canalis busway trunking system helps you to realize flexibility

15
Slide 1 2007 – Lachat Electrical distribution with Canalis Speaker: Lachat Laurent – Area export manager for Asia & Pacific Seminar SA01 Canalis Busway Trunking System helps you to realize Flexibility, Reliability and Energy Saving Slide 2 2007 – Lachat I. Introduction and concept II. Customer benefits III. Environment VI. Conclusion Summary...

Upload: duonghuong

Post on 30-Jan-2017

228 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Canalis Busway Trunking System helps you to realize Flexibility

Slide 12007 – Lachat

Electrical distribution with Canalis

Speaker: Lachat Laurent – Area export manager for Asia & Pacific

Seminar

SA01

Canalis Busway Trunking System helps you to realize Flexibility, Reliability and Energy Saving

Slide 22007 – Lachat

I. Introduction and concept

II. Customer benefits

III. Environment

VI. Conclusion

Summary...

Page 2: Canalis Busway Trunking System helps you to realize Flexibility

Slide 32007 – Lachat

I. Introduction and concept

II. Customer benefits

III. Environment

IV. Conclusion

Slide 42007 – Lachat

� End-users : flexible, evolutive, safe and environmentfriendly electrical distribution, without production downtime

� Investors : buildings easy to rent. The installation isupgradeable and can be adapted by the tenant

� Electrical consultant : easy to study and specificy in complete confidence (safety, standards compliance, …)

� Contractors : productivity (worksite times halved)

I - Buildings (industial, offices, healthcare,

data centers …) : what are the needs ?

Page 3: Canalis Busway Trunking System helps you to realize Flexibility

Slide 52007 – Lachat

The electrical distribution systems

� Centralised distribution :• Applications: continuous process:

– Cement works, petrochemistry, iron and steel, oil and gas• Advantages:

– Continuity of supply– Mixed electrical distribution and control-monitoring– Supervision

� Decentralized distribution:

• Applications : manufacturing industries:– mechanical, textiles, timber, plastics, electronics,…..

• Advantages:– Study without detailed knowledge of the installation– Live upgradeability without operating downtime– Quickly operational (reduced worksite time)– Economic according to number of loads

Slide 62007 – Lachat

Canalis busway / Cable

Cable

Power distributed fromsource to load

Power accessedwhenconductors are connected to connection box.

Distributeselectrical currentvia insulatedconductors :- on cable tray- within conduits

Busway

Trunking lengthsjoined togetherdistribute power from source to load.

Distributeselectrical currentvia conductorscarried withinprefabricatedlengths of steeltrunking.

Power accessedvia tap-off points built-in to the trunking.

Page 4: Canalis Busway Trunking System helps you to realize Flexibility

Slide 72007 – Lachat

The Canalis concept

Power pack

Fire barrier

Line lengths

Devices for wall-mountingor suspension

Connectors and tap-off units

Closingend piece

Directionalchange

Trunking support

Trunking support

Slide 82007 – Lachat

Busbar distribution with Canalis

Lighting and power socket Distribution (20A – 40A)

Electrical energy available at all points of the installation

Page 5: Canalis Busway Trunking System helps you to realize Flexibility

Slide 92007 – Lachat

Canalis KDP: 20 A flexible busbar trunking

� Used for distribution• of lighting when light fittings are supported by the building

structure, • of power sockets

� Installed, for example, in suspended ceilings and elevated floors

� Tap-off centre-distances correspond to building construction standards

� Prefabricated cords to supply a number of light fittings from a single connector

� Degree of protection: IP55

Slide 102007 – Lachat

� Adapted to the most common needs:• Lighting distribution• Power socket distribution

� Has 1 or 2 circuits allowing for example:• Creation of a circuit for power sockets• Dimming• Combination of lighting and emergency lighting

� Combined with KBL, the offer is highly competitive in buildings with a low level of illumination (car parks…)

� Degree of protection: IP55

Canalis KBA &KBB : rigid busbar trunking (25A & 40A)

Page 6: Canalis Busway Trunking System helps you to realize Flexibility

Slide 112007 – Lachat

Busbar distribution with Canalis

Lighting and power socket Distribution (20A – 40A)

Power distribution (63A – 800A)

Electrical energy available at all points of the installation

Slide 122007 – Lachat

III. The Canalis product range

Canalis KN: small power electrical distribution up to 160 A

� Tap-offs by circuit-breaker or fuse units up to 63 A� Flexible lengths for directional changes� Flat mounting (elevated floor) or on suspended

edges or wall mounted

� Aluminium conductors with silvered copper contacts� White RAL 9001� Degree of protection: IP55

Page 7: Canalis Busway Trunking System helps you to realize Flexibility

Slide 132007 – Lachat

Canalis KS: medium power electrical distribution up to 800 A

� 7 power ratings : from 100 to 800 A

� Live conducteurs(Aluminum/Copper) all contacts consisting of silver plated aluminium/copper bimetalstrips.

� Degree of protection as standard IP 52 or IP 54 withaccessories.

Slide 152007 – Lachat

Busbar distribution with Canalis

Transfo-switchboard link & highpower distribution (800A – 6000A)

Lighting and power socket Distribution (20A to 40A)

Power distribution (63A – 800A)

Electrical energy available at all points of the installation

Page 8: Canalis Busway Trunking System helps you to realize Flexibility

Slide 162007 – Lachat

Iline 2 High Power from 800A to 6000A

� Rated voltage:• 415V AC(UL standard)

• 690V AC(IEC standard)• Copper or aluminum• 3 or 4 pole

� Tap-off unit• Square D MCCB PIU:15-1600A• Square D fusible PIU:30-1600A

• Merlin Gerin MCCB PIU:15-1000A� IP40~IP66,Optional

800 4000 5000 6000

Copper (UL standard)

Aluminum (UL standard)

Copper (IEC standard)

Rating range

Dif

fere

nt C

ondu

ctor

Slide 172007 – Lachat

A comprehensive and consistent system for all

building types

Whatever the building, there is a Canalis solutionIndustrial buildings:garages, workshops, agricultural buildings, logistic centres

Commercial spaces:boutiques, shopping malls, supermarkets, hotels

Tertiary buildings:offices, schools, hospitals, sports halls, cruise ships

Page 9: Canalis Busway Trunking System helps you to realize Flexibility

Slide 182007 – Lachat

I. Introduction and concept

II. Customer benefits

III. Environment

IV. Conclusion

Slide 192007 – Lachat

Power distribution using Canalis:Advantages of the Canalis Busway solution

- the Buswaysdistribute all the supply’s power

- distribution to all floors

Power availableat all points of the installation:

- the installation can be designedindependentlyto the distribution of power and the positioningof loads

Simple to design:

- prefabricatedcomponents thatcan be simply and quickly connectedtogether

- less fixing points

Installation time halved:

More competitivethan cables and

upgradeable

Page 10: Canalis Busway Trunking System helps you to realize Flexibility

Slide 202007 – Lachat

Power distribution using Canalis:

Advantages of the Canalis Busway solution

- production line layouts can beeasily changed.

Modifiable layout:

Continuity of service:

- rapid live connection and disconnection of loads, avoidingthe need for a shutdown.

- loads can beeasily added, moved or replaced.

Installation

More competitivethan cables and

upgradeable

Slide 222007 – Lachat

Reliability of Canalis system is ensured

thanks to prefabrication and factory tests

� Canalis system units are designed withSchneider Electric equipment

� Products are secured by type-testing(Compliance with IEC 60439-2 )

� 100% of live elements are routine tested beforerelease from the factory

� The declared performances are irrespective of the implementation

Page 11: Canalis Busway Trunking System helps you to realize Flexibility

Slide 232007 – Lachat

I. Introduction and concept

II. Customer benefits

III. Environment

IV. Conclusion

Slide 242007 – Lachat

Canalis helps conserve natural resources

� Canalis reduces the use of raw materials by more than 60%

Centralized

Decentralized

ConductorsCalculation hypothesis:Run 250A, 25m long, 8 loads (5 x 20 kW and 3 x 30 kW)30% load level, 5 days a week and 10 hours/day

100

40

Co = 250mm²

Al = 137 mm²Co eq = 95mm²

Plastics

100

30

12kg

4kg

Page 12: Canalis Busway Trunking System helps you to realize Flexibility

Slide 252007 – Lachat

� Conductors are air insulated

� Housing is made of steel� Plastic parts are mainly

made of PA

� XLPE = cross-linked polyethylene PA = Polyamide

No hazardous substances in Canalis

components

� All Canalis components are halogen free as standard (no PVC)

� Canalis is designed in compliance with the RoHsEuropean recommendation

� Conductors insulation and sheathing are made of XLPE

Slide 262007 – Lachat

100m² of offices= 200 kg of cables= 20 kg of PVC

� 44 000 m3 of smoke

� 3,7 kg of corroded steel

� 7,5 m3 of HCI

Dangers of PVC in the event of fire

� The combustion of PVC generates important volumes of smoke which have:

• Effects on humans:– Smoke opacity:

– Panic risks

– Difficulty of rescuers intervention– Smoke toxicity:

– Hydrochloric gaz : danger of death

– Carbon monoxide : asphyxiation

• Effects on materials:

– Corrosion– Hydrochloric gaz = acid

Page 13: Canalis Busway Trunking System helps you to realize Flexibility

Slide 272007 – Lachat

Canalis has a long lifecycle and can be

easily recycled

� Canalis is designed for a long service life and can easily be dismantled, cleaned and reused

� All components of our products are stamped to show their material to make recycling easier

� All materials used in our packing can be recycled

Old circuits cables become a waste in 95% of cases

Slide 292007 – Lachat

Decentralized distribution by Canalis enables

energy saving

� Canalis reduces lines losses by 40%

Centralized

I1 I2 I3 I4 I5 I6

ΣΣΣΣ Ixks

Decentralized

Losses

100

60

1600 Joules

1000 Joules

Calculation hypothesis:

I1 I2 I3 I4 I5 I6

ΣΣΣΣ Ixks

Run 250A, 25m long, 8 loads (5 x 20 kW and 3 x 30 kW)30% load level, 5 days a week and 10 hours/day

Page 14: Canalis Busway Trunking System helps you to realize Flexibility

Slide 302007 – Lachat

I. Introduction and concept

II. Customer benefits

III. Environment

IV. Conclusion

Slide 312007 – Lachat

Electrical solution with Canalis

The 3 main messagesThe 3 main messages

� On study, time savings. On installation, worksite times are halved. During operation, considerable savings : 20 to 30% reduction of on-line joule losses.

� An flexible, upgradeable and reliable solution for all building types

� The commitment of a major manufacturer : The combined experience of a leading manufacturer and itscustomers

Page 15: Canalis Busway Trunking System helps you to realize Flexibility

Slide 322007 – Lachat

QQV. Conclusion

uestions & answers

Slide 332007 – Lachat

for your attentionThanksThanks