1 1. Background The Nordic International Support Foundation (NIS) is a Norwegian-registered non-profit organization engaged in stabilization and reconciliation initiatives in conflict and post-conflict locations. Our primary areas of intervention are institutional development, public service delivery and conflict resolution. Headquartered in Oslo, Norway, NIS recently finalized a project in Sri Lanka and currently implements projects in Somalia, Myanmar and the Sahel. NIS Somalia is currently implementing a wide range of stabilization projects in all Federal Member States with plans to expand into new areas. The projects, funded by different donors, aim to support the implementation of government policies across a range of sectors, all working in different ways to achieve greater stability and better prospects for the country’s longer-term development goals. The various stabilization initiatives share the objective of contributing toward a more inclusive post-conflict society which sees the value of diversity and gender equality. 2. Scope of Works Nordic International Support Foundation (NIS) secured fund for ‘’Initiative for Stabilization, Transition and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is planning to construct Bailey Bridge in Bariire town, Lower Shabele region, Somalia. Bariire Bridge was damaged on 29 th September 2017. Located at 2.045899°,44.899881° and it spans the Webi Shabele River (Wabi Shebele in English) adjacent to the town of Bariire, approximately 63km from Mogadishu Airport. The bridge appears to be a single lane, single span 'Bailey' style structure of length 48.768m (160 feet) and deck width 3.353m capable of carrying an HS20-44 truck AASHTO loading. Please see in the annex 1- the preliminary assessment conducted earlier, based on the inspection reports and photos, a detailed design of existing conditions for inspiration and guidance. NIS is looking qualified manufacturer for the Bailey Bridge to provide a suitable design to construct newly Fixed Baily bridge and cost associated (from manufacturing to delivering Mogadishu Port, Somalia). The bridge will be constructed in Bariire, Lower Shabelle of Somalia. The manufacturer shall propose and design two options of Bailey bridge: Option 1 – single span 48m Bridge and Option 2 – three span 50m Bridge supported by two intermediate Reinforced Concrete Columns. A work plan should be developed by the manufacturer to support the process. CALL FOR PROPOSAL DATE OF ISSUE 12 th December 2019 CLOSING DATE 4:00 pm E.A.T. 15 th January 2020 PROJECT TITLE Manufacture and delivery of Baily bridge for Bariire PROJECT LOCATION Bariire Bridge, Lower Shabele region, Somalia GRANT MANAGER Nordic International Support Foundation (NIS) FUNDING AGENCY Norwegian Ministry of Foreign Affairs (NMFA)

Upload: others

Post on 10-Jul-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

1

1. Background

The Nordic International Support Foundation (NIS) is a Norwegian-registered non-profit organization engaged in stabilization and reconciliation initiatives in conflict and post-conflict locations. Our primary areas of intervention are institutional development, public service delivery and conflict resolution. Headquartered in Oslo, Norway, NIS recently finalized a project in Sri Lanka and currently implements projects in Somalia, Myanmar and the Sahel. NIS Somalia is currently implementing a wide range of stabilization projects in all Federal Member States with plans to expand into new areas. The projects, funded by different donors, aim to support the implementation of government policies across a range of sectors, all working in different ways to achieve greater stability and better prospects for the country’s longer-term development goals. The various stabilization initiatives share the objective of contributing toward a more inclusive post-conflict society which sees the value of diversity and gender equality.

2. Scope of Works

Nordic International Support Foundation (NIS) secured fund for ‘’Initiative for Stabilization, Transition and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is planning to construct Bailey Bridge in Bariire town, Lower Shabele region, Somalia. Bariire Bridge was damaged on 29th September 2017. Located at 2.045899°,44.899881° and it spans the Webi Shabele River (Wabi Shebele in English) adjacent to the town of Bariire, approximately 63km from Mogadishu Airport. The bridge appears to be a single lane, single span 'Bailey' style structure of length 48.768m (160 feet) and deck width 3.353m capable of carrying an HS20-44 truck AASHTO loading. Please see in the annex 1- the preliminary assessment conducted earlier, based on the inspection reports and photos, a detailed design of existing conditions for inspiration and guidance. NIS is looking qualified manufacturer for the Bailey Bridge to provide a suitable design to construct newly Fixed Baily bridge and cost associated (from manufacturing to delivering Mogadishu Port, Somalia). The bridge will be constructed in Bariire, Lower Shabelle of Somalia. The manufacturer shall propose and design two options of Bailey bridge: Option 1 – single span 48m Bridge and Option 2 – three span 50m Bridge supported by two intermediate Reinforced Concrete Columns. A work plan should be developed by the manufacturer to support the process.

CALL FOR PROPOSAL DATE OF ISSUE 12th December 2019

CLOSING DATE 4:00 pm E.A.T. 15th January 2020

PROJECT TITLE Manufacture and delivery of Baily bridge for Bariire

PROJECT LOCATION Bariire Bridge, Lower Shabele region, Somalia

GRANT MANAGER Nordic International Support Foundation (NIS)

FUNDING AGENCY Norwegian Ministry of Foreign Affairs (NMFA)

Page 2: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

2

The SI International System of Units shall be used on all the Bill of Quantity in the documents.

3. Scope of Works for Activity – Development of Technical Designs, Bill of Quantities for the

Manufacturing and delivering of Bailey Bridge

A. The technical Specifications of the Bailey Bridge should include: i. The Manufacturer shall provide a full drawing for the supply of Bailey Bridge both options

above both PDF. The selected manufacture shall provide AUTOCAD for the Bailey bridge.

ii. Abutment Details Drawing

iii. Extra over launch & erection equipment/tools

iv. Erection manual and Proposed construction method.

v. Design and Protective Treatment: All main structural components hot dipped galvanized (nuts, bolts, pins etc spun galvanized or plated transom)

vi. The design service life of Bailey bridge in terms of life span

vii. Abutments and Approaches: The scope of supply should cover the bridge superstructure and bearings only. The Manufacturer shall provide typical bridge reactions and details to enable the abutments and approaches to be designed, detailed and constructed by others

viii. Manufacturer shall provide training Course for technical / Engineers persons in Mogadishu, Somalia (propose options if possible, for other locations)

Option 1: Single Span (16 Bay) 48.768m Bridge with wide single lane (Width: 3.353m to 4.2m) carriageway with steel decking with ‘durbar’ chequer plate finish. Double Single Reinforced Construction DSHR1 H+ Construction. Launch and Erection Scheme for a Single Span (16 Bay) 48.768m and Installation drawings

Option 2: Three span 50m Bridge (5/6/5 bay) three span supported by reinforced concrete columns. The Bridge would be supplied in Double Single Construction (DSH) and with an extra wide single lane (Width: 3.353m to 4.2m) carriageway of steel decking with ‘durbar’ chequer plate finish and Installation drawings.

B. Price for supplying the above Bailey Bridge should include (in US Dollar)

ix. Production cost

x. Extra over launch & erection equipment/tools cost

xi. Shipping to Mogadishu port, excluding destination port charges

xii. Training Course cost for 5 technical persons

.

4. Qualifications and experience of the Manufacturer

The Manufacturer to undertake the delivery of the Bailey Bridge should have the following competencies:

a. Should have registration licence for designing and manufacturing Bailey Bridges

b. Should have Quality Management System

c. Should have proven track record of having manufactured and supplied Bailey Bridge in the past.

Page 3: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

3

d. Should have professional engineers for designing international standard and carrying out technical, drawings and BoQ. At least 3 CVs to be submitted to NIS.

e. Extensive practical experience in designing and manufacturing similar Bridge in development contexts.

f. Familiarity with the Africa context and working in difficult environments will be an asset.

5. Submission of proposals

Concepts should be submitted on or before 4:00 pm E.A.T. Wednesday 15th January 2020. All concepts

must be submitted electronically to [email protected] with the subject line

“CALL FOR PROPOSAL - Manufacture and delivery of Baily bridge for Bariire ".

Call for Proposal received after the indicated date and time will be disqualified.

6. Contact information

Please forward any query to the following e-mail address: [email protected].

Page 4: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

BARIIRE BRIDGE REHABILITATION FEASIBILITY STUDY

1.0 Introduction

The Bariire Bridge was damaged on 29 September 20171. Located at 2.045899°, 44.899881°. It spans the Webi Shabeelie River (Wabi Shebele in English, or in Arabic and in

Amharic) adjacent to the town of Bariire, approximately 63km from Mogadishu Airport, reportedly a two hour drive. Before damage, the bridge appears to be a single lane, single span 'Bailey' style structure of length 48.768m (160 feet) and deck width 3.353m (11 feet), capable of carrying an HS 20 AASHTO loading.

Figure 1 Bariire and Bariire Bridge.

P a g e | 1

Mahad
Typewriter
Annex 1- Bariire bridge rehabilitation feasibility study (Extract)
Mahad
Typewriter
Page 5: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

P a g e | 2

1.1 Bailey Bridges

A Bailey bridge is a type of portable, pre fabricated, modular truss bridge developed by the British militaryduring the Second World War. It has the advantages of requiring fewer specialty tools and heavyequipment to assemble compared to steel beam or concrete girder bridges of comparable spans. Thesebridges are pre assembled on one side of a river (e.g. the south abutment of the Bariire span), and areincrementally pushed across to the other side, or 'launched'. This is usually done with a small bulldozer ortractor, depending on mass of the structure.

Figure 4 Simple graphic of a Bailey style bridge.Launching a Bailey Bridge requires preassembly of a disposable 'nose' and 'tail', as well as the span, ontemporary rollers. This allows the bridge to reach the far abutment without assistance by a crane(although crane assist and craned options are also available for erection, it is assumed that this is notpossible in Bariire due to logistics and security constraints).

Figure 5 – Bailey bridge launching with bulldozer.

A complete sequence for staging and launching 36.624m / 130' Mabey brand bridge can be viewed at thefollowing url:

https://www.youtube.com/watch?v=p5uaj90VTzQ.

Page 6: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

1.2 Loading

From discussion with engineers in the Bailey Bridge industry and available photos, it is likely that theexisting structure was designed to HS 20 or equivalent loading. This is recommended for repair, as it willbe easier to construct and will allow a wide variety of military and commercial vehicles to cross safely,however it is considered undersized by modern vehicular standards. The following AASHTO LRFD(American Association of State Highway and Transportation Officials / Load and Resistance Factor Design)loads are used in such calculations:

One 8,000 pound (36kN) and two 32,000 pound (142kN) point loads on the bridge deck. AASHTO loading of 480 pounds/ft or 7,0kN/m is the distributed load (i.e. 'lane load').

Figure 6 – M ATV in Kismayo, Somalia. This vehicle has grossweight of 32,500 pounds or 145kn, equating to 36kN perwheel. Wheel width is 7' 0" and wheelbase is 13' 0".

Figure 7 – HS 20 loading.

2.0 Inspection and Existing Condition

The damaged Bariire Bridge has enjoyed several inspections lately, including by IOM SSI on 30 June 2019and by Hope Agribusiness Enterprises Ltd. (HAEL) on 6 June. IOM also shared an Information Request on28 May, and AMISOM visited the structure on 13 June.

Figure 8 – Drone photo from HAEL on or around 6 June 2019 Figure 9 – Undated photo from IOM Information Requestshowing Wabi Shebelle River with no flow.

The following conclusions are drawn from the various inspections and photographs made available for this report:

The span is verified at 160', with an 11' deck and 14' 7" from center of truss to center of truss (bearing to bearing). The abutments are monolithic reinforced concrete of 22' width and 6' 6" depth longitudinally (see Figure 12 Concrete abutment dimensions in American units.). The manufacturer of the superstructure (steel truss) cannot be identified, therefore it is not possible to rehabilitate the existing structure by adding new parts. Minor spalling of the concrete is visible on the south abutment.

P a g e | 3

Page 7: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

P a g e | 4

Other surface deficiency such as localized spalling and delamination is unknown due to the presence ofsand on the substructure.

Figure 10 – North Abutment bearing pads covered bysuperstructure and obscured by debris.

Figure 11 – South Abutment showing damage . Bearing pad area is covered in sand, not inspected.

Figure 12 Concrete abutment dimensions in American units.

ClearanceweeksManufacturing:

weeksProcurement:weeksDesign:Detailed

manufacturers:bysuggesttoisschedulefollowingThe

Schedule 3.

weeksShipping:weeksLoading:and

Page 8: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

P a g e | 6

4.1 Submissions

The potential suppliers will be required to submit the following documents to ascertain that they canefficiently procure, transport, and erect the structure:

1.

Cover Letter detailing firm information, affiliation with administering agency, delivery time, paymentterms, price validity, warranty, etc.,

2.

Specifications for the structure they propose.3.

CAD Drawing for the structure they propose.4.

Company Profile including past projects of a similar nature in the Mogadishu area or in Somalia.5.

CVs of Key Staff including Project Manager, Project Engineer, Site Supervisor, and Manufacturer'sRepresentative.

6.

Training Program including location, duration, content, and personnel to be trained in Bailey Bridge

7.

erection techniques. Detailed Schedule including fabrication, logistics.

4.2 Abutment Modification

It is assumed that the existing abutments must be modified to accommodate the new superstructure. Thiswould include resurfacing of the area where the bearing pads will be located, as well as any removal ofconcrete necessary to allow installation of the launching equipment. These requirements will be vendorspecific, but can be performed with hand tools and normal concreting methods.

4.3 Launching

submittals.tenderoftimetheatmanufacturerthebyspecifiedbewillequipmentThislaunching.forsufficientisbulldozersmallortractor

astructure,theofmasstheonDependingends.receivingandlaunchingthebothonbearingsrollerspecialusingchanneltheacrosslaunchedisbridgetheapproach,souththeonerectedisbridgetheAfter

Page 9: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

P a g e | 9

5.0 Photos

Figure 13 – Bridge deck, expansion joint, and north approach,looking north.

Figure 14 – Bridge deck from midspan looking south.

Figure 15 – Bridge superstructure looking north, west(downstream) truss. Bridgewould be supported around areashown for deconstruction.

Figure 16 – Bridge superstructure looking south, east(upstream) truss. Bridge would be supported around areashown for deconstruction.

Page 10: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is

48m

6.75

mB

EA

RIN

G P

AD

S =

4.4

5m

9m

1.5m

2m

BE

AR

ING

PA

DS

AB

UTM

EN

T

(cen

ter t

o ce

nter

)

BO

TTO

M O

F C

HA

NN

EL

0.5m

0.6m

5.55

m

0.6m

2m

2m

3.4m

1.5

m

BE

AR

ING

PA

DS

DE

CK

WID

TH =

3.3

5m

VE

RIF

Y A

LLD

IME

NS

ION

S B

EFO

RE

TEN

DE

RIN

G

0.7m

Page 11: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is
Page 12: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is
Page 13: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is
Page 14: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is
Page 15: CALL FOR PROPOSAL - Hiiraan...and National Development (I-STAND)’’ supporting the authorities to deliver tangible public services to communities in newly recovered areas and is