Sciredule I Pase 1 cf 2 SCHEDULE OF GUARANTEES The tenderer shall guarantee the performance of the pump offered by filling up the data below. The tenderer who failed to fulfill the requirement will not be considered. Preference will be given to the pump giving the best performance, i.e. the capacity and efficiency. The tenderer shall also examine and ensure that the power absorbed by the pump/pumps at Normal, Minimum and Maximum head condition running single and parallel(if required) will not overload the motor. 1. RUMAH PAM TAMAN SRI GOMBAK 1A & 18, GOMBAK A. Single Operation Item Description Offer (a) Case 1 Normal Head Cond ition (b) Case 2 Min im unr Head Cond ition (c) Case 3 Maximum Head Cond ition 1 Capacity lls 2. Static head m 3. Frictional losses m 4. Minor losses through fittings m 5. Station losses m 6. Total head (sum at 2,3, 4, and 5 ) m 7. Closed valve head m B. Speed RPM 9. Pump efficiency ol la 10.. Power Absorbed KW i1 Motor efficiency ol lo 12. Power factor of motor ol lo 13. Overall efficiency of pump set ol lo 14. N PSH required m

Upload: danstrato

Post on 04-Jun-2018

240 views

Category:

Documents


0 download

TRANSCRIPT

8/13/2019 Calgon Tech Spec

http://slidepdf.com/reader/full/calgon-tech-spec 1/4

Sciredule I

Pase 1 cf 2

SCHEDULE OF GUARANTEES

The tenderer shall guarantee the performance of the pump offered by filling up the data below.The tenderer who failed to fulfill the requirement will not be considered. Preference will be

given to the pump giving the best performance, i.e. the capacity and efficiency.

The tenderer shall also examine and ensure that the power absorbed by the pump/pumps at

Normal, Minimum and Maximum head condition running single and parallel(if required) willnot overload the motor.

1. RUMAH PAM TAMAN SRI GOMBAK 1A & 18, GOMBAK

A. Single Operation

Item Description

Offer

(a)

Case 1

Normal

Head

Cond ition

(b)

Case 2

Min im unr

Head

Cond ition

(c)

Case 3

Maximum

Head

Cond ition

1 Capacity lls

2. Static head m

3. Frictional losses m

4. Minor losses through fittings m

5. Station losses m

6. Total head (sum at 2,3, 4, and 5 ) m

7. Closed valve head m

B. Speed RPM

9. Pump efficiency olla

10.. Power Absorbed KW

i1 Motor efficiency ollo

12. Power factor of motor ollo

13. Overall efficiency of pump set ollo

14. N PSH required m

8/13/2019 Calgon Tech Spec

http://slidepdf.com/reader/full/calgon-tech-spec 2/4

Scheduie 1

Page 2 of 2

B. Parallel Operatjon

Item Description

Offer

(a)

Case '[

One Pump

(b)

Case 2

Two Pumps

(c)

Case 3

Three Pumps

1 Capacity lls

2. Static head m

3. Frictional losses m

4. Minor losses through fittings m

5, Station losses m

6. Total head (sum of 2,3, 4, and 5 ) m

7. Closed valve head m

B, Speed RPM

9. Pump efficiency allo

10. Power absorbed KW

ln accordance with the Specification we guarantee that the head, quantity, efficiency and

related to the pump offered by us shall conform to the figures given in column (a) above.

We further guarantee the figures given in column (b) and (c) that the pumps supplied by us willoperate satisfactorily throughout the duty range.

' Calculation shall be submitted by the contractor to substantiate particulars given in item 2, 3,

4,5and6above.

We hereby attached together pump characteristic curve for single and parallel operation.

Dare: : {: l^ ?

8/13/2019 Calgon Tech Spec

http://slidepdf.com/reader/full/calgon-tech-spec 3/4

Schedule I

Page I of 2

SCHEDULE OF GUARANTEES

Thetenderer shall

guaranteethe

performanceof

the pump offered by filling up the databelow.The tenderer who failed to fulfill the requirement will not be considered. Preference will be

given to the pump giving the best performance, i.e. the capacity and efficiency.

The tenderer shall also examine and ensure that the power absorbed by the pump/pumps at

Normal, Minimum and Maximum head condition running single and parallel(if required) willnot overload the motor.

2. RUMAH PAM TAMAN SRI HARTAMAS, KUALA IUMPUR

A. Single Operation

Item Description

Offer

(a)

Case 1

Normal

Head

Cond ition

(b)

Case 2

Minimum

Head

Cond ition

(c)

Case 3

Maxim unl

Head

Cond ition

1 Capacity l/s

2. Static head m

3. Frictional losses m

4. Minor losses through fittings m

5. Station losses m

6. Total head (sum of 2,3,4, and 5 ) m

7. Closed valve head m

B. Speed RPM

9. Pump efficiency ollo

10.. Power Absorbed KW

11 Motor efficiency ollo

12.. Power factor of motor olla

{')tJ. Overall efficiency of purnp set ol

lo

14. NPSH required m

8/13/2019 Calgon Tech Spec

http://slidepdf.com/reader/full/calgon-tech-spec 4/4

Scheduie 1

Page 2 cf Z

B. Parallel Operation

Item Description

Offer(a)

Case 1

One Pump

(b)

Case 2

Two Pumps

(c)

Case 3

Three Pumps

1 Capacity lls

2. Static head m

3. Frictional losses m

4. Minor losses through fittings m

5. Station losses m

6. Total head (sum o{ 2, 3, 4, and 5 ) m

7. Closed valve head m

B. Speed RPM

9. Pump efficiency allo

10. Power absorbed KW

ln accordance with the Specification we guarantee that the head, quantity, efficiency and

related to the pump offered by us shall conform to the figures given in column (a) above.

We further guarantee the figures given in column (b) and (c) that the pumps supplied by us willoperate satisfactorily throughout the duty range.

i Calculation shall be submitted by the contractor to substantiate particulars given in item 2, 3,

4,5and6above.

We hereby attached together pump characteristic curve for single and parallel operation.