calculos ripios jose m

8
“For External Distribution. © 2004 Halliburton. All Rights Reserved.” CALCULO DE RIPIOS Y PERDIDAS POR HUMECTRACION HALLIBURTON

Upload: ramon-bartolozzi

Post on 19-Jan-2016

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

CALCULO DE RIPIOS Y PERDIDAS POR HUMECTRACION

HALLIBURTON

Page 2: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

NOMECLATURA DE LOS INSTRUMENTOS UTILIZADOS PARA EL CALCULO DEL %

V/V Y P/P

CILINDRO GRADUADO

CONDENSADORCUERPO DE LA RETORTA

LANA DE ACERO

TAPA

ENVASE DE LA RETORTA

OJO LECTORTORNILLO DE GRADUACIONPESAS DE 500 gr.

PESAS DE 10 gr.

PESAS DE 100 gr.PLATO

PESAS DE 1000 gr. C/U

HALLIBURTON

Page 3: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

CALCULOS PARA DETERMINAR EL % DE HUMECTACION EN V/V Y P/P

LEYENDA

SV = PESO SHAMBER VACIO.

SM = PESO SHAMBER CON MUESTRA.

SMS = PESO SHAMBER CON MUESTRA SECA.

CV = PESO CILINDRO VACIO.

CM = PESO CILINDRO CON MUESTRA.

VA = VOLUMEN DE AGUA EN CC /ml

PMH = PESO DE LA MUESTRA HUMEDA EN gr.

PRS = PESO DE LOS RIPIOS SECOS EN gr.

PMA = PESO DE LA MASA DE ACEITE

PMA = CM – (CV+ VA)

+/- 0.05

FORMULAS

PMH= SM - SV

PRS = SMS - SV

BALANCE DE MASA

% P/P = PMA

PMH

PRS + PMA + VA

PMH=

X 100

HALLIBURTON

Page 4: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

PASOS PARA DETERMINAR EL % DE HUMECTACION EN V/V Y P/P

PESO DEL SHAMBER VACIO (

SV)

PESO DEL SHAMBER CON

MUESTRA ( SM)

PESO DEL CILINDRO VACIO

( CV)

1 2

3

238.7 gr 256.9 gr

PMH = SM - SV

PMH = 256.9 – 238.7

PMH = 18.2 gr

31.0 gr

HALLIBURTON

Page 5: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

PASOS PARA DETERMINAR EL % DE HUMECTACION EN V/V Y P/P

PESO DEL CILINDRO CON

MUESTRA ( CM)

5

EN EL 5 PASO SE TIENE LA

LECTURA EN % V/V DEL O DE

LOS LIQUIDOS PRESENTE

33.4 gr

PMA = CM – (CV+ VA)PMA = 33.4 gr –(31.0 gr+ O gr)PMA = 2.4 gr

PESO DEL SHAMBER CON

MUESTRA SECA ( SMS)

4 254.2 gr

PRS = SMS - SVPRS = 254.2 gr – 238.7 grPRS = 15.5 gr

PMA

PMH% P/P = X 100

% P/P = 2.4 gr

18.2 grX 100

% P/P = 13.18 %HALLIBURTON

Page 6: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

CALCULO DE RIPIOS POR FASE

LEYENDA

RP = RIPIOS PERFORADOS.

D = DIAMETRO DEL HOYO .

PH = PERDIDAS POR HUMECTACION.

% V/V = % DE HUMECTACION.

Fe = FACTOR DE ENSANCHAMIENTO.

RT = RIPIOS TOTALES.

FT = PIES PERFORADOS

X FeRP =

PH =% V/V

RP X 100%

D X F t

1029.5

RT = PH

RP +

M = RT / 6.28

M = RT X 0.159

3

3

2

Page 7: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

CALCULO DE RIPIOS POR FASE D X F t

1029.5

CEMENTO

0’

1.000’

7.006’

14.870’

14.976’

14.147’

16.626’

17.364’ PT

O = 26”

X FeRP =

PH =% V/V

RP X

100%

2

RT = PH

RP +

M = RT / 6.28

M = RT X 0.159

3

3

O = 17 1/2”

O = 12 1/4”

166 M3

430 M3

303 M3

Fe = 1.12

Fe =1.12

Fe =1.5

O = 8 1/2”

O = 8 1/2”

Fe =1.8

Fe =1.8

% V/V =42

% V/V = 35

% V/V = 11

% V/V =9

% V/V =10

55 M3

38 M3

1.0

00’

6.0

06’

7.8

64’

1650’

Page 8: Calculos Ripios Jose M

“For External Distribution. © 2004 Halliburton. All Rights Reserved.”

CALCULO DE RIPIOS DESCARTADOS POR EQUIPOS

RD = RIPIOS DESCARTADOS.

T = TIEMPO DE LLENADO DE ¼ DE GALON

H = HORAS DE DESCARTE O DE TRABAJO.

21.48 = CONSTANTE.

FORMULAS

RD = 21.48 / T X H