campbell hall replacement uc berkeley - ucop

18
Campbell Hall Replacement UC Berkeley MARCH 2008

Upload: others

Post on 11-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Campbell HallReplacement

UC Berkeley

MARCH 2008

CAMPBELL HALL REPLACEMENT 2

OVERVIEW

Existing Campbell Hall (1959)

• Replaces existing Campbell Hall

Completed 1959

Poor seismic rating

Replacement better value per sq ft than seismic retrofit

• Labs, offices, interaction spaces for Physics and Astronomy

• 25% more sq ft than existing Campbell Hall

CAMPBELL HALL REPLACEMENT 3

PROJECT SITE

• Campus Park classical core defined in 2020 LRDP

• Physical Sciences complex

• UC Berkeley physical sciences strategic initiative:

Old LeConte renovation (2007) Birge Hall improvements (2009)

Campbell Hall

Physical Sciences Complex

2020 LRDP Classical Core

Downtown Berkeley

CAMPBELL HALL REPLACEMENT 4

PROJECT SITENational Register buildings

Landscape features: priorities in Landscape Master Plan

National Register

Priority Landscapes:

• Mining Circle• Oppenheimer Way

CAMPBELL HALL REPLACEMENT 5

PROJECT SITE

HearstMining

Evans Hall

MiningCircle

New Stanley

Tan Hall

CampbellHall

Campbell Hall, Tan Hall, New Stanley Hall and Hearst Memorial

Mining Building frame the historic Mining Circle

6

< NewStanley

Gilman >

< Hearst Mining

Old LeConte >

ENVIRONS

CAMPBELL HALL REPLACEMENT 7

ARCHITECTURE

• Campbell Hall faces and frames the Mining Circle and Oppenheimer Way

• Form and design reflect the vocabulary of campus palette

8

ARCHITECTUREPunched openings with operable windows provide thermal mass,

light control and airflow to offices at north and east

9

ARCHITECTURENorthwest: glass and louver wall assembly allows more daylight,

controls heat and glare at western exposure

CAMPBELL HALL REPLACEMENT 10

ARCHITECTURE

• Campus Palette

Tri-part composition (base-middle-top)

Pitched tiled roof within classical core

Precast concrete skin with sand texture

Primary skin color within range of legacy buildings

Punched inset windows, vertical shape

Satin finish metals as trim and accent materials

CAMPBELL HALL REPLACEMENT

Proposed materials

CAMPBELL HALL REPLACEMENT 12

LANDSCAPE

1212

Landscape Heritage Plan (2004)

Consistent with Landscape Heritage Plan

CAMPBELL HALL REPLACEMENT 13

PROGRAM BASEMENT

Office: Private

Office: Open

Astronomy Lab

Physics Lab

Interaction

Building Core

Mechanical

Support

CAMPBELL HALL REPLACEMENT 14

PROGRAM GROUND FLOOR

Office: Private

Office: Open

Astronomy Lab

Physics Lab

Interaction

Building Core

Mechanical

Support

CAMPBELL HALL REPLACEMENT 15

PROGRAM TYPICAL UPPER FLOOR

Office: Private

Office: Open

Astronomy Lab

Physics Lab

Interaction

Building Core

Mechanical

Support

CAMPBELL HALL REPLACEMENT 16

PROGRAM TOP FLOOR

Office: Private

Office: Open

Astronomy Lab

Physics Lab

Interaction

Building Core

Mechanical

Support

GREEN DESIGN

• Target: equivalent to LEED silver rating

• Target: outperform Title 24 by>20%

• Operable windows

• Floors zoned by function: future flexibility, optimum environmental control

• More intense use of already developed site

17CAMPBELL HALL REPLACEMENT