Capacity Charts for the Hydraulic Design of Highway Culverts Hydraulic Engineering Circular No. 10 November 1972* Prepared by the Hydraulics Branch, Bridge Division, Office of Engineering, Federal Highway Administration, Washington, D.C. 20590 CONTENTS Section I Introduction II Description of Capacity Charts A. Scope of Charts B. Composition of Charts C. Reading of Charts III Requirements and Limitations for Use of Charts IV Special Uses of Capacity Charts V Design Considerations A. Magnitude and Frequency of Floods B. Design Floods C. Allowable Headwater D. Other Factors VI Design Data A. Hydrologic Data B. Topographic and Other Site Data C. Stream Channel Calculations D. Design Data Tabulation E. Multiple Barrel Culverts VII Culvert Capacity Charts VIII Appendix A. Hydraulic Principles and Compilation of Charts B. Accuracy of Chart Solutions C. Chart Listing Page 10-1 10-2 10-2 10-3 10-4 10-7 10-9 10-14 10-15 10-15 10-16 10-17 10-18 10-18 10-18 10-19 10-20 10-21 10-22 10-75 10-75 10-82 10-90 *Reprint of March 1965 publication U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION Archival Superceded by HDS-5 3rd edition - April 2012

Upload: others

Post on 12-Sep-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Capacity Charts for the Hydraulic Design of Highway Culverts

Hydraulic Engineering Circular No. 10 November 1972*

Prepared by the Hydraulics Branch, Bridge Division, Office of Engineering, Federal Highway Administration, Washington, D.C. 20590

CONTENTS

Section

I Introduction

II Description of Capacity Charts A. Scope of Charts B. Composition of Charts C. Reading of Charts

III Requirements and Limitations for Use of Charts

IV Special Uses of Capacity Charts

V Design Considerations A. Magnitude and Frequency of Floods B. Design Floods C. Allowable Headwater D. Other Factors

VI Design Data A. Hydrologic Data B. Topographic and Other Site Data C. Stream Channel Calculations D. Design Data Tabulation E. Multiple Barrel Culverts

VII Culvert Capacity Charts

VIII Appendix A. Hydraulic Principles and Compilation of Charts B. Accuracy of Chart Solutions C. Chart Listing

Page

10-1

10-2 10-2 10-3 10-4

10-7

10-9

10-14 10-15 10-15 10-16 10-17

10-18 10-18 10-18 10-19 10-20 10-21

10-22

10-75 10-75 10-82 10-90

*Reprint of March 1965 publication

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 2: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

FEDERAL HIGHWAY ADMINISTRATION Hydraulic Design Publications

The engineer who designs hydraulic structures for highways is aware of the dearth of design information in this field. Because of this lack of design information, the Federal Highway Adminis­tration conducts and sponsors research to obtain data on which to base sound hydraulic procedures. The Federal Highway Administration analyzes research results and studies the practical aspects of design.

As design information is developed, it will be made available through the in-service Hydraulic Engineering Circulars for limited distribution to highway agencies preparing construction plans . The contents of these circulars will vary, but basically, they will contai.n general design infor­mation, including methods and procedures presented in a simple manner for ready use by highway engineers. Some material will be preliminary or tentative, subject to change upon further research. Criticisms and suggestions on material contained in the circulars are welcomed.

Some circulars and related documents are available for purchase from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C., 20402, at the prices listed below. Requests for documents not available at the Government Printing Office and suggestions on the contents of the circulars should be addressed to the Federal Highway Administration, Bridge Division, Office of Engineering, Washington, D.C., 20590. Payment should accompany orders to the Government Printing Office.

Hydraulic Engineering Circulars

Limited number available to State Highway Departments and other public agencies from the Federal Highway Administration.

HEC No. - SELECTED BIBLIOGRAPHY OF HYDRAULIC AND HYDROLOGIC SUBJECTS - August 1970

HEC No. 2 - ESTIMATED FLOOD DISCHARGES IN PIEDMONT PLATEAU - November lg6o

HEC No. 3 - HYDROLOGY OF A HIGHWAY STREAM CROSSING - January 1961

HEC No. 4 - ESTIMATING PEAK RATES OF RUNOFF FROM SMALL WATERSHEDS - (Individual circulars for parts of some States east of l05th Meridian) .

HEC No. 10 - CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS - November 1972

Available from the Superintendent of Documents.

HEC No. 5 - HYDRAULIC CHARTS FOR THE SELECTION OF HIGHWAY CULVERTS - December lg65 - 55 cents

HEC Nos. 6, 7, and 8 - Discontinued

HEC No. 9 - DEBRIS-CONTROL STRUCTURES - March 1971 - 50 cents

HEC No. 11 - USE OF RIPRAP· FOR BANK PROTECTION - June 1967 - 50 cents

HEC No . 12 - DRAINAGE OF HIGHWAY PAVEMENTS - March 1969 - $1 . 00

BEC No. 13 - HYDRAULIC DESIGN OF IMPROVED INLETS FOR CULVERTS - August 1972

Hydraulic Design Series

HOS No. - HYDRAULICS OF BRIDGE WATERWAYS - Second Edition 1970 - $1.25

HOS No. 2 - PEAK RATES OF RUNOFF FROM SMALL WATERSHEDS - 1961 - Out of Print

HOS No. 3 - DESIGN CHARTS FOR OPEN-CHANNEL FLOW - 1961 - $1.50

HOS No. 4 - DESIGN OF ROADSIDE DRAINAGE CHANNELS - 1965 - 65 cents

Electronic Computer Programs

Limited number available to State Highway Departments and other public agencies from the Federal Highway Administration.

HY-1 - HYDRAULIC ANALYSIS OF CIRCULAR CULVERTS

HY-2 - HYDRAULIC ANALYSIS OF PIPE-ARCH CULVERTS

HY-3 - HYDRAULIC ANALYSIS OF BOX CULVERTS

HY-4 - HYDRAULICS OF BRIDGE WATERWAYS

HY-5 - FLOOD RECORD COMPILATION AND FREQUENCY PLOT

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 3: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

U.S. DEPARTMENT OF TRANSPORTATION Federal Highway Administration

CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Prepared by Lester A. Herr Deputy Chief, Bridge Division

Off ice of Engineering

In Collaboration with Herbert G. Bossy, Retired Formerly Hydraulic Research Engineer, Structures and Applied

Mechanics Division, Office of Research and Development

I. INTRODUCTION

Since hydraulic capacity is one of the most important factors in the design of a highway culvert, simple methods for making this deter­mination are needed. This circular contains a series of hydraulic capacity charts which permit the direct selection of a culvert size for a particular site without making detailed computations.

The charts in this circular do not replace the nomographs of Hydraulic Engineering Circular No. 5 (HEC No. 5). The procedures given in the two circulars supplement each other by providing a solution for most designs likely to be encountered. Both circulars give identical answers in certain ranges of hydraulic operation, but the nomographs of HEC No. 5 must be used for the higher headwater depths and in cases of submerged outlets. This circular discusses the requirements and limitations for the use of the capacity charts and the instructions tell when HEC No. 5 must be used.

The designer , after becoming familiar with the capacity charts, will discover that these direct-reading charts have advantages over the trial and error procedure used in HEC No. 5. For instance, the capacity of the various types and sizes of culverts in common use can be compared rapidly and the charts provide a more accurate solution for low headwater depths which is the main limitation in the use of HEC No. 5. Sometimes the chart answer must be modified if a special culvert is used or an unusual site condition is encountered, but for the majority of culvert problems the capacity charts are adequate for the selection of a culvert size.

A list of the culvert capacity charts is given on the last page of this circular for eacy reference. All symbols, notations and descriptive terms used are the same as in HEC No. 5 and the appendix

10-1

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 4: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

contains a discussion of the hydraulic computation methods used in compiling the culvert capacity charts.

In addition to the capacity charts and instructions for their use, this circular includes a brief discussion of other desig~ consid­erations to emphasize that culvert capacity is only one of the many problems confronting the engineer in the design of a culvert.

II. DESCRIPTION OF CAPACITY CHARTS

A. Scope of Charts

Charts for nearly all culverts commonly used for highway construc­tion are contained in this circular. The principal shape classifica­tions are square, rectangular, circular, oval, and pipe-arch sections. A barrel shape is represented by separate charts if the barrel materials have significantly different roughness characteristics. Separate charts are not included for vitrified clay or timber culverts. Culverts of these latter materials may be designed by using the charts for concrete culverts. A list of charts is given on the last page of the circular.

The two basic types of culvert inlets included in the charts are: (1) headwalls with wingwalls and (2) projecting barrels to toe of embankment. The capacity charts can be used for several other entrance treatments without appreciable error. These entrances are discussed on the page preceding each group of charts.

Headwalls are comm.only used in combination with wingwalls placed at various angles of flare, ranging from oo to 900 with the longi­tudinal axis of the culvert. In box culverts flared wingwalls placed at 300 to 75° with the longitudinal axis are superior to wingwalls at other angles of flare. Two sets of charts for box culverts are included to show the hydraulic performance with these different angles of flare.

Tests have shown that wingwalls have little effect on the capacity of circular pipe or pipe-arch culverts. For these sections, the form of the edge at the entrance is the prime factor affecting capacity. A corrugated metal pipe projecting beyond the fill slope provides a thin­edged inlet and gives less capacity than the same pipe incorporated in a headwall. Consequently, all metal culverts are classified as a pro­jecting or a headwall entrance on the charts.

Concrete pipes and other pipes made of material having a relatively thick wall perform nearly the same with or without headwalls. The standard tongue-and-groove pipe joint, if used as an entrance, pro-vides sufficient enlargement to form the most efficient inlet of those commonly used. Charts for concrete pipe are provided for a square-edge entrance and for a groove-edged entrance with the limitation of various types of wingwalls given on page 10-35.

10-2

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 5: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

In the "chart listing" on the last vage of this circular, mitered inlets or standard end-sections are not given. Separate charts are not required for these inlets, since the performance of these inlets is similar to other types that are included. The mitered inlet on metal pipe gives .approximately the same performance as a projecting metal pipe (see chart 5 of HEC No. 5). Standard concrete and metal end-sections have the same headwater discharge relationship as a square-edged concrete pipe or a metal pipe in a headwall. Charts for these respective end treatments may be used for these standard end-sections, pgs. 10-35 and 49.

All the charts are designed for a range of headwater, discharge, length, slope and size adequate for the design of most highway culverts . The make-up of the charts is discussed in "Composition of Charts" below and in the appendix.

The use of the charts for the hydraulic design of special culverts, such as broken grade lines or paved inverts, is discussed in sec . IV, "Special Uses of Capacity Charts."

B. Composition of Charts

Each culvert capacity chart contains a series of curves which show the discharge capacity of each of several sizes of similar type culverts for various depths of headwater. Headwater depth is given in feet above the invert of the culvert at the inlet, referenced to the first complete cross-section of the barrel. The discharge rate per barrel is given in cubic feet per second (cfs). The invert of the culvert is defined as the low point of its cross section (sometimes referred to as the flow line). The solid-line curves represent inlet control and the dashed-line curves represent outlet control. (See HEC No. 5 or appendix A of this circular for a discussion of these controls) . The L/100S0 ratio marked on the curves is used to measure the degree to which head­water is influenced by length (L in feet) and invert slope (So in ft./ft.).

The solid-line inlet-control curves are plotted from model test data. A description of inlet control flow and diagrams of various stages of this condition are shown in HEC No. 5. In inlet control the inlet edge contour and the barrel size control the depth of headwat er. The length and roughness of the barrel and the flow in the outlet channel have no effect upon the headwater required to discharge a given rate of flow in inlet control.

The dashed-line outlet-control curves were computed for culverts of various lengths with relatively flat slopes. Further details regarding the methods for computing the curves are given in appendices A and B. Free outfall at the culvert outlet was assumed. For this free outfall condition, tailwater or flow in the outlet channel has no effect on culvert performance. Diagrams of outlet control flow where the outlet is not submerged by tailwater are shown in figures 2B, C and D of HEC No. 5.

10-3

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 6: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

For all culvert types flowing in outlet control, loss of head at the entrance was computed by use of the entrance loss coefficients of table 1, appendix B, HEC No. 5. The hydraulic roughness of the various materials used in culvert construction was taken into account in com­puting resistance loss in full or part-full flow with outlet control of headwater. The Manning n values used for each culvert type are given in appendix A-4.

Headwater depths shown in the charts extend to 3 times the culvert height except for the large pipe sizes. Pipe-arches and oval pipe show headwater up to about 2.5 times their height, since they are normally used in low fills. The dotted line, stepped across the chart curves, shows headwater depths of about twice the barrel height. This line in­dicates the upper headwater limit for the unrestricted use of the charts. (See sec. III, "Requirements and Limitations for Use of Charts".)

The headwater depth given by the charts is actually the difference in elevation between the culvert invert at the entrance and the total head; that is, depth plus velocity head for flow in the approach chan­nel. In most cases the water surface upstream from the inlet is so close to this same level that the chart determination may be used as headwater depth for practical design purposes.

C • Reading of Charts

The capacity charts may be used for determining headwater or dis­charge of a given culvert installation or for selecting a size which will operate under a given set of conditions.

For purposes of illustrating how the charts are read, sections of charts are shown in fig. l. Fig. lA contains curves for a 36-inch pipe taken from chart No. 19, and combines in one graph the two sepa­rate sets of curves for a ~6-inch projecting entrance standard corruga­ted metal pipe. Included are the inlet control curve with L/10080 of 50, and two outlet control curves with L/100S0 of 250 and 450. Addi­tional curves for L/10080 of 100, 200, 300 and 400 have been added to the chart 19 curves by linear interpolation. These additional curves are located by measurement along several discharge lines to divide the headwater deptb range between curves into intervals proportionate to L/10050 • The curves are shown to aid in illustrating the interpola­tion procedure which is to be used in reading headwater from a culvert capacity cha.rt when the given L/100S0 ratio is different from the chart curve.

Headwater depth is read from a capacity chart by entering at the design Q and following up the chart to intersect a curve with an L/10050 value computed fran the length and slope of the particular cul­vert to be investigated. Headwater is read on the ordinate scale. Fig. lA is pre-pared to show how this is done. If L/10080 is 50 or less, the culvert operates in inl.et control, and headwater depth is read on the solid line inlet control curve. No lesser depth o~ headwater is

10-4

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 7: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

t-= LL 6

INTERPOLATED z L

IOOSo CURV/

(a) 36 - INCH STANDARD 3 ~'f--+--+--t--+--+-t--+-+---+--+ CORR. METAL Pl PE

PROJECTING ENTRANCE

2 .__...___.__.___...~.__.....__.____,,___.~......___._---'-__._~....._.......__.____,,___.~~ 30 40 50 60 70

DISCHARGE IN C.F.S.

L = 240 FT. So= 0 .002

L 240 100 So= 0.2 = 1200

i-: LL 7 ..---.---t----t--z DESIGNATES

(b) 42" TO 54" CONCRETE Pl PE GROOVE-EDGED

ENTRANCE

3 1&.....o1E::....111:_,,c_.l..._-..L-~"'---'-~-L--L...~..L----1..~....1..---1.~....1-.....:.....i.~....L..---l~-'---l~-L---1L....-~

40 60 80 100 120 140 160 180 200 220 240 DI SCH AR GE IN C.F. S.

Figure I - TYPICAL CULVERT CAPACITY CHARTS

10-5

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 8: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

possible even for smaller L/10080 values. If the L/lOOS0 happens to be that ot one of the curves shown, headwater depth would be read from that curve. For any L/100So value other than shown on the curves and within the chart limit, i.e., greater than 50 and less than 450, head­water depth must be read by interpolation between the curves.

For example, consider a peak discharge rate of 50 cfs. For a 36-inch culvert 78 ft. long on a 0.0056 slope (L/10050 ,= 140), headwater depth will be 5.2 f't. Another culvert l.66 ft. l.ong at o.5'f, slope (L/lOOS0 = 330), wil.l require a headwater depth of 6.3 ft. at the same discharge rate.

It should be noted that the latter probl.em begins to get into the range of headwater depths (above 2D) where less reliable determinations of headwater can be made as discussed in "Composition of Charts", sec. II B. If' the accuracy of the 6.3 ft. headwater depth is important to the solution of the problem, this depth should be checked by procedures given in HEC No. 5.

The factors governing culvert size selection include the design discharge rate, a limiting headwater depth, the culvert length and in­vert slope. The type of culvert must be preselected in order to lo­cate the capacity chart to be used. Figure lB, which is a part of chart No. 13 with an expanded scale, is used to demonstrate culvert size selection. The type selected is a concrete pipe with a groove­edged entrance •

For a culvert length of 240 ft. and slope of 0.002 as shown in fig. lB, a range of headwater and discharges can be studied for the three sizes of groove-edged concrete pipe shown. The L/10080 ratio is 1200, therefore headwater-discharge values may be determined accurately along the "1200 curve" up to the HW = 2D line. If the problem under consideration stated that the discharge was 100 cfs for a limiting headwater of 6.0 ft., a 48-inch pipe must be selected, since the smaller 42-inch size gives a headwater of 6.8 ft. A 48-inch gives a headwater of 5.2 ft.

(The "HW == 1. 3D lines 11 shown on fig. lB are limits below which the maximum L/10080 ratios on the capacity chart may be extrapolated to 1. 5 the value shown. In this case the curves may be extrapolated to L/10060 of' 1800 below HW = l.3D as discussed in sec. IV, case 9. The l.3D lines are not shown on the capacity charts.)

A discharge rate of 120 cfs and an allowable headwater depth (AHW) of 6.o ft. wil.l be used to illustrate further the culvert selection procedure. Inspection of fig. lB or cha.rt No. 13 reveals that a 42-inch diameter culvert of this type would not be adequate for any length-slope ratio, because the minimum headwater depth is 7.4 ft. for the 120 cfs, not the 6.o ft. desired. A 48-inch size would be a proper selection for all L/100S0 ratios less than approximately 900. Some extreme length and small slope conditions giving higher L/lOOSo ratios would require a 54-inch culvert.

10-6

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 9: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Some specific L/10080 ratios will be considered for the above al­lowable headwater of 6 .O ft. and discharge of 120 cf's. If L/100So is approximately 90.0 or less, a 48-inch size would satisfy the limiting headwater of 6 .O ft. according to fig. lB. A check computation may be made by use of the proper full-flow nomogra.:ph found in HEC No. 5. As­swning a culvert length of 210 ft. and a slope of 0.0023, L/lOOS0 = 910. Solving the problem by use of the full-flow nomograph and procedures of REC No. 5, it is found that H = 3.0 ft. and ho = 1/2 (3.3 + 4.o) = 3.6 ft. For the conditions stated LS0 = 0.5 ft. Therefore, HW = H + ho - 1,s0 = 6 .1 ft. Considering the minor inaccuracies that are inevitable in reading the graphs, the two methods check.

Another problem for the same Q and AHW could involve a long cul­vert on a small slope, say L = 360 ft. and S0 = 0.0024, so that L/10080 = 1,500. Obviously, from reading the chart the head.water exceeds 6.o ft. for the 48-inch culvert, therefore, ,a larger culvert must be selected. By extrapolation of' the 54-inch pipe curves for an L/10080 of 1,500, instructed by sec. IV, case 9, the headwater is read as 5.3 ft. (This headwater is less than l.3n. Therefore, extrapolation is permitted by case ya.) A more exact method, based on a backwater profile computation, (not shown) gives HW = 5.25 ft. An outlet con­trol computation as given i n HEC No. 5 gives HW = 2.2 + 3.8 - 0.9 = 5.1 ft., but this value of headwater as stated in the nomograph method, is slightly below the range for accurate answers. It should be clear, however, that either extrapolation of the capacity charts or the use of the nomographs of HEC No. 5 is adequate for the proper selection of a culvert size to pass the 120 cfs within a headwater limit of 6.o ft.

III. REQUIREMENTS AND LIMIXATIONS FOR USE OF CHARTS

Because culvert flow problems vacy in complexity it is difficult to express headwater-discharge relationships in simple curves or charts without some limitations. The culvert capacity charts are de­signed to provide an easy method for the direct selection of culvert size for the majority of highway culvert installations, but the follow­ing requirements and limitations for the direct use of the charts must be observed for correct solutions .

A. Requirements and Limitations

1. The culvert type under consideration must be represented by the chart as noted in the title. (Other inlet types can be used -- see B-1 next page.)

2. The culvert size must be included on the chart.

3. The culvert invert must be on a continuous straight-line slope from inlet to outlet, and slope downward in the direc­tion of flow (not level).

10-7

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 10: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

4. The L/lOOS0 ratio must not exceed the largest value shown on the chart for the size invo.lved.

5. The headwater depth must be less tha:r1 2D for the size considered .•

6. The elevation of the tailwater in the outlet channel must not submerge critical depth at the outlet. (Critical depth for various culvert sections may be found from charts in H.EC No. 5.)

B. Problems Not Meeting Above Requirements

Problems will be encountered which will not meet the above require­ments for the direct solution by the charts. In many cases these prob­lems can be solved by finding a chart for a culvert of similar character­istics {and, therefore, the same hydraulic performance) or by modifica­tion of the problem so that one of' the charts i s applicable. Therefore, the above requirements and limitations are discussed in the following paragraphs to broaden the use of the charts.

l. The charts may be used for some entrance types o·ther than shown in the titles. The instructions preceding each set of charts list equivalent entrance types. Some charts may be used for solving problems involving other mater::l.als with similar rough­ness characteristics, i.e., vitrified clay can be assumed to have the same roughness as concrete. Also instructions are given in sec. IV, cases l and 2, for modification of problems wb.en a corrugated metal pipe is paved.

2. Instructions for the use of the charts when sizes are not in­cluded on the charts are given in sec. IV, cases 3 through 6.

3. Procedures for the selection of culverts on zero slopes and. broken grade lines (broken-back) are given in sec. IV .• ct:!,ses 7 and 8, respectively.

4. When a L/100S0 ratio exceeds the cha.rt' s value for the size involved, refer to sec. IV, case SJ for instructions.

5. When the headwater depth exceeds 2D as indicated by the step­dotted line of the charts, values read from the curves become less reliable. If accurate headwater depths are important in this range, they should be checked by procedures in HEC No. 5.

6. The charts are prepared for free flow conditions at the outlet, i.e., tailwater is sufficiently low that it does not modify flow in the culvert. Therefore, a chart solution for culvert size should not be accepted until the depth of flow in the out­let channel has been compared to the indicated culvert barrel height and to critical depth at i ts outlet. Ch.ctrts giving critical depth at the outlet are i nduded i.n UF,C No. 5.

10-8

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 11: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

The following procedures must be followed to determine headwater for the tailwater cond:i ti.ons stated:

a. Tailwater depth is less than barrel height and less than critical depth at the culvert outlet. Jn this case the culvert capacity chart solution for headwater depth is de­p~ndable, as in A-6 above.

b . Tail.water depth submerges the crown of the cu.lvert outlet. In this cv.se do not use the capa.ci ty charts, but follow procedures of HEC No. 5. .

c. Tailwa.ter elevation lies be_tween critical depth and the crown of the culvert at the outlet. Find HW from the ca.­paci ty cha.rts as directed by steps (1) or (2) and check answer by (3) below:

(1) I:f' L/100S0 is equal. to or greater than 1/2 of the value on the solid

1line curve of the capa.ci~y chart,

find HW by adding ~ (TW - de) to the chart determina­tion of HW, thP.n cnP.ck (3).

(2) If L/100S0 is less than 1/2 the value on the solid line curw~, d.etermine HW by using chart value of HW, then check (3).

(3) In some cases, es:pecially in pr0blems involving large culverts and low flow, t,he tail water elevation could be higher than the HW.elevation given in steps (1) and (2). If the t.'i\ilws:ter elevation is higher than above HW determination, refer to ~rocedures in REC No. 5.

IV. SPECIAL USES OF CAPACITY CHARTS

r-:}ome culverts ca.nnot be selected directly fr0m ~ culvert capacity cht!..rt because one or more of the requirements of sec. III are not met. In order t~hat the chA.rts can be more r.enera.lly applicable, several sueciaL useR are descrfoed h.elow:

If the barrel roughnes$ is changP.d by pavement of some type, use the <~hart f'oi- an unpaved culvert nf the SF!JJle

entrance type. Reduce the culvert length by means of the following instructions and con:pute L/l00S0 using re­duced length . 'l'hen ur.e the chart in th~ n0rmal D'F.nner.

o.·r5 L i'nr standnrd or structur!-il plate circu1~.r C.M. pipe with 0 'j<fo of circu..'r:ferenc:e TJrnred.

10-':f

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 12: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

0.60 L for standard (1/2") C.M. pipe-arch with 40% of circumference paved.

0.67 L for structural plate (2") C.M. pipe-arch with 33% of circumference paved (average value).

Case 2. Fully paved corrugated metal pipe with headwall entrance.

Use the square-edged entrance concrete pipe culvert charts, with L/10080 computed for the total length. The charts cannot be used for projecting entrance C.M. pipe nor for C.M. pipe-arch. For the latter cases, use the C.M. pipe of pipe-arch nomographs of REC No. 5, adjusting the culvert length on the basis of n = 0.012 for outlet control.

Case 3. Rectangular concrete box culverts of 5 ft. height or more.

a. Select a trial size square box of the height desired.

b. Determine from chart the discharge Q for the allowable headwater and the square box selected. If Q is not equal to the design Q, find the required span B as follows: Determine discharge per foot of span (q) for the square box using the Q determined from the chart.

Q Design The required span B = q • If the span-to-height

ratio is not satisfactory, try another trial square culvert.

c. All other conditions required for the direct use of the charts must be met, including the adjustment of HW for TW depth.

Case 4. Circular pipe sizes not included in the charts for concrete or corrugated metal pipe.

If all other conditions required for the direct selection procedure are met, pipe sizes of diameter half-way between those shown in the chart (such as half-foot diameters above 72-inch, or quarter-foot diameters below 36-inch) may be selected by interpolation horizontally as follows:

a. The Q-AHW point of the problem must be between chart curves, and sufficiently above the lower curve (larger size) to indicate that an intermediate size may be acceptable.

b. Note whether the culvert L/10080 , as applied to the two adjacent sizes included in the chart, indicates that HW would be read on the solid line curve, a dashed line curve, or an intermediate position.

10-10

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 13: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

c. Working on the first HW grid line of the chart below AHW, note the point on the line a.t which the proper curve of L/10080 for each of the adjacent chart sizes, from step b above, will cross the selected HW grid line.

d . Then measure horizontally on this grid l~ne to find a point midway between the two points found in step c • The headwater curve for the intermediate culvert size, as defined by L/10080 , will pass through the midway point and be parallel with the chart curves of the same L/10080 •

e. .Examination of the approximate path of this i nterpo­lated curve tor the intermediate size will show whether it will be below the Q - AHW point defined by the design conditions. If so, the size is acceptable. It not, use the next larger size, which in these cases is included in the chart.

t . Make adjustment for 1W if necessary .

Case 5. Oval concrete pipe sizes not on the charts.

Three of the available pipe sizes within the range · covered by charts 15 to 18, i.e., numbers 3, 5 and 7, are not in­cluded in the charts because of the small differ~nce in headwater depths between the sizes shown. The headwater curves for each will pass through points on horizontal lines (headwater depth lines) midway between the curves for the adjacent chart sizes. The procedures of Case 4 are used to obtain an interpolated curve for the inter­mediate size based on the culvert L/l.OOS0 • A table of' oval pipe sizes is given in the instruction sheet preced­ing chart 15.

C 6 C ted t t al nl t (2" X 611) ' h ' t ase • orruga s rue ur ...-,a e _ _ pipe-arc sizes no

on the charts.

The culvert capacity charts include headwater curves for only 8 of the 34 standard sizes generally available. A complete table of sizes of pipe-arches with corner plates of 18-inch inside radius, with dimensions and area of each, is included i n the instruction sheet preceding the pipe-arch charts, p. 10-70. The number of sizes avail­able between those represented by curves on the charts .YB.ties_ as shown by the listing of' sizes. Hodzontal in­terpolation can be used to determine curves for inter­mediate sizes as explained below:

a. The Q-AHW point of the design problem must be between the chart curves. In addition, a significant differ-

10-11

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 14: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

ence in resulting headwater depth should be indicated in order to justify selection of an intermediate size.

b • Find the points at which headwater curves for the two adjacent sizes of the chart, at the culvert L/lOOS0 , will cross the first headwater depth grid line below the AHW point.

c. Divide the horizontal distance along this headwater grid line, as found in step b, into a number of equal spaces corresponding to the number of. intervals be­tween available sizes in the range from one chart size to the next. For example, the horizontal dis­tance between curves for sizes 12 and 17 of the chart would be divided into 5 equal spaces along any head­water depth line, and the curve for size 14 will be found at 2/5 this distance from number 12.

d. The interpolated curve for the intermediate size will pass through the division point on the headwater depth line, as obtained in step c, and will be nearly parallel with the chart curves of the same L/lOOS0 •

e. Examination of the approximate path of this interpo­lated curve will show if HW at design Q is below the AllW point, and therefore the size is acceptable. If not, use the next larger size.

t. All other conditions required for the direct selection must be met, including the adjustment of HW for TW depth.

Case 7. Culvert slope zero (level invert).

The ratio L/lOOS0 cannot be computed for a zero slope, but a size meeting the design requirements can be selected by the following instructions:

a. In order to compute L/lOOS0 for use of the charts, as­sign a fictitious slope S0 , and determine a fictitious fall of the invert L x So. Use the following slopes:

0.002 for all concrete culverts.

0.004 for standard C.M. pipe and pipe-arch, un­paved or paved.

0.010 for structural plate C.M. pipe or pipe-arch, unpaved or paved.

For paved invert C.M. culverts use the reduced lengths of Case l to compute L/lOOS0 and the fall L x 80 •

10-12

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 15: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

b. To select a culvert size from the capacity charts, first reduce the AHW depth by the amount of the tic­ti tious fa.11 introduced in a above. Then use the standard procedure for the use of the capacity charts and the above computed L/100S0 to select an accepta­ble culvert size. The culvert selected should meet the modified AHW requirement .

c. If the actual .HW for the selected culvert is desired for recording purposes in the design procedure, it is. found by adding the fictitious fall to the HW read from the chart.

d. All other conditions required for the direct selection must be met, including the adjustment of HW for ~ depth. The increase for submergence of de by ~ is in addition to the amount L x So added to the chart reading to compensate for the level invert.

e. If a culvert with level invert is also classified as one of the above 6 special cases for culverts not meeting the requirements for the direct use of charts, the above procedure is also used.

Case 8. Culverts with broken slo;pes .

The capacity charts may be used with the cw.vert invert on two different slopes if all other requirements for use of the direct size selection are met. Tailwater depth seldom affects HW for broken slope culverts. In most cases the steep slope ot ei.ther the inlet or outlet sec­tions will establi.sh an outlet veloc:i. ty sufficient to re­pel a depth establ ished by the downstream channel.

With two slopes , the control section may be at the inlet, at the break in grade if the first slope is relatively flat and the second slope is steep, or at the outlet. Outlet control is possible under some conditions regard.­less of the two elopes of the barrel . Therefore, a check headwater computation must be made for outlet control us­ing the total length and procedures in HEC No. 5.

In all cases a trial culvert size i s selected from the appropriate culvert capacity chart on the basis of the ratio L1/1oos

0 for the first sec tion of pipe, where r,1

and 80 equals the length and slope of this section. The

10-13

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 16: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

following procedure is used regardless of whether the slope of the inlet section is the steeper or the flatter of the two slopes:

a. Using L1/100S0 for the first section, determine the size of pipe required, neglecting the second or out­let section of pip·e.

b. Using the entire length of culvert find HW by procedures of HEC No . 5 for outlet control, where

HW = H + h0 - fall of invert (from inlet to outlet)

c . The correct headwater depth will be the highest HW given by steps a or b. If the headwater found in b is above the limiting AHW, the culvert size determined in a is not acceptable and a larger trial size must be selected until the HW in step b is satisfactory.

Case 9. The culvert L/10080 exceeds the chart value.

In such cases, the chart may still be used for culvert selection by estimating the effect of the greater L/lOOSo, but the actual headwater depth for a possible size should be determined before considering that size to be acceptable. The check of HW depth may be made by one of two methods, depending upon relative depth of headwater.

a. If L/10080 is no greater than 1.5 times the largest value shown on the chart curves for the size under consideration, extrapolate above the chart curves on the basis of L/lOOSo to find HW for the design Q. If the resulting HW is equal to or less than l.3D, the answer read from the charts is valid. (Refer to example in sec. II C, p. 10-7 and explanation, appendix B-2, part a, p. 10-84). If HW is greater than l.3D refer to b below.

b . If HW is greater than l.3D or if L/10080 exceeds 1.5 times the chart value for HW less than l.3D, do not extrapolate above the chart curves. Use the size indicated by the capacity chart as a trial size, and determine HW by use of HEC No. 5. If headwater is low, methods of HEC No. 5 may not apply and backwater computations are required if accurate headwater depths are desired.

10-14

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 17: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

V. DESIGN CONSIDERATIONS

The objective in the design of an economical culvert is to provide a waterway opening adequate for the passage of floods. A primary con­sideration in selecting a culvert to meet this objective is the deter­mination of its hydraulic capacity. The hydraulic capaci ty charts in this circular and the procedures of HEC No. 5 solve this problem. There are; however, other important design considerations which must be evaluated by the designer in order that the structure selected will operate satisfactorily. Some of these considerations are discussed briefly in the following paragraphs.

A. Magnitude and Frequency of Floods

In the last half century many formulas have been used to estimate flood discharges or to determine the size of a culvert. These formulas, developed from very limited streamflow data, are adjusted and modified by the designer to meet local conditions as determined by flood experience. Most highway engineers realize the shortcomings of these formulas and in recent years programs for gaging streamflow from small drainage areas have been initiated by many States to improve our methods for estimating floods.

As flood data become available, more reliable procedures for determining the magnitude and frequency of floods are being developed. Such procedures enable an engineer to estimate a design flood at a particular site and to determine a culvert size based on hydraulic principles rather than selecting a culvert on outdated methods used in the past.

The occurrence of floods is discussed in Hydraulic Engineering Circular No. 3, "Hydrology of a Highway Stream Crossing," and procedures for estimating floods on culvert-sized streams are available in many areas. Each l ocal agency responsible for hydraulic design should develop estimat ing procedures for their area of responsibility. If stream-f l ow data are not available, steps should be taken to accumulate the needed records.

The designer of a culvert should remember that once a culvert is installed, its flood capacity is fixed. This fact alone should emphasize the importance of estimating flood discharges and their frequency of occurrence.

B. i Design Floods

Proper design can only be accomplished by first determining the magnitude of the design flood and then selecting a culvert to pass this flood on the basis of hydraulic principles and site conditions. The determination of the design flood is the most difficult part of the

10-15

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 18: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

culvert design problem and involves both selecting the appropriate fre­quency flood and determining its .magnitude .

Two aspects that should be consi4ered are the accuracy of the esti­mating procedure and the probability of the flood selected being ex­ceeded a short time after construction. The selection ,of a flood based on average frequency of occurrence alone is not entirely satisfac:tory since the risks due to a poor estimating procedure, costly construction and damage to adjacent property can be different - even within the limits of one construction project. Standards of risk for various cul­vert locations and types of highways are not well established. The com­mon practice is to design minor roads for low average recurrence inter­vals, say 10 to 25 years and major highways for average recurrence in­tervals of 50 years or more. Specifying a high recurrence interval means the use of a larger design flood and a reduction in the .risk from flooding or washouts but an increase in the cost of the structure.

The average recurrence interval does not measure the degree of safety or risk of damage for short periods of time. A flood. peak of say a 50-year average frequency or recurrence interval has a o.oe prob­ability that at least one flood of this magnitude or greater may occur in any one year. Probability methods may be used to show that it also has an 0 .18 probability, or about a 1 out of 5 chance of being equalled or exceeded at least once in any period of 10 consecutive years. For longer periods, the risk of at least one flood exceeding the 50-year frequency increases as follows: 0.38 for 25 years, o.64 for 50 years and o.86 for 100 years. .

The greatest need in hydraulic research is to develop more accurate flood estimating procedures for small drainage areas so that highway culverts can be designed upon the more adequate basis of an evaluation of the risk arising from the occurrence of flood pea.~s greater than the design flood and the economics of the installation related thereto.

c. Allowable Headwater

Channel properties and discharge determine the depth of flow in a stream channel. A culvert which constricts the flow even a small amount will cause s~me increase in the depth of flow in the natural channel and upstream from the culvert entrance. The depth of water at the culvert inlet, measured vertically from the culvert invert, is called headwater .

The rate of discharge through a culvert increases with depth of headwater. It follows that the most economical culvert will be one which makes use of the maximum rise of the upstream pool {headwater) without en.dangering the roadway or causing significant damage from this ponding.

A culvert can be sized to produce a given headwater depth for a particular discharge. (As headwater increases, discharge increases and

l0-16 ·

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 19: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

herein lies the significance of the allowable headwater as a design consideration.) For a given design flood the allowable headwater can be different for two crossings of the same stream, because of condi­tions at each site which determine ponding that can be tolerated and. the damage which would occur in the event of a greater flood. Differ­ent culvert sizes might be justified for these crossings because of two different allowable headwaters.

D. Other Factors

Velocity of Flow - The flow in culverts is usually at velocities .greater than those in the natural stream. These increased velocities make erosion at the culvert outlet a potential problem. This aspect of design is discussed briefly in HEC No. 5.

Sediment and Debris - The charts of this circular are based on hy­draulic computations assuming clear water flow . It is well known that :flood f'low in particular carries various kinds o:f' debris which could change the capacity :f'rom that given by the charts. In most instances, however, the effect of most moving debris on capacity is minor. Engi­neering judgment mus·t be used to evaluate problems related to abrasion of the culvert walls and deposition of material in the barrel and at the entrance. Slope, alinement and oftentimes the size and type of cul­vert barrel are important factors in transporting sediment and debris. HEC No. 9, "Debris-Control Structures", describes various methods tor the control of debris at the inlet to a culvert.

Structural Requirements - Although the structural design of high­way culverts is not within the scope o.f this circular, it must be pointed out that structural failures have occurred be~'use of hydrau­lic forces. Such failures are associated with uplift!t, bending at the inlet and erosion at the outlet. Some failures are caused by water flowing along the outside of the culvert barrel and washing away supporting material.

Selection of Culvert Types - The selection of the culvert type is often based on the initial in-place construction cost. Although the initial cost is of prime importance , durability, replacement costs and maintenance should be considered in the selection. Ideally, th•3 total annual cost of a culvert installation .for the expected life of the highway should be kept to a minimum, but many factors important to such an analysis are not well defined , making it difficult to justify an individual analysis except for expensive installations.

Alinement and Grade - Ordinarily a culvert barrel is placed on an alinement and grade that generally conforms to the natural stream chan­nel. Culverts skewed with the channel or located near bends can create a problem of sediment deposition particularly if the culvert is composed

j} "Drainage Structures", Highway Research Boa.rd, Bulletin 286 _, page 13, 1~60.

10-17

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 20: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

of several barrels. If straight alinement is not possible, mild curves can be used within the culvert barrel without creating a trap for de­bris.

Because of irregular stream.profiles, culvert barrels are some­times constructed with broken grade lines to avoid costly excavation. Methods for determining the hydraulic capac;i.ty of "broken-back11 culverts are given in sec. IV, case 8 of this circular.

VI. DESIGN DATA

A. Hydrologic Data

The design of highway culverts by use of' hydraulic methods such as the culvert capacity charts, requires that the design flood peak be se­lected by a reliable method, and that the average recurrence int~rval of the design flood be selected on the b•sis of a realistic evaluation of' the damage which would occur during a greater flood. (See sec. v.)

The scope of the problems involved in determining flood magnitudes on an average frequency basis and in selecting the acceptable degree of risk of d.ama8e, make it clear that the estimation of floods is a duty ot the highway design engineer, and may not be assigned to the location or field engineer.

However, the field engineer should obtain and report complete data regarding flood evidence. Highwater marks are very helpful in plotting water profiles and estimating past floods. Downstream controls of water stages should be noted. The size, invert elevations and complete descriptions of existing culverts or bridges can be helpful to the de­signer, particularly if a history of their performance during major floods can be obtained. If overflow of the existing road has occurred, a profile of the roadway will also be necessary. Flood estimates from a frequency analyses should be checked against the calculated rates of flow based upon field data. If serious discrepancies are found, both the field data and the method of flood estimation should be carefully reviewed. The site conditions indicating the degree of damage which may result from unusually high floods should be carefully considered be­fore selecting the average frequency for design. In many cases it will be necessary to tabulate two or more flood magnitudes for use in design decisions, identifying each by its average frequency.

B. Topographic and Other Site Data

Adequate data describing the culvert site must be supplied by the loc~ting engineer. More adequate data can be obtained if survey par­ties are given full instructions as to what is required and why each item is needed. One of the first requirements for design is a drainage

10-18

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 21: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

area map defining each watershed area and showing the highway station number at which each stream channel crosses the route. For small culverts a minimum of data is required, but more extensive data, sometimes including a large scale contour map, are required where the size of the stream indicates · the need for a large culvert. The minimum site survey data needed for culvert 'design are a dimensioned sketch of the channel alinement, with station and angle of crossing, stream cross-sections and a stream bed pr6f ile based on the highway survey datum and referenced to the stream location sketch.

Adequate stream channel data will include a profile extending a sufficient distance each side of the proposed location to determine the stream slope and appropriate culvert invert elevations at inlet and out­let. Sufficient cross sections of the channel should be taken to permit channel flow calculations for estimating tailwater depth. Data regard­ing the flow resistance characteristics (Manning n) of the channel should also be obtained. In addition, the downstream channel should be examined over a considerable distance for any evidence of degradation. Abrupt drops in the channel which may progress upstream to the outlet of a culvert are important design factors and should be fully described.

The survey party should give special attention to locating all structures of land improvement on the upstream. side of the highway that could be damaged if flooded by the headwater pool. The exact elevation at which damage begins should be reported together with a statement describing the kind of damage and the probable costs caused by flooding.

The foundation soils at the culvert site should be investigated. Load carrying properties of foundations for small culverts may be judged by observation or probing, but test borings are usually required for large structures. The field report should aiso include esti~ates of the type, size, and probable amount of drift. This information is obtained from evidence along the stream and from the present and the potential use of the upstream land.

For large, long, or multiple barrel culverts sufficient topographic data should be obtained to permit preparation of large scale layouts. The culvert layout should be superimposed on a contour map prepared from these surveys. The layout is used to select the proper location and skew angle for the culvert and to provide data for calculating excavatmon quantities.

C. Stream Channel Calculations

The depth of flow in the natural stream channel must be calculated for the design flood. The channel sections, slope, and roughness data furnished by the field survey are used for this purpose. These calcu­lations are usually made by assuming uniform flow unless there is an indication that controls downstream regulate the water stage. A plot of discharge against depth will be helpful in determining the stage for a specific rate of flow. The difference between channel stage at design discharge and the elevation of the culvert invert at the outlet is the tailwater depth, TW, in feet. Record this tailwater as Item D-9 following.

10-19

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 22: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

D. Design Data Tabulation

{see Tabulation Sheet in Circular No. 5)

1. Record the highway station number at the stream crossing, the watershed area, and the estimated peak rate or the design flood (more than one if required), designating the average recurrence interval, as for example:

Q10 • 460 cfs. (10-year average frequency)

Q50 = 750 cfs. (50-year average frequency)

2. Plot a roadway cross section along the center line of the cul­vert, using the skew angle indicated by the survey data.

3. From the cross section and the stream profile data, establish the culvert invert elevations at the inlet and the outlet.

4. Where a straight grade is used throughout the culvert length, compute the culvert barrel slope, s0 , in feet per toot, and i:n percent, 100 S0 • Where a broken invert grade is required, de­termine So tor each section of straight grade.

5. Determine the approximate culvert length, L, in feet. '!'he plan length, which may require the culvert height, is not necessary at this stage ot design.

6. Compute the culvert length-slope ratio. L/10080 from the above data . Where broken barrel slopes are used, compute Li/10060 for the section at the inlet and also record the total L and the total fall, in feet, from inlet to outiet invert eleva­tions.

7. Record the elevations of all headwater limits governing the de­sign, such as:

a. Low point of pavement within reach of the headwater pool, or if preferred, the shoulder elevation.

b. Roadway channel bottoms at which overflow could occur.

c. Points at which flood damage to structures on upstream property would begin.

8. From the data of No. 7 above and the inlet invert elevation of No. 3, determine the allowable headWf,l.ter depth AHW, in feet, above the culvert invert at the inlet. If different flood fre­quencies apply to different elevations, record the design Q and AHW for each, for later determination of the governing con­dition.

10-20

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 23: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

9. From the stream channel calculations and the outlet invert elevation of No. 3, record the tailwater depth TW, in feet above the culvert invert at the outlet.

10. Determine Q per barrel, if a multiple culvert is a possible design. (See E below).

E. Multiple Barrel Culverts

In many cases the designer must decide whether a multiple barrel culvert is to be considered as one of the selections used in economic · comparisons. The culvert capacity charts show the discharge rate per barrel. If a multiple culvert, consisting of the same type and size of barrel, is placed so that all the elements are equal, the total dis­charge is assumed to be divided equally to each of the barrels. Dissim­ilar barrels or unequal invert elevations require a trial procedure to find individual barrel discharge rates so that their sum equals the total Q at a common headwater elevation (but not necessarily equal HW depths).

Often the choice of culvert barrel height is restricted by the elevation of the roadway, and in some cases, it may be necessary to use arch or rectangular sections rather than raise the proposed roadway grade to provide cover for a circular section.

The general magnitude of culvert opening area required by the design flood is one factor involved in the decision as to types of culverts to be considered. Small flood peak rates may indicate that a small pipe culvert will be the economical choice. As the flood rates become larger, it is not at once obvious whether a single opening or multiple openings may be most advantageous. Selecting span and height dimensions most suitable for the site complicate the problem.

The following equation is suggested as a means of estimating a trial size:

Total area of culvert opening = .Q._ 10

The total culvert area in square feet, an approximation only, may indicate use of a single barrel or a multiple culvert. Division of the total flood peak by the number of barrels of a trial selection wi ll obtain a design Q per barrel to be used in selecting a culvert size from the charts.

10-21

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 24: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII. CULVERT CAPACITY CHARTS

The culvert capacity charts in this section provide a means for selecting a culvert of adequate size to convey the design discharge rate per barrel without exceeding an allowable depth of headwater determined by the site conditions. The allowable headwater depth AHW,

. and the actual headwater depth HW that results from the culvert size selected, are measured in feet above the culvert invert at the inlet. The 36 culvert capacity charts are divided into 8 groups according to eight basic types of culverts as determined by barrel shape and material. The charts appear in the order of the list shown on the last page of this circular.

Each group of charts is preceded by an explanation of the factors determining the two main inlet types represented by the charts. Infor­mation regarding other inlets types classified as equivalent to one of the two types shown in the titles and other design data necessary to the use of each group of charts are also included. Tables of dimensions and cross-sectional areas of the available sizes of each type 'of culvert are given in some instances.

The procedures for accumulating design data and for selecting a culvert size as previously discussed are summarized in the following steps: (This information should be tabulated on a prepared design data sheet to be used as a work sheet and a record. See tabulation sheet in HEC No. 5).

1. Select the average frequency of the design flood.

2. Determine the estimated peak discharge of the design flood.

3. Obtain all site data. Plot a roadway cross section at the culvert site and a stream channel profile. Make a contoured site plan where necessary.

4. Establish the culvert invert elevations at inlet and outlet and the culvert length. Then determine the invert slope So and compute L/10080 •

5. Determine the allowable headwater depth (or depths) AHW, considering the factors discussed in sec. V.

6. Compute the depth of flow in the stream channel (including flood plain) for the design flood, and determine TW depth.

7. Select one or more appropriate culvert types. Compute an approximate barrel area Ab = Q/10 to guide selec.tion of type and possible numbers and sizes of multiple barrels. Compute the discharge rate Q per barrel if multiple barrels are used.

10-22

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 25: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

8. Determine if the culvert types selected together with the governing headwater, length and slope, meet requirements for the direct use of charts, sec. III.

a. Select the culvert capacity chart for the culvert and entrance type to be considered.

b. On the chart, locate the point of intersection of Q and AHW.

c. Use the ·culvert L/10050 and the L/10050 of the chart curves to determine the smallest culvert size which will result in an actual headwater depth HW equal to or less than AllW (sec. II C).

d. Check tailwater as instructed in sec . III.

9. Culvert size may also be selected from the charts for some conditions where the requirements for direct selection of size from charts are not met and therefore step 8 above can­not be followed. These conditions include the following cases as described in sec. IV.

Case l - Paved Invert C.M. Pipe or Pipe-Arch.

Case 2 - Fu1ly Paved C .M. Pipe.

Case 3 - Rectangular Concrete Box sizes not in charts .

Case 4 - Concrete or C.M. Circular Pipe sizes between those of chart curves.

Case 5 - oval Concrete Pipe sizes not in chart.

Case 6 - Corrugated Structural Plate Pipe-Arch sizes not in chart.

Case 7 - Culvert slope zero (level invert).

Case 8 - Broken slope culverts.

Case 9 - L/10080 exceeds chart value .

10-23

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 26: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII A. Concrete Box Culverts

Two groups ot charts are included. The first group, Charts 1 to 5, are tor box culverts with headwalls at 90 degrees to the culvert axis and sutticiently long to retain the till slopes clear of' the waterway opening. These headwall charts may also be used tor culverts w1 th wiDg­walls flared trom 10 degrees to 20 degrees w1 th the culvert axis. The headwater-discharge relation is based upon small cbamf'ers at all exposed edges at the entrance.

The second group of' charts, Bos. 6 to 10, are tor box culverts with wingwalls tlared trom 30° to 750 with the- culvert axis and cham­fered edge at the top of' the entrance. Culverts with wingwalls flared 30 degrees or more require less headwater depth f'or a given size and discharge rate than do those with just a headwall or 15° wingwalls.

Culverts with parallel wine;w&lls formed b;y extension of' the box side walls have a capacity less than the designs covered by these charts. It was not considered necessary to include charts tor this in­ef'f'icient type.

All charts are based upon an entrance f'ace at rie;ht angles to the barrel axis. Model tests indicate that skew of' the entrance reduces capacity ot headwall types and increases capacity ot flared wingwall types. However, tor skews up to 45 degrees the head-discharge relation shown by the charts is not modified to a sie;niticant degree.

A square box culvert ot halt-foot dimension increments, it re­quired tor a special purpose, may be selected tram the square box charts, which include only the sizes at toot intervals. Use the same method given in sec. IV, case 4, tor selection ot intermediate sizes of' con­crete pipe. The same procedure may also be used tor rectangular boxes ot bal.t-toot increments in span it the height is equal. to that of' one ot the charts tor rectangular boxes. Bote the example on Chart 7.

Chart curves are not included tor all possible rectangular box sizes, particularly the wide-span boxes with heie;ht of' 5 f't. or more. In this size range resistance losses are a slll&ll part of' headwater depth vi th outlet control. Therefore, the capacity of' a culvert of given height is nearly proportional to ·the span. Culvert sizes may be selected from the charts for square box culverts as explained in eec. IV, case 3.

10-24

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 27: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART I 5

I J/ I v v1 I/ !/ JV , / 1-l!:f 4 LL I

3: :c ri: 3 w I-

~

-- / L o/

IOO"S0

..-----_§

1/ / v ':/'

/..._ 1.5' /

--- _ ). fj

Q / 0 ,'>~~

~I v I/

v

I ..... '2'i1.'5't v v /' - - ~ -- -

<& v oo,; ,-i;,,, I/ v

/ ./

I.-/ v ./ 1 .......... J -

I/ f3Txi:5'l l/ I/ v< /4'x1,5'f-r"

/ ...:.;:__

- "7'

/ x ~

.... ~ v -- - - .-c

,,,,v loo v o.18/

v ,<z;'Y

v"' ....

1 ..........

v ,,. v !,..--'

0 2 <( w v: ~ r~ v -~ ~ I..-'

' __. i...-

J~ ~ 'l 1--"'" ....-

---,.....,....

'--:c

0 10 20 30 40 50 60

6

ti 5 w LL I

3: 4 :c I

0:: w I-~ 3

-- ~! L 8 10050~ v

I J

I V ir/ /

/ I 11 I~ 2'} J

~~~C< <r) ~ "' ~ v

/ / v v //

r/ ~

DISCHARGE-Q- CFS

/I / / f v /{' v .......... r ~ ,

J 3 x2'17' / ~ / ~- ® v / ~ I

I _L --/

l( J ~: v I/ " _L'. ~~- _L'. v --o.<P v ~~ 1,• cl v {,,90/''iJ~ '°"~o-1<>Y {V <:>']

.....--I/ v

/ v v ,,,,, ... ....... v 1 .... "

i,, v /

/ ' /, _... / ........ v .....-: -:/..,..,,. / .?- v I:,.;::::;-._.~ 0

<( w ~IJ~v ~~J .......... i.--- i.--i.--

~ Q ~'l

:c 2 I_......-; r::.. f-::::::

~ ~ ~ t::::--"-0

0

EXAMPLE

® GIVEN :

10

103 CFS; AHW• 5.2 FT. L = 150 FT. ; S0 =0.015

2 0

25

~ SELECT 6 ' x 2'; HW= 4.5 FT. OR 5'x2.5'; HW=4.6FT.

30

I__...

i...- ......

40 50 60 70 80 90 100 110 120

DISCHARGE -Q- CFS

50 75 100 125 150

DISCHARGE - Q- CFS

BUREAU OF PUBLIC ROADS JAN. 1963 10- 25

CULVERT CAPACITY RECTANGULAR CONCRETE BOX

90°AND 15°WINGWALL FLARE 1.5', 2.0' AND 2.5' HEIGHTS Ii II

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 28: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 2 9

8

I- 7 w w LL I

3:: 6 ::c I

a:: w ~ 5 ~ <C w ::c 4

1-w

3

2 0

10

9

8

~ 7 I

3:: ::c ~ 6 w I-

i ~ 5 w ::c

4

3

2 0

/ l / I / v , 'I' / 1 /

r!if?i I J l!J ~ Ifil'.l IID'.I 1~ / I ' I / 1V

, /

I J I I ® II / I J~

, j /

I /_ _L 1_ I rL ~ I' CT~ , __

--- -- _ .. - ----- ------ L --I .. ~" i,~ /'

/ .j

' , I /

_L _ _,___ 31 ti ~'¥ O' o/ oO'l,~ 0 ~ IOOSo !1/ ~~ ,'Vo/~ ~/ OJ

.p ,..,

I/ I ?/ / v / / ,/ v / /

j/ / 11 .1 v ,jl / .;/ /

/ v 1'/ // u ..... v /' / v

// ,y .... ~ v / .......... ~

/ v tl / /

v v v v v 17 .; ~

,y l/ I/ / ~ ~ v ;f / v:: ~ ~ v

50 100 150 200

DISCHARGE - Q - CFS

' I ./ I JJ ll / / ) /

I"! ,~1 14'J 5'x4 6 1X411 11!~'1 N

, ___ ~~

I j I I I ' J I / I ~

v I J_ v _(_

, I J_ j j_ - .L --- - - --,_ _ - --- - ---- ,_ _ - -

i..; 0 1 o 8 ~ !I ll "'cf ) oc '/ l~o/ IOOSn~~/g} !!!J 0) ~

I I ~ I / I / I v v / J / J 1/ I / /v /I'

• J

I I /J 1/ v ,"l" / / /

1/ I" // 'V /~ I/ v

I n /

~, j ,, ,

/ / vv v /j ~ r/ v

I I ,;' ~ r / / ,,,,.,

I / .; I/

// ,} / ...,v ..... v .;/ '/'

/

~'! I / ) / I/ v v v

A v / / v v"' / / .....

' '/ I/ v / :;: / / /

1,j J I ~ ~ v 50 100 150 200 250 300 350

DISCHARGE - Q -CFS

v

240

400

EXAMPLE

®GIVEN; 115 CFS ; AHW =7.2 FT. L = 300 FT. ; S0 = 0.003

CULVERT CAPACITY RECTANGULAR CONCRETE BOX

~ SELECT ,4' x ~·; HW • 6 .3 FT. OR 3 x 4 ; HW • 7. 2 FT.

BUREAU OF PUBLIC ROADS JAN 1963 .l.0-26

90°AND 15° WINGWALL FLARE 3' AND 4' HEIGHT S IOI a lc:::::JI

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 29: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

16

14

I- 12 w w LL. I

3: 10 ::c: I

a: w ~ 8 ~ <t w ::c: 6

1-w

4

2 0

18

16

14

~ 12 I

3: ::c: I IQ a:

w ~ ~ <t 8 w ::c:

6

4

/ I/ ~

~ ~ v

/

/ /

v: 0 ~ . I~ ~ c:- /

CHART 3 efv -~

, ¥

/ ~ /~ r J v i// ~ v / --""

6'x5'

//1' JI~ v v /

/ v 1' ., '/ .. v v

(j v_~ / v v -- --· -- -- -- -~ -- _.,.

l o/ L ~?~~v ffe v ~v IOQS,, ~1;J / JS> ~ ~

/~ / ~/v v v / , v V' '/ v" h ~· / _,...

/~ y

,;~ v v v / __,_,...

/ v ~

.... v I;""

• / v v v ~ v / /

~ v

100 200 300 400 500

DISCHARGE-Q-CFS

u'V ,f /' <D ~t~ j~ )(

' it> .... I ; /j I/ I/

/ v . v Is' ~ / v @ 1 v l/v

~L lj v v ----· -- - -- - - .- - , J - - - •-' t- - - ~ -

_L __ ~~~)# I' y: ~v 0 " d t-Aoo ~ \~ 10050 ~~ OJ

/ JV ~ ,,.v v 00

s·x§r / v v?' ~~ v v" /

v ~--_...

,-/" / l'l v .,,.

v / v ....... v ---b ... ~ v , /" ~ ......-

(/ '/ __,_,... ~ ,,

;~ / ....-

/ ....... ~

~ .. _... _... __,_,...

v v " v ........ i.-~

~ / -v -~ ,,,.. ~ v v ...-

/ __,_,...

/ /" i _...

2 0 100 .200 300 400 500 600

EXAMPLE

@ GIVEN , 290 CFS; AHW=13.5 FT. L = 250 FT.; So= 0.010

~ SELECT 4 'x 5' HW= 12.3 FT.

BUREAU OF PUBLIC ROADS JAN. 1963

OISCHARGE-Q-CFS

CULVERT CAPACITY RECTANGULAR CONCRETE BOX 90°AND 15° WINGWALL FLARE

5' AND 6' HEIGHTS [Jl 10-27

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 30: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 4 9

_.{,,.-- f-.../ .Iv [ 3'J/"

// --..I v ...... V/ . / 8

/ ~ I/ ~/ v /

I ,,,,_., / ~ Vj / v

/

7

I­I.LI ~ 6

I [2' / ~I v .I /:._ v

-- --- . ...L --I

== ::c: I 5

0

I •,,-) I

j [ 5'1/ ,.._.,

0

l ~I

- -'~ --

v v , __

J , , / '

I / LI --J

,_(_ ~-, , v / ,..v ..... -- ~, 0

v v ,,f' v ......... V" ~ 7 k::::::

/ Ir' v v· ..... l,.....-,,"' / _,• ....-ffi

~ ~ 4 ~I !!!J ,' ~I

I !fl $ ~/ .p .zy. ., ~ ,'k Jfa' ~~ c.:::: ~ L s'!>O --- 10050

<( I.LI ::c:

3

2

I

___ L I

I )

ii/, h ~ I~ ~

_l I I j

I I / / ~ ~ ~ c....-v

I / v ~ / ~ ;:::::;.--

I .--

/ /~ / L.~ v L--" v

// ,,

'P"' v-~ _,,...

v v v .......

0 10 20 30 40 50 60 70 80 90 100 110 120

18

16

I- 14 I.LI I.LI LL I

== 12 ::c: I

0: I.LI ~ 10 3: ~ ~ 8

6

I/ v /

I ,

I

- _f°l_'!'"'°l / I/

I v / /

v ,,, v L,....-

~ ~ 1:-.- V"

/ I L4J

~ -- -- _,, v ,

/ , / , rp , {Ii _, v v / ~

v v I-'" v v v v ........ ~

DISCHARGE-Q- CFS

/ I 6'J

I/ v )/

5J v ,, I/

, v ,

v v , , J7 r ----- -- -- _.., -- -- -v , ,., ,,......, ...... , , v /

v , , v ......... , / / - --

I/ v

I--"" v

\~ v

'l-39,9.--,,,....- _c._

........__ IODS0 v v .......

1-

4 100 200 300 400 500 600 700

EXAMPLE

@ GIVEN: 72CFS ; AHW=5.7 FT. L= 200 FT.; So=0.002

~ SELEC:f 3' x 3' HW= 5.2 FT.

BUREAU OF PUBLIC ROADS JA N. 1963

DISCHARGE-Q-CFS

10-28

CULVERT CAPACITY SQUARE CONCRETE BOX

90° AND 15° WINGWALL FLARE 1.5' X 1.5' TO 7' X 7 1 [Q]

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 31: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

2 8

26

24

16

14 --

/ 1 ~oo

20

18

I- 16 w w IL. I

!/ 1 a'I I

I v 171 J

I/ _}_ ' --

I§ I/ I ,.,rJ/I I ~ ,

I I / I --- -- " j

I / J I ~

L/ v v v , I I/ ,v I/

I / v v v ; / J

1000

- --

CHART 5

I / j 110' [ 11' /

9'1 v JV v -12°

,__

I v ,._ ; -- -- -- -·

I / , , v J , 'J' v .L

, , v ; .... --- --I /

, , v , /

II' , v v ) - .1. ,

--- -- I-' ,

I/ , , v v ,v ,

' I/ v v -J /

$ .,o'cfr' ,,rJ ~ L . IOOSq

/ v v v ,v v

/

/ v vv EXTENSION OF LOWER GRAPH

v v /

1500 2000 2500 3000

DISCHARGE-Q- CFS

I v !/ j 7' a' -- -- j 9' --I/ I/ , ® v , ;

,

v LL , ~ / ---1-- - .--- ./ /

/ ,' I/ /v / 10° ,

'--

_/ _ , ; v v / b::::::. / r-c 3: 14

:I: ,

/ v / v ~ I a: w ~ 12 ~ /v

/ /v

v /

/

~/ // v-- v .....

...-

~ .-12° ~ v 1,..--'"'

,......- v .,,..- .., ~

1,..--'"' --v .--~ w :I: 10

co/ q,~ ":>ocfa/

""' ...,ro;JY' ~

" c.~ ~

000 IP roQ!l9---'

:.,.....- L TOQs,;

v /

v / ........ v ...... .--/ ....- :_.......- ..... .--

/ / v ,,,.,,.... v c::-1,..--'"' / ...

,,V: ~ l.-:::: /'.'.'. ...-::::: ;.....-----8

v ::::-::: t::--". t::::::: .,,..,,..,. I ...--6 300 4 00 500 600 700 800 900 1000 1100 1200 1300 1400 1500

EXAMPLE

QSl GIVEN• 1270 CFS; AHW = 17.5 FT L= 250 FT.; S0 = 0.010

~ SELECT 9'x9' HW = 16 .7 FT

BUREAU OF PUBLIC ROAOS JAN. 1963

DISCHARGE - Q- CFS

10-29

CULVERT CAPACITY SQUARE CONCRETE BOX

90° AND 15° WINGWALL FLARE 7'X7' TO 12'Xl2' [QJ

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 32: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 6 5

/ ;.V , l/f / / I / I/

v'-- ..f.5} !f- ~2'~!J!j -Yv .,-<. ~ v / '- J~ ""' v ,, v L -- - it

, .. I , v .... v -- ---- j - ~· -- - _..,.: lot":

-- -- _)::-~ L 8/

10050 ...--.~ ~o '~ tfr ll' ,iv. "'~o..-1 ~ v ~o__,.,,..

6

I- 5 IJ..I

/ / ~ "/.

10

I/ I./ 4 -/

~~ / ....-

!/'.'. -~ ~ ~

......--10

20 30

"' ) _,./ ~/ v /

I/ v .... . ,, ./ --/" , v v v ....-.

/' -v -· v ~

_.. t:::- ,,,.,.,... t:::- _.. -..-:::: __.. ~ --

20 30 40

DISCHARGE-Q-CFS

40 50 60 70 80 DISCHARGE-Q- CFS

/1 ) / /'J j/ /II'

,q2.s1-: / lf4'x2.5 v ,,

l/ / v ~ ,,,,."

II'

/

50 60

90 100 110 120

/ / -~v / /

,,,,:~ / / ·V $ v i,...- v

/ / / L o°! ,.,oo/ ~/ oY ~· v ov , 0 ......-j.o-9-' v

I 00 50

-----..;...+ -Of ,'l< ~ ' '!; ~ <J:-0~

IJ..I LL..

~ 4 :c I

0::: IJ..I I- 3 ~ ~ ~ 2

I

't/ /, v ~ ,,

/ ~ / ,,~~ ~ '.'/' ~

/,; v / // / _ ...-:: v

r? ~ ~ ~ ...- ~ , [::::: _.. --/

v v ,, ......- v .... /

, v l/ ,,,.,.,... \ ,,,,. ,, ./ ,,, / /

v ~...-

, ... v ~ v - ,,,.,.,... _..-::: ....-~ v ~ ~ ,,,. ~

_.. _........-

0 25 50 75 100 125 150

EXAMPLE

@ GIVEN: 87 CFS; AHW = 5.0 FT. L=l 20 FT.; So= 0.003

IJ) SELECT 5'x2'; HW=4.2 FT. OR 4' X2.5'; HW=4.6FT.

BUREAU OF PUBLIC ROADS JAN. 1963

DISCHARGE-Q- CFS

10-30

CULVERT CAPACITY RECTANGULAR CONCRETE BOX 30° TO 75°WINGWALL FLARE

1.51

1 2.0' AND 2.51 HEIGHTS lc::::::il

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 33: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 7

50 100 150 200 240

DISCHARGE-a- CFS

10

r~ I~ ~ I I~ '~!4 I/ tsfx~ '1K~ )(

~J ,__

1-LLJ LLJ

9

8

u.. 7 I

' f.l_C\Jf/ ::.i I

-,

I

- - - .J -- - J. - j_ L 0, 81 g1 0

10050--.-!::! "' .!)l•- -2 11 I I'"-' ''

I I I V /

'

11...:...1 I

Ii v " 'I -- - _, -- - --

J]~l 81 -..'I "'

0~1 ~

~ v I

' I/ 11 I/ II [/ II

1-rT / [7- /f / ' I/ v v I ' l/ I 1 ~. ,

1/ !/ _ ( v v v !/ '-- . ~ -- _, - - -00/ 4 ' 1' 0 oo/ ~ ,, ~<y ·~

II

1./ v I/ I/ , ,

I/ I/ ,; v

, , I/ ! I II I/ "(J J ll I/ 1/ v I/ v ·v v

l.1

3: I

J: 6 LLJ I-

~ ~ 5 LLJ I

4

3

I /J

'

// 1/ I J I/

I

1V V I I v 'I ,/

I I/ ,I / v , v ~ '/ J

I/ /, ~ /' ~ v / / .,

I,

~ 9' / v /, [/,; I/ I./

'

/ J / I.'/ / I/

i, / vv ,· / / ' J J ,

J / :, v "/ _,, / /I/

I/ I/ / I/ , / / / Y L"' / / v

·" ., //

' /1 /~ ,,' / .,.-· / v v, / ,

,/ i,; /v / /

v vv I/ ., v .....

2 0 50 100 150 200 250 300 350 400

EXAMPLE

0 GIVEN' 125 CFS; AHW • 7.5 FT. L• 400 FT.; S0 • 0.004

(%) SELECT 4'x 3'; HW•6.B FT. OR 3.5'x4'; HW• 6.3 FT.

BUREAU OF PUBLIC ROADS JAN. 1963

DISCHARGE-a- CFS

io-:..1

CULVERT CAPACITY RECTANGULAR CONCRETE BOX 30° TO 75° WINGWALL FLARE 3' AND 4 ' HEIGHTS [JI Si Jc:::::::il

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 34: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 8 16

14

I- 12 IJ.J IJ.J LL. I

::.;: 10 :c I

a: IJ.J ...... ~ 8 c <I: IJ.J :c 6

4 ,/,I

~ ~ b ~ ~

/

v ,, ~

/

--- v.~ -106s0 ~<&o/}#/

/ / /, / ~~

/ L/ )~ v ~

V' /~ t:/" ~~ v ~

r?-~ ~ :.,.....-- ....

~ v

~ ~ /

1/ v I I , II I

L. -- -_,i~

!t.~~ :\~

/ 'V v / ~ v"' '/

v L.~

~ t:::""""

I ~, ~ ?' JC ,

/ ~ t:T J /

/, / ,,/ '/ v /

,./ II / v ~~

~ '/ v~ v ,~" ~ _.., ,.,, v L . ~ -- - -A -- -

o ~ ,,, lo< ...... v ~ \0 ,~·~P-1(.oV

~<V ~ ,...~v ,/

v ~~ v .

~

2 0 100 200 300 400 500

1-IJ.J

18

16

14

~ 12 I

::.;: :c ri= 10 IJ.J

~ ~ 8 IJ.J :c

6

4

2 0

EXAMPLE

Q9 GIVEN'

,,}

~~ -:V ~

# ~ ~ v ~ ~

,,. v

100

270 CFS; AHW= 11.5 FT. L= 450 FT.; So =0.005

(%) SELECT 4' x 5' HW= 10.7 FT.

v~ ... -"'.

v.::: v v

DISCHARGE-Q - CFS

~,v ·~ ~ v I ffe1

JC

~ >----

1~~

/ J ~/ ..-v II II vv ,f"ti' j j '/ /

v v vv , / ~ 6'

/ lL ~...,! v 12:. v - ---II-. --- - _,,, 1-- -- --L/- -- ~-- --~/- -

L o°j ~ I 0 0 S~ __,.....zy ~ ® ~~l~V ' '\ ~o3""l.6<> ~ '/,O co/

~

1/ / 1/' v v' V' ,,V ~

/ / / v r;:.. ,,, ,,/ 8'x6~ ~ ~ / ~n

/I I/ '/ v ·~ v /

\~ ,I" / ,/ _.,,,. /

/ / _,,," v ..... /"' v v~

..... ,,. .... ,,,,, / _.,,,. v ,.;".: ~ ~~ .......... / ....... ~

~ l-'

r? v ~

....... ,,.,,.,,. .... ~ A ~ _,,.. v ,,.

/ v :,....-- .--

~ ~

/ v ....

200 300 400 500 600

DISCHARGE - Q - CFS

BUREAU OF PUBLIC ROADS JAN. 1963 10-32

CULVERT CAPACITY RECTANGULAR CONCRETE BOX 30° TO 75° WINGWALL FLARE

5' AND 6 1 HEIGHT S IDJ

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 35: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

I­ll.I

9

8

7

~ 6 I

~ :I: I

a:: 5 UJ

/.- J.5'j-'' I I I I I

I --J.. ---

/- 2'J 7 I

i/ I

I I -- - .I- ---v,, , , I ,,,

_f ,' I _,V

CHART 9 / ,I

/~ {! r--; / ~1- ~2.5 ''-Y" /, v

/ v ~ ,,,/ v / , / ~ ,.v

/ / ' v ---- ---- ... __ _,,,_

~../ ,

l/' ,./' - .I.

/ ~/ v .. l..-/ / ........ I.--' ... 4' v

/ / -i 0 4 ct

L 8 _]Q~o -~J 8/ ' f - I~

co/ $/ 'VI {I< • .po/ {!:oJ I.' op" 173-°-- .. -'~ v....-

\

_[ I v __ j

./ ' I I / / / i '

I

,,/ ~ J /

UJ :I:

3

1l // /;. ~ / _..

/1 ~~ ~ :;;..-::: ~-".'.'"~

2

J V0 ~ ~ I 0 10 20 30

18

16

I- 14 UJ UJ u..

I

~ 12 :I:

I 11 4'Y / / a::

UJ

L c§>lc5}1 / , !;t 10 ~ 0 10050 --Of,, "'7 .'

V' , , - __ /J_ __

~~v ,,/

<I:

~ 8

v~v ... ~ / / ~/

, .. ::, v /' v ... _,,

6

v ~ v v ....... ,.... ..... ..... 4 100

EXAMPLE

@ GIVEN;

.. 200

93 CFS; AHW = 7.1 FT. L = 280 FT. ; So= 0.0035

~ SELECT 3' X 3' HW = 6 .7 FT.

,. .. /

,.....-I_,..

---

/ /

-~

/ / ,,/ v ~ - ~-/' ... / - ~

II' ~,,, •' / I-"-v-

/ / -_ ..

l-"" ,,,,,-/

v ....... :;:;. 1.---"'

...... :::;...--i:..-

40 50 60 70 80 90 100 110 120

DISCHARGE-Q-CFS

v /

J s'l /

v v / /

1 5' v .. -·

'/ ,,,.. ,_

,,/ . l/-'. . / - -- -- -- -- --- _ ..

l/ y , / 7' r / , / ..-~

if/ v / ..,/ v v --... .... _ __.

-~

0%0°1' ~ ,cy- ,";_oy \~ ..... v _,, v ...

~ v-

v v ~

v ~ ,,,,. ....

1.---" :,....----

.......

300 400 500 600 700

DISCHARGE-Q-CFS

BUREAU OF PUBLIC ROADS JAN. 1963

CULVERT CAPACITY SQUARE CONCRETE BOX

30° TO 75° WINGWALL FLARE 1.51 X 1.51 TO 7 1 X 7 1 [Q]

10-33

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 36: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 10

1-L&J

28

26

24

~ 22 I ;:

::c ~ 20 L&J

~ [2' I

I

r 8'

I I

I

I I ---- _.l

J

9'

J

I J

I/ / v / -- - J

I , v , ,

I / , _,,_

I II" j

110'] 11'1

I / / / -- --- _./,

/ , , l 12j J / ,

/ / , / -- -- ~ -- _,, / , / // , ,' / /

iJ' /

/ //

/ / ~ 18 <( L&J " !I I oo/

I q,_roJ & 'lj ~'fr ~ ,.q,; _:]._

-10050

I ~

® v LI' I/ ,,.v --'- I / ,. - -J

I ,. I I v v / v ,,

::c

16

, v ... v ... v v , - _ ..J. . / / _,

14

I-L&J L&J LL I ;:

::c I

a:: L&J

!;i ~ <( L&J ::c

12 600

20

18

16

14

12

10

8

J

6 ~

I I

/. .,, /

v / ... v I v /v /

1000

_ ..... ~ L '.I-~ ~ 10050

,__ ,, /~ /

,~/" / /

)~ / ,..,, / v v v / .....-::: v / _,,

~ C- e:::::: :::::::: ;....---

,...v ./ v EXTENSION OF ,LOWER GRAPH

v v ... 1soo ; 2000 2500 3000

DISCHARGE-Q -CFS

I / I 7'J [8 ']

·' -- --- 0 lL

/ , ,__

/ ,

J , /

/ / , , ® /

- --- -- . .L --- --J /

/ , ,

J%f' , / /

/l , , / ,, I O'j , / / --- ---/~ / / ~

/ Iii' k:::'.

/ v v / ~ .......... L:_.j

/ ,..,, 12" ~ .,,.,g; / -&o/ ~o.,......-1>¢ ........- ~9-' ~

/ v v v .......... ~ --/ .......... i.-

_,,V v ~ - ~-_,,, - ~

.......... ~ l,....---" t:-i--_,,,

v ........-

300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

EXAMPLE

@GIVEN' 1270 CFS; AHW• 16.5 FT. L = 320 FT.; S0 = 0.016

~ SELECT 9 '• 9' HW• 15.4 FT.

BUREAU OF PUBLIC ROADS JAN. 1963

DISCHARGE - Q- CFS

10-34

CULVERT CAPACITY SQUARE CONCRETE BOX

30° TO 75°WINGWALL FLARE 7'X7' TO 12'Xl2' [gJ

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 37: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII B. Circular Concrete Pipe Culverts

Charts 11 and 12 are for concrete pipe culverts with a square-edged entrance, and apply equally to culverts installed in a headwall , head­wall and wingwalls, or projecting to or beyond the toe of the embankment slope .

A square-edged entrance is the result of cutting of concrete pipe sections to obtain a particular length. Culverts with such entrances have ·1esser capacity than those with a groove-edged entrance .

Inlet details for which the square-edged entrance charts may also be used:

a. Skewed inlets. (Inlet face skewed with longitudinal axi s of culvert barrel • )

b ,• Flared wingwalls , with headwall over the crown. The flare angle may be as small as 20° . Headwater depth is reduced by such flared wingwalls, but the reduction is not enough to be significant in design.

c. Para1lel wingwalls increase headwater depth. If the distance between walls is l.25D or more the charts may be used for de­sign. Do not use the charts for parallel wing walls only LOD apart.

d. Concrete culvert end-sections , with a short section of uniform barrel diameter. Headwater depth when these sections· are used is slightly less than shown by the charts, but the charts will serve for size selection .

e . Concrete pipe cut to form a mitered inlet in the plane of the fill slope.

Charts 13 and 14 are for concrete pipe culverts installed with the socket end of a tongue-and-groove pipe joint forming a groove-edged en­trance. The head-discharge relation of the chart curves is based on a projecting pipe. Although capacity of this pipe in a headwall is slightly greater, the difference is not significant. The semi-bell socket of a cast and vibrated pipe presents a larger groove which im­proves culvert capacity, but the difference is too small to justify separate charts for design. These charts may also be used for vitri­fied clay pipe culverts installed with the spigot end forming the en­trance .

Inlet details for which the groove-edged entrance charts may also be used:

a. Flared wingwalls, as described for square-edged inlet varia­tions, have little effect upon headwater when used with a groove-edged entrance.

10-35

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 38: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

b. Parallel wingwal.ls are acceptable it l.25D or more apart.

c. Filling the entrance groove with mortar to torm a bevel has 110 effect on headwater. The charts may be used.

STAIDABJ) SIZES or CIRCULAR COllCBETE PIPE

Diameter A!!! Diameter A!!! Diameter &:!! in. tt. sq. tt. in. tt. sq. tt. in. tt. sq. tt.

12 1.00 0 .79 54 4.5 15.90 120 10.0 78.5 15 1.25 1.23 60 5.0 19.64 126 l0.5 86.6 18 1.50 1.77 66 5.5 23.76 132 11.0 95 .• 0 21 1.75 2.41 72 6.o 28.3 138 11.5 103.9 24 2.00 3.14 78 6.5 33.2 144 12.0 113.l 27 2.25 3.98 84 7.0 38.5 l.50 12.5 122.7 30 2.50 4.91 90 7.5 44.2 156 13.0 132.7 33 2.75 5.94 96 a.o 50.3 162 13.5 143.1 36 3.00 7.07 102 8.5 56.7 168 14.o 154. 42 3.50 9.62 lo8 9.0 63.6 174 14.5 165. 48 4.oo 12.57 114 9.5 70.9 180 15.0 177·

Si zes larger than 108-in. may not be available; consult local manutacturers.

10-36

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 39: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

8

7

I- 6 LI.I LI.I LL

I

== 5 :c I

c:: LI.I

~ 4

== Cl ct ~ 3

2

I 0

,Kia

I J~ ?r ~a !--* !Y

,· v

I I I .:

-' __ LL / _)

I ) / ,, v ~ ~ i/ ,J

~ v;. e ~ ~ ..... )~ ~

10

fl I

~ -- a ~/ I -·- ,, -

I

l./v v [,.

I/ J

~ ~ t::.-i..--

20

CHART 11

) L-- 1-(3~ ' i-, v 1A;' I/ I/ v 1(36

II

j , n ) v V 1/

17 Vi 24 I/ I/ ) /

v '/ [I v I [,' v

I , -- -- - I J I/ l/ v ()' '

[, I/ / I/

,,, I./ '

I/ l/ , 1./' v IJ 1£ v ,_

1-- . 0 - -09 ""-'-' o -" _,' oO/ '-1.c

czy ~· -1:>'} :.' ( ~ o.~ .....

,<i~ ,/ ~ ~ I/

-_v. , '/

/~ I/ 17 ,

I/ v I/ /

v J/ vv :....- L):O' v J I/

_v I/ 1...-!,...-

I/ / ~

!,...-1 .......

v r.::: ... L,..o-"

I/ 1....- i..--

.,,....

30 40 50 60 70 80 DISCHARGE-Q- CFS

1 611--r-.-.-,-,-r-.-,--,--,r-r-r-.--..-r-r-r-o--r-,-,-r-.--,--.,...-,-,--,-...,.--,~~6~0~,,, -.---.-i

" v 54 / /

14 1-t-t--l--t-+-f-l-+-+--!-+-+-l-+-l--!-+-+-1-+-+-l--t-~~.,.+-+--!-..:1£-~'-l--1--1--l / /"' / ,,/ I/

J~~[%~~E'.'.t:;::v"'" 4 f-+-+-~l--+,/.~,;r.,.~~~~~q~~~~:+-i:.....+-+--+-+---t-+--+-+-l-+-l-+-~~-+--+-+---t-+--+-+-I~

h~~p 2 1-..1__.a~ ... ~r&io~-'--.J...._L.....J.--1.,._J__l__.J...._L.....J.__L_L_L__l__.L__JL_l._J____t__l_.J...._L.....J.--1...--1-_L_.J_L.....J._L_J___J

0

EXAMPLE

@ GIVEN :

50

48 CFS; AHW = 4.8 FT. L = 60 FT.; S0 = 0 .00 3

~ SELECT 36" HW=3.9 FT.

100

BUREAU OF PUBLIC ROADS JA N. 1963

150 200 250 300 350 DISCHARGE - Q- CFS

10-37

CULVERT CAPACITY CIRCULAR CONCRETE Pl PE SQUARE - EDGED ENTRANCE

1811 TO 66 11 (0

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 40: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 12 28

26

24

~ 22 w u. I

3: 20 :c I

0:: w !;i 18 3: Q ct ~ 16

14

12

10

@' ciL ~@ ...... o ~

J / _ I I '

-- _/ /__ / / I ,' I I .

I I I I 500

@>" I I I

~ -' I

' '

I I I

II J

I/ I/ I/ v

I I '/ J J

I I / I - --, I I I / , I /

j --___ ,

~6)' ~ " @g' (32"' __ 14'~:, , 156)

J I I I , / / ,

I ---I I __ L I

/ / : T I I_ / / / / ----'

J l __ / I I / /' I / . ad' I J ,'I I/ / ,V / / ~

' - ...... I

I l .1 I -- J v / v ~~

,, v 0 V o<o/ 7

~ip- 0 /

-~ -~ _ <v ~ -~ ~~ -1~0 (() :::;

J I / v ..,.v /" )*' I

/ / v v J / v

,v / ~/ v / v

/ / / / v / / /

/ v / ... / EXTENSION OF LOWER GRAPH

~ v / _...

1000 1500 2000 2500 2800 DISCHARGE-Q-CFS

~ 12 1--+-+-+-+--h'-f+--+.t=..!-l=-=+--lf-+-+--+--,'7f--+---hoL.l--+~~___,,~+--~:::p;..~ w u.

I

~ 10 I---+--......_·

I

0:: w ~ 8 t---+-+--+--H--H:H---7f--7~~~r""S..-.S.~-:::::1---""T---t--+-+--+-l--+-+-+--t 3: 0 ct ~ 6 1--+-+--H-4-o,..q...~~~;,....::;:..__ji--+--+-+--+--+--+--+-+--+---JI--+--+-~

4 L_L....~~~:::l__L__l__J__j_JL_l_J__l__L_J__L_l_l_j_L_l__l__L_J

0 100 200 300 400 500 600 700 800 900 1000 1100 1200

EXAMPLE

@ GIVEN: 950 CFS ; AHW =IG FT. L = 480 FT.; So= 0 .040

~ SELECT IOB" HW = 15.0 FT.

BUREAU OF PUBLIC ROADS JAN. 1963

DISCHARGE-Q- CFS

10- 38

CULVERT CAPACITY CIRCULAR CONCRETE PI PE SQUARE-EDGED ENTRANCE

6011 TO 180" {g)

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 41: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

8

7

I- 6 IJJ

~ I

3: 5 :c

J I

_L_~8' ~ 10050_~~ I

a:: IJJ !'i 4 ~ <( IJJ :c 3

2

I . ~

0

J

I . -- -- ---I v

I / I/ I/ ~ ~

J I ~. , .... ~~ ......

10

~ 18)- rJ I

~/ 0 '/ ~,·

Ii . rt __ , _, /I, ~,

/ . [/, / I/ ,,v

v ... v v I/ I . " ~

... ~ ~ /

.... ....:: ~ ~ ....

20

CHART 13 / 1-(30:'

I v , \..... L..- ~ r-.... /

r7 [/ .. K J , I II v I

r.7

(3~' ._ 24 ........ ~ ll I;' .'- ..

I v v 17 ~/ j 'I , -- ~ -- J -- - - -Ii v y I/ , , !/ I/ , I/ v

v IL.' 116

-- ~ 7 ,

i.... · v l/'v

--- -- -- -- ~

0/ 1/ oq..• ~ #7 097 .~9'

I? ~ .· .ffe. ,ri.;

II'., / I/ v L..- v --- ~ I/ v 1,,, 1_..

l/ [/ ) ...... v ) .... i.- !...--I/ ·' ,__..

I; ... I/ i..· ...... 1.--' ... I..;' ..... I/ i...--. I/ v ~ t::: i...---, ~

30 40 50 60 70 80

DISCHARGE-Q-CFS

/ 14 t-t--+-+--+-+-t--i--+-+--++-+-1-+-+-+-+--+--t--1--+-+--+-+-t--i--+--!77tr:+--+---,1-+~":.i:=ohr7'!I /y" / 160 "'

>"' II 54

EXAMPLE @GIVEN:

50

43 CFS; AHW= 5.4 FT. L=120 FT.; S0 =0.002

~ SELECT 30" HW=4 .7 FT.

100

BUREAU OF PUBLIC ROADS JAN. 1963

150 200 250 300 350

OISCHARGE-Q-CFS

:l.0 -39

CULVERT CAPACITY CIRCULAR CONCRETE PIPE

GROOVE-EDGED ENTRANCE 18 II TO 66 II 0

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 42: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART14

~ w u..

28

26

24

22

3 20

(84 "

I

19~

' I

I J

' I

I I

I J

10~· 12~

J J I I/

J . .

-- --· v . --- ___ ,

I

'

J J J I v f

I v --(32)" l44 ' . .

- -- ,

I , / ---_, " ./_ . /v e .

-- -· / / v ,

I / v x I I I J ... - _ _, I I/ / ,,/ ffi ~ 18

~ <[ w x 16

14

12

10

(7~· '

I I 0 _gf_ -0

0 ,., - -I _j ;'

rt I --- j

I ' / I J I ( 'i/

500

I --.L.: /

. I -- • J

-:-&L ~~j_ 1-00/

~ l>'r :~ CV/

I I ,V /

/ v /v / / / v

I / ,,,, / / / v v /

0 ~ -/ v v ./

1000

, / / /

@ I /

I /' / / / /

":';/ v v ,/ ... Y ~

0 ,J

~oO L q,' / ~v ~ ~ -10050 / v v ,/ v ,,, ./

/ I/ ,,,..

__,./ v ..... / / EXTENSION OF LOWER GRAPH

1500 2000 2500 2800 DISCHARGE-Q-CFS

200 300 400 500 600 700 800 900 1000 1100 1200 1300 DISCHARGE - Q-CFS

EXAMPLE @GIVEN:

490 CFS; AHW• 9 . 6 FT. L•SO FT.; So•0.000

i%l SELECT 90" ( -'fi-: 8 l HW= 9.2 FT.

BUREAU OF PUBLIC ROADS J AN. 1963

10-40

CULVERT CAPACITY Cl RCU LAR CONCRETE Pl PE

GROOVE-EDGED ENTRANCE 60" TO 180"©

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 43: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII C. Oval Concrete Pipe Culverts

Long Axis Horizontal

The charts of this sub-section apply only to pipe installed with the long axis.horizontal, suitable tor low embankments.

Chart 15 is for oval concrete pipe culverts with a square-edged entrance, as described tor circular concrete pipe culverts. The chart also applies to all inlet variations given under circular concrete pipe with square-edged entrance.

Chart 16 applies to oval concrete pipe culverts installed with the socket-end of a tongue-and-groove pipe Joint forming a groove-edged en­trance, as described tor circular concrete pipe culverts. The chart also applies to all inlet variations given tor circular concrete pipe with groove-edged entrance.

An oval concrete pipe resembles an ellipse and is made up of two pairs of circular arcs. The arcs on the inside of the section are of the following approximate radii in terms of the short dimension D of the pipe: long radius 1.35 D; short radius 0.43 D. The sizes generally available are given in the following table, with actual opening area.

Size Nominal Sizez In. Actual Sizez In. Area No. Span Height Span Height s.t.

1 23 14 22.83 14.31 1.84 2 30 19 30.30 19.20 3.28 3 34 22 34.11 21.57 4.14 4 38 24 37.86 23.99 5.12 5 42 27 41.93 26.71 6.31

6 45 29 45.44 28.79 7.37 7 49 32 49.49 31.57 8.80 8 53 34 53.28 34.02 10.21 9 60 38 59.92 38.28 12.92 10 68 43 67.88 43.42 16.6o

11 76 48 75.50 48.17 20.5 12 83 53 83.02 53.01 24.8 13 91 58 90.54 57.86 29.5

Charts are not provided for all sizes listed in some manufacturers catalogs. Three intermediate sizes (lfos. 3, 5 and 7) are not included in the charts, but may be selected from the charts if desired by using the methods of sec • IV, case 5.

10-41

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 44: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 45: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 15

1-IJJ IJJ

6

5

LL 4 I

~ :I: I ir 3 UJ

ti ~ 2 <I: IJJ :I:

~

~ 'T

0 0

10

® cD '1..---L f rt/ J I

g/ o/ 8' ~ '#} ., !!' ,;fJ ~ -- ~ ---.,- - ..... . , I , J r·i---1 '

,i / , I v J v ... /, - -1- tJ '/ -- ~ ~ ~ I , i/ l/2 ~ v ~ ~ ~

-......-

~

10 20 30

© /® v '/ -- IL ~ v

/ '-"--11 /J --- 7 , v" ~-- -- / ' , ,

II I/ ---~7 -- :/- - j ....... v / "" . I J

,-- ·- II' v Vv , I / / / --"'~

I/ if!. ~ v 0 ~ I,/.; I _1 ~/ \~ ·1§9. -10050

P® v / (.....-"" 1_../ L. ...... L/ CD - 23"x 14" ._

I~ B v ...... ® - 3d'x 19" -

[.....-"" © - 38"x 24" -® - 45"x 29" ~

@ - 53"x 34''

40 50 60 70 80 90 100 11 0 120 DISCHARGE-Q-CFS

<ID ,--- fJ __ ___ (!

1-IJJ IJJ

9

8

LL 7 I

~ :I: I 6

a: IJJ

ti ~ 5 <I: UJ :I:

4

3

2 0

EXAMPLE

®GIVEN :

~~ A ~

dD @) I ,r

' G: I v ' ' ---J/ I ' I / /

10~ s --~'II / ----,,,¥ -- I/ cW ,rJ)~ ~ ._i.; 0 ....

I I/ v -, ' ,/ /

-- ~1-1 - v / v v /

/' / 1 /v v /I/

I/ / / v I/ J

,V 7 / ~ v // / ~ 'i /

; '/ / ~ '/"" ~ ~ ~ ~'/

100 200

DISCHARG E-Cl-CFS

/ , ' 17 , .---;

,, ___ _ _, I/

v / /

0oV '~ v

®- 60"x 3811

ClQ) - 68"x 43"

® - 76"x 48"

@ - 83"x 53 11

@ - 91"x 58"

300

CU LVERT CAPACITY

'--

.____

~

-

400

38 CFS; AHW • 3.2 FT. L• 66 FT.; 5

0• 0.0015

~ SELECT NO. 5, 42"X 27" HW= 3.0 FT.

BUREAU OF PUBLIC ROADS JAN. 1963

OVAL CONCRETE PIPE - HORIZONTAL SQUARE-EDGED ENTRANCE 23

11X 14 11 TO 91 11 X 58 11 0

10-43

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 46: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 16

6 ~ ,.--::-!. ,/ 8I?---z / ...._6~ ~ ~

5 ,L-0 7 / /~ --- ;,,.,-" //

Rb- f / / .7 --- -/ /- J ,,,, /' -"" /.CI>; I / / /" y I/ / v---J --- -- ..J ,,,

! I I v,, i v ~/ ~/ v ...... i,,· v""" , / ~

§1 8/,fL--:W-~~/ - .... t-.;,;. ~ <tj /..•Jl/'?J~/<-;~ f:¢'s......... L

-IOOSo

, ,. / /// ~'.'./'." --~ ~ ~·~ CD- 23"x 14"

-1 -t I/ ~~ ~ ~ ~ .... -® - 30"xl9"

A r

1-­IJ.J

0 0

10

9

8

~ 7

3: :c I

0:: 6 IJ.J !;t ~ <[ 5 IJ.J :c

f 'l / ~ r?'_/ ~ ~ ~ ~ 7

10 20

:,......-- ©- 38"x24'

@- 45"x29"

(8) - 53" x 34'

30 40 50 60 70 80 90 100 110 DISCHARGE-Q -CFS

(i2) ~ :ii:: I/~- -- ~ ,/

ti()) / • 'Y_. r7 ---- t;f'- J ,, (i) .r y ~-L

, .' v ___ L. ,,, ~ /

iv 1 V I l/' ,,,

/ v ,,/ 7 /" /

L f/ ~: lOO§o---- ,,, ., / -~er w ~-- co §Jo/. ,oy ()~ ~ ~ ,;( ~- q; ,~ "'

I J I // /'/ /" / / / J - ---1 -7- I / 7/ / ,, '/ ~/ I /

I/ , I / / .,/ ,, V/, v I/ v

J/ v> Ir ~.;: v v ®- 60"x38" .. ~ ~

7, .,. /~ V,,.;;' v:;::: ~ v .. 'l' ~ @- 68"x43"

/. /_/ ~~ ~ v @- 76"x48" 4

~ ~ ~ / @- 83"x 53"

3

2 0

EXAMPLE

@GIVEN:

~ ~ ~

,~v

56 CFS; AHW = 4,3 FT.

~ ~ ~

100 200 DISCHARGE -Q -CFS

@- 91"x 58"

300

CULVERT CAPACITY

--

-

-

120

---

~

...__

~

...__

-

400

L = 109 FT.; So= 0.0016

(Zl SELECT NO. 6, 45" x 29" HW = 3.7 FT.

OVAL CONCRETE PIPE-HORIZONTAL GROOVE-EDGED ENTRANCE

BUREAU OF PUBLIC ROADS JAN. 1963 2311 x 1411 TO 91 11 x 5811 0

10-44

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 47: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII D. Oval Concrete Pipe Culverts

Long Axis Vertical

The charts of this sub-section apply only to pipe installed with the J.ong axis vertical, as might be required by the J.oad i.mposeli by a high fill. The geometry of these pipes is the same as listed for oval pipe with J.ong axis horizontal.

Charts are not provided for all sizes listed in same manufacturers catalogs. Three intermediate sizes (Nos. 3, 5 and 7) are not i'ncJ.uded in the charts, but may be seJ.ected from the charts if desired. Use the methods of Bee. IV, case 5.

Chart 17 is for oval concrete pipe culverts with a square-edged entrance, as described for circular concrete pipe culverts. The chart also applies to all inlet variations given for circular concrete pipe with square-edged entrance •

Chart 18 is for oval concrete pipe culverts installed with the socket end of a tongue-and-groove pipe joint forming a groove-edged en­trance, as described for circular concrete pipe culverts. The chart also applies to all inlet variations given for circular concrete pipe with groove-edged entrance.

10-45

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 48: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 49: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

1-IJJ IJJ

12

10

LL 8 I

3:: :c ci: 6 IJJ I­<(

~ 4 <( IJJ :c

2

.Ir: :Y-

§jg,

I h' - 7/' / ~ ~ r v

1-IJJ IJJ LL

0 0

20

18

16

I 14 3:: :c I

ffi 12 I-<(

3:: ~ 10 IJJ :c

8

6

d Ir;> I~ , ' I I

~i ij,-·~· I~ _!_VI~

VJ / / ~; ~ ~

vQ-b/ / " //.. -9 hy-j /

1 ,P ~ I ' ~ ,-;; P"·---/ / /

" ,,

,, ~'®-. [;,././ ""'/ v j J /

-1-- ~,r =/-~ / / ., ~ ~rJ?:f~o,o~ V L

---10050 .... ,,,,. .,,.· / ~ ~

50

~

100 DISCHARGE - Q-CFS

ij '{ )-

}°J " I

/ ·' / , --

/ ~ I v v v

ii I v / _L _____ &

I~ 0 .,,o/ ,,~-~y --- --IOOSn !§ "' ~ , ~

11 v , -j -- / ,

// r- ~/-. J,/ / J/

i/ / / 'I' / /

-7) -J I/ v

,I , / ~' I

,r,t v v v / / ,I'

'l / ~ :;...-- ....

~ ~ ~v

4 0

~ ~, 100 200 300 400

DISCHARGE - Q- CFS

CHART 17

j~-/~ r~Y . v --

8-14" x 23"

0-1911

x 3011

8-24" x 38"

0-29"x 45"

0-34" x 53"

150 180

~ ):::; /

0-3811

x 60" - >--

§-4311

x 6811 - -

8-48" x 76" --@-53" x 83" - -

500 600

EX AMPL E

@GIVEN: 75 CFS; AHW • 7.5 FT. L= 60 FT.; So• 0.015

CULVERT CAPACITY

~ SELECT N0.6, 29" x 45" HW = 6 .7 FT.

BUREAU OF PUBLIC ROADS JAN. 1963

10-47

OVAL CONCRETE PIPE-VERTICAL SQUARE-EDGED ENTRANCE

14 11 x 23 11 TO 5311 x 8311 ©

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 50: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 18

12 /.<.. ~ /! ~ r----..,.

/ // \J y 10

I­Li.i LI.I LL. I 8

3: :I: I

a:: 6 LI.I l-ei: 3: 4 0 <I: II.I :I:

I-w w LL. I

3: :I: I

a:: II.I I-<I: 3: 0 <I: II.I :I:

2

20

18

16

14

12

10

8

6

-

I ~

y

4 0

/._

i1-;d / W/1

I! ~1 !j. 0;oJ: I J·/ ~, --li ~~ ~~ v

'~ 1-.. I /- v v i

/ '/ / ' x . .;;? 2 ' ':Jl I /~;?~

., ____ /:./ ll ----,/;~ ~ ·""" ~ ........ ~0o ~~~o ~~ ~oO ~ ~-:~ ~~~-~ ....

50 100 DISC HARGE-Q-CFS

'~oli' 1:-~ / ~I/ / '

f ~ I I l/ -' / _L __ 8 , .:/ ?/ 0 •01 rvo/

IOOSA !!? !:?o ,.,~ ~°I l><:JI

/ / ' ,/ / , --' J ,/ / i/

~

// _/ v

./ r --

/ ('.)- 14"x23"

0- 19"x30"

-8-24"x38"

0-29"x45"

0-34"x53"

150

~ ' " .; /· .x; ~ ~ /I /

I / / j / ;~, 1/ $ / o.'b°/ ·- 7 ---

I I / I , -T -/ .£_; /' //

7 J ,

L · ·'/ , ,, /'

0-38"x 60" -J / -~

7 7 • , v v· v' v ~ ,,'A~ I/ / @-43''.x68" I

- --17., I' ~ I/ ~ I/ v J ,,, 17 ~ 17 ? r~ v"" 8-48"x 76" /

I/ h , ~ ~ ~ /

@-53"x 83" / ~ ~ ~ ~ ' ~ ~

t?' //

i ~ 100 200 300 400 500

DISCHARGE - Q-CFS

.. )

EXAMPLE

@GIVEN : CULVERT CAPACITY

v

180

,

600

105 CFS; AHW = 8.8 FT. L= 115 FT.; S0 = 0.0015

~ SELECT NO. 7, 32" x 49" HW = 8.2 FT.

OVAL CONCRETE PIPE - VERTICAL GROOVE-EDGED ENTRANCE

BUREAU OF PUBLIC ROADS JAN. 1963 14

11 x 2311

TO 5311 x 83

11 ©

10-48

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 51: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII E. Standard Circular Corrugated Metal Pipe Culverts

1/2-in. by 2-2/3 in. corrugation I

Charts 19 ' to 21 are for circular corrugated metal pipe with inlet face normal to the axis and projecting to or beyond the toe of fill.

Other inlet details for which the projecting entrance charts (Charts 19 to 21) may be used are as follows:

a. Skewed inlets, with full pipe section cut on a skew to form a face parallel to the roadway.

b. Mitered inlets; normal or skewed, formed by a miter cut through the pipe on a plane inclined to the horizontal and conforming to the side slope of the fill.

c. Stepped mitered inlets, where the miter cut begins above the invert and ends below the crown.

d. Low height headwalls, extending less than 1/2 the barrel height, leaving the full-section pipe projecting from the fill above the partial headwall.

Charts 22 to 24 are for a full-height headwall at 90° to the culvert axis, extending at least 1/12 D above the pipe crown and of sufficient length to retain the f ill slopes clear of the waterway opening.

Other inlet details for which the headwall entrance charts (Charts 22 to 24) may be used are as follows:

a. Flared wingwalls, with curb over the crown and at 90° to the barrel. The flare angle may be as small as about 20° with axis of culvert. Such wingwalls reduce the headwater depth, but not enough to be significant in design.

b. Parallel wingwalls increase headwater depth. If the distance between walls is 1.25 D or more, the charts may be used for design. Do not use the charts for parallel wingwalls only l .OD apart.

c. Skewed inlets, with the angle between the inlet face and a plane at 90° to the barrel axis (the skew angle) not exceeding 45°.

d. Standard metal culvert end-section, with apron and side wings.

Standard corrugated metal pipe diameters usually conform closely to the nominal diameter. Pipe diameters and areas are listed under sec. VII B.

For paved invert culverts, of all inlet types, use the charts in the normal manner, but reduce the culvert length to compute L/100S0 as instructed in sec. IV, case 1.

10-49

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 52: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 53: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 19 8

7

I- 6 I.LI I.LI u..

3: 5 :c ' a::

I.LI

!;i 4 3: 0 <( I.LI :c 3

2

I

-

0

l(1a}" L fi? l c

1oos;;-... !!!

l I I --I I ,' / ! '

, l/ - - • .J

. .J

' ! j I I I " l'

• ·' ,,,,

~· I/

/ ...... ~ v

I v /~ ~~ i'l

10

' I

~I

I l j

/ /

I ~

/

v-' k'

1. J3o'f ~, ,([36J ./ v /

,/ / / _I

L "'i / ./"' ~,

24 I /

I / " ' I/ I / __ !,.(_ -- --- --/ . i, •

l/ .,/ 1/ I .

,· -. ,

~ ~/ _<So~ , -,o/ _,o_..' ,.-- -~; ___ -- D</ 'l,7

I , v /' ,,,, ,,, / , . !/ ,

I J .. v / I/ ·",, ,, ~ / _, , ·

v l/v l-"'.'.'. :;,,1,,

~<. ,,,,,

L-" 'rV"'

~ _ .........

...... ~ ......... ...

20 30 40 50 60 DI SCHARGE - Q -CFS

8 l,( ~ L(3o)' L--/')I/ .v REFER TO UPPER GRAPH FOR

7

I- 6 I.LI I.LI u.. 3: 5 :c

I a:: I.LI

tc 4 3: 0 <(

L GREATER IOO So VALUE S

J

1/--~ay- t ,/ j ;

L o/ iOOS~!!.'1 ij ~I

--'I I I j _ _/ -- --I Vl / ~ I

,

/ .... " \!!..--I - r-._24 /

I l

v I/ I

I/ - - :®. ---

" , r§'/ ~ / .,,

, / ,,/ L , , _I J

... •· v ...-/ ...... .. "" ,,,.

I v / I / ·' / /

/ .I .-< II / ,/ \~ 36 ~ -/ -- "'~- --

I/ / ~/ [). , . -

~ v v .-- / I/

~ v 'l,-,o,,,' ~~

v

-· v v· / v v .....

~

........ I.LI :c 3 --' --- )_ / , , ,, v ,,,. I.-' [....--... v: .,..,, ...... l..--'

2

l o

EXAMPLE

@GIVEN:

I J

I~ ~~ ~

v v ,/ 17 k ~

10

33 CFS; AHW = 5.2 FT. L • 70 FT. ; S0 = 0.005

~ SELECT 30" UNPAVED HW • 4.9 FT.

v v I ,,

~ ....-.,... .. ~ v

i::::: ..,,.

BUREAU OF PUBLIC ROADS JAN. 1963

... ~ ~,, v FOR 25% PAVED CULVERTS ,, ... _.., v

REDUCE LENGTH TO 0.75 ACTUAL L ....... v ..... L '-- TO COMPUTE IOOSo

20 30 40 50 60 DISCHARGE-Q- CFS

10-51

CULVERT CAPACITY STANDARD

CIRCULAR CORR. METAL PIPE PROJECTING ENTRANCE

1811 TO 3611 0

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 54: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 20 16

14

t;j 12 I.LI LL. I ~~· I. 42

'---" 3: 10 :t: L o f l oo I /! 1oos-"'' "' 0 I

a:: ~ 8

~ 0 <( I.LI 6 :c:

4

c- . 0 'It- I CIJ'D

J~· / It _j 'I

I i 4 I ,'

/, / I / , I "I

~· ,,

J I v. /~ ~ I'.'~ :; . ,. ,, :'?,:""

.I u ..

,I

. -~:· 1/ I ' /

1/ k~ ~ ~

~I I

0

rS I

/ / / .. .....

J [[,(54 ~ /

/ 1' / lF

" ,

L 4a Y-; ,

I v / " I /

/ ,

/ " l/ ,.· , ,I , / .... _ .... .../ ... o l °/, 0

, 0 ... _, ,..o 'b "". ® 1->oJ roo ,.,+>"/ . 'i?.o%~r . E>:Yi .;·

' ,,,v / / ,/I_,.; v ;' , J C/ .. v1 / ~

, ~ v . ,/ L/

I/'/ ... ~ t. ~~ ~ ~ ~

,,,..

2 0 50 100 150 200

DISCHARGE - Q - CFS

16 REFER TO UPPER GRAPH FOR

L GREATER IOOSo VALUES

/ 6~' ~1 66 ;.1 , / v _,.v

,/ , [/ 1 /

v / /

/ / ~ v

/

250 300

/. i. ~Of -/ ,,.

/ v /,, 14

,i-j54° y )/ .Iv / ~/ I-I.LI 12 I.LI LL.

,' ,v If / " / v' -· I ·'

J 48 '( .'~, v /' / ,,,,, v J - - -"'-

3: 10 :c: I

.~2J ll" I , ,

~~ v -;.1 l' _./ I _I / - - /

/36 ¥ !lg lf. v / /, ,• [/ v / _./ I " / ·" a:: I.LI 8 I-<(

3: 0 <(

6

L o t ~

0 1 1'1.oo • 66.~' ~~,,,~- ,">~ ~"J >/ ,~y 1oos;;--::J1 ~ <o ">1 Q) ";>~

J [;" /

i I I L. ,:, J v,,. v ~· .. ~ t::· •' I--"' .... / ~ ..

I ' 'l J ,,/ I/ ,,

.... ~ / ~ ~ t:,.. v - -- ·-- , .. ,..,

350

,§6 1· v J ,

I/

I.LI :c: / V: ~~ / ~ ::.-~ ,,,.. .....

FOR 25% PAVED CULVERTS I ) I/ I ,.

4 ' ) /,,

~ ~.I!~

2 0

L.V.-

EXAMPLE

@ GiVEN:

~ ~ -50

~ ~ ~

115 CFS; AHW =9.4FT. L= 135 FT.; So= 0 .0034

~ SELECT 48' UNPAVED HW = 8.6 FT.

~ ~

::;;--~

,,,.. REDUCE LENGTH TO 0 .75 ACTUAL L

~ t:;::. ...... L

TO COMPUTE IOOSo

100 150 200 250 300 350

DISCHARGE - Q - CFS

CULVERT CAPACITY STAN DARD

CIRCULAR CORR. METAL PIPE PROJECTING ENTRANCE

BUREAU OF PUBLIC ROADS JAN.1963 36 11 TO 66 11 0

10-52

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 55: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

I­ll.I II.I

24

22

20 RiJ." /

r; 7 i . I i I J I

,41)' I f ; J I

' / I / / " I v i ~1 I / i I/

~ J

CHART 21 I -· /f X, v J(., v ~ , p_o~ :fi~ ~/ ,I I // / I I I L L -

I/ / ,./ / /' J

- lL: _/_ _, ," .,.'

/' /' §.& II ~ ~f§i~ I $;J'1 "~'W -~°I 4)~ ,~<J)I offe .,_____b__ , 00 ca, .., . / IOOSo

u.. 18

:b ::c I

ffi 16 I 1 I' I I I / , I !l , ' L_ ,/ I

, v I/ v I I ti

3: 0 ct 14 II.I

I I

:J: / / , I

12 ---j

ii ,~

10

~~ ,~

8 300

12

~ 10

~ I

~ 8 I

0: II.I I-

I h' /

/ / l/ ~.

I // I I

// _L I

/ --1, / /"<9 /~ ; ' -/' ! I I 1/ I )~~ II' •/ ,,, / v,~ ~ .. ~~ l,.-/ ' , / ~/ ~ v ~ ~ v

500

/ 1' , v / v / ' v / J ,, V/ / / / / v ~'/ // v ·':- /

/ II'

,/,, / ~ .. /' ,, / .. v~ ~; ..... ~ /

~ '/ EXTE NSION OF LOWER GRAPH

v

700 900 1100 1300 1500 DISCHARGE -Q- CFS

,· J ..t ~· 72 /

/ L .484): / ,_ ..... ~ v .... 1.-

I/ " x , ,, / ~ ... ... /!,....... ~n ~ ~ _/ _,, ~

, .. .... /

L i::P1£; ~ ~ ~; ~ ,, ~..:. ~oO~ v-,0oo ..J~ '::;;;> ~ ~ IOOSo- --~ ~' ~ - ,g ;r' ~ ... ...... "'~

/.' /,...-: 1~ .. ;..-_ I'° ~: ~~ ... i...... -- ~--J / / .,,;'I !..- ~-

~-- /. V ' ~;.. ~ "=<.~ :;... .......... ----./. ~;: .... ......

!..-i.-i..-.. ~

:.' ~ ~ ~ ..-:::: - ·i.- ........ --...111111 ..-:::~ ~ 6 0 ct ILi

l.i~ ~ ~ ~ ~ ~ t:::- '\.°12p " FOR 25% PAVED CULVERTS

~ REDUCE LENGTH TO 0 .75 ACTUAL L

::c 4

2 .A

0

EXAMPLE

@GIVEN :

,..~ ~

,,. I.I

~ .. %

~ ~

100

530 CFS; AHW 13,8 FT. L = 2 70 FT; So= 0.0060

~ SELECT 90" UN PAVED HW = 13 .0 FT.

~ ::;:: ~~ '108" L ~

TO COMPUTE IOO So

::;;.-'

200 300 400 500 600

DISCHARGE-Q-CFS

BUREAU OF PUBLIC ROADS JAN. 1963

CULVERT CAPACI TY STANDARD

CIRCULAR CORR. METAL PIPE PROJECTING ENTRANCE

7 211

TO 12011 0

10-53

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 56: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 22 8

/ / //

I / ,,,/ I

/ .,

/' J I / ..... 7

I- 6 UJ

/j24}t' , ~

).._,,- 3q; 17·· ·~ -:{3~ ----~~ - -- -UJ IL I

~ 5 I

a:: UJ I-~ 4 0 <( UJ :::c: 3

2

I

,{{_a I I

L o 0 ~ IOOSo-~ !!/ .;:)

I i __ L I I ' ' ·' I ' I/ _, / I / I

• I -'

I I ~· I _) ,,• .-'-:.::

'l .)/,.~ ....:; ~ ,..,,,

/t ,._;:; ~ "'-

/ I I

/ l '81 "/ , ,'

,

-~ -_, I

I

/ ,~/ ...... ,.

~,,,. ,. ,.,· ......

--/ / , ,· /

, , ,,; ,/

L ,' , ,

/ ,,./ - -- --- -~· _,

, ,

"~ !<>o'/ -,o/ Q9 ,~ ,-, , ~ ~ i,-·

I/' /.v .

I~ ,,,." / ; _,. ~/ ,;' ~"'

,,.' .,,.,. ~"' .,

[.,,." ,/ ,,/

' ~"" - ........ ,,,.- v' ... --' ....:.'. .. -

0 10 20 30 40 50 60

8

7

I- 6 IU LL.I LL

J

~ 5 ::c I

a: LL.I

~4 3: 0 <( IU ::c 3

2

I

REFER TO UPPER GRAPH FOR L

GREATER IOOSo VALUES

f-. la ' l...--1 --- -1 / . I I

j I I I

L o' ro l !&' ,

IOOSo -!!/ _-::;. ---i 1/,- /

II ' I _J. ' / / -· --

I I I ,../ I I ·' k ' I /v..,, /' ~ ~- :::...-V"'

I L..,..-.. ~

/ ,,t. v , ~ ~ ~ ........ ,,,./

~~ ~ 6 ~ ....

DISCHARGE-Q-CFS

/' ~ ~ ~ ---... -

/ "-... v Jr- ..._.... 2411' / / / ,,; /

I J II /.

,,, ·-~~ I ---

J v /, ,

._/

~rt· / / ,' ,,,. v 6

,,, / / j --- -- -- -- -- ,,.

/ ,' / ,, v •' JJ.. '·' ,,/

~ "-'o.' ~ v _,,o,,,./ :;9-V"' --- -- ~· ~

v )I' v .,,. ,..,,, ......... / ...... i-

/ /; ,.., ...... ........

~v -· i-""' L..,..-,,-

,. ::::: -~ -........ FOR Z5% PAVED CULVERTS .J ~ !..--i.- REDUCE LENGTH TO 0 .75 ACTUAL L

~ ~ L

TO COMPUTE IOO So

0 10 20 30 40 50 60

EXAMPLE

@GIVEN: 43 CFS; AHW • 4.9 FT. L • 72 FT.; S0 = 0.003

~ SELECT 36" UNPAVED HW • 4.4 FT.

BUREAU OF PUBLIC ROADS JAN 1963

DISCHARGE-Q-CFS

10-54

CULVERT CAPACITY STANDARD

CIRCULAR CORR. METAL PIPE HEADWALL ENTRANCE

18" TO 36 11 0

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 57: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

16

14

I-LLJ 12 LLJ l.J... I

5: J:

10

I a:: w I- 8 <(

3'; 0 <(

6 LLJ J:

4

16

14

1-LLJ 12 LLJ l.J... I

5: 10 J: I

a:: LLJ I- 8 <(

50 100

' REFER TO UPPER GRAPH FOR

L GREATER IOOSo VALUES

L 3 sf; / L 0 ~I)! 10050 !!? - I

CHART 23

v' / ~,. .:~ ,,.. -

150 200 250 300 350 DISCHARGE - Q - CFS

I~ t(Gcy" · v , I/

II ~ ; ,

l) l-(5j ,_ v v / [/ .. --; v ,

I/ II' I/ v ,, r(s~' I/ ./ ; ,. ~ 4a

II v ,/ v l/ ,,·'" I/ I-"> [/ .. / ~ I ) - -i "42 {!-, v v II' / v / v , L.' I ' v"" ·~ ' ' I / _ ~~ - ~ / ; '

v j/ / V,-

, ,,- v ,,,, v ' ; I/ ./~ - - / / ..... / rd/ l o %oo/ ,<J / cP/" ro°/ "' ~ .. JY' v-

"> _J J?.. _ _ .)l _q; ~· '.!-7 :9-/ ..... ,

......... 5: 0

I ~ ~·' _/_ ·'/ /~ / ~ ~" ~ ,, ~

./ ./

~ 6 J:

4

2 0

EXAMPLE

®GIVEN:

I

...& ~

- J --/ J

I /~ ,/ / ~ ~ ':::; ~ ~

50

130 CFS ; AHW = 6.2 FT. L= 120 FT. ; S0 = 0.025

~ SELECT 54" UNPAVED HW = 5.6 FT.

j 'I v I' I / /

/ /. / ,...:: ,,,.

;

~· ~ ~;

~ ~ ... /"

~ ~~

100

BUREAU OF PUBLIC ROADS JAN. 1963

~ / ~ / ~ ..... .,,,,,....-

~ ./• ~ ...... d ~ ~ -...... ....... FOR 25% PAVED CULVERTS ..... REDUCE LENGTH TO 015 ACTUAL L ;;....- L

TO COMPUTE IOOS

150 2QO 250 300 350 DISCHARGE - Q - CFS

10-55

CULVERT CAPACITY STANDARD

CIRCULAR CORR. ME TAL PIPE HEADWALL ENTRANCE

36 11 TO 66 11 Q

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 58: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 24 24 I I I ~/ ,J/ /

/

/ I I /' / ~·

1'

j I I I I/ I I / ,

! I , ~ '-- ~II~ ,_,).17j,_ ,~ r; ~4lj I rf-~6 ~ .,

/ ' i_o • j / ,J / _1 r: y I v, ; I v / /" ,· I/ I , ,

22

20

1-w ~ 18

/ I j I I I v . I I / L! II"/ v / -~ , /

--- ---I 3: :I: I

ffi 16

~ 3: ~ 14 w :I: .

5 §/ !i?J

I / // J

i /) J I

/' Vf

J ' /

~1

I/ I I

I

/ i-__

~~ /ro "'

-.. '1~7 0>.o' J~ .'I

/ /_ v, .. -~

~l' I , ,.

//' , I/. -- - I

~ ,, I ~ / ,,

~°J~o'¥' .§ v -§}~ ~- ¥ L ,o V~ - IOOSo_ h ' 'I' //~ __ j -',,' / /

V.1 ,

~/·- /..,-/

v / v" ..... v ~ ~v /

..... ,

12 i' JI i/' V': , /.. '/ ~ v L -- - ) l / I J'// t0

,. A

, ,_,, ~/ I ,,

1~·· ~ 1/ ~ ,, ,, " / EXTENSION OF LOWER GRAPH , ~

A ··, ~

,. .,- ,, 10 v ~ v /' , (/

8 300

/,- .;~ ~ v .J' v

12

I- 10 w w u. I 3: 8 :I: I a: ~ ~ 6 c <( w :I: 4

2 0

~

EXAMPLE

@GIVEN :

500

~J ~ ~

-~ ~ ~ """~ ... ~

... 100

380 CFS ; AHW = 9.5 FT. L= 120 FT. ; S0 = 0.00a3

~ SELECT a4" UNPAVED HW = a .a FT.

_,.; ~

~ ~ :;,.::::: ~

~

700 900 1100 1300 1500

DISCHARGE-Q-CFS

I ; L4· /. K 4 · ~ ~1--1'. rr-II

'I') r ~ , i,' I :y""

~ Cd:'. \(96)"~~ ~ I .1-' ....... L . ~'O.I ~ l-60 ~ ~ ~ ~oO ...-

~ ~-I~ ~. IOOS0-W<0~' 0 ... • €1 ·1 ~

L/ / .... ~ ---- ~ ~ ... -r~ ~ -...-~ _, r~\0 1-..J ~ ,oo ~ ~;;..;;-

/~ v ~~ ~ ... ~ ~ ... ._;:. ;,....-" ~ ....-~ -L...-" ~ _. -~ -v,.- ·' / .... v ....

~ ~ -:::::: ::.... -/. ~· / ~ ....... ~ -:::::: ::;: :;;;: ~ ::;;..- \.120" FOR 25% PAVED CULVERTS

/ REDUCE LENGTH TO 0 .75 AC)UAL L

:;;::; :;::::: -t'°95" 1-108" L

TO COMPUTE IOOSo

200 300 400 500 600

DISCHARGE-Q-CFS

BUREAU OF PUBLIC ROADS JAN. 1963 10-56

CULVERT CAPACITY STANDARD

CIRCULAR CORR. METAL PIPE HEADWALL ENTRANCE

7211 TO 12011 0

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 59: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII F. Standard Corrugated Metal Pipe Arch Culverts

l/2-in. by 2-2/3-in. corrugation

Curves tor all commercially available pipe-arch culvert sizes are shown on the charts. The sizes show on each graph are arranged in an alternate manner to avoid overlapping of the curves.

Charts 25 and 26 are tor pipe-arch culverts with inlet face normal to the axis and projecting to or beyond the toe of fill. The charts may also be used tor mitered inlets, and the other inlet variations listed under ~c. VII E for circular corrugated metal pipe With project­ing entrance.

Charts 27 and 28 are tor a full-height headwall at 90° to the cul­vert axis, extending at least 1/12 D above the pipe crown and of suffi­cient length to retain fill slopes clear of the waterway opening. The charts may also be used with all inlet variations listed under filec. VII E tor circu1ar corrugated metal pipe with headwall entrance.

Pipe-arches are made by pressing standard circular C.M. pipe to form sections with a span about 1.63 and a rise about 0.74 times the pipe diameter. The cross-sectional area is about 0.90 that of the cir­cular pipe from which the pipe-arch is made. The charts are computed tor a standardized section of the above dimensions. The inside dimen­sions (crest to crest) and area of each size are given in the table be­low.

Dimensions of Standard C.M. Pipe-Arch Sections Included in Charts

Nominal Size Span Height Area Round Pipe inches ft. ft. s.f. diam., in.

25 x 16 2.11 1.29 2.16 21 29 x 18 2.41 1.48 2.83 24 36 x 22 3.01 1.85 4.42 30 43 x 27 3.61 2.22 6.36 36 50 x 31 4.22 2.59 8.65 42 58 x 36 4.82 2.96 11_.30 48 65 x 4o 5.42 3.33 14 .34 54 72 x 44 6.02 3.70 17.7 6o

10-57

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 60: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 61: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

1-w w LL I

4.0

3: 3.0 :I: I

a::: w 1-<C 3: Cl

~ 2.0 :I:

1.0 0

4.6

4.0

,.( I \ ""jLI ~ I

o o • ~ !!J/ ~/ ii ' !

I I/ I I J I I " :1 i

, /

I I ' / ,/ v

.' I ,v/ v j • ., I , ~ '/

/, '/ ,,~' /J/ h

10

C·HART 25 I

- 3 }-.._ - I.,.., ""'v ' I

/ _I 17 11· ii ~,

) ® J I v

/ 1/ J 1/ II'

' ~

o ' ~ , L.: !§J ., 10050 II v '

/ v v CD - 25"x 1611

0 - 36"x 22"

20 30 40 50 60

DISCHARGE-0- CFS

' . .-f--j ? 4 \._ J /• '-- v -'- Cl '\II'

, '

v I/ I 7

1-w w LL

l.f 2"'\1--. I I /

I 3: :I: 3.0 I

a::: w 1-<C 3: Cl <(

J

I

k-"

~ 0 '!]

I I

I I I I

I ·

I j I ~ 2.0 I I V

,,r/ I l j ~

l,Jh" ~~:..-

1.0 0

EXAMPLE

@GIVEN:

" '/ . -~

10

33 CFS ; AHW, 3.5 FT. L ' 60 FT.; So' 0.005

~ SELECT NO. 4, 43" x 27" HW, 2.9 FT. UN PAVED INVERT

//

I I

)

II

/ .. '. ~~

V'

BUREAU OF PUBLIC ROADS JAN. 1963

\. I ® 7 r7 :J/ ~°I ~°' ~~15os I /

/ / I o

"/ ... ~ 7 FOR 40% PAVED CULVERTS

/~ 17 17 REDUCE LENGTH TO 0.6 ACTUAL L / ~ L

,/ / /., TO COMPUTE IOOSo

.• / ' v lJ' v' v

/ .. ~ (D - 29"x 1811

v-' v v 0 - 43"x 27"

20 30 40 50 60

DISCHARGE -Q- CFS

CULVERT CAPACITY STANDARD CORR. METAL PIPE-ARCH

PROJECTING ENTRANCE 2511 xl611 TO 43

11x27

11 0

10-59

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 62: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 26 8

7

1-IJJ 6 IJJ ll.. I

3= 5 :::c: I

0:: IJJ I- 4 <t 3= 0

~ / .... j/

9/ o' f'j ~ !f?'I "o ,' I v

/ // ~

<t IJJ 3 :::c:

I .y .' /. / . v/

1-

/~~ /& ~/ 2 ~,

I 20

8

7

"'/~ y ~

50

ti

~

l/...,..... v

1,,/.- ' 1' -/ ----/ /'

I/ ,,.v /' ~

.,0 .1 ~~~ L 0-:~ IOOSo

v v

/

100

DISCHARGE-Q- CFS

/ /

(})-50"x31"

(I)-65"x40"

150 200

£ ~ / / / .

,,'' v /

IJJ 6 IJJ ll.. J f 6) / . / /1 I

3= 5 :::c: I

0:: IJJ I- 4 <t 3= / 0 <t IJJ 3 :::c:

_,//

,, 'i'.: ~~ ~ ~

~ '/" 2

,, I 20 50

EXAMPLE

@GIVEN: 115 CFS; AHW ,5.2 FT. L' 110 FT.; 5 0 , 0.0055

(J> SELECT N0.8, 72"x 44" HW' 4.5 FT. PAVED INVERT

/ ,_,oil' ""~

/ / ,, /

v_ ...... / v

BUREAU OF PUBLIC ROADS JAN. 1963

}' ,

/ w ,y ,,._.,';/ / ~ L

~ -+:------ IOOSo ,,, ~ I _/ /

/ / FOR 40% PAVED CULVERTS ... ~ REDUCE LENGTH TO 0.6 ACTUAL L ......

100

DISCHARGE- Q - CFS

TO COMPUTE IDOLSo

(D-58"x36"

®-72"x44"

150 200

CULVERT CAPACITY STANDARD CORR. METAL PIPE-ARCH

PROJECTING ENTRANCE 50

11 x 3111

TO 7211x4411 0

10-60

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 63: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

1-w w LL. I

4.0

3: 3.0 :::c I

a:: w l­et 3: 0 ct w 2.0 :::c

1.0 0

4.6

4.0

J[ I ) " '...-' 1 v '-.

o 1 ' f l ~I ~; ~1

I I '

I / I I I / I

I I , ,

·' I I i I; .

I ' "' ~ v' v

) /

J / I/ v, r/~ I ') ... ~ v

1,,. r/. v 10

CHART 27

- /' 3 ).. .-.

J--- '/ 1/-v ..._ rY

f ' J ' I .

)® I J v v

I I v I ./ I/ t.:

jl ~~1005 ~· I/ o

/ I/ v (D-25"x 16" .__ '----v

(D-36"x22" ~ ,____

;

20 30 40 50 60 DISCHARGE - Q - CFS

' ,__ r 4 )- r-- v ,/-v /.,.; -r--v

J I v 1/ I' v

<

1-w w LL. I

-- 1/ 2 )- "' I ,,' v ,..._....

1!-

3: ~I Bi

7 3.o a:: w l­et 3: 0 ct w :::c 2.0

1.0 0

EXAMPLE

@GIVEN:

/.

I I

I

! I

! / .'

,

I / )

/ / v 1 / I/~ ~ ~.,

10

35 CFS; AHW = 3.5 FT. L= 145 FT.; So= 0.020

' I

/ I

j /

.. ~ v

~ SELECT N0.4 , 43" x 27" HW = 2.8 FT. UNPAVED INVERT

/

/ ~

v

)

v /,

,,,. .,.,.

'~/ II 0 / v /

~ J?°I fQO/ '.!>9--V~ t

.... 10~50 I/ v / l/1

' 1/ / /Tl .. v FOR 40% PAVED CULVERTS

I/ / ,, / /lo' REDUCE LENGTH TO 0.6 ACTUAL L L

.I "' / v TO COMPUTE IOOSo

.,,,, ,,, / /

/ J • •' v G)-29" xl8" ... .... / ~,, G)-43" x27"

20 30 40 50 60

DISCHARGE-Q- CFS

CULVERT CAPACITY STANDARD CORR. METAL PIPE-ARCH

HEADWALL ENTRANCE

BUREAU OF PUBLIC ROADS JAN. 1963 2511 x 16 11 TO 4311 x 27u 0

10-61

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 64: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 28

8

7

I- 6 I.LI I.LI u. I

3: 5 :I: I

a:: I.LI

ti 4 3: 0

"" I.LI :I: 3

2

8

7

_/ ,.~

~

,r{I)-,1-v ,~ ;

I

!,' ~I .. °'°/ J / /

/

I / v ,,,,,-"" I ,

/:. .. " 7 ,,~ / ., ...

// 0 •' ..... ~~ ~

~ ~ .........

50

/ 1-C1J---, ,,I

v .1:.v 7 / ',//

, / /

" / / /"

" / / '•

// / O<f:>~ ~

.,o/ '7 lY L ~IOOSo

v' ~ / ""' , ""'/ v

@- 50"x31"

Ci)- 65"x40"

100 150 200

DISCHARGE - Q - CFS

!.'/ / ' ,, / / i..---~

~ -......... / /" ~ ,~

/ ,,/

/~ )' / / _, I- 6 11.1 11.1

Ir_, /:_v l.Y / / ,,,• •"' v ...

u.

~ 5 I

a:: ILi I-~ 4

/' 0 < UJ :x: 3 ..... v -

_,,/~~ ~

2 .,/~ ~

;;;;.....--

~ ~ .. I 20 50

EXAMPLE

@GIVEN: 95 CFS; AHW • 4.8 FT. L • Z40 FT.; So• O.OIZ

~ SELECT NO. 7, 65"x 40" HW • 4.3 FT. UNPAVED INVERT

.:?I /

/ / /

,,• ~/. ,~ ~.....-...... ~

i,......--

BUREAU OF PUBLIC ROADS JAN. 1963

o il ,.,, IY °'~ I/ ,<:>~ · , y ~/ v / ...-· ., .... /

,, .... v ........ , ""/ ..... ......

~ ""~ ~ .y .......

100

DISCHARGE-Q-CFS

';v V- L ~10050

I FOR 40% PAVED CULVERTS

REDUCE LENGTH TO 0.6 ACTUAL L L

TO COMPUTE IOO So

@- 58"x36"

®- 7211x44"

150 200

CULVERT CAPACITY STANDARD CORR. METAL PIPE - ARCH

HEADWALL ENTRANCE 50"x 31 11 TO 7211 x4411 0

10-62

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 65: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII G. Structural Plate Circular Corrugated Metal Pipe Culverts

2-in. by 6-in. corrugation

Charts 29 and 30, are used for culverts with inlet face ~onnal to the axis and projecting to or beyond the toe of fill. The charts may also be used for mite.red inlets, and all inlet variations given in sec. VII E for standard (1/2" x 2-2/3") circular corrugated metal pipe with projecting entrance.

Charts Jl and 32, are used for a full-height headwall at 90° to the culvert axis, extending at least 1/12 D above the pipe crown and of sufficient length to retain the fill slopes clear of the waterway opening. The charts also apply to all inlet variations given in sec. VII E for standard circular corrugated metal pipe with headwall entrance, except that prefabricated metal end-sections are not available for structural plate pipe.

The high resistance loss for flow in unpaved structural-plate pipe indicates that the culvert invert slopes should be at least 0.01, i f possible. Very flat slopes may require a size increase of 1 foot or more for culverts over 200 feet long. The outlet control curves (dashed lines) of the charts are computed for culverts on 0.01 slopes. There­fore the length, in feet, used for each size is equal to the L/10080

number. The coinciding curves for 300 ft. and 120 ft. culverts, or 400 and 240 ft., at low headwater depths mean that normal depth is reached on the backwater profile before it reaches the crown. In such cases, greater culvert length does not increase headwater depth .

Where it may be necessary to install structural plate culverts at slopes less than one percent, the normal method for determining head­water depth on the basis of the culvert L/10080 from a chart curve or by interpolation requires modification for more accurate results. Inlet control operation can occur on small slopes only for short culverts, that is, length less than 10 times the di ameter, and then only after HW becomes greater than 1.3 D. For greater lengths or lower headwater with short lengths, outlet control will always govern . For slopes significantly less than 0.01, find HW by t he following method, for both paved and unpaved culverts :

1 . Compute L/10080 for the culvert L at a slope 0. 01, that is , L/10080 is equal to L. Use reduced L for paved inverts (p. 10-9).

2. Use the L/10080 of step 1 to read HW f rom the chart curves for the size under consideration, on the solid line curve or by interpolation.

3. Compute the additional hypothetical fall of the culvert invert introduced by using the one percent slope, i.e., L (0.010 - S0 ), in feet .

10-63

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 66: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

4. Add the amount from step 3 to HW read from the chart in step 2 to obtain a close approximation ot the headwater depth required.

The pipe sizes given in the charts are the nominal inside diameter (crest-to-crest. of corrugations). The charts are canputed tor the man­ufacturers standard inside diameters as given in the table below.

Nominal Diam., in.

6o 66 72 78 84

90 96

102 lo8 ll4

Table ot Actual Inside Diameters ot Structural Plate C.M. Pipe

Actual Diam. Area Bominal Actual Diam. in. tt. s.t. Diam., in. in. tt.

59.1 4.93 19.05 120 120.2 10.02 65,.2 5.43 23.19 126 126.3 io.53 71.3 5.94 27.73 132 132.4 ll .04 77.4 6.45 32.67 138 138.6 u.55 83.6 6.97 38.12 144 144.7 12.06

89.7 7.48 43.88 150 150.8 12.57 95.8 7.98 50.06 156 156.9 13.08

101.9 8.49 56.63 162 163.0 13·58 lo8.o 9.00 63.62 168 169.1 14.09 114.1 9.51 71.01 J,.74 175.2 l4.6o

18o 181.3 15.ll

10-64

Area s.t.

78.8 87.0 95.7

104.8 114.2

124.o 131-i-.3 144.9 156.0 167.4 179·3

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 67: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

28

26

24

22 l­

tj20 LL

I 18 :;: I

c:: 16 w !;x 14 :;: ~ 12 IJ.J I

10

8

6

! c::- II I r ~ 7

I t:::::. I I !

·~ I / I I ,gf IL_

~ 11.k:- -~! §t ~o /$. !YI ~

! I /_ _i ; I / ! . l.J\Oi I • ' j / J I } ,,' I 1 1 ,1,., _,

' l JI L. ,, -~ .-I 1' .... : ~-

// ;: /."'. :;;.' /l.J ,,,:b .-

.~ qjllll

CHART 29

,' / '!Of ~ ~, ~, x:::;

I 196 II / /' ,.

I -.;::,;;i 17 v ,,I

'/ I ,l / ,/ _/ ,,

I • I/ I ,. ,' / ' r ~ I , I ,-

/ J I I •' / ,,

I v / ,, ~·-

I / / ,I ,-' ,' L I I

,, __ / /

,,,

' _,'I 1' '/ ,,, L

, / ,. _,/ ,,, ,

,.'ii' !P'Y ..J;' ,~o,.

/ , r> / / ' [ft

~/ ,,,.. .... - !""

200 400 600 800 1000 1200

24

22

20

I- 18 IJ.J

,_._ REFER TO UPPER GRAPH FOR

GREATER IO~So VALUES

DISCHARGE - Q - CFS

6 11 ~~/ I

I ,· 1"7·~; ' / / J

I I I/ ,' I j J j I I/

, ~ •/ v~ II'

1· ~ / ,,-,,. /

' , v / , - /

-./~ / --, , , - ....

w i;- 16

:;: ~· i I I / - L: _L ---

, ,,,, .~

I 14 I ~

I I - L ..__ o - IOOSo - !)}/ Jr/ -----a::

~ 12 <l

! -

:;: 10 0

)

' I ! I

' ' ! / I /

/ J 1 / <l

~ 8

6 /. ,z,,

-~ ~ 4 ~

.~" 20

EXAMPLE

QSl GIVEN:

/ 17 ,,· .... ~ ~ ~ :;>""

200

380 CFS., AHW= 11.7 FT. L= 152 FT., S0=0.0080

~SELECT 84" HW• 10.5 FT.

.... ~ ~

l I/ j j ,,; "' ~' , ,,. ,,,, J __ L L _-' ,' / ,,, /

&1 ~ /~ ~ ~'Jr 'bo/ 'b9'. v .L /_ _/ I I/ ·' / J, . v

/ QS ,. / .. ' / .... ,., ::;,.....-

v .a: v ..,:, ,,,, --~ "' ,,r/ .... ~ ~-- y

,y I,;~ ....,~~

~ './ .,--

400 600 800 1000 1200

DISCHARGE - Q- CFS

BUREAU OF PUBLIC ROADS JAN.1963

CULVERT CAPACITY STRUCTURAL PLATE

CIRCULAR CORR. METAL PIPE PROJECTING ENTRANCE

60 II TO 10811 0 10-65

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 68: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 30

24

22

20

1-18 ILi ILi

>--

400

-

800

I I I L --o-i

--+""L IOOS0-cv1

' -I I

I

1200 1600 2000 2400 2800 3200 3600

DISCHARGE - Q - CFS

~~~ i~ ~ ~ [;.=Y

~~~ - 180" ./ ~

>-. L ,oy,o .'-' '40~7 ~ ... 'd3 6.L n,9-0 .... "' .... II' 7 -;:/- -.. , cv1'fj- -cv1 ' , I i) ./ I/

/ _. .'I 'J .~ / / 7 ' / ' v , / /

/ ,,,, 1 / ~ / / / v REFER TO UPPER GRAPH FOR

1, // ,/ / / / GREATER _L_ VALUES _,, IO OSo u..16 I ' j 1/ ,J l.J v ,,/ v 3: :I: 14 I

I II

a: ~12 <X 3: 10 0 <X

~ 8

6

4

._

- -~ "1

. /J IJ

') I , 11 w

// /j v,,; I h f/ ~

-~ -'/ ~ r::::: //, ~ 0 v

~ 400 800

EXAMPLE @GIVEN:

1350 CFS., AHW= 22.5FT. L = 560 FT., S0 = 0. 014

~ SELECT 132" HW = 20.6 FT.

'J .,

!~~ v I/ ..,;"

Ii' [,,j ./ v .... ~ v J,~ i--; f/ [/ v [/' ~ ~v

~ v I

1200 1600 2000 2400 2800 3200 3600

DISCHARGE - Q- CFS

INLET CONTROL L/100 So REVISED SEP. 1964

BUREAU OF PUBLIC ROADS JAN. 1963

CULVERT CAPACITY STRUCTURAL PLATE

CIRCULAR CORR. METAL PIPE PROJECTING ENTRANCE

10811

TO 18011 0 10-66

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 69: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

26

24

22

1-20 I.LI

II

_, .,.___ I

I I/

I .. -I

,,.-.., 11 .,· I 84 ~ I '--' I

~I I I ' ,

CHART 31

/ / ~"

, IL

~6,._ ·/ / JOC , ,. '--' \

/ / ~~· ,,, ·' ,/

,. / ,.

I.LI LL J 8 I

I .:f._2; 1 , I / ,,, ,,' --- -- _ _ I!,.

~J6 J

ffi J4 1-

- ~ L -

Joos;:

c;11

~" ~8 ~ ,.;1

i I

: I

I I

! Ii 'I ~I .§

I _L J II' / I/

I / v / /' _,,. .-"" I/

<1.os-1= ... ,, / / -

~°' --~0,7' :a~ ,'VV

,/-" / ,/ "' v ---./ I/

"' / ,.., .

<l 31: J2 c

I ! L - I / / / , _,/ ; i'

I I / I I I / I/ i.-"' / ...... ... I I ;

,. " ,~ .... _ ... ~.,,,, ...., . J

/ I ..t / ,,,

,,,. ; ' ;]ii,o, ...

<l ~ JO

8 I I I , , .

.~ ~ ... .......

~

/ ll / IA" r,....· v JI ~ '/ I..~ ..

1:1 "/ ~ 6

,[6_.;:: 200 400 600 800 JOOO J200

DISCHARGE - Q - CFS

24 , / ,,_

v / ,rf v REFER TO UPPEI.R GRAPH FOR v' '184 ' j ,~ .. / , "' - GREATER IOOSo VALUES \9~/

22

20

l-J 8 I.LI I.LI LL J 6 I

31: J: J4 I

0:::

~J2 <l 3': J 0 c <l

~ 8

6

4 -- ..

(y.; II I/ I 72'7

/;::;:::.' I I I I

L --or ~" v / JOOSo_!Y, '!?j #I ~/ ~

I I I v ll'_ -I I/ I ,,,',,. /

I J _/ - L ,- ,,,

/ I

' / , I/ / , v / I ,. II./ I / ,,. v .. ... / . - -

i I I / / I/ _,,... .? ... .-I I . , v .-"' /. ... --.... ~"" ..-, / /,."' .-6 ~ [:...-""

I /, ·;: .......... -:::---" /. ;%;:: ~-

~ ~

I/ ."J 17 /' ""1 I i

,, v , JOE b.L

/ / 1./ I/ ~ --- ~ ,, / / ........ :,_ ,,v

I/ .,

~v ...... - , - /., --- - ~·

,,,cy -~~, r. r ,~q,, <:>,9. "'

~--, , v ,..r /v ,

, / ,.

/ V' / ,.- v ... / ... ..... ~ ~ .......... _......

v

2 0 200 400 600 800 JOOO J200

EXAMPLE (8) GIVEN:

520 CFS., AHW=9.8 FT. L = 114 FT., So=0.0085

!%) SELECT DUAL 72" HW=9.2 FT. OR

SINGLE 108" HW=9.3 FT.

BUREAU OF PUBLIC ROADS JAN. J963

DISCHARGE - Q - CFS

10-67

CULVERT CA PACI TY STRUCTURAL PLATE

CIRCULAR CORR. METAL PIPE HEADWALL ENTRANCE

60 11 TO 108" Q

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 70: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 32

26 @' '~

I ~·1 /_ a L ~ H . ,, / j.-.. II / /. ,_.., II ,, ! l~f 156 ~ 7 ==i I ~ '>' 18 ._.. J '---' ~ ,· ~ )'

24

22

1-20 I.LI

~ 18 I

31:

L --10050-

! T_

1

I io ~ :: I I

; ' J I I

I ,' I

I§ ,~1 . .... 1 : '

I I : I

I I f i _/

i i I 'l I

"lb-~j h o p ; __ , 0 ~"

;

I / ,. ,' I J ·' ,•

q)T / , , ,; , l ~ I ,,. •' -~

I I ,' .' ,' ·' ,,

I I{ ,

t:_~~ -r-~Ot/:>07 ;

- o 00~ ~ 0 $>• .I D< , • . ,. ,' ,. ; , ,," , / ·" ·' ,

, .. •' / ,, ,,:::, .,,. ./. , .. .. ,::>-

/ 7 16 a:: I / / I j ·' , ;' ~; .... .- v UJ !;:( 14 31: ~ 12 I.LI :I:

ti

10

8

6

24

22

20

18

~ 16

3: 7 14 a:: L&J

I/,

T T 1;

,• j I J

,' I ,,. ~"'· ,,

-~ . .,,, .,,. -.. ~ 1:::;: ...

/ ~~ ~ ~·

~ ;(JI

/X

400 800

L of-IOOSn --~

- __ , -

I I

I I

I I J I /

l I/,• ./ · ~

1; ,, ;r v i,..• , ii"' i.." I/ V' "" ... - ... ~ .. ~

1200 1600 2000 2400 2800 3200 3600 DISCHARGE-0-CFS

I ~ .. , itlio"L ~L ~ ~ ~ ~ j..-<, . ,; t(e;j"/ __.,

~

/ 16 ,...... ~ -- '-- =-1 1/ N I i-,..- )""\,J

I I / . / I / v ·' /l v !/ ,, j O ~} =;?A'I ~ ~I .,,'.1

L ,( / Y/ / / ~ 0 , :v If!.~ ~~,~~~

, .,, ff)/ -- ~- " ~- ,o

!_, J ,' I / ,; , / , ,,,, -·< / I

, / / / ,;' •' ..-: ,,, ~ .....

/ ~ / / / 1 / ·' ,,,~ .. 'A ... -........ '' _, / -' / " ~ .... / ... "" REFER TO UPPER GRAPH FOR .

GREATER IO~So VALUES I/ ~-, 1/ [/. ,,. .... / _../ ,

"'. ,_.., I.Ill'' I/ .. ,. ,,...

.... I;" ~ ~ v ~ 12 I / '/.'/ ..... ..... ..... v ~ <l 10 L&J :J:

8

.· ~ '/ I/' '· ·~ /. ~

I I ~ :;::;j: v I _, z ~

6 w"' l .1~ v v 4

I 400 800

EXAMPLE

@GIVEN: 1500 CFS., AHW•l7.6 FT L = 180FT., 50 •0.006

~ SELECT 144" HW= 16.5 FT.

L/ ~ :;;..-~

1200

-uREAU OF PUBLIC ROADS JAN. 1963

1600 2000 2400 2800 3200 3600

OISCHARGE-Q-CFS

l0-68

CUL VERT CAPACITY STRUCTURAL PLATE

CIRCULAR CORR. METAL PIPE HEADWALL ENTRANCE

108'' TO 18011 Q

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 71: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VII H. Structural Plate Pipe-Arch Corrugated Culverts

2-in. bz 6-in. corrugation

18-inch Radius Corner Plates

Charts 33 and 34, are for structural plate pipe-arch with inlet face normal to the axis and projecting to or beyond the toe of fill. The charts may also be used for mitered inlets, and the other inlet variations listed under sec. VII E for standard (1/2" x 2-2/3") circu­lar corrugated metal pipe with projecting entrance.

Charts 35 and 36, are tor a f'ul.l-height headwall at 90° to the cul­vert axis, extending at least 1/12 D above the pipe crown and of suffi­cient length to retain the fill slopes clear of the waterway opening . The charts may also be used with all inlet variations listed under cec. VII E tor standard circular corrugated metal pipe with headwall en­trance, except that metal end-sections are not available.

The capacity charts for pipe-arches of corrugated structural plate include headwater curves for outlet control computed for 0.01 invert slopes, as was done for the circular pipe with 2" x 6" corrugations. It is advisable to install all such culverts at slope of 0.01 or more, if feasible. The factors involved are discussed briefly in eec . VII G.

Headwater depth for pipe-arch culverts with invert slopes signifi­cantly less than O.Ol r:ray be read from the capacity charts and increased as provided in the instructions sec.VII G for structural plate circular pipe.

The culvert capacity charts include 8 of the 34 standard sizes available in structural plate pipe-arches . Sizes not included in the charts may be selected by use of the methods given in ~ec • IV, case 6 . The actual inside r:raximum dimensions, crest-to-crest of corrugations , are given in the following table , with the inside perimeter and area of each section.

l0-69

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 72: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

STRUCTURAL PLATE PIPE-ARCHES - 18" CORIER BADIUS

Section Span Rise Perimeter Area No. ft. ft. ft. s.f.

*l 6.o8 4.58 9.46 22.1 2 6.33 4.76 9.81 24.1 3 6.77 4.91 10.28 26.1

* 4 7.02 5.09 10.64 28.4

5 7.25 5.27 10.99 30.6 6 7.70 5.42 u.46 32.9 7 7.93 5.60 ll.82 35.4

*8 8.15 5.78 12.17 38.0

9 8.62 5.92 12.64 4o.4 10 8.83 6.u 12.98 43.1 ll 9.32 6.26 13.48 45.8

*12 9.52 6.44 13.82 48.7

13 9.72 6.62 14.16 51.6 14 10.22 6.77 14.64 54.5 15 10.70 6.91 15.15 57.5 16 l0.92 7.09 15.48 6o.7

*17 u.40 7.24 16.00 63.9

18 u.62 7.42 16.32 67.2 19 u.82 7.61 16.65 1c>.1 20 12.32 7.75 17.17 74.1 21 12.52 7.93 17.48 77.6 22 12.70 8.12 17.81 81.3

*23 12.87 8.31 18.15 85.2

24 13.40 8.44 18.64 88.7 25 13.93 8.58 19.17 92.6 26 14.12 8.77 19.47 96.5 27 14.28 8.96 19.80 100.7 28 14.82 9.10 20.33 104.8

*29 15.33 9.23 20.86 lo8.7

30 15.53 9.42 21.17 u3.1 3l 15.70 9.61 21.48 u7.5 32 15.87 9.8o 21.SO 122.2 33 16.42 9.93 22 .32 126.5

*34 16.58 10.12 22.64 131°3

* Pipe-arch size included in charts

10-70

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 73: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

24

22

20

1-18 UJ LIJ t.. 16 I

3:: :I:l4 I

a:: LIJ 12 1-<t 3:: 10 0 <t LIJ 8 :I:

6

22

20

18 1-LIJ L&JI 6 ~

114 3::

:I:

i!::12 LIJ

!i10 3:: 0 <t 8 LIJ :z:

6

4

I

.i ~2'-- -,' ,/

/ -- I' , J

'r e ~ / ,. /

[. 4 ) I ; / ,,ti I (.../ ['-,' I , I " ,. - .,,£_ -- ... ~

f I 1 I I / I ,," " ,,r ,, / ,,

.!,,_ i--9 r- ;;/d o/ ~ ,,c 'I,/ sr o;.· --- - 0 ,,

~.,,,· .,.___ IOOS0 '1~ ' ''!,: ,., "')_' 1- --;,. j ,,. x ,, ..

J I ~ - .... .'Y' 'I ./ /· . .. " /' ,,.., - _J_ 1.,• ' / ..,, ,' I ,, .~ ......

I' Ii/ // /~ .. " ~po

/ / I,' ' ,' .# .- ,, . / v L.r ... .... _ ...

/,, / ,,.~ ~~ ,,,-"""'

,,i;.• ~~ -... -,~· ... ~~ ...

.A,,;)'!

200 400 600 BOO DISCHARGE - Q - CFS

~

HEFER TO UPPt.R GRAPH FOR (g_ - GREATER _L_ VALUES v IOOSo - ,,r

IU..J , / .~ jlf I/ /

(_~ ,' / I /

v v ·' , , , h --

(_ I } , 'I

, /

,, / -- ,-- ,,,."',, v , ~

L ~rci_ ~,l~ , / ,,..

7 ·"' ~ 10056 .... , -~1 -:_~JI. 7 •'\ ~ ., ,,,; v , / .... "'... j /. ·' .~ J', ,' 1"' ,,",, v ... ~ ,

-- I _ I/ / / , / ... v "'~~ / L/ I ,,'·/ )P' . .-9'

I / / v ,,~ ..,y --~ ...... , . // /,I ,p .,,? ~.-::. V"" , ;.(~ ,.;;; ... ~ .........

-~ ~ ~ ......

-~ ~ "1? ... ~ .....

200 400 600 800

DISCHARGE - Q - CFS

CHART 33

L~ I <.......---.-- -,•

/ ,,' /

,, / ,,,,,

,,,.,,,

" ... . •" -

1000 1200

V11\ ~/

,,"/

,,"' / _,, /

,, ... "/ , / ,

ffi 6.1' x 4 . 6' -7.0' x 5. I' -

@e.1'x 5.8' [email protected]'x 6. 4' -

@tl . 4'x 7. 2 -

1000 1200

EXAMPLE @ GIVEN:

320 CFS., AHW: I 0.8 FT. L= 158 FT., So=0.009

iJl SELECT No. 6 7.7'x 5.4'

HW •9.7 FT.

CORNER-RADIUS

CULVERT CA PACI TY STRUCTURAL PLATE

CORR. METAL PIPE-ARCH PROJECTING ENTRANCE

4.6' TO 7.2' RISE BUREAU OF PUBLIC ROADS JAN. 1963 10-71

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 74: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 34

26

24

22 l­

:!:120 LL

I 18 3: :I: I 16

a:: LLJ

~ 14 ~

~ 1 2 LL.I :I:

10

8

6

I,, , r..,,,

~~~ .. -:- -:." ,,;~~ ·~"'

_ L _ _ o IOOSo - o , .,.,

.' --- _£_ _

,'

I I

I ,-I

/ / / ,,/' _,. _,. ........ .... _, ..... ~";.. ""

J ~3 '

' 17 \ f-- / \ -../.

i ./\ ·,1 I I J I

I / .' / ~--

·' L~o/_ L~ ~~'- _-$io , 1 ' ~ -"'+- ' .,_o

/ ,/ I / / , -.l~-

, / ,' .I

.I , ,' .. ,,-_I,' , "'.-" ......

J / ~,. ,., -/., ' ; ' ,.,; ... / ,, ... ;. ......

/ 'I Lr34\_

h .... 29" )-....· /, - ,,"' I

, I / , ,

.' / ~-

" , /

,, , /

/ / I/ I /

v , , _./.. __ ,,_ --- ---

/ .' ,-' I/ ,t'

;L-- --., -~' / , ,

,- / , -~o -- -.,,.'}~ - roC Y' v·

/ I, I /~•"

L"''

4 200 6 00 1000 1400 1800 2200 2600

DISCHARGE - Q - CFS 24

22

20 1-:!:11 s LL

I 16 3: :I: I 14

0:: UJ

~ 12 3: ~10 LL.I ::c:

8

6

-

"h

n~•t:R TO UPPER GRAPH Fun [ 17J GREATER _J,,_ VALU ES y { IOOSo

I' J l

~+1-to I I )

~~~°/ iOOS "t-.::~ O)v 0 J ~--~'-t~--

/ I / ' / V --- 1/--· _./ I/'/ -

I / / II' li? ,' V '/ -~

'/ ,y Q ._?

/V .~fl" ... ~ ,., .. ,; ';,.;"' ,/ ...... .... ~ ...,::,.-..

ii/ I~ ......-,,,, ~~ V" ,; """" ...... ~ ............ ~ .-::;.... ,.

_ .. v...~ ~ :;:...--' ~~ ,,. ........:: ,,,. ~

V23~ 1/21< 1'3 4\_ -w ,7- Lr / / / V

""" 'J ~/ ~" / , /

,...-~ ... -

---;4 ,.,~ ~ ,. ' ~ ,, ,,,. .. 0 ...,.. 0

' ,'0 1~'" I

,,~ # "' ;. '/ I~ I'

.t/ ~"' ... ~ _, ...

@ 11 .4' x 7. 2' -@ 12. 9' x 8 .3' -@15. 3 ' x 9 ; 2' -@ 16.6' x 10. I' -

4 200 600 1000 1400 1800 2200 2600

EXAMPLE @ GIVEN:

1350 CFS., AHW = 13. 8 FT. L =278 FT., % =0 . 0 22

~ SELECT No. 29 15.3 ' • 9.2'

HW =l3.2 FT.

DISCHARGE - Q - CFS

CORNER- RADIUS

CULVERT CAPACITY STRUCTURAL PLATE

CORR. METAL PIPE-ARCH PROJECTING ENTRANCE

7. 21

TO 10.11 RISE BUREAU OF PUBLIC ROADS JAN. 1963

10-72

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 75: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 35

l-18t---+---+-+-----+-+---+---l--+--+--+--l--l----tr--+-+---i>~+-----l~-+--t-_,._+--l-----l

~ I u..16 /1 8 \-/' / I / 4\ ' V I / / ,/ 3: - ~· I / / / ~-;1 ------ ~~ --f 14 LU / / I I / / / / ... "" o: r--~ ____!.___ -Cir "'~Zf8 ~' o ~~1 4 'r><i i;1"" - ~o~~,--1~h~q."r-'---.-+-+--+--+---+---+-1

w 12 r-- IOOSo _,,,,__._ ,.,_.,.. _ ,,, ~ ' ·~ I- I d -/ ~ / ./ ~10 J I L _ . .!j / , , / i.' ',' · "' c _j _ _u' ,, . I ,~- / t...'' /, ,..- · <t w 8 I l / / / , ' / - ,,/' ..-::. .- ' :::t: ! I I II I./ .... ::...... ...i...--

1 I / h .... ~- t...--• 6 l---t--+---,+.J.V~~~~,_ ~_..,-:._-:,•::_......-~+.;,......,,,,,C...b~~:...._+--+-1--+--+-t---t--+-+--t---t--t--+--!-+--l

:/~,,~~~"] 4 l---+-._,~~~~~~~~-+--l---+-----4-+--+-+--+----lf--+----+-+--+--l---+-----4-+--+-+-~

2 .___.~iC.....1.-..!.--'--'---'-----'---'--'---'--L---''---'----'---'--'--'---1----'---'--'---'---'---' 0 200 400 600 800 1000 1200

20

18

~16 l1J

IJ..1 4 I

3: ::i:::12 I

0: l1J 10 1-<t 3: 8 c <l:

~6

4

2

REFER TO UPPER GRAPH FvR - GREATER _L_ VALUES IOOSo

L

I (__!_. I L --o,

IOOSo -JJ;..--- ~ f~

/ I II _,_ ,

I _ _j v , -- -1--

/ )' / I/ / /, ...... ,"''/

l .I.? /_; ~ ~

~ ~ ~ ~ ... :,::...---

,~ ~ ~ -;; ,,:.. ~ ~ ~

DISCHARGE - Q - CFS

, ,· (..!_~ '/ _,.¢µ ~ - y ; y , ,

(_ 8j / / ,

/ ,' , / ,.._ I--' IV ,, / , .. /

_:::,.~ 'J / / .. v ; -/ ,, -r- -- --

ctVc:7 ,

Vo ,

~ :-~o ..... , .. /

~ k

r~ ,e.:_~o

I ~"' K:~"" )/ v / / 1 .. --- - 7 ~ ,. / ·"'

; / /, / , / , ... ......... ,

"" ,- / ,' ~~_, ..... v ffi 6 .1' x 4. 6

1

~ - - - r--

/ ,,' '/ ; 1.,_.., 7 .0' x 5. I' -, ... ".., / ... ~ ...........

~Bl'• 5 . 8 1 -..... _ :;...-9 .5' x 6 . 4' -II .4' x 7 . 2' -

-

0 200 400 600 800 1000 1200

EXAMPLE QSl GIVEN:

570 CFS., AHW= 12.4FT. L = 110 FT., S =0.007

~ SELECT No.12 9 .5'x6.4'

HW = 11 .5 FT.

DISCHARGE- Q - CFS

CORNER-RADIUS

CULVERT CAPACITY STRUCTURAL PLATE

CORR. METAL PIPE- ARCH HEADWALL ENTRANCE

4.6 1 TO 7.2' RISE BUREAU OF PUBLIC -RG-AD_$ JAN.1963

10-73

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 76: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

CHART 36

' 26 f--l--+--+--+--+--+---+---+--+---+----i-f--+-+-+--+--+--+---17---+. ........ .---i-r-,_..l--+-+--+->~'-+--l _ 2 9\--f?' I /

24>--t--+--+---+--+--+--+---+--+--+----<-+--+--+---+--+--+-_,.../ ......____,_ __ ~1~'~J,__+---+-~'~'-1--+--+--< V I/ ./

500 1000 1500 2000 2500 3000 DISCHARGE - Q - CFS

24 .J_ 11'29\ / 11'34\ .;1 ' ~~/ j ./ l'Y ,,. ,...._ 'y

REFER TO UPPER GRAPH FOR I "I v , / 22

20 1-tj 18 LL.

I 16 3: ::c I 14

0:: L&J

~12 3: 0 <t 10 L&J

- GREATER _L _ VALUES IOOSo

1 1 ~ _L __

IOOSo--

-- -1

/ ' / /

J /

/ V ,~

I

! {17\ f I v / / - {_ --~--I ' .. I/ ' / ,' / ,,/ ,' /

-o / / . ..L -~r ,-. -- -/ -· ~ v

~' ,,.,01 Q;,01 ,,q,o., .. 'O~ ~ -~c:i; ,c 'Y ,..,.,

' I I/ ,..., .. -- -;I _, ,,1 / , / J

i I

-~ /v ,; _,,,. j/ " , -- 1.1-- I 11! /

,. ,; - .• _,.,, I ~, / !,,' / _, /

v ,1 / ," .. v ,..y I V- ,..; ,,. .... ~,

-L /.,, ~ "> '/ -· ~ --~ .... I® 11.4' x 1.2· -

8 ,,v ;;...-"' ~ "' ~ @ 12.9' x 8.3' J:

•Z -~ -:;.

6 ~ ~ ~.....-

4 0

EXAMPLE @GIVEN:

,., ,z•

,:; ~

,_ ...... /

..... 500

1270 CFS., A HW = 15. 6 FT. L =I 26 FT., S =0.013

(%l SELECT No. 23 12.9' x 8.3'

HW = 14-4 FT. (OR 12.7' x 8.1' HW=15.3FT.)

'/'"'" ® 15.3' x 9.2' -@ 16.6'x 10.1' -- I

1000 1500 2000 2500 3000 D I SC HAR G E - Q - C F S

Q CORNER -RADIUS

CULVERT CAPACITY STRUCTURAL PLATE

CORR. METAL PIPE-ARCH HEADWALL ENTRANCE

7. 2' TO 10.1' RISE BUREAU OF PUBLIC ROADS JAN.1963 10-74

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 77: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

VIII. APPENDIX

A. Hydraulic Principles and Compilation of Charts

A-1 Notation

A Area of a cross-section of flow, in sq. ft.

Ab Area of culvert barrel opening, in sq. ft.

AHW The allowable headwater depth, in ft. above the culvert invert at the inlet. The depth corresponding to the upstream water surface elevation which the designer considers would be dangerous to exceed at a particular site. It is usually that elevation above which damage from flooding of adjacent property or the roadway would result in damage greater than some acceptable value.

B Span of box culvert, or maximum horizontal dimension of an oval pipe or a pipe-arch, in ft.

D Height of any culvert barrel opening, such as a box culvert, pipe, or pipe arch; also circular pipe diameter, in ft.

(Diameter of pipe is commonly used in inches, and for this reason the charts show pipe sizes in inches, although all calculations are made in foot units).

de Critical depth, in ft. (in a culvert barrel, as used here). The depth of flow at which depth plus velocity head is a minimum. See critical depth charts in REC No. 5.

HW Depth of headwater at a culvert, in ft.

The difference in elevation from the culvert invert at the inlet to the water surface of the headwater pool required to discharge any given rate of flow through a culvert.

ke Entrance loss coefficient for full flow. Values in REC No. 5.

1 Length of culvert, in ft., measured along the culvert axis and face-to-face of headwalls, or end-to-end of projecting pipe. Lengths of culverts with mitered ends are usually measured at one-half height.

n Manning's roughness coefficient.

Q Rate of flow through a single barrel culvert, or per barrel in a multiple culvert in cubic feet per second, cfs.

Sf Head loss per ft. of length of culvert due to friction.

S0 Slope of the invert of a culvert barrel with reference to a horizontal plane, in ft. per ft. of length; thus the sine of the slope angle.

10-75

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 78: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

100 80 Invert slope in percent, or ft. of fall per 100 ft. of culvert lerigth.

v

Tailwater depth, in f't. The depth of flow in the outlet channel below a culvert, as referenced to the invert of the culvert at its outlet.

Mean velocity of f'low at any depth in feet per second, fps. '!'bat is, Q divided by cross-sectional area of flow A.

Mean velocity of flow at critical depth, in fps.

Velocity head, in ft.; kinetic energy of flow.

A-2 Inlet Control Flow

Inlet control flow is defined as flow through a culvert with the depth of headwater controlled by the inlet. The area, shape and eclge detail of the inlet face affect the depth of headwater required. In inlet control, conditions of flow downstream and the roughness, lerigth and slope of the culvert barrel do not affect the depth of headwater.

It is necessary to determine the discharge capacity of the various inlet types experil:Dentally. The headwater-discharge curves of the cul­vert capacity charts are · obtained by scaling up the data from labora­tory tests of' model culverts, principally those tests conducted for the Bureau of Public Roads by the National Bureau of Standards.

The capacity charts for each culvert type apply to a particular inlet type and inlet edge detail . A series of sizes of culverts of that type make up the inlet control (solid line) curves of each chart. These solid line curves apply only to inlet control flow, although a headwater curve for outlet control flow will correspond very closely to the inlet control curve if a length and slope combination are selected to give that result.

A-3 Outlet Control Flow

Outlet control flow is defined as culvert operation with headwater controlled by conditicms at the culvert outlet. The depth of flow at the outlet, either critical depth or tailwater depth, plus velocity bead, establishes the total head above the invert at the plane of the culvert outlet. Headwater depth, measured above the invert at the en­trance, incl\ldes the total head at the outlet, resistance loss for flow in the barrel, and head loss at the entrance. In the calculation proce­dure it is necessary to subtract the difference in elevations between the inlet and outlet inverts in changing the measurement datum from the

10-76

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 79: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

control section at the outlet to the inlet. In this way, the headwater depths for inlet and outlet control operation are measured from a common reference point at the inlet. Measurement of headwater from the same reference point is essential to the construction of the capacity charts containing both inlet and outlet control headwater curves.

The outlet control curves of the culvert capacity charts are based upon critical depth at the outlet end of the culvert barrel. Any greater depth of flow in the culver.t barrel, as might be caused by depth of flow in the outlet channel, will result in an increase of total head at the outlet and an increase of headwater depth, p. 10-8.

To compute the outlet control curves of the capacity charts, a particular length of culvert was selected, and a slope less than critical slope was assigned. The values used for various culverts are given in detail in A-5 following. A discharge rate was selected, and critical depth computed. Then the usual step method for non-uniform flow calculations was used to compute the depth of flow throughout the length of the culvert. The depth at the inlet determines the mean velocity at this point, and thus the velocity head. The head loss at the entrance is ke v2/2g, where the entrance loss coefficient ke is obtained from Table 1 of HEC No. 5. Headwater depth for each particular culvert and discharge rate is the sum of depth and velocity head at the inlet, plus entrance head loss. The fall of the barrel is taken into account in the backwater calculations.

A greater rate of flow, a longer culvert, or a flatter slope can result in the backwater profile, which begins at critical depth at the outlet, reaching the top of the culvert barrel downstream from the inlet. Upstream from this point the barrel flows full. The length of barrel flowing full is found by subtracting the length of free surf ace flow of the backwater profile from the total length of culvert. Above the free surface length, the hydraulic grade line rises from its position at the crown at a rate equal to the resistance slope for full flow minus the invert slope . Therefore, at the plane of the inlet the hydraulic grade line is above the inlet invert by the amount

where Sf is the friction slope in full flow and Lz is the length of the backwat er profile from outlet depth to the point of full flow. Headwater depth is obtained by adding velocity head and entrance loss to the height hl of the hydraulic grade line.

A pipe, or any culvert section with an arched soffit, will always involve some length of free surface flow at the outlet, however short it may be at the higher rates of flow. This occurs because critical depth is always less than the height of the barrel. Box culverts present a different condition.

Flat soffit cross-sections, such as box culverts, result in critical depth reaching the top of the box at a sufficient rate of discharge. The discharge rate for de equal to D is within the common range of use.

10-77

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 80: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

of box culverts for highway drainage. Therefore, the culvert capacity chart headwater curves for outlet control involve cases where the cul­vert flows full at the outlet.

Where a box culvert flows full at the outlet, the f'low tends to spread as it leaves the culvert, and this results in a convex upward curvature of the surface as the flow turns downward. As a result, the pressure of the flow on the f'loor is decreased, and it would follow that the hydraulic grade line for tlow in the barrel would pierce the plane of the outlet at some point below the top of the barrel. Ample experimental evidence is available to confirm this conclusion. However, highway culverts are normally used for a range of discharge rates, in proportion to size, that just reaches into those producing the condi­tions discussed above. A substantial lowering of the hydraulic grade line can occur only at discharge rates greater than can normally be per­mitted for highway culverts. In addition, the extent of lowering of the hydraulic grade line is reduced if the channel width is only moder­ately greater than the culvert span, because the flow spreads to a les­ser degree.

For these reasons the chart headwater curves were computed on the basis of the hydraulic grade line at the outlet of box culverts being at the top of the barrel for discharge rates giving critical depth equal to or greater than box height. Headwater depth was calculated by the same method used for all culverts with a partial length of full flow, except that the total length was used to compute the rise of the hy­draulic grade line.

A-4 Resistance Factors

In backwater profile calculations and in determining the friction slope in full flow, the Manning equation was used, with resistance fac­tors appropriate for the culvert material in each case. The available expenmental data were used to determine the Manning n tor each mate­rial. The values of the following table Vere used to canpute headwater curves for outlet control flow:

Concrete box culverts n = 0.012

Concrete pipe culverts n = 0".012

Standard (l/2") corrugated metal, Unpaved, n varies with size:

Pipe Diam. in. 18 24 36 48 6o 72 96 Pipe-Arch Span, in. 29 43 58 72

n 0.0247 .0245 .024o .0237 .0234 .0231 .0228

Structural plate (2") corrugated metal, Unpaved, n varies with size:

Pipe Diam. ft. 5 7 9 13 15 Pipe-Arch span, tt. 6.1 8.2 u.4 16.6

n 0.0328 .0320 .0314 .0305 .0302

10-7d

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 81: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

The culvert capacity charts do not include curves for corrugated metal pipe or pipe-arch culverts with paved inverts. The curves are used tor paved invert culverts by reducing the length of the culvert and using the charts with L/lOOSo canputed for the reduced length {Sec. IV) • This compensates for the smaller loss of head by resistance, because of a smoother surface for a part of the perimeter. The value of n varies with depth of flow, and was computed on the basis of n = 0.012 tor the paved portion in making the trial computations to determine the length reduction to be used.

A-5 Chart Curves

A wide range of conditions of culvert operation will be included in the band of headwater depths between the inlet control curve for a particular size and kind of culvert and an outlet control curve for a long culvert of the same size at ~ small slope. Curves for culverts on a zero slope are not shown because highway culverts 200 ft. or more in length are usually not built on a level grade.

The lengths and slopes used in constructing the outlet control curves of the charts were selected with the objective of obtaining a wide range of use of the charts, while avoiding chart curve.a that are difficult to read. Difficulties in reading headwater will result if the outlet control curve crosses the curves of the next smaller size. Therefore, the lengths that could be used in the charts, at the flat­ter slopes, were limited. However, the culvert length used to construct the chart outlet control curve does not limit use of the charts to cul­verts of this particular length. The charts can be used for reliable determinations of size or headwater for culverts of other lengths and slopes by use of the culvert L/10080 ratio. The lengths and slopes used in the charts for the various culvert materials are given in the paragraphs below.

a. Concrete Culverts. Charts for concrete box and concrete pipe culverts include the inlet control curve for each size, and in most cases, an outlet control curve for a culvert 24o feet long on a 0.002 slope (O.~). This length and slope give L/100S0 equal to 1,200, and this appears in the charts. For examples, re:f'er to Chart Nos. l, 4, ll and 13. For the larger sizes the length was increased to 300 feet, then 400 feet, and final.ly the outlet control curve was omitted since it plotted close to the inlet control curve.

b. Standard Corrugated Metal Culverts. The chart headwater curves for standard corrugated metal pipe and pipe-arch culverts in­volve a modification of the system used for concrete box and pipe culverts. The greater resistance losses in the rough pipe increases the depth of headwater above that for the same size concrete pipe in outlet control at the same discharge rate. Therefore, the culvert length used to construct curves must be decreased, or the slope increased, or both. Otherwise the out­let control curve for one size will cross the inlet control curve of the next smaller size.

10-7';;'

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 82: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

The method used for circular pipe was to plot the curves i n two separate graphs. The lower graph contains the inlet con­trol curve and an outlet control curve for a culvert of inter­mediate length. Lengths of 120, 150 and 180 feet were used tor the intermediate curves for such culverts, together with o.8 or o.6'fo slopes. The upper graph repeats this outlet con­trol curve, and adds another curve, beginning at a length of 180 feet at 0.4'fo slope for small sizes, and increasing to 240 feet at o .4'/o, and finally to 300 feet at o .3'fo for the largest sizes . For examples, refer to Chart Nos • 19, 20 and 21.

The above arrangement of chart curves permits interpolation tor intermediate sizes between those represented by the curves. (See s ec. IV, cases 4, 5 and 6.) Because all s i zes of standard corrugated metal pipe-arches (above the minimum used) are included in the capacity charts, interpolation is not necessary . Therefore, charts 25 to 28 combine the inlet control curve and two outlet control curves for a size in one graph. Separation of curves i s obtained by combining sizes 1 and 3, 2 and 4, etc .

c . Structural Plate Culverts. The chart headwater curves for structural plate corrugated metal pipe and pipe-arches are presented in a two-graph system as for the standard circular C.M. pipe culverts. The resistance factors tor structural plate (2" x 6" corrugation) are still greater than for the standard 1/2-inch corrugation depth, as is shown above . There­fore, it was found a.d.Visable to use a flow line slope of 0.010 (1.0'/o) tor culverts operating in outlet control. The inter­mediate curve, tor outlet control, is based on lengths of 120 feet, or 180 feet for larger sizes . The upper outlet control curve for each size is computed for a length of 300 feet, or 400 feet for the larger sizes.

A-6 Interpolation for Headwater

The capacity charts may be applied to a wide range of site condi­tions. This is accomplished by using the culvert L and S0 as an L/10050 value to read headwater by interpolating between the chart curves . Be­cause greater length causes an increase of. headwater , and a steeper in­vert slope decreases headwater, the quotient L/100S0 serves to indicate the relative headwater depth for a given culvert size.

Application of interpolation to the chart curves , as described in s.:.ec. II C, requires that the inlet control curve be assigned an L/lOOS0 number and treated as an outlet control curve. This is possible, even though length and slope do not affect headwater depth in inlet control, because there is also a combination of length and slope which gives an outlet control headwater curve generally coinciding with the inlet con­trol curve over most of the discharge range . Using this particular

10-80

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 83: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

length and slope, as found by solution of simultaneous equations for headwater, L/lOOS0 was calculated and shown on each inlet control curve wher e an outlet control curve is also shown for that size. There~ fore, the inlet control curve (solid line) is also an outlet control curve for use in interpolating for headwater depths between chart curves.

The interpolation method for determining headwater depth was discontinued where it was found that length and slope became relatively insignificant factors. This was found to occur with the larger size concrete culverts. At certain sizes, determined by check calculations , the charts for c9ncrete box and concrete pipe culverts contain only the inlet control curve for each size, shown as a solid line (see Chart 5 or 12). This is satisfactory for application to a wide range of lengths and s l opes because the culvert length giving an almost identical headwater curve, at one particular slope, was .always greater than 300 feet, and for most sizes the length was greater than 400 feet .

The range of application of this single curve for a size was found by a series of trial calculations that established the hQghest L/100S0 value that could be shown on the chart curve and still be used without significant error in reaching the chart. The criteria used was that the true headwater curve for any long culvert in outlet control , with L/lOOS0 equal to or less than the chart value, would always be within 5 percent or less of the discharge shown by the chart curve at equal headwater depth, within the limit•. that headwater does not exceed 2D. This limit of twice the barrel height D, in feet, is shown in the charts by· a dotted line in steps across the curves for the various sizes. Therefore, the single curve may be used to determine headwater depth, or capacity at a given headwater depth, with assurance that discharge capacity will not be over- estimated by more than 5 percent at points below the dotted stepped line, proviied of course, that the culvert L/100S0 does not exceed the chart value.

For culvert lengths no greater thart were used to construct the charts, the accuracy of a headwater determination made from a capacity chart will be good, particularly at all headwater depths less than 2D , and within the limit that L/100S0 does not exceed t he value shown in the chart. The effect of various lengths and slopes upon headwater depth is examined further in Appendix B.

10-81

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 84: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

APPENDIX

VIII B. Accuracy of Chart Solutions

B-1 General Considerations

The culvert capacity charts provide one of the several methods that are available for making hydraulic calculations related to _flow through highway culverts. The purpose of all these methods is to select a culvert of sufficient capacity to carry the design flood peak without requiring a headwater depth exceeding so~e limit fixed by site conditions. A culvert size is found to be satisfactory through some procedure for calculating the depth of headwater required to discharge the design flood. A number of trial solutions will give one or more ctlverts meeting the requirements.

No exact solution for a culvert design problem is possible, in view of the fact that the flood magnitude must be estimated. The selec­tion of an acceptable probability of occurrence of a greater flood or an average frequency, does not guarantee that the flood rate estimate is correct. One could not be certain, for example, that the flood of SO-year average recurrence interval on a certain stream was 300 cfs., and was not in fact 270 or 330 cfs. The difference in headwater depth would be minus or plus one foot, or less, from that required for a discharge rate of 300 cfs.

In routine application of any hydraulic design method for determining headwater depth, a finding of headwater below the allowable limit would indicate an acceptable culvert, and headwater above the limit would be cause for rejection of consideration of that culvert size. However, it may be noted from the example cited above that a culvert that would give headwater one foot or less over the limit at 330 cfs would carry 300 cfs within the headwater limit. The difference of ten percent in capacity at the design headwater limit is not necessarily a serious factor, in view of the difficulties one faces in estimating the magnitude of future floods.

The points mentioned above are major considerations in culvert design. However, the accuracy of the capacity charts will be considered here from the standpoint of the reliability of a headwater determination made from the chart for a certain size of culvert at a specific discharge rate.

The capacity charts are used to determine headwater depth for a given culvert and rate of flow. In this determination the L/10080

ratio for the particular culvert is used to interpolate between the chart curves, and in some cases to read headwater on a curve. There is no implication that L/10080 , in itself, may be used to calculate the depth of headwater. This ratio is useful only for application to charts containing headwater curves plotted for a particular size of

10-82

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 85: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

culvert of one type, including an outlet control curve for a particular culvert length and slope. The L/10080 ratios must be given tor the chart curves. However, the L/10080 ratio is a logical indicator :for headwater depth because greater length increases headwater and greater slope decreases it, at least down to the slope limit tor beginning of' inlet control operation . Interpolation tor headwater depth between an inlet control curve and an outlet control curve of a chart means that the inlet control curve is actually used as if it were an outlet control case. This is satisfactory procedure, as was explained in Appendix A-6 .

The accuracy of a headwater depth read :from a culvert capacity chart on the basis of the L/10080 ratio varies with the depth of head­water relative to the barrel height D. If inlet control is certain be­cause of the low L/10080 ratio, then headwater depth read on .the inlet control curve i s exact over the entire range of headwater, proVided, of course, that the chart applies to the culvert inlet type. However, if L/lOOSo requires i nterpolation between chart curves because it exceeds the value given on the inlet control curve ot the chart , then the rela­tive depth ot headwater is a significant factor in regard to acc~cy of results.

The length of a culvert may vary over a wide range for any gi ven L/10080 ratio. Culvert lengths exceedi ng those used to construct the charts (Appendix A-5) are the principal factor causing errors in head­water depth as read f'ram a chart on the basis of' L/100$0 • Length of the culvert becomes a more significant fact or as headwater depth in­creases . For a given culvert, higher headwater depths are caused by greater discharge rates, and larger rates of' flow result in a greater rate of' head loss from resistance loss per :foot of length. The unit rate of loss varies as the square of the discharge rate. Therefore , culvert length will cause larger relative increases in headwater at · greater discharge rates , and thus at greater depths of headwater .

B-2 E:f'f'ects of' Relative Headwater Depths

The degree of reliability of' a headwater depth determined f'rom a culvert capacity chart may be placed in one of three general classi ­ficati ons . It should be understood that errors in the headwater deter­mination can occur only with outlet control f'low . However, the charts are used without requiring any procedure for a fully reliable deter­mination of' whether the control section is at the inlet or the outlet . The omission of' such difficult procedures is one of the principal ad­vantages of the culvert capacity chart method .

Because many culvert length and slope combinations do not show be­yond doubt that inlet control will govern, the' degree of' reliability of headwater read from a chart will be considered as a general problem ap­pl i cable to all cases . From this standpoint, the reliability of a head­water depth read from a chart on the basis of L/10080 can be evaluated in regard to the relative depth of' headwater as follows:

l0-83

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 86: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

HW 1.3 to 2 D

BW > 2 D

Good accuracy, even when read above the chart curves by extrapolating up to 1. 5 times the upper curve L/10080 •

Good accuracy, if' L/10080 is within the chart limit.

BW may deViate considerably from the chart solution tor certain lengths and slopes.

The accuracy of the capacity charts Within the above ranges of head­water is discuased more tully in the following paragraphs.

a. HW less than 1.3 D. Headwater depths less than 1.3 D permit considerable latitude in use of the charts • In plotting head­water curves with a wide range of lengths and slopes, it was found that the curves were closely spaced until headwater sub­merges the inlet. At greater headwaters, culverts longer and steeper than used to ccostruct the chart, were found to give headwater curves diverging tram the chart curves. A typical illustration is given in Fig. 2, page 10-86, which shows head­water curves tor 48-inch CMP culverts of several different lengths and slopes.

Fig. 2 shows that headwater curves for culverts of various lengths all tollow an almost identical pattern until headwater reaches some value in the range ot 1.25 to nearly 1.5 D. These are cases where the culvert slope is small so that out­let control occurs even at small discharge rates. The limit tor a restricted effect ot length upon headwater has been de­fined as 1.3 D tor design purposes.

This 1.3 D value cannot be an exact headwater figure because it is attected by entrance loss, resistance factor, and length and slope of the culvert. However, 1 . 3 D ·serves well as a depth marking the end of a headwater zone where length and ~lope have limited effect; and therefore, the chart curves may be extrapolated to find HW tor L/10080 values beyond the naxi­mum given in the chart it the actual HW is determined to be less than 1. 3 D. Bote the example given in sec. II C.

b. BW 1. 3 D to 2 D. For headwater depths in the range of 1. 3 D to 2 D, the possible spread ot headwater curves tor culverts ot lengths other tban were used to construct the charts rules out the use of headwaters above those acquired from the L/10080 value shown on the higher chart curve tor ,each size • The cause tor headwater curves deviating from the pattern of the chart curves, and the degree ot deviation, may best be explained be consideration of an example.

Except for the one case of a zero slope, the lengths and slopes tor the headwater curves shown on Fig. 2 were selected to give

10-84

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 87: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

L/10080 ratios of either 300 or 600, the values shown in Chart No. 20 for this particular size and entrance type. For comparison, the chart curves are also shown in Fig. 2 by heavy lines. The chart outlet control curves represent culverts 120 feet long at 0.4 percent slope and 240 feet iong at the same slope.

It may be noted that there is a tendency for .the headwater curves for culverts with L/lOOSo of 600 to group around the chart curve of the same value, and a similar tendency for culverts with L/10080 of 300. A closer examination will show that headwater curves of equal L/lOOSo go above the chart curves if L is greater than for the chart curve, and are displaced to the right if L is less. For example, the headwater curve for a culvert 120 ft. long and at 0.002 siope (t/10080 = 600) lies very close to the chart curve for L/lOOSo equal to 300. In fact the curves are parallel, and offset by the difference of fall of the inverts, that is, by 0 . 24 ft.

In applications to culvert design, this means that the actual capacity of a culvert of given L/10080 will be greater than shown by the chart curve at a certain headwater level if the actual headwater curve position is to the right of the chart curve. Conversely, the actual capacity is less than indicated if the actual headwater curve would lie to the left of, or above, the chart curve .

The first condition results in a conservative, and therefore acceptable, choice of culvert size. As may be seen in Fig. 2, the under-estimation of capacity is negligible for headwater depths less than 5 ft., and may be as large as 10 percent or more at 8 ft. of headwater. For concrete culverts, where the outlet control curve of the chart, for a still longer culvert, lies much closer to the inlet control curve, the degree of possible under-estimation of capacity becomes much smaller .

Therefore, the design problems of concern will be those in which the actual headwater curve lies above the chart curve. In Fig. 2 it will be seen that this condition occurs for headwater depths above 1.5 D. This is generally the condition that exists in all charts, but identification of a particular minimum level is not required in application of the general design procedure. A more essential need is to define an upper headwater level, below which the possible error of over­estimation of capacity is sufficiently small as to be acceptable.

It is obvious that the spread of outlet control headwater curves increases with discharge, and thus with headwater depth. Therefore, a headwater limit, below which the errors will be acceptably small, may be found by trial calculations for headwater curves for a variety of culvert lengths, with slopes

10-85

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 88: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

..... 0 I Q)

°'

11 .-----.,....-----r---.-----r----r---...,..----r----.-------.----..--T"'T"'---r--r--"71'""7-,....-'7r7-""7""'"'"1

10 W § ff I .

CULVERT

9

8

7 ~

' '~/lj~' _L_ - _ L_ •300 IOOS0 - ~OO I ·· -~ / I IOOSo

I d I I I I I

6

5 -- - - ---- ZERO SLOPE - - -L/S 300

I I -- -- L/S 600

4 f- W I I I I l ... ~S---: I I I I 48 11 CIRCULAR CORRUGATED

METAL PIPE CULVERTS

I I PROJECTING FROM FILL SLOPE

3 I- !¥ I I L~ I I I 1o'oso CONSTANT AT 300 8 600

VARIOUS LENGTHS SUPERIMPOSED ON BASIC CHART CURVES

I I .Jr~ I I I I I I I I I

2

I 0 20 40 60 80 100 120 140

:!1 cO c ~

CD

"'

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 89: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

sel.ected to keep L/l.0060 equal to or l.ess than a ch&rt curve value.

The above procedure was applied to many of the sizes incl.uded in the culvert capa.ci ty charts • A headwater l.imi t of 2 D was sel.ected because, at that headwater depth, it was found that the over-estimation of discharge capacity would not exceed 5 or 6 percent it the culvert L/10080 was no greater than that shown on the outlet control curve ot the chart .

Simil.ar trial calculations established that the charts tor culvert sizes shown onl.y by a single sol.id line curve, the inl.et control. curve, may be used with confi dence for culver ts with L/l.0060 within the chart l.imit and headwater bel.ow 2 D.

c . BW greater than 2 D. Headwater depths greater than 2 D de­fine a zone where certain culvert lengths will give headwater· discharge curves deviating considerably from the pattern shown by the capacity chart curves. As illustrated in Fig. 2, the headwater curves for.various culverts, with L/10060 the same as for the culverts used to plot the chart curves, actually do depart consi derab1y from these chart curves in the range of headwater depths above twice the culvert height . The actual headwater depth for a specific case may be either g~ater or 1ess than would be read from the chart by use of the general method based on L/10080 • The possibility of' error and its magnitude increase in rel.ation to the difference between the culvert l.ength and the l.ength used in construction of the charts .

The headwater curve for a 600-ft. l.ong culvert at 0.02 s1ope (L/lOOSo ·= 300) in Fig . 2 illustrates a condition encountered with longer culverts. That part of the curve below the inl.et control curve is shown as a lightweight dashed l.ine to signify that it is not a valid representation of headwater in this range.

The follow:ing will expl.ain the factors i nvol.ved in this ex­ampl.e . Critical al.ope for a culvert barrel. increases with in­creasing discharge rate. Therefore, a certain al.ope, found to be less than critical at the design discharge, may still be greater than critical at smal.l or intermediate discharge rates, .so that on a rising fl.ood bydrograph the culvert Will begin . gperating with inl.et control. That is, the headwater depth will fol.1Q¥ the solid l.ine curve of the capacity chart, as is shown tor the 6oo-ft. culvert at 2fi, slope in Fig. 2. At a discharge rate of U6 cts. the operation changes to outlet control. with a steeply rising headwater curve. This is a typ­ical condition, and :further evidence of the necessity for checking headwater determinations where BW is greater than 2 D. For a discharge of l.16 cf's. critical depth in a 48-inch pipe is 3.3 ft . or 0 .82 D, and the friction slope for fl.ow at

10-87

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 90: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

either 0.82 Dor full flow is 0.022 ft. per ft., or more than the barrel slope in this case. Therefore, the free surface flow condition of inlet control cannot be maintained at greater discharge rates, with the result that the culvert operation will convert to outlet control.

Fran Fig. 2 it is evident that headwater depth read fran the culvert c.apacity- chart tor a 600-tt. culvert at 2'fo slope, i.e., L/10080 = 300, will be correct at only one point, that tor Q = 123 cts. For all lesser discharge rates headwater will be less than read on the chart curve for L/10080 ot 300, and tor all greater discharge rates the actual headwater depth will be greater than read from the chart.

Below a headwater of 2 D, the error is on the sate side, in that the capacity- ot the culvert is under-estimated at all headwater depths below 9 ft. tor this particular example. These situations can be recognized and steps taken to obtain a more correct solution tor headwater depth it it is consid­ered worthwhile.

The significant factor in all such cases is that a long cul­vert is involved. The chart curve tor 300 L/100S0 is com­puted tor L = 180 :rt. and S0 = o.006, as explained in Appen­dix A-5· The 600-ft. long ·culvert of the exampl.e tar exceeds all lengths used in the chart, where the usual length for the upper curve of L/100$0 of 600 was 24o f't., and only 180 tt. was usec). for the intermediate curve. Where long culverts are involved, as compared to lepgths used to construct the charts, the procedure of HEC Bo. 5 should be used.

In application of the capacity charts to culvert design, it is not normally necessary to use the nomographs to check head­water depth for these long culverts, provided the indicated headwater does not exceed 2 D. For the case considered above, the actual capacity of the 48-inch corrugated metal culvert can be as much as 141' greater tban read on the chart curve for 300 L/10080 , at KW of' 7.1 ft. Also, the maximum error in headwater, read at 8 tt., would be 1.2 feet.

The above is admittedly an extreme case, but even so the next smaller culvert size (42-in.) would be entirely unacceptable in most cases because of excessive headwater depth. The fact that an alternate selection of a smaller size culvert cannot be made in the situations where the capacity charts under­estimate the discharge capacity (or over-estimate headwater) is a strong argument against being concerned with this type of error in use ot the charts • The problems ot real concern are only those where headwater depth read from the chart may be less than the real value. Such situations, with significant degrees of error, occur only tor headwater depths greater than 2 D.

10-88

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 91: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

In order to obtain satisfactory accuracy in the determination of headwater from a culvert capacity chart, the instructions specify (sec. III) that headwater should be below 2 D, other­wise the headwater should always be checked by use of HEC Bo. 5. It is essential that this check also be made for cases in­volving culvert sizes shown by only the inlet control curve. The L/10050 ratio shown on these curves is sufficiently large to include possible long lengths which can result in errors in the range of headwater depths exceeding twice the culvert open­ing height.

B-3 Culverts on Level Grade

The instructions for use of the charts provide for selection of culvert size if the culvert invert is on a zero slope, so that L/10080 cannot be computed. Fig. 2 includes the headwater curve for a culvert 90 ft. long at zero slope, obtained from backwater profile calculations It will be noted that a zero slope has no marked effect upon he84water depth for a relatively short culvert (L/D equals 22.5), even for a cor­rugated metal culvert with a relatively high resistance factor.

Instructions for use of the charts (sec. IV, case 7) can be teat~d for the culvert included in Fig. 2. Assigning a fie ti tious slope or· 0.004, L/10080 is 225 and L x 80 equals 0.36 ft. Headwater obtained by interpolation from the chart and addition of the fictitious fall of the invert is compared to a precise calculation in the table below.

Chart HW Q 225 L/10080 BW + 0.36 1 Actual BW

50 3.58 3.94 3.84 80 5.o8 5.44 5.46

llO 7.36 7.72 7.72

10-89

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 92: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

APPENDIX

VIII C. Chart Listing

The Culvert Capacity Charts are arranged in groups applying to each culvert material and shape. Two sets of charts are included, one for each of two entrance types used with that kind of culvert. The following charts are included.

Charts

1 to 5

6 to 10

11, 12

13, 14

15

16

17

18

19 to 21

22 to 24

25, 26

27, 28

29, 30

31, 32

33, 34

35, 36

Culvert T~e Entrance

Concrete Box Headwall

Concrete Box Wingwall

Concrete Pipe, Circular Square-Edged

Concrete Pipe, Circular Groove-Edged

Concrete Pipe, Oval, long axis horizontal Square-Edged

Same Groove-Edged

Concrete Pipe, Oval, long axis vertical Square-Edged

Same Groove-Edged

Standard (1/2") C.M. Pipe Projecting

Standard (1/2") C.M. Pipe Headwall ~ ........... --

Std. (1/2") C.M. Pipe-Arch

Std. (1/2") C.M. Pipe- Arch -~-

Structural Plate (2") C.M. Pipe, Circular

Same

Structural Plate (2") C.M. Pipe- Arch*

Same

Projecting

Headwall

Projecting

Headwall

Projecting

Headwall

Size "Range

Rectangles 1.5 to 6 ft. high; and

Square 1.5 to 12 ft.

18 to 180 inch Diameter

23" x 14" to 91" x 58"

14" x 23" to 53" x 83"

18 to 120 inch Diameter

25" x 16" to 72" x 44"

60 to 180 inch Diameter

6.1' Span by 4.6' High, to

16.6' Span by 10.1 ' High

*18-inch corner radius; these charts do not include the 31-inch corner radius Pipe-Arches.

10-90

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 93: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS

Archiva

l

Superc

eded

by H

DS-5

3rd ed

ition -

Apri

l 201

2

Page 94: CAPACITY CHARTS FOR THE HYDRAULIC DESIGN OF HIGHWAY CULVERTS