camelot itlab sap tm transport management
DESCRIPTION
Camelot ITLab SAP TM Transport ManagementTRANSCRIPT
-
Efficiency through standardization
_TEchnologiEs
CAMELOT ITLAB CusTOMEr suCCEss sTOry
_ProducTs & soluTions _sAP APPlicATions
Transparency in freight cost management with SAP TM in the passenger car segment
For the optimization of freight cost management with more
than 6 million passenger car transports BMW Group implemented
sAP Transportation Management and took a step forward to
standardization and cost reduction.
From Innovations to solutions.
-
rE-AlignMEnT And rE-dEsign oF FrEighT billing
Problem today:
Inconsistent end-to-end processes
and lack of data quality
results:
High degree of manual validation
efforts, no transparency of current billing
volumeAdditional risks:
Outdated technologies, dying know-how of
technical and functional support
objectives
Number ONE is the branding of the corporate strategy BMW
Group established to lead business areas to efficiency and long
term value add . Logistics, being a crucial business area, and
freight cost management as a part of it, is using this strategy
for the management of 80 suppliers who transport vehicles
from production site to distribution centers either by land,
by air or sea.
In 2011, 1.7 million passenger cars were routed to their final
destination plus special freight transports for special vehicles
like preproduction prototypes.
BMW Group regarded the adaption of new logistic concepts
in freight cost management as a challenge. The former IT solu-
tion, an inhouse development, did not have the functionalities
to meet all requirements. End-to-end processes for freight cost
billing were not fully covered. software technologies and hard-
ware were outdated and important know-how of technical
and functional support slowly disappeared. A new IT solution
was stringently required as BMW planned to expand its busi-
ness with freight cost billing volume to further extend.
CAMELOT ITLAB CusTOMEr suCCEss sTOry
Transparency in freight cost management with SAP TM in the passenger car segment
Figure 1:situation at project start
-
The solution
BMWs choice of sAP Transportation Management as its
favoured platform for freight cost management is fully inte-
grated into an existing sAP solution landscape for planning,
purchase, billing and transport services.
To minimize efforts in invoice verification, services are billed
via credit item procedure. In certain cases invoices are pub-
lished to suppliers via platform for download and further
financial processing.
Early Product Experience
Being one of the first roll-outs, go-live for sAP TM 8.1 was
in June 2012. BMW was looking for an implementation
partner who had combined expertise in products, end-to-
end processes in supply chain and freight cost management.
CAMELOT is a process-oriented IT consultancy with proven
track in sAP sCM and sAP TM.
CAMELOT supported sAP AG during the implementation
of sAP TM 6.0, sAP TM 7.0 and sAP TM 8.0 prototypes.
CAMELOTs expertise was also requested by sAP AG for
the implementation blueprint of sAP TM at BMW in 2011.
BMW chose CAMELOT as its implementation partner and the
established project teams cooperated closely from blue-
print phase to final business concept. Two main challenges
had to be mastered: new technologies which bases sAP TM
and a close time frame given.
Due to a strict project management approach, with progress
and milestones to be monitored every two weeks, the new
solution for freight cost management was implemented
within 7 months. BMWs and CAMELOTs team consistingly
exchanged for setting up testsystems and live demonstra-
tions to eventually co-create the final solution design.
Figure 2: sAP standard and BMW's implementation requirements
sAP TM includes all functionalities of an integrated transport management solution
The consistent document flow concept follows a stringent end-to-end process
state of the art technologies meet customer's requirements
sAP Ecc
_sAP TM concEPT
Bid for transportation
3
Order handling
1
Transportation
4
Transport planning
2Freight
cost billing
5
Most TM functionalities stay in existing systems
Possibility of a consistent document flow concept through high degree of interfaces
Freight order the central object of freight cost management
_bMW scEnArio
Tbb/EXTKoM
Freight cost billing
5
6
AsTrAs
3
GPs/THP/MDBB
1
FAIs/spetros
2
FAIs/spetros
4
-
results
BMW was able to implement a standardized, transparent
passenger car freight billing process without technical or
functional disruptions, clear responsibilities and less manual
validation efforts.
Costs were reduced while dataquality increased. Through
enhanced evaluation methods, decision makers quickly gain an
overview of a suppliers services and billing volume. Mapping
of freight contracts and according price combinations were
simplified. Tax calculations for passenger car transports and
transport sections in various countries are now available at the
push of a button.
The biggest benefit for BMWs IT department is the fall back
on internal know-how for administration and support of sAP
TM and regular functional software updates.
A potential solution upgrade in the future is not an obstacle
anymore: Even though a high degree of individual processes in
passenger car freight cost management was maintained sAP
TM releases are installed easily.
outlook
After the successful project phase for passenger car distribu-
tion, BMW will conclude the upcoming project phase with
CAMELOT. Objective is the optimization of freight manage-
ment for billing scenarios Factory supply Production Mate-
rial and spare Parts Transport based on the latest release.
Figure 3: Functional extension of freight cost management in sAP TM
_inTErFAcEs _TEchnology
subsequent modification of freight order
Port services
Progressive freight order handling
Generation of final freight order
Taxation attribute
Cost allocation
Destination-dependent freight payer
up-/Download of pricetables
Performance enhancement
Tiered volume
Dieselfloater
Freight cost calculation
Packaged freight cost documents
Explicit calculation for containers and passenger car positions
_businEss ProcEss
hisToricAlly EsTAblishEd ProcEssEs rEquirE EXTEndEd sTAndArd FuncTionAliTiEs
-
interview
dr. Kirsten commerBMW Group, Process-IT Order to Delivery
What is the relevance of passenger car freight cost
management within bMWs supply chain ?
It is crucial as a supply chain only works as long as delivered
services are compensated accordingly.
After the blue print phase sAP TM went productive in
less than 7 months. What were the drivers for such a fast
implementation ?
Main driver was certainly the close cooperation of responsi-
bles from planning, purchase, transport logistics, accounts
payable and IT working with CAMELOT. CAMELOTs process
consultants and sAP TM solution architects had a deep under-
standing for our business needs. so at all times a high quality
was delivered and given time lines kept.
Which challenges did bMW face with the implementation
of sAP TM ?
At that specific time the software was brandnew and still in
ramp-up phase. The challenge was to find an implementation
partner who had already expertise in the field.
Transport management is not as widely spread as other clas-
sic ErP solutions so there are less resources with profound
know-how to be found.
CAMELOT met all our expectations: deep expertise in prod-
ucts, methodology and close relation to sAP AG. That relation
is an important criteria for problem solving if consultation of
the software manufacturer is needed.
PrinciPlEs
Projectmanagement needs to support core activities
during implementation (supplier of specialists)
Less, but efficient reporting documents and project
monitoring
Clear milestones and activities
Exact role definition
stakeholder and management communication
riskmanagement via projectsponsor and project
office (no additional ressources needed)
bEnEFiTs
reduced administration
Prioritization of activities by management
_ succEss FAcTor 1: lEAn ProjEcT MAnAgEMEnT
PrinciPlEs
step by step development (2-3 weeks cycle),
individual workpackages
- Early involvement of and validation by customer
Clearly defined and short term development results
bEnEFiTs
Visible progress in systems, not only slides
_succEss FAcTor 2: EFFiciEnT dEvEloPMEnT APProAch
-
CAMELOT ITLAB CusTOMEr suCCEss sTOry
your contacts
bMW group
BMW Group and brands BMW, MINI, Husqvarna Motorcycles
and rolls-royce is the most successful manufacturer of pas-
senger cars and motorcycles. As a global player BMW Group
is represented in 140 countries by its own distribution net-
work and has production sites in 14 countries.
At the end of 2011 earnings before interest were 7.38 bil-
lion E, sales revenues 68.82 billion E and approx. 100.000 employees worked for BMW Group.
www.bmwgroup.com
cAMEloT iTlab
CAMELOT ITLab is a process-oriented IT consultancy with
strong focus on sAP modules MDG, srM, sCM, CrM, TM and
BI. Established partnerships with leading IT providers like
sAP, IBM, Oracle and Microsoft in conjunction with customer
focused solutions and innovative blueprints make CAMELOT
ITLab the consultancy of choice for end-to-end-processes.
CAMELOT provides in addition to sAP standards independ-
ent solutions like the Add-On supplier Management Camelot
Csx. As part of CAMELOT International Group we provide
combined strategy-, organizational- and IT-consultancy
services. Headquarters are based in Mannheim.
cAMEloT iTlab gmbh
Mario Baldi Managing Partner
Theodor-Heuss-Anlage 12 68165 Mannheim
Phone +49 621 86298-800 [email protected]
www.camelot-itlab.com
Consistentautomationoffreightcostmanagement
Moretransparency
Increaseddataquality
Improvedanalysis
Lessmanualvalidation
Lessmanualdataentry(Dieselfloatercalculation/
up-/Download)
Cost-andtime-saving
Improvedmappingoffreightcontracts
Varietyofpricecombinationsinstandardsolution
ReleaseabilitydespitehighdegreeofBMWspecific
processes
_ FrEighT cosT MAnAgEMEnT bAsEd on sAP TM AT A glAncE: