Canada Mal ting Silos Workshop 19 April 2005 Summary notes of proceedings Goldsmith Borgal & Company Architects  

Upload: nneka101

Post on 09-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 1/11

Canada Malting Silos Workshop19 April 2005

Summary notes of proceedings

Goldsmith Borgal & Company Architects

 

Page 2: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 2/11

Canada Malting Meeting

Introduction

A meeting of interested individuals met on April 19, 2005 to participate in a work-shop / charette to consider ideas for the potential reuse of the Canada Malting site(see attached attendees list).

The day was introduced by Councilor Olivia Chow, Rita Davies Executive DirectorCulture Division, and Phil Goldsmith, Architect (Goldsmith Borgal & Company Ltd.Architects).

As an introduction to the day, speakers provided some contextual information on

the site opportunities and constraints in roughly an organization of past, presentand future.

Wayne Morgan, Preservation Coordinator Heritage Preservation Services, City of Toronto provided an heritage backgrounder with historic images and informationon the site and the history of the location. To summarize:

The construction of the current Canada Malting silos started in 1928 as a facility tostore barley and to process it into malt (brewing). This project re-established To-ronto in the grain shipping trade after some years with the loss of the earlier wood

silos to fire. The building is of a functional design and included grain storage binsand germination facilities.

The current composition was built in stages as follows:

1 Silos6 Kiln Otto Luebkert 19282 Headhouse5 Germination House

page 2

Canada Malting Silo site

Page 3: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 3/11

Page 4: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 4/11

Phil Goldsmith provided a presentation of adaptive reuse precedents fromaround the world of similar waterfront and / or silo sites. This group of precedentsincluded major institutions, mixed use projects, hotels, offices, parking facilities,theatre and other examples. He further touched on principles that are commonly

considered when looking at heritage sites for adaptive reuse and the need to po-sition the project relative to appropriateness and fit with the nature of the site andits unique structures.

Brainstorming

The group considered the site, options, issues, and potential uses. These werepresented and discussed at the end of the day. The ideas were wide ranging andvaried from the presentation of general objectives, through specific ideas for ac-tual uses.

The following is a summary paraphrasing of the results of the day in the followingkey headings: objectives, possible approaches, suggested uses and hanging ques-tions.

Objectives

• This is an unique site, preserve the iconic, inspirational components of the building complex.

• Don’t ruin the iconic image of the silos on the waterfront, retain the es-sential architectural features.

• Take the long term view of this unique site , caution against short terminappropriate reuse.

• This site should set an example for heritage preservation, green building,and city beautiful. Demonstrate how to do it right. Incorporate sustain-able objectives, mitigate pollution of the Portland St. slip.

page 4

Stadtlagerhaus - Mixed Commercial, Offices

Rotterdam Study - Proposal Concert Hall

Page 5: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 5/11

• The heritage element is key. Preserve the spirit of the site and material fab-ric of the buildings, link to past.

• Provide public access to the site, particularly at the ground level.

• Deal with safety issues so the site can be opened.• Incorporate a community voice / participation from the beginning, antici-

pate long term community needs, use should be connected to the com-munity.

• Create a destination and a mix of uses (public / private) possibility of di-verse and diversity of uses.

• The reuse should be based on a viable business plan.

• Encourage marine uses, recognition of waterfront theme, extend waterfront

promenade for access to Ireland Park.• Take project to Council for September to get commitment for the 2006

budget.

Possible Approaches

• Redevelop the site in context of a master plan / site programme. Definethe vision of the site. Needs to be done right. Leave door open for theBIG IDEA to happen. First steps can happen now, incrementally. De-velop a 5 year plan with better information about context.

• Take a phased approach, consider mixed use, preserve the silos.

• Create a committee similar to the Harbourfront Steering Committee.This group chaired by Councillor Chow with money is needed.

• Need full consultation with the community, take discussion to commu-nity in late May / early June 2005 to discuss initial phase and longer

page 5

OXO Tower London, Mixed Commercial

Batersea Power Station, London, Master Plan

Page 6: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 6/11

term.

• City should start by beautification of park on water’s edge, accessible topublic, open up south and east path. Stabilize buildings for safety. Moneyfrom Harbourfront Parks? TWRC to repair water’s edge?

• Study condition of existing buildings, run tests. Federal Government did astate of good repair and environmental study 10 years ago, update report.This is good public information (for possible users).

• Consider parcelling site for smaller uses / users before we get to the bigidea. Decide on uses for adjunct buildings, short term leases maybe on themodel of 401 Richmond or Distillery District.

• Consider the option of all or part retained in picturesque dereliction.

• Talk to builders / developers who have worked on similar projects e.g.. Ci-tyscape (Goderham & Worts site).

• Keep in touch with and coordinate with Ireland park for good access.Incorporate pedestrian link, music garden, link park to community cen-tre and school, possible bridge connection to school (pedestrian safety).

• Approach senior levels of government for funding, at least for heritageissues.

• Deal with dock wall structure. Work with federal - provincial to transferownership.

Suggested Uses

• Silos are an iconic structure and site for a significant public and culturalinstitution. Space to showcase different cultures (cultural mosaic).

• Landmark site, could be tourist destination. Consider landscaping, light-ing, sculpture-fountain using silos as first step.

page 6

Tate Modern - Art Gallery, London

Page 7: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 7/11

• Cultural showcase, museum of immigration, world youth centre, abo-riginal cultural centre. Possible site for Humanitas.

• A possible site for Ontario Archives or Toronto artifact collection.

• Programming hub for innovation, sustainability and youth.

• Encourage marine use, cruise terminal or port of call. Fisherman’s wharf type retail mixed use. Consider a “belt line” ferry - this could be onestop. Add a ship, old laker, as additional capacity and environment set-ting artifact.

• Toronto National Aquatics Centre where slip separated from the harbourbecomes a major pool.

• Aquarium, marine attraction-marine industry museum.

• Recreation uses such as rock / wall climbing, fitness.

• Intrawest type urban resort village, downtown spa and village, roof top res-taurant.

• Casino

• Residential, condo, mixed use, retail, restaurant, public uses at grade,connection to community, roof top public access, views, restaurant.

• Telecommunications centre, new media.

Hanging Questions

• How to deal with site in the interim, can it be cleaned up, made safe,repair silos - stabilize site?

• Is this a possible site for Humanitas?

page 7

Phillipe Starck, Buenos Aries

Helsinki - Office Project

Page 8: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 8/11

• How will the site fit into developing plans for the World’s Fair bid?

• What impact would the development of the Island Airport have?

• How will site fit into future plans for the western gap?

• How much investment is the City prepared to make?

• How much control does the City want to maintain?

• What proportion of the site and buildings should be retained?

Conclusions

It was a spirited day with positive results. As can be seen above some excellentsuggestions were made and important questions left unanswered. The signifi-

cance and iconic value of the site are clear and there was a definite interest inthe recognition of this site as a special waterfront location with heritage andsymbolic value.

There appeared to be more interest in the development of the site as a major in-stitution although the practicability of this lead to alternative views of public pri-vate partnerships, mixed use and finer grain uses both commercial and institu-tional or even residential uses. It was almost unanimous that the views from theroof top are very special and important, public access should be maintained andit would make an excellent restaurant as all or part of this experience (considerOXO Tower or Tate Modern Gallery). The community interest in facilities relatedto their needs and environment were also well represented.

The location of the site is clearly important to the development of the waterfront. Itwas noted that the two silo sites, this one and the Victory Soya Mills site are likeanchors to a waterfront “mall”. Each site one east and one west could anchor anddefine the public city waterfront across the entire core linked by a pedestrian andpark network and as such are extremely valuable sites for public destination uses.In addition to a pedestrian system the very interesting idea of a “belt line” ferry was

page 8

Page 9: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 9/11

raised adding a marine transportation element around instead of just across theharbour.

The development of the site will ultimately be based on either a proactive or reac-tive basis.

On a proactive basis the City could retain leadership of the development of the site.This could include full use of the site as a major institution such as Humanitas orthrough a public -private partnership a mixed use development with both privatecommercial and institutional uses sharing the site under City control. Spaces cre-ated for rental use would have to bear rents and exist in a marketing / promotional/ operational model that helped to create an environment for commercial viability.The advantage of maintaining control is that the City could develop the site to suitexpressed needs for public uses, ensure heritage preservation, avoid inappropriatealterations, stabilize and maintain the iconic values of the site, and make connec-

tions to waterfront aspirations and the public realm.

On a reactive basis the City would seek significant proposals for the commercialuse of the site. Criteria would be set as the basis for this selection process butwould of necessity need to be flexible enough to permit the private developers / promoters room for a financially successful project. Within this context, principlesand requirements would have to be established to ensure heritage preservation, in-appropriate alterations, stabilization and maintenance of the iconic values of thesite, connections to waterfront aspirations and the public realm. These later re-quirements are often seen as being at odds with business interests and it can be ex-

pected that significant City participation in the public aspects of the project wouldbe requested. The advantage of this scenario is that the project might proceed witha lower requirement for public funding.

In either development scenario the site is clearly important with the potential forfacilities that improve the Toronto quality of life experience, enhance the water-front, and become a major tourist destination.

page 9

Page 10: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 10/11

Next Steps

To move forward we suggest consideration of the following list of next steps. Theseare suggested to do two things; one, develop a clear background piece for informa-tion required under any development scenario and two, to develop momentum forthe eventual reuse of the site. These steps could be conjoined as a larger study ordeveloped incrementally as separate pieces of work.

Heritage Building Structure Report

Prepare a Heritage Building Structure Report. This report can be generated from ex-isting materials and / or will require further site investigations or updates to pre-existing information.

This report will provide site plan information, basic building plans, notes on the

history of the site and its development in time, comments on the social history of the site, summary of required stabilization work, preliminary ball park costs.

Heritage values should be identified and include character setting features thatshould be preserved. This could form the basis for “reasons” for designation.

Site Assessment

A site assessment that looks at the surrounding community, pattern of use, officialplan and zoning designations, known or anticipated development projects. This willestablish the known context for the project and opportunities for linkages in one

direction and suggestions for fit of other proposals in the other direction. Maps anddiagrammes would summarize the opportunities and constraints.

Existing Building Adaptive Reuse Study

This study would look at specific opportunities and constraints for the developmentof the building elements and the local ground plain / context. The study should lookat world wide precedents for the adaptive reuse of industrial sites generally and si-los specifically to inspire creative thinking.

page 10

Page 11: Canada Malting Silos Workshop 05

8/8/2019 Canada Malting Silos Workshop 05

http://slidepdf.com/reader/full/canada-malting-silos-workshop-05 11/11

The internal volumes of the building and restrictions on alterations should be pre-liminarily identified in relation to the Heritage Building Structures Report. Op-portunities based on items such as structural capacities, light and air, views inand out, restrictions or opportunities for new fenestration, access, separations,

fire and life safety.A list of “expressed interest” for alternate uses that the City would prefer or bewilling to consider should be developed. These should include consideration of alarger vision of the site at the local community, city wide and provincial (fed-eral?) level given the significance of the site. Input from appropriate industrypeople or organizations should be sought to test interest and potential viability of the uses under consideration.

From this work a series of “development principles” should be created . Theseprinciples would then help to guide and inform either proactive or reactive de-

velopment scenarios. These principles could include a master plan scenario.

Commitment

In order to move forward it will be necessary for the City to show leadership andresolve. Funds will have to be assigned to be able to undertake any of the nextsteps and so is an important next step in and of itself. In addition to funding car-riage of the project should be clearly defined, assigned and scheduled.

Based on funding and schedule one or more of the next steps outlined aboveshould proceed.

page 11