cambodia...can cover 1,200 m2 p/day = 18,000 m2 per month machine can cover 1,000 m2 p/day = 18,000...

10
CAMBODIA ASEAN Regional Workshop, November 14 th 2018

Upload: others

Post on 01-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

CAMBODIAASEAN Regional Workshop, November 14th 2018

Page 2: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

MDR Team

Manual Team

Brush Cutter

MDR Team

Manual Team

Manual Team

TSD Team

Brush Cutter

Cambodia Program

Siem Reap Province Preah Vihear Province

Trainers and

handlers

11 TS dogs

Senior Trainers

Kampong Chhnang

Program management

Visitor Centre

Marketing

Fundraising

Page 3: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

2018 in Numbers

Page 4: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

2018 Achievements and 2019 Targets

25% efficiency improvement in MDR operations.

Fixing the balance of the different teams in the toolbox.

Quality Management SOPReaching 1,000,000 M2

TS Pole Search Method.Aerial Survey

2018Building additional MDR team in

one of the north-western provinces.Clearing 2,000,000 M2

Integration of Technical Survey SMART dogs in Preah Vihear and reporting on the results of the trials and on the SMART.

Piloting the TS Pole method within the program/partners and measuring cost efficiency.

Piloting the SMART dogs in CMRS

2019

Page 5: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

2018 Achievements and 2019 Targets

Each couple of handlers have 3-4 rats, used in rotation during 3 hours between6:00-9:00. Each rat expected to search not more than 350 m2 per day.

In place where 10 rats are needed to achieve 3,000 m2 cleared per day, betterto have 12 rats assigned – 2 spare rats in case of skin surgery and recovery time.

Rats come to their maximum cost efficiency in places where MechanicalVegetation Cutting Machine is working. The parameter that sets the pace of therats is the vegetation cutting.

There any many polygons in Cambodia where Organizations use VegetationCutting Machines for Survey/Clearance. In all these places, rats can accelerate theoperations.

TS searching method using a Pole, doesn’t require preliminary manual safetylanes. A handler with a rat can follow the veg. cutting machine.

Main Understandings 2018

1 + 7 + 10 = 3,000 m2 p/day

Page 6: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

6 handlers with 10 MDRs

7 deminers team

Veg. Cutting

Excavator

Can cover 3,000 m2

p/day = 45,000 m2 per

month

Machine can cut 2,500 m2

p/day = 45,000 m2 per

month

Creating safe lanes

Target Investigation

Clearing areas where

MDRs are limited.

FULL CLEARANCE

OP BALANCE

Page 7: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

2 handlers with 4 MDRs

2 deminers (target

investigation)

Small Veg. Cutting

Machine

Can cover 1,200 m2

p/day = 18,000 m2

per month

Machine can cover 1,000

m2 p/day = 18,000 m2 per

month in TS

If average 20% of land is

surveyed before reduction

One team can release

90,000 m2 p/month

TECHNICAL SURVEY

OP BALANCE

Page 8: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

SMART DOGS IN TS

Page 9: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

SMART DOGS IN CMRS

Page 10: CAMBODIA...Can cover 1,200 m2 p/day = 18,000 m2 per month Machine can cover 1,000 m2 p/day = 18,000 m2 per month in TS If average 20% of land is surveyed before reduction One team

PARTNERS AND DONORS