capability statement€¦ · inspection and test plans fabrication itp’s detailing our workshop...
TRANSCRIPT
![Page 1: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/1.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
CAPABILITY STATEMENT
![Page 2: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/2.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
MISSION STATEMENT
Our mission is to provide our clients with the highest quality service and
supply of structural steel. We deliver quality products on time and at a
competitive price.
We are committed to developing the NT through sourcing employment, supply and subcontractors. We
have an unwavering commitment to engaging and up skilling indigenous Australians. We purchase only
Australian made steel, supplies and consumables from local NT Companies. We pride ourselves in being
“Territory Proud” and keeping local business and families in the NT.
• Our capabilities range from large
structural steel items through to detailed
and design based architectural steel
features from projects across
infrastructure, mining and general
construction sectors in Darwin and
around the Top End
• Our services also include
installation/Erection of our
fabricated Structural Steel .
Delivery to site with our Body
truck or Prime Mover with
extendable trailer.
![Page 3: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/3.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
OUR TRANSPORT DIVISION
Our Transport Division services comprise of Prime Mover and trailers for all structural steel
for onsite deliveries, Plant & Equipment to local and remote areas. Our Tilt Tray service also
caters for transport of Plant & Equipment to site local and remote, We also do call outs for
broken down cars that need to be towed to mechanical workshops 24/7.
![Page 4: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/4.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
CAPABILITIES
STEEL FABRICATION
Jakes Steel & Welding’s core business has always been Structural Steel Fabrication and our fully equipped
workshop allows us to fabricate steel for multiple clients simultaneously, even while undertaking large
fabrication projects.
We have established a team of young, dynamic Boiler Makers that are committed to ongoing training and
where each member plays an integral part in our success.
All blasting and painting / galvanising are carried out by local companies that ensure standards are
performed to exceed requirements.
Our quality systems cover the full fabrication process from receipt of drawings through to blast, paint /
galvanising and final delivery, followed by completion of our QA documentation.
Our team is backed by modern and fully maintained plant and equipment and supported by management
and administration based in our Darwin Office.
![Page 5: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/5.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PERSONNEL
Our personnel have extensive industry experience and exposure, having worked on projects throughout
the Top End including remote communities. Indivually they have specific areas of expertise which,
combined with a practical and flexible approach, allows Jakes Steel & Welding to successfully undertake a
broad spectrum of activities within the industry.
Jakes Steel & Welding Pty Ltd was established in 1981 and has remained a family owned and operated
business since day one. Our qualified Boiler Makers have a combined experience of over 130 years.
Jake Kroonstuiver Director 50 Years’ Experience
Gail Kroonstuiver Director 45 Years’ Experience
Adrian Kroonstuiver Workshop Manager 25 Years’ Experience
Jason Kroonstuiver Transport Manager 27 Years’ Experience
Jo Lucas Administration/Accounts
Kim Kroonstuiver Administration/Accounts
Darren Peacock 2IC – Boiler Maker 27 Years’ Experience
![Page 6: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/6.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
OUR MANAGEMENT STRUCTURE
![Page 7: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/7.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
QUALITY ASSURANCE
WORKSHOP FABRICATION: QUALITY CONTROL
During Manufacture and fabrication for our projects, we have systems in place to manage our Quality
Assurance from the start to the completion of each project. Upon request, comprehensive reports are
collated and submitted to our clients at the completion of the project. Our reports document each step of
the process and provide assurance to our clients that their completed product is of the highest quality
standard.
Each component of fabrication, which will include the following test reports and documentation, will be
supplied upon request at time of award.
Inspection and Test Plans
Fabrication ITP’s detailing our workshop processes and test will be included.
Tradesman Qualifications (Macro tests)
A third party certificate can be supplied showing our tradesmen are qualified to complete the fabrication to
AS/ANS ISO 90010
WPQR’s and WP’s
Our Welding Procedure Qualification records will be prepared by a qualified third party, these procedures
will then be followed by Welding Procedure Specifications.
NDT Testing
Non – Destructive Testing will be performed and reported by a third party. All compliance reports will be
supplied to our client.
Steel Test Certificates / Heat numbers
Steel test certificates for each order will be supplied showing heat numbers, batch numbers and the
material conforms to Australian Standards.
Blast & Paint / Galvanising
Compliance certificates / Micron Reading specifications will be reported and conform to Australian
Standards.
![Page 8: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/8.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
WORK HEALTH & SAFETY
Jakes Steel & Welding are committed to ensuring a safe and healthy workplace by eliminating or
minimising the risk of injury and damage to people, property, plant and equipment. We will achieve this by
meeting and exceeding relevant workplace safety laws and embracing a risk management strategy which
includes:
▪ Identifying hazards in the workplace
▪ Assessing risks to workers and others
▪ Deciding upon and implementing measures to control those hazards
▪ Monitoring that the controls are effective
Jakes Steel & Welding adopts the hierarchy of hazard controls plan to effectively manage all risks
associated with the works completed.
We are committed to ensuring the provision of:
▪ A Safe work environment
▪ Suitable, safe and well maintained equipment, including PPE
▪ Information, instruction, training and supervision to ensure competence and safety
▪ Safe systems of work for our workers
▪ Safe use, storage and transportation of substance used in the workplace
Jakes Steel & Welding is committed to environmental awareness and preservation is reflected throughout
our company. We conduct business in a manner that manages environmental issues responsibly. We
fulfil this commitment by:
▪ Complying with environmental regulations
▪ Conduct operations in an environmentally sound manner
▪ Apply the principles or reduce, reuse and recycle in all processes
▪ Promoting environmental responsibility among our employees
Jakes Steel & Welding involve all employees in all levels of the company to help plan, develop and manage
health and safety in the workplace. Workers have obligations under the Work Health and Safety Act 2011
and are expected to follow all company safety directives to create and maintain a safe and healthy
workplace.
![Page 9: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/9.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
NORTHERN TERRITORY SECURE FACILITIES PPP
Under contract to Sitzler Boulderstone Joint Venture, the Northern Territory Secure facilities PPP was a
split contract with a number of buildings being awarded to several contractors. Jakes Steel & Welding’s
contract was the supply, fabrication, delivery to site, onsite installation/erection of seven (7) medium and
high security Prison buildings for male and female inmates. Creating individual cells, living areas and the
gate house using over 700 Tonne of Structural steel. The Prison itself, now currently holds over 800
prisoners.
![Page 10: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/10.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
SKYCITY CASINO – HIGH ROLLERS ACCOMMODATION
Under contract to John Holland, the Skycity Casino was a supply, fabricate and install/erection of the High
Rollers accommodation and lagoon pool bridge. This project of 200 Tonne was met with many challengers
with very limited space for delivery and crane access as well as environmental concerns as the structures
were additions to the already existing Skycity Casino and located on Darwin’s major beach front.
![Page 11: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/11.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
MARRARA SPORTING COMPLEX – SEATING CANOPY
Under contract to Sitzler Pty Lty, The Marrara Sporting Complex received a new curved roof for their
grandstand structure. Jakes Steel & Welding’s contract was to supply, fabricate and install/erect the 30
Tonne structural steel.
![Page 12: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/12.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Elcho Island, Bathurst Island & Ramingining Housing
Contracted to Territory Alliance, Jakes Steel & Welding supplied and fabricated over 40 house frames to
remote communities on Elcho Island, Bathurst Island and Ramingining. Meeting Barge delivery deadlines,
the project was a huge success in helping to boost infrastructure and employment in remote communities
![Page 13: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/13.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Palmerston Special School
Contracted to Sunbuild, the Palmerston Special School is approximately 110 Tonne of Structural steel.
Jakes Steel & Welding are to supply, fabricate, deliver and install/erect all structural steel. The school is
broken up into individual buildings with breezeways all located under one main roof structure.
![Page 14: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/14.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Robertson Barracks
Contracted to John Hollands. Jakes Steel & Welding was contract to Supply 700 Tonnes of Structural Steel
for new Logistic Sheds on our Local Defence Base. As this project was carried out for the Australian
Defence Force, for security purposes no pictures of this project are available to view.
![Page 15: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/15.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Larrakeyah Barracks
Under contract to Sitzler Pty Ltd, This Australian Defence Force Project was made up of 200 Tonnes of
Structural Steel. Jakes Steel & Welding Pty Ltd supplied and erected/installed the accommodation
dwellings on the Larrakeyah Compound. Due to Security Purposes no pictures of the project are available
to view.
![Page 16: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/16.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Braitling School – Alice Springs
Under contract to Asbuild, This project was to supply and erect/install for the new Braitling School in Alice
Springs. One Main building and seven Shade structures. 35Tonne of Structural Steel was fabricated in
Darwin and transported for Install at Alice Springs.
![Page 17: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/17.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Centre Point Roof
Under contract to Paspalis. Supply and Install new roof for the Paspalis Building. This project was met
with a few challengers. From timeframes to crane access and road closures to safely unload and position
roof elements in place. Many businesses and tenants of surrounding businesses were required to be on
board in order to make the install a success.
![Page 18: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/18.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Ramingining School
Contracted to Probuild NT we undertook the Supply and erection/install of the remote Ramingining School.
Located 552km East of Darwin this culturally rich Indigenous community is located on the edge of the
Arafura Swamp. As well as being used as a working class room within the school, this building also serves
as a community Cyclone Bunker.
![Page 19: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/19.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Mackillop College - Crucifix
Palmerston’s local Catholic college were after a standout piece for the front of their school. Fabricated in
our workshop and erected on site was this fantastic 8 meter high Crucifix with the Southern Cross stars
attached.
![Page 20: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/20.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
PAST PROJECTS
Djurrubu Yard – Maintenance Structures
Supply and Erection/Install of Maintenance Structures at Dujjubu Yard Jabiru for the indigenious Rangers
program. Washbays, Covered areas and walk ways and tank stands.
![Page 21: CAPABILITY STATEMENT€¦ · Inspection and Test Plans Fabrication ITP’s detailing our workshop processes and test will be included. Tradesman Qualifications (Macro tests) A third](https://reader035.vdocuments.net/reader035/viewer/2022070211/60fd4f6dcf859a518f537ee7/html5/thumbnails/21.jpg)
C:\Users\JSW\Dropbox\POLICIES - Jakes Steel & Welding\CAPABILITY STATEMENT new 2019.docx
Contact Details
Website: www.jakessteel.com.au
Director/s: Jake & Gail Kroonstuiver [email protected]
Mobile: 0418 895 190
Workshop/Project Manager: Adrian Kroonstuiver [email protected]
Mobile: 0418 893 939
Accounts/Admin: Jo Lucas & Kim Kroonstuiver [email protected]
Phone: (08)8947 5452
Transport/Operations Manager: Jason Kroonstuiver [email protected]
Mobile: 0418 893 290
Postal Address: PO Box 38455, Winnellie NT 0821
Business Address: 14 Nebo Road, East Arm NT 0822