capability statement 2016 - phe · capability statement 2016 ... • work method statements, ......
TRANSCRIPT
![Page 1: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/1.jpg)
Capability Statement 2016Industrial Electrical Contractorswww.phe.net.au
![Page 2: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/2.jpg)
2 phe.net.au
![Page 3: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/3.jpg)
Table of contents1. About PHE ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 5
2. Industry focus ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 5
3. Our services ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 6
4. Our Capabilities ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 7 -9
5. Safety Policy ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 10
6. Core Values ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 11
7. Our Goals ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 12
8. Projects ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg 13-17
9. Contact Us ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . pg 18
3
![Page 4: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/4.jpg)
4 phe.net.au
![Page 5: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/5.jpg)
Renewable Energy
Power generation
Pulp & paper manufacturing
Food and beverage
Timber processing industries
About PHEPHE Pty Ltd (PHE) provides electrical and instrumentation operations support services to clients
throughout Australia including mining, hydro power generation, remote gas power generation plants,
pulp and paper manufacturing and timber processing industries.
Established in 1975, PHE has over 40 years of experience and expertise in the Installation
and termination of High Voltage, Low Voltage and communication installations.
We also design and construct Low Voltage distribution and motor control switchboards and provide
SCADA, PLC and DCS integration.
Industry focus
5
Mining
![Page 6: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/6.jpg)
LV Cable Installations
All site cable supply and associated cable support and PVC conduit systems including cable pits
and underground cable ducts.
Instrumentation
PHE provides the installation, calibration, and loop testing of all instrumentation including air,
pressure, flow, level, temperature and analysers.
Distribution Switchboards
From our manufacturing facility in Gympie, PHE designs and manufactures fully type tested power
distribution switchboards up to 7000A with a 120kA rating. These Form 4b switchboards fully
comply with AS/NZ 3439.1 standard.
Motor Control Switchboards
Form 1 through to Form 4b Motor Control Switchboards can be designed and manufactured to the
individual requirements of our customers. We also manufacture all type of control panels,
marshalling boxes, local control stations, PLC panels and control desks etc.
HV Cable Installations
PHE provides the supply and termination of HV cabling up to 33kV including the supply and instal-
lation of transformers, and ring main units.
Our Services
6 phe.net.au
![Page 7: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/7.jpg)
Electrical Installations
• Design and installation of HV, LV and Fibre Optic cabling.
• Installation of the underground equipment.
• Installation of mine dewatering systems.
• Installation of underground ventilation systems. Primary and Secondary ventilation.
• Installation and termination of high voltage up to 33kV, low voltage, communications, instrumentation, network
control and fibre optic cabling.
• Installation of equipment in hazardous areas.
• Test installations in hazardous areas.
• Cable ladders, cable trays, catenaries, bracketing and metal conduits.
• Trenching, PVC conduits, cable pits and UG cable ducts.
• Switch room and control room builds, MCC’s, switchboards and distribution boards.
• Transformers, ring main units, liquid resistance starters and power factor correction units.
• Electrical field devices and equipment.
• CCTV cameras, monitors and system network equipment.
•
Calibration, installation and loop testing of all instrumentation including air,, flow, level, pressure,
temperature and analysers.
• Fire detection, warning and suppression systems.
• Lighting and power networks.
• Earthing and lightning protection.
• Demolition work, upgrades and shutdowns.
• Pre-commissioning and wet, dry, load commissioning.
Our Capabilities
7
PHE has the capability of performing project works in all states of Australia and also PNG.
![Page 8: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/8.jpg)
Instrumentation Installation & Calibration
• Selection and procurement of process instrumentation and associated hardware.
• Shutdown instrumentation including in- situ calibration.
• Instrument fitting including air manifolds, lines, valves and associated hardware.
• Stainless steel impulse tubing for instruments.
• Installation and termination field cabling, marshalling boxes and patch wiring to DCS, PLC and HMI hardware.
• Solenoid, staging and valving panels for control valves and shutdown valves.
• Pressure, level, flow, density, vibration and mass flow transmitters and devices.
• ESD system installation.
• SCADA, PLC and DCS systems.
• Instrumentation installation and calibration carried out in line with our Quality Certification to AS/NZS ISO
9001:2008.
• Test and calibration equipment is up to date with the latest instrumentation requirements as well as
traceable certification.
Our Capabilities
8 phe.net.au
Client Services / Maintenance
• Maintenance and Breakdown Service.
• Shutdown Services.
• Electrical and Instumentation Shift Coverage.
![Page 9: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/9.jpg)
Operations Support
PHE provide electrical and instrumentation operations support services to clients throughout
Australia including mining, hydro power generation, remote gas power generation plants, pulp and
paper manufacturing and timber industries.
Services can be tailored to provide individual requirements including:
• Provision of skilled and experienced staff to align and work with client maintenance and
capital works teams.
• PHE site managed, supervised operations support teams.
• Experienced technically qualified commissioning personnel and procedures.
• Project cost controls including project planning/budgeting/scheduling and forecasts.
• Flexibility and benefits to the client include:
• Proven and effective safety and licensing systems.
• Access to resources such as HV and fibre optic cable termination and testing services.
• Equipment procurement and buying power.
• Management of risk and controls for operational electrical and instrumentation work scope.
• Work method statements, project safety plans for overall and detailed works.
• Self-sufficient contractor through the management of its vast fleet of underground equipment.
Installation pre-commissioning and commissioning
PHE provides testing, pre-commissioning and verification to the client’s standards in all E&I contracts.
Our Capabilities
9
![Page 10: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/10.jpg)
Safety PolicyAt PHE Pty Ltd we have developed a strong Health and Safety policy with the aim of zero accidents.
Our set of safety and training procedures has been tailored for our employees and sub-contractors to achieve this
goal. PHE has a dedicated team striving for excellence in the delivery of our health, safety and environmental record. A
guide to demonstrate our commitment to health and safety is the regular achievement of zero Lost Time Injury (LTI)
rate. This is due to our fully trained staff along with regular safety audits and daily risk assessments. PHE provides
continual training in the use of equipment and Personal Protective Equipment (PPE) along with continual improvement
to procedures to minimise potential incidents.
Our people and their safety are our primary responsibility and every effort is made to provide a safe working
environment on every site.
Quality AssuranceOur focus is customer satisfaction in every project or service undertaken and to achieve this, a strict set of operational
procedures are in place. These procedures are in place to meet contract compliance and the company’s overall
effectiveness to deliver a quality assured product. PHE has been endorsed to meet or exceed the requirements of
AS/NZS ISO 9001:2008.
10 phe.net.au
Environmental PolicyPHE Pty Ltd is committed to a high standard of environmental management, as such request all personnel and visitors
participate in assisting PHE meet their envionmental objectives and targets.
![Page 11: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/11.jpg)
The objective of PHE is to provide a high quality, prompt, efficient and reliable service that meets the
expectation and requirements of our customers.
To assist us in meeting our objectives PHE operates a Quality System which complies with the
requirements of AS/NZS ISO9001 standards.
All employees at PHE are active participants in the ongoing maintenance and improvement of our
management system and are driven by the companies’ quality objectives to meet all of our customers’
requirements.
Core Values
11
![Page 12: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/12.jpg)
Customer/client focus
People development
Continuous improvement
Hard work and performance
Lead by example and take responsibility
Always lead by example and set high standards. Take responsibility for your actions and results. Don’t blame others when things go wrong.
Team work and respect
Work together and never let your team mates down. Show respect for all points of view and understand all facts before passing judgement. Support decisions made.
Honesty and integrity
Be honest, behave ethically. Act with integrity, make your word your bond.
Our Goals
Encourage people to be the best they can be and take advantage of opportunities to learn and grow and support others in their development. Our success depends on having the right people in the positions with the right attitude.
Be positive and open to new ideas, listen to others. Sharing ideas and measuring progress always leads to better results. Continually look at ways of doing things better and more efficiently.
Be persistent and always have a go and make things happen. If you promise something, do it. Enjoy what you do.
Listen to our customers and clients to build relationships so we can understand their needs and provide them with the very best service.
12 phe.net.au
![Page 13: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/13.jpg)
When Newcrest’s Cadia Valley Operations achieves nameplate capacity, the Cadia East Gold Mine will treat 27 million tonnes of ore per annum for a predicted output of around 800,000 ounces of gold. It will be the largest underground mine in Australia and one of the largest gold mines in the world.
PHE has been involved as the major E&I (Electrical & Instrumentation) contracting company for the site providing the installation and commissioning of the crushing and ore handling systems along with ancillary equipment.
Our team of project managers, supervisors, HSEQ team, schedulers, leading hands and electricians have been the key to delivering a safe, on time and quality project to our customer Newcrest.
The project was delivered with a zero LTI rate.
The project included installation of cable support systems, High Voltage Switchgear and Reticulation system, Low Voltage cabling, MCC installations and Fibre Optic cabling.
The Cadia Valley is located approximately 25km from the city of Orange in NSW.
Customer: Newcrest Mining Limited
Project Scope: Construction of the Cadia East underground mine
Value added: $90M+
Mining - Newcrest’s Cadia Valley Operations
Projects
13
![Page 14: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/14.jpg)
Pulp and Paper - Visy Tumut Kraft Mill Stage 2
PHE were engaged in the initial construction of the Visy Pulp and Paper Mill back in 2001 and the first class paper mill was placed into production.
This initial phase was so successful that a 2nd stage or duplication took place and PHE were once again engaged in the construction phase.
The project consisted of the cable reticulation support system, high voltage switchgear, high voltage motor ca-bling up to 5.2MW drives, low voltage cabling to 800 drives ranging up to 800kW, installation of MCC’s, transformers and plant wide earthing and lightning protection.
PHE now supplies up to 25 E&I Technicians and electricians on contract to Visy for the operational maintenance.
Customer: ABB Oy Distribution Automation
Project Scope: Construction of the Plant Duplication
Value added: $4M+
Projects
14 phe.net.au
![Page 15: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/15.jpg)
Power Generation - QGC Chinchilla Water Treatment Plant Power Station
Clarke Energy a leading supplier in Coal Seam Gas powered generators engaged PHE to provide the Electrical Installation of seven 3MW generator sets.
The project involved all Low Voltage cabling, 11kV terminations and hazardous areas installations.
The project was completed for principal contractor Laing O’Rourke on the QGC Chinchilla Water Treatment Plant north of Tara in the Surat Basin of Queensland.
Customer: Clarke Energy
Project Scope: Electrical Installation of 7 x 3.3MW Generators
Value added: $2M+
Projects
15
![Page 16: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/16.jpg)
Snowy Hydro - Tumut2 Modernisation
PHE received a Certificate of Commendation for the T2 Modernisation Project in the 2015 NECA Excellence Awards for the category of Industrial Projects under $2M.
Upgrade of the T2 Transformer and Line Protection equipment. Demolition works of existing electrical services and the design and construction of cable support systems, LV cable installation, installation of control panels and terminations.
Snowy Hydro Limited embarked on a substantial modernisation project to maximise the value of the Snowy Scheme hydro-generation assets.
Modernisation of the Snowy Scheme Power Stations has introduced advanced controls and protection systems technology to the Tumut 2 Power Station. Ageing and high maintenance plant components such as circuit breakers, relays and other control antiquated systems were replaced with modern components and automation platforms.
PHE continues to work closely with Snowy Hydro Limited with all modernisation projects.
Customer: Snowy Hydro Limited
Project Scope: Tumut2 XP and LP Installation
Value added: $600K+
Projects
16 phe.net.au
![Page 17: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/17.jpg)
Maintenance Contracts
17
Lion Brewery - Milton QLD
Preventative MaintenanceInstallation Projects
Snowy Hydro - Cooma NSW
Electrical and Instrumentation Maintenance Management & ControlInstallation Projects
Visy Industries Pulp & Paper Mill - Tumut NSW
Electrical and Instrumentation Maintenance Management & ControlInstallation Projects
Cadia Valley Operation - Orange NSW
Electrical and Instrumentation Maintenance Management & ControlInstallation ProjectsUnderground Installation and Maintenance
Evolution Mining - Cracow QLD
Shift CoverageInstallation Projects
The Laminex Group - Gympie QLD
Preventative MaintenanceInstallation Projects
Carter Holt Harvey Woodproducts - Gympie QLD
Preventative MaintenanceInstallation Projects
![Page 18: Capability Statement 2016 - PHE · Capability Statement 2016 ... • Work method statements, ... The project consisted of the cable reticulation support system,](https://reader034.vdocuments.net/reader034/viewer/2022051407/5aeaf7eb7f8b9ac3618e8469/html5/thumbnails/18.jpg)
8 Hall Rd Gympie
Copyright © PHE Pty Ltd 2016. All rights reserved. Photographs may be subject to copyright of their respective owners