Page 1: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 2: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

- 1 -

July 20, 2010 To: Those with Interest in the City of Cambridge Trail System Re: City of Cambridge Council Approval “City of Cambridge Trails Master Plan – June 2010” The City of Cambridge review and update of its Council approved ‘1996 Cambridge City-Wide Multi-Use Trail Study’ was completed by MHBC Planning Ltd., and MTE Ltd., from March to June of 2010, under direction of a Council/Staff/Cambridge Trails Advisory Committee Steering Committee. The review and update resulted in the “City of Cambridge 2010 Trails Master Plan” which was reviewed by the City’s ‘Master Plan for Leisure and Recreational Services Steering Committee’, prior to consideration by Cambridge City Council. On Monday July 5, 2010 the General Committee of Council received and approved the “June 2010 Trails Master Plan” as follows; which was subsequently approved by Council on Monday July 12, 2010.

COMMUNITY SERVICES DEPARTMENT 1. CITY OF CAMBRIDGE TRAILS MASTER PLAN Moved by Councillor Tucci Seconded by Mayor Craig

THAT Council receive the City of Cambridge Trails Master Plan as outlined in Report CSD/10-56, as information. AND THAT Council direct staff to review the recommendations and present priorities and timelines for the implementation of the trails master plan on an ongoing basis commencing with the 2011 Cambridge Trails Advisory Committee planning process.

CARRIED DIRECTION: Staff for the Cambridge Trails Master Plan was directed to include a recommendation that future plan updates include consultation with the Cambridge Environmental Advisory Committee and that a map depicting the Environmentally Sensitive Areas be included as an appendix to the Plan.

Community Services Department City Hall

50 Dickson Street, P.O. Box 669 Cambridge ON N1R 5W8

Tel: 519-740-4681

Page 3: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

CONTENTS EXECUTIVE SUMMARY .............................................................................................. i-iv 1.0 INTRODUCTION ...................................................................................................... 1 1.1 Purpose of the Trails Master Plan ......................................................................................................................................... 1 1.2 Goals of Tralis Master Plan ........................................................................................................................................................ 1 1.3 Purpose and Process of the Trails Master Plan Study .............................................................................................. 3 2.0 BACKGROUND ......................................................................................................... 4 2.1 1996 City of Cambridge City-Wide Multi-Use Trail Study ...................................................................................... 4 2.2 Bikeway Network Master Plan ................................................................................................................................................ 5 2.3 Official Plan ........................................................................................................................................................................................ 5 2.4 Inventory of Existing Conditions .......................................................................................................................................... 6 3.0 MULTI-USE TRAIL NETWORK ANALYSIS .............................................................. 7 3.1Are the Existing Multi-Use Trail Study Principles Sound? ....................................................................................... 7 3.2 Non-Motorized Use ...................................................................................................................................................................... 8 3.3 Contraints and Opportunities ................................................................................................................................................ 8 3.4 Community Input ....................................................................................................................................................................... 10 3.5 Recommendations .................................................................................................................................................................... 10 4.0 PROPOSED TRAIL NETWORK AND PRIORITIES ................................................ 12 4.1 Analysis of Trails Network and Priorities ........................................................................................................................ 12 4.2 Findings of the Trails Network Analysis ......................................................................................................................... 12 4.3 Multi-Use Trail Network ........................................................................................................................................................... 14 4.4 Short Term Priority (0-5 Years) ............................................................................................................................................ 15 4.5 Medium Term Priority (5-10 Years) ................................................................................................................................... 16 4.6 Long Term Piroirty (More than 10 Years) ...................................................................................................................... 17 5.0 MULTI-USE TRAIL DESIGN GUIDELINES ............................................................ 18 5.1 Accessibility .................................................................................................................................................................................... 18 5.2 Trail Width ....................................................................................................................................................................................... 19

Page 4: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

5.3 Trail Surface .................................................................................................................................................................................... 20 5.4 Trail Grades ..................................................................................................................................................................................... 21 5.5 Signs and Wayfinding .............................................................................................................................................................. 21 6.0 TRAIL MAINTENANCE ........................................................................................... 25 6.1 Operational Maintenance ...................................................................................................................................................... 26 6.2 Capital Infrastructure Maintenance ................................................................................................................................. 26 6.3 Trails Redevelopment .............................................................................................................................................................. 27 6.4 Safety .................................................................................................................................................................................................. 27 7.0 COMMUNITCATION AND PROMOTION OF TRAILS ......................................... 31 8.0 CAMBRIDGE TRAILS ADVISORY COMMITTEE (CTAC) ..................................... 33

MAPS 1.0 EXISTING TRAILS NETWORK ..................................................... After Section 8.0 2.0 MAJOR CONSTRAINTS & BARRIERS ........................................ After Section 8.0 3.0 DESTINATIONS AND OPPORTUNITIES ................................... After Section 8.0 4.0 RECOMMENDED TRAIL NETWORK ........................................... After Section8.0 5.0 SIGNIFICANT NATURAL AREAS.................................................After Section 8.0

APPENDICES 1.0 TRAIL DESIGN GUIDELINES .......................................................................... Tab 1 2.0 SURVEY RESULTS SUMMARY ........................................................................ Tab 2

Page 5: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Purpose of the Trails Master Plan

Page 6: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Sustainable

Accessible

SafeConnected

Community Involvement

Goals of the Trails Master Plan

Page 7: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Summary of Recommendations

Page 8: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 9: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 10: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

SHORT TERM (0 TO 5 YEARS) MEDIUM TERM (5 TO 10 YEARS) LONG TERM (BEYOND 10 YEARS)

Page 11: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Sustainable

Accessible

SafeConnected

Community Involvement

Purpose of the Trails Master Plan

Goals of the Trails Master Plan

Page 12: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Purpose and Process of the Trails Master Plan Study

Background Research and Identification of Existing Conditions

Analysis and Plan Development

Plan Finalization and Detailed

Implementation

Page 13: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 14: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

1996 City of Cambridge City-Wide Multi-Use Trail Study

Page 15: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Bikeway Network Master Plan

Official Plan

Page 16: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Inventory of Existing Conditions

Page 17: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Are the Existing Multi-Use Trail Study Principles Sound?

Page 18: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Non-Motorized Use

Constraints and Opportunities

Page 19: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 20: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Community Input

Recommendations

37%

39%

12%

4%7% 1%

Cycling Walking Jogging

Rollerblading Cross country skiing Other

Page 21: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 22: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Analysis of Trails Network and Priorities

Findings of the Trail Network Analysis

Page 23: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 24: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Multi-Use Trail Network

Page 25: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Short Term Priority (0 - 5 years)

Page 26: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Medium Term Priority (5 -10 years)

Page 27: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Long Term Priority (More than 10 years)

Page 28: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

City of Cambridge P a g e | 18 Trails Master Plan June 23, 2010

5.0

MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines and provide recommendations for updates or changes. The analysis of the trail design guidelines included:

review of the existing trail design guidelines contained in the City-Wide Multi-Use Trail Study (1996);

review of accessibility guidelines and legislation;

analysis of the community input received, including input from the Cambridge Trails Advisory Committee, the Cambridge Environmental Advisory Committee, and the Accessibility Advisory Committee; and

review of trail design standards used by other municipalities.

The City-Wide Multi-Use Trail Study (1996) provides guidelines to address a number of trail design issues including trail types, signs and trail markings, grading, trailhead design and access points, and road and rail crossings and others. The 1996 City-Wide Multi-Use Trail Study also included guidelines for on-road cycling facilities. However, since on-road cycling routes and design guidelines are now addressed in the City’s Bikeway Network Master Plan, on-road cycling design guidelines are not included in the Trails Master Plan. In general, the existing trail design standards in the 1996 City-Wide Multi-Use Trail Study are consistent with best practices. Review of the existing trail design guidelines indicates that most of the guidelines are still relevant and are consistent with current standards. Therefore, many of the existing trail design guidelines have been carried forward and are included in this report. Key issues that were identified during the trail design guideline review process are discussed below. Complete Trail Design Guidelines are included as Appendix 1.

5.1 Accessibility A key part of the review of the trail design guidelines was the assessment of accessibility standards and what changes are required to the existing guidelines. The analysis consisted of:

review of the City’s current accessibility standards and guidelines;

Page 29: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Trail Width

Page 30: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Trail Surface

Page 31: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Trail Grades

Signs and Wayfinding

Page 32: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 33: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 34: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 35: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

40%

51%

9%

Are the trails adequately maintained?

Well maintained Adequately maintained Poorly maintained

Page 36: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Operational Maintenance

Capital Infrastructure Maintenance

Page 37: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Trail Redevelopment

Safety

Page 38: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 39: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 40: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 41: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

54%

46%

Yes

Page 42: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 43: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 44: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 45: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 46: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 47: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 48: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 49: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines
Page 50: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

APPENDIX 1

Page 51: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

City of Cambridge JUNE 2010 Trail Master Plan

CITY OF CAMBRIDGE TRAILS MASTER PLAN

Trail Clearance Width And Trail Maintenance Areas Will Be Required To Be Wider At All Intersections, Sharp Turns, And Other Areas Requiring Clear Sight Lines.

Page 52: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

City of Cambridge JUNE 2010 Trail Master Plan

CITY OF CAMBRIDGE TRAILS MASTER PLAN

Page 53: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

City of Cambridge JUNE 2010 Trail Master Plan

CITY OF CAMBRIDGE TRAILS MASTER PLAN

Page 54: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

City of Cambridge JUNE 2010 Trail Master Plan

CITY OF CAMBRIDGE TRAILS MASTER PLAN

Page 55: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

APPENDIX 2

Page 56: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

City of Cambridge City-Wide Multi-Use Trails Study Update Summary of Survey Results: Based on 68 completed surveys

Q1. How often do you use the trails in Cambridge? Answer Options Response (%) Regularly (a few times a week) 59.7 Occasionally (a few times a month) 29.9 Seldom (a few times a year) 10.4 Never 0.0 Q2. When you use the trails what type(s) of activity do you do? Check all that apply Answer Options Response (%) Cycling 75.0 Walking □(including wheelchair or other mobility device) 77.9 Jogging 25.0 Rollerblading 7.4 Cross country skiing 13.2 Other 2.9 Q3. Rank the trail surface that you prefer in order of preference with 1 being the most preferred:

Answer Options 1 2 3 4 Rating Average Beaten earth or woodchip narrow hiking trail 22 18 12 3 1.93 Stone dust (compacted fine gravel screenings) 22 25 8 4 1.90 Asphalt 21 13 20 4 2.12 Other _______________ 0 0 3 9 3.75

Q4. What class or distance of trail do you use most often or prefer to use? Check all which apply and rank in order of preference with 1 being highest use /most preferred:

Answer Options 1 2 3 4 Rating

Average Neighbourhood trail loop/link (generally under 1km in length) 11 10 13 19 2.75 Longer community trails linking several neighbourhoods (1-5km in length) 22 19 18 0 1.93 City wide trails (i.e. riverbank and main tributary trails) (over 5km in length) 33 16 9 1 1.63 Intercity Trails (trails that connect to other adjacent Cities or towns) 14 9 8 16 2.55

Q5. Why do you or members of your household typically use trails? Answer Options Response (%) For relaxation, enjoying nature, 73.5 Walking the dog 25.0 Exercise 85.3 To access neighbourhood schools, parks or recreation facilities 29.4 To commute to shopping or employment areas 27.9 Other ________________ 7.4

Page 57: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

Q6. What changes or improvements to the trail system would encourage you to use the trail system more often?

• Better Links: Preston to Galt; Linear trail to Riverside Park; Crossing over the 401; • Better signs: At trail links; directions to next off road section of trail; • More trails closer to where I live • More off-road trails/bike lanes: CanAmera Boulevard trail • More asphalt trails: to allow rollerblading; • Other: More garbage cans; lease free trail(s); more information on trails

Q7. Where would you like to see new trails or new trail connections? List your top three.

• A trail connecting Linear trail to Galt (via a bridge or along the east side of the river) • Better connection of Riverside park entrance to Linear trail and to Blair/TransCanada trail • Extend Devil’s Creek trail south • North-South route from Hespeler over the 401

Q8. Are the trails and trail infrastructure (such as trail surfaces, bridges, signs etc.) adequately maintained?

Answer Options Response (%) Well maintained 40.0 Adequately maintained 50.8 Poorly maintained 9.2

Q9. Do you think that there is sufficient trails system information available to the public? Answer Options Response (%) Yes 52.3 No 44.6

Q10. What is the best way to provide information to the public on trails (e.g on the City’s website, newspaper advertisements, radio advertisements, an annual or bi-annual public trail user meeting forum/workshop, provision of more trailhead signs at key locations along trails) Website (30) Newspaper (24) Trailhead signs (29) Radio (9) Annual Event (16) Other (7): Phonebook, Flyers, Circulate through the schools; Q11. OTHER COMMENTS: (please provide other comments, ideas or suggestions to the Questions. A sample:

• Keep up the good work;

• Cambridge trails are great!; • Tour-de-Cambridge, it's worth the drive to Cambridge;

Page 58: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines

• Clean the bike lanes;

• All motorized vehicles (gas or battery powered) should not be allowed on the trails; • Install curb cuts where trails intersect with roads. Road bikes are not meant to hop curbs - e.g.

Greenway park trail at Glamis Road. • Patrol the trails with those Community Bike Patrol Auxiliary Officers • I feel unsafe by myself on the trails. • Cambridge has a great trail system, it just isn't well known.

Page 59: Cambridge City-Wide Multi- June...Trails Master Plan June 23, 2010 5.0 MULTI-USE TRAIL DESIGN GUIDELINES The purpose of this section is to review the existing trail design guidelines