 63,5 +03, 223,8

5+, -3068 +23505 -2390 0 0 0   3068 ,+32, 2390 38 63,+

5+6 3,9+ +083897 -28388 0 0 0   3,9+ +938 28388 7388 7+355 2

5+7 -,3, 9376, -230+8 0 0 0   ,3, 737+ 2302 5325 9390

Page 57: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 57/123

5+9 53+, +0639 -2832+ 0 0 0   53+, +,30 2832+ 637 6830 +

5+8 5237, 6,355+ -++3995 0 0 0   5237, +0329 ++399 +830+ ,23+ +

520 -+,3986 -5235,2 +,3507 0 0 0   +,3986 6360 +,35+ 238 2,35

52+ +3,2+ 593+25 -73277 0 0 0   +3,2+ 77307 7329 ++36 25325

522 +23697 5385+ -,37 0 0 0   +23697 75399 ,37 83+8 20350

525 +2375 5,3875 -6362, 0 0 0   +2375 7382 6365 +0360 20357

52 +3,67 583+6 -93+,9 0 0 0   +3,7 793++ 93+6 +530, 2535+

52, +3878 03586 -73682 0 0 0   +389 7835, 7368 +235+ 25387

+52 5++ -0386+ 6398, -0306 0 0 0   0386 ,39 0306 03+0 +3,

5+2 -+3+5 387 -03078 0 0 0   +3+5 5382 0309 03+5 +39+

5+5 -03,85 3607 -03629 0 0 0   03,85 53,6 0365 +300 038,

5+ -+3,55 395 +350 0 0 0   +3,55 5379 +350 2308 23,

5+, -53879 -+53977 -03++ 0 0 0   53879 2,307 03++ 03+9 ,,386

5+6 5+3098 +3,,8 -03225 0 0 0   5+3098 03,+ 0322 0356 837

5+7 -5390, -++38,6 -0308, 0 0 0   5390, 26388 03+0 03+, ,,368

5+9 5+3265 539 -0320 0 0 0   5+3265 235 0320 0355 ,0302

5+8 52399 2,377 -0302, 0 0 0   52399 6370 0305 030 ,236+

520 -553+9 +035+ 03095 0 0 0   553+9 8326 0309 03+5 ,5308

52+ -032 63,29 -03608 0 0 0   032 ,39 036+ 0387 0367

522 -+356 637,+ +3525 0 0 0   +356 ,370 +352 23+2 23+9

525 -+3,0+ 73262 0398 0 0 0   +3,0+ 632+ 038 0379 230

52 -03,62 730 -+3 0 0 0   03,6 ,388 +3 235+ 0380

52, -+3+85 ,3+9, -0309+ 0 0 0   +3+8 3+5 0309 03+5 +38+

+55 5++ -+,3,++ +93525 03298 0 0 0   +,3,+ ,7327 0328 036 2392

5+2 -+73755 +73885 0355 0 0 0   +7375 ,638 0355 03,5 29357

5+5 -+736+ +73925 -032+ 0 0 0   +736+ ,6377 032+ 035 2738

5+ -+93+5 +9327 +36,6 0 0 0   +93+5 ,7322 +366 236, 2836

5+, -83986 +0326, 035+, 0 0 0   83986 832+ 0352 03,0 78395 +

5+6 0379 2+3+28 03+9+ 0 0 0   0379 60309 03+9 0328 0376

5+7 -7367 +03,8, 0327 0 0 0   7367 83, 0327 03 76329 +5+9 237 2+3,8 03+ 0 0 0   237 603+ 03+ 0322 352

5+8 +636,5 2630, 0350 0 0 0   +636,5 6,300 0350 038 2636

520 -553722 +,3+97 0359 0 0 0   553722 ,3+ 03 0370 ,5386

52+ -+,3258 +93+,5 -032,+ 0 0 0   +,3258 ,73+0 032, 030 2359

522 -+63+8 +936 +36+, 0 0 0   +63+8 ,73,, +362 23,9 2,380

Page 58: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 58/123

525 -+,3795 +9385 03928 0 0 0   +,3795 ,73 0395 +355 2,32,

52 -+395+ +930, -+3057 0 0 0   +395 ,6388 +30 +366 25375

52, -+73669 +9309 03525 0 0 0   +7367 ,7305 0352 03,2 29327

+5 5++ -+5302, 2+352+ 0357 0 0 0   +5305 60327 03 0370 2039

5+2 -+,357 2+3,,9 03,02 0 0 0   +,357 603,+ 03,0 0390 2360

5+5 -+,32+9 2+3+ -0306 0 0 0   +,32+9 60358 030, 0307 235,

5+ -+,3772 223008 +397 0 0 0   +,3772 60386 +39, 2386 2,32

5+, -,238+8 253,,8 03,09 0 0 0   ,238+8 623,+ 03,+ 039+ 9367 +

5+6 03+7+ +386 03527 0 0 0   03+7+ ,53, 0355 03,2 0327

5+7 -,03,7 253525 035 0 0 0   ,03,7 62327 03 037+ 9038+ +

5+9 23,2 +326 03262 0 0 0   23,2 ,532+ 0326 032 305

5+8 23,+8 +8352 035+ 0 0 0   23,+8 ,9327 035 0368 58325

520 -293,7+ 293595 036+5 0 0 0   293,7+ 67355 036+ 0389 ,37+

52+ -+23968 2+320 -03+++ 0 0 0   +23968 603+, 03++ 03+9 203,8

522 -+5325 2+3772 +3792 0 0 0   +5325 60372 +379 239, 2+39

525 -+53+92 2+358 03896 0 0 0   +53+92 60358 0388 +3,9 2+308

52 -+23629 20397+ -03807 0 0 0   +2365 ,8392 038+ +3, 20320

52, -+,3508 2+3625 038 0 0 0   +,35+ 603,7 038 0378 238

+5, 5++ -93+75 56362 03065 0 0 0   93+7 7,3,7 0306 03+0 +5309

5+2 -+032+ 59395, 03077 0 0 0   +032+ 77379 0309 03+2 +635

5+5 -+032+7 593+9 -0358 0 0 0   +032+7 77357 0358 0365 +635,

5+ -83 +3+,6 +3207 0 0 0   83 903++ +32+ +385 +,3++

5+, -563,6 673288 0307 0 0 0   563,6 +0632, 0307 03+2 ,93,0 +

5+6 -263,, -+730,, -03+77 0 0 0   263,, 2+398 03+9 0329 238

5+7 -53,2 6,309, 0306 0 0 0   53,2 +0305 0306 03+0 ,,32 +

5+9 -23,+5 -+83268 -03+8 0 0 0   23,+5 +8369 03+8 0350 58322

5+8 +93+77 93+,6 03066 0 0 0   +93+77 73++ 0307 03++ 28309

520 93+66 823,+ 035+7 0 0 0   93+66 +5+36 0352 03,+ +5307

52+ -93+77 563205 -0309 0 0 0   93+77 7,3+, 03+ 036, +5309

522 -730 5938+ +3+85 0 0 0   730 77398 +3+8 +38+ ++39, 525 -93+7 573059 03,5, 0 0 0   93+7 7,388 03, 0396 +5307

52 -9385 535 -+3067 0 0 0   938 7532, +307 +37+ +35+

52, -+03+6, 5939+8 03072 0 0 0   +03+7 77377 0307 03+2 +6326

+2 5++ -0327, 70305+ 237+ 0 0 0   0329 +09389 237+ 35 03

5+2 -03297 9+3+,5 53077 0 0 0   0328 +203+0 5309 382 036

Page 59: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 59/123

5+5 -03295 9+3+57 5309+ 0 0 0   03295 +20308 5309 385 03,

5+ -0328+ 9+3509 53099 0 0 0   0328+ +20326 5308 38 037

5+, -0358 9+3098 53072 0 0 0   0358 +2030 5307 382 0365

5+6 -0326 9+3057 2398 0 0 0   0326 ++8388 2398 362 032

5+7 -03592 683867 237+ 0 0 0   03592 +09382 237+ 35 036+

5+9 -032,2 6838+, 23,27 0 0 0   032,2 +09396 23,5 30 030

5+8 -03+69 70308, 237+8 0 0 0   03+69 +0830 2372 35, 0327

520 -03289 703+7 2380+ 0 0 0   03289 +083+0 2380 36 039

52+ -0327+ 7030+, 237+9 0 0 0   0327+ +09386 2372 35, 035

522 -03278 703+96 2372, 0 0 0   03278 +083+ 2375 356 03,

525 -03278 70307 237+ 0 0 0   03278 +08300 237+ 35 03,

52 -03272 683976 23705 0 0 0   0327 +09395 2370 352 03

52, -03297 9+3+56 53076 0 0 0   0328 +20308 5309 382 036

+5 5++ -032+, 6,386 -23,6 0 0 0   0322 +03, 23,6 3+0 035

5+2 -0322+ 76372, -238 0 0 0   0322 ++,367 2380 36 035,

5+5 -032+7 7636+8 -2380+ 0 0 0   032+7 ++,3,7 2380 36 035,

5+ -03225 763777 -23987 0 0 0   03225 ++,375 2380 36 0356

5+, -03557 7636+ -23988 0 0 0   03557 ++,3,6 2380 36 03,

5+6 -03227 773+28 -5308 0 0 0   03227 ++6309 5308 38, 0356

5+7 -0355+ 6,359, -23,,8 0 0 0   0355+ +0355 23,6 308 03,5

5+9 -0322+ 6,380+ -237, 0 0 0   0322+ +039, 237, 3+ 035,

5+8 -03088 6,3607 -23,6+ 0 0 0   03088 +03,6 23,6 3+0 03+6

520 -03208 6,3082 -23566 0 0 0   03208 +030 2357 5378 0355

52+ -032+ 6,358+ -23,6+ 0 0 0   032+ +035 23,6 3+0 035

522 -032+7 6,3,8 -23,,6 0 0 0   032+7 +03,0 23,6 308 035,

525 -032+8 6,3602 -23,,8 0 0 0   032+8 +03,, 23,6 308 035,

52 -032+5 6,3 -23,65 0 0 0   032+ +0358 23,6 3+0 035

52, -03222 76370+ -23988 0 0 0   0322 ++,36, 2380 36 0356

Page 60: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 60/123

Page 61: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 61/123

C;%<

o%

o%

o%

o%

o%

*..(

o%

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(

Page 62: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 62/123

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%*..(

*..(

*..(

o%

o%

Page 63: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 63/123

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%o%

o%

o%

o%

o%

Page 64: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 64/123

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%

o%

o%

o%

o%

o%o%

o%

o%

o%

o%

Page 65: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 65/123

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%o%

o%

o%

o%

o%

Page 66: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 66/123

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%o%

o%

o%

o%

o%

Page 67: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 67/123

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%o%

o%

o%

*..(

o%

Page 68: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 68/123

*..(

o%

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(*..(

*..(

*..(

o%

o%

Page 69: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 69/123

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

*..(

*..(

o%

o%o%

o%

o%

o%

o%

Page 70: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 70/123

o%

o%

o%

*..(

o%

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%o%

o%

*..(

*..(

*..(

Page 71: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 71/123

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

o%o%

*..(

*..(

o%

o%

Page 72: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 72/123

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%o%

o%

o%

o%

o%

Page 73: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 73/123

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

o%

o%

o%

o%

o%

o%

o%o%

o%

o%

*..(

o%

Page 74: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 74/123

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

*..(

*..(

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(o%

o%

*..(

o%

o%

Page 75: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 75/123

o%

o%

o%

o%

o%

o%

o%

*..(

o%

*..(

o%

*..(

*..(

o%

o%

o%

o%

o%

o%

o%

o%

o%

*..(

*..(

o%

*..(

*..(

o%

o%

o%o%

o%

o%

o%

o%

Page 76: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 76/123

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

o%

Page 77: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 77/123

2988758583B)s

STRUCTURAL C!CR"T" 

Sectio* > @/ & @/

COLUMN   030 030 7937, 1.0 1.

BEAM TRANSVERSAL   0350 0320 9300 . 0.BEAM LONGITUDINAL   03,, 0350 7832, 13.0 1.31

TIE BEAM 030 0320 65370 5.10 0.51

PLATE 150 MM THK 03+, 0300   5073+2 2 !.07 !.1

TOTA1 7.7 7.7

C!CR"T" FU!DAT#! 

I T E M UNIT NOS QUANTiTY0) L%+$; "*%(

&f = +3, /

1. Excavatio   15 78.52 78.52   1f = +3, /

!. Bac" #i$$   15 63.32 63.32   &! = 03 /

%. L&a coc'&t& 15 1.92 1.92   1! = 03 /

(. Coc'&t&   15 14.24 14.24   0388 &OF E) = +3 /

). R&i*o'ci+ ,a' to   15 1.42 1.42   >f = 03, /

>s = 037 /

>! = +3+ /

"ATERIAL TAE OFF CONCRETE FOUNDATION DESIGNCENTRAL CONTROL / LABORATORY BUILDING

1ET>@/

VO1GE@cu/

Re;(r@to*

M%

M%

M%

M%

Page 78: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 78/123

A33AC/<E03-$ S3AAD P41 I0P23

S3AAD SPACE CC4 - #AB B#DGS4AD4 RG )3GDIA4G)E))EED (A4E 2-Gct-07E)( RG )3GDIA4G))=@4 W(4; 7+@)4 IE4ED I4G)RG)4 CGGD()A4ES1 2+ 0 0U 2 +*1 0 0U &* 0 0U & &*1 0 0U 2+ *1 0U +*1 *1 0U

7 &* *1 0U 8 &*1 *1 0U + 2+ 0 *1U 17 2+ 0 7*U 20 &*1 0 7*U21 2+ *1 7*U 22 +*1 *1 7*U 2 &* *1 7*U 2& &*1 *1 7*U2 2+ 0 1*0U 28 &*1 0 1*0U 2+ 2+ *1 1*0U 0 +*1 *1 1*0U1 &* *1 1*0U 2 &*1 *1 1*0U 2+ 0 1+*U & +*1 0 1+*U &* 0 1+*U &*1 0 1+*U 7 2+ *1 1+*U 8 +*1 *1 1+*U+ &* *1 1+*U &0 &*1 *1 1+*U &1 2+ 0 2*U &2 +*1 0 2*U& &* 0 2*U && &*1 0 2*U & 2+ *1 2*U & +*1 *1 2*U&7 &* *1 2*U &8 &*1 *1 2*U &+ 2+ 0 0U 7 2+ 0 *1U8 +*1 0 *1U + &* 0 *1U 0 &*1 0 *1U 1 2+ *1 *1U2 +*1 *1 *1U &* *1 *1U & &*1 *1 *1U 0 0 *1U 7* 0 *1U 7 1*0 0 *1U 8 1+*0 0 *1U + 2&* 0 *1U 70 0 *1 *1U71 7* *1 *1U 7 7* * *1U 7 1*0 * *1U 77 1+*0 * *1U78 2&* * *1U 7+ 2+ * *1U 81 2+ * 7*U 82 2+ * 1*0U8 2+ * 1+*U 8& 2+ * 2*U 8 2+ * 0U 87 0 0 7*U 88 7* 0 7*U8+ 1*0 0 7*U +0 1+*0 0 7*U +1 2&* 0 7*U +2 0 *1 7*U+ 7* *1 7*U +& 7* * 7*U + 1*0 * 7*U + 1+*0 * 7*U+7 2&* * 7*U +8 0 0 1*0U ++ 7* 0 1*0U 10 0 *1 1*0U

10& 7* *1 1*0U 10 7* * 1*0U 10 1*0 * 1*0U107 1+*0 * 1*0U 108 2&* * 1*0U 10+ 0 0 1+*U 110 7* 0 1+*U11& 0 *1 1+*U 11 7* *1 1+*U 11 7* * 1+*U117 1*0 * 1+*U 118 1+*0 * 1+*U 11+ 2&* * 1+*U120 0 0 2*U 121 7* 0 2*U 122 1*0 0 2*U 12 1+*0 0 2*U12& 2&* 0 2*U 12 0 *1 2*U 12 7* *1 2*U 127 7* * 2*U128 1*0 * 2*U 12+ 1+*0 * 2*U 10 2&* * 2*U 11 0 0 0U12 7* 0 0U 1 1*0 0 0U 1& 1+*0 0 0U 1 2&* 0 0U 1 0 *1 0U17 7* *1 0U 18 7* * 0U 1+ 1*0 * 0U 1&0 1+*0 * 0U1&1 2&* * 0U 1&2 &2*1 0 7*U 1& &2*1 0 1*0U 1&& &2*1 *1 7*U1& &2*1 *1 1*0U 1& 2&* 0 1*0U 1&7 2&* 0 1+*U 1&8 2+ *1 *77U1&+ +*1 *1 *77U 10 &* *1 *77U 11 &*1 *1 *77U12 2+ *1 10*U 1 &2*1 *1 10*U 1& &*1 *1 10*U 1 2+ *1 1*U1 +*1 *1 1*U 17 &* *1 1*U 18 &*1 *1 1*U1+ &*1 *1 22*U 10 &*1 *1 2+*2U 11 &* *1 22*U12 +*1 *1 22*U 1 2+ *1 22*U 1& 2+ *1 2+*2U

1 +*1 *1 2+*2U 1 &* *1 2+*2U 17 +*1 *1 10*U18 &* *1 10*U 1+ 2+ *1 *1U 170 2+ *1 0UIEIED )C(E)CES1 1 U 2 2 U 7U & & 8U 1 2U 2 U 7 &U 8 U + 7U 10 7 8U 11 1 17U7 17 81U &0 20 2&U && 21 1&&U & 1&& 2&U 0 20 28U & 2& 2U 2 82U8 28 2U 2 2+ 1&U & 1& 2U 8 28 U 70 0 8U 71 1 +U 72 2 &0U7 8U 7& & 8U 7 +U 7 &0U 80 7 8U 81 8 +U 82 + &0U 8 &&U88 8 &U 8+ + &7U +0 &0 &8U +1 &1 8&U +2 &2 &U + & &7U +& && &8U +8 & &U++ & &7U 100 &7 &8U 101 &1 7U 127 7 1U 128 8 2U 12+ + U 10 0 &U11 7 8U 12 8 +U 1 + 0U 1& 1 2U 1 2 U 1 &U 17 & &8U18 &7U 1+ 2 &U 1&0 2& 8U 1&1 20 &U 1&2 0 &&U 1& 2 7U 1&& 22 U1& 70U 1& 7U 10 U 11 7U 12 7 8U 1 8 +U 1& + +U1 70 71U 17 7 7U 18 7 77U 1+ 77 78U 10 78 7+U 11 7 7U 12 8 77U1 + 78U 17 8& 8U 18 8 82U 1+ 82 81U 170 81 7+U 178 87U 18 70 +2U18 7 +&U 18 7 +U 187 77 +U 188 78 +7U 18+ 87 +2U 1+0 88 +&U 1+ +2 +U1+8 +& +U 1++ + +U 200 + +7U 201 +7 81U 202 8+ +U 20 +0 +U 20& +1 +7U20 87 +8U 210 +2 10U 212 +& 10U 21 + 10U 21& + 107U 21 +7 108U

21 +8 10U 217 ++ 10U 22 10 10&U 22 10 108U 22 +8 10+U 27 10 11&U2+ 10 11U 2&0 10 117U 2&1 107 118U 2&2 108 11+U 2& 10+ 11&U 2&& 110 11U20 11& 11U 22 11 11+U 2+ 10+ 120U 2& 11& 12U 2 11 127U 27 117 128U28 118 12+U 2+ 11+ 10U 270 120 12U 271 121 127U 277 12 12U 27+ 127 128U280 128 12+U 281 12+ 10U 282 10 8&U 28 122 128U 28& 12 12+U 28 12& 10U28 120 11U 2+1 12 1U 2+ 127 18U 2+& 128 1+U 2+ 12+ 1&0U 2+ 10 1&1U2+7 11 1U 2+8 12 18U 2++ 11 12U 00 12 1U 01 1 1&U 02 1& 1U0 1 &+U 0& 1 17U 0 18 1+U 07 1+ 1&0U 08 1&0 1&1U 0+ 1&1 8U10 1 1+U 11 1& 1&0U 12 1 1&1U 1 1&2 1&&U 1& 1& 1&U 1 1&& 1&U1 71 +U 17 + 10&U 18 10& 11U 1+ 11 12U 20 12 17U 21 21U22 21 2+U 2 2+ 7U 2& 7 &U 2 & 1U 2 1& 108U 27 1&7 11+U28 108 82U 2+ 11+ 8U & 1&8 1&+U 1&+ 10U 10 11U & 1 1U 1 17U 17 18U 7 0 22U 8 1 2U 1 12 17U 2 17 1U 1 18U & 18 1&U 1 12U 12 11U 7 11 1+U 8 1& 1U+ 1 1U 70 1 10U 8 1+ 7+U &2 170 8U &2 8 8&UE>EIE)4 )C(E)CES S;E>>

71 10 7 8 11U 72 2 10 11 2&U 7 2 2& 1& 18U 7& 1 18 1& 2U7 17 1 2 18U 7 + 17 18 &0U 77 8 1 17 +U 78 1&+ 7 10U7+ 22 1&+ 10 2U 80 1 1&& 2 18U 81 1& 1 18 1U 82 0 17 1 1&U8 17 22 1&& 1U 8 1&+ 1&8U 87 21 1&8 1&+ 22U 88 11 + &0 1+U8+ &7 11 1+ &8U +0 1 &7 &8 10U +1 1 10 &U +2 2 1 1 U+ 1 1& 1 2U +& 1 & &7 1U + 1& & & 1U + & 12 11 &7U+7 12 8 + 11U +8 1 0 1 17U ++ +2 70 71 +U &00 10 +2 + 10&U

Page 79: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 79/123

A33AC/<E03-$ S3AAD P41 I0P23

&01 11& 10 10& 11U &02 12 11& 11 12U &0 1 12 12 17U&0& 18 127 128 1+U &0 127 11 117 128U &0 11 10 10 117U&07 10 +& + 10U &08 +& 7 7 +U &0+ + 7 77 +U &10 1+ 128 12+ 1&0U&11 128 117 118 12+U &12 117 10 107 118U &1 10 + + 107U &1& + 77 78 +7U&1 107 + +7 108U &1 118 107 108 11+U &17 12+ 118 11+ 10U&18 1&0 12+ 10 1&1U &1+ 1&1 10 8& 8U &20 10 11+ 8 8&U &21 11+ 108 82 8U&22 108 +7 81 82U &2 +7 78 7+ 81U &27 & 1 12 &U &28 1 7 8 12U&2+ 7 1 1 8U &0 1 2+ 0 1U &1 2+ 12 17 0U &2 12 21 22 17U

&& 120 10+ 11& 12U & 10+ +8 10 11&U & +8 87 +2 10U &7 87 70 +2U&8 11 1 17 12U &+ 12 1 1+ 18U &&0 11 120 12 1U &&1 + 71 7 +&U&&2 + +& 10 10&U && 10& 10 11 11U &&& 11 11 127 12U&& 17 12 127 18U && 1 1+ 1&0 1&U &&7 1& 1&0 1&1 1U&&8 1 1&1 8 &+U &&+ 170 1 7 &+U &0 7 1 2 8U &1 8 2 +U&2 + & 0U & 0 & &8 &&U && && &8 &0 U & &0 2 28U& 28 2 2& 20U &7 20 2& 8 &U &8 170 8 8& &U &+ & 8& 8 7U&0 7 8 82 2+U &1 2+ 82 81 21U &2 21 81 7+ 1+U & & 8 7 U && 7 2U& 2 1U & + 7+ 78 +U &7 + 78 77 8U &8 8 77 7 7U &+ 7 7 7 U&70 71 70 U &71 1 1+ +UE>EIE)4 =DG=ED471 4G 8 8 4G &2 &27 4G &2 4;C)ESS 0*18&& 4G &71 4;C)ESS 0*2(E3)E IA4EDA> S4AD4SG4DG=C CG)CDE4EE 2*21&7eH00=GSSG) 0*17

(E)S4 2*&022A>=;A 1e-00(AI= 0*0E)( (E3)E IA4EDA>CG)S4A)4SIA4EDA> CG)CDE4E IEI 1 4G 11 7 &0 && & 0 & 8 2 & 8 70 4G 7 80 -81 4G 82 8 88 4G +& +8 4G 101 127 4G 1& 10 4G 1 17 4G 1 17 4G 170 -178 18 18 4G 1+0 1+ 1+8 4G 20 210 212 4G 217 22 22 22 27 2+ 4G 2&& -20 22 2+ 2& 2 4G 271 277 27+ 4G 28 2+1 2+ 4G 0& 0 4G 2+ -& 4G & 4G 8 1 4G 8 8 4G &2 &2 4G &2 && 4G &71IEIED =DG=ED4 AIEDCA)1 4G & 7 &0 8 7 4G 7 +1 4G +& 127 4G 10 1& 1& 11 4G 1 18+ 1+0 -202 4G 20& 21 217 2& 2&& 270 271 28 4G 28 2+7 2+8 10 4G 1& 2 27 -8 &2 =DS ( 0*& K( 0*&&& & 2 & 22 22 =DS ( 0*8 K( 0*&8 70 80 88 +8 1& 1+ 1&& 21 4G 2 7 =DS ( 0*7 K( 0*

& & 1 8 =DS ( 0* K( 0*2& 71 72 8+ +0 17 18 1&0 1& 1 8 =DS ( 0*& K( 0*2 4G 7 + 4G 11 0 8 81 82 8 ++ 4G 101 11 4G 1 1 1 1&1 1&2 -10 4G 1 17 4G 10 17 4G 170 178 18 18 4G 188 1+ 1+8 4G 201 20 210 -212 4G 21 22 22 27 2+ 4G 2&2 20 2+ 2& 2 4G 2+ 277 27+ 4G 282 28 -2+1 2+ 4G 2+ 2++ 4G 0& 0 4G 0+ 1 4G 20 28 2+ 2 - 4G & 7 + 70 &2 =DS ( 0*& K( 0*2S@==GD4S1 4G & 17 20 2 28 4G &1 4G && 7 4G 0 4G + 87 4G +1 +8 ++ 10+ -110 120 4G 12& 11 4G 1 1&2 1& 1& 1&7 3JE(FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF(E3)E @C >GA(KG)E 0* 1*2 DWJ DWK S4= 2 C4 0*071SE>3WE;43>GGD WE;4DA)E &* 3>GA( 0*1& JDA)E -100 100 KDA)E -100 100DA)E &* 3>GA( 0*1 JDA)E -100 100 KDA)E -100 100

DA)E 7 3>GA( 0*1& JDA)E -100 100 KDA)E -100 100DA)E 7 3>GA( 0*1 JDA)E -100 100 KDA)E -100 100FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF(E3)E 4IE ;S4GD (4 0*0014=E 1 3GDCE0 0*12 0*0&7 04=E 2 3GDCE0 1*7& 0*0&7 04=E 3GDCE0 2*0+ 0*0&7 04=E & 3GDCE0 2*18 0*0&7 04=E 3GDCE0 1*82 0*0&7 04=E 3GDCE0 0*2 0*08 0

4=E 7 3GDCE0 0* 0*08 04=E 8 3GDCE0 0*&+ 0*08 04=E + 3GDCE0 0*&2 0*08 04=E 10 3GDCE

Page 80: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 80/123

A33AC/<E03-$ S3AAD P41 I0P23

0 0*2 0*08 04=E 11 3GDCE0 0*7 0*08 04=E 12 3GDCE0 0*& 0*08 04=E 1 3GDCE0 0*28 0*08 04=E 1& 3GDCE

0 0*&8 0*08 04=E 1 3GDCE0 0*&2 0*08 04=E 1 3GDCE0 0* 0*08 04=E 17 3GDCE0 0*&7 0*08 04=E 18 3GDCE0 0*+1 0*08 04=E 1+ 3GDCE0 1*0+ 0*08 04=E 20 3GDCE0 0*+ 0*08 04=E 21 3GDCE0 1* 0*08 04=E 22 3GDCE0 1*8+ 0*08 0

4=E 2 3GDCE0 1*1 0*08 04=E 2& 3GDCE0 0*2 0*08 04=E 2 3GDCE0 0*107 0*08 04=E 2 3GDCE0 0*+& 0*08 04=E 27 3GDCE0 0*82 0*08 04=E 28 3GDCE0 0*7 0*08 04=E 2+ 3GDCE0 1*2+ 0*08 04=E 0 3GDCE0 1*1& 0*08 0

4=E 1 3GDCE0 0*+8 0*08 04=E 2 3GDCE0 1*&& 0*08 04=E 3GDCE0 1*7& 0*08 04=E & 3GDCE0 1*&8 0*08 04=E 3GDCE0 0*78 0*08 04=E 3GDCE0 1*& 0*08 04=E 7 3GDCE0 1*18 0*08 04=E 8 3GDCE0 1*02 0*08 04=E + 3GDCE

0 1* 0*08 04=E &0 3GDCE0 1*81 0*08 04=E &1 3GDCE0 1*& 0*08 04=E &2 3GDCE0 0* 0*08 04=E & 3GDCE0 1*12 0*08 04=E && 3GDCE0 0*++ 0*08 04=E & 3GDCE0 0*8 0*08 04=E & 3GDCE0 1*2 0*08 04=E &7 3GDCE

0 1*2 0*08 04=E &8 3GDCE0 1*2+ 0*08 04=E &+ 3GDCE0*12 0 0*178 0*20 0*1+8 04=E 0 3GDCE0*12 0 0*178 0*&& 0*1+8 0

Page 81: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 81/123

A33AC/<E03-$ S3AAD P41 I0P23

4=E 1 3GDCE0*12 0 0*178 0*& 0*1+8 04=E 2 3GDCE0*12 0 0*178 0*&7 0*1+8 04=E 3GDCE0*12 0 0*178 0*+ 0*1+8 04=E & 3GDCE0*12 0 0*178 0*&7 0*1+8 0

ADD#A> 4IE0 0*1& 0*1+8(AI=) 0*0C@4 G33 IG(E S;A=E 2&FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( 1 SESIC >GA( J (D "SJ$FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF@C >GA( J 1FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( 2 SESIC >GA( K (D FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF@C >GA( K 1FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( (EA( >GA( "(>$FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFSE>3WE;4 -13>GGD >GA(

DA)E &* 3>GA( -0*1& JDA)E -100 100 KDA)E -100 100DA)E 7 3>GA( -0*1& JDA)E -100 100 KDA)E -100 100FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF#1AD ) #I=E #1AD >##?FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFSE>3WE;4 -0*0001FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( DGG3 >#E >GA( ">D$FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF3>GGD >GA(DA)E &* 3>GA( -0*1 JDA)E -100 100 KDA)E -100 100DA)E &* 3>GA( -0*1 JDA)E -100 100 KDA)E -100 100DA)E 7 3>GA( -0*1& JDA)E -100 100 KDA)E -100 100DA)E 7 3>GA( -0*1 JDA)E -100 100 KDA)E -100 100FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( W)( >GA( J (D "WJ$

FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFIEIED >GA(& 10 @) J -0*2+&0 @) J -0*&8 @) J -0*&87 @) J -0*&+& @) J -0*81 127 @) J -0*11& 2+7 @) J -0*118+ @) J -0*221 @) J -0*22& @) J -0*2270 @) J -0*210 2+7 @) K 0*1& 1& @) K -0*12+8 @) K 0*210 11 @) K 0*18

12 @) K 0*1127 @) K 0*2&128 @) K 0*2812+ @) K 0*21& @) K -0*211 12 @) K -0*1+1 @) K -0*11 @) K -0*2&2 @) K -0*28 @) K -0*2FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( 7 W)( >GA( K (D "WK$FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFIEIED >GA(10 2+7 @) K -0*2+2+8 @) K -0*

10 11 @) K -0*&&12 @) K -0*8127 @) K -0*128 @) K -0*812+ @) K -0*8& 1& @) K -0*11& @) K -0*27

Page 82: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 82/123

A33AC/<E03-$ S3AAD P41 I0P23

11 12 @) K -0*2&1 @) K -0*211 @) K -0*2 @) K -0*7 @) K -0*1& 10 @) J 0*12&0 @) J 0*178 @) J 0*2

7 @) J 0*1++& @) J 0*11& 2+7 @) J -0*018+ @) J -0*1721 @) J -0*22& @) J -0*1+270 @) J -0*1FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( 8 >AS4 >GA( ">$FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFSE>3WE;4 J 1SE>3WE;4 1SE>3WE;4 K 13>GGD >GA(DA)E &* 3>GA( -0*1 JDA)E -100 100 KDA)E -100 100DA)E &* 3>GA( -0*1 JDA)E -100 100 KDA)E -100 100DA)E 7 3>GA( -0*1& JDA)E -100 100 KDA)E -100 100

DA)E 7 3>GA( -0*1 JDA)E -100 100 KDA)E -100 1004IE >GA(8 & 3J 1 1 1*0000002& 3J 2 1 1*0000002 3J 1 1*000000&0 3J & 1 1*000000&8 3J 1 1*0000008 & 70 1 3K 1 1*00000071 17 3K 7 1 1*0000007 77 1+ 1&0 3K 8 1 1*00000078 1&1 3K + 1 1*000000 1 3K 10 1 1*000000 2 3K 11 1 1*0000007 3K 12 1 1*00000070 1 3 1 1 1*00000071 17 3 1& 1 1*000000

7 77 1+ 1&0 3 1 1 1*00000078 1&1 3 1 1 1*0000008 & 3 17 1 1*0000007 3 18 1 1*000000 2 3 1+ 1 1*000000 1 3 20 1 1*00000081 3 21 1 1*0000001&& 3 22 1 1*0000002& 3 2 1 1*000000+2 3 2& 1 1*000000+ 3 2 1 1*000000+ + 3 2 1 1*000000+7 3 27 1 1*00000010 3 28 1 1*00000010& 3 2+ 1 1*00000010 107 3 0 1 1*000000108 3 1 1 1*000000

82 3 2 1 1*0000001& 3 1 1*0000002 3 & 1 1*000000&0 11& 3 1 1*00000011 3 1 1*000000117 118 3 7 1 1*00000011+ 3 8 1 1*0000008 3 + 1 1*0000008 3 &0 1 1*000000+ 3 &1 1 1*000000&8 12 3 &2 1 1*00000012 3 & 1 1*000000128 12+ 3 && 1 1*00000010 3 & 1 1*0000008& 3 & 1 1*000000& 3 &7 1 1*000000

&7 3 &8 1 1*00000070 1 3J &+ 1 1*000000 1 3J 0 1 1*000000+2 3J 1 1 1*00000010 3J 2 1 1*00000011& 3J 1 1*00000012 3J & 1 1*000000

Page 83: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 83/123

A33AC/<E03-$ S3AAD P41 I0P23

FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF >GA( CGI 3GD CG)CDE4E S4D@C4@DEFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( CGI 21 1*&( 1*&>GA( CGI 22 1*&(>H1*>>H1*>D  1*& & 1* 1*>GA( CGI 2 1*&(>H1*>>H1*>DH1*&WJ

1*& & 1* 1* 1*&>GA( CGI 2& 1*&(>H1*>>H1*>DH1*&WK 1*& & 1* 1* 7 1*&>GA( CGI 2 1*2(>H1*2>>H1*2>DH1*2WJ 1*2 & 1*2 1*2 1*2>GA( CGI 2 1*2(>H1*2>>H1*2>DH1*2WK 1*2 & 1*2 1*2 7 1*2FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF 3GD CGI)A4G) W4; SESIC W>> E @SEFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF>GA( CGI 27 1*2(>HSJH0*>>H0*>D  1*2 1 1*0 & 0* 0*>GA( CGI 28 1*2(>HSKH0*>>H0*>D  1*2 2 1*2 & 0* 0*>GA( CGI 2+ 0*+(>HSJ 0*+ 1 1*0>GA( CGI 210 0*+(>HSK

0*+ 2 1*0>GA( CGI 211 0*+(>-SJ 0*+ 1 -1*0>GA( CGI 212 0*+(>-SK 0*+ 2 -1*0>GA( CGI 21 0*+(>HWJ 0*+ 1*0>GA( CGI 21& 0*+(>HWK 0*+ 7 1*0>GA( CGI 21 0*+(>-WJ 0*+ -1*0>GA( CGI 21 0*+(>-WK 0*+ 7 -1*0>GA( CGI 11 (> 1*0>GA( CGI 12 (>H>>H>D 

1*0 & 1*0 1*0>GA( CGI 1 (>H>>H>DHWJ 1*0 & 1*0 1*0 1*0>GA( CGI 1& (>H>>H>DHWK 1*0 & 1*0 1*0 7 1*0>GA( CGI 1 (>H>>H>DHSJ1 1*0 1*0 & 1*0 1*0>GA( CGI 1 (>H>>H>DHSK2 1*0 1*0 & 1*0 1*0>GA( CGI 17 (>HSJ1 1*0 1*0>GA( CGI 18 (>HSK2 1*0 1*0>GA( CGI 1+ (>-SJ 1*0 1 -1*0>GA( CGI 20 (>-SK 1*0 2 -1*0

>GA( CGI 21 (>HWJ 1*0 1*0>GA( CGI 22 (>HWK 1*0 7 1*0>GA( CGI 2 (>-WJ 1*0 -1*0>GA( CGI 2& (>-WK 1*0 7 -1*0>GA( CGI 2 (>H>>H>DH> 1*0 & 1*0 1*0 8 1*0=ED3GDI A)A>SS>GA( >S4 21 4G 2+ 210 4G 21 11 4G 2S4AD4 CG)CDE4E (ES)CG(E AC3IA) &2000 IEI 1 4G 11 7 &0 && & 0 & 8 2 & 8 70 4G 7 -80 4G 82 8 88 4G +& +8 4G 101 127 4G 1& 10 4G 1 17 4G 1 17 4G 170 -

178 18 18 4G 1+0 1+ 1+8 4G 20 210 212 4G 217 22 22 22 27 2+ 4G 2&& -20 22 2+ 2& 2 4G 271 277 27+ 4G 28 2+1 2+ 4G 0& 0 4G 2+ -& 4G & 4G 8 1 4G 70 8 &2 &23C 000 IEI 1 4G 11 7 &0 && & 0 & 8 2 & 8 70 4G 7 80 4G 82 8 -88 4G +& +8 4G 101 127 4G 1& 10 4G 1 17 4G 1 17 4G 170 178 18 18 -18 4G 1+0 1+ 1+8 4G 20 210 212 4G 217 22 22 22 27 2+ 4G 2&& 20 22 -2+ 2& 2 4G 271 277 27+ 4G 28 2+1 2+ 4G 0& 0 4G 2+ & 4G & -

Page 84: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 84/123

A33AC/<E03-$ S3AAD P41 I0P23

4G 8 1 4G 70 8 &2 &2CG)CDE4E 4AE(ES) E>EIE)4 A>>(ES) CG>@I) 1 4G & 7 &0 8 7 4G 7 +1 4G +& 127 4G 10 1& 1& 11 -12 4G 1 18+ 1+0 202 4G 20& 21 217 2& 2&& 270 271 28 4G 28 2+7 2+8 10 -11 4G 1& 2 27 8 &2(ES) EAI 4G 11 && & 0 & 2 & 8 70 4G 72 80 4G 82 8 88 4G +0 +8 -++ 4G 101 11 4G 17 1+ 4G 1&& 10 4G 1 17 4G 10 17 4G 170 178 18 18 -

18 4G 188 1+ 1+8 4G 201 20 210 212 4G 21 22 22 22 27 2+ 4G 2&2 20 -22 2+ 2& 2 4G 2+ 277 27+ 4G 282 28 2+1 2+ 4G 2+ 2++ 4G 0& -0 4G 0+ 1 4G 2 2+ & 4G & 4G 8 1 4G 70 &2E)( CG)CDE4E (ES)=D)4 S4GD (D34=D)4 A)A>SS DES@>4S3)S;

Page 85: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 85/123

2 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

$. C6ec7 Colu"n Deflection

Column ;eight ";$ % 1 cm

Allowable (eflection % ;'200 % 2*8 cm % 2*7 mm

  /ori@ontal =ertical /ori@ontal 4esultant 4otational

  0ode #C "" "" Z "" "" r rad r rad rZ rad

Ia. J 11 1 (>H> 1 -1*&2 -0*1&7 2 0 0 -0*00

Iin J 11 1+ (>-SJ -0*+& -1 -0*02 1*7& 0 0 0*001

Ia. 1& 1 (>H> 0 *107 -0*00 0 0 0*011

Iin 118 1& (>H> 0*8 -*++ 0 & -0*00+ 0 0*00+

Ia. K 170 1 (>H> -0*01 0*+ 2 2 0 0 0Iin K 1+ 20 (>-SK -0*078 0*7 -1*&&8 1*&+8 0 0 0

Ia. rJ 107 1 (>H> 1*02 -+*2 0*01 +*1 0*01 0 0*008

Iin rJ 118 1 (>H> 1 -*8 0*022 & -0*00+ 0 0*00+

Ia. r 170 1 (>H> 0 0*+ 1* 2 0 0 0

Iin r 1+ 12 (>H> 0*18 -0*1 -0*2 0*1 0 0 0

Ia. rK 1& 1 (>H> -0*0 *0+8 0*&81 *1 0 0 0*011

Iin rK 117 1& (>H> 1 -2*22 0 2 -0*00+ 0 -0*00+

Ia. Dst $$ 1& (>H> 0*8 -*++ -0*00 +(.&$ -0*00+ 0 0*00+

'. C6ec7 Bea" Deflection

 #10GI32DI0A# BEA<

eam >ength ">$ % && cm

Allowable (eflection % >'2&0 % 1*8 cm

  MAX MEMBER SECTION DISPLACEMENTS

  --------------------------------

Beam Ia. (is! >ocation >'C >'(is!l lobal J lobal lobal K

"mm$ "m$ "mm$ "mm$ "mm$

2+ +8366 532, 5+, 550 +3078 -9+3+92 030+8

2+ +836,+ 532, 5+5 550 03,6+ -9+3+2, 0302

2+ +8369 532, 5+2 550 03,6+ -9+3+2 0302

2+ +8369 532, 5+6 550 03,6 -9+3+, +3227

2+ +8369 532, 5+ 550 03,6+ -9+3+,6 -03007

2+ +83,0+ 532, 52, 555 03,6 -90359 0302

20 +8357 532, 5+, 55, +3+58 -7836,2 030+,

20 +8356+ 532, 52, 55, 036+7 -793802 030+9

20 +835,5 532, 5+5 55, 0362 -78398 030+6

20 +835,5 532, 5+ 55, 0362 -783,+, -03008

20 +835,5 532, 5+6 55, 0362, -78389 +30620 +835,2 532, 5+2 55, 0362 -78387 030+9

2+ +23,29 532, 5+7 ,+9 03802 -,63655 030+6

2+ +23,+, 532, 52+ ,+8 03595 -,63,76 0302+

Page 86: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 86/123

of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

2+ +23,+5 532, 520 ,+8 0359+ -,63,8 -+3+92

2+ +23,+5 532, 52 ,+8 0359 -,63,79 030,2

2+ +23,+5 532, 522 ,+8 0359 -,63607 -03008

2+ +23,+5 532, 5++ ,+8 0359 -,63,85 0302+

2+ +23,+2 532, 5+9 ,+8 03598 -,63,8, +322

2+ +23,++ 532, 525 ,+8 0359 -,636+ 0302+

2+ +2387 532, 5+8 ,20 -03+52 -,63,,2 0302,

20 +23558 532, 5+7 ,26 0385 -,,37 030+2

20 +235+8 532, 522 ,27 0325 -,,3,6 -030+2

20 +235+9 532, 52+ ,27 0322 -,,3,57 030+,

20 +235+7 532, 5++ ,27 0325 -,,3,, 030+6

20 +235+7 532, 520 ,27 032 -,,3, -+302620 +235+7 532, 5+9 ,27 032, -,,3,, +30,9

20 +235+6 532, 525 ,27 0325 -,,3,,5 030+,

20 +235+6 532, 52 ,27 0322 -,,3,26 0305

20 +2328, 532, 5+8 ,29 -03089 -,,358 030+9

+5 83++5 53+6 5+6 929 -03267 -55399 03968

+5 93828 53+6 5+ 9, -03+6+ -5536+5 0307+

+5 93827 53+6 5+5 9, -03+7+ -553,92 03096

+5 93998 53+6 5+2 98 -03+6 -553,6 03098

+5 9399+ 53+6 52, 9,0 -03+6 -553,52 03098

+5 9399+ 53+6 5+, 9,0 03+7+ -553,0+ 03066

5+, 930 237, 5+6 6, -03528 -83,7+ +3+0

5+, 93599 237, 5+ 6,, -03267 -83,,5 030,

5+, 93597 237, 5+5 6,, -03278 -83,, 03066

5+, 93596 237, 52, 6,, -0327 -83,8 03067

5+, 9359, 237, 5+2 6,, -0327 -83,8 03067

5+, 93579 237, 5+, 6,6 032,+ -83,58 03062

+59 9328 5377, 5+5 8+, -03+5 -93,7, -0300,

+59 932+9 5377, 52, 8+9 -03+56 -93, -03009

+59 932+ 5377, 5+2 8+8 -03+ -93, -03009

+59 93208 5377, 5+, 8+8 03+,9 -93,5, 030+7

+59 93+56 5377, 5+ 827 -03+ -936+ -03026

+59 93066 5377, 5+6 856 -0302, -9358 03769

+0 636+8 5377, 5+6 ++0 -035,5 -636 0358+0 63,,8 5377, 5+5 ++,+ -03+82 -6360 03062

+0 63,,9 5377, 5+2 ++,+ -03+96 -6360 0306+

+0 63,,9 5377, 52, ++,+ -03+96 -6360 0306+

+0 63,,7 5377, 5+ ++,+ -03+9 -6360, 030,

+0 63,22 5377, 5+, ++,7 03+5 -6360 -0302

5+, 63265 237, 5+9 979 -032, -73+22 +308

5+, 632,2 237, 5+8 978 -037+6 -73+08 030,8

5+, 6329 237, 522 990 -03+82 -73+0 0305+

5+, 6327 237, 52+ 990 -0320, -73+0+ 030,2

5+, 632, 237, 5++ 990 -03+8, -73+ 030,

5+, 6325 237, 525 990 -03+96 -73089 030,,

5+, 632+ 237, 52 99+ -03202 -73086 0307,5+, 63259 237, 5+7 99+ 03526 -7308+ 0309

5+, 63227 237, 520 995 -03+56 -73079 -03895

+5 ,399 23,+7 5+9 +280 -032++ -27308 039,

Page 87: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 87/123

& of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

22 ,368 532, 5+5 +++ 03,65 -73+22 03052

22 ,3682 532, 5+6 ++2 03,67 -73+2 +355

22 ,368+ 532, 5+2 ++2 03,6 -73+2 03055

22 ,368 532, 5+ ++2 03,6 -73++8 03002

22 ,368 532, 52, ++2 03,65 -73++ 03055

22 ,3698 532, 5+, ++2 +309, -73++7 03027

+5 ,3697 23,+7 522 +527 -03++, -26378 0308

+5 ,3696 23,+7 52+ +527 -03+27 -2637,9 0306,

+5 ,3662 23,+7 5+8 +555 -039 -26379+ 03098

+5 ,36, 23,+7 5++ +55, -03+2+ -26375 03067

+5 ,366 23,+7 5+7 +557 0322 -263678 030,

+5 ,362+ 23,+7 525 +55 -03++, -26370+ 03068+5 ,362 23,+7 52 +55 -03+27 -26366, 0309

+5 ,3,8 23,+7 520 +595 -0302, -263+ -037+2

+59 3958 5377, 520 +,60 -032++ -,308 -03775

+59 3768 5377, 52 +,95 -03086 -,3022 0302

5,9 3728 237, 52, ++65 -032,7 -538+ 030,,

5,9 3729 237, 5+2 ++65 -032,7 -53825 030,,

+59 3726 5377, 52+ +,87 -03+0, -3879 -0300+

5,9 372, 237, 5+ ++65 -032,+ -538,5 03059

5,9 372 237, 5+, ++6 032, -5396+ 030

5,9 37+9 237, 5+5 ++6, -03267 -53985 030,,

5,9 3688 237, 5+6 ++70 -035+6 -53867 0392+

+59 368, 5377, 5+8 +609 -03587 -389 -03025

+59 368+ 5377, 5++ +608 -03088 -385 -0300,

+59 3696 5377, 5+7 +6++ 03+8, -3858 0302

+59 36,6 5377, 525 +62+ -03085 -3808 -0300,

+59 36+5 5377, 522 +656 -03+02 -3966 -03025

+59 3,5 5377, 5+9 +66+ 030+2 -378 0377+

+ 35 23,+7 5+6 +758 -03+89 -2,309 +3205

+ 3+, 23,+7 5+ +92+ -03+55 -2,3022 0306+

+ 3+ 23,+7 5+5 +925 -03+5 -2,3025 0309

+ 3+2+ 23,+7 52, +952 -03+56 -23895 03097

+ 3++6 23,+7 5+2 +95 -03+56 -23872 03097

+ 3++2 23,+7 5+, +956 03225 -238, 030992+ 536, +357, 5+ +,0, 035+ -++387 -03008

2+ 536, +357, 5+5 +,06 035+ -++388 0302

2+ 5366 +357, 5+, +,09 03975 -++386+ 030++

2+ 5362 +357, 5+2 +,+0 035 -++386+ 0302+

2+ 536 +357, 5+6 +,+0 03, -++386, +325

72 53,88 532, 5+6 +90, -035+ -53672 0329

72 53,88 532, 52, +906 -0350 -5367+ 03009

72 53,88 532, 5+2 +906 -0350 -5367+ 03009

72 53,88 532, 5+, +906 032, -53667 03009

72 53,89 532, 5+5 +906 -03522 -5367+ 03007

72 53,89 532, 5+ +906 -03289 -5367+ 03002

7+ 53,, 23+67 5+2 +950 -0350 -27385 030527+ 53,8 23+67 5+, +95+ 032,7 -273982 0305+

7+ 53,8 23+67 5+5 +95+ -035+5 -27380 03052

7+ 53,9 23+67 5+ +95+ -03289 -2738 030+,

Page 88: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 88/123

of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

7+ 53, 23+67 52, +955 -0350 -2738+7 03052

2+ 53,2, +357, 52, +,60 035+ -++3826 0302+

2+5 53,+2 +357, 5+ +,6, 0357 -++379, 030,2

2+5 53,09 +357, 5+5 +,67 03 -++3796 03079

2+5 53,09 +357, 5+, +,67 03978 -++3925 03095

2+5 53,02 +357, 5+6 +,70 03,56 -++3788 +3+5+

2+5 53, +357, 5+2 +,7+ 03 -++378, 03078

7+ 5389 23+67 5+6 +9,9 -0355, -27398 0378+

+ 53, 23,+7 5+9 2+96 -03+6+ -203+, +3+96

269 5309 3, 52, +760 03+ -+53++2 03027

2+5 53596 +357, 52, +62 0358 -++376+ 03078

269 53576 3, 5+5 +777 03+, -+53505 03029269 5357+ 3, 5+, +778 039,7 -+535+9 03029

269 5357 3, 5+6 +790 035+5 -+535+2 +325

269 53569 3, 5+2 +79+ 03+, -+535+, 03027

268 53566 53, 5+6 +792 035,9 -3557 +3556

269 535, 3, 5+ +785 03+8 -+535, -03006

268 5355 53, 52, +78 03, -35+7 030

267 53556 3, 52, +789 032, -+2395+ -0306

268 5352, 53, 5+ +90 03,7 -3288 030+2

268 53507 53, 5+2 +9+ 03,7 -3292 030

268 535 53, 5+, +9+9 0382 -327, 0306

268 53289 53, 5+5 +9+8 03, -3275 0306

+ 532,8 23,+7 522 25+6 -03086 -20305 030,

+ 532,, 23,+7 52+ 25+8 -03+0, -20305 03069

+ 5325, 23,+7 5+8 2555 -03,8 -+83887 03068

+ 5325+ 23,+7 5++ 2556 -03086 -+83878 0307+

+ 53227 23,+7 5+7 2558 0326 -+83862 03072

267 532++ 3, 5+, +969 03967 -+53+,5 -030,6

267 532++ 3, 5+5 +969 0326 -+53++, -0306

+ 53207 23,+7 525 25, -03085 -+83829 03075

+ 53205 23,+7 52 25,7 -03+02 -+83828 03087

267 53202 3, 5+2 +975 0329 -+53+2 -0306

267 532 3, 5+6 +97 03552 -+53+22 +300,

+57 53+78 5377, 5+ 257 -03+8 -532+2 -03058267 53+78 3, 5+ +997 0329 -+53+, -03076

+57 53+78 5377, 5+5 257, -03+8 -532+2 -03056

+57 53+79 5377, 5+2 257, -03+5 -532+2 -03056

+57 53+79 5377, 52, 257, -03+5 -532+2 -03056

22 53+7 532, 52+ 207 03596 -3+58 03028

22 53+7 532, 5+8 207 -03+5, -3+58 0305,

22 53+75 532, 52 209 03599 -3+57 0306+

22 53+72 532, 520 209 0359 -3+57 -+327+

22 53+72 532, 5++ 208 03599 -3+56 03028

22 53+72 532, 5+9 208 0358+ -3+56 +3528

22 53+72 532, 522 208 03599 -3+56 -0300

22 53+7 532, 5+7 20,0 03809 -3+5 0302222 53+7 532, 525 20,0 03599 -3+5, 03028

+0 53+, 5377, 5+9 2586 -03289 -53+2 0355

+57 53+ 5377, 5+, 20+ 03+67 -532+2 0309

Page 89: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 89/123

of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

+0 53+26 5377, 5+8 2+, -0377 -53+29 03+26

+57 53++8 5377, 5+6 220 030+2 -532+6 032

+0 5308+ 5377, 52 22 -03+8 -53+29 030,2

+0 5308 5377, 52+ 25 -03+5 -53+29 030,

+0 5308 5377, 5++ 25 -03+56 -53+29 030,

+0 53098 5377, 525 2 -03+5 -53+29 030

+0 53098 5377, 522 2 -03+5 -53+29 03059

+0 530,5 5377, 5+7 275 03+89 -53+29 -03056

+0 53028 5377, 520 282 0302, -53+52 -0325

+58 530+ 5377, 5+5 2,09 -03+55 -53+ 03026

+ 53009 23,+7 520 2,+0 -03057 -+83,5 -+30,

+58 2389 5377, 5+2 2,28 -03+5 -5359 03025+58 23892 5377, 52, 2,52 -03+27 -53592 03025

+58 23878 5377, 5+, 2,5 03+7+ -53579 030++

+58 23827 5377, 5+ 2,78 -03+27 -5352, -0300,

+97 239+2 23867 52, +,92 035+ 23+22 0302+

+58 23782 5377, 5+6 270 -0307 -53+99 +3+2+

+96 23796 23867 52, +,87 035+, 23098 0308,

28, 23768 +395 5+6 +607 03+7 23092 +3258

2+ 23768 +357, 522 +896 03289 -93+7 -030+

2+ 2376, +357, 52+ +898 03288 -93+8 030+9

28, 2376+ +395 5+ +6++ 035+6 2307+ -03007

2+ 2376+ +357, 5+7 +88+ 037+ -9352 03008

+97 2376 23867 5+, +6+2 0375 23067 030+

2+ 2376 +357, 520 +885 03+8, -932, -+3+99

+97 237,8 23867 5+2 +6+2 035+ 2306, 0302+

2+ 237,7 +357, 5++ +88, 0350+ -935 0302

2+ 237,, +357, 5+9 +886 0306 -935, +3229

2+ 237,5 +357, 5+8 +889 -03+ -9328 0305

2+ 2378 +357, 525 2000 0350+ -932 0302+

28 237, +395 5+ +62+ 0328, 230, -03087

2+ 237, +357, 52 2005 0350 -93 030,+

28 2372 +395 5+6 +622 03+6 2308 0388+

+96 237+ 23867 5+, +625 03686 23058 03+

+97 23759 23867 5+5 +62, 035+ 2305 030+8+96 23755 23867 5+2 +627 035+, 23055 03086

+97 23755 23867 5+ +629 03559 23059 -030+

28, 237+5 +395 5+, +60 0370 23022 0305

28, 237+2 +395 5+2 +60 035+5 2302 03027

+96 237+2 23867 5+5 +6+ 035+, 230++ 0308

+96 23709 23867 5+ +65 035+5 23006 03069

+97 23705 23867 5+6 +66 039 23005 +325

28 2370+ +395 5+, +67 03676 23005 -0307,

266 23686 5 5+, 222, +300, -53796 -0328

28 2368 +395 5+2 +6,+ 03285 +3889 -03065

269 2368 3, 52 2227 0329 -8327 030,,

28, 23682 +395 5+5 +6,5 035+5 +3889 0305+96 23696 23867 5+6 +6,6 039 +3892 +3+,

266 23692 5 52, 2257 03,25 -537+9 -03226

266 2369+ 5 5+5 2259 03,2, -537+9 -03227

Page 90: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 90/123

7 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

269 2369 3, 52+ 2258 0329, -8326, 0302

266 23677 5 5+2 22+ 03,26 -537+, -03227

269 2367, 3, 5+7 222 03728 -83278 0302

2+5 2367, +357, 522 20,6 0350+ -93522 0305

28 2367 +395 5+5 +66 03285 +3876 -03065

269 23675 3, 5+9 22 03+95 -8327 +325+

269 23672 3, 5++ 22, 03297 -83277 0302

266 23672 5 5+ 22, 03,26 -53708 -032,

2+5 2367 +357, 52+ 20,8 03502 -9352 030,6

2+5 2367 +357, 5+7 20,8 037+ -9356 0306

269 2367 3, 520 227 03598 -8329 -+3+96

269 23667 3, 5+8 228 -03+,, -8327, 03022+5 2366 +357, 5+9 206 03 -93556 +3++

269 23665 3, 525 22,5 03297 -83298 0302

2+5 23662 +357, 5++ 206, 03502 -93555 030,7

2+5 2366 +357, 520 2067 03206 -9355 -0388,

28, 2366 +395 52, +675 035+2 +387 03027

266 236,8 5 5+6 22,6 039 -53689 03602

2+5 236, +357, 525 2072 0350 -9355 030,8

2+5 236, +357, 5+8 2072 -03+5, -93507 030,

2+5 2368 +357, 52 2076 0350, -935 0309

269 2368 3, 522 226 03299 -83506 -03008

28 2362 +395 52, +69 0328+ +388 -03065

5,7 23,8, 237, 5+2 2++8 -0350+ -5+3,6 0306

5,7 23,85 237, 5+5 2+20 -035+ -5+3,8+ 030,8

5,7 23,85 237, 5+, 2+2+ 032++ -5+3,+ 030,8

5,7 23,82 237, 52, 2+2+ -0350+ -5+3,,9 0306

5,7 23,8+ 237, 5+ 2+22 -0328, -5+3,77 0305,

5,9 23,96 237, 520 2+26 -03+2 -5+39, -03725

267 23,96 3, 52 2520 0328 -83+5 0

5,7 23,9, 237, 5+6 2+29 -03565 -5+3728 +3+72

267 23,72 3, 52+ 2552 0328+ -83+,5 -03029

267 23,7+ 3, 5+7 2555 03752 -83+82 -03058

5,9 23,67 237, 525 2+2 -03+7 -5+38+8 030

267 23,66 3, 520 2559 03599 -83+6, -+309267 23,65 3, 5++ 250 03285 -83+62 -03028

267 23,6+ 3, 5+9 255 03+87 -83+6+ +3025

5,9 23,6 237, 5+8 2+9 -0368, -5+38,+ 030,6

5,9 23,6 237, 52 2+9 -03+82 -5+39,8 0306+

5,9 23,,7 237, 5++ 2+,+ -03+96 -5+3999 030

267 23,,, 3, 5+8 257 -03+7 -83+5 -0302

267 23,, 3, 525 259 03285 -83+72 -03028

5,9 23,, 237, 522 2+,5 -03+9 -5+38+7 03027

5,9 23,,5 237, 5+7 2+, 03528 -5+392, 03052

5,9 23,7 237, 52+ 2+,8 -03+8, -5+39,9 0305

267 23,+ 3, 522 256+ 0328, -83+82 -030,8

5,9 23,29 237, 5+9 2+76 -0322 -5+385+ 039+258 2356, 532, 5+, 279 +328 -53766 030+6

258 23562 532, 5+5 27,+ 037+8 -53699 030+9

258 2356 532, 5+2 27,5 0372 -53697 030+9

Page 91: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 91/123

8 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

258 2356 532, 52, 27,5 037+9 -5369 030+8

258 2356 532, 5+6 27, 0372 -53697 0397

258 235,9 532, 5+ 27,6 037+8 -5369 -0300

7+ 23555 23+67 520 279, -03+9 -2036+2 -03752

+58 23552 5377, 520 5256 -03+77 -236, -+307

7+ 23292 23+67 52 297 -03225 -203,2+ 0305

7+ 23292 23+67 5+8 299 -0377, -203,68 03029

7+ 23292 23+67 525 299 -0320, -203,,6 03026

7+ 2329 23+67 5++ 29,0 -032+7 -203,5+ 03026

7+ 23278 23+67 52+ 29,+ -03226 -203,06 03026

7+ 23278 23+67 5+7 29,2 035 -20385 0302,

7+ 23278 23+67 522 29,2 -032++ -203,+ 0300899 23252 23, 5+5 2699 -0329, +3298 030+

7+ 23229 23+67 5+9 28+7 -0329 -203,+ 0379

99 23229 23, 5+2 2685 -03278 +3296 030+

99 23226 23, 5+, 268 03255 +329, 0305+

99 23226 23, 52, 268, -03276 +329 030+

99 232+8 23, 5+ 270 -03276 +3277 030+5

+58 23+89 5377, 52 55, -03085 -23,+5 0309

99 23+8 23, 5+6 275 -03258 +32,7 +3+57

+97 23+68 23867 520 20,+ 03089 +3677 -+3+85

+58 23+66 5377, 52+ 596 -03088 -239 03025

+96 23+9 23867 520 207+ 0309 +368 -0388

+58 23+6 5377, 5+8 5,+9 -0358+ -236+ 03056

+58 23+ 5377, 5++ 5,27 -03085 -23, 0302

+97 23+57 23867 52 2092 0325 +362 030,+

+58 23+5, 5377, 5+7 5,56 0320, -239 0300,

+97 23+5 23867 525 209, 032 +3659 03022

+96 23+27 23867 52 2082 03222 +362, 03086

+96 23+22 23867 525 2086 0322 +362 0307

28, 23+2+ +395 5+9 2087 03076 +365+ +3256

+58 23++, 5377, 525 5,68 -03097 -2328 030+7

+97 23++5 23867 5+7 2+0, 03629 +36+7 03009

28, 23++5 +395 522 2+06 0322 +36+8 -030+

+97 23++5 23867 5++ 2+06 03258 +36+, 0302+97 23+++ 23867 5+8 2+09 -03+8 +36+5 0305+

28 23+09 +395 522 2++0 03205 +36+ -03072

+96 23+09 23867 5+7 2+++ 036 +3605 03075

28 23+0, +395 5+9 2++5 03067 +3608 +30+6

+96 23+0+ 23867 5++ 2++9 032+8 +3,89 03068

+96 23085 23867 5+8 2+2, -03+6 +3,8+ 0306

+97 2308 23867 52+ 2+29 03258 +3,82 030+7

+97 23097 23867 522 2+52 03257 +3,99 -030++

28, 2309, +395 525 2+5 032+8 +3,8+ 0302+

+58 23095 5377, 522 562 -0308 -23586 -030++

+96 23079 23867 52+ 2++ 032+8 +3,7 03067

28 23079 +395 525 2++ 03202 +3,78 -030++96 2307 23867 522 2+, 032+, +3,7 030+

28, 2306, +395 5+7 2+, 03609 +3,7 03027

28 2306 +395 5+7 2+,, 03,95 +3,65 -030,+

Page 92: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 92/123

+ of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

28, 2306 +395 5++ 2+,6 032+7 +3,69 0302

28, 23065 +395 5+8 2+,6 -03+72 +3,67 0302+

28 230,7 +395 5++ 2+62 03202 +3,,7 -030+

+97 230,, 23867 5+9 2+6, 03595 +3,,5 +3255

+96 230,5 23867 5+9 2+67 035,5 +3,6 +3+26

28 230, +395 5+8 2+70 -03+9+ +3,,+ -03028

28, 230 +395 52+ 2+77 032+7 +3,7 0302

28 23057 +395 52+ 2+9, 032 +3,5, -03059

2+, 23026 23282 5+2 27+ 037 -23866 0302

2+, 23025 23282 5+, 27+9 0385 -23865 030+

2+, 230+8 23282 5+5 272 0375 -2386 03022

2+, 230+9 23282 5+ 2726 0375 -238,8 -0300928, 230+, +395 52 2209 032+ +3,+7 030,9

5+9 230+ 532, 5+, 5227 -032 -53,, 0300

28 23008 +395 520 22+ 0355, +3,0, -+3088

28, 23007 +395 520 22+6 0356 +3,06 -+3+98

28 23006 +395 52 22+7 03+89 +3,0 -030+

5+9 2300+ 532, 5+6 527 -039,+ -53,8 0379,

5+9 2300+ 532, 5+5 529 -03966 -536+ 03007

5+9 2300+ 532, 52, 529 -039, -53,6 03007

5+9 2300+ 532, 5+2 529 -039,6 -53,8 03007

5+9 2 532, 5+ 528 -03967 -53,9 -030+5

2+, +388 23282 52, 27,7 0375 -23855 03025

2+, +387+ 23282 5+6 2780 03,7, -238+, +35+7

+58 +389 5377, 5+9 597, -03008 -232,9 +3++,

5,7 +386 237, 520 292, -03+,9 -2,3025 -+306+

5,7 +38 237, 52 295 -03225 -2,3+7, 03076

5,7 +3859 237, 5+8 2957 -03752 -2,32++ 030,2

5,7 +3859 237, 525 2959 -032+ -2,3+6+ 030,2

5,7 +3857 237, 5++ 290 -0322 -2,3+99 030,+

5,7 +385, 237, 52+ 292 -03228 -2,32+6 0308

5,7 +385, 237, 5+7 295 0328+ -2,3+66 0307

5,7 +3855 237, 522 29, -032+ -2,3202 0302

5,7 +3827 237, 5+9 29, -03292 -2,35, +3+6

2+2 +382 237, 5+6 296 036++ -2382+ +30922+2 +38+9 237, 5+, 2969 +3008 -2387 0327+

99 +38+ 23, 520 5++ -03256 +3+76 -+3066

2+2 +3806 237, 5+5 299 03,5 -23809 032,2

2+2 +380, 237, 5+ 2997 03,28 -23807 0325+

2+2 +3805 237, 5+2 2980 03,5 -2380, 032,5

2+2 +3988 237, 52, 298, 03,29 -2380+ 032,+

99 +399, 23, 52 5+92 -03+89 +3+,, 030,9

99 +399+ 23, 52+ 5+80 -0320, +3+,+ 03055

99 +3979 23, 5+8 5+8 -03707 +3+9 03058

99 +3976 23, 5++ 5+87 -03+8, +3+7 0305+

99 +397, 23, 5+7 5+88 035+6 +3+6 0302

99 +3972 23, 525 520 -03+96 +3+5 0305+69 +397+ 532, 5+6 57 03609 -2378 +3579

+69 +397 532, 5+ 57, 0360, -2376 03008

+69 +397 532, 52, 576 03602 -2379 030+

Page 93: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 93/123

10 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

+69 +397 532, 5+2 576 0360, -2376 030+

+69 +397 532, 5+5 576 03602 -2377 030+

99 +3969 23, 522 52+2 -03+82 +3+58 0300,

+69 +39, 532, 5+, 5,0, +3+26 -23657 03055

52+ +397 5377, 5+, 099 03256 -23522 03++5

99 +395 23, 5+9 52,, -03+,9 +3++9 +3+27

257 +39+ 532, 5+, 5,50 -0352 -+3999 0300+

257 +39 532, 5+5 5,55 -0379, -+3995 -0300+

257 +3958 532, 5+ 5,55 -03796 -+3995 -03008

257 +3958 532, 5+6 5,55 -03768 -+3995 03267

257 +3958 532, 5+2 5,55 -0377 -+3995 -0300+

257 +3958 532, 52, 5,55 -03768 -+3995 -0300++57 +37,9 5377, 520 28, -032, -+3727 -03288

+57 +3755 5377, 5+8 5,, -0308 -+3752 -03+0

+57 +3688 5377, 52+ 5 -03+0, -+375+ -03025

+57 +3688 5377, 522 5 -03088 -+375+ -03028

+57 +3688 5377, 5++ -03088 -+375+ -0302

+57 +3689 5377, 525 7 -03085 -+375+ -0302

+57 +3689 5377, 52 7 -03085 -+3752 -030+7

72 +368, 532, 5+9 595 -03225 -+37,+ 03279

72 +368, 532, 5+8 595, -0379+ -+37,, 03007

72 +368 532, 52+ 5956 -03228 -+37, 03007

72 +368 532, 5++ 5956 -03225 -+37, 03007

72 +368 532, 522 5956 -032+7 -+37, 0300+

72 +368 532, 5+7 5956 035+ -+376 03007

72 +368 532, 525 5956 -0320, -+37, 0300,

72 +368 532, 52 5956 -03225 -+37, 030+2

72 +368 532, 520 5957 -032++ -+37, -03266

52+ +3697 5377, 5+ 76 -03++2 -23+95 -0307

52+ +3678 5377, 5+5 86 -03+2+ -23+79 -0302+

52+ +367, 5377, 52, ,06 -03++, -23+7 -030+6

52+ +367, 5377, 5+2 ,06 -03++, -23+7 -030+7

+57 +366 5377, 5+7 ,57 032+7 -+375+ 030,7

98 +366 +3, 5+5 56+5 -032, 038+2 030+,

98 +36,8 +3, 52, 56+, -0322 038+ 030+98 +36,8 +3, 5+2 56+, -0322 038+ 030+

98 +36,6 +3, 5+, 5622 0329, 03809 0302+

98 +36,, +3, 5+ 562, -0322 03806 -0300,

+57 +3658 5377, 5+9 606 030,6 -+375, 032,6

98 +362+ 2 520 5700 -0320, +3067 -0377

98 +36+6 +3, 5+6 57+ -03225 03967 03772

98 +3,95 2 52 5780 -03+77 +305 03028

98 +3,9 2 5+8 5789 -0368, +3026 0300+

98 +3,78 2 52+ 5900 -03+95 +3027 030+2

98 +3,77 2 5++ 590 -03+7 +302 030+2

52+ +3,7, 5377, 5+6 785 -03225 -23+6 +327+

98 +3,7, 2 525 59+0 -03+6+ +302+ 030++98 +3,7 2 5+7 59+2 0357 +3022 03022

98 +3,7+ 2 522 59+8 -03+7+ +30+9 -03006

98 +3,52 2 5+9 58+, -03+5 0389+ 03768

Page 94: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 94/123

11 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

56, +38+ 23,2, 5+7 677, 0328+ -53968 -030+8

56, +397 23,2, 5+9 6782 -03+6+ -539, +350,

56, +39, 23,2, 52+ 6905 -032+7 -5387 03058

56, +392 23,2, 52 69+5 -032++ -5386 0307

56, +39 23,2, 5++ 692, -032++ -53867 03057

56, +377 23,2, 522 6959 -03209 -5387 0300,

56, +37, 23,2, 525 699 -03202 -5386 0305

56, +37 23,2, 520 69,2 -032,7 -3098 -+3252

56, +368 23,2, 5+8 697, -037+5 -306 03085

+67 +3528 5 52, ,+5 03,02 -23+09 0309

+67 +3529 5 5+ ,+9 03,0, -23+0, 0306

+67 +3527 5 5+6 ,22 0306 -2300+ +358++67 +3527 5 5+2 ,22 03,02 -23+0 0309

+67 +3526 5 5+5 ,2, 03,02 -23+0 0309+

5+8 +350, 5 5+6 ,89 -03779 -2326 0370,

5+8 +350 5 5+, 602 -03266 -23,0, -03066

5+8 +328, 5 52, 65+ -036+ -235 -03072

5+8 +328, 5 5+5 652 -036,5 -2357 -03072

5+8 +328, 5 5+ 652 -036, -235+ -0308

+67 +328, 5 5+, 655 03896 -23026 0307,

5+8 +328 5 5+2 65, -036, -235, -03072

268 +3282 53, 5+9 6, 032+, -+382 +352,

26 +32,, 5 5+, 778 -03228 -+350+ 0305

26 +32,5 5 5+5 798 -036+6 -+3287 03096

26 +32,5 5 5+2 798 -03606 -+3287 03096

26 +32,2 5 5+ 780 -036+5 -+3287 0309

26 +32,2 5 52, 780 -03602 -+3287 0309

26 +32,+ 5 5+6 78 -0375 -+3286 035,7

268 +32, 53, 522 900 035+6 -+3805 0300+

268 +32 53, 525 958 035+, -+398 03052

268 +3259 53, 5+8 9, -03+,5 -+3985 03052

268 +325+ 53, 5++ 972 035+, -+3996 0305

268 +3226 53, 5+7 98, 0379+ -+399 0305,

268 +322 53, 52+ 802 035+5 -+3978 0305,

266 +3225 5 5+7 806 03959 -2302, -03+76258 +3225 532, 5+7 ,5+, +30+6 -232,5 030+5

266 +3222 5 520 8++ 035 -+387 -03878

258 +322 532, 52+ ,52, 0397 -23+76 030+,

258 +32+8 532, 52 ,552 0399 -23+7, 03056

258 +32+9 532, 520 ,55, 039 -23+7 -039+,

258 +32+9 532, 5++ ,557 0399 -23+7 030+,

258 +32+7 532, 5+9 ,558 038+ -23+7 039

258 +32+7 532, 522 ,52 0397 -23+72 -03007

258 +32+, 532, 525 ,58 0399 -23+7+ 030+,

258 +32+5 532, 5+8 ,5,6 -030 -2308 030+6

268 +32+5 53, 52 87 035+2 -+3968 03069

266 +32+ 5 52 860 035,7 -+386 -03+29266 +3207 5 52+ 87+ 035,7 -+38,7 -03+,5

266 +320 5 5++ 89 035,7 -+38, -03+,5

266 +32 5 525 889 035,9 -+38,+ -03+,5

Page 95: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 95/123

12 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

266 +3+89 5 522 ,0+0 035,8 -+389 -03+79

266 +3+9, 5 5+9 ,062 0329+ -+3857 0367,

266 +3+9, 5 5+8 ,06 -03+22 -+399 -03+5

268 +3+72 53, 520 ,++8 03++ -+395+ -+32,8

52, +3+72 5377, 5+, 6+ 03228 -+3,95 -03026

52+ +3+9 5377, 5+7 6,7 03267 -+3,28 03+26

70 +3+57 +362, 5+2 ,7+9 -03522 -2+355 030,

70 +3+56 +362, 5+5 ,722 -03552 -2+3 030,

70 +3+5, +362, 5+, ,72, 03256 -2+3+5 030,

70 +3+5 +362, 5+ ,755 -035+6 -2+35+ 0302,

70 +3+5+ +362, 52, ,7, -03522 -2+3+, 030,

52, +3++5 5377, 5+6 6792 03005 -+367 +358+5+9 +3085 532, 5+7 ,86 -03+29 -2322 0300

70 +308 +362, 5+6 ,865 -03572 -2+3+ +3+,2

5+9 +309+ 532, 5+9 60+, -03,, -23+5, 03797

5+9 +309 532, 52+ 60+7 -03,7 -23+56 03007

5+9 +309 532, 52 60+8 -03,8 -23+56 0302,

5+9 +3078 532, 5++ 602+ -03,,8 -23+5 03007

5+9 +3078 532, 522 602+ -03,7 -23+55 -030+5

5+9 +3078 532, 525 602 -03,8 -23+52 03007

5+9 +3078 532, 520 602, -03,6 -23+5 -03775

52+ +3077 5377, 520 7007 03022 -+307 -+328+

5+9 +3066 532, 5+8 6089 -0388+ -2309 030+

80 +30,9 5 5+6 ,670 -03+82 -+3++8 0328

80 +30,5 5 5+, ,689 032, -+3++2 0302

80 +30,+ 5 5+5 ,706 -032, -+3++5 -030+9

80 +30,+ 5 52, ,707 -0322 -+3++5 -030+6

80 +30,+ 5 5+2 ,707 -0322 -+3++5 -030+6

80 +30,+ 5 5+ ,708 -03256 -+3++5 -03025

56, +307 23,2, 5+, 862 03209 -39+, -03008

56, +305 23,2, 5+6 869 -0329 -378 +35+6

56, +302 23,2, 5+5 868 -0350 -38+, 0309

56, +3057 23,2, 5+2 8758 -0328, -38+2 0307

56, +305 23,2, 5+ 876 -0328, -38+, 030+

56, +3025 23,2, 52, 8975 -0328, -38+2 030952, +3009 5377, 5+5 796 -03+08 -+3 03+22

52, +300, 5377, 52, 7,+, -03+02 -+356 03++6

52, +300 5377, 5+2 7,+6 -03+02 -+356 03++6

52, 03898 5377, 5+ 7656 -03088 -+322 03092

52+ 03899 5377, 522 762 -0309+ -+3598 -0305

52+ 0389+ 5377, 52+ 7686 -0308 -+359, -03007

52+ 03877 5377, 5++ 7729 -0309+ -+359 -03005

52+ 03875 5377, 525 77,6 -0307 -+3576 0300+

257 0387 532, 5+7 6687 -03077 -+30++ 03002

257 03868 532, 52 6709 -0387 -+3007 03007

257 03868 532, 5+9 6708 -03,0 -+3007 03266

257 03868 532, 5++ 6708 -03,08 -+3007 0300+257 03868 532, 52+ 6708 -03,2 -+3007 -0300+

257 03868 532, 522 6708 -03,2 -+3007 -03007

257 03869 532, 525 67+2 -0389 -+3007 -0300+

Page 96: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 96/123

1 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

257 03869 532, 520 67+2 -03,+ -+3006 -03266

257 03867 532, 5+8 6725 -038+ -+3002 -0300+

+69 03867 532, 5+8 672 -03+02 -+377, 030+

52+ 03866 5377, 52 79+9 -03097 -+357+ 03027

+69 038,+ 532, 5+9 695+ 03+8 -+3669 +357

+69 038, 532, 522 6958 03+8 -+366 03002

+69 038, 532, 52+ 6958 03+, -+3666 0305,

+69 038, 532, 525 6958 03+8 -+3665 0305,

+69 038, 532, 5++ 692 03+, -+366 03055

+69 038, 532, 52 692 03+, -+366, 03069

+69 0388 532, 520 699 03+, -+366+ -+35

+68 03858 237, 5+2 ,9, 03,5 -+3797 0300+68 03858 237, 5+5 ,9,6 03,5 -+3797 03002

+68 03858 237, 5+ ,9,6 03,5 -+379, -03029

+68 03859 237, 52, ,966 03,27 -+3796 0300

70 03857 +362, 520 685, -03+77 -+73+97 -+3062

+68 03857 237, 5+6 ,97+ 03655 -+399, +35+7

+69 0385 532, 5+7 68,9 03856 -+3,, 03027

+68 038+5 237, 5+, 602, +30++ -+37+, -0300

70 0398 +362, 52 727 -03255 -+73+67 03067

70 03982 +362, 5+8 7296 -0379 -+73+9 030,

70 0398+ +362, 525 728+ -0322 -+73+,5 030+

70 0398 +362, 5++ 7288 -03228 -+73+6 0302

70 0398 +362, 52+ 7506 -03258 -+73+76 030+

70 03998 +362, 5+7 75++ 03528 -+73+, 03056

70 03999 +362, 522 7525 -03225 -+73+65 030+6

52+ 03977 5377, 5+9 96++ -03+98 -+35,5 +329

52, 0397, 5377, 5+7 9627 0326 -+32++ -0306

2+2 0397, 237, 5+9 6297 035 -+3,89 +3005

2+2 0397 237, 5+7 628, 039+ -+369 03+85

2+2 03962 237, 52+ 6590 03562 -+3,96 03+7

2+2 0396 237, 522 6582 0356 -+3,9 03+,

2+2 039,9 237, 5++ 608 03562 -+3,95 03+7

2+2 039,7 237, 52 62+ 0356 -+3,9+ 03+86

2+2 039,, 237, 525 652 03565 -+3,9 03+7,5+7 039, 237, 5+, 60 -03267 -23009 03077

5+7 0396 237, 5+5 687 -036,+ -+38 03098

5+7 0396 237, 5+2 6,05 -0362 -+38+ 03098

5+7 039, 237, 52, 6,09 -03659 -+3858 03097

5+7 039, 237, 5+ 6,09 -036, -+382 03068

70 039 +362, 5+9 7702 -03278 -+73+2 +3+5

2+2 0395 237, 5+8 6,2+ -03++6 -+3,+8 03+,6

2+2 0392 237, 520 6,55 03292 -+3,69 -036,,

5+7 03956 237, 5+6 6,92 -03,0, -+388 0396,

2+0 0395 237, 5+, 6629 -03229 -0397, -030

2+0 03928 237, 5+6 665, -0369 -03972 03+98

2+0 03929 237, 52, 66, -03,86 -0397+ -030952+0 03929 237, 5+2 66, -036 -0397+ -03095

2+0 03927 237, 5+ 666 -036+5 -0397 -0308+

2+0 03927 237, 5+5 666 -036+ -0397 -0309

Page 97: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 97/123

1& of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

52, 039+6 5377, 5+9 827 0305+ -+308, +35,5

52+ 03906 5377, 5+8 8572 -035 -+325+ -03+55

2+, 03727 23282 520 7,65 0325+ -+35, -+3269

52, 03725 5377, 52 +056 -0307 -+3079 03++6

, 037+6 237, 5+, 7695 0329 -03785 -0300

, 037+, 237, 5+ 7698 -03267 -0378, 03055

, 037+, 237, 5+5 768+ -0329, -0378, 03058

, 037+, 237, 5+2 768, -03275 -0378, 03059

, 037+, 237, 52, 768, -03275 -0378, 03059

+67 037+ 5 5+8 90 -03+55 -+358+ 0306+

52, 037+2 5377, 52+ +06+0 -03079 -+3069 0309,

, 03709 237, 5+6 7765 -03528 -03798 035+552, 03709 5377, 5++ +067+ -0307+ -+306 03092

52, 0370 5377, 525 +0728 -0306, -+30,8 03076

5+8 03686 5 5+9 96+8 -03,6 -+3,0, 0375

5+8 0368, 5 5+7 965+ -0309 -+3,9 -0305,

52, 03682 5377, 522 +08+5 -03069 -+30, 030,

5+8 03697 5 52+ 9759 -0356 -+3,+6 -0305

5+8 03696 5 522 975 -0355 -+3,+ -0306

5+8 03696 5 5++ 979 -0326 -+3,+ -0305

5+8 0369, 5 52 97,6 -032 -+3,+7 -030+8

5+8 0369, 5 525 97,6 -03+9 -+3,+2 -0305

+67 0369 5 522 9776 0357 -+35+, 03025

+67 03695 5 525 979+ 0357 -+35+ 030,

+67 03695 5 520 9780 035 -+3+6 -+32,,

+67 03695 5 5++ 9780 0357 -+35+ 030,7

+67 03695 5 5+9 9780 032,+ -+32+2 +3569

+67 03692 5 52+ 9900 035 -+35+, 030,9

+67 0369+ 5 52 99++ 035 -+35+2 03098

2+, 0369 23282 52 909 03555 -+35+ 030,7

2+, 03678 23282 525 9+02 03552 -+3508 03027

5+8 03676 5 5+8 997+ -0390, -+35 -0308

5+8 03676 5 520 999+ -0328 -+3,22 -039+9

2+, 0367, 23282 5+8 9+8 -03+5, -+350, 03058

26 0367+ 5 5+7 9859 -03025 -037++ 030+62+, 0367+ 23282 5++ 9+89 03552 -+350+ 0302,

26 0367 5 520 98,6 -03272 -03709 -032+,

26 03668 5 52 9868 -03582 -03707 0306

26 03668 5 5++ 987 -03588 -03707 030,9

26 03668 5 52+ 987 -0308 -03707 030,9

26 03668 5 525 987 -0358 -03707 030,6

26 03669 5 522 9892 -0307 -03706 030,2

2+, 03669 23282 5+7 9257 03789 -+3289 030++

26 03667 5 5+9 9880 -03,27 -03706 03528

26 03666 5 5+8 800, -03776 -03702 03089

2+, 0366 23282 52+ 929, 03552 -+328, 0302

2+, 03665 23282 522 950+ 03528 -+328 -03007+67 036,+ 5 5+7 82+ 03929 -+3257 030,

2+, 036+6 23282 5+9 9852 035+ -+32, +35+9

52, 03,88 5377, 520 +2600 -03+9 -+3055 -+3+8,

Page 98: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 98/123

1 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

80 03,8, 5 5+9 +008+ -03+2 -0365 032,,

80 03,98 5 5+7 +0+9+ 03522 -03656 0305

80 03,99 5 52 +020+ -03+7 -03657 -03006

80 03,99 5 5++ +02++ -03+67 -03657 -030+2

80 03,99 5 525 +02++ -03+,, -03657 -030+2

80 03,99 5 52+ +02++ -03+96 -03657 -030+2

80 03,97 5 522 +022+ -03+6+ -03656 -030+9

80 03,96 5 5+8 +025+ -0366 -03659 -030,

80 03,9+ 5 520 +052 -032+7 -0365+ -03277

525 03,6 532, 5+6 ++98 -036 -+3,, +3586

525 03,, 532, 5+ ++8+8 -03 -+3,7 030+8

525 03,, 532, 52, ++825 -035 -+3,8 030,2525 03,, 532, 5+2 ++829 -035 -+3,7 030,2

525 03,, 532, 5+5 ++852 -03,5 -+3,9 030,2

52, 03, 5377, 5+8 +587 -0305 -038+7 03222

+68 03,59 237, 5+8 +025+ -03+08 -+327, 03026

525 03,5+ 532, 5+, +226 03+02 -+359 0306

+68 03,+5 237, 520 +07+9 03275 -+3+0, -+328,

+68 03,++ 237, 52 +0766 0357, -+320, 030,

+68 03,++ 237, 5++ +0766 03568 -+320 030+9

+68 03,++ 237, 525 +0766 03572 -+3202 0302

+68 03,+ 237, 52+ +077, 03568 -+320, 030+,

+68 03,+ 237, 522 +0795 03568 -+320+ -030+

+70 03,+ 23,86 5+6 9752 03,5 -+3267 +352,

+68 03,09 237, 5+9 +092 037+ -+3502 +355+

+68 039 237, 5+7 ++570 039,5 -+3+52 030+

5+7 0362 237, 520 ++8+, -03,6 -+3258 -0372

5+7 03,8 237, 5+7 ++87, -0307 -+35+5 030,

5+7 03,2 237, 52+ +2+6, -035+ -+328 030,9

5+7 03,2 237, 52 +2+70 -03+ -+326 0307,

2+0 03,2 237, 5+7 +2+7, -0302+ -038+ -030+2

5+7 03,2 237, 5++ +2+9+ -0322 -+327 030,7

5+7 03,+ 237, 522 +220+ -035, -+329 03059

5+7 03,+ 237, 525 +220+ -03+ -+32, 030,7

2+0 03,+ 237, 5+9 +220+ -03262 -0399 032+72+0 03, 237, 5++ +2255 -0358 -0397 -030,6

2+0 038 237, 525 +2259 -0359 -0397 -030,

2+0 038 237, 52+ +2259 -030 -0396 -030,6

2+0 038 237, 52 +2259 -0359+ -0397 -0307

2+0 038 237, 522 +2259 -0306 -0396 -03065

2+0 039 237, 520 +226, -03,26 -0396 -03529

2+0 037 237, 5+8 +2507 -03766 -0392 -03087

5+7 03 237, 5+8 +2588 -03789 -+3+9+ 03068

5+7 03+ 237, 5+9 +26 -0329 -+32,, 0395

+70 0355 2322, 5+5 +0299 035,7 -03856 03026

+70 0352 2322, 5+ +0287 035,5 -03828 -03005

+70 0352 2322, 5+2 +0506 035,7 -0385, 03028+70 035 2322, 52, +05,5 035,7 -03855 0305

+70 03+8 2322, 5+, +065+ 037 -+30+ 030+7

, 03+9 237, 520 +5+6 -03+8 -039+ -032,

Page 99: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 99/123

1 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

, 03+5 237, 5+7 +5550 03528 -0375 -030+

, 03+2 237, 52+ +558 -032++ -0376 03028

, 03+2 237, 522 +55,6 -03+82 -037, 03025

, 03+2 237, 525 +5562 -03+96 -037, 03029

, 03+2 237, 5++ +5562 -03+89 -037, 03028

+9, 03+2 +39, 5+6 +09+5 03577 -0369+ +3+96

, 03++ 237, 52 +5569 -0320, -037, 0305

, 03++ 237, 5+8 +559+ -03726 -0377 0307+

, 030, 237, 5+9 +5,66 -0329 -037 03505

285 0302 23,86 5+, ++07+ 03,59 -0369+ -0359

26 03587 2322, 52, ++20+ 035+6 -0392 0306

26 03586 2322, 5+5 ++2, 035+6 -039+9 03067+9, 0358, +39, 5+, ++262 03,,7 -036,8 03599

26 0358, 2322, 5+ ++267 03522 -0392 0305

26 0358, 2322, 5+2 ++279 035+6 -039+7 0306

26 03592 2322, 5+, ++6,6 0370 -03988 0306

285 035,8 23,86 5+5 +2578 03+88 -03677 -03557

285 035,, 23,86 52, +2,+9 03+88 -0367 -03557

+9, 035,, +39, 5+ +2,+ 032+6 -036,9 0355+

+9, 035, +39, 5+5 +2,90 032+8 -036,7 035,+

285 035,5 23,86 5+2 +26+2 032 -0367+ -03557

+9, 0357 +39, 5+2 +292+ 0322+ -036, 035,2

+9, 035, +39, 52, +298, 032+8 -0368 035,+

285 03557 23,86 5+ +5+87 03205 -036,7 -0356,

+70 03552 23,86 5+9 +559 035 -+300, +35

520 03522 2322, 5+6 +5788 -03,05 -0368 036,8

26 0352+ 2322, 5+6 +59,0 03+6 -03,7 +35,5

+95 035+8 2322, 5+6 +58,+ -03069 -03527 03+68

26 035+8 +39, 520 +5862 03587 -03855 -+32,7

286 035+9 +3++5 5+6 +00+ 03+8+ -03+,+ +3556

286 035+5 0372 5+ +22+ 035,9 -03256 030+,

28+ 03287 2322, 5+, +889 -03062 -0359 0306

286 03286 0372 52, +,029 035,5 -032,, 0308

286 03286 0372 5+, +,05 0379+ -03266 030,2

+95 03286 2322, 5+, +,0,7 -03066 -0356 -030,9286 03285 0372 5+2 +,+90 035,, -032,7 0308

285 03298 23,86 5+6 +,580 0305 -0362 0387

286 0329 0372 5+5 +,6,6 035,5 -03267 030,2

5+6 0329 2322, 5+ +,665 -0328, -0367 03++7

5+6 0329 2322, 5+5 +,67 -0328 -03668 03+56

5+6 03295 2322, 5+2 +,78 -0329, -03667 03+56

5+6 03292 2322, 52, +,760 -03292 -03667 03+5,

28+ 0329 2322, 5+5 +,990 -035+7 -03565 03+59

28+ 0329 2322, 5+ +,990 -035+ -0356+ 03+28

28+ 0329 2322, 5+2 +,990 -035+ -03562 03+59

28+ 0329 2322, 52, +,990 -03509 -03562 03+5,

520 0329 2322, 5+5 +,802 -03298 -03697 -03++6+95 03278 2322, 52, +,82 -035++ -0356 -03+52

+95 03278 2322, 5+5 +,86 -035+8 -0356 -03+5,

+95 03278 2322, 5+2 +,86 -035+5 -0356 -03+55

Page 100: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 100/123

17 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

520 03278 2322, 52, +,8,7 -03292 -03696 -03++6

+95 03279 2322, 5+ +,890 -0352, -03562 -03+2

520 03279 2322, 5+2 +,88+ -0329 -0369, -03++6

520 03276 2322, 5+ +6+05 -0329 -03678 -03++

525 03272 532, 5+8 2582 -039,8 -+3+92 030,

+70 0326+ 23,86 5+8 +7075 -03+2+ -03,22 0306

285 0326 23867 520 +7+02 03297 -0322 -+3068

525 032,8 532, 5+9 2,097 -035+5 -+3076 +358

286 032,8 +395 5+9 +720 0307 -03007 +3526

525 032,8 53782 520 2,+5+ -035+ -+307 -+3286

525 032,9 532, 525 2,259 -0350 -+3072 030

525 032,7 532, 52 2,2,7 -035+6 -+3075 03077525 032,7 532, 52+ 2,2,7 -035+8 -+3075 0306

525 032,7 532, 522 2,2,7 -035+ -+3072 030+5

525 032,7 532, 5++ 2,2,7 -035+ -+3072 030

+9, 032,, +395 5+9 +767 0350 -030, +309+

26 0326 +39, 5+8 +9062 -03+,9 -036 03052

+70 0326 2322, 52 +9+08 0326 -0366 0307,

+70 032, 23,86 52+ +9+55 032,+ -036+2 030

+70 032, 2322, 5++ +9+67 0326 -036,5 030

+70 032 23,86 525 +920, 032, -036+2 030,

+70 032 2322, 522 +922 032, -0366 030+2

5+6 0325 23,86 5+, +929, -030,5 -0372 03++6

525 0325 532, 5+7 26768 03255 -03862 03058

285 0322 23867 5+7 +9560 036 -03585 -0327,

28+ 032 2322, 5+6 +9,05 -03,,6 -0358, 0358

520 032 +39, 5+, +9,76 -030,+ -0375 -03+0+

5+6 03259 2322, 5+6 +97+, -03066 -0366+ 038+,

286 03257 +3++5 522 +9776 0325 -03+02 03002

+9, 03256 +39, 5+7 +9952 038 -0326 0329

+70 03252 2322, 5+7 +8+69 0369 -03755 03052

26 0325+ +39, 52+ +82,8 032+ -03,+ 0305,

26 0325+ +39, 522 +828+ 03225 -03,9 -03002

26 0325 +39, 52 +855 032+ -03,55 03066

26 0325 +39, 5++ +85, 032+7 -03, 0305226 0325 +39, 525 +8567 032+7 -03,+ 03028

286 0322 +3++5 525 20+86 032 -03++8 03055

+99 0322 +39, 5+6 20252 03,+5 -036+2 +35+

26 032+6 2322, 5+7 206+5 036+ -036,9 03056

285 032++ 23867 52 2++0, 03+2 -0308 -03207

286 03208 +3++5 5+7 2+22 036,6 -03+7 03058

286 03207 +3++5 5++ 2+,+ 032 -03+55 03056

286 0320 +3++5 5+8 2+927 -03+77 -03++8 03055

5+6 03202 23,86 520 220,9 -03+9 -03,0+ -03698

520 032 +39, 5+9 2227, -03+8 -03,+6 03702

285 03+88 23,86 52+ 22525 03+56 -03 -03229

+9, 03+87 +39, 522 2265+ 03+, -0326 03222+9, 03+86 +39, 52+ 227,9 03+,5 -032 0322

28+ 03+8, 2322, 520 2299 03059 -03+97 -03208

+95 03+8 2322, 5+9 22865 03059 -03+9 032+2

Page 101: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 101/123

18 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

285 03+85 23,86 5++ 25000 03+57 -035 -03229

286 03+85 +3++5 52+ 250, 03258 -03+7 03056

5+6 03+8+ 2322, 5+8 2522 -0322 -03,7 03+08

520 03+98 2322, 5+8 25,05 -032, -0368 -03099

+9, 03+98 +39, 5++ 25600 03+,5 -03+9 0325

285 03+96 23,86 525 25979 03+59 -0329 -0325+

+99 03+9 +3++5 520 229 0309 03+0, -+3266

+9, 03+95 +39, 525 25+7 03+, -03+5 032

+9, 03+9+ +39, 52 2,69 03+,9 -03++ 0326

285 03+77 23,86 522 2,+52 03++ -03+8 -032,6

52 03+76 2 5+6 5+25 -03528 -+3007 +3,8

286 03+7, +3++5 52 2,575 03256 -03+66 0307++99 03+7 53709 5+, 2,,,2 039+ -035,7 0300,

+70 03+72 2322, 520 2,8+9 03097 -0328, -+329

+99 03+72 53709 52, 2,857 03596 -0358 0302

28+ 03+7+ 2322, 5+7 2,876 030 -03206 030+7

+99 03+7+ 53709 5+2 260,, 03599 -035, 0302

286 03+7+ 0372 520 2607 0358, -0322, -+32,

+95 03+7 2322, 5+7 26+2 03058 -0320 -030+

+99 03+65 53709 5+5 275,8 03596 -035,8 030+9

+99 03+6 53709 5+ 27925 0359 -0356+ -030++

5+6 03+,7 23,86 52+ 29508 -03209 -038 03098

5+6 03+,6 23,86 52 29,5+ -03+82 -038 03+09

5+6 03+,6 23,86 5++ 29,67 -03202 -038+ 03098

5+6 03+,6 23,86 522 29602 -032+2 -0382 0307

26 03+,, 2322, 5+9 29652 030, -032+6 +3526

520 03+,, +39, 52+ 29690 -03208 -03,+ -03075

28+ 03+,, 2322, 5++ 29759 -03209 -0322 0308+

28+ 03+,, 2322, 525 29758 -0320+ -032+8 0308+

+95 03+,, 2322, 52 2970 -03+8, -032+6 -03078

28+ 03+,, 2322, 522 29776 -03207 -032+8 0309,

28+ 03+,, 2322, 52 29776 -03209 -0322+ 03+0+

5+6 03+,, 23,86 525 29799 -03+86 -0398 0308

28+ 03+, 2322, 52+ 299++ -032+ -0322 0308,

+95 03+, 2322, 525 2999 -0320+ -032+7 -03096520 03+, +39, 522 29986 -0320 -03,05 -03087

520 03+, +39, 5++ 29802 -03205 -03,07 -03075

+95 03+, 2322, 52+ 2982+ -032+ -032+9 -03082

+95 03+, 2322, 5++ 2982+ -03207 -032+9 -03098

520 03+, +39, 52 2989+ -03202 -03,+2 -0309

+95 03+,5 2322, 522 28050 -032+8 -032+8 -03088

520 03+,5 +39, 525 28089 -03+89 -03,0, -03075

285 03+ 23,86 5+8 50922 -0320+ -032, -03+99

+9, 03+2 +39, 5+8 5+27 -03+92 -03++ 03206

52 03+58 23, 5+2 5082 -03565 -+30 03+2+

52 03+58 23, 5+5 5++ -03568 -+30+ 03+2+

52 03+58 23, 5+ 5222 -03565 -+30+ 0309752 03+58 23, 52, 5252 -03565 -+30+ 03+2+

28+ 03+59 2322, 5+8 522,+ -03,6 -03255 03+68

+95 03+57 2322, 5+8 52599 -03, -0325+ -03+65

Page 102: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 102/123

1+ of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

+99 03+5 53709 52 55290 03279 -032+, 030,6

+99 03+52 53709 525 5560 03276 -032+6 03027

285 03+28 23,86 5+9 56+7 -0302 -0305 03606

52 03+29 2 5+9 69+6 -03225 -0379 +35+

522 03+29 53667 520 28+, -032,+ -03959 -+35

+99 03+27 53709 5+7 5,00 03688 -03255 03008

+9, 03+2, +39, 520 5,659 -03005 -03599 -03,8+

+99 03+2 53709 5++ 5,882 0327 -03226 0302

5+6 03+22 23,86 5+7 560+ 030,5 -0399 0307+

520 03+2 +39, 5+7 57+2, 030,5 -03,0, -030,7

+99 03+2 53709 5+8 57257 -03+,2 -032+8 030

522 03++6 53667 5+ 760 -0359 -+3098 -030,52 03++6 23, 5+, ,+780 03+,2 -038,8 03068

522 03++, 53667 5+2 7620 -0358+ -+308 -030+5

522 03++, 53667 5+5 7675 -03587 -+308+ -030+,

522 03++, 53667 52, 7790 -0358+ -+308+ -030+5

+99 03++, 53709 52+ 59798 03275 -03256 03022

28+ 03++, 2322, 5+9 59798 -03,5 -032,5 0358,

+95 03++ 2322, 520 59897 -03,5 -032,+ -0358

+99 03++5 53709 522 5825+ 0327+ -03257 -03007

5+6 03++ 23,86 5+9 059+ 030+5 -0392 03967

520 03+09 +39, 520 +076 030+2 -0388 -039,+

52 03+09 23, 5+8 ,,597 -03768 -03986 03++

522 03+0 53667 5+8 ,29+8 -0395+ -0386, -0305,

+99 03+ 53709 5+9 6+7 032, -03277 +35+5

522 03089 53667 5+, ,,82 03+,2 -+30+ 0302+

522 03099 53667 522 62+8 -0329, -0399 -03052

522 03097 53667 52+ 6299 -03289 -03996 -0300+

522 03097 53667 525 62876 -03292 -0399 03002

522 03097 53667 5++ 65070 -03299 -0399, -0300+

52 03097 2 52 68+08 -032, -0395 03++8

522 03096 53667 52 6565, -0328, -03996 03052

52 03096 2 52+ 68752 -0326 -0395+ 03099

52 03096 2 525 68957 -032, -03928 0309,

52 03096 2 5++ 6882 -032, -03928 0309,52 0309, 2 522 7075 -032,+ -0395 030,5

59, 0309 037, 5+6 +9955 035 -036+5 +3+25

522 0307, 53667 5+6 75790 -035+ -+3+57 +355

522 0307+ 53667 5+7 77, 032,+ -0390, 0305

59, 03068 037, 5+9 2+95 03599 -03,9, +3+7,

52 03067 2 5+7 80002 03276 -037, 03058

59, 0306 0362, 5+2 2,+2 03202 -03+65 -03+72

59, 0306 0362, 5+5 2,+9, 03202 -03+6 -03+76

59, 0306 0362, 5+8 2,+9, -032++ 03025 -03+,8

59, 030,8 0362, 52, 2,220 03202 -03+62 -03+7+

59, 030,8 0362, 5+ 2,56 03+8, -03+,+ -0320

52 030,2 23, 520 ++,027 -03299 -0399, -+32,59, 0308 0362, 52 50959 03+,2 -03+9 -03092

59, 0309 0362, 5+, 5+05 03,6 -03522 -03+26

59, 0309 0362, 525 5+05 03+8 -03+59 -03+08

Page 103: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 103/123

20 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

59, 0309 0362, 5++ 5+2,5 03+8 -03+56 -03++

59, 0309 0362, 52+ 5+59 03+6 -03+5 -03++9

59, 0309 0362, 522 5+,,0 03+5 -03+2, -03+6

522 0307 53667 5+9 ++92,6 -03552 -03852 +355

59, 03057 0362, 5+7 +0, 03,0, -0328, -03069

59, 03052 03, 520 7,9 -03079 03528 -+306

34A0S=E4SA# BEA<

eam >ength ">$ % 00 cm

Allowable (eflection % >'2&0 % 22*+2 cm

  MAX MEMBER SECTION DISPLACEMENTS

  --------------------------------

Beam Ia. (is! >ocation >'C >'(is!l lobal J lobal lobal K

"mm$ "m$ "mm$ "mm$ "mm$

92 +035,5 537, 5+ 72 -032,8 -+03797 -03009

92 +0355 537, 52, 726 -0326, -+03765 0300,

92 +03526 537, 5+2 726 -0326, -+0376 0300,

92 +03522 537, 5+6 726 -032 -+037, 03,8+

92 +0326+ 537, 5+5 750 -03279 -+0368 03006

92 +03227 537, 5+, 755 0328 -+036,9 03029

2,0 932+ 5377, 5+, 8+8 -035+8 -830+7 0300,

2,0 93206 5377, 5+5 820 -037,9 -9387 030+

2,0 93+88 5377, 5+ 820 -037,7 -93862 03002

2,0 93+8 5377, 52, 82+ -0372 -938,7 030+6

2,0 93+95 5377, 5+2 822 -0377 -9389 030+

2,0 93+6 5377, 5+6 826 -039+ -9380, 03,+

225 93++ 5377, 5+6 850 -03662 -939,6 03,2+

225 93+0+ 5377, 5+, 852 -035+6 -9397, 03002

225 93086 5377, 5+5 852 -0378 -9395 -03006

225 93097 5377, 5+ 855 -037,+ -9392, -0302

225 9309+ 5377, 52, 85 -03755 -939+7 -03009

225 9307+ 5377, 5+2 85, -03759 -93909 -03006+00 7355 537, 5+ +009 -03+8 -7376+ -03056

+00 73+ 537, 52, +0++ -03+8 -7372 -0302

+00 73+ 537, 5+2 +0+2 -03+8 -73759 -03022

+00 73588 537, 5+6 +0+5 -03+07 -73726 03,7+

+00 735,7 537, 5+5 +0+8 -03206 -7369 -0302

+00 7355 537, 5+, +022 0325 -7366 03057

277 63,+2 5377, 5+5 ++,8 -03,2 -63855 03022

277 63,0, 5377, 5+ ++60 -037 -63822 0300,

277 6398 5377, 5+2 ++65 -03 -63808 0302

277 6397 5377, 52, ++65 -03 -63807 03022

277 6392 5377, 5+, ++6 -03+27 -63827 -03005

+86 6375 5377, 5+6 ++66 -032,7 -63999 03,2+86 63588 5377, 5+5 ++78 -03,7 -6390+ -030+2

+86 63585 5377, 5+ ++9+ -0362 -6378, -03026

277 6358 5377, 5+6 ++9+ -03657 -63786 03,,,

Page 104: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 104/123

21 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

+0 63597 537, 5+6 ++7 -0329+ -63565 03708

+86 63576 5377, 5+2 ++9 -038 -63777 -030+2

+86 6357 5377, 52, ++9 -036 -6377, -030+5

+86 63569 5377, 5+, ++9, -03+55 -63785 030+

+0 63525 537, 5+5 ++96 -03082 -63562 03088

+0 63525 537, 5+2 ++96 -03099 -63562 03088

+0 63525 537, 52, ++96 -03099 -63562 03089

+0 6352+ 537, 5+ ++96 -03078 -63562 0309

+0 63296 537, 5+, ++85 03+0 -63562 030+9

88 ,362+ 537, 5+6 +55 -03+2+ -63295 03858

88 ,36+ 537, 5+5 +556 -032++ -63279 030+

88 ,36+ 537, 52, +556 -0320, -63277 030++88 ,3608 537, 5+, +557 03256 -63276 030+2

88 ,3602 537, 5+2 +559 -0320, -63268 030++

88 ,3,89 537, 5+ +558 -0320, -63265 -030+2

9+ ,36 537, 5+, +577 0327 -63598 0302,

9+ ,359 537, 52, +578 -03276 -63595 03026

9+ ,359 537, 5+6 +578 -032, -6359+ 038,

9+ ,356 537, 5+5 +578 -03299 -6359 03026

9+ ,329 537, 5+2 +59+ -03278 -63572 03026

9+ ,32 537, 5+ +592 -03276 -6357 0300,

92 3902 537, 5+8 +,6+ -0375 -,3+28 -030+7

92 3769 537, 525 +,75 -03+7, -,3085 03006

92 375 537, 522 +,9, -03+9, -,30,, -03006

92 3709 537, 520 +,82 -03208 -,3055 -03,79

92 3705 537, 5++ +,8 -03+99 -,3027 03006

92 3689 537, 5+9 +,86 -03+65 -,302+ 03,98

92 3676 537, 52 +605 -03+8 -, 0302

92 3659 537, 52+ +6+7 -032 -386+ 03006

92 360 537, 5+7 +629 0356 -3826 03028

2,0 53865 5377, 520 +80, -032, -3,2 -03,+,

2,0 538,9 5377, 5+7 +807 -0306 -3,,2 03005

2,0 5388 5377, 52+ +8++ -03,02 -3,06 030++

2,0 5382 5377, 522 +8+, -03,0+ -387 -03005

2,0 53826 5377, 5++ +822 -0382 -392 030++225 538+2 5377, 5+9 +828 -0309 -3,5 03,22

2,0 538+ 5377, 52 +850 -0392 -369 0302,

2,0 53805 5377, 525 +85 -039+ -3,8 030+2

+88 53805 5 5+6 +,57 03,+ -382 +3+9

225 53988 5377, 5+7 +856 -03062 -372 0300,

2,0 5398, 5377, 5+8 +859 -0382 -3+2 0302

225 5398 5377, 52+ +859 -038, -35+ -0300,

+88 5398 5 52, +,+ 03597 -382 0309

+88 53985 5 5+ +,+ 03596 -3826 030+8

+88 53982 5 5+5 +,+ 03598 -382, 0307

+88 53982 5 5+2 +,+ 03598 -382 0309

2,0 53998 5377, 5+9 +8+ -03,,9 -3 03,59225 5399, 5377, 522 +85 -0387 -32+ -030+7

+88 5397, 5 5+, +,9 039+2 -3807 0305

225 53968 5377, 5++ +8,+ -039, -30, -03005

Page 105: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 105/123

22 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

225 539,5 5377, 52 +8,8 -0372 -3598 030++

290 5398 5 52, +,,8 03566 -397+ -03008

290 5399 5 5+2 +,,8 03567 -397, -03008

290 5397 5 5+5 +,,8 03567 -3976 -03008

290 5396 5 5+ +,60 03568 -3968 -0302

225 539 5377, 525 +86 -037 -359 -03005

225 53958 5377, 5+8 +866 -03807 -3558 -030+2

290 53956 5 5+6 +,6 0326 -39,6 +3+2+

290 5395 5 5+, +,66 0378+ -39,8 -030+2

225 53926 5377, 520 +875 -03,6+ -35,7 -03,28

529 537,9 +395 5+6 ++9 036+ 23,++ +355,

528 537, +395 5+5 ++9, 03,, 23,0 030,528 537, +395 5+ ++9, 03,9 23,05 030+7

528 537,+ +395 5+2 ++96 03,9 23,0+ 030,

528 537, +395 5+, ++96 +3072 23,52 0305

529 537+ +395 5+5 ++98 03,, 23,0+ 0302

529 537 +395 5+2 ++98 03,, 23,0+ 03022

529 53758 +395 5+ ++80 03,, 23, -03008

528 53757 +395 5+6 ++80 0389 238 +356+

529 5375 +395 5+, ++8+ +307, 23,26 030+

528 537+, +395 52, ++87 03,, 2367 030,

529 5370 +395 52, +20+ 03,, 2367 03022

+56 53697 537, 5+ 2055 -03067 -537+9 -030,

+56 53696 537, 52, 205 -0306 -537+9 -03057

+56 53696 537, 5+5 205 -03067 -537+7 -03057

+56 53696 537, 5+2 205 -0306 -537+9 -03057

+5, 5369+ 537, 5+6 2057 03077 -53759 03827

+5, 53678 537, 5+, 2059 03+0, -53756 03005

+5, 53676 537, 5+ 200 -03062 -5375, -03022

+5, 53676 537, 52, 200 -030,8 -5375, 03005

+5, 53676 537, 5+2 200 -03062 -5375, 03005

+5, 53676 537, 5+5 200 -03062 -5375, 03005

8 5367, 537, 5+, 200 03088 -537,2 03+02

8 53675 537, 52, 20+ -03079 -537,+ 03+09

8 53675 537, 5+2 20+ -03079 -537,+ 03+088 53675 537, 5+ 20+ -0307, -537,+ 03097

8 53675 537, 5+5 202 -0309+ -537,+ 03+06

+00 53672 537, 5+8 202 -03,9+ -53829 -03075

8 53669 537, 5+6 20 -032+7 -5379 +308

+56 536,+ 537, 5+, 20, 03++5 -537+9 0307

+00 5368 537, 525 20,, -03+28 -5380 -030+

+56 53625 537, 5+6 2070 03+52 -537+6 03,67

+00 536+9 537, 522 2072 -03+59 -53975 -03029

+00 53609 537, 520 2079 -03229 -53962 -0360,

+00 53,8, 537, 5++ 2096 -03+59 -539, -030+

+00 53,9 537, 5+9 2082 -030,+ -53957 03,79

+00 53,72 537, 52 2088 -03++ -53927 0+00 53,+ 537, 52+ 2++7 -03+, -53786 -030+2

+00 53,+8 537, 5+7 2+5+ 03502 -53772 030,

277 5308+ 5377, 520 22 -03+02 -53+, -03,+9

Page 106: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 106/123

2 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

+,, 53099 5377, 5+6 2, 03++2 -53+0 03,26

+,, 53067 5377, 5+, 26+ 03002 -53+0 030+9

50 53065 5377, 5+, 26 03002 -53+0 -03008

+0 5308 537, 5+9 2,8 -032,8 -530+9 0369,

+86 5305 5377, 5+9 29+ -03+0 -535,2 03,27

+,, 530+ 5377, 5+2 292 -03+6+ -53+06 -0300,

+,, 530+ 5377, 5+5 292 -03+6, -53+06 -03006

+,, 530+ 5377, 52, 295 -03+,8 -53+0, -03007

50 530 5377, 5+ 295 -03+,9 -53+06 03005

+,, 53058 5377, 5+ 29 -03+7+ -53+06 -030+8

50 53059 5377, 5+2 29, -03+62 -53+06 030+8

50 53057 5377, 5+5 29, -03+66 -53+06 030+850 53057 5377, 52, 29, -03+6+ -53+06 030+6

+0 5302+ 537, 5+8 292 -032,6 -530+7 03+,6

277 530+ 5377, 52+ 2,0, -03502 -5352, 030+7

277 53007 5377, 522 2,+0 -03289 -535+ 03002

277 23888 5377, 5+8 2,+7 -036+2 -5329 030

277 2388+ 5377, 5++ 2,25 -0328, -5350+ 030+7

50 2388+ 5377, 5+6 2,2 -035, -53+07 03,6

+0 2389, 537, 52 2,+2 -0307 -530+7 0308

+0 2389 537, 525 2,+5 -0306+ -530+9 0307,

+0 2389 537, 5++ 2,+5 -0306 -530+7 0307,

+0 2389 537, 52+ 2,+5 -03067 -530+7 0307,

277 2389 5377, 5+7 2,50 03022 -535+8 -03009

+0 23895 537, 522 2,+ -030,7 -530+7 0306

277 23876 5377, 52 2,56 -03282 -53298 0305+

277 23868 5377, 525 2,2 -03297 -53278 030+6

+86 23869 5377, 52+ 2,5 -0350 -5326, -03008

+86 23862 5377, 522 2,8 -03508 -532,8 -03022

+86 238, 5377, 5+8 2,,, -036+2 -53227 -03028

+0 2387 537, 5+7 2,, 03+2, -530+7 -03006

+86 2386 5377, 5++ 2,65 -03287 -5322 -03008

+86 23857 5377, 5+7 2,70 030+8 -532,7 030+5

+86 23828 5377, 52 2,77 -0329 -5322 0300,

+86 23825 5377, 525 2,95 -03299 -532+9 -03009+0 2382 537, 520 2,69 03+28 -530+6 -03,5,

277 23982 5377, 5+9 26+0 -0399 -53+98 03,,2

+86 2399 5377, 520 26,0 -0398 -53+52 -03,5

9+ 2366 537, 5+7 29+, 035, -5359 0302

9+ 236,7 537, 5+9 2925 -03+77 -5357, 038

9+ 236,, 537, 52+ 292, -03209 -5357, 03025

9+ 236, 537, 52 2950 -03202 -5357 0305

9+ 2367 537, 5++ 2955 -03+88 -53567 03022

9+ 2365 537, 522 2957 -03+8, -5356 0

9+ 23659 537, 525 292 -03+98 -535,8 03022

9+ 23656 537, 520 29, -03225 -535,9 -03802

9+ 23628 537, 5+8 29,5 -0377 -535, 0302288 236+ 537, 5+9 2968 -030,8 -53+26 03859

88 23605 537, 52+ 299+ -03+,2 -53+2 030+2

88 23602 537, 5+7 2992 0328 -53++9 030++

Page 107: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 107/123

2& of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

88 236 537, 52 299 -03+6 -53++9 0305

88 23,8, 537, 5++ 2998 -03+6 -53++2 030++

88 23,8 537, 522 298, -03+6 -53+0, -030+2

88 23,98 537, 5+8 2987 -03,96 -53+06 03008

88 23,99 537, 525 2989 -03+ -53+0 03008

88 23,77 537, 520 28+0 -0325 -53089 -038+6

528 239 +395 520 +78+ 032 +3,8 -+327

528 2372 +395 5+8 +900 -03+, +3,,6 0302

528 2372 +395 522 +900 03577 +3,98 03006

528 2372 +395 52+ +900 0357 +3,98 03058

528 237 +395 5++ +90+ 03577 +3,97 03058

528 2368 +395 52 +902 0357 +3,97 0307+528 2369 +395 5+7 +902 03989 +36+8 03055

528 2369 +395 525 +902 03577 +3,96 03057

528 23,, +395 5+9 +9+2 03529 +3,9 +35,

278 238 23282 5+, 22, 03776 -5352 -03205

529 2329 +395 5+9 +955 0358 +3,58 +3556

+89 232, 23282 5+, 2267 0378, -53292 032+7

278 232 23282 5+6 2268 0322 -53277 037+

529 23+ +395 5+8 +95 -03+59 +3,05 03055

529 23+ +395 52+ +96 03595 +3,5 03025

529 23+ +395 52 +96 03596 +3,5 030,6

529 2308 +395 5++ +97 03595 +3,28 03025

529 2309 +395 522 +97 03595 +3,28 -03009

529 2309 +395 525 +99 03595 +3,29 0302,

529 230 +395 5+7 +9,+ 0380 +3,,6 030+6

278 23585 23282 5+5 2289 035,, -5326 -03+77

529 2358+ +395 520 +96+ 0355+ +3,+8 -+3299

278 23598 23282 5+ 2502 035,6 -532 -0320,

278 23597 23282 5+2 2505 035,, -532 -03+79

+89 2357 23282 5+ 252+ 03572 -532++ 03+76

+89 23568 23282 5+5 252+ 0357 -532+ 03+89

+89 2356 23282 5+2 2526 0357 -5320 03+88

278 235,6 23282 52, 255 035, -53207 -03+79

+89 23552 23282 52, 25,9 03572 -53+7 03+89+89 23529 23282 5+6 2562 0399 -53+67 +3++9

+88 2352+ 5 5+8 2,9 -03+,2 -530,6 0302

+88 235+ 5 5+9 2,82 03582 -530,9 +3+69

+88 23505 5 522 260 03269 -5302 03009

+88 23505 5 52 260 03275 -53057 03066

+88 23505 5 52+ 260 0327 -530+ 03056

+88 23505 5 5++ 260 0327 -53058 03057

+88 23505 5 525 260 0327+ -53059 03058

+88 23282 5 520 26+7 03+8 -5302+ -+308,

+88 23296 5 5+7 262 03685 -5302 03055

290 23277 5 5+8 265, -03+72 -53009 0

290 2327 5 520 265 03572 -530++ -+3+55290 2326 5 52 26, 032, -23887 03028

290 232,9 5 52+ 26,6 032,5 -23885 0

290 232,9 5 525 26,6 032,5 -23898 -0300,

Page 108: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 108/123

2 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

290 232,9 5 5++ 26,7 032,5 -2388+ -03002

290 232,6 5 522 26,8 032, -2389, -03055

290 2326 5 5+9 2670 03+52 -2387+ +3+5

29+ 232, 53209 52, 28 03572 -530 0305+

290 232 5 5+7 2679 03676 -2387 -0300,

29+ 232+8 53209 5+6 278 0325 -530++ +329,

29+ 232+2 53209 5+5 29, 0357 -530+, 03056

29+ 232++ 53209 5+2 297 0357 -530++ 03055

29+ 23209 53209 5+, 280 0390, -53008 03057

29+ 23207 53209 5+ 28+ 03579 -5300 -03002

200 23+7 53209 52, 2,62 030+ -23825 03029

200 23++, 53209 5+5 2600 030+ -2398, 03026200 23++ 53209 5+ 260+ 03 -2398 -03005

200 23++5 53209 5+2 2602 0305 -23982 03029

200 23+09 53209 5+, 2608 03952 -23997 030+2

200 23+07 53209 5+6 26+0 03,5, -2398 +329+

+56 +386+ 537, 520 592 -03257 -+3828 -03626

+56 +385+ 537, 5+8 5995 -03222 -+3826 -03+02

+56 +3989 537, 522 58,0 -030, -+3829 -03057

+5, +3989 537, 5+9 58,+ 03086 -+387 03827

+56 +3987 537, 525 58, -03058 -+3829 -0302,

8 +3987 537, 520 58, 0309 -+38,8 -039,5

+56 +3987 537, 5++ 58, -0302 -+3827 -0302,

+56 +3986 537, 52+ 58,, -0309 -+3827 -0302,

+5, +398, 537, 5+7 58,6 03+2 -+38 03005

+56 +398, 537, 52 58,9 -03058 -+3827 -03006

8 +398 537, 5+7 5860 03++9 -+38,6 0309+

+5, +3985 537, 525 5860 -030 -+38 0

+5, +3985 537, 522 586+ -030 -+38 -03022

+5, +3985 537, 52+ 586+ -0307 -+385 03006

+5, +3985 537, 5++ 586+ -030 -+385 03005

+5, +3985 537, 52 5862 -030 -+385 03029

8 +3982 537, 522 586 -030,5 -+38,6 0306,

8 +3982 537, 525 586 -030,5 -+38,6 0308

8 +3982 537, 5++ 586 -030,6 -+38,6 030978 +3982 537, 52+ 586 -03062 -+38,6 0309

8 +398+ 537, 52 586, -03062 -+38,6 03+08

+5, +398+ 537, 5+8 5866 -032++ -+382 03005

8 +398 537, 5+8 5869 -03255 -+38,, 03085

+5, +3999 537, 520 587+ -03+95 -+38 -0382+

8 +3997 537, 5+9 587 -03+88 -+38,5 +3027

+56 +3962 537, 5+7 029 03+5, -+3829 030,6

+56 +395 537, 5+9 099 03+,5 -+3826 03,9

+,, +366+ 5377, 5+9 ,6 03+68 -+3672 03,2,

50 +36,7 5377, 520 ,,, 03+67 -+3672 -03,+,

+,, +36 5377, 5+7 60 030,9 -+367+ 030+7

50 +3656 5377, 5+7 6+5 030,7 -+367+ -03008+,, +36+6 5377, 52 672 -0308 -+3672 03007

+,, +36+ 5377, 525 677 -03+ -+3672 -03006

+,, +36+ 5377, 5++ 679 -03+0 -+3675 -03006

Page 109: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 109/123

2 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

50 +36+5 5377, 522 690 -03+05 -+3675 0

+,, +36+5 5377, 52+ 690 -03+09 -+3675 -03007

+,, +36+2 5377, 522 69 -03++ -+3675 -0302

50 +36++ 5377, 525 696 -03+02 -+3675 030+6

50 +36+ 5377, 5++ 699 -03+07 -+3675 030+6

50 +36+ 5377, 52+ 698 -03+++ -+3675 030+8

50 +3609 5377, 52 68, -03++ -+3675 0305+

+,, +3,99 5377, 5+8 7, -03267 -+367 -0305

50 +3,9, 5377, 5+8 76 -0327+ -+367, 0305

+,, +3,67 5377, 520 9+7 -03577 -+367 -03,59

50 +3,6 5377, 5+9 929 -0359 -+367 03,8

+,9 +3266 5 5+6 759 0357 -+328 +3+86+,9 +326 5 5+, 7, 036, -+328+ 030,+

507 +326 5 5+, 79 035 -+328+ -030+8

507 +326+ 5 5+2 7,9 03+66 -+328+ -030+2

+,9 +326+ 5 5+2 7,9 03+8+ -+328 030,,

+,9 +326+ 5 52, 7,9 03+8+ -+328 030,,

507 +326+ 5 52, 7,9 03+6 -+328+ -030+6

507 +326+ 5 5+5 7,9 03+6 -+328+ -030+6

+,9 +326 5 5+ 760 03+97 -+3298 0302,

+,9 +326 5 5+5 760 03+8+ -+3298 030,2

507 +326 5 5+ 760 03+68 -+328+ -030,

507 +32, 5 5+6 795 03008 -+329, +3+26

29, +306 355 5+6 62,2 03669 -0322 +38,5

29, 038,9 355 5+ 680 037,7 -0326 03867

29, 038 355 5+2 707 037,9 -0327 03872

29, 0385 355 5+, 7+2+ +306 -0327 03868

29, 0385 355 5+5 7+8 0376 -0329 0386

29, 03829 355 52, 7+68 0377 -0329 0386

278 038+8 23282 5+7 ,89 0366 -+3,,+ -03+5

+89 03805 23282 5+7 608 03678 -+3,2, 03+,7

278 03985 23282 5+9 6+,, 03+5+ -+3,09 039

509 03996 237, 5+6 6208 0302 -0398 +329+

+,7 0399 237, 5+, 628 03+2 -0396 0325,

506 03979 237, 5+, 626, 0358+ -0396+ -032+7+89 03976 23282 520 627, 03+, -+395 -0379+

+,7 03975 237, 5+6 6289 03506 -03968 +3+6+

278 03965 23282 52+ 6576 032 -+379 -03++8

509 039,8 237, 5+5 600 03222 -03822 0305

+,7 039,8 237, 52, 60+ 03+5, -0399 032+

509 039,8 237, 5+2 605 03222 -03822 030

+,7 039,8 237, 5+5 60 03+5, -03992 032+

278 039,8 23282 522 60, 032, -+372 -03+6

+,7 039,9 237, 5+ 607 03+5+ -03992 03+97

278 039,9 23282 5++ 608 032 -+375 -03++8

509 039,9 237, 5+ 608 03226 -0382 03006

509 039,9 237, 52, 608 03222 -03822 030+,7 039,9 237, 5+2 608 03+56 -03992 032++

506 039,7 237, 5+5 62+ 03++5 -0399 -03+96

506 039,7 237, 52, 62+ 03++2 -0399, -03+96

Page 110: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 110/123

27 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

278 039,7 23282 52 62+ 0322 -+375 -03085

506 039,6 237, 5+ 625 03++6 -0399, -032+

506 039,6 237, 5+2 62 03++5 -0399 -03+98

+,8 039,, 237, 5+ 628 032, -03826 -030+2

+,8 039,, 237, 5+5 652 032,7 -03826 030+7

+,8 039,, 237, 5+2 65, 032,7 -03826 0302

+,8 039,, 237, 52, 65, 032,7 -03826 0302

509 039,5 237, 5+, 6,0 03,27 -0387 0307

278 039,5 23282 525 6,0 032 -+367 -03++8

+,8 0398 237, 5+, 676 03,6+ -038,+ 0

+89 0396 23282 522 689 032,6 -+3,5 03++,

+89 0396 23282 52+ 6,0+ 032,8 -+3,2 03+59506 0392 237, 5+6 6,50 -030,7 -03989 03765

+89 039+ 23282 5++ 6,+ 032,8 -+36 03+59

+89 0395, 23282 525 6,9, 0326 -+3 03+

+89 0395, 23282 52 6,98 03262 -+358 03+62

+,8 03929 237, 5+6 662 03 -0386 +3265

278 03922 23282 520 6682 035,7 -+356 -+3057

+89 0390, 23282 5+9 6955 03575 -+308 +30,7

278 03786 23282 5+8 6807 -03+76 -+358 -0308,

+89 03778 23282 5+8 7065 -03+6+ -+3569 03+2

29+ 037 53209 5+9 7599 03+27 -+3299 +3277

29+ 037 53209 52 75, 032, -+328, 030,8

29+ 03758 53209 5+8 75 -03+7+ -+328+ 0302

29+ 03759 53209 52+ 7,+ 032,7 -+328+ 03029

29+ 03756 53209 5++ 77+ 032,8 -+3299 03026

29+ 0375 53209 525 78+ 0326 -+329 0302,

29+ 03755 53209 5+7 788 0368 -+329, 03055

29+ 03755 53209 522 7,07 03262 -+329+ -03009

29+ 03729 53209 520 7,,0 0358+ -+3298 -+3226

29, 03672 355 5+9 8989 0357, -03279 +3,,5

200 0366, 53209 5+8 9276 -03+7 -+3202 0305

200 0366 53209 520 9279 03+8 -+3+8, -+3226

200 0366+ 53209 522 952+ 03278 -+320+ -0300

200 0366+ 53209 52+ 952+ 0329+ -+320+ 03026200 036,8 53209 5++ 950 03292 -+3+89 03027

200 036,7 53209 52 9566 0329, -+3+8 030,8

200 036,7 53209 525 9576 03292 -+3+8 03028

200 036, 53209 5+7 90, 037++ -+3+85 030++

200 036, 53209 5+9 9+0 03+ -+320+ +329

507 03655 5 520 878 0327+ -0366 -+3+7

+,9 03655 5 5+9 878 03285 -0366 +3+95

507 0365+ 5 5+7 8,09 0358+ -036,7 -03008

+,9 0365+ 5 5+7 8,09 03++ -036,7 03059

+,9 03629 5 525 8,6+ 03+59 -036,6 030

507 03629 5 5++ 8,6+ 03++6 -036,7 -03006

+,9 03629 5 52 8,6+ 03+58 -036,6 03072+,9 03629 5 5++ 8,6+ 03+56 -036,6 0302

+,9 03629 5 522 8,6+ 03+55 -036,6 030+2

+,9 03629 5 52+ 8,6+ 03+56 -036,6 030

Page 111: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 111/123

28 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

507 03627 5 52+ 8,6+ 03++, -036,7 -03006

507 03627 5 525 8,6+ 03++6 -036,7 -03008

507 03627 5 522 8,67 03++9 -036,7 -030

507 03627 5 52 8,67 03++5 -036,6 03029

+,9 0362 5 5+8 86+, -03+ -036,, 030,

507 0362 5 5+8 86+, -03+6 -036,6 -03005

+,9 03622 5 520 86 -0302 -036,2 -+3088

507 03622 5 5+9 86,0 -030 -036,2 +3+5,

29, 03,6, 355 522 ++775 0362 -03292 03,66

29, 03,,6 355 525 ++870 0362 -03295 03,79

29, 03,, 355 5+8 ++885 03+,9 -03295 03,7,

29, 03,7 355 5++ +2+65 036 -0329 03,7+29, 03,+ 355 5+7 +2502 03768 -0329 03,67

29, 03, 355 52+ +2526 036, -0329 03,6

29, 03,5 355 52 +2,2 0367 -03296 03,77

509 03,6 237, 5+9 +2065 -0302 -03,5 +327

+,8 03,5 237, 520 +2+6 03006 -03, -+3225

+,7 039 237, 5+7 +2266 0357 -0352 03+7

506 036 237, 5+7 +25+9 035, -0355 -03+,,

29, 035 53978 520 +,0++ 0386 -032,5 -03297

+,7 032 237, 5+9 +27 0326, -032 +3086

506 03 237, 520 +289 0326 -035 -+3075

509 0356 237, 5+8 +262 -03+6 -036 03022

+,8 035+ 237, 5+8 +278 -03++, -0365 030

509 035+ 237, 52 +2772 03+,, -039 0306,

509 035 237, 52+ +2786 03+,9 -039, 0305+

509 0328 237, 5++ +2907 03+6 -039, 03029

509 0328 237, 525 +29+8 03+6 -039, 03029

509 0328 237, 522 +2950 03+6 -0397 -03006

+,7 0327 237, 52 +297, 03089 -03,6 03+7

+,7 0327 237, 52+ +2976 0308 -03,, 03+

+,7 0327 237, 525 +2997 0308 -03,6 03+7

+,7 0327 237, 5++ +2999 0308 -03,, 03+6

+,7 0327 237, 522 +2999 0308 -03,, 03+2+

+,8 0327 237, 522 +2999 03+9 -0397 -030+++,8 0326 237, 52+ +2800 03+99 -0399 030+9

506 0326 237, 52 +28++ 03075 -03,7 -03086

+,8 0326 237, 5++ +28+2 03+99 -0399 0302+

506 0326 237, 525 +28+8 03076 -03,9 -03+2

+,8 0326 237, 525 +282 03+98 -0399 03025

506 032, 237, 52+ +285+ 0307, -03,7 -03+2+

+,8 032, 237, 52 +285, 03+82 -0399 030,5

506 032, 237, 522 +282 03079 -03,7 -03+,2

506 032, 237, 5++ +28, 0307, -03,7 -03+2

509 0325 237, 5+7 +2885 0365 -03,+ 030

+,8 032+ 237, 5+7 +5076 038+ -03,+2 03002

+,7 03+2 237, 520 +5556 -03077 -0368 -0390,506 03++ 237, 5+9 +559+ -0308, -037+ 03929

20+ 0309 23,86 5+, +08+6 03966 -+3+5 030+,

+,7 0306 237, 5+8 +5,8 -03+92 -0378 03+2+

Page 112: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 112/123

2+ of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

506 030, 237, 5+8 +5,86 -03202 -039+ -03085

509 0305 237, 520 +56,+ 035+ -03,+9 -+32+2

+,8 03588 237, 5+9 +5768 0357 -03,2+ +326,

20+ 0358+ 23,86 52, ++568 0328 -+3++2 03026

20+ 0358 23,86 5+ +++6 0326 -+3++ -0300,

20+ 03597 23,86 5+2 ++82 0328 -+3+09 03026

20+ 03596 23,86 5+5 ++,59 0326 -+3+09 0302

292 035,7 23,86 5+6 +265 032,8 -038+9 +355

+60 035, 2322, 5+6 +2725 03,22 -03767 +352+

+60 03556 2322, 5+2 +52,6 03288 -0385 0305

+60 0355, 2322, 5+ +5272 03286 -0396 03002

+60 0355, 2322, 5+5 +5272 03288 -038+ 0305++60 0355, 2322, 52, +5297 03288 -0382 0305

508 03555 2322, 52, +556, 032,6 -036 030,

508 03555 2322, 5+2 +556, 032,6 -036 030,

508 03555 2322, 5+ +5590 03262 -0367 030+6

508 03555 2322, 5+5 +559+ 032,5 -03,9 030,5

+60 0355 2322, 5+, +597 03657 -03608 030+7

508 03529 2322, 5+, +5,67 03,8 -03,9 030,6

20+ 03525 23,86 5+6 +5766 03,66 -+3+9 +35+6

508 035+8 2322, 5+6 +58,0 03056 -03+98 +3555

292 03509 23,86 5+, +,, 03928 -03878 030,

292 03289 23,86 5+2 +855 0358, -03867 030,

292 03287 23,86 5+ +868 03589 -0386, 0302

292 03287 23,86 5+5 +898 03582 -03867 030,7

292 0328 23,86 52, +,+50 03582 -0386 030,

20+ 032, 23,86 520 +779+ 03+68 -0368 -+32,,

20+ 03206 23,86 5+7 2+,77 0372 -037,6 03022

+60 03+82 2322, 5+9 252++ 039 -03,9+ +3529

508 03+8+ 2322, 520 2556 0309 -03,,2 -+32,5

20+ 03+98 23,86 522 25,88 03502 -03756 03005

20+ 03+99 23,86 525 25699 0350, -0375 03057

20+ 03+96 23,86 5++ 2585 0350, -03755 0305,

20+ 03+9 23,86 52+ 2+56 0350, -03755 03055

20+ 03+95 23,86 52 2556 03509 -0375+ 03067+60 03+92 2322, 5+8 229 -03++5 -03+8 030,9

508 03+9+ 2322, 5+8 2,55 -03+, -03+6+ 0302,

+60 03+77 2322, 525 2,++5 0322, -03509 030

+60 03+77 2322, 522 2,++ 032+8 -035 03008

+60 03+77 2322, 52 2,++ 03229 -035+5 03075

+60 03+77 2322, 5++ 2,+70 03222 -03506 030+

+60 03+77 2322, 52+ 2,+70 03222 -0350, 03059

508 03+76 2322, 525 2,22, 03+99 -03295 03029

508 03+76 2322, 5++ 2,22, 03+99 -0329+ 0305+

508 03+76 2322, 522 2,250 03+8+ -03298 -03006

508 03+76 2322, 52+ 2,29+ 03+9 -0329 0305

508 03+76 2322, 52 2,550 03+9+ -03275 03069+60 03+72 2322, 5+7 2,928 03,6 -0325 0302

508 03+72 2322, 5+7 2,859 03,2, -0302 03057

20+ 03+6, 23,86 5+8 27026 -03+52 -037+ 0307

Page 113: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 113/123

0 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

508 03+65 2322, 5+9 27556 -03056 -030+2 +35+,

+60 03+62 2322, 520 2769 -03002 -03052 -+326

292 03+,7 23,86 5+9 295,6 03+59 -03,,7 +3526

20+ 03+2+ 23,86 5+9 567+8 03+ -03775 +352

292 03+08 23,86 5+7 097, 03709 -036+8 03056

292 03+05 0372 520 5++ 03588 -03595 -+32,+

292 03+0+ 23,86 525 +97 0327 -03607 03056

292 03+ 23,86 52 5+, 03269 -03609 0307+

292 03+ 23,86 5++ 628 0327 -03607 03057

292 03088 23,86 522 87 03277 -0360, 03005

292 03089 23,86 52+ ,99 0327+ -03606 03058

292 0308 23,86 5+8 8,55 -03+65 -03,8, 03057

34A0S=E4SA# BEA<

eam >ength ">$ % 1100 cm

Allowable (eflection % >'2&0 % &*8 cm

  MAX MEMBER SECTION DISPLACEMENTS

  --------------------------------

Beam Ia. (is! >ocation >'C >'(is!l lobal J lobal lobal K

"mm$ "m$ "mm$ "mm$ "mm$

22 *078 8* 1 1 1*082 -&*&+ 0*02

22 2*+72 8* 2 1 0*&7 -&*&+ 0*02

22 2*++ 8* 1 1 0*&+ -&*8 0*02

22 2*+7 8* 1& 1 0*&+ -&*7 -0*002

22 2*+&+ 8* 12 1 0*&+ -&*2+ 0*02

22 2*+28 8* 1 1 0* -&*08 1*10

22 2* 8* 1 22 1*088 -&*01+ 0*00

22 2*& 8* 2 2 0*&+ -*8+ 0*01

22 2*&1 8* 1 2 0*07 -*8+ 1*0+

22 2*& 8* 1& 2 0*2 -*88 -0*01&

22 2*&+ 8* 1 2& 0* -*8 0*01

22 2*&2+ 8* 12 2& 0*2 -*8&7 0*0122 20*&1 8* 17 82 0*+1 -21*&2& 0*022

22 20*& 8* 17 8 0*+1+ -21*&7 0*00

22 20*08 8* 20 87 0*2 -21*27+ -1*0+

22 20*2+ 8* 21 87 0*82 -21*2 0*022

22 20*2+& 8* 22 87 0*82 -21*2 -0*00

22 20*28+ 8* 18 87 0*& -21*28+ 1*0+

22 20*287 8* 22 87 0*8 -21*28 -0*017

22 20*28 8* 11 87 0*8 -21*28 0*022

22 20*27+ 8* 2& 88 0*8 -21*2 0*01

22 20*277 8* 2 88 0*8 -21*2&8 0*022

22 20*27 8* 21 88 0*8 -21*27 0*012

22 20*2 8* 11 88 0*8 -21*2 0*01222 20*2 8* 18 88 0*& -21*27 1*102

22 20*27 8* 2 8+ 0*8 -21*2 0*012

22 20*2& 8* 2& 8+ 0*8 -21*2&& 0*0&2

Page 114: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 114/123

1 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

22 20*2&& 8* 20 8+ 0*&28 -21*2& -1*07

22 20*18 8* 1+ 8& -0*1 -21*0+2 0*022

22 20*1 8* 1+ 8&& -0*1 -21*0+& 0*02

&& *1 *&8 1 1++ -0* -7*82 1*81

&& *1 *&8 1 200 -0*2 -7*87 0*1

&& *12 *&8 12 2011 -0*2 -7*7 0*12

&& *11 *&8 2 2011 -0*2 -7* 0*12

&& *0& *&8 1& 201& -0*2 -7*8 0*1&

&& *&7& *&8 1 202 0*2& -7*27 0*178

2 *27 *&8 1 208+ -0*18 -7*&08 1*282

2 *22 *&8 1 210 -0*21 -7*&1 0*0&8

2 *202 *&8 12 2112 -0*1 -7*2 0*0&82 *1+8 *&8 2 211 -0*12 -7*17 0*0

2 *1+2 *&8 1& 211 -0*0+ -7*1 0*01+

2 *171 *&8 1 2122 0*22 -7*21 0*087

&& &*+ *&8 18 28 -0* -*+0+ 1*&8

&& &*8 *&8 1+ 2+2 -0*8& -*+1 0*11&

&& &*8& *&8 21 270 -0*1+7 -*7 0*127

&& &*8 *&8 2& 270+ -0*1+& -* 0*17

&& &*827 *&8 11 271& -0*1+1 -*1 0*12+

&& &*81+ *&8 22 2718 -0*18 -*&2 0*101

&& &*807 *&8 2 272 -0*182 -*1 0*11

&& &*78+ *&8 17 27 0*0 -*11 0*1&

& &*771 7 1& 21 -0*2 -*2 0*0

& &*7 7 1& 221 -0*21 -*28 0*011

& &*7& 7 2 228 -0*27 -*2+ 0*0

& &*7&& 7 12 22+ -0*27 -*2+ 0*01

& &*7 7 2 2& -0*21+ -*0 0*02

& &*7 7 12 2& -0*21+ -*0 0*02

& &*72 7 1 2 -0*2 -*28& 0*+

& &*71 7 1 2&& -0*& -*28 0*78

&& &*87 *&8 20 27+& -0*08 -*+ -1*0+

& &*81 7 1 2 -0*22 -*2&+ 0*02&

& &*8 7 1 2& -0*272 -*22+ 0*0

& &* 7 1 278 0*277 -*22 0*00& &*& 7 1 278 0*1& -*2 0*01+

2 &*2 *&8 18 28+8 -0*2 -*&1& 1*2

2 &*&8 *&8 1+ 2+20 -0*7+ -*&1 -0*00

2 &*&7& *&8 21 2+28 -0*28 -*&7 0*01

2 &*& *&8 2& 2+ -0*2 -*7 0*0

2 &*& *&8 11 2+&2 -0*228 -*2 0*0

2 &*&& *&8 22 2+&8 -0*22 -*1 0*00

2 &*&2 *&8 2 2+ -0*222 -*0 0*0

2 &*&21 *&8 17 2+ 0* -*27 0*08

2 &*8 *&8 20 2+8 -0*222 -*2+ -1*201

& *& 7 1+ &+2 -0* -*8 0*0&1

& *&0+ 7 2 1+ -0*11 -*8+ 0*022& *87 7 1+ & -0*72 -*7+8 0*07&

& *8 7 22 0 -0*17 -*80+ 0*00

& *7 7 20 -0*0&+ -*801 -0*

Page 115: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 115/123

2 of  A33AC/<E03-' C1#2<0 A0D BEA< DE!#EC3I10

& * 7 2 71 -0*17 -*78 0*0&

& * 7 11 7 -0*1& -*78& 0*02

& * 7 18 + -0*272 -*77 0*7&

& * 7 2& 0 -0*17 -*7+ 0*0

& *2 7 22 11 -0*182 -*71 0*02

& *0+ 7 20 2 -0*17+ -*71& -0*0

& *01 7 21 -0*17 -*7 0*01+

& *2+7 7 11 &0 -0*188 -*70& 0*0&

& *28 7 18 2 -0*1+8 -*+ 0*8

& *27 7 17 & 0* -*702 -0*001

& *27 7 2& + -0*1+1 -*78 0*07

& *2 7 21 712 -0*1+8 -*& 0*0&2& *20 7 17 7&2 0*82 -*11 0*00+

Page 116: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 116/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

1. GENERAL

1.1 SCOPE

T$is c()cu)(tio* s$eet is !ur!ose# to !erfor/ !re)i/i*(r' c()cu)(tio* of Su;st(tio* &ui)#i*. (*#

fou*#(tio* for (ssi Toui) 1 Proect3

1. CODES AND STANDARD

+323+ G*ifor/ &ui)#i*. Co#e4 G&C +887

+3232 A/eric(* Societ' of Civi) E*.i*eers4 ASCE 7 -89

+3235 A/eric(* We)#i*. Societ'

+323 A/eric(* I*stitute of Stee) Co*structio*

+323, A/eric(* Societ' for Testi*. (*# (teri()s

1.3 REFERENCES

+353+ 8-9D-6578 S!ecific(tio* for Structur() Desi.*

+3532 8-D-6578 S!ecific(tio* for Desi.* Re:uir/e*ts for Wi*# 1o(#s

+3535 8-+,D-65378 S!ecific(tio* for Desi.* Re:uire/e*ts for E(rt:u(%e 1o(#s

 for 1 F(ci)ities

+353 C+,-+F-6578 F(;ric(te# Rei*forci*. Stee)

+353, 8-+2D-6578 &(sis Fou*#(tio* Desi.*

1.! DESIGN BASIS

1.!.1 "#$%&'#(

 A3 Stee)

- Stee) s$(!es AST A56 or <IS 5+0+ SS 00

F' = 25, P( /i*3 'ie)# stre*.t$

Fu = 00 P( /i*3 te*si)e stre*.t$

- >i.$ stre*.t$ ;o)t AST A52,

Fv; = +70 %.?c/2

Ft; = 5080 %.?c/2

&3 Co*crete

- Co*crete

I$%)C*+&%$% C(#

C(# C

Desi.* stre*.t$ 500 %.?c/2 @50 !(

Ce/e*t T'!e V @AST C+,0

(B3 sie of co(rse (..re.( + +? i*c$es @50 //

/(B3 w(ter ce/e*t r(tio* 03,

s)u/! /(B +00 ///i* 7, //

- Rei*force/e*t AST A6+,4 f' = 200 %.?c/2

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

Page 117: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 117/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

1.!.. L*#'+ #$#

E:ui!/e*t 1o(#i*. #(t( s$()) ;e refer to )o(#i*. #(t( i*for/(tio* i*#ic(te# i* Doc o3 8-9D-6578

e:ui!/e*t erectio*4 !rovi#e# ;' st(tic .rou!3

De(#4 1ive (*# Wi*# 1o(# s$()) ;e refere# to !roect #ocu/e*ts /e*tio*e# i* sectio* 2

1.!..1 D%# L*# D

T(;)e-+

D%# L*# *2 "#*& "#$%&'#(

(teri() De(# 1o(#

Rei*force# Co*crete 23 to*?/5

P)(i* Co*crete 235 to*?/5

Structur() Stee) 739, to*?/5

Soi) +39 to*?/5

r(ti* ,0 % ?/2

E)ectric() I*stru/e*t C(;)e Tr(' 90 %.?/2   @(ssu/e#

1.!... L'4% L*# L

1ive )o(#s (re t(%e* (s s!ecifie# v()ues i* #ocu/e*t *o 8-9D-6578

For t$is c()cu)(tio*4 )ive )o(# is #efi*e# (s @see (tt(c$/e*t for #et(i)

- W()%w('s Access P)(tfor/ +80 %.?/2

- Roof 1ive )o(#s (re t(%e* ;(se# o* t(;)e +6-C = +00 %.?/2

1.!..3. P''+ L*# 6P 8 PE, PO, #+ PT 9

T$is )o(# is *e.)ecte#

1.!..!. W'+ L*# W

#. W'+ L*# *+ S$%%( S$&>$>&% A)) !(r(/eters use# for wi*# )o(# (re #eter/i*e# ;(se# o* #ocu/e*t *o 8-D-6578

sectio* 32 (*# ASCE 7-8,

F

F #esi.* wi*# force @

ve)ocit' !ressure (t $ei.$t (;ove .rou*# @see t(;)e-2

V ;(sic wi*# s!ee# = 032 /eter?seco*#

I i/!ort(ce f(ctor = +3+, @for c(te.or' III

.ust effect f(ctor = 039, @for eB!osure C

Force coefficie*t =   2 @t(;)e 6-+0 of ASCE 7-89@for Stee) Structure (*# O* 56+9-E00+

Force coefficie*t =   +32 @t(;)e 6-++ of ASCE 7-89 @for !i!e

T$e De(# 1o(# is t$e )o(# of t$e structure itse)f @c()cu)(te# ;' STAAD-PRO (*# soi) (;ove footi*.s@for fou*#(tio* ;ut eBc)u#es e:ui!/e*t4 /(c$i*er'4 (*# !i!i*. )o(#s3 T$is structure is *ot fire-!roofe#@(s !er Fire Proofi*. o*e i*fo fro/ >SE .rou! T$

@.G.C

2 .A

2N

= 036+5 3Q 3Q

t 3Q

# 3 V2 I @?/2

Cf

Cf

Page 118: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 118/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

Ve)ocit' !ressure Coefficie*t --J ;(se# o* t(;)e 6-, of ASCE 7-89

@see t(;)e 2 ;e)ow

To!o.r(!$ic F(ctor = + @t$e !rocess site is co*si#er(;)' f)(t

@see sectio* 6-, (*# fi.ure 6-2 of ASCE 7-89

Directio*()it' F(ctor =   039, @for structure

  =   038, @for !i!e

@see t(;)e 6-6 of ASCE 7-89--J to si/!)if'4 use 038,

!roecte# (re( *or/() to wi*#

T(;)e -2

Ve)ocit' !ressure (t $ei.$t (;ove .rou*#

$ei.$tO* /e/;er wit$ $ei.$t

5000// 6000// 9000//

@/ t?/ t?/ t?/

030 - 36 039, 925308 930 0329 039,7 +3+2

36 - 63+ 0380 8730 883 03,07 +30+ +35,2

63+ - 736 038 +0+7355 +0539 03,28 +30,8 +3+2

736 - 83+ 0389 +060362 +0932 03,,2 +3+0 +372

1.!..5 S%')' L*# S

Seis/ic )o(# wi)) ;e c()cu)(te# ;' st((#!ro usi*. G&C +887 Co#e4 o*e =+

1.!.3 D%2(%$'*+

&e(/ wit$ #e(# )o(# (*# )ive )o(# 1?20

W$ere 1 re!rese*ts t$e s!(*3

1.!.! C*+%$ *2 C#(>(#$'*+

(3 T$e c()cu)(tio* wi)) ;e #esi.*e# (s structur() s!(ce ;(se# o* (ssu/!tio*

Tr(*svers() #irectio* @(.(i*st vesse) tu;e fr(/e wit$ /o/e*t co**ectio*

1o*.itu#i*() #irectio* @(.(i*st vesse) tu;e fr(/e wit$ !i* co**ectio*

;3 Co**ectio*

Co**ectio* ;etwee* co)u/* ;(se !)(te (*# !e#est() is #esi.*e# (s !i**e# i* ;ot$ #irectio*3

c3 T$e structure wi)) ;e (*()'e# wit$ STAAD PRO structur() (*()'sis co/!uter !ro.r(//i*.

(*# (s s!(ce fr(/e (*()'sis3

Q =

Qt =

Q# =

 Af  

Q

  :

@?/2 @%.?/

(3T$e )i/iti*. !er/issi;)e vertic() #ef)ectio* for structur() stee) /e/;ers s$());e (s s!ecifie# ;e)ow (s !er G&C 87 T(;)e +6 D

;3 T$e )i/iti*. !er/issi;)e $orio*t() #ef)ectio* for !ort() fr(/es s$()) ;e$ei.$t?,0 (s !er G&C 87 sectio* +6503+0323 C()cu)(te#3

Page 119: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 119/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

. PLAN, FRA"ING ELEATION AND DETAIL

3D-IEW

LAY OUT

Page 120: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 120/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

3. LOADINGSDEAD K LIE LOAD

Page 121: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 121/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

WIND LOAD 1 DIRECTION

Page 122: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 122/123

Docu/e*t - PI-060+7-CIV-0+0  

 

G!#(te# +0?+?20+,

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

WIND LOAD DIRECTION

Page 123: Calculation CCR (RC)

7/17/2019 Calculation CCR (RC)

http://slidepdf.com/reader/full/calculation-ccr-rc 123/123

GASSI TOUIL LNG PROJECT

ARZEW, ALGERIA

CALCULATION OF CENTRAL CONTROL / LABORATORYBUILDING

WIND LOAD Z1 DIRECTION