Capital Program
• Overview – Previous FCS data
• Upcoming Facility Condition Survey
• Capital Tools Refresher
• DAHP support
Steve LewandowskiChief Architect
October, 2018
• Overview – Previous FCS data
Previous Facility Condition Survey
Overview
• Building condition trend – How do they change over time?
• System building condition summary – What is our goal?
• Maintenance expenditures comparison – How do you
compare to others?
4
Average Building Condition Trend
5
Adequate = 275
64%
System Building Condition Summary
6
What has affected the progress in reaching this goal?
• Repair funding level has increased by 10% per biennium• Major project funding reduced over the last 3 biennia• Upward trend towards achieving this goal has become flat
Facility Condition Immediate ReplacementNeeds Major RenovationNeeds ImprovementAdequateSuperior
State Board goal:
All buildings in adequate condition or better by 2020.
20134.9%10.5%21.1%33.5%30.0%
63.5%
20152.8%12.9%20.0%36.9%27.4%
64.3%
20172.6%11.6%22.3%33.8%29.7%
63.5%Adequate or better
Average Building Condition Trend
Budget Requests tell a story:
7
Trend: 64% flat
System Building Condition Summary
8
Facility Condition Immediate ReplacementNeeds Major RenovationNeeds ImprovementAdequateSuperior
State Board goal:
All buildings in adequate condition or better by 2020.
Counteracting changes in condition:
• A few buildings receive significant improvement every biennium• All other buildings slowly degrade• System has reached equilibrium under current funding level
20134.9%10.5%21.1%33.5%30.0%
63.5%
20152.8%12.9%20.0%36.9%27.4%
64.3%
20172.6%11.6%22.3%33.8%29.7%
63.5%Adequate or better
System Building Condition Summary
9
What does it cost to achieve the goal:
• 1 out of 5 buildings need minor improvements ($230k average x 219 buildings x 2 systems = $100.6 Million)
• 1 out of 10 buildings need major renovations($30M average x 98 buildings = $2.94 Billion)
• 1 out of 40 should be replaced($35M average x 25 buildings = $875 Million)
Total cost = $3.92 BillionTarget duration to reach goal = 10 bienniaCost per biennium = $392 Million
System Building Condition Summary
10
Biennial budget request required to reach goal:
Maintain current conditions $300 MillionAdditional improvements to conditions $392 MillionTotal budget required (for 10 biennia) $692 Million
Actual request:
2019-21 Budget request $600 Million2021-23 Estimated budget request $850 Million(if 2019-21 is successful)
11
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
Bat
es
Bel
levu
e
Bel
lingh
am
Big
Ben
d
Cas
cad
ia
Cen
tral
ia
Cla
rk
Clo
ver
Par
k
Co
lum
bia
Bas
in
Edm
on
ds
Ever
ett
Gra
ys H
arb
or
Gre
en R
iver
Hig
hlin
e
Lake
Was
hin
gto
n
Low
er C
olu
mb
ia
No
rth
Sea
ttle
Oly
mp
ic
Pen
insu
la
Pie
rce
Fort
Ste
ilaco
om
Pie
rce
Pu
yallu
p
Ren
ton
Seat
tle
Cen
tral
Sho
relin
e
Skag
it V
alle
y
Sou
th P
uge
t So
un
d
Sou
th S
eatt
le
Spo
kan
e
Spo
kan
e Fa
lls
Taco
ma
Wal
la W
alla
Wen
atch
ee V
alle
y
Wh
atco
m
Yaki
ma
Val
ley
2013 Staff 2013 Contracted 2015 Staff 2015 Contracted 2017 Staff 2017 Contracted
Maintenance Expenditures Comparison
Annual maintenance expenditures (staff, materials and outside contracts)
Upcoming Facility Condition Survey
Facility Condition Survey
• Surveys occur Feb – Nov, 2019 (Scheduled in January)
• Support documents provided with Outlook invite and email
• Facility Condition Survey Tool is available
• Results will be used to ask for roughly $48M in the 2021-23 budget for
repairs (10% increase)
• Average repair funding request = $1.4M per college
13
Process
• The survey is completed roughly every two years at each college.
• All owned buildings are evaluated and scored based on their condition.
• Building and site deficiencies are evaluated and scored.
• A report is generated for each college and published at the end of the calendar year. These reports are used to help the State Board build part of the capital budget proposal.
• All college deficiencies are ranked by score. The highest ranking deficiencies are included in the next capital budget proposal.
• The building condition scores will be used by colleges that request a major capital project (worth 15% of total points).
• Funding is requested in the next biennium capital budget.
• Funding becomes available 2 years after survey (on average).
14
Preparing for the survey
• Review Pre-survey questions (your use only)
• Review State Board guide to identify deficiencies (email)
• Use the Facility Condition Survey tool to enter datahttp://www.sbctc.edu/colleges-staff/programs-services/capital-budget/facility-assessment.aspx
• Evaluate and obtain supporting documentation for deficiencies that are
not observable.
Examples: underground utilities, electrical systems, obsolete safety
equipment with verification that it is no longer supported, extent of
moisture damage, etc
15
Site visit
• Initial interview with facility director and business officerUpdate facility condition and planning data
Discuss currently funded and previously identified minor works projects
Review and update deficiency and maintenance management data provided by college
• Survey building and site conditionsScore buildings and review deficiencies
• Exit interviewGo over survey highlights
Overview of building and site score changes
Overview of deficiencies that will be included in the survey report
16
Other Focus Areas
• Continued focus on spending Minor works funds in two years. Projects
should start immediately after budget bill is signed. Coordinate with
DES prior to the release of funds.
• A new focus on infrastructure. Many campuses have utilities that are
more than 50 years old. System failures could be extremely disruptive
to programs. Campus-wide solutions could be considered as a major
project request.
17
Infrastructure Survey
• A system-wide infrastructure condition survey will be completed in addition to the facility condition survey. This survey will be independent of the FCS. This new survey will be used to build a database and identify projects that will reduce the risk of major system failures.
• This is a new type of minor work project since much of the work may be preventative. Projects may be ranked based on system age and component materials rather than observable degradation. The State Board plans to hire a contract employee to complete the survey. The effort may take 8 to 10 months to complete.
• Colleges will be asked to provide resources to help identify system composition and age. The data will be used to identify high priority infrastructure repair or replacement projects that will be included in the 2021-23 biennium request.
18
Infrastructure Survey
• The system will request $34M for these infrastructure minor works
projects. This is in addition to the request for site, roof and facility
repairs. The site repair category will no longer include infrastructure.
Equipment that is not located in close proximity to a building (roughly 5
feet) will be considered infrastructure during the facility and
infrastructure condition surveys.
• Infrastructure project examples: Utility loops, electrical feeder lines,
transformers, cooling towers or remote mechanical equipment.
19
Capital Tools Refresher
• Facility Condition Survey Tool
• Allocation and Monitoring tables (SBCTC website)
• Minor Works Project Change Tool
• ADA standards Tool
20
Capital Tools Refresher
• Facility Condition Survey Tool
• Allocation and Monitoring tables (SBCTC website)
• Minor Works Project Change Tool
• ADA standards Tool
21
22
sbctc-fcs
23
24
25
26
27
28
29
30
31
32
33
Capital Tools Refresher
• Facility Condition Survey Tool
• Allocation and Monitoring tables (SBCTC website)
• Minor Works Project Change Tool
• ADA standards Tool
34
Allocation and Monitoring
35
SEARCH
“ALLOCATION AND MONITORING”
SBCTC.EDU
36
Allocation and Monitoring
37
Allocation and Monitoring
38
Allocation and Monitoring
39
Allocation and Monitoring
Capital Tools Refresher
• Facility Condition Survey Tool
• Allocation and Monitoring tables (SBCTC website)
• Minor Works Project Change Tool
• ADA standards Tool
40
41
42
43
44
45
46
47
48
49
50
Capital Tools Refresher
• Facility Condition Survey Tool
• Allocation and Monitoring tables (SBCTC website)
• Minor Works Project Change Tool
• ADA standards Tool
51
52
ADA Review Tool
53
ADA Review Tool
54
ADA Review Tool
55
ADA Review Tool
56
ADA Review Tool
57
ADA Review Tool
58
ADA Review Tool
59
ADA Review Tool
DAHP support(Department of Archaeology & Historic Preservation)
• What is the law?
• Support provided by State Board
• Requirement flow chart
60
What is the law?
Executive order 05-05 (protect cultural heritage and archeological resources)
Capital projects will require DAHP review if:
• Project funds are appropriated
• Project includes ground disturbing activities
• Renovation project includes work in a building that is more than 45 years old
• Project is required to go through the State Environmental Policy Act (SEPA) process
61
Support Provided by State Board
The State Board will:
• Submit master list of all minor projects at start of biennium to DAHP to
determine which are exempt from DAHP review
• Submit initial forms required for DAHP review
The College will:
• Submit all forms required through a SEPA process
• Coordinate with DAHP to fulfill any requirements beyond the initial
review
62
63
Proposed Construction
Project
?
Questions?
64
Questions?
Questions?
Questions?
Capital Updates• Capital Timeline and budget request
• Minor Works projects status update
Steve LewandowskiChief Architect
Cheryl BivensBudget Analyst
2018 2019
2019DecOctSepAugJul JunAprMarFebJan MayNov
2020Implementation of 19-21 budget
Implementation of 17-19 budget
19-21 request Legislature develops final 19-21 budgetOFM Governor’s 19-21 budget
21-23 instr.Develop changes to scoring system for 21-23 Facility Condition Survey
Stakeholder input for 2023-25. How is the capital process working? What needs improvement? Principles
2017 2018Implementation of 17-19 budget
19-21 prepColleges develop 19-21 requests Scoring
PrinciplesStakeholder input for 2021-23. How is the capital process working? What needs improvement?
DecOctSepAugJul JunAprMarFebJan MayNov
DecOctSepAugJul JunAprMarFebJan MayNov
Major Requests
Due
We Are Here
21-23 prepColleges develop 21-23 requests Scoring
2021-23 Workshop
66
Minor Requests
Due
67
Request 2019-21
Category Total
Minor Work – Preservation $23,739,000
Minor Repairs – Roof $15,252,000
Minor Repairs – Facility $38,527,000
Minor Repairs – Site $3,310,000
Minor Work – Program $37,148,000
Minor Work - Infrastructure $34,000,000
Major Projects $483,888,000
Total Request $627,357,000
*Includes $14,195,000 in postponed minor projects
*
68
Request 2019-21
69
Request 2019-21
Minor Works Projects status
70
• Schedule data has been collected from colleges• WACT requires an updated status report of all minor works
projects (see handout). The summary report is provided when requested at WACT meetings and includes:
1. Number of projects with missing schedules2. Any project schedules that extend beyond the current
biennium3. Number of projects that are NOT reported to be on
schedule
• Data can be reviewed or updated using the minor works project change tool
71
Minor Works Project Schedules SummaryStatus of projects with at least $1,000 in State appropriations as of 10/09/2018
College Number of projects Projects missing schedulesProject schedules extending
beyond this bienniumProjects NOT reported to be
on scheduleBates Technical College 8 0 0 0Bellevue College 5 5 0 5Bellingham Technical College 8 0 0 0Big Bend Community College 11 1 0 1Cascadia College 4 4 0 4Centralia College 4 0 0 0Clark College 4 4 0 4Clover Park Technical College 5 2 0 2Columbia Basin College 9 0 0 0Edmonds Community College 3 3 0 3Everett Community College 8 1 0 1Grays Harbor College 11 0 0 0Green River College 14 0 0 0Highline College 9 0 0 0Lake Washington Institute of Technology 8 0 0 0Lower Columbia College 8 0 0 0North Seattle College 5 0 0 0Olympic College 8 8 0 8Pierce College Fort Steilacoom 6 6 0 6Pierce College Puyallup 2 2 0 2Renton Technical College 6 0 0 0Seattle Central College 7 7 0 7Shoreline Community College 8 1 0 1Skagit Valley College 4 4 0 4South Puget Sound Community College 9 0 0 0South Seattle College 13 13 0 13Spokane Community College 3 0 0 0Tacoma Community College 3 3 0 3Walla Walla Community College 9 0 0 0Wenatchee Valley College 5 0 0 0Whatcom Community College 4 0 0 1Yakima Valley College 5 0 0 0Grand Total 218 65 0 66
72
Mis
sin
g So
me
Sch
edu
les
Mis
sin
g A
llSc
he
du
les Delayed Bill passed Jan, 2018
Allowed 17 months to spend instead of 24Colleges given chance to postpone work
Have spent 16% of allocationsShould be at 37% based on schedules providedNo black bar = nothing spent or no schedulesChart shows lots of red (college schedules)Funds not spent by June 30 will dissolveIf can’t complete work, offer funds to others
BAC will see this report next weekWACT will see this report in December
Questions?