TJDFTSOLUES EM FUNDAES - MAIO 2009200 80 50 40 17.5 480 8 70 40 3 2
PLANILHA PARA CLCULO E ORAMENTO DE PROJETOS EM TUBULESMelhor visualizado em 1024 x 768 pixels
Licenciado para: TRIBUNAL DE JUSTIA DO DISTRITO FEDERAL E TERRITRIOS
5
TJDFT3
O 2009 CLIQUE ABAIXO PARA COMEAR
E PROJETOS EM TUBULESAutor: Eng. Civil Guilherme Magalhes Almeida
do em 1024 x 768 pixels
Matr. 315255
TJDFT - SERCIV
Tel: (61)3103-7759 FEDERAL E TERRITRIOS
ESTE MDULO DO SOFTWARE AINDA EST EM FASE DE DESENVOLVIMENTO. AGUARDE O LANAMENTO DA NOVA VERSO!!!
1
1
DATA
CONTADOR
O QUE VOC DESEJA FAZER?QUERO CALCULAR UM TUBULO DE BASE OVAL (FALSA ELIPSE) QUERO CALCULAR UM TUBULO DE BASE CIRCULAR QUERO ORAR UM TUBULO OVAL (FALSA ELIPSE) J CALCULADO QUERO ORAR UM TUBULO CIRULAR J CALCULADO
TUBULO DE BASE CIRCULAR fck (kg/cm2) Taxa do terrento sigma s (kg/cm2) Carga Q (Tf) Perfurao do fuste Pf (m) Limite para altura da base - h lim (cm) NMERO DE REPETIESRECALCULAR OS PARMETROS ABAIXO
ENTRADA 200.00 3.00 500.00 12.00 200.00 1.00
TAXA DO TERRENO NECESSRIA PARA H=200 CM (kg/cm2) CARGA MXIMA PARA H=200 CM (Tf)
6.03 194.24 60.35 16.98 0.71 24.91 22.61 31.11 235.00 16.98 4.34 21.34 12.66 64.71 108.00% 500.00 194.24
ngulo da base alfa (graus) rea da base (m2) rea do fuste (m2) Volume da base (m3) Volume alargamento base (m3) Volume total (m3) Valor do fuste para h lim = 200 cm rea da base com fuste alterado (m2) rea do fuste com a alterao (m2) Volume da base com fuste alterado (m3) Vol. alargamento da base com fuste alterado (m3) Volume total com fuste alterado (m3)Percentual de aumento do volume total com alterao do fuste
CARGA ATUANTE CARGA MAXIMA
TAXA CALCULADA TAXA ORIGINAL
6.03 3.00
D (cm) 460.67 ADOTAR d (cm) 91.59 ADOTAR h (cm) 320.42 ADOTAR ATENO! h = 325 > h lim = 200 valor do fuste recalculado = 235 cmRecalcula fuste quando h > h lim
RESULTADOS 465.00 95.00 325.00
fuste alter vinc teste
TRUE
Alternar fuste
TRUE
CP 100 CP 135 CP 150 CP 200 CP 250 CP 300 CP 400 CP 500
4
1 2 3 4 5 6 7 8
COTAO DOS INSUMOS MO DE OBRAArmador Carpinteiro Pedreiro Servente Poceiro
UNIDADEh h h h h
PREO3.31 3.31 3.31 2.13 3.31
Nivel de Perdas Perdas =
MATERIAISConcreto C-15 usinado - p/ tubules Concreto estrutural C15 usinado - p/ blocos Armadura CA-50 diam. 12,5 mm Arame Recozido, 18 BWG Cimento comum Brita 1 Areia lavada Tbua 1''x12'' , pinus ou similar Sarrafo 1''x4'' , pinus ou similar Pontalete 3''x3'' , pinus ou similar Prego 18x30 Desmoldante para formas
UNIDADEM3 M3 KG KG KG M3 M3 METRO METRO METRO KG LITRO
PREO275.32 275.32 4.16 11.75 0.39 66.27 83.73 7.21 2.58 9.19 6.85 6.99
TAXA DE LEIS SOCIAIS (%)
APLICAR TAXA DE LEIS SOCIAIS
COMPOSIES Nvel de perdasPerfurao do fuste (CIRULARES) Servente Pocerio ml h h
mn5.4285 5.4285
med6.0317 6.0317
Perfurao do fuste (OVAIS) Servente Pocerio
ml h h
mn3.0535 3.0535
med3.3928 3.3928
Alargamento da base Servente Pocerio Lanamento de concreto C-15 - p/ tubules Concreto C-15 usinado Pedreiro Servente
m3 h h
mn10.0000 12.0000
med12.0000 14.0000
m3 m3 h h
mn1.0300 3.0000 3.0000
med1.0500 4.0500 4.0500
Colocao de ferragem de topo - CA-50 12mm Armadura CA-50 diam. 12,5mm Arame recozido, 18 BWG
kg kg kg
mn1.0800 0.0200
med1.1500 0.0200
Armador Servente
h h
0.0700 0.0700
0.0900 0.0900
Escavao manual Servente
m3 h
mn1.6000
med2.1700
Lastro de concreto magro Cimento comum Areia mdia - lavada e peneirada pedra 1 Pedreiro Servente
m3 kg m3 m3 m3 h
mn209.0000 0.6631 0.8342 3.0000 4.0000
med220.0000 0.6980 0.8780 4.0500 5.4000
Corte e preparo de cabea de tubulo Pedreiro Servente
Unidade h h
mn0.2400 2.4000
med0.2500 2.5000
Confeco, colocao e remoo da frma Tbua 1''x12'' , pinus ou similar Sarrafo 1''x4'' , pinus ou similar Pontalete 3''x3'' , pinus ou similar Prego 18x30 Desmoldante para formas Carpinteiro Servente
m2 m m m kg l h h
mn1.0000 3.5000 0.9000 0.1500 0.1500 1.3500 1.3500
med1.0500 3.9000 0.9800 0.1600 0.1700 1.5000 1.5000
Dobramento e colocao da armadura Armadura CA-50 diam, 12,5 mm Arame recozido , 18 BWG Armador Servente Lanamento e adensamento de concreto estrutural para blocos Servente Pedreiro Concreto usinado para blocos
kg kg kg h h
mn1.0800 0.0200 0.0700 0.0700
med1.1500 0.0200 0.0900 0.0900
m3 h h m3
mn3.0000 3.0000 1.0000
med4.0500 4.0500 1.0500
Reaterro Servente
m3 h
mn1.5000
med2.0300
Bota fora Servente
m3 h
mn1.6000
med2.1700
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DA LISTA?
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DO PROJETO?
min med mx 2
1.00 2.00 3.00
XA DE LEIS SOCIAIS (%)APLICAR TAXA DE LEIS SOCIAIS
124.00 TRUE
el de perdasmx7.2380 7.2380
adotada6.0317 6.0317
preo 4.77 7.41 Total: 28.78 44.72 73.50
mx4.0714 4.0714
adotada3.3928 3.3928
preo 4.77 7.41 Total: 16.19 25.16 41.34
mx14.0000 16.0000
adotada12.0000 14.0000
preo 4.77 7.41 Total: 57.25 103.80 161.06
mx1.0700 4.8600 4.8600
adotada1.0500 4.0500 4.0500
preo 275.32 7.41 4.77 Total: 289.09 30.03 19.32 338.44
mx1.2500 0.0200
adotada1.1500 0.0200
preo 4.16 11.75 4.78 0.24
0.1100 0.1100
0.0900 0.0900
7.41 4.77 Total:
0.67 0.43 6.12
mx2.6000
adotada2.1700
preo 4.77 Total: 10.35 10.35
mx242.0000 0.7678 0.9658 4.8600 6.4800
adotada220.0000 0.6980 0.8780 4.0500 4.0500
preo 0.39 83.73 66.27 7.41 4.77 Total: 85.80 58.44 58.19 30.03 19.32 251.78
mx0.2600 2.6000
adotada0.2500 2.5000
preo 7.41 7.41 Total: 1.85 18.54 20.39
mx1.1000 4.1000 1.0800 0.1700 0.2000 1.5500 1.5500
adotada1.0500 3.9000 0.9800 0.1600 0.1700 1.5000 1.5000 7.21 2.58 9.19 6.85 6.99 7.41 4.77 Total: 7.57 10.06 9.01 1.10 1.19 11.12 7.16 47.20
mx1.2500 0.0200 0.1100 0.1100
adotada1.1500 0.0200 0.0900 0.0900
preo 4.16 11.75 7.41 4.77 Total: 4.78 0.24 0.67 0.43 6.12
mx4.8600 4.8600 1.1000
adotada4.0500 4.0500 1.0500
preo 4.77 7.41 275.32 Total: 19.32 30.03 289.09 338.44
mx2.4300
adotada2.0300
preo 4.77 Total: 9.69 9.69
mx2.6000
adotada2.1700
preo 4.77 Total: 10.35 10.35
TUBULO OVAL - ENTRADA DE DADOSENTRADA
NMERO DE REPETIES
1.00 80.00 21.00 205.00 20.00
DADOS DO FUSTEDIMETRO DO FUSTE d (cm) PERFURAO DO FUSTE Pf (m)
DADOS DA BASEALTURA DA BASE h (cm) ALTURA DO RODAP dh (cm) DIAMETRO DA BASE D
DADOS DO BLOCOCOMPRIMENTO DO BLOCO X (cm) LARGURA DO BLOCO Y (cm) ALTURA DO BLOCO HB (cm) BITOLA UTILIZADA NO BLOCO (mm)CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3) 100.00 100.00 95.00 12.50 80.00 60.00 50.00 50.00 60.00 60.00 50.00 50.00 60.00 12.50 8 200.00
Distncia a1 (cm) Distncia a2 (cm) Distncia a3 (cm) Distncia a4 (cm) Distncia b1(cm) Distncia b2 (cm) Distncia b3 (cm) Distncia b4 (cm)
ARMADURA LONGITUDINALBITOLA UTILIZADA (mm) QUANTIDADE DE FERROS COMPRIMENTO DO FERRO (cm) 8 FERROS DIMETRO DE 12,5 mm - 200
ARMADURA TRANVERSAL (ESTRIBOS)BITOLA UTILIZADA (mm) ESPAAMENTO (cm) COBRIMENTO (cm) COMPRIMENTO DO ESTRIBO (cm) QUANTIDADE DE ESTRIBOS (un) - 1 TUBULO 10 FERROS DIMETRO DE 5 C/ 20 - 2605.00 20.00 2.00 260.00 10.00
DADOS COMPLEMENTARESNGULO DA INCLINAO DO TALUDE BETA (GRAUS) ALTURA DO CONCRETO MACRO C (cm)ENTRADA NO BLOCO D (cm) Distncia A (ARREDONDADA) ngulo Beta adotado (graus)DESCONTA VOLUME DA ENTRADA
60.00 60.00
60.00 5.00 5.00 57.73DIST. A ORIG.
Material + mo de obra
PREO (R$)
DescrioPerfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Lanamento e adenamento de Concreto magro e= 5cm Corte e preparo da cabea do tubulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura no bloco Lanamento e adenamento de concreto estrutural p/ blocos Reaterro Bota fora TUBULO
Unidademl m3 m3 kg kg m3 m3 Unid. m2 kg m3 m3 m3
Quantidade21.00 -0.72 9.83 15.98 4.16 6.88 0.17 1.00 3.80 76.00
Unitrio73.50 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12
BLOCO
0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra:
MATERIALPREO (R$)
DescrioConcreto Armadura longitudinal Armadura tranversal Concreto magro Concreto estrutural Forma ArmaduraTub.
Unidadem3 kg kg m3 m3 m2 kg
Quantidade9.83 15.98 4.16 0.17 0.95 3.80 76.00
Unitrio
289.09 5.02 5.02 202.43 289.09 28.92 5.02 Total material Total mo de obra:
Bloco
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DA LISTA?
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DO PROJETO?
PREO (R$)
Total1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 R$ 6,149.69
ARMADURA Vol. Base = 0,31 m3 CA-50 DIAM. 12,5 CA-60 DIAM. 5 8 BARRAS C = 200 10 BARRAS C = 260
CA-50 DIAM. 12,5
PREO (R$)
Total2,843.16 80.22 20.86 35.40 274.63 109.91 381.44 R$ 3,745.61 R$ 2,404.08
R$ 6,149.69
DADOS
TIPO 1
TIPO 2
TUB
TUBULO
UL
E
IR C S
C
UL
E AR
S
BLOCO
X (cm) Y (cm) HB (cm) ARMADURA Fuste d (cm) Pf (m) h (cm) dh (cm) D (cm)ARM. LONG. ARM.TRANV.
100.00 100.00 95.00 CA-50 DIAM. 12,5 80.00 21.00 205.00 20.00
-
REPETIES MATERIAL + MO DE OBRA Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora MATERIAL Concreto Armadura longitudinal UNIDADE m unid. m3 kg kg m3 m2 m3 m2 kg m3 m3 m3 UNIDADE m3 kg
CA-50 DIAM. 12,5 8 BARRAS C = 200 CA-60 DIAM. 5 10 BARRAS C = 260 1.00 TOTAL UNITRIO 21.00 21.00 -0.72 -0.72 9.83 9.83 15.98 15.98 4.16 4.16 6.88 6.88 0.17 1.00 3.80 76.00 0.95 5.76 10.96 9.83 15.98 0.17 1.00 3.80 76.00 0.95 5.76 10.96 9.83 15.98
TOTAL
TUB.
BLOCO
TUBULO
TUB.
Armadura tranversal Concreto magro Concreto estrutural Forma Armadura
kg m3 m3 m2 kg
4.16 0.17 0.95 3.80 76.00 73.50 1,543.49 3,745.61
4.16 0.17 0.95 3.80 76.00
PREO UNITRIO DA PERFURAO (R$) - POR METRO PREO TOTAL DA PERFURAO (R$) PREO UNITRIO DO MATERIAL (R$) PREO TOTAL DO MATERIAL (R$) PREO UNITRIO DA MO DE OBRA (R$) PREO TOTAL DA MO DE OBRA (R$) PREO UNITRIO (MO+MAT) (R$) PREO TOTAL(MO+MAT) (R$)
BLOCO
UNITRIO 3,745.61 2,404.08
2,404.08 6,149.69 6,149.69 TIPO 1 TIPO 2
SOMA QUANTITATIVOS T1 A T10GERAL - BLOCOS RETANGULARES
PREO (R$) UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg m3 m3 m3 1.00 3.80 76.00 0.95 5.76 10.96 UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12 338.44 9.69 10.35 TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47
QUADRO ORIGINAL DAS QUANTIDADES
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural p/ blocos Reaterro Bota fora
BLOCO
TUBULO
BLOC
Total material + mo de obra Total material Total mo de obra
6,149.69 3,745.61 2,404.08
TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg m3 m3 m3 1.00 3.80 76.00
PREO (R$) UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12
PRIMEIRA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 6,149.69 3,745.61 2,404.08
BLOCO
TUBULO
0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES
TUBULO
Perfurao do fuste Alargamento da base Lanamento de concreto
UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83
PREO (R$) UNITRIO VAR 161.06 338.44
SEGUNDA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53
TUBULO
Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
kg kg m3 m2 unid. m2 kg m3 m3 m3
15.98 4.16 6.88 0.17 1.00 3.80 76.00
6.12 6.12 10.35 251.78 20.39 47.20 6.12
97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 6,149.69 3,745.61 2,404.08
BLOCO
0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura
UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg 1.00 3.80 76.00
PREO (R$) UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12
TERCEIRA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79
BLOCO
TUBULO
BLOCO Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m3 m3 m3
0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra
321.52 55.74 113.47 6,149.69 3,745.61 2,404.08
TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg m3 m3 m3 1.00 3.80 76.00
PREO (R$) UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12
QUARTA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 6,149.69 3,745.61 2,404.08
BLOCO
TUBULO
0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
UNIDADE QUANT. m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3
PREO (R$) UNITRIO TOTAL
DEZENA 5 AINDA NO UTILIZADA
BLOCO
TUBULO
Total material + mo de obra Total material Total mo de obra
TUBULES OVAISGERAL - BLOCOS RETANGULARES
UNIDADE QUANT. m m3 m3 kg kg m3 84.00 -2.88 39.34 63.93 16.62 27.52
PREO (R$) UNITRIO TOTAL VAR 161.06 338.44 6.12 6.12 10.35 6,173.97 -464.13 13,314.12 390.97 101.65 284.93
RESULTADO FINAL - SOMA DAS 5 DEZENASRestaurarRestaurar Restaurar Restaurar Restaurar Adequar alterao do unitrio do fuste
Perfurao do fuste Alargamento da base TUBULO Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual
Restaurar
BLOCO
Restaurar
Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m2 unid. m2 kg m3 m3 m3
0.70 4.00 15.20 304.00 3.80 23.02
251.78 20.39 47.20 6.12 338.44 9.69
176.11 81.56 717.46 1,859.17 1,286.06 222.97 453.89 24,598.75 14,982.44 9,616.30
Restaurar
RestaurarRestaurar
BLOCO
RestaurarRestaurar Restaurar Restaurar Restaurar todas as quantidades e preos originais do BD
43.84 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES OVAISQUANTITATIVOS GERAL
BLOCO
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma
UNIDADE QUANT. m 160.00 m3 79.37 m3 205.03 kg 599.34 kg 245.87 m3 249.68 m2 5.46 unid. m2 20.00 110.40
PREO (R$) UNITRIO TOTAL VAR 10,471.00 91.39 7,253.96 159.37 32,676.60 2.15 1,290.95 2.15 529.60 6.32 1,577.74 132.92 726.36 8.75 24.54 174.99 2,709.11
TUBULO
BLOCO
Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
kg m3 m3 m3
2,649.60
2.15
5,707.13 5,869.63 1,247.86 1,539.42 R$ 71,774.35 R$ 39,324.06 R$ 32,450.29 10.00 12.00 6.00 CUSTO FINAL R$ 93,731.56 R$ 51,354.08 R$ 42,377.48 30.59% R$ 21,957.21
33.12 177.22 211.10 5.91 243.62 6.32 Total material + mo de obra Total material Total mo de obra LUCRO (%) ADMNISTRAO (%) CUSTOS FINANCEIROS (%) Total material + mo de obra total material Total mo de obra BDI MDIO DIFERENA BRUTA
TIPO 3
TIPO 4
TIPO 5
-
-
-
-
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
UNITRIO
UNITRIO
UNITRIO
UNITRIO
TIPO 2
TIPO 3
TIPO 4
TIPO 5
UANTIDADES
alterao do unitrio do fuste
s e preos originais do BD
TIPO 6
TIPO 7
TIPO 8
TIPO 9
-
-
-
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
UNITRIO
UNITRIO
TIPO 6
TIPO 7
TIPO 8
TIPO 9
TIPO 10
-
-
UNITRIO
TOTAL
UNITRIO
UNITRIO
UNITRIO
TIPO 9
TIPO 10
RESUMO DOS FERROS TABELA ORIGINAL
AO BLOCO CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0 ARM. LONGIT. CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0ARM. TRANSV.
TIPO 1
TIPO 2
TIPO 3
TIPO 4
76.00
15.98
CA-50 6.3 8.0 10.0 12.5 16.0 CA-60 3.4 5.0 6.0
4.16
TIPO 5
TIPO 6
TIPO 7
TIPO 8
TIPO 9
TIPO 10
AO BLOCO SOMA 1 CA-50 0.00 8.0 0.00 10.0 76.00 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. LONGIT. 0.00 CA-50 0.00 8.0 0.00 10.0 15.98 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. TRANSV. 0.00 CA-50 0.00 6.3 0.00 8.0 0.00 10.0 0.00 12.5 0.00 16.0 0.00 CA-60 0.00 3.4 4.16 5.0 0.00 6.0
3.40 0.00
RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00 RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA QUARTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA QUINTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00
3.40 0.00
5.00 4.16
20.00 0.00
3.40 0.00
5.00 4.16
20.00 0.00
3.40 0.00
5.00 4.16
20.00 0.00
3.40 0.00
5.00 4.16
20.00 0.00
3.40
5.00
20.00
3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 25.00CA-50+10 % CA-60+10 %
0.00 16.62 0.00 0.00 0.00 0.00 367.93 0.00 0.00 0.00 405.00 19.00
RESULTADO FINAL AO
kg
kg
CA - 50
CA - 60
DADES 25.00 0.00
25.00 0.00
25.00 0.00
25.00 0.00
25.00 0.00
25.00
ENTRADA DE DADOS DE TUBULES OVAIS DE DIVISA - CLCULODADOSfck (kgf/cm2) Taxa do terreno sigma s (kg/cm2) Carga Q1 (tf) - TUBULO OVAL DE DIVISA gama f (NB51/78 =1,4) gama c (NB51/78 =1,6) Lado do pilar paralelo viga alavanca b0 (cm) Brao de alavanca y (dist. eixo-eixo entre pilares) [cm] Valor de n (a = nb) a < 2,5b Perfurao do fuste Pf (m) Carga Q2 (tf) - TUBULO CIRCULAR Valor limite para altura da base - h lim (cm) Nmero de conjuntos (1 conjunto = 1 apoio)RECALCULAR OS PARMETROS ABAIXO
ENTRADA 200.00 3.00 50.00 1.40 1.60 40.00 500.00 2.00 21.00 10.00 200.00 1.00
REPRODUZIR COM CARGA MXIMA
NMERO DE TUBULES NECESSRIOS PARA 1 CONJUNTO COM h lim = 200 cm TAXA DO TERRENO NECESSRIA PARA USAR S 1 TUBULO COM h lim 200 cm (kg/cm2) CARGA MXIMA PARA H=200 CM (Tf) TUBULO COM H < 200 cm OK!
Dimetro do fuste d (cm) rea para b (cm2) Dimetro do setor circular b (cm) R1 (ton) - reao no tubulo rea para clculo x (cm2) X (cm)
29.87 16,666.67 96.62 53.19 17,730.50 98.77 121.24 200.00 2.07 1.06 30.00 3.19 1.60 8.40 1.77 0.28 1.85 1.50 7.44
adotar adotar
adotarh h lim Alternar fuste
1.60 8.40 1.77 0.28 1.85 1.50 7.44
CALCULO TUBUL. NECESS. CARGA ATUANTE CARGA MAXIMA CARGA AT/CARGA MAX SEGURANA TAXA CALCULADA TAXA ORIGINAL PRODUTO fuste alterado vinculo do fuste
1.00 50.00 94.07 0.53 88.14% 1.59 3.00 1.00
TRUE
338.44
0
TUBULO OVAL - ENTRADA DE DADDOSENTRADA
NMERO DE CONJUNTOS (APOIOS) NMERO DE TUBULES NECESSRIOS P/ 1 CONJ. NMERO TOTAL DE TUBULES
1.00 1.00 1.00 60.00 21.00 100.00 20.00 175.00 90.00 85.00 80.00 80.00 75.00 10.00 80.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 12.50 6.00 200.00
DADOS DO FUSTEDIMETRO DO FUSTE d (cm) PERFURAO DO FUSTE Pf (m)
DADOS DA BASEALTURA DA BASE h (cm) ALTURA DO RODAP dh (cm) COMPRIMENTO DA BASE OVAL a (x + b) - (cm) BASE RETA x - (cm) DIMETRO b (cm)
DADOS DO BLOCOCOMPRIMENTO DO BLOCO X (cm) LARGURA DO BLOCO Y (cm) ALTURA DO BLOCO HB (cm) BITOLA UTILIZADA NO BLOCO (mm) CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3) Distncia a1 (cm) Distncia a2 (cm) Distncia a3 (cm) Distncia a4 (cm) Distncia b1(cm) Distncia b2 (cm) Distncia b3 (cm) Distncia b4 (cm)
ARMADURA LONGITUDINALBITOLA UTILIZADA (mm) QUANTIDADE DE FERROS COMPRIMENTO DO FERRO (cm) 6 FERROS DIMETRO DE 12,5 mm - 200
ARMADURA TRANVERSAL (ESTRIBOS)BITOLA UTILIZADA (mm) ESPAAMENTO (cm) COBRIMENTO (cm) COMPRIMENTO DO ESTRIBO (cm) - 1 TUBULO QUANTIDADE DE ESTRIBOS (un) - 1 TUBULO 10 FERROS DIMETRO DE 6,3 C/ 20 - 1976.30 20.00 2.00 197.00 10.00
DADOS COMPLEMENTARES
NGULO DA INCLINAO DO TALUDE BETA (GRAUS) ALTURA DO CONCRETO MACRO C (cm) DESCONTA VOLUME DA ENTRADA ENTRADA NO BLOCO D (cm)Distncia A (ARREDONDADA) ngulo Beta adotado (graus) 50.00 60.00
60.00 5.00 5.00 46.19DIST. A ORIG.
Material + mo de obraPREO (R$)
DescrioPerfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Lanamento e adenamento de Concreto magro e= 5cm Corte e preparo da cabea do tubulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura no bloco Lanamento e adenamento de concreto estrutural p/ blocos Reaterro Bota foraTUBULO
Unidademl m3 m3 kg kg m3 m3 Unid. m2 kg m3 m3 m3
Quantidade21.00 0.92 6.85 12.00 5.00 4.30 0.15 1.00 2.40 38.40
Unitrio41.34 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12
BLOCO
0.47 338.44 3.67 9.69 7.48 10.35 Total material + mo de obra:
MATERIALPREO (R$)
DescrioConcreto Armadura longitudinal Armadura tranversal Concreto magroBloco Tub.
Unidadem3 kg kg m3 m3 m2 kg
Quantidade6.85 12.00 5.00 0.15 0.47 2.40 38.40
Unitrio289.09 5.02 5.02 202.43 289.09 28.92 5.02 Total material
Concreto estrutural Forma Armadura
Total mo de obra:
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DA LISTA?
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DO PROJETO?
PREO (R$)
Total868.21 147.73 2,319.89 73.39 30.58 44.51 37.23 20.39 113.28 234.84 157.67 35.55 77.47 R$ 4,160.74
ARMADURA Vol. Base = 1,2 m3 CA-50 DIAM. 12,5 CA-60 DIAM. 6,3 6 BARRAS C = 200 10 BARRAS C = 197
CA-50 DIAM. 10
PREO (R$)
Total1,981.60 60.23 25.10 29.93 134.67 69.42 192.73 R$ 2,493.67 R$ 1,667.07
R$ 4,160.74
DADOS BLOCO X (cm) Y (cm) HB (cm) ARMADURA Fuste d (cm) Pf (m) h (cm) dh (cm) a (cm) x (cm) b (cm)
TIPO 1
TIPO 2
100.00 100.00
-
100.00 100.00
MATERIAL + MO DE OBRA Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro
UNIDADE m unid. m3 kg kg m3 m2 m3 m2 kg m3 m3
TUBULO
TUBULO
U B U T
L
S E
O
IS A V
95.00 95.00 CA-50 DIAM. 10 CA-50 DIAM. 10 80.00 80.00 21.00 21.00 205.00 205.00 20.00 20.00 335.00 350.00 150.00 135.00 185.00 215.00 ARM. LONG. CA-50 DIAM. 12,5 8 BARRAS C = 200 CA-50 DIAM. 12,5 ARM.TRANV. CA-60 DIAM. 6,3 10 BARRAS C = 260 CA-60 DIAM. 6,3 NUM. CONJUNTOS 1.00 1.00 NUM. TUB. 1 CONJ. 1.00 1.00 TOTAL TUBULES 1.00 1.00 TOTAL UNITRIO TOTAL 21.00 21.00 21.00 7.37 7.37 8.77 17.93 17.93 19.33 16.00 16.00 16.00 7.00 7.00 7.00 6.88 6.88 6.88 0.17 1.00 3.80 76.00 0.92 5.76 0.17 1.00 3.80 76.00 0.92 5.76 0.17 1.00 3.80 76.00 0.92 5.76
BLOCO
BLOCO Bota fora MATERIAL Concreto Armadura longitudinal Armadura tranversal Concreto magro Concreto estrutural Forma Armadura TUB.
m3 UNIDADE m3 kg kg m3 m3 m2 kg
19.05 17.93 16.00 7.00 0.17 0.92 3.80 76.00 73.50 1,543.49 6,091.43
19.05 17.93 16.00 7.00 0.17 0.92 3.80 76.00
20.45 19.33 16.00 7.00 0.17 0.92 3.80 76.00 73.50 1,543.49 6,496.15
PREO UNITRIO DA PERFURAO (R$) - POR METRO PREO TOTAL DA PERFURAO (R$) PREO UNITRIO DO MATERIAL (R$) PREO TOTAL DO MATERIAL (R$) PREO UNITRIO DA MO DE OBRA (R$) PREO TOTAL DA MO DE OBRA (R$) PREO UNITRIO (MO+MAT) (R$) PREO TOTAL(MO+MAT) (R$) PREO MDIO MATERIAL - 1 TUBULO PREO MDIO MO DE OBRA - 1 TUBULO PREO MDIO MATERIAL + MO DE OBRA - 1 TUBULO
BLOCO
1 CONJUNTO 6,091.43 4,191.94
4,191.94 10,283.37 10,283.37 TIPO 1 6,091.43 4,191.94 10,283.37 PREO (R$)
4,501.01 10,997.15 TIPO 2 6,496.15 4,501.01 10,997.15 QUADRO ORIGINAL DAS QUANTIDADES
SOMA QUANTITATIVOS T1 A T10GERAL - BLOCOS RETANGULARES UNIDADE QUANT.
BLOCO
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo
m m3 m3 kg kg m3 m2 unid.
105.00 24.75 72.58 76.00 33.00 31.63 0.85 5.00
UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39
TOTAL 6,993.95 3,986.87 24,565.12 464.79 201.82 327.44 213.29 101.95
TUBULO
BLOCO
Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m2 kg m3 m3 m3
17.52 338.16
47.20 6.12
826.97 2,068.09 1,392.04 257.17 804.03 42,203.52 25,094.54 17,108.98
4.11 338.44 26.55 9.69 77.66 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3
105.00 24.75 72.58 76.00 33.00 31.63 0.85 5.00 17.52 338.16
PREO (R$) UNITRIO TOTAL VAR 6,993.95 161.06 3,986.87 338.44 24,565.12 6.12 464.79 6.12 201.82 10.35 327.44 251.78 213.29 20.39 47.20 6.12 101.95 826.97 2,068.09 1,392.04 257.17 804.03 42,203.52 25,094.54 17,108.98
PRIMEIRA DEZENA COPIADA
BLOCO
TUBULO
4.11 338.44 26.55 9.69 77.66 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.
PREO (R$) UNITRIO TOTAL
DEZENA 2 AINDA NO UTILIZADA
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3 Total material + mo de obra Total material Total mo de obra
BLOCO
TUBULO
TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.
PREO (R$) UNITRIO TOTAL
DEZENA 3 AINDA NO UTILIZADA
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual
m m3 m3 kg kg m3
BLOCO
TUBULO
Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m2 unid. m2 kg m3 m3 m3 Total material + mo de obra Total material Total mo de obra
BLOCO
TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.
PREO (R$) UNITRIO TOTAL
DEZENA 4 AINDA NO UTILIZADA
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3
BLOCO
TUBULO
BLOC
Total material + mo de obra Total material Total mo de obra
TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.
PREO (R$) UNITRIO TOTAL
DEZENA 5 AINDA NO UTILIZADA
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3 Total material + mo de obra Total material Total mo de obra
BLOCO
TUBULO
TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.
PREO (R$) UNITRIO TOTAL ^VAR 6,993.95
RESULTADO FINAL - SOMA DAS 5 DEZENASRestaurar Adequar alterao do unitrio do fuste
Perfurao do fuste TUBULO
m
105.00
Adequar alterao do unitrio do fuste
Alargamento da base TUBULO Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3
24.75 72.58 76.00 33.00 31.63 0.85 5.00 17.52 338.16 4.11 26.55
161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12 338.44 9.69
3,986.87 24,565.12 464.79 201.82 327.44 213.29 101.95 826.97 2,068.09 1,392.04 257.17 804.03 R$ 42,203.52 R$ 25,094.54 R$ 17,108.98
Restaurar Restaurar
RestaurarRestaurar
RestaurarRestaurar
RestaurarRestaurar Restaurar Restaurar
BLOCO
RestaurarRestaurar Restaurar todas as quantidades e preos originais do BD
77.66 10.35 Total material + mo de obra Total material Total mo de obra
TUBULES OVAISQUANTITATIVOS GERAL
TUBULO
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal
UNIDADE QUANT. m 8.00 m3 21.71 m3 28.64 kg 15.00
PREO (R$) UNITRIO VAR 91.39 159.37 2.15
TOTAL 577.21 1,984.37 4,564.41 32.31
TUBULO
Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora
kg m3 m2 unid. m2 kg m3 m3 m3
18.00 11.48 0.21 1.00 6.00 150.00
2.15 6.32 132.92 11.09 24.54 2.15
38.77 72.57 27.89 11.09 147.23 323.09 324.62 55.56 194.15 R$ 8,353.28 R$ 4,418.61 R$ 3,934.67 10.00 12.00 6.00 R$ 10,908.72 R$ 5,770.35 R$ 5,138.37 30.59% R$ 2,555.44
BLOCO
1.83 177.22 9.40 5.91 30.72 6.32 Total material + mo de obra Total material Total mo de obra LUCRO (%) ADMNISTRAO (%) CUSTOS FINANCEIROS (%) CUSTO FINAL Total material + mo de obra Total material Total mo de obra BDI MDIO DIFERENA BRUTA
TIPO 3
TIPO 4
TIPO 5
-
100.00 100.00
8 BARRAS C = 200 10 BARRAS C = 260
90.00 90.00 85.00 CA-50 DIAM. 10 70.00 21.00 70.00 20.00 140.00 60.00 80.00 CA-50 DIAM. 12,5 CA-60 DIAM. 6,3 1.00 1.00 1.00 TOTAL 21.00 0.53 8.61 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64
7 BARRAS C = 200 10 BARRAS C = 228
90.00 90.00 85.00 CA-50 DIAM. 10 70.00 21.00 100.00 20.00 170.00 90.00 80.00 CA-50 DIAM. 12,5 CA-60 DIAM. 6,3 1.00 1.00 1.00 TOTAL 21.00 0.82 8.90 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64
7 BARRAS C = 200 10 BARRAS C = 228
95.00 CA-50 DIAM. 10 80.00 21.00 205.00 20.00 330.00 145.00 185.00 8 BARRAS C = 200 CA-50 DIAM. 12,5 10 BARRAS C = 260 CA-60 DIAM. 6,3 1.00 1.00 1.00 UNITRIO TOTAL 21.00 21.00 8.77 7.27 19.33 17.83 16.00 16.00 7.00 7.00 6.88 6.88 0.17 1.00 3.80 76.00 0.92 5.76 0.17 1.00 3.80 76.00 0.92 5.76
UNITRIO 21.00 7.27 17.83 16.00 7.00 6.88 0.17 1.00 3.80 76.00 0.92 5.76
UNITRIO 21.00 0.53 8.61 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64
UNITRIO 21.00 0.82 8.90 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64
20.45 19.33 16.00 7.00 0.17 0.92 3.80 76.00
18.95 17.83 16.00 7.00 0.17 0.92 3.80 76.00 73.50 1,543.49 6,062.52
18.95 17.83 16.00 7.00 0.17 0.92 3.80 76.00
9.46 8.61 14.00 6.00 0.16 0.67 3.06 55.08 56.27 1,181.74 3,181.09
9.46 8.61 14.00 6.00 0.16 0.67 3.06 55.08
9.75 8.90 14.00 6.00 0.16 0.67 3.06 55.08 56.27 1,181.74 3,263.35
9.75 8.90 14.00 6.00 0.16 0.67 3.06 55.08
1 CONJUNTO 6,496.15 4,501.01
1 CONJUNTO 6,062.52 4,169.86
1 CONJUNTO 3,181.09 2,091.68
1 CONJUNTO 3,263.35 2,154.49
4,169.86 10,997.15 10,232.38 TIPO 2 6,062.52 4,169.86 10,232.38 TIPO 3 10,232.38
2,091.68 5,272.77 5,272.77 TIPO 4 3,181.09 2,091.68 5,272.77
2,154.49 5,417.84 5,417.84 TIPO 5 3,263.35 2,154.49 5,417.84
UANTIDADES
alterao do unitrio do fuste
alterao do unitrio do fuste
s e preos originais do BD
1
TIPO 6
TIPO 7
TIPO 8
TIPO 9
-
-
-
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
UNITRIO
TOTAL
1 CONJUNTO
1 CONJUNTO
1 CONJUNTO
TIPO 6
TIPO 7
TIPO 8
TIPO 9
TIPO 10
-
-
UNITRIO
TOTAL
UNITRIO 0.00
1 CONJUNTO
1 CONJUNTO
TIPO 9
TIPO 10
RESUMO DOS FERROS TABELA ORIGINAL
AO BLOCO CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0 ARM. LONGIT. CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0ARM. TRANSV.
TIPO 1
TIPO 2
TIPO 3
TIPO 4
76.00
76.00
76.00
55.08
16.00
16.00
16.00
14.00
CA-50 6.3 8.0 10.0 12.5 16.0 CA-60 3.4 5.0 6.0
7.00
7.00
7.00
6.00
TIPO 5
TIPO 6
TIPO 7
TIPO 8
TIPO 9
TIPO 10
55.08
14.00
6.00
AO BLOCO SOMA 1 CA-50 0.00 8.0 338.16 10.0 0.00 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. LONGIT. 0.00 CA-50 0.00 8.0 0.00 10.0 76.00 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. TRANSV. 0.00 CA-50 33.00 6.3 0.00 8.0 0.00 10.0 0.00 12.5 0.00 16.0 0.00 CA-60 0.00 3.4 0.00 5.0 0.00 6.0
3.40 0.00
RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 0.00 0.00 33.00 0.00 338.16 76.00 0.00 0.00 RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 33.00 0.00 338.16 76.00 0.00 RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00
3.40 0.00
5.00 0.00
20.00 0.00
3.40
5.00
20.00
3.40
5.00
RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00
20.00
3.40
5.00
RESULTADO DAS ARMADURAS DA QUARTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00
20.00
3.40
5.00
RESULTADO DAS ARMADURAS DA QUINTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00
20.00
3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 25.00CA-50+10 % CA-60+10 %
0.00 0.00 0.00 33.00 0.00 338.16 76.00 0.00 0.00 0.00 492.00 0.00
RESULTADO FINAL AO
kg kg kg
CA - 50
CA - 60
DADES 25.00 0.00
25.00 0.00
25.00
25.00
25.00
25.00
PLANILHA DE CUSTO
Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Lanamento e adenamento de concreto magro Corte e preparo da cabea do tubulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura no bloco Lanamento e adenamento de concreto estrutural Reaterro Bota fora
UNIDADE m m3 m3 kg kg m3 m2 unidade m2 kg m3 m3 m3
QUANTIDADE 189.00 21.87 111.92 139.93 49.62 59.15 1.55 9.00 32.72 642.16
UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12
TOTAL 13,167.92 3,522.74 37,879.25 855.77 303.47 612.37 389.40 183.51 1,544.43 3,927.26
BLOCO
TUBULO
7.91 338.44 2,678.10 49.57 9.69 480.14 121.50 10.35 1,257.92 TOTAL MO DE OBRA + MATERIAL R$ 66,802.27