capital wpc investme /apc/ hwm bmw etp / stp nt in …

61
Sl.No Year Present Status PCB ID Name of the Industry Address Area Type of Organa zation Product Manufacture as per consent Capital investme nt in Lakh Rs Revised Category No. Industry Sector Classific ation Cate gory Date of Establisment DD/MM/YY WPC /APC/ B.A Consent Validity Whether covered under HWM Y/N HWM Authorisation Validity Whether covered under BMW Y/N BMW authorisation validity Whether covered under Plastics Y/N Plastic Registration Validity Whether covered under Battery Y/N Validity under Battery Rules Whether covered under e- Waste Y/N e-Waste authorisation and Registration validity Sewage in KLD Trade effluent Perticulars of Treatment units ETP/STP /ST &SP ETP / STP under operation Y/N Whether Connected to UGD Y/N Whether Connected to CETP Y/N Defaultor APC System under operation 10287 ABB Ltd, No.4A, 5 & 6, II Phase, PIA, Bangalore- 560 058, II Phase I Engineering with pre treatment 20834.41 R-44 Industry or process involving metal Large Red 1992 BA 30.06.2021 Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 228 0.003 STP Y N Y NA Yes - Forging & Allied Products, No.B-123, 3rd cross, I Stage, PIE, Banglaore-58 I Stage I Steel Forging activity 6.63 O-32 Forging of ferrous and non- ferrous metals Medium Orange 1975 BA 30.06.2017 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 75778 Precission Sheet Metal works (P) Ltd Unit-2, Plot No. a-149(a) & A-150(a), 5th Main Road, II Stage, PIE, Bengaluru-560 058 II Stage I Manufacture of Sheet metal components 310 G-78 Switches without electroplatin Small Green 2013 BA NA Y 30.06.2017 N N N N N NA NA NA 0 NA NA NA NA N NA Yes 4 2009-10 CL - Precission Sheet Metal works (P) Ltd No.21, II Phase, PIA, Bengaluru-560 058, II Phase I Electrical Portable power Tools 17568 G-78 Switches without electroplatin Large Green 1998 BA 30.06.2010 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 5 2009-10 CL - H.Dasappa & Sons, No.47, II Phase, PIA, Bengaluru-560 058, II Phase I Brewarage 808.68 R-60 molasses / grain / yeast based) Medium Red 1990 BA 30.06.2012 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 6 2009-10 O 10718 High Temp Furnaces Ltd, No.1-C, II Phase, PIA, Bengaluru-560 058, II Phase I Brewarage 2448.827 O-36 Heat treatment using oil fired furnace Large Orange 1992 BA 30.09.2030 Y 30.06.2024 N N N N N NA NA NA 3.2 0.1 N N Y Y NA Yes 7 2009-10 O 24121 Hittco Tools Ltd., No.78, III Phase, PIA, Bengaluru-560 058, III Phase I Manufcture of Drills and taps 734.16 G-91 Manufacture of Adhesives and adhesive Medium Green 2000 BA 31.12.2021 Y 30.06.2015 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes 8 2009-10 O 11202 KDDL Ltd (formerly know as Kamala Dials & Devices), No.296 & 297 IV Phase, PIA, Bengaluru-560 058, IV Phase I Wrist Watch Hands with brass strap stapping, reviting,degreasing, 2120.95 R-44 Industry or process involving metal Large Red 1992 BA 30.06.2021 Y 30.06.2021 N N N N N NA NA NA 3.8 5.5 ETP Y Y N NA Yes 9 2009-10 CL 11202 Kongovi Electronics Pvt Ltd , No.377,10th cross, PIA, IV Phase, Bengaluru-560 058 IV Phase I Engineering with Electroplating 442 R-44 Industry or process involving metal Small Red 1989 BA 30.06.2018 Y 30.06.2019 N N N N N NA NA NA 1.6 12 ST & SP ETP Y N N NA Yes 10 2009-10 O 10513 Karnataka Antibiotic & Pharmaceutical Ltd, No.14, II Phase, PIA, Bengaluru-560 058 II Phase I Formulation of Pharmaceuticals 9895 O-74 Pharmaceuti cal formulation Large Orange 1984 BA 30.09.2030 Y 30.06.2020 N N N N N NA NA NA 45 94.2 ETP Y Y N NA Yes 11 2009-10 CL - Kirloskar Electrical Co, II Phase, PIA, Bengaluru-560 058 II Phase I Electric motors G-78 and electronic item Large Green Closed BA 31.12.2014 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 12 2009-10 O 11432 Naptha Resins & Chemicals Pvt Ltd, No.492, IV Phase, PIA, Bangalore- 560058 IV Phase I unsaturated Polyester Resin and Phenolic Resin 875 R-22 Organic Chemicals manufacturi ng Medium Red 1975 BA 30.06.2021 Y 30.06.2021 N N N N N NA NA NA 4 3.35 (inceneration) ST & SP N N N NA Yes 13 2009-10 O 11139 Eurofins Advinus Limited (Formertly Advinus Therapeutics Private Ltd), Unit -1, Unit -1, No 21/ 22, II Phase, PIA, Bengaluru-560 058 II Phase I R & D activity on toxycology, biological efficiency on residue of pesticides & R & D 11674.02 R-58 Pharmaceuti cal (Bulk drug & Active Large Red 1980 BA 30.06.2021 Y 30.06.2021 Y 30.06.2100 N N N NA NA NA 70 37 STP & ETP Y N N NA Yes 14 2009-10 O 11155 Rewdale Precission Tools Pvt Ltd., No.484 B & C, IV Phase, PIA, Bengaluru-560 058 IV Phase I Precision turned components with pre treatment 1222.57 R-44 Industry or process involving metal Large Red 1983 BA 30.06.2020 Y 30.06.2025 N N N N N NA NA NA 3 0.25 ST & SP N N Y NA Yes 15 2009-10 O 20885 Ace Designers Ltd (Unit-II), No.533, 10th Main, IV Phase, PIA, Bengaluru-560 058 IV Phase I Engineering Unit 1407 G-10 Carpentry & wooden furniture manufacturi Large Green 2007 BA 31.12.2026 Y 31.12.2023 N N N N N NA NA NA 8 N N N Y N NA Yes 16 2009-10 O 11411 Anglo French Drug & Co, No.4, II Phase, PIA, Bengaluru-560 058 II Phase I Formulation of Pharmaceuticals 1862 O-74 Pharmaceuti cal formulation Large Orange 1980 BA 30.09.2021 Y 30.09.2021 N N N N N NA NA NA 18 31.5 STP & ETP Y N N NA Yes 17 2009-10 O 10855 Micro Labs Ltd, No.67/68-A, III Phase, PIA, Bangalore-560058 III Phase I Formulation of Pharmaceuticals 4524.34 O-74 Pharmaceuti cal formulation Large Orange 1978 BA 30.09.2021 Y 30.09.2021 N N N N N NA NA NA 13 6 ETP Y Y N NA Yes 18 2009-10 O 11251 Integrated Electric Co Pvt Ltd, No. 497/A, IV Phase, Bengaluru-560 058 IV Phase I Engineering with spary painting 1684 O-62 Spray painting, paint baking, paint Large Orange 1989 BA 30.09.2030 N N N N N N N NA NA NA 6.4 N ST & SP N N N NA Yes 19 2009-10 O 10508 Sami Labs Ltd, No.19/1 & 19/2, 1st Main, II Phase, PIA, Bangalore-560058 II Phase I R & D activity on Herbal productes 4673 R-58 Pharmaceuti cal (Bulk drug & Active Large Red 2000 BA 05.08.2025 Y 30.06.2025 N N N N N NA N NA 7 5 STP & ETP Y N N NA Yes 20 2009-10 CL - Vijaya Steels Ltd, No.37, II Phase, PIA, Bengaluru-560 058 II Phase I non Ferrou alloys casting 1968 O-66 Non- ferrous metal extraction Large Orange 1972 BA 30.09.2012 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 21 2009-10 O 10286 Ace Designers Ltd, No.7 & 8, II Phase, PIA, Bengaluru- 560 058 II Phase I CNC Machinery with surface treatment such as Degreasing, Derusting, 8286.19 R-44 Industry or process involving metal Large Red 7/11/2001 BA 30.06.2021 Y 30.06.2021 N N N N N NA NA NA 40 10 STP & ETP Y N N NA Yes 22 Site No.19 & 20,Sy No.467, 468 & IV Phase Engineering with Spray 2009-10 O 11925 Pragathi Automation Pvt Ltd, 469, IV Phase, PIA, Bengaluru-560 058 I spary painting 4899 O-62 painting, paint baking, paint Large Orange 2006 BA 30.09.2028 Y 30.09.2025 N N N N N NA NA NA 4 N STP Y N N NA Yes 23 2009-10 O 11217 Auma (India) Ltd, No.39-B, II Phase, PIA, Bengaluru- 560 058 II Phase I Engineering with spary painting (Manufacture of Gear Boxes and Actuators) 7088 O-62 Spray painting, paint baking, paint Large Orange 1986 BA 30.09.2022 Y 30.09.2018 N N N N N NA NA NA 10.8 N NA N Y N NA Yes 24 2009-10 CL 11417 Shashikar Enterprises , No.188, 11th Main, III Phase, PIA, Bengaluru-560 058 III Phase I Readymade Garment 894 G-72 Garment Stitching/ Stitching of shoe uppers/ Medium Green 2003 BA 31.12.2026 N N N N N N N NA NA NA 29.52 N STP Y N N NA Yes 25 2009-10 O 11428 Bata India Ltd, No.474, 475,476, IV Phase, PIA, Bengaluru-560 058 IV Phase I Foot wear 2192 G-26 Leather foot wear and leather products Large Green 1988 BA 31.12.2022 Y 31.12.2023 N N N N N NA NA NA 30 N STP Y N N NA Yes 26 2009-10 CL - KPIT Communis Infosystem Private Limited ( Old name C.G.Smith Soft Ware Pvt Ltd)., No.1-A, II Phase, PIA Bengaluru-560 058 II Phase I Softwere Techonology 809 G-78 Switches without electroplatin Medium Green 1994 BA 31.12.2004 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 27 2009-10 CL - Turbomeca Turbochargers Industrial Indaia Pvt Ltd No.385 & 386 IV Phase, PIA, Bengaluru-560 058 IV Phase I Manufacture of Turbines 786 G-78 Switches without electroplatin Medium Green 2006 BA 31.12.2015 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 28 2009-10 O 27009 Ace Manufacturing Systems Ltd, No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058 IV Phase I CNC Vertical with SPRAY painting 5533 O-62 Spray painting, paint baking, paint Large Orange 2006 BA 30.09.2023 Y 30.06.2023 Y 31.12.2100 N N N NA NA NA 15 3.5 STP Y N Y NA Yes 29 2009-10 O 10288 Fouress Engineering India Ltd, N No.2, II Phase, PIA, Bengaluru-560 058 II Phase I Valves Isolators & Fabrication works 3983 R-44 shipping Large Red 20/8/74 BA 30.06.2021 Y 30.06.2021 N N N N N NA NA NA 25 2.6 STP & ETP Y N N NA Yes 30 2009-10 O 40236 Champion Extrusion, Unit-II, No.A-21, III Stage, PIE, Bengaluru-560 058 III Stage I Electroplating 179.7 R-44 Industry or process involving metal Small Red 2012 BA 30.06.2022 N N N N N N N NA NA NA 1.2 0.05 N N Y Y NA Yes 31 2009-10 CL - Krone Communications Ltd, No.30C, II Phase, PIA, Bengaluru-560 058 II Phase I Elctronic components asembly C1 G-78 Switches without electroplatin Medium Green Closed BA 31.12.2008 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 32 2009-10 O 87408 A D C India Communication (P) Ltd., No.10/C, II Phase, PIA, Bengaluru-560 058 II Phase I Assembling of various tele communication equipment 2088.38 G-78 Switches without electroplatin Large Green 1989 BA 31.12.2034 Y 31.12.2024 N N N N N N N N 1.8 N N N Y N N Yes 33 2009-10 O 24905 Leo Isro, No.16, I Cross, I Stage, PIE, Bengaluru-560 058 I Stage I Electro Optical Systems required for stallite 1800 G-53 ng of optical lenses (using Large Green 2002 BA 31.12.2022 N N N N N N N N N N 14 N STP N N N N Yes 34 2009-10 CL - NTTF Industries Ltd, No.23/24, II Phase, PIA, Bengaluru- 560 058 II Phase I Automotive Componenets 6953 G-78 Switches without electroplatin Large Green 1994 BA 31.12.2014 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 35 2009-10 CL 22154 Pearl Insulations Pvt Ltd, Unit- 1, Unit-1, No.505-507, IV Phase, PIA, Bengaluru-560 058 IV Phase I Insulated copper and alluminium conductor 577.96 G-96 Manufacturi ng of insulated conductors Medium Green 1991 BA 31.12.2015 Y 31.12.2019 N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes 36 2009-10 CL - Sonal Garments - II, No.254, III Phase, PIA, Bengaluru- 560 058 III Phase I Garment 347 G-72 Garment Stitching/ Stitching of shoe uppers/ Small Green 2000 BA 31.12.2001 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 37 2009-10 CL 11625 Supertex Labels Pvt Ltd, No.488D, IV Phase, PIA, Bengaluru- 560 058 IV Phase I woven polysters labels 2473 G-91 Manufacture of Adhesives and adhesive Large Green 1997 BA 31.12.2017 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 38 2009-10 O 40263 Auto Cnc Machining Pvt Ltd, No.282, IV Phase, PIA, Bengaluru- 560 058 IV Phase I General Engg. CNC Machinery Components 893 G-10 Carpentry & wooden furniture manufacturi Medium Green 2003 BA 31.12.2022 Y 31.12.2024 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes 39 2009-10 CL 11177 Indus Fila Pvt Ltd, No.21-D-2, II Phase, PIA, Bengaluru- 560 058 II Phase I Garment 5297.27 G-72 Garment Stitching/ Stitching of shoe uppers/ Large Green 2005 BA 31.12.2013 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 40 2009-10 CL - J.J.Exports Ltd, No.21-D, II Phase, PIA, Bengaluru- 560 058 II Phase I Weaving 556 G-72 Garment Stitching/ Stitching of shoe uppers/ Medium Green 2005 BA 31.12.2009 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 41 2009-10 O 11213 Jeans Knit Pvt Ltd, No.485/2,13th cross, IV Phase, PIA, Bengaluru-560 058 IV Phase I Readymade Garments 3711.65 G-72 Garment Stitching/ Stitching of shoe uppers/ Large Green 2005 BA 31.12.2024 N N Y 31.12.2100 CL CL CL CL CL CL 0.12 N ST & SP N N N CL Yes 42 2009-10 CL 10648 Jeans Knit Pvt Ltd, No.34/A, II Phase, PIA, Bengaluru- 560 058 II Phase I Readymade Garments 1430 O-12 Silk screen printing, sari printing by wooden Large Orange 1995 BA 30.09.2022 Y 30.09.2020 N N N N N NA NA NA 16 0.02 ETP Y Y N NA Yes 43 2009-10 CL 11520 Agro Extracts Ltd, No.16, II Phase, PIA, Bengaluru-560 058 II Phase I Vegetable Oil, De Oil Cake, DAP and Belnding of Lubricating Oil 471 R-4 Manufacturi ng of lubricating oils ,grease Small Red 1975 BA 30.06.2022 Y 30.06.2020 N N N N N NA NA NA 2 6 ST & SP N N Y NA Yes 44 2009-10 CL - Anz Tyres International (Unit- III), Unit-III, No.480/D, PIA, IV Phase, Bangalore IV Phase I Engineering Unit C1 G-78 Switches without electroplatin Small Green Closed BA 30.06.2007 CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 45 2009-10 CL 15886 Asian Fab tech Ltd, No.15, II Phase, PIA, Bangalore- 560058 II Phase I Engineering with zinc spraying 1159.96 R-44 Industry or process involving metal Large Red 2002 BA 30.06.2015 Y 30.06.2015 N N N N N NA NA NA 2 0.6 ST & SP N N Y NA Yes 46 2009-10 CL - Momentive Performace Materials India (P) Ltd., ( No.275, IV Phase, PIA, Bengaluru-560 058 IV Phase I Silicon Sealant 1960 G-98 Tyre & Tubes/rubbe Large Green 1998 31.12.2004 - formerlyGe Bayer Silicon (India) Pvt Ltd,) r tubes only BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL 47 2009-10 O 10679 Glastronix LLP (Formerly known as Glastronix), No.21-E2, II Phase, PIA, Bengaluru- 560 058 II Phase I Electrical & Electronics Components 3336 R-44 Industry or process involving metal Large Red 1987 BA 30.06.2021 Y 30.06.2020 N N N N N NA NA NA 4.8 0.1 Combined ETP Y N N NA Yes

Upload: others

Post on 23-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Sl.No Year

Present

Status

O/Cl/Y

PCB ID

Name of the Industry Address Area

Type of

Organa

zation

Product

Manufacture as per

consent

Capital

investme

nt in

Lakh Rs

Revised

Category

No.

Industry

Sector

Classific

ation

Cate

gory

Date of

Establisment

DD/MM/YY

WPC

/APC/

B.A

Consent

ValidityWhether covered

under HWM

Y/N

HWM

Authorisation

Validity

Whether

covered under

BMW Y/N

BMW

authorisation

validity

Whether

covered under

Plastics Y/N

Plastic

Registration

Validity

Whether

covered under

Battery Y/N

Validity under

Battery Rules

Whether

covered under e-

Waste Y/N

e-Waste

authorisation and

Registration validity

Sewage in

KLD Trade effluent

Perticulars of

Treatment units

ETP/STP /ST &SP

ETP / STP

under

operation Y/N

Whether

Connected to

UGD Y/N

Whether

Connected to

CETP Y/N Defaultor

APC System

under

operation

12009-10 O

10287ABB Ltd,

No.4A, 5 & 6, II Phase, PIA, Bangalore- 560 058,

II PhaseI

Engineering with pre treatment 20834.41 R-44

Industry or process involving metal

Large Red 1992BA

30.06.2021Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 228 0.003 STP Y N Y NA Yes

22009-10 CL

-Forging & Allied Products,

No.B-123, 3rd cross, I Stage, PIE, Banglaore-58

I StageI

Steel Forging activity6.63 O-32

Forging of ferrous and non- ferrous metals

Medium Orange 1975BA

30.06.2017CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

32009-10 YTC

75778

Precission Sheet Metal works (P) Ltd

Unit-2, Plot No. a-149(a) & A-150(a), 5th Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacture of Sheet metal components 310 G-78

Switches without

electroplatinSmall Green 2013

BANA

Y 30.06.2017 N N N N N NA NA NA 0 NA NA NA NA N NA Yes

42009-10 CL

-

Precission Sheet Metal works (P) Ltd

No.21, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Electrical Portable power Tools 17568 G-78

Switches without

electroplatinLarge Green 1998

BA30.06.2010

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

52009-10 CL

-H.Dasappa & Sons,

No.47, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Brewarage808.68 R-60

molasses / grain /

yeast based) Medium Red 1990

BA30.06.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

62009-10 O

10718High Temp Furnaces Ltd,

No.1-C, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Brewarage2448.827 O-36

Heat treatment using oil fired furnace

Large Orange 1992BA

30.09.2030Y 30.06.2024 N N N N N NA NA NA 3.2 0.1 N N Y Y NA Yes

72009-10 O

24121Hittco Tools Ltd.,

No.78, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Manufcture of Drills and taps 734.16 G-91

Manufacture of Adhesives andadhesive

Medium Green 2000BA

31.12.2021Y 30.06.2015 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

82009-10 O

11202

KDDL Ltd (formerly know as Kamala Dials & Devices),

No.296 & 297 IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Wrist Watch Hands with brass strap stapping, reviting,degreasing,

2120.95 R-44Industry or process involving metal

Large Red 1992BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 3.8 5.5 ETP Y Y N NA Yes

92009-10 CL

11202Kongovi Electronics Pvt Ltd ,

No.377,10th cross, PIA, IV Phase, Bengaluru-560 058

IV PhaseI

Engineering with Electroplating 442 R-44

Industry or process involving metal

Small Red 1989BA

30.06.2018Y 30.06.2019 N N N N N NA NA NA 1.6 12 ST & SP ETP Y N N NA Yes

102009-10 O

10513

Karnataka Antibiotic & Pharmaceutical Ltd,

No.14, II Phase, PIA, Bengaluru-560 058

II PhaseI

Formulation of Pharmaceuticals 9895 O-74

Pharmaceutical formulation

Large Orange 1984BA

30.09.2030Y 30.06.2020 N N N N N NA NA NA 45 94.2 ETP Y Y N NA Yes

112009-10 CL

-Kirloskar Electrical Co,

II Phase, PIA, Bengaluru-560 058 II PhaseI

Electric motorsG-78

and electronic

itemLarge Green Closed

BA31.12.2014

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

122009-10 O

11432

Naptha Resins & Chemicals Pvt Ltd,

No.492, IV Phase, PIA, Bangalore-560058

IV PhaseI

unsaturated Polyester Resin and Phenolic Resin

875 R-22Organic Chemicals manufacturing

Medium Red 1975BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 4

3.35 (inceneration) ST & SP N N N NA Yes

132009-10 O

11139

Eurofins Advinus Limited (Formertly Advinus

Therapeutics Private Ltd), Unit -1,

Unit -1, No 21/ 22, II Phase, PIA, Bengaluru-560 058

II PhaseI

R & D activity on toxycology, biological efficiency on residue of pesticides & R & D

11674.02 R-58Pharmaceutical (Bulk drug &Active

Large Red 1980BA

30.06.2021Y 30.06.2021 Y 30.06.2100 N N N NA NA NA 70 37 STP & ETP Y N N NA Yes

142009-10 O

11155

Rewdale Precission Tools Pvt Ltd.,

No.484 B & C, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Precision turned components with pre treatment

1222.57 R-44Industry or process involvingmetal

Large Red 1983BA

30.06.2020Y 30.06.2025 N N N N N NA NA NA 3 0.25 ST & SP N N Y NA Yes

152009-10 O

20885Ace Designers Ltd (Unit-II),

No.533, 10th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit1407 G-10

Carpentry & wooden furnituremanufacturi

Large Green 2007BA

31.12.2026Y 31.12.2023 N N N N N NA NA NA 8 N N N Y N NA Yes

162009-10 O

11411Anglo French Drug & Co,

No.4, II Phase, PIA, Bengaluru-560 058

II PhaseI

Formulation of Pharmaceuticals 1862 O-74

Pharmaceutical formulation

Large Orange 1980BA

30.09.2021Y 30.09.2021 N N N N N NA NA NA 18 31.5 STP & ETP Y N N NA Yes

172009-10 O

10855Micro Labs Ltd,

No.67/68-A, III Phase, PIA, Bangalore-560058

III PhaseI

Formulation of Pharmaceuticals 4524.34 O-74

Pharmaceutical formulation

Large Orange 1978BA

30.09.2021Y 30.09.2021 N N N N N NA NA NA 13 6 ETP Y Y N NA Yes

182009-10 O

11251Integrated Electric Co Pvt Ltd,

No. 497/A, IV Phase, Bengaluru-560 058

IV PhaseI

Engineering with spary painting 1684 O-62

Spray painting, paint baking, paint

Large Orange 1989BA

30.09.2030N N N N N N N NA NA NA 6.4 N ST & SP N N N NA Yes

192009-10 O

10508Sami Labs Ltd,

No.19/1 & 19/2, 1st Main, II Phase, PIA, Bangalore-560058

II PhaseI

R & D activity on Herbal productes 4673 R-58

Pharmaceutical (Bulk drug &Active

Large Red 2000BA

05.08.2025Y 30.06.2025 N N N N N NA N NA 7 5 STP & ETP Y N N NA Yes

202009-10 CL

-Vijaya Steels Ltd,

No.37, II Phase, PIA, Bengaluru-560 058

II PhaseI

non Ferrou alloys casting 1968 O-66

Non- ferrous metal

extraction Large Orange 1972

BA30.09.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

212009-10 O

10286Ace Designers Ltd,

No.7 & 8, II Phase, PIA, Bengaluru-560 058

II PhaseI

CNC Machinery with surface treatment such as Degreasing, Derusting,

8286.19 R-44Industry or process involving metal

Large Red 7/11/2001BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 40 10 STP & ETP Y N N NA Yes

22 Site No.19 & 20,Sy No.467, 468 & IV Phase Engineering with Spray 222009-10 O

11925Pragathi Automation Pvt Ltd,

Site No.19 & 20,Sy No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering with spary painting 4899 O-62

Spray painting, paint baking, paint

Large Orange 2006BA

30.09.2028Y 30.09.2025 N N N N N NA NA NA 4 N STP Y N N NA Yes

232009-10 O

11217Auma (India) Ltd,

No.39-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering with spary painting (Manufacture of Gear Boxes and Actuators)

7088 O-62Spray painting, paint baking, paint

Large Orange 1986BA

30.09.2022Y 30.09.2018 N N N N N NA NA NA 10.8 N NA N Y N NA Yes

242009-10 CL

11417Shashikar Enterprises ,

No.188, 11th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Readymade Garment894 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2003BA

31.12.2026N N N N N N N NA NA NA 29.52 N STP Y N N NA Yes

252009-10 O

11428Bata India Ltd,

No.474, 475,476, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Foot wear2192 G-26

Leather foot wear and leatherproducts

Large Green 1988BA

31.12.2022Y 31.12.2023 N N N N N NA NA NA 30 N STP Y N N NA Yes

262009-10 CL

-

KPIT Communis Infosystem Private Limited ( Old name C.G.Smith Soft Ware Pvt

Ltd).,

No.1-A, II Phase, PIA Bengaluru-560 058

II PhaseI

Softwere Techonology 809 G-78

Switches without

electroplatinMedium Green 1994

BA31.12.2004

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

272009-10 CL

-

Turbomeca Turbochargers Industrial Indaia Pvt Ltd

No.385 & 386 IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of Turbines 786 G-78

Switches without

electroplatinMedium Green 2006

BA31.12.2015

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

282009-10 O

27009

Ace Manufacturing Systems Ltd,

No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

CNC Vertical with SPRAY painting 5533 O-62

Spray painting, paint baking, paint

Large Orange 2006BA

30.09.2023Y 30.06.2023 Y 31.12.2100 N N N NA NA NA 15 3.5 STP Y N Y NA Yes

292009-10 O

10288

Fouress Engineering India Ltd, N

No.2, II Phase, PIA, Bengaluru-560 058

II PhaseI

Valves Isolators & Fabrication works 3983 R-44

shippingLarge Red 20/8/74

BA30.06.2021

Y 30.06.2021 N N N N N NA NA NA 25 2.6 STP & ETP Y N N NA Yes

302009-10 O

40236Champion Extrusion,

Unit-II, No.A-21, III Stage, PIE, Bengaluru-560 058

III StageI

Electroplating179.7 R-44

Industry or process involving metal

Small Red 2012BA

30.06.2022N N N N N N N NA NA NA 1.2 0.05 N N Y Y NA Yes

312009-10 CL

-Krone Communications Ltd,

No.30C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Elctronic components asembly C1 G-78

Switches without

electroplatinMedium Green Closed

BA31.12.2008

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

322009-10 O

87408

A D C India Communication (P) Ltd.,

No.10/C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Assembling of various tele communication equipment

2088.38 G-78Switches without

electroplatinLarge Green 1989

BA31.12.2034

Y 31.12.2024 N N N N N N N N 1.8 N N N Y N N Yes

332009-10 O

24905Leo Isro,

No.16, I Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Electro Optical Systems required for stallite

1800 G-53ng of optical

lenses(using

Large Green 2002BA

31.12.2022N N N N N N N N N N 14 N STP N N N N Yes

342009-10 CL

-NTTF Industries Ltd,

No.23/24, II Phase, PIA, Bengaluru-560 058

II PhaseI

Automotive Componenets 6953 G-78

Switches without

electroplatinLarge Green 1994

BA31.12.2014

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

352009-10 CL

22154

Pearl Insulations Pvt Ltd, Unit-1,

Unit-1, No.505-507, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Insulated copper and alluminium conductor 577.96 G-96

Manufacturing of insulatedconductors

Medium Green 1991BA

31.12.2015Y 31.12.2019 N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes

362009-10 CL

-Sonal Garments - II,

No.254, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment347 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2000BA

31.12.2001CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

372009-10 CL

11625Supertex Labels Pvt Ltd,

No.488D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

woven polysters labels 2473 G-91

Manufacture of Adhesives andadhesive

Large Green 1997BA

31.12.2017CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

382009-10 O

40263Auto Cnc Machining Pvt Ltd,

No.282, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

General Engg. CNC Machinery Components

893 G-10Carpentry & wooden furnituremanufacturi

Medium Green 2003BA

31.12.2022Y 31.12.2024 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

392009-10 CL

11177Indus Fila Pvt Ltd,

No.21-D-2, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment5297.27 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2005BA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

402009-10 CL

-J.J.Exports Ltd,

No.21-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Weaving 556 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2005BA

31.12.2009CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

412009-10 O

11213Jeans Knit Pvt Ltd,

No.485/2,13th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Readymade Garments3711.65 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2005BA

31.12.2024N N Y 31.12.2100 CL CL CL CL CL CL 0.12 N ST & SP N N N CL Yes

422009-10 CL

10648Jeans Knit Pvt Ltd,

No.34/A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Readymade Garments1430 O-12

Silk screen printing, sari printing bywooden

Large Orange 1995BA

30.09.2022Y 30.09.2020 N N N N N NA NA NA 16 0.02 ETP Y Y N NA Yes

432009-10 CL

11520Agro Extracts Ltd,

No.16, II Phase, PIA, Bengaluru-560 058

II PhaseI

Vegetable Oil, De Oil Cake, DAP and Belnding of Lubricating Oil

471 R-4Manufacturing of lubricatingoils ,grease

Small Red 1975BA

30.06.2022Y 30.06.2020 N N N N N NA NA NA 2 6 ST & SP N N Y NA Yes

442009-10 CL

-

Anz Tyres International (Unit-III),

Unit-III, No.480/D, PIA, IV Phase, Bangalore

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

452009-10 CL

15886Asian Fab tech Ltd,

No.15, II Phase, PIA, Bangalore-560058

II PhaseI

Engineering with zinc spraying 1159.96 R-44

Industry or process involving metal

Large Red 2002BA

30.06.2015Y 30.06.2015 N N N N N NA NA NA 2 0.6 ST & SP N N Y NA Yes

462009-10 CL

-

Momentive Performace Materials India (P) Ltd., (

No.275, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Silicon Sealant1960 G-98

Tyre &Tubes/rubbe Large Green 1998 31.12.20042009-10 CL

-

Materials India (P) Ltd., ( formerlyGe Bayer Silicon

(India) Pvt Ltd,)

058 I 1960 G-98 Tubes/rubber tubes only

Large Green 1998BA

31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

472009-10 O

10679

Glastronix LLP (Formerly known as Glastronix),

No.21-E2, II Phase, PIA, Bengaluru-560 058

II PhaseI

Electrical & Electronics Components

3336 R-44Industry or process involving metal

Large Red 1987BA

30.06.2021Y 30.06.2020 N N N N N NA NA NA 4.8 0.1 Combined ETP Y N N NA Yes

482009-10 O

13301

Twivi Technologies Pvt Ltd., ( Formerly known as Hi-Tech

Pneumatics Treaters Pvt Ltd,)

No.V-34(A), 7th Main, II Stage,PIE, Bengaluru-560 058

II StageI

Heat Treatment540 O-36

Heat treatment using oil fired furnace

Small Orange 1999BA

30.09.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

492009-10 CL

-

Hindustan Eletcro Technology Pvt Ltd,

No. SB-57, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit89 G-78

Switches without

electroplatinSmall Green 1972

BA31.12.2014

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

502009-10 O

19677Kamalam Handlooms Pvt Ltd,

No.266, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Silk yarn dyeing688.36 R-40

Yarn / Textile processinginvolving

Medium Red 2003BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 2 40 ST & SP ETP Y N N NA Yes

512009-10 O

11421Kotak Urja Pvt Ltd,

No.378, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Photovoltaic system (solar power generating system, solar street lighting

1545 G-114Solar power generation throughsolar

Large Green 1997BA

31.12.2021Y 31.12.2025 N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

522009-10 CL

-

Mag Engineering (P) Ltd, Unit -1,

Unit -1, No.1A/1, 1st main road, II Phase, PIA, Bengaluru-560 058

II PhaseI

All types of sheet metal Fabrication with pretreatment

2355.59 R-44process

involvingmetal

Large Red 2007BA

30.06.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

532009-10 CL

13216

Organica Aromatics (Bangalore) Pvt Ltd,

No.407, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Aromatic compound 374.03 R-84

metal surface

treatment orSmall Red 2004

BA30.06.2018

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

542009-10 CL

-Peenya Alloys Pvt Ltd,

No.248, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Steel rerollingC1 O-63

steel products

usingSmall Orange Closed

BA30.09.2004

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

552009-10 O

10522

Beckman Coulter India Pvt Ltd.,(Formerly known as Rea

Matrix India Pvt Ltd),

No.50 B, II Phase, PIA, Bangalore-560058,

II PhaseI

R & D activity1535 R-58

Pharmaceutical (Bulk drug &Active

Large Red 2003BA

30.06.2021Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 3.5 1 Combined ETP N N N NA Yes

562009-10 O

12053

Radiall India (P) Ltd (formerly Known as Radial Protection

(P) Ltd),

Plot No 25D II Phase, PIA, Bengaluru-560 058,

II PhaseI

Manufacture of RF Connectors with Cable assembly

12.23 G-78Engineering and fabricationunits (dry

Small Green 1994BA

31.12.2022Y 31.12.2022 N N N N N NA NA NA 0.01 N NA N Y N NA Yes

572009-10 CL

-Saritorius Bio-Tech Pvt Ltd,

No 10 , III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering with Electroplating 1202 R-44

process involving

metal Large Red 1999

BA30.06.2010

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

582009-10 CL

-

Shiltron Electronics & Engineering,

No.10C, II Phase, PIA, Bengaluru-560 058

II PhaseI

PCB manufacture C1 R-44

process involving

metal Small Red Closed

BA30.06.2010

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

592009-10 CL

-Shyam Steel Rolling Mills,

No.5C, I Phase, PIA, Bengaluru-560 058

I PhaseI

Steel rerollingC1 O-63

steel products

usingSmall Orange Closed

BA30.09.2010

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

602009-10 CL

-Sutures India Pvt Ltd,

No.118, III Phase, PIA, Bengaluru-560 058

III PhaseI

SuturesC1 R-44

process involving

metal Small Red Closed

BA30.06.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

612009-10 CL

11700Swan Silk Ltd,

No.107-108, III Phase, PIA, Bangalore-560058

III PhaseI

Silk yarn dyeing213 R-40

Yarn / Textile processinginvolving

Small Red 1993BA

30.06.2022Y 30.06.2020 N N N N N NA NA NA 0.8 5 ST & SP ETP Y N N NA Yes

622009-10 CL

-Hi-tech pneumatics

No.V-34(B) II Stage,PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2002

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

632009-10 O

15896The Southern Gas Pvt Ltd,

No.10F, II Phase, PIA, Bangalore-560058

II PhaseI

Oxygen Gas & Nitrous Oxide 600 G-109

Refilling, Repacking andblending of

Medium Green 1985BA

31.12.2024Y 30.06.2008 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

642009-10 O

24302Therelek Engineers Pvt Ltd,

No.70/71, III Phase, PIA, Bangalore-560058

III PhaseI

1.Manufacture of Furnaces, Ovens & Incinerators 2.Heat Treatment Activity

1321.55 O-36Heat treatment using oil fired furnace

Large Orange 1981BA

30.09.2022Y 30.09.2021 N N N N N NA NA NA 4 N ST & SP N N N NA Yes

652009-10 O

20194

Advinus Therapeutics Pvt Ltd, unit - 2,

unit -2 No.203, III Phase, PIA, Bangalore-560058

III PhaseI

R & D activity on Pharmaceuticals, Bulk drug & Bio technology

909.1 R-58Pharmaceutical (Bulk drug &Active

Medium Red 2005BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 1 1 NA N Y Y NA Yes

662009-10 O

11615Alufit (India) Pvt Ltd,

No.17-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Aluminium anodizing570 R-44

Industry or process involving metal

Medium Red 2002BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 3.6 0.6 NA N Y Y NA Yes

672009-10 CL

-

Armstrong Acmite India Mfg (P) Ltd,

No.33B II Phase, PIA, Bengaluru-560 058,

II PhaseI

Non Ferrou alloys casting 220 O-66

Non- ferrous metal

extraction Small Orange 2005

BA30.09.2011

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

682009-10 O

11412

Mag Engineering Pvt Ltd (A unit of Sandhar Technologies),

No.46-A, 3rd Main road, Unit -2 , II Phase, PIA, Bengaluru-560 058,

II PhaseI

Mild Steel Cabinets, Control Panels, Switch Boards, Elevating

5438 R-44Industry or process involving metal

Large Red 2004BA

30.06.2024Y 30.06.2020 N N N N N NA NA NA 10 10.5 STP & ETP Y N N NA Yes

692009-10 O

17763

Mysore Thermo Electric Pvt Ltd,

No.62, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Lead Acid Battery manufacture 1396.56 R-7

Lead acid batterymanufacturing(excluding

Large Red 1974BA

30.06.2021Y 30.06.2020 N N N N Y NA NA NA 2 0.5

ST & SP ETP(trt in Unit-II) Y N N NA Yes

702009-10 CL

33278Nash Industry,

No.393, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering with powder caoting 376 R-44

Industry or process involving

Small Red 1/8/2004BA

30.06.2010CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL33278 involving

metal BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

712009-10 CL

-

Seenu Precission Tooling Systems (P) Ltd Unit-II,

Unit-II, No.484, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering with Heat treatment 267 O-63

Industries with Heat

Treatment, Small Orange 1/7/2006

BA30.06.2011

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

722009-10 O

32065Alutop,

No.P 26C, 10th Main, III Stage, PIE, Bengaluru-560 058

III StageI

Aluminium pilfers proof caps 258 G-1

utensils fromaluminum circles by

Small Green 2010BA

31.12.2026N NA N N N N N NA NA NA 2.5 NA ST & SP N N N NA Yes

732009-10 O

10964

Mysore Thermo Electric Pvt Ltd,

No.36, III Phase, PIA, Bengaluru-560 058,

III PhaseI

manufacture of Formed plates 88.02 R-7

Lead acid batterymanufacturing(excluding

Small Red 1974BA

30.06.2023Y 30.06.2023 N N N N N NA NA NA 0.62 2 ST & SP ETP Y N N NA Yes

742009-10 O

11496Ador Fontech Ltd, Unit-I

No.486, B -1, 14th Cross, 3rd Main, IV Phase, PIA, Bangalore - 58,

IV PhaseI

Welding electrodes376 O-4

Coated electrode manufacturing

Medium Orange 2003BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 1.2 0.2 NA N Y Y NA Yes

752009-10 O

19593Ador Multiproducts Limited.,

No.A-13 & 14, III Stage,PIE, Bengaluru-560 058

III StageI

Cosmetics 360 O-10

Manufacturing of tooth powder,toothpaste,

Small Orange 1996BA

30.09.2023N N N N N N N NA NA NA 0.64 0.1 NA N Y Y NA Yes

762009-10 CL

-Advani Overlikon Ltd,

No.A-288, II Stage,PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

772009-10 CL

-Amc Cook Ware (I) Ltd,

No.21A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Cookware utensils895 G-1

utensils fromaluminum circles by

Medium Green 2001BA

31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

782009-10 CL

-Bleach Lakier,

No.260, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Auto part6.5 G-78

Switches without

electroplatinMedium Green 2006

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

792009-10 O

39610Ceramed Engineers Pvt Ltd,

No.B-67 & 68, III Stage,PIE, Bengaluru-560 058

III StageI

Vibro polishing184 O-96

Gold and Silver smithy (purification

Small Orange 1988BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 2.4 0.11 NA N Y Y NA Yes

802009-10 CL

11591Bombay Royon Fashions Ltd,

No.58, 4th Main, 2nd cross, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment 1229 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 1997BA

31.12.2020Y 30.09.2018 N N N N N NA NA NA 30 N STP Y N N NA Yes

812009-10 O

10696

Jeans Knit Pvt Ltd,(Fibres & Fabrics International),

No.21-E, 20/A, II Phase, PIA, Bangalore-560058,

II PhaseI

Garment Washing15553.73 O-50

Mechanized laundry using oil fired

Large Orange 2005BA

30.09.2022Y 30.09.2022 Y 31.12.2100 N N N NA NA NA 36 1599 ETP Y Y N NA Yes

822009-10 O

16488

Gemini Dyeing & Printing MIIl Ltd Division -I (formerly AG Exports unit-I,( Formerly

Gemini Fashios Pvt. Ltd., )

No.1-E, 1st Main, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Stitching of ready made Garments 592.19 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2006BA

31.12.2022N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes

832009-10 O

11729

Gerb Vibration Control Systems Pvt Ltd.,

No.27/A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering with painting 2666 O-62

Readymade leather garments

Large Orange 1993BA

30.09.2021Y 30.09.2020 N N N N N NA NA NA 3 0.02 ST & SP N N Y NA Yes

842009-10 CL

12854Greys Exim Pvt Ltd,

No.477-B, IV Phase, PIA, Bangalore-5600588,

IV PhaseI

Stitching of Garments & Garment Washing 876 O-50

Mechanized laundry using oil fired

Medium Orange 2003BA

30.09.2022N N N N N N N NA NA NA 1.2 1.4 ST & SP ETP Y N N NA Yes

852009-10 CL

-H & R Flavours & Fregrances,

No. , II Stage,PIE, Bengaluru-560 058 II StageI

Perfumery items C1 O-10

ng of tooth powder,

toothpaste, Small Orange Closed

BA30.09.2004

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

862009-10 CL

-

Indus youth Engineering Pvt Ltd,

No.1A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Machinery & spances for Rubber 167 G-78

Switches without

electroplatinSmall Green 1996

BA31.12.2009

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

872009-10 CL

-Kashyap Coated Sands,

No.477, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2005

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

882009-10 CL

-Kaveri Steels Ltd,

Plot No 20, I Phase, PIA, Bengaluru-560 058,

I PhaseI

Engineering Unit322.5 G-78

Switches without

electroplatinSmall Green 1989

BA31.12.2000

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

892009-10 O

10925

Meyer Organics Pvt. Ltd.,(Old Name Meyer Health Care),

No.10-D, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Formulation of Pharmaceuticals 1900 O-74

Pharmaceutical formulation

Large Orange 1996BA

30.09.2022Y 30.09.2018 N N N N N NA NA NA 16 42 ETP Y Y N NA Yes

902009-10 O

16680

Nash Industries (I) Pvt Ltd. (E.O.U.),

No.236-237/2, 8th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Fabrication of Sheet metal 1688 G-78

Panel Board, Switches withoutelectroplatin

Large Green 2003BA

31.12.2021Y 31.12.2025 N N N N N NA NA NA 7.2 N ST & SP N N N NA Yes

912009-10 O

11635Pragathi Automation Pvt Ltd.,

No.413, 11th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

General Engineering activity with spray Painting: Components for tool Turrets,

4168 O-62Automobile servicing,repairing and painting

Large Orange 1986BA

30.09.2021Y 30.09.2021 N N N N N NA NA NA 4.8

0.5 (inceneration) NA N Y Y NA Yes

922009-10 O

10663Prerana Motors Pvt Ltd,

No 28D/29, II Phase, PIA, Bangalore-560058,

II PhaseI

Automobile Servicing1022 O-62

Automobile servicing,repairing and painting

Large Orange 1993BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 4.8 N STP Y N N NA Yes

932009-10 O

11209Remidex Pharma Pvt Ltd,

No.B-249, II Stage,PIE, Bangalore-560058

II StageI

Formulation of Pharmaceuticals: Tablets, Capsules & Syrups/ liquids

2535 O-74Pharmaceutical formulation

Large Orange 1983BA

30.09.2021Y 30.09.2021 Y 31.12.2100 N N N NA NA NA 6.5 4.7 ETP Y Y N NA Yes

942009-10 O

16604S.R.K. Products Pvt Ltd,

No.228 & 233, 11th main, III Phase, PIA, Bangalore - 560058,

III PhaseI

Soap nut powder turmeric powder and cofffe poder

211 G-47Re-packing of finishedproducts (Dry

Small Green 1994BA

31.12.2026N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

95 No.Sb-57, I Stage, PIA, Bengaluru-560 I Stage Engineering Unit Switches 952009-10 CL

-Searock Precission Products,

No.Sb-57, I Stage, PIA, Bengaluru-560 058,

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

962009-10 CL

-

Singarama Roller Flour Mills Ltd, IV Phase, PIA, Bengaluru-

560 058,

IV Phase, PIA, Bengaluru-560 058, IV PhaseI

Pulverizing C1 O-26

processing, mineral

processing, Medium Orange Closed

BA30.09.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

972009-10 O

12892Stanzen Links,

No.473, A-2, IV Phase, PIA, Bangalore-560058,

IV PhaseI

Electrical stamping, Automobile components

882 G-77Manufacture of Motor & Pumpswithout

Medium Green 1980BA

31.12.2021N N N N N N N NA NA NA 2.6 N ST & SP N N N NA Yes

982009-10 CL

-

The India Thermit Corporation Ltd,

No.366, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Lutting sand242 G-99

sand reclamation

unit/Small Green 1997

BA31.12.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

992009-10 O

27522Navami Engineering (P) Ltd,

No.461, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Diesel Filters142 W-14

Engineering and fabricationunits (dry

Small White 2005BA

31.12.2025N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

1002009-10 CL

21655New Arya Bhavana,

No.3, III Phase, PIA, Bangalore-560058,

III PhaseI

Confectionery items (sweet & kara) 144 O-2

confectionery units withproduction

Small Orange 2004BA

30.09.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1012009-10 CL

-Abb Ltd,

No. 1 & 2 , III Stage,PIE, Bengaluru-560 058

III StageI

Assembling of integration 599 G-78

Switches without

electroplatinMedium Green 1996

BA31.12.2009

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1022009-10 CL

-Acc Ready Mix Concrete,

No.34B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Ready mix concreate981 G-37

Ready mix cement

concreteMedium Green 2000

BA31.12.2011

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1032009-10 CL

10286Ace Designers Ltd (Unit-I),

No.282, IV Phase, PIA Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinMedium Green Closed

BA31.12.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1042009-10 O

27008

AMS Bhargava Machining Pvt., Ltd.,

No.A-153 & 154, 2nd C Main Road, II Stage,PIE, Bangalore-E1450560058

II StageI

Machining Components 255 O-63

Engineering Industries with HeatTreatment,

Small Orange 2007BA

30.09.2027N N N N N N N NA NA NA 0.04 0.84 NA N Y Y NA Yes

1052009-10 O

12033Ace Multi Axes Ltd,

No.A-50/49, II Stage,PIE, Bengaluru-560 058

II StageI

CNC Machining and Manufacture of Machine Components

1257 G-78Panel Board, Switches withoutelectroplatin

Large Green 1996BA

31.12.2022Y 31.12.2026 N N N N N NA NA NA 1.6 N NA N Y N NA Yes

1062009-10 O

25854Neumtica Technogies Pvt Ltd

No.9/F, 3rd Main Road, 10th Cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Garment2331.566 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 15/1/03BA

31.12.2026Y 31.12.2017 N N N N N NA NA NA 0.32 N NA N Y N NA Yes

1072009-10 CL

-Apeego Ltd,

No.498, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1082009-10 CL

-Argee Exports,

No.296, IV Phase, PIA, Bangalore, IV PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2002CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1092009-10 CL Balaji Garments Pvt Ltd,

No.B-13 & 14, 2nd "B" Main road, II Stage,PIE, Bengaluru-560 058

II StageI

Garment156 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1998BA

31.12.2022N N N N N N N NA NA NA 2.88 N NA N Y N NA Yes

1102009-10 O

12035Bangalore Shirt Co,

No.12/B, 6th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Readymade Garment782.35 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2005BA

31.12.2024Y 31.12.2020 N N N N N NA NA NA 24 N NA N Y N NA Yes

1112009-10 CL

-Buildmet Fibres Pvt Ltd,

No.A9, I Stage, PIE, Bengaluru-560 058,

I StageI

Woven sacks40 G-79

Plastic sack bags, woven

sackSmall Green 1999

BA31.12.2010

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1122009-10 CL

-

Consolidated Engineering Construction Co,

No.244, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit56.8 G-78

Switches without

electroplatinSmall Green 1997

WA31.12.2013

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1132009-10 O

11117

Healthium Medtech Pvt Ltd (Formerly Sutures India Pvt

Ltd,

No.472/D, IV Phase, PIA, Bengaluru-560058

IV PhaseI

Manf of catgut sutures, silk sutures, nulon sutures PGA,

acid sutures

5584 R-44Industry or process involving

Large Red 2003BA

30.06.2021Y 30.6.2021 Y 31.12.2100 N N N NA NA NA 9.6 20 Combined ETP N Y N NA Yes

1142009-10 CL

13311Debeers India Surveys Pvt Ltd,

No.36A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Mineral Processing312 O-26

processing, mineral

processing, Small Orange 2002

BA30.09.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1152009-10 CL

11529Foretel Cables Pvt Ltd.,

No.116, 7th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Manu of wire and cable 371.64 G-96

Manufacturing of insulatedconductors

Small Green 2002WA

31.12.2012CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1162009-10 CL

-Dudani Exports Pvt Ltd,

No.473/A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green ClosedBA

31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1172009-10 CL

12765Elastrex Polymers Pvt Ltd,

No.397, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Rubber Foot wear709 G-26

wear and leather

products Medium Green 2001

BA31.12.2006

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1182009-10 CL

-

Emfoam Power Project (P) Ltd, I

II Phase, PIA, Bengaluru-560 058, II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinMedium Green Closed

BA31.12.2009

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1192009-10 CL

-Eternit Exist Ltd ,

II Phase, PIA, Bengaluru-560 058, II PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching of

Medium Green ClosedBA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL- Stitching of

shoe uppers/ BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1202009-10 CL

-Euro Clothing Co,

No.38/A, III Phase, PIA, Bengaluru-560 058,

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green ClosedBA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1212009-10 CL

-Foretel Cables Pvt Ltd.,

No.403, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1222009-10 CL

-G.C.L India Pvt Ltd,

No.A-415, II Stage,PIE, Bengaluru-560 058

II StageI

Engineering with painting 55.71 O-62

spray painting Small Orange 1993

BA30.09.2017

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

1232009-10 CL

-G.C.L. India Pvt Ltd,

No.A-419 & 420, II Stage,PIE, Bengaluru-560 058

II StageI

Weaving Machine462 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1993BA

31.12.2013N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes

1242009-10 CL

12045

BOMBAY RAYON FASHIONS LTD., Uint-2A,

No.57/A, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment631 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 1/10/2013BA

31.12.2021Y 30.09.2010 N N N N N NA NA NA 4.8 N NA N Y N NA Yes

1252009-10 CL

-pre¥ÀgÉ

No.8-1D, I Stage, PIE, Bangalore, I StageI

Garment306 G-77

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2017CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1262009-10 O

30065Grantools,

No.A-30 & B-31, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit103 G-78

Switches without

electroplatinSmall Green 1990

BA31.12.2025

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

1272009-10 CL

-Grantools Pvt Ltd,

No.A-53, II Stage,PIE, Bengaluru-560 058

II StageI

Engineering Unit150 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1994WA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1282009-10 CL

-H.M.T Ltd,

H.M.T Ltd, No.30C, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2008

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1292009-10 CL

-Hind High Vaccum Pvt Ltd,

No.472, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1302009-10 O

25726Hydrolines India,

No.M-4, I Stage, PIA, Bengaluru-560 058,

I StageI

Hydraulic hose assembles 943 G-77

of Motor & Pumpswithout

Medium Green 1999BA

31.12.2023Y 31.12.2023 N N N N N NA NA NA 1.3 N NA N Y N NA Yes

1312009-10 CL

-Innova Polypack Pvt Ltd,

No.A-7 & 8, I Stage, PIE, Banglaore-58

I StageI

HDPP/PP Woven Fabrics 544 G-79

Plastic sack bags, woven

sackMedium Green 1998

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1322009-10 O

22836IPA Pvt Ltd,

No.472/B2, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit1183 G-78

Switches without

electroplatinMedium Green 1978

BA31.12.2034

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

1332009-10 CL

-

John Crane Flexibox (India) Pvt Ltd,

No.10-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1342009-10 CL

-K.K. Nag Ltd,

No.484, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1352009-10 CL

-K.R.M.International,

No.9, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2008

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1362009-10 CL

-Kongovi Electronics,

No.30/C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Electroplating1100 R-44

Industry or process involvingmetal

Large Red 2006BA

30.06.2021Y 30.06.2020 N N N N N NA NA NA 1 29 ST & SP ETP Y N N NA Yes

1372009-10 CL

-Kumbhukaram Machine Tools,

II Phase, PIA, Bengaluru-560 058 II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1382009-10 CL

11636L.T.Karle & Co,

No.V-77 & 78, II Stage,PIE, Bangalor-58

II StageI

Garment1699.83 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2001BA

31.12.2024N N N N N N N NA NA NA 8.8 N STP Y N N NA Yes

1392009-10 CL

-L.V.Exports,

No.152, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1402009-10 CL

-L.V.K. Investments Pvt Ltd,

No.112, I Stage, PIE, Banglaore-58 I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2006CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1412009-10 O

11628

Bombay Royon Fashions Ltd, Unit-10,

unit -10, No.2, 4th Cross, I Stage, PIA, Bengaluru-560 058,

I StageI

Garment667 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 1996BA

31.12.2022N N N N N N N NA NA NA 10 N NA N Y N NA Yes

1422009-10 O

11193MPP Technologies Pvt Ltd,

No.487/C, 14th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Control panel cabins with spray painting 1286.95 O-62

Spray painting, paint baking, paint

Large Orange 1982BA

30.09.2021Y 30.09.2021 N N N N N NA NA NA 1.5 N STP Y N N NA Yes

1432009-10 CL

11593

Avery Dennsion India private limited (Formerly Paxar Air

Pvt Ltd,)

No.90/91, 7th Main, III Phase, PIA, Bangalore-560058,

III PhaseI

Manufacture of Woven labels & heat transfer tags with printing on clothes

3280 R-40Yarn / Textile processinginvolving

Large Red 1997BA

30.06.2017Y 30.06.2019 N N N N N NA NA NA 15 6.5 STP & ETP Y N N NA Yes

144 No.28, II Phase, PIA, Bengaluru-560 II Phase Garment Garment 1442009-10 CL

-Manipal Apparels,

No.28, II Phase, PIA, Bengaluru-560 058,

II PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2007CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1452009-10 CL

11917Mapal India,

No.307 & 308, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit1379 G-10

Carpentry & wooden furnituremanufacturi

Large Green 2001BA

31.12.2018N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

1462009-10 O

31626Quality Profiles (P) Ltd

C-215, 4th Cross, I Stage, PIE, Bengaluru-560058.

I StageI

Manufacturing of Nozzles, Blades 497 G-78

Switches without

electroplatinSmall Green 2016

WA31.12.2026

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

1472009-10 O

10555

Merck Life Science Pvt Ltd., (Formerly known as Millipore

(India) Pvt Ltd),

No. 50-A/51, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering with lab testing (Medical Equipment)

3095 R-83Research and Analytical laboratories

Large Red 1989BA

30.06.2021Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 14 4.6 Combined ETP N Y N NA Yes

1482009-10 CL

-Multilink,

No.497-B, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Moulding with painting 427 O-92

moulding, Fiber Glassreinforced

Small Orange 1992BA

30.09.2010CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1492009-10 CL

20896

Texport Syndicate India Pvt., Ltd.,

No.296-297, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment178 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1992BA

31.12.2017Y 31.12.2021 N N N N N NA NA NA 12 N STP Y N N NA Yes

1502009-10 O

11598

Nagel Special Machines Pvt Ltd.,

No.26C/27-A, II Phase, PIA, Bangalore-560058.

II PhaseI

Honing machines (Vertical, Horizontal & special urpose) with spray paiting

1990.17 O-62Spray painting, paint baking, paint

Large Orange 1993BA

30.09.2021Y 30.09.2020 N N N N N NA NA NA 2 0.75 ST & SP N N Y NA Yes

1512009-10 O

22907Narang Plastics Pvt Ltd,

No.303, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

(Feeding bottles n nipples) Plastic 688.1 G-32

Polythene and plastic processedproducts

Medium Green 1982BA

31.12.2023N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

1522009-10 CL

16681

Nash Industry, No.B-226, I Stage, PIE, Bengaluru-560 058,

No.B-226, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2011

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1532009-10 CL

26488Neri Machine Tools Pvt Ltd.,

No.C-199, 4th Cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit (Manufcturing of CNC Manchines and Accessories)

69.45 G-10Carpentry & wooden furnituremanufacturi

Small Green 2004BA

31.12.2024N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

1542009-10 CL

-New Generation Apparels,

No.28E, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garment517 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 10/1/1994BA

31.12.2012CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1552009-10 O

24127

The News Line Printers Bangalore,

No.A-356, I Stage, PIA, Bengaluru-560 058,

I StageI

Printing press181 O-59

Printing press &/or Screen Printing

Small Orange 1999BA

30.09.2028N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes

1562009-10 CL

22773Nisha Designs,

No.485/11, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment171 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2023Y 31.12.2021 Y 31.12.2013 N N N NA NA NA 25 N STP - BWSSB Y N N NA Yes

1572009-10 CL

21650OEN India Ltd,

No.487-A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit254 G-110

Diesel Generator sets (250 KVA

Small Green 1986BA

31.12.2016CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1582009-10 O

10646Out Door Clothing, N

No.30/C, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garment2220 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2000BA

31.12.2022Y 31.12.2017 N N N N N NA NA NA 40 N STP Y N N NA Yes

1592009-10 CL

22153Pearl Metal Products,

No.527, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Manufacture of bars insulated aluminium wires

245 G-96Manufacturing of insulatedconductors

Small Green 1991BA

31.12.2015Y 30.09.2018 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

1602009-10 CL

-

Pepprel+Fluchs (India) Pvt Ltd (Software Unit),

No.C-10, I Stage, PIE, Bengaluru-560 058,

I StageI

Softwere Techonology 146 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1612009-10 CL

-Power Gear Pvt Ltdq,

No.15 & 16, III Phase, PIA, Bangalore-560058,

III PhaseI

Electrical Goods with Spray paiting 740 O-62

Spray painting, paint baking, paint

Medium Orange 1980BA

30.09.2019CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1622009-10 CL

-Precission Moulding Pvt Ltd,

No.473/D, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1632009-10 O Prime Lables Pvt Ltd,

No.59, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Lables Manufacturing486 G-91

Manufacture of Adhesives andadhesive

Small Green 1995BA

31.12.2024N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

1642009-10 O

Prime Lables Pvt Ltd, (Unit-II) N

(Unit-II) No.B-164, II Stage,PIE, Bengaluru-560 058

II StageI

polyster woven garment labels 424 G-91

Manufacture of Adhesives andadhesive

Small Green 2002BA

31.12.2024N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

1652009-10 CL

-Primex Plastics Pvt Ltd,

No.A-317/318, 7th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic injection moulded components and moulds

748 G-32Polythene and plastic processedproducts

Medium Green 1990BA

31.12.2014CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1662009-10 O

15378Process Pumps (I) Pvt Ltd,

No.86, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit349 G-77

Manufacture of Motor & Pumpswithout

Small Green 1986BA

31.12.2022N Y N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

1672009-10 CL Reliance Engineers Ltd,

No.84/85, III Phase, PIA, Bengaluru-560 058

III PhaseI

Cable manufacturing 491 G-78

Switches without

electroplatinSmall Green 15/8/81

BA31.12.2016

N Y N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes

1682009-10 CL

-

Rewadale Precission Tools Pvt Ltd,

No.28-A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering Unit477 G-78

Switches without

electroplatinSmall Green 2003

BAC1

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL- electroplatin BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1692009-10 O

28510Sagittarius Metals Pvt Ltd,

No.509, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

steel processing 344 G-46

Steel furniture without spray

Small Green 2002BA

31.12.2026N Y N N N N N NA NA NA 1.4 N NA N Y N NA Yes

1702009-10 CL

-Sai Security Printers Pvt Ltd.,

No.256, 8th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Offset printing 889 O-59

Printing press &/or Screen Printing

Medium Orange 1996BA

31.12.2015Y 31.12.2016 N N N N N NA NA NA 4.8 N ST & SP N N N NA Yes

1712009-10 CL

11333

Scotts Garments, No.V-27, 7th Main, II Stage,PIE, Bengaluru-

560 058

No.V-27, 7th Main, II Stage,PIE, Bengaluru-560 058

II StageI

Garment536 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2000BA

31.12.2022Y 31.12.2018 N N N N N NA NA NA 11 N STP - BWSSB Y N N NA Yes

1722009-10 CL

-Scorpio Engineering,

No.55, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1732009-10 O

18131

Seenu Precissions Toolings Systems (P) Ltd,

No.28-A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Manufacture of Tool Holders & Checks (Engineering Unit)

487 G-78Switches without

electroplatinSmall Green 1992

WA31.12.2022

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

1742009-10 CL

-Shankala Industries,

No.147, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1752009-10 O Sigma Punch Forms (P) Ltd,

No.C-299/300, I Stage, PIE, Banglaore-58

I StageI

Engineering Unit631 G-10

Carpentry & wooden furnituremanufacturi

Medium Green 1991BA

31.12.2024N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

1762009-10 O

33170

Creative Design and Manufacturing

Site No.1, 1A and 3, Plot No.491, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Mine benification components etc 1100 O-62

Spray painting, paint baking, paint

Large Orange 2017BA

30.09.2030N N N N N N N NA NA NA 3 N NA N Y N NA Yes

1772009-10 CL

-Span Global Pvt Ltd, Unit-II,

Unit-II, No.97/98, 8th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment298 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2014CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1782009-10 O

13314Steer Engineering Pvt Ltd,

No.290,4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Egineering industry with heat treatment: Twin screw compounding

2687 R-58Pharmaceutical (Bulk drug &Active

Large Red 8/11/1994BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 12.8 0.23 NA N Y Y NA Yes

1792009-10 CL

-Super Star Garments,

No.323, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1802009-10 O

33803Intech Dmis Pvt Ltd

B117, 3rd Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Additive manufactured /3D printed metal components

1248 G-7Brass and bell metal utensilsmanufacturi

Large Green 2014BA

31.12.2026Y 31.12.2022 N N N N N NA NA NA 8 N NA N Y N NA Yes

1812009-10 O

11179Surhennings Pvt Ltd,

No.1-B, II Phase, PIA, Bangalore-560058

II PhaseI

Engineering with surface treatment and powder caoting

1487 R-44Industry or process involvingmetal

Large Red 1980BA

30.06.2021Y 30.06.2015 N N N N N NA NA NA 8 1 STP Y N Y NA Yes

1822009-10 CL

-Surya Designers,

No.A-313 & 314, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit109 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2004

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1832009-10 O

11605Synthetic Packers Pvt Ltd,

No.262/263, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Polythene Rolls and Bags of thicknes more than 40 microns

2012 G-79Plastic sack bags, woven sack -- 10 10 15 -- 15 10

Large Green 1981BA

31.12.2022N N N N Y 29.01.2021 N NA NA NA 2.4 N ST & SP N N N NA Yes

1842009-10 O

26312

Texport Industries pvt ltd,unit-4,

No.459/B, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment709.5 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2002BA

31.12.2023Y 31.12.2016 N N N N N NA NA NA 16 N STP - BWSSB Y N N NA Yes

1852009-10 CL

-Texport International,

No.119, III Phase, PIA, Bengaluru-560 058,

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1862009-10 CL

-Texport Overseas,

No.102, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment640 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2005BA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1872009-10 O Textronics (I) Ltd,

II Phase, PIA, Bengaluru-560 058 II PhaseI

Electronic Components 3 W-13

Electrical and electronic item

Small White 2005WA

31.12.2022N N N N N N N NA NA NA NA N NA N N N NA NA

1882009-10 CL

-Thermal Transfer Products,

No.A-153, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2003

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1892009-10 CL

-Towler Enterprises Solutions,

No.17, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1902009-10 CL

-Transpack Asia Pvt Ltd,

No.489, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

PP oven fabrics 430 G-79

covered underPlastic

Small Green 2003BA

31.12.2014CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1912009-10 O

37738

BPREX Pharma Packaging India Pvt Ltd (Rexam Pharma

India Pvt Ltd),

No.485, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

plastic container (PHARMA) 5908 O-25

DG set of capacity >1MVA but <

Large Orange 1997BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 10 N NA N Y N NA Yes

1922009-10 CL

-Tulip Labels,

No.17D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment364 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2012CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

193 No.1-2, I Stage, PIE, Banglaore -58 I StageHospital

Hotel Hotels/Resor1932009-10 CL

-Ujwala Hotel International,

No.1-2, I Stage, PIE, Banglaore -58 I StageHospital

ity

Hotel256 G-52

Hotels/Resorts having

more than 20 Small Green 2001

BA31.12.2023

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1942009-10 O

22830Unique Punch Systems,

No.485/7, 14th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Activies with CNC Sheet Metal Fabrication.

713 G-7Brass and bell metal utensilsmanufacturi

Medium Green 2001BA

31.12.2023Y 31.12.2016 N N N N N NA NA NA 3.2 N STP Y N N NA Yes

1952009-10 CL

-Vardana Banda Ltd,

No.81/82, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit243 G-78

Switches without

electroplatinSmall Green 1986

BA30.09.2016

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

1962009-10 O

13307Vinayaka Cnc Centre Pvt Ltd,

No.347, II Stage,PIE, Bengaluru-560 058

II StageI

Manufacutre of Engineering components (Flange, Drive flange.

647 O-96Gold and Silver smithy (purification

Medium Orange 1985BA

30.09.2021Y 30.09.2021 N N N N N NA NA NA 3.2 N NA N Y N NA Yes

1972009-10 O

11902Waters (India) Pvt Ltd,

No.36A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Assembly of Liquid Chromatography System.

1607 G-78Switches without

electroplatinLarge Green 1986

BA31.12.2022

N N N N N N N NA NA NA 3.8 N ST & SP N N N NA Yes

1982009-10 CL

15090Welflex Polymers (P) Ltd,

No.26-E, II Phase, PIA, Bengaluru-560 058

II PhaseI

Rubber moulded190 G-86

Tread rubber including pre-curedrubber

Small Green 1983BA

31.12.2011N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes

1992009-10 CL

-

Bombay Royon Fashions Ltd, P

Unit -15, Plot No 40, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment243 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1995BA

31.12.2022N N N N N N N NA NA NA 9 N CL N Y N NA Yes

2002009-10 CL

-Abb Ltd,

No.543, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembly low voltage switch gear 646 G-78

Switches without

electroplatinMedium Green 2005

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2012009-10 CL

-Ace Super Auto Forge Pvt Ltd,

Site No.15,Sy No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit846 G-78

Switches without

electroplatinMedium Green 2007

BA31.12.2014

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2022009-10 CL

-Navalagunda Auto Park,

No.323, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment421 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2006BA

31.12.2022CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2032009-10 O

12812

Auto Cnc Machining Pvt Ltd, Site

Site No.16,Sy No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

CNC Machinising Components 1351 G-10

Carpentry & wooden furnituremanufacturi

Large Green 2006BA

31.12.2022Y 31.12.2020 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

2042009-10 O

22622Control Infotech Pvt Ltd,

No.426, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Control panel cabins195 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1995BA

31.12.2023N N N N N N N NA NA NA 0.82 N ST & SP N N N NA Yes

2052009-10 CL

-Debeers India Pvt Ltd,

No.Sb-14, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2062009-10 CL

-Dhakshini Appareals Pvt Ltd,

No.374-A, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment315 G-72

Stitching/ Stitching ofshoe uppers/

Small Green 2005BA

31.12.2008CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2072009-10 O

14980

Electronics & Controls Power Systems (P) Ltd, Unit-II,

Unit-II, No.29-A, II Phase, PIA Bengaluru-560 058,

II PhaseI

UPS System521.65 G-78

Switches without

electroplatinMedium Green 1998

BA31.12.2021

N N N N N N N NA NA NA 3 N ST & SP N N N NA Yes

2082009-10 CL

24110Gokuldas Images (P) Ltd,

Ltd, No.81/ 82, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment193 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004BA

31.12.2010CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2092009-10 CL

-Hoshi Tools (P) Ltd,

No.B-166, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit153 G-78

Switches without

electroplatinSmall Green 1994

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2102009-10 O

31213Heatronix, Unit-2

No.341, 9th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Aluminium melting and making billets 24.35 O-28

Non- ferrous metal

extraction Small Orange 2016

BA30.09.2021

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

2112009-10 CL

-

Kinematic Transmissions (P) Ltd,

No.A-274, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit150 G-78

Switches without

electroplatinSmall Green 2004

BA31.12.2022

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2122009-10 O

11404

Leitz Tooling Systems India (P) Ltd,

No.486/C, 14th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

wood working tool1665 G-10

Carpentry & wooden furnituremanufacturi

Large Green 1999BA

31.12.2022N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

2132009-10 CL

-Motherson Sumi Systems Ltd,

No.471D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

General Engineering895 G-78

Switches without

electroplatinMedium Green 2004

WA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2142009-10 O

Research Development & Manufacturing Corporation,

No.A-490-K, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit1167 G-78

Switches without

electroplatinLarge Green 2010

BA31.12.2028

N N N N N N N NA NA NA 0.83 N ST & SP N N N NA Yes

2152009-10 CL

31649

Sartorius Mechatronics India (P) Ltd,

No.17, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit525 G-78

Switches without

electroplatinMedium Green 2005

BA31.12.2012

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2162009-10 O

11622

Sealed Air Packaging Materials (India) LLP (Formerly Sealed

Air (India) Pvt Ltd,,

No.245, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of plastic carryr bags 1007 G-32

Polythene and plastic processedproducts

Large Green 23/6/2005BA

31.12.2022Y 31.12.2022 N N Y 18.12.2020 N NA NA NA 2 N ST & SP N N N NA Yes

2172009-10 YTC Synthetic Packers Pvt Ltd,

Unit.3, A-360, 8th Cross, I stage, PIE, Bengaluru-560 058

I StageI

Plastic rolls 596 G-32

Polythene and plastic processed

Medium Green 2015BA Y 30.06.2019 N N N N N NA NA NA 0 NA NA NA NA N NA Yesprocessed

products BA Y 30.06.2019 N N N N N NA NA NA 0 NA NA NA NA N NA Yes

2182009-10 CL

-Spice Islands Apparels Ltd,

No.193B, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2192009-10 CL

-Sri Sai International,

No.392/1, IV Phase, PIA, Banglaore-58

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2007

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2202009-10 O

24909Slider Bags Bengaluru (P) Ltd

No.A-367, 6th Main, I State, PIE, Bengalore-58

I StageI

Plastic process products 107 G-32

Polythene and plastic processedproducts

Small Green 2013WA

31.12.2023N N N N N N N NA NA NA 0.16 NA N N Y N NA NA

2212009-10 CL

-Unuique Appareals (P) Ltd, N

Unuique Appareals (P) Ltd, No.V-40, II Stage, PIE, Bengaluru-560 058,

II StageI

Garment139 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2005BA

C1CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2222009-10 CL

-Vijaya Engineering Pvt Ltd,

, No.379/380, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit175 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2023

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2232009-10 O

22989Vipra Machine Tools Pvt Ltd,

Vipra Machine Tools Pvt Ltd, No.29/30, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit1075 G-110

Diesel Generator sets (250 KVA

Large Green 1991BA

31.12.2023Y 31.12.2023 N N N N N NA NA NA 1.08 N ST & SP N N N NA Yes

2242009-10 CL

-

Rewdale Precision Tools Pvt Ltd (Unit-II),

No.28-A, II Phase, PIA, Banglaore-58 II PhaseI

High precision Tool477 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2021

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2252009-10 O

12433

Weir Minerals India Pvt. Ltd., (FormerlyWarman

International (India) Pvt Ltd, )

No.471/D-1, IV Phase, PIA Bengaluru-560 058

IV PhaseI

Engineering 1277 G-77

Manufacture of Motor & Pumpswithout

Large Green 2002BA

31.12.2021Y 31.12.2022 N N N N N NA NA NA 8 N N N Y N NA Yes

2262009-10 CL

-3 M Batteries,

3 M Batteries, No.B-135, II Stage, PIE, Bengaluru-560 058

II StageI

Lead Acid BatteriesC1 R-7

batterymanufacturing(excluding

Small Red ClosedBA

30.06.2007CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2272009-10 O

33384A.P.S Industires,

No.B-213, II Stage, PIE, Bangalore-560058

II StageI

Lead suboxide 22.52 R-7

Lead acid batterymanufacturing(excluding

Small Red 1997BA

30.06.2022Y 30.06.2013 N N N N N NA NA NA 0.5 N NA N Y N NA Yes

2282009-10 CL

-Abhirami Industries,

No.C-59, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2017

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2292009-10 O

20600Ace Carbo Nitrades,

No.A-145, 3rd Cross, I Stage, PIA, Bangalore-560058,

I StageI

Engineering with Heat treatment 356 O-63

Engineering Industries with HeatTreatment,

Small Orange 1974BA

30.09.2022Y 30.06.2018 N N N N N NA NA NA 1.7 0.13 NA N Y Y NA Yes

2302009-10 O

24119Accura Die Casters,

No.19, Ist Main Road, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Manufacturing of Alluminium Pressure Die Casting

198 O-41Aluminium pressure die casting

Small Orange 2002BA

30.09.2030N N N N N N N NA NA NA 0.5 N N N Y N NA Yes

2312009-10 CL

-Adept Engineers,

No.162, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

2322009-10 O

15058Adpro System India (P) Ltd

318, 8th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electroplating (Hardchrome) 173.4 R-44

Industry or process involvingmetal

Small Red 2003BA

30.06.2023N N N N N N N NA NA NA 0.3 0.5 ST & SP N N Y NA Yes

2332009-10 CL

-Agrochem Industries,

No.A-320, II Stage, PIE, Bengaluru-560 058

II StageI

Formulation of Pesticides & Insecticides.

25 R-37(technical)(excluding

formulation)Small Red 1987

BA30.06.2005

N N N N N N N NA NA NA 0 N NA N N N NA NA

2342009-10 CL

-Aldec Castings,

No.B-116, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2352009-10 CL

-Alisons Electroplating,

No.C-78, III Stage,PIE, Bengaluru-560 058

III StageI

ElctroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2362009-10 O

33580All Cast Industries,

No.B-31/32, I Stage, PIE, Bangalore-560058

I StageI

Aluminium alloy and stainless steel 46.81 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 1974BA

30.09.2022N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes

2372009-10 O

13783Ammonia Marketing Co,

No.125, III Phase, PIA, Bengaluru-560 058

III PhaseI

Bottling/ Refilling of Anhydrous Liquid AmmoniaLiquid Ammonia

506 R-22Organic Chemicalsmanufacturing

Medium Red 1988BA

30.06.2024N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes

2382009-10 CL

11439Ananda Metal Corporation,

No.C-81, III Stage,PIE, Bengaluru-560 058

III StageI

Lead smelting 25.5 R-7

Lead acid batterymanufacturing(excluding

Small Red 1998BA

30.06.2018Y 30.06.2015 N N N N Y NA NA NA 0.2 N NA N Y N NA Yes

2392009-10 CL

-Anapsons Chemicals Lab Ltd,

I Stage, PIE, Bengaluru-560 058 I StageI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2402009-10 CL

-Anita Fluxes Alloy Speciality,

No.24, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Wleding rodsC1 R-44

process involving

metal Small Red 1982

BA30.06.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2412009-10 CL

-

Annapurna Chemicals Lab, No. ,

No. , I Stage, PIE, Banglaore -58 I StageI

Chemical23 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

242 No.A-357, I Stage, PIE, Bengaluru- I Stage Engineering Unit Switches 2422009-10 CL

-Annapurna Enterprises,

No.A-357, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2432009-10 CL

-Annapurna Heat Treaters,

No.B-95, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2442009-10 CL

17237Anoop Ceramics,

No.C-246, 5th cross, I Stage, PIE, Banglaore - 58

I StageI

Technical Ceramics160.22 O-22

Ceramics and Refractories

Small Orange 1991BA

30.06.2017N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes

2452009-10 CL

-Anz International,

No.519, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2462009-10 CL

-Anz Tyres International,

No.A-322, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Compnent with Heat treatment

11 O-36treatment using oil

fired furnaceMedium Orange 2004

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2472009-10 CL

-

Apollo Lubricants, Next Ton Bmtc Depot, ,

Next Ton Bmtc Depot, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2003C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2482009-10 CL

-Appollo Industries,

No.B-222, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2492009-10 O

13590Apollo Paints Pvt Ltd,

No.51, 4th Main, III Phase, PIA, Bangalore-560058,

III PhaseI

Paint303 O-54

Paint blending and mixing (Ball mill)

Small Orange 1984BA

30.09.2021Y 30.06.2021 N N N N N NA NA NA 1.6 N N N Y N NA Yes

2502009-10 CL

-Aravind Alloys Pvt Ltd,

No.SB-44, I Stage, PIE, Banglaore I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2512009-10 O

12520Arun Industries,

No.B-64, III Stage,PIE, Bengaluru-560 058

III StageI

Waste oil reprocessing 14.93 O-81

Industries engaged in recycling /reprocessing

Small Orange 2004BA

20.09.2030Y 30.09.2025 N N N N N NA NA NA 0.12 N NA N Y N NA Yes

2522009-10 CL

-Ash Coat,

No.477, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Resin coated sand 33.77 G-57

powder ( fine dust of

sand) Small Green 16/8/2002

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2532009-10 CL

-Ashish Metal Ltd,

No.A-2, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2542009-10 CL

-Ashoka Industries,

No.B-232, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2552009-10 O

15066

Associated Chemicals & Engineering Company,

No.B-301, 5th Main , IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Refilling of industrial chemicals and HW reprocessing

48.16 R-72Solvent Recycling Small Red 1984

BA30.06.2021

Y 30.06.2021 N N N N N N N N 1.2 1.9 ST & SP N N Y NA Yes

2562009-10 CL

-Associated Electro Ceramics,

No.B-104, I Stage, PIE, Bangalore -58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2572009-10 CL

-

Associated Oxides & Chemicals,

No.368, IV Phase, PI A, Bengaluru-560 058,

IV PhaseI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2582009-10 CL

-Auditya Industries,

No.S-25, III Stage,PIE, Bengaluru-560 058

III StageI

Poultry feeds15.86 O-30

poultry feed and cattle

feedSmall Orange 1990

BA30.09.2010

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

2592009-10 CL

-Balaji Castings,

No. 114, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.09.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2602009-10 CL

-Balaji Coaters, N

No.120, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Powder coating18 R-44

Industry or process involving metal

Small Red 2001BA

30.06.2019C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2612009-10 O Sree Balaji Enterprises,

No.A-302(a), 7th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Aluminium anodizing & powder coating 26.1 R-44

Industry or process involvingmetal

Small Red 2003BA

30.06.2019N N N N N N N NA NA NA 0.08 0.4 NA N Y Y NA Yes

2622009-10 O

14182Sri Balaji Enterprises,

No.333, 9th cross , 4th Main, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit with Electroplating (Zinc Electroplating)

23.45 R-44Industry or process involvingmetal

Small Red 27.06.2005BA

30.06.2024N N N N N N N NA NA NA 0.1 0.05 N N Y Y NA Yes

2632009-10 CL

-Balaji Foams,

Balaji Foams, No.485, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2642009-10 CL

-Balaji Hard Chrome,

No.C-185, II Stage, PIE, Bengaluru-560 058

II StageI

24.45 R-44

process involving

metal Small Red 2003

BA30.06.2007

N N N N N N N NA NA NA 0 N NA N N N NA NA

2652009-10 O

15270Balambiga Metal Finishers,

No.C-435, I Stage, PIE, Bengaluru-560 058,

I StageI

Electroplating Zinc Plating 129 R-44

Industry or process involvingmetal

Small Red 2003BA

30.06.2022N N N N N N N NA NA NA 2.3 1.5 NA N Y Y NA Yes

2662009-10 O Bangalore Acids & Chemicals,

No.SB-42/1, I Stage, PIE, Bengaluru-560 058,

I StageI

Refilling and Trading of Chemicals 139.84 R-22

Organic Chemicalsmanufacturi

Small Red 2000BA

30.06.2024N NA N N N N N NA NA NA 0.19 N NA N Y N NA Yesmanufacturi

ngBA N NA N N N N N NA NA NA 0.19 N NA N Y N NA Yes

2672009-10 CL

-Bangalore Cable Industries,

, No.B-230, I Stage, PIE, Banglaore -58

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2682009-10 O

14727

Asiaan Metals and Aluminium Castings Pvt Ltd., (Formerly

Bangalore Die castings)

No.257/258, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Aluinium Ingots from scrap and aluminium die casting of automobile

302.55 O-28Ferrous and Non- ferrous metalextraction

Small Orange 2006BA

30.09.2022Y 30.06.2019 N N N N N NA NA NA 1 N N N Y N NA Yes

2692009-10 O

33543Bangalore Chemical Industry,

No.93, III Phase, PIA, Bangalore-560058,

III PhaseI

Cement mould oil6.95 G-27

Lubricating oil, greases orpetroleum

Small Green 1974BA

31.12.2026N NA N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes

2702009-10 CL

-Bangalore Dye Stuff,

No.B-381, I Stage, PIE, Banglaore-58 I StageI

Food StuffC1 G-19

handling, storage and

transportatioSmall Green Closed

BA31.12.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2712009-10 O

0

Bangalore Electroplating Industry

No.C-75, II Stage, PIE, Bengaluru-560 058

II StageI

electroplating ( ZINC PLATING) 2.86 R-44

Industry or process involvingmetal

Small Red 1998BA

30.06.2022N N N N N N N NA NA NA 0.08 0.06 NA N Y Y NA Yes

2722009-10 CL

-Bangalore Forge,

No.C-283, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2002

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2732009-10 CL

-

Bangalore Heat Treaters Pvt Ltd,

No.A-147, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2742009-10 CL

-Bangalore Liquid Oxygen Co,

No.83, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Oxygen refilling C1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2752009-10 O

15889Bangalore Oxygen (P) Ltd,

No.10E, II Phase, PIA, Bengaluru-560 058.

II PhaseI

Acetylene gas104.11 R-6

Industrial carbon includingelectrodes

Small Red 8.5.1984BA

30.06.2023Y 30.06.2010 N N N N N NA NA NA 0.5 0(Recycle) ST & SP Y N N NA Yes

2762009-10 CL

-Bangalore Polyresins Pvt Ltd,

No.B-228, I Stage, PIE, Bangalore I StageI

ResinsC1 O-75 Synthetic

resinsSmall Orange Closed

BA30.09.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2772009-10 CL

-Bangalore Refinery,

No.A-18, III Stage,PIE, Bengaluru-560 058

III StageI

ElectroplatingC1 R-44

process involving

metal Medium Red Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2782009-10 CL

12064

Bangalore Technomet Pvt Ltd (Formerly Known as Heat Treatment Service Centre),

No.B-223, II Stage, PIE, Bangalore-560058,

II StageI

Heat Treatment97.79 O-63

Engineering Industries with HeatTreatment,

Small Orange 1987BA

30.06.2018N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

2792009-10 CL

12745

Basrur Universal Gaskets Pvt Ltd,

No.19/1-A, II Phase, PIA, Bangalore-560058.

II PhaseI

Gasket Mfg1412.85 R-24

and asbestos based

industriesLarge Red 10/7/2001

BA30.06.2010

CL 30.09.2014 N N N N N NA NA NA 0 N NA N N N NA NA

2802009-10 CL

-Beltron India Ltd,

No.B-38, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2812009-10 CL

-Best Coats,

No.458/C, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2822009-10 CL

-Best India Anodisers,

No.458, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2832009-10 O

14720Bhagyalakshmi Metal Works,

No.121, III Phase, PIA, Bangalore-560058,

III PhaseI

Foundry (cast iron Rough Casting) 9.89 O-42

Industry or processes involvingfoundry

Small Orange 1992BA

30.06.2017Y 30.06.2013 N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

2842009-10 CL

-Bhakta Maruthi Enterprises,

No.B-18, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2852009-10 O

40659Shcub Laboratories

Plot No.473, D5, II Floor, 13th Cross, 4th Phase, PIA, Bengalore-58

IV PhaseI

Ink concentrate and get fuel 44 O-58

Printing ink manufacturing

Medium Orange 2014WA

30.09.2023Y 30.06.2017 N N N N N NA NA NA 0.16 NA NA NA Y N NA NA

2862009-10 CL

-Bhargava Refractories,

No.B-104, I Stage, PIE, Banglaore-58 I StageI

Refractory materialsC1 O-22

Ceramics and

RefractoriesSmall Orange Closed

WA30.09.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2872009-10 O

Aeromech Technologies Pvt Ltd.,

No.362, 10th Cross, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit153 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2008BA

31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

2882009-10 CL

-Bhavani Metal Finishers,

No.121, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2892009-10 CL

-Bio-Culture Mfg Laboratories,

No.259, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2902009-10 CL

-Bonn Polymers,

No.194, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Plastic bagsC1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

291 IV Phase, PIA, Bengaluru-560 058, IV Phase Resins2912009-10 CL

-Bonn Polymers Pvt Ltd, I

IV Phase, PIA, Bengaluru-560 058, IV PhaseI

ResinsC1 O-75 Synthetic

resinsSmall Orange Closed

BA30.06.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2922009-10 O Bright Services,

No.B-142, 3rd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Bright Bars33.53 G-78

Industry or process involving metal

Small Green 1991BA

31.12.2026N NA N N N N N NA NA NA 0.1 N NA N Y N NA Yes

2932009-10 CL

-C.B.S Industrial Equipment,

No.160, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

2942009-10 CL Cables & Conductors,

No.A-15, III Stage,PIE, Bangalore -58 III StageI

Manufacture of copper/ aluminum conductors for electrical machinery

37.84 R-44Industry or process involving metal

Small Red 1987BA

NAN N N N N N N NA NA NA NA N NA N N N NA NA

2952009-10 CL Canara Agro Chemicals,

No.443/A,IV Phase,PIA, Bengaluru-560 058,

IV PhaseI

Micro Nutrients45 R-25

Formulation Organic Nutrientwithout the

Small Red 1994WA

30.06.2019Y 30.06.2008 N N N N N NA NA NA 0 N NA N Y N NA Yes

2962009-10 O

11519Celtek Batteries,

No.471/B, IV Phase, PIA, Bangalore-560058,

IV PhaseI

Battery manufacture 260 R-7

Lead acid batterymanufacturing(excluding

Small Red 1989BA

30.06.2024Y 30.06.2024 N N N N Y NA NA NA 1.2 N NA N Y N NA Yes

2972009-10 CL

15255Chemitals Pvt Ltd,

No.A-156, 3rd cross, I Stage, PIE, Banglaore-58

I StageI

Zinc oxide 286 R-55

Zinc SmelterSmall Red 1973

BA30.06.2017

Y 30.06.2018 N N N N N NA NA NA 1.4 N NA N Y N NA Yes

2982009-10 CL

13016Chevur Chemicals Pvt Ltd,

No.B-304, II Stage, PIE, Bangalore-560058

II StageI

Copper oxychloride57.92 R-44

Industry or process involving metal

Small Red 1982BA

30.06.2014Y 30.06.2015 N N N N N NA NA NA 0.16 2 NA N Y N NA NA

2992009-10 CL

-Chirag Polymers,

No.B-42, III Stage,PIE, Bengaluru-560 058

III StageI

Polymer resinsC1 O-75

Synthetic resins Small Orange 1982

BA30.09.2002

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3002009-10 CL Chitra Granite Works,

No.141, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Granite cutting and polishing 10 G-56

Cutting, sizing and polishing ofmarble

Small Green 1999WA

30.09.2011N N N N N N N NA NA NA 0.5 N ST & SP N N N NA NA

3012009-10 O

24205City Coats,

No.B-318, I Stage, PIE, Banglore-560058

I StageI

Blending &mixing of polyester resin putty, solvent thinners

16.85 O-55Paints and varnishes (mixing and blending

Small Orange 1994BA

30.09.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

3022009-10 CL

-Colloids Impex Pvt Ltd,

No.B-42, III Stage, PIE, Bengaluru-560 058,

III StageI

Chemical refiling and trading 40 R-25

chemicals and electrochemicals

Small Red 2002BA

30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

3032009-10 CL

-Colour Inks Pvt Ltd,

No.123, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Printing inkC1 O-58

Printing ink manufacturi

ngSmall Orange Closed

BA30.09.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3042009-10 CL

-Colour Pack,

No.216, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Offset printing 37.7 O-59

press &/or Screen

PrintingSmall Orange 24/11/98

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.2 N ST & SP N N N NA NA

3052009-10 CL

-

Composite Technologies Pvt Ltd,

No.A-151, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2015

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3062009-10 CL

15225Data Cast Malleable,

No.A-370, I Stage, PIE, Banglaore-58 I StageI

Ferrous casting 4.49 O-28

Non- ferrous metal

extraction Small Orange 1978

BA30.06.2015

Y 30.06.2010 N N N N N NA NA NA 0.2 N NA N Y N NA NA

3072009-10 CL Deepak Industrial Chemicals,

No.SB-116, I Stage, PIA, Bangalore-560058,

I StageI

Rust Preventive Compounds 25.54 R-44

Industry or process involvingmetal

Small Red 1989BA

30.06.2014N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

3082009-10 O

14190Deepak Tools Heat Treaters,

No.B-257, II Stage, PIE, Bengaluru-560 058

II StageI

Heat Treatment46.11 O-36

Heat treatment using oil fired furnace

Small Orange 1999BA

30.06.2014N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

3092009-10 O

11697Deepthy Labs Pvt Ltd,

No.23, III Stage,PIE, Bengaluru-560 058

III StageI

Acid purification86 R-25

Basic chemicals and electrochemicals

Small Red 1999BA

30.06.2023N N N N N N N NA NA NA 1 N NA N Y N NA Yes

3102009-10 CL

-Deepu Batteries,

No.C-73, II Stage, PIE, Bengaluru-560 058

II StageI

Battery manufacture 35 R-7

batterymanufacturing(excluding

Small Red 1997BA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3112009-10 CL

-Demink Engineering,

No.A-325, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3122009-10 O

Dwaraka Industries Enterprises,

No.A-358/1, 9th cross, I Stage, PIE, Banglaore-58

I StageI

Assembly of Bicycle Dynamo lighting set without electroplating

43 W-2Assembly of bicycles ,babycarriages and

Small White 1980BA

31.12.2020N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

3132009-10 CL

-

Sutures India (Old name : Easy Stitch Needles) Pvt Ltd,

No.B-260, II Stage, PIE, Bengaluru-560 058

II StageI

Suture needles manufacture with electroless polishing

165 R-44process

involvingmetal

Small Red 1998BA

30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA

3142009-10 CL

-Electrochemical Industry,

No.537, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

electroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3152009-10 O

24057

Elheat Ceramics Engineering Pvt Ltd,

No.B-93, 2nd cross, I Stage, PIE, Bangalore-560058,

I StageI

Ceramics refactory bricks with celeminite Al & Clay

55.38 O-64Ceramics and Refractories

Small Orange 2001BA

30.06.2028N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes24057 Al & Clay Refractories BA N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

3162009-10 CL

-Eshwari Paper Mill Pvt Ltd,

No.253, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Kraft Paper3.36 R-18

Paper ( waste paper

based Medium Red 1973

BA30.09.2008

N N N N N N N NA NA NA 0 N NA N N N NA NA

3172009-10 O

74256

Eskay Heat transformers Pvt. Ltd. (Eskay Industries),

No.444-445, 12th cross, IV Phase, PIA, Bangalore-560058,

IV PhaseI

Heat exchangers, fabrication & Engineering products with spray painting

379.33 O-63Engineering Industries with HeatTreatment,

Small Orange 2007BA

30.09.2028Y 30.06.2015 N N N N N NA NA NA 2.1 N NA N Y N NA Yes

3182009-10 CL

24111Essem Powder Coatings,

No.B-215, II Stage, PIE, Bengaluru-560 058,

II StageI

Powder coating 42.95 R-44

Industry or process involvingmetal

Small Red 1/6/2001BA

30.06.2018N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

3192009-10 CL

-

Essen Engineers & Heat Treatment,

No.B-208, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3202009-10 CL

-Essen Powder Coaters,

No.C-91, III Stage,PIE, Bengaluru-560 058

III StageI

Powder coatingC1 R-44

Industry or process involving metal

Small Red ClosedBA

30.09.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3212009-10 O

12760ETA Technology Pvt Ltd,

No.484/D, IV Phase, PIA, Bangalore-560058,

IV PhaseI

Special purpose machines with spray painting activity with job work

1039 O-63Engineering Industries with HeatTreatment,

Large Orange 2004BA

30.09.2021Y 30.06.2023 N N N N N NA NA NA 5.2 0.01 NA N Y Y NA Yes

3222009-10 O

15064Excel Process Pvt Ltd,

No.278, 4th Main, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Printed name plates, fabrication, anodization & spray painting

86.81 R-44Industry or process involvingmetal

Small Red 1992BA

30.06.2022N N N N N N N NA NA NA 0.64 0.16 ST & SP N N Y NA Yes

3232009-10 O

21033

Excel Metal Engineering Pvt Ltd,

No.340, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

General Engineering for pressed & turned component manufacturing

1531 G-7Brass and bell metal utensilsmanufacturi

Large Green 2000BA

31.12.2024Y 31.12.2024 N N N N N NA NA NA 10.8 N STP Y N N NA Yes

3242009-10 CL

-Forge Craft,

No.108, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2002

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3252009-10 O

82479Universal Heat Treaters,

No. V-44, 8th Main Road, II State, PIE, Bengalore-58

II StageI

Heat Treatment108 O-36

Heat treatment using oil fired furnace

Small Orange 1975BA

30.09.2019N N N N N N N NA NA NA 1 NA ST & SP N NA n NA Yes

3262009-10 CL

-G.N.Industries,

No.490-D, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Lead smelting 47.09 R-7

Lead acid batterymanufacturing(excluding

Small Red 9/12/2002BA

30.06.2017Y 30.06.2015 N N N N Y NA NA NA 0.3 0.2 NA N Y Y NA Yes

3272009-10 CL

-G.R.Lubricants,

No.22, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Grease manufacturingC1 R-4

ng of lubricatingoils ,grease

Small Red ClosedBA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3282009-10 O

15893G.V.Enterprises,

No.17F, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Alluminum anodizing93.12 R-44

Industry or process involvingmetal

Small Red 2003BA

30.06.2022Y

30.06.2022N N N N N NA NA NA 0.4 1.5 ST & SP ETP Y N N NA Yes

3292009-10 CL

12523Ganapathi Metal Finishers,

, No.C-212, I Stage, PIE, Banglaore-58

I StageI

Electroplating19.9 R-44

Industry or process involvingmetal

Small Red 2001BA

30.06.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3302009-10 O

15071Ganesh Engineering,

17(1), II Phase, PIA, Bangalore-58 II PhaseI

Electroplating (Hardchrome) 345.12 R-44

Industry or process involvingmetal

Small Red 1988BA

13.11.2024Y 30.06.2024 N N N N N NA NA NA 0.15 0.14 NA N Y Y NA Yes

3312009-10 CL

-Gayathri Colour Coats,

No.B-291, II Stage, PIE, Banglaore-58, II StageI

Powder coatingC1 R-44

Industry or process involving metal

Small Red ClosedBA

30.06.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3322009-10 CL

-Gayathri Metal Finishers,

No.C-151, I Stage, PIE, Banglaore -58 I StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3332009-10 CL

15411Geethashree Forge,

No.B-88, 2nd cross, I Stage, PIE, Banglaore-58

I StageI

Forging9.25 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1997BA

30.06.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

3342009-10 O

15443Geeyem Refractories,

No.SB-114, 3rd Cross, I Stage, PIE, Banglaore-560058

I StageI

Refractory materials11.4 O-22

Ceramics and Refractories

Small Orange 2000BA

30.06.2029N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

3352009-10 O

14739Gem Paints,

No.B-266, II Stage, PIE, Bangalore-560058

II StageI

Paint 9.25 O-52

Paint blending and mixing (Ball mill)

Small Orange 1982BA

30.09.2022N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

3362009-10 O

17691Gem Paints Ltd, Unit II

No.281, IV Phase,PIA, Bengaluru-560 058 ,

IV PhaseI

Paint , Primers, enamel, varnish , thinners & alkyd resins

34.9 O-52Paint blending and mixing (Ball mill)

Small Orange 1986BA

30.09.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

3372009-10 O

14739Gem Paints Ltd,

No.490-H, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Paint 48.75 O-52

Paint blending and mixing (Ball mill)

Small Orange 2000BA

30.09.2022N N N N N N N NA NA NA 3.6 0.7 (recycled) ST & SP N N N NA Yes

3382009-10 CL

-Gemini Die Chem

No.B-382, I Stage, PIE, Banglaore-58 I StageI

Garment dyeingC1 R-40

Textile processinginvolving

Medium Red 2010BA

30.06.2017C1 C1 C1 C1 C1 C1 C1 NA NA NA NA N NA N N N NA Yes

3392009-10 CL

-Goyal Mg Gases,

No.439, 12th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

refilling of industrial gases, Oxygen & Argon

44.51 R-84Production

ofIndustrial

Small Red 1988BA

30.06.2007N N N N N N N NA NA NA 0.08 N ST & SP N N N NA NA

340 No.B-137, I Stage, PIE, Banglaore -58 I Stage Casting Non- ferrous 3402009-10 CL

-Gravi Castings,

No.B-137, I Stage, PIE, Banglaore -58 I StageI

Casting C1 O-28

Non- ferrous metal

extraction Small Orange Closed

BA30.06.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3412009-10 CL

-Hanashree Treaters,

No.C-252, I Stage, PIE, Banglaore -58 I StageI

Heat Treatment75 O-63

Engineering Industries with HeatTreatment,

Small Orange 2002BA

30.06.2011N N N N N N N NA NA NA 0 N NA N N N NA Yes

3422009-10 O

29861Hanu Heat Treaters,

No.C-330, 3rd Main, I Stage, PIE, Bengaluru-560 058,

I StageI

Heat Treatment96.93 O-63

Engineering Industries with HeatTreatment,

Small Orange 2002BA

30.09.2029N N N N N N N NA NA NA 0.72 N NA N Y N NA Yes

3432009-10 CL

-Haseen Glass Marbles,

No.525, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Glass art workC1 O-34

ceramics, earthen

potteries andSmall Orange Closed

BA30.09.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3442009-10 CL

-Heat Chem Industries,

No.B-73, I Stage, PIE, Bengaluru-560 058

I StageI

Heat TreatmentC1 O-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3452009-10 CL

-Hebran Coats,

No.B-168, I Stage, PIE, Bengaluru-560 058

I StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3462009-10 CL

-Hemalatha Metal Mart,

No.B-65, III Stage,PIE, Bengaluru-560 058

III StageI

Lead smelting C1 R-7

batterymanufacturing(excluding

Small Red ClosedBA

30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3472009-10 O

33521

Ganesh Forge Tech, ( Formerly Known as M/s Hi-

Tech Forge),

No.C-259, 5th cross, I Stage, PIE, Banglaore-58

I StageI

Steel Forging 199.77 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1995BA

30.09.2022N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes

3482009-10 O

39954

Hi-Tech Forgings (Bangalore) Pvt Ltd,

No.V-1(A), 3rd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Steel & Copper Forging 361.9 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2003BA

30.09.2021N N N N N N N NA NA NA 1 N NA N Y N NA Yes

3492009-10 O

24388

Hind Forge Tech (Formerly Known as M/s.D F Forging),

No.B-353, I Stage, PIE, Banglaore-58 I StageI

Steel Forging activity24.01 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1998BA

30.09.2029N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

3502009-10 CL

-

Hindal Industrial Oil & Lubricants, IV Phase, PIA,

Bengaluru-560 058,

Iv Phase, PIA, Bengaluru-560 058, IV PhaseI

grease manufacturingC1 R-4

ng of lubricatingoils ,grease

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3512009-10 O

16277

I.E.E Engineering Enterprises Pvt Ltd,

No.B-94, 2nd cross. I Stage, PIE, Banglaore-58

I StageI

Al/Polypropylene electrical capacitor for AC motors

216 O-62Spray painting,paint baking, paint

Small Orange 1986BA

30.09.2027Y 30.06.2015 N N N N N NA NA NA 1.8 N NA N Y N NA Yes

3522009-10 CL

-Incap Paints,

, No.536, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

PaintC1 R-21

ng of paintsvarnishes, pigments

Small Red ClosedBA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3532009-10 O

77120

EYE-M-EYE MACHINES PVT LTD.,

No.170, 10th Main, III Phase, PIA, Bangalore-5600058,

III PhaseI

Tyre Retreading machinery 189 G-48

Tyres and tube retreading(without

Small Green 1/1/1996BA

31.12.2035N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes

3542009-10 CL

-Indian Metal Industries,

No.170, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Electroplating43 R-44

process involving

metal Small Red 1985

BA30.06.2014

N C1 N C1 N C1 N NA NA NA 0 N NA N N N NA NA

3552009-10 O

24116Indian Oxide

No.C-141, II Stage, PIE, Bengaluru-560 058

II StageI

Lead suboxide 16.35 R-7

Lead acid batterymanufacturing(excluding

Small Red 1998BA

30.06.2024N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

3562009-10 CL

-

Indian Silk Printing & Processing,

No.25-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Dyeing & Printing of silk fabric 67 R-40

Textile processinginvolving

Small Red 1982BA

30.06.2008Y 30.06.2013 C1 C1 C1 N C1 NA NA NA 0 N NA N N N NA NA

3572009-10 CL

-Indo Lubes & Solvents,

No.185, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Waste oil reprocessing C1 R-3

engaged inrecycling/rep

rocessing/Small Red Closed

BA30.06.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3582009-10 CL

-Indo Lubes & Solvents,

No.352, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Calcium Salt & grees58.28 R-4

Manufacturing of lubricatingoils ,grease

Small Red 2002BA

30.06.2017Y 30.06.2019 N N N N N NA NA NA NA N NA N N N NA Yes

3592009-10 O

86466Indo Metal Lubricants,

No.B-35/P, III Stage,PIE, Bengaluru-560 058

III StageI

Manufacture of lubricanting Compound & Lubricating Oils

84.87 O-75Synthetic resins Small Orange 1998

BA30.09.2029

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

3602009-10 O

81388Indrajit Industries,

No.42/43, III Phase, PIA, Bangalore-560058,

III PhaseI

Dyeing & Printing of silk fabric 127 G-109

Refilling, Repacking and blending of chemicals

Small Green 1973BA

31.12.2033N NA N N N N N NA NA NA 0.16 N NA N Y N NA Yes

3612009-10 CL

-Industrial Alloy Casting ,

No.33B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Casting C1 O-28

Non- ferrous metal

extraction Small Orange Closed

BA30.06.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3622009-10 CL

-Industrial Metalic Painting Co,

No.198, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Powder coating 12 R-44

Industry or process involving metal

Small Red 2004BA

30.06.2011N N N N N N N NA NA NA NA N NA N N N NA Yes

3632009-10 CL

-Intigrated Metal Coats,

No.464, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electroplating Electro less nickel platers 8.9 R-44

process involving

metal Small Red 2006

BA30.06.2005

N N N N N N N NA NA NA 0 N NA N N N NA NA

3642009-10 CL

-Jagan Mirror,

No.P-21, III Stage,PIE, Bengaluru-560 058

III StageI

Mirror processingC1 O-34

ceramics, earthen

potteries andSmall Orange Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- potteries and BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3652009-10 O

17223Jaymech Ultra Coaters,

No.B-232, 6th Cross, I Stage, PIE, Bangalore

I StageI

Powder coating with De-rusting degreasing, zinc phosphating

45.82 R-44Industry or process involvingmetal

Small Red 2002BA

30.06.2024Y 30.06.2010 N N N N N NA NA NA 0.4 0.11 NA N Y Y NA Yes

3662009-10 CL

-Jaylac Paints & Varnishes,

No.171, III Phase, PIA, Bengaluru-560 058,

III PhaseI

paint8 R-21

Manufacturing of paintsvarnishes, pigments

Small Red 2003BA

30.06.2008N N N N N N N NA NA NA 0 N NA N N N NA NA

3672009-10 CL

-JIT Lubricants,

No.486, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

oil blendingC1 R-3

engaged inrecycling/rep

rocessing/Small Red Closed

BA30.06.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3682009-10 CL

-K.K.Systems,

No.171, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3692009-10 CL K.S.N. Enterprises,

No.39, III Phase, PIA, Bangalroe-560058,

III PhaseI

Non ferrous casting22.34 O-66

Ferrous and Non- ferrous metalextraction

Small Orange 1992BA

30.06.2012N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes

3702009-10 O

23048

Asiaan Metals & Aluminium Casting Private limited

(formerly known as Asian Metals & Aluminium Casting (

No.26-B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Foundry696 O-66

Ferrous and Non- ferrous metalextraction

Medium Orange 2003BA

30.09.2030Y 30.09.2024 N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

3712009-10 CL

-Karnataka Chemical Indsutry,

No.A-3 & 4, II Stage, PIE, Bengaluru-560 058

II StageI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3722009-10 CL

-

Karnataka State Co-Op Marketing Federation,

No.39/A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Formulation of Pesticides & Insecticides.

58 R-37(technical)(excluding

formulation)Small Red 1984

BA30.06.2010

Y 30.06.2010 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

3732009-10 O

19705

Karnataka Insecticide & Fungascide,

No.27- B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Insecticides & Fungicides formulation

67.94 O-29Formulation of Pesticide,insecticide, & fungicide

Small Orange 1986BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 1 N ST & SP N N N NA Yes

3742009-10 CL

-

Karnataka Insecticides & Fungacides ,

No.A-149, I Stage, PIE, Banglaore-58 I StageI

Pesticide formulation C1 R-37

(technical)(excluding

formulation)Small Red Closed

WA30.06.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3752009-10 O

24163Karnataka Metal Products,

No.A-16, III Stage,PIE, Bengaluru-560 058

III StageI

Winding conductors (Paper covered/ cotton covered- Copper/ Aluminium

24.8 G-78Switches without

electroplatinSmall Green 1977

WA31.12.2023

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA

3762009-10 CL

-

Karnataka Chemicals Industries Ltd,

No.A-151, I Stage, PIE, Banglaore-58 I StageI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3772009-10 O

13834

Karnataka Thermal Engineering Co,

No.B-220, 5th Man, II Stage, PIE, Bengaluru-560 058

II StageI

Heat Treatment19.73 O-36

Heat treatment using oil fired furnace

Small Orange 1984BA

30.09.2028N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

3782009-10 CL

-Karnataka Welding Products,

No.485, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3792009-10 O

24136Kasturi Heat Carbo,

No.B-21, I Stage, PIE, Bangalore-560058

I StageI

Heat Treatment16.55 O-63

Engineering Industries with HeatTreatment,

Small Orange 1996BA

30.09.2029N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

3802009-10 CL

-Kaviraj Appliances Pvt Ltd,

No.234, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3812009-10 CL

-Kaviraj Housewares,

No.13/C, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3822009-10 O

14296Kaviraj Incorporation,

No.99, III Phase, PIA, Bangalore-560058

III PhaseI

Alluminium utensils & Non stick utensils with Coating

53 G-1Aluminium utensils from Al circles

Small Green 26-4-01BA

31.12.2034N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

3832009-10 CL

-

Kayanathu Surface Finishing Pvt Ltd,

No.470, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Elctroplating34.37 R-44

process involving

metal Small Red 1987

BA30.06.2002

CL CL C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

3842009-10 CL

-Keerthi Containers (P) Ltd,

IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3852009-10 CL

-Kyes Industries,

No.B-43, I Stage, PIE, Banglaore-58 I StageI

Heat Treatment8.27 O-63

Engineering Industries with HeatTreatment,

Small Orange 1974WA

30.09.2012C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

3862009-10 O

11471

Monarch Paints (Kincha Paints & Colour) Co,

No.422, 11th cross , IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Paint 36.5 O-54

Paint blending and mixing (Ball mill)

Small Orange 2005BA

30.09.2022N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

3872009-10 CL

-

Kodiyal Rubber Works Pvt Ltd,

No.245, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Silicon Rubber Compounds 13.8 G-41

goods industry (with gas

Small Green 18/7/02BA

31.12.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3882009-10 CL

-Kongavi Electronics Pvt Ltd,

No.B-172, Il Stage, PIE, Bengaluru-560 058

II StageI

Nickel and chrome plating onl 95.54 R-44

process involving

metal Small Red 1997

BA30.06.2006

Y 30.06.2010 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

389 No.Sb-105, I Stage, PIE, Banglaore- I Stage plastic injection Polythene 3892009-10 CL

-Kongavi Plastics,

No.Sb-105, I Stage, PIE, Banglaore-58

I StageI

plastic injection moulding and electro plating

65.34 G-32Polythene and plastic processedproducts

Small Green 1990BA

31.12.2000N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

3902009-10 CL

-Kripa Industries,

No.79/80, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3912009-10 CL

-Krishna Balarama Industries,

No.143(B), I Stage, PIE, Bengaluru-560 058,

I StageI

Electroplating Zinc Plating 22.14 R-44

process involving

metal Small Red 2000

BA30.06.2011

N N N N N N N NA NA NA 0 N NA N N N NA NA

3922009-10 CL

-Krishna Polymers,

No.C-22, II Stage, PIE, Bengaluru-560 058

II StageI

Synthetic resinC1 O-75 Synthetic

resinsSmall Orange Closed

BA30.06.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3932009-10 O

17784Lach Products,

, No.B-278, 7th Main, II Stage, PIE, Bangalore-560058

II StageI

Electroplating of Lead, Zinc & Nickel 8.27 R-44

Industry or process involvingmetal

Small Red 2000BA

30.06.2022Y 30.06.2013 N N N N N NA NA NA 0.18 0.075 NA N Y Y NA Yes

3942009-10 O

14179Sri Luxmi Electroplating,

No.79/80, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Electroplating34.53 R-44

Industry or process involvingmetal

Small Red 1993BA

30.06.2025N N N N N N N NA NA NA 0.1 0.2 NA N Y Y NA Yes

3952009-10 CL

23898Lakshmi Electroplaters,

No.455,IV Phase, PIA,Bengaluru-560 058,

IV PhaseI

Electro Plating20 R-44

process involving

metal Small Red 2001

BA30.06.2021

N N N N N N N NA NA NA 0.96 0.05 NA N Y Y NA Yes

3962009-10 CL

-Lakshmi Industries,

No.C-260, I Stage, PIE, Bengaluru-560 058,

I StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3972009-10 CL

-Lakshmi Metal Works,

No.B-294, II Stage, PIE, Bengaluru-560 058

II StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

3982009-10 CL

-Lakshmi Powder Coating,

No.B-160, I Stage, PIE, Banglaore-58 I StageI

Powder coating 21 R-44

Industry or process involving metal

Small Red 1993BA

30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA

3992009-10 O

24142

Vintech Surface coaters (Formerly Lalan Enterprises)

No.B-226, 5th Main, II Stage, PIE, Bangalore-560058

II StageI

Powder coating with pre-surface treatment activity

49.72 R-44Industry or process involvingmetal

Small Red 1984BA

30.06.2024N N N N N N N NA NA NA 0.72 0.2 NA N Y Y NA Yes

4002009-10 O

15278Leo Hard Chrome ,

No.B-73, I Stage, 2nd cross, PIE, Banglaore-58

I StageI

Machine of Hydraulics with Electroplating (Hardchrome)

22.62 R-44Industry or process involvingmetal

Small Red 2000BA

30.06.2024N N N N N N N NA NA NA 0.24 0.2 NA N Y Y NA Yes

4012009-10 O

11617Leo Engineering,

No.108, I Stage, PIE, Banglaore-58 I StageI

Electroplating (Hardchrome) 12.69 R-44

Industry or process involvingmetal

Small Red 1994BA

30.06.2023Y 12.06.2007 N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes

4022009-10 CL

-Leonid Chemicals Pvt Ltd, N

No.V-31, II Stage, PIE, Bengaluru-560 058,

II StageI

Pharma DistributorsC1 O-74

Pharmaceutical

formulationSmall Orange Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4032009-10 CL

-Maatha Industries,

No.490, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2000

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4042009-10 O

24167Mehar Metals India Pvt Ltd,

No.A-346, 9th Main, II Stage, PIE, Bengaluru-560 058

II StageI

wire drawing with pickling 81.34 R-44

Industry or process involvingmetal

Small Red 1985BA

30.06.2024N N N N N N N NA NA NA 0.4 0.1 NA N Y Y NA Yes

4052009-10 CL

-Mahat Power Systems (P) Ltd,

No.409, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4062009-10 CL

-Mahaveera Mineral ,

No.417, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2019

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4072009-10 CL

12171Makam Agrochem Pvt Ltd,

No.A-280, II Stage, PIE, Bengaluru-560 058

II StageI

Formulation of Pesticides & Insecticides.

94.51 R-37Pesticides (technical)(excluding formulation

Small Red 1978BA

30.06.2014Y 30.06.2019 N N N N N NA NA NA 0 N NA N N N NA Yes

4082009-10 CL

-Mani Industries,

No.235, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Casting Iron rough casting 22 R-53

(involvingprocessing from ore/

Small Red 1995BA

30.06.2011C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

4092009-10 CL

-Maruthi Industrial Enterprises,

No.198, III Phase, PIA, Bangalore-560058,

III PhaseI

Powder coating 32 R-44

Industry or process involvingmetal

Small Red 2002BA

30.06.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes

4102009-10 CL

-Mascot Agrochemicals Pvt Ltd,

III Phase, PIA, Bengaluru-560 058, III PhaseI

Pesticide & Insecticide formulation

C1 R-37Pesticides (technical)(excluding formulation

Small Red ClosedBA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4112009-10 CL

-Mascot Chemicals Works,

No.B-81, I Stage, PIE, Banglaore-58 I StageI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4122009-10 CL

-Myur Polymers,

No.333, IV Phase, PIA, Bengaluru-560 058 ,

IV PhaseI

Synthetic resin28 O-75 Synthetic

resinsSmall Orange 1998

BA30.09.2012

N N N N N N N NA NA NA 0 N NA N N N NA NA

4132009-10 CL

-Mayurka Instruments Pvt Ltd,

No.A-181, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4142009-10 CL

15257Mekala Metal Works,

No.B-152, II Stage, PIE, Bengaluru-560 058

II StageI

Lead smelting 155 R-7

Lead acid batterymanufacturing(excluding

Small Red 1993BA

30.06.2019Y 30.06.2020 N N N N Y NA NA NA 0.2 N NA N Y N NA Yes

4152009-10 O

21284Metal Coats,

No.B-180, II Stage, PIE, Bangalore -58

II StageI

Aluminium anodizing25.61 R-44

Industry or process involvingmetal

Small Red 1999BA

30.06.2024Y 30.06.2020 N N N N N NA NA NA 0.4 0.6 NA N Y Y NA Yes

4162009-10 CL

-Metal Nitrides,

No.M-14, I Stage, PIE, Banglaore-58 I StageI

Bright BarsC1 R-44

Industry or process involvingmetal

Small Red ClosedBA

30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4172009-10 O

24140Metal Process,

No.C-249, I Stage, PIE, Banglaore-58 I StageI

Heat Treatment11.64 O-36

Heat treatment using oil fired furnace

Small Orange 1992BA

30.09.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

4182009-10 CL

-Metco Metalizers Pvt Ltd,

Ltd, No.C-200, I Stage, PIE, Banglaore-58

I StageI

Sand BlastingC1 G-99

sand reclamation

unit/Small Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4192009-10 O

15157Metreat Chem Enterprises,

, No.C-76, III Stage,PIE, Bengaluru-560 058

III StageI

Electroplating Glod & Silver Plating 6.5 R-44

Industry or process involvingmetal

Small Red 1988BA

30.06.2023Y 30.06.2023 N N N N N NA NA NA 0.16 0.5 ETP N Y N NA Yes

4202009-10 CL

-Metro Batteries,

, No.172, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Lead Acid BatteriesC1 R-7

Lead acid batterymanufacturing(excluding

Small Red ClosedBA

30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4212009-10 CL

-Micast,

No.B-147, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2016

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4222009-10 O

11150Microtex Energy Pvt Ltd.,

No.42 & 43,2nd Main, II Phase, PIA, Bangalore-560058,

II PhaseI

Battery manufacture 4815 R-7

Lead acid batterymanufacturing(excluding

Large Red 2001BA

30.06.2021Y 30.06.2021 N N N N Y N NA NA 2.5 3 ST & SP ETP N N N NA Yes

4232009-10 O

16510Mineral Processing Ltd,

No.180, 11 Main, III Phase, PIA, Bangalore-560058,

III PhaseI

Mineral Grinding/ crushing 28.01 O-26

Dry coal processing, mineralprocessing,

Small Orange 1993BA

30.06.2018N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

4242009-10 O Modern Light Industries,

No.B-103, 2nd cross, I Stage, PIE, Banglaore-58

I StageI

Manufacture of Aluminium, Stainless Steel & Brass name plates

27.2 R-44Industry or process involvingmetal

Small Red 1980BA

30.06.2024N N N N N N N NA NA NA 0.36 0.16 NA N Y Y NA Yes

4252009-10 CL

24055Mohan Metal Crafts,

No.122, 7th Main, 2nd cross, III Phase, PIA, Bangalore-560058,

III PhaseI

Foundry75.27 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1987BA

30.06.2019N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

4262009-10 CL

-Mora Metal Industies,

Mora Metal Industies, No.SB-47, I Stage, PIE, Banglaore-58

I StageI

Heat TreatmentC1 O-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4272009-10 CL

-Multi Heat Treaters,

No.B-385, I Stage, PIE, Banglaore-58 I StageI

Heat TreatmentC1 O-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.06.2018C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4282009-10 O

13570Multimin Agro Chemicals,

No.443-A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Formulation of Pesticides & Insecticides.

17.57 O-29 Formulation of Pesticide,insecticide, & fungicide

Small Orange 2004BA

30.09.2023N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

4292009-10 O

34676Multiplex Agricare Pvt Ltd,

No.454, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Zinc Sulphate84 O-32

Zinc SmelterSmall Orange 1998

BA30.09.2021

Y 30.09.2021 N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

4302009-10 O

34133Multiplex Bio-Tech Pvt Ltd,

No.C-428, I Stage, PIE, Bengaluru-560 058,

I StageI

Sterilization of Carboys & Manufacturing of micronutrients

24.44 R-58Pharmaceutical (Bulk drug &Active

Small Red 2009BA

30.06.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

4312009-10 CL

-Mysore Alkaline Batteries,

No.A-12, II Stage, PIE, Bengaluru-560 058

II StageI

Battery manufacture C1 R-7

batterymanufacturing(excluding

Small Red ClosedBA

30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4322009-10 CL

-N.C.Bhandari Forging,

No.108-C, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4332009-10 CL

12428Navkar Metals,

No.B-32, III Stage, PIE, Bengaluru-560 058,

III StageI

Casting of Ferrous & non ferrous alloys 36.61 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2003BA

30.06.2018N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

4342009-10 CL

-New Long Wires,

No.305, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4352009-10 CL

-Nathanial Engineering Co,

No. III Stage,PIE, Bengaluru-560 058 III StageI

electroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4362009-10 CL

-Nordon Laboratories,

No.19-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

chemical laboratoryC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4372009-10 O Odochem Indsutries,

No.C-71, II Stage, PIE, Bangalore-560058

II StageI

Manufacture of Aldehyde 22.17 G-112

Fragrance, flavours essence etc.for food

Small Green 1991BA

30.12.2099N NA N N N N N NA NA NA 0.015 N NA N Y N NA Yes

438Om Shiva Shakthi Metal

No.B-196, II Stage, PIE, Bangalore- II Stage Lead in guards by Industries 4382009-10 CL

17082

Om Shiva Shakthi Metal Industries,

No.B-196, II Stage, PIE, Bangalore-560058,

II StageI

Lead in guards by recycling of lead acid batteries

99 R-32Industries engaged in recycling/

Small Red 2005BA

30.06.2017Y 30.06.2018 N N N N Y NA NA NA 0.4 N NA N Y N NA Yes

4392009-10 CL

-Om Steel Industries,

No.112, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4402009-10 CL

-Oorja Udyog,

No.B-32, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4412009-10 CL

-Oxide India,

No.C-31, II Stage, PIE, Bangalore -560058

II StageI

Lead suboxide 12.38 R-7

Lead acid batterymanufacturing(excluding

Small Red 1984BA

30.06.2018Y N N N N N Y NA NA 0.3 N NA N Y N NA Yes

4422009-10 CL

-P & S Chemicals,

No.B-223, I Stage, PIE, Banglaore-58 I StageI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4432009-10 O

14945P & S Galvasols,

No.490-1, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electroplating169 R-44

Industry or process involvingmetal

Small Red 1996BA

30.06.2022N NA N N N N N NA NA NA 0.4 0.5 ST & SP N N Y NA Yes

4442009-10 CL

23857P & S Precitech,

No.A-174, 4th cross, I Stage, PIE, Banglaore-58

I StageI

Plating Chemicals103.4 R-25

Basic chemicals and electrochemicals

Small Red 1996BA

30.06.2017N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

4452009-10 O

33732P.C.Process Pvt Ltd,

No.V-3(C), 14th cross, II Stage, PIE, Bangalore-560058

II StageI

Printed Circuit Board manufacture 260 R-74

Printed circuit boardmanufacturing units

Small Red 1999BA

30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.08 0.23 NA N Y Y NA Yes

4462009-10 O

24056Panch Dhatu,

No.B-47, III Stage,PIE, Bengaluru-560 058

III StageI

Aluminium alloy casting & copper alloy casting

56.69 O-28Ferrous and Non- ferrous metalextraction

Small Orange 1991BA

30.09.2029N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

4472009-10 CL

-Parachem Agrochem Ltd,

No.B-196, II Stage, PIE, Bengaluru-560 058

II StageI

Bio Fertlizer C1 O-29

(granulation /

formulation / Small Orange Closed

WA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4482009-10 CL

23030Pearl Coatings & Chemicals,

No.B-248, 6th Main, II Stage, PIA, Bangalore-560058

II StageI

Distemper, Primers, Putty & Emulsion 21.58 R-21

Manufacturing of paintsvarnishes, pigments

Small Red 2002BA

30.06.2019N NA N N N N N NA NA NA 0.5 0.05 NA N Y Y NA Yes

4492009-10 CL

-Peenya Heat Treatment Co,

No.424,11th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Heat Treatment21 O-63

Engineering Industries with HeatTreatment,

Small Orange 2003BA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4502009-10 CL

16595Perfect Profiles,

No.B-233, 6th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Carryingout drawing and polishing of Iron and steel bass & coils

222.6 R-44Industry or process involvingmetal

Small Red 1997BA

30.06.2018N N N N N N N NA NA NA 0.3 0.1 ST & SP N N Y NA Yes

4512009-10 CL

24138Pest Control (India) Pvt Ltd,

No.B-384, I Stage, PIE, Bengaluru-560 058

I StageI

Sterilization of Surgical Gloves, Medical Disposables, Spices, Raw Herbs,

32.33 O-65Surgical and medical productsincluding

Small Orange 2000BA

30.06.2018N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

4522009-10 CL

-Phosphate Plasticizers (P) Ltd,

II Phase, PIA, Bengaluru-560 058 II PhaseI

Bio Fertlizer O-29

(granulation /

formulation / Small Orange Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4532009-10 CL

-Pioneer Petro Chemicals,

No.B-212, II Stage, PIE, Bengaluru-560 058

II StageI

grease manufacturingC1 R-4

ng of lubricatingoils ,grease

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4542009-10 CL

-Pollite Batteries,

No.B-226, I Stage, PIE, Banglaore-58 I StageI

Lead Acid BatteriesC1 R-7

Lead acid batterymanufacturing(excluding

Small Red ClosedBA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4552009-10 O

11614

Toyo Paints Pvt Ltd (Formerly Polo Paints Pvt Ltd),

No.B-225, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacturing of paints by blending & mixing

29.57 O-55Paints and varnishes (mixing andblending)

Small Orange 1996BA

30.09.2028N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

4562009-10 CL

-Polymer & Allied Products,

No.C-77, III Stage,PIE, Bengaluru-560 058

III StageI

Synthetic resinC1 O-75 Synthetic

resinsSmall Orange Closed

BA30.09.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4572009-10 CL

-Pooja Chemicals,

No.Sb-46, I Stage, PIE, Bengaluru-560 058

I StageI

ChemicalC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4582009-10 CL

-Power Build Batteries Pvt Ltd,

No.B-52, III Stage,PIE, Bengaluru-560 058

III StageI

Battery manufacture C1 R-7

batterymanufacturing(excluding

Small Red ClosedBA

30.06.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4592009-10 CL

-Power Build Batteries Unit - II,

No.B-54, III Stage,PIE, Bengaluru-560 058

III StageI

Lead Acid BatteriesC1 R-7

Lead acid batterymanufacturing(excluding

Small Red ClosedBA

30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4602009-10 CL

-Pradeepthi Power Products,

No.251, III Phase, PIA, Bengaluru-560 058

III PhaseI

Lead Acid BatteriesC1 R-7

Lead acid batterymanufacturing(excluding

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4612009-10 CL

-Praveen Electroplaters,

No.C-288, I Stage, PIE, Banglaore-58 I StageI

ElctroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4622009-10 CL

-Precission Pattern Pvt Ltd,

No.C-248, I Stage, PIE, Banglaore-58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4632009-10 CL

-Premadasa Process,

No.A-266, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4642009-10 CL

-

Premier Alloy Foundry, No.172, III Phase, PIA,

Bengaluru-560 058,

No.172, III Phase, PIA, Bengaluru-560 058,

III PhaseI

ferrous castingC1 O-28

Non- ferrous metal

extraction Small Orange Closed

BA30.09.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4652009-10 CL

-

Premier Metal Finishers, No.C-260, I Stage, PIE, Banglaore-58

No.C-260, I Stage, PIE, Banglaore-58 I StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4662009-10 CL

-

Prince Auto Batteries, No.C-92, II Stage, PIE, Bengaluru-

560 058

No.C-92, II Stage, PIE,Bengaluru-560 058

II StageI

Battery manufacture C1 R-7

batterymanufacturing(excluding

Small Red ClosedBA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4672009-10 CL

11708Prithvi Fabrications Pvt Ltd,

No.189, 11th Main,2nd Cross, III Phase, PIA, Bangalore-560058

III PhaseI

Alluminum cans with degrasing 48.44 R-44

Industry or process involvingmetal

Small Red 1979BA

30.06.2019Y 30.06.2019 N N N N N NA NA NA 0.3 1 ST & SP ETP Y N N NA Yes

4682009-10 CL

12041

Priyadarshini Textile Process House, (Unit of Karnatka

handloom development corp ltd)

No.A-9 & 10, II Stage, PIE, Bangalore -560058

II StageI

Bleeching, dyeing and printing fabric and silk yarn dyeing

305 R-40Yarn / Textile processinginvolving

Small Red 1980BA

30.06.2017Y 30.06.2017 N N N N N NA NA NA 4.8 72 ETP Y Y N NA Yes

4692009-10 CL

-Process Pumps (I) Pvt Ltd,

No.B-32, I Stage, PIE, Bengaluru-560 058

I StageI

Pumps manufacturingC1 G-77

of Motor & Pumpswithout

Small Green ClosedBA

30.06.2017C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4702009-10 CL

34603

Anode tech (Formerly Profal Coters),

No.342, 9th cross, IV Phase, PIA, Bangalore-560058

IV PhaseI

Aluminium anodizing66 R-44

Industry or process involving metal

Small Red 2001BA

30.06.2017N N N N N N N NA NA NA 0.4 0.5 ST & SP N N Y NA Yes

4712009-10 CL

-Project Consultant,

No.160, III Phase, PIA, Bengaluru-560 058

III PhaseI

Enginerring with electroplating 47.43 R-44

Industry or process involving metal

Small Red 1997BA

30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4722009-10 CL

-Prominent Power Systems,

No.C-98, III Stage,PIE, Bengaluru-560 058

III StageI

UPS System78 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2005BA

30.06.2002N N N N N N Y NA NA NA 0 N NA N N N NA Yes

4732009-10 CL

-Protech Systems,

No.427, 12th cross, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Hot Dip Galvanizing17.93 O-41

Hot dip GalvanizersSLAB,, Zinc

Small Orange 1990BA

30.06.2008Y N N N N N NA NA NA 0 N NA N N N NA NA

4742009-10 O

14976Protective Coatings Pvt Ltd,

No.B-264, II Stage, PIE, Bengaluru-560 058

II StageI

Protective Coating17.41 R-44

Industry or process involvingmetal

Small Red 1997BA

30.06.2023Y 30.06.2017 N N N N N NA NA NA 1.04 1 NA N Y Y NA Yes

4752009-10 CL

14960Pushpagiri Forgings Pvt Ltd,

No.516, 10th Main IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Forging with heat treatment 176 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1989BA

30.06.2017N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

4762009-10 O Qualidels,

No.C-88, 3rd cross, III Stage, PIE, Bengaluru-560 058,

III StageI

General Engineering39.34 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2021

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA

4772009-10 CL

-Quality Casting,

No.B-77, I Stage, PIE, Bengaluru-560 058

I StageI

ferrous castingO-28

Non- ferrous metal

extraction Small Orange Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4782009-10 CL

-

Super Bond Industries ( R.D Industries),

No.B-297, II Stage, PIE, Bengaluru-560 058

II StageI

Adhesives 27.68 O-51

synthetic adhesive resin, wooden box

Small Orange 1993BA

30.09.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes

4792009-10 CL

-R.J.Hitech Pvt Ltd,

No.477-C, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitG-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4802009-10 CL

-Raga Industries,

No.A-359, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitG-78

Switches without

electroplatinSmall Green Closed

BA30.06.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4812009-10 CL

15192Rainbow Powder Coaters,

No.425, 11 th Cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Powder coating with pre-surface treatment activity

45.84 R-44Industry or process involvingmetal

Small Red 1/3/1994BA

30.06.2013N N N N N N N NA NA NA 0.14 0.1 ST & SP N N Y NA Yes

4822009-10 CL

-Raj Interior Designers ,

No.142, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Alluminum Fabrication with anodising

R-44process

involvingmetal

Small Red ClosedBA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4832009-10 CL

-Raja Rajeshwari Metals,

No.C-307, I Stage, PIE, Bengaluru-560 058

I StageI

Non ferrous castingO-32

Forging of ferrous and non- ferrousmetals (

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4842009-10 CL

-Rakhi Heat Treaters,

No.B-385, I Stage, PIE, Bengaluru-560 058

I StageI

Heat TreatmentO-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4852009-10 CL

-Rapalano Enterprises,

No.D-432, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitG-78

Switches without

electroplatinSmall Green Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4862009-10 CL

-Rare Alloys And Castings,

No.B-34, III Phase,PIE, Bengaluru-560 058

III PhaseI

Non ferrous castingO-32

Forging of ferrous and non- ferrousmetals (

Small Orange ClosedBA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

487 No.C-147, II Stage, PIE, Bengaluru- II Stage Ammonia & Industries 4872009-10 O

17642Rare Metal Manufacturers,

No.C-147, II Stage, PIE, Bengaluru-560 058

II StageI

Ammonia & paratungstate, Cobalt Oxide

30.16 R-10Industries engaged in recycling/

Small Red 1983BA

30.06.2024N N N N N N N NA NA NA 0.12 0.24 NA N Y Y NA Yes

4882009-10 CL

-Rasayana,

No.A-353, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering UnitG-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4892009-10 CL

-Rathod Rubber Products,

No.B-231, I Stage, PIE, Bengaluru-560 058

I StageI

Rubber componenentG-41

Rubber goods industry (with gas

Small Green ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4902009-10 CL

-Reinforced Plastics,

No.B-167, II Stage, PIE, Bengaluru-560 058,

II StageI

Helmet9.6 O-92

Helmet Manufacturi

ngSmall Orange 2002

BA30.06.2007

N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

4912009-10 CL

15664Rhodium Ferro Alloys ,

No.73, III Phase, PIA, Bangalore-560058,

III PhaseI

Mineral crushing116 O-26

Dry coal processing, mineralprocessing,

Small Orange 24.10.2001BA

30.06.2017N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

4922009-10 CL

-Roxy Metal Finishers,

No.A-158, I Stage, PIE, Bengaluru-560 058

I StageI

Electro plating chemicals by formulation

8.47 R-44Industry or process involvingmetal

Small Red 1976BA

30.06.2007N N N N N N N NA NA NA 0 0 NA N N N NA Yes

4932009-10 CL

-

Rubber Extrusions & Moulding Co,

No.C-336, II Stage, PIE, Banglaore-58,

II StageI

Rubber componenent20 G-41

Rubber goods industry (with gas

Small Green 1984BA

31.12.2004N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

4942009-10 CL

-S.L.Industries,

No.251, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Assembling and wiring of electrical control panel

19.8 W-14Engineering and fabricationunits (dry

Small White ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4952009-10 CL

-S.M.Powder Coaters,

No.B-215, II Stage, PIE, Bengaluru-560 058

II StageI

Powder coating C1 R-44

Industry or process involving metal

Small Red ClosedBA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

4962009-10 O

14723S.P.Engineering Enterprises,

No.50, III Phase, PIA, Bangalore-560058,

III PhaseI

M.S.General structural fabrication & Stress reliving m/c

44.65 O-63Engineering Industries with HeatTreatment,

Small Orange 1990BA

30.09.2028N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

4972009-10 CL

-S.R.Industries,

No.C-140, II Stage, PIE, Bangalore -560058

II StageI

Lead suboxide 12.65 R-7

Lead acid batterymanufacturing(excluding

Small Red 1992BA

30.06.2017Y N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

4982009-10 O

14951S.S.Industries,

No.57-C, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Battery manufacture 33.32 R-7

Lead acid batterymanufacturing(excluding

Small Red 2001BA

30.06.2017Y 30.06.2014 N N N N Y NA NA NA 0.25 0.2 ST & SP N N Y NA Yes

4992009-10 CL

-S.S.Engineering,

No.B-186, II Stage, PIE, Bangalore-560058

II StageI

ferrous & non ferrous casting 28 O-28

Non- ferrous metal

extraction Small Orange 1993

BA30.06.2011

N N N N N N N NA NA NA 0 N ST & SP N N N NA Yes

5002009-10 CL

15474Sabari forgings,

No.1-A, III Phase, PIA, Bangalore-560058,

III PhaseI

Forging42.1 O-32

ferrous and non- ferrous

metals ( Small Orange 1989

BA30.06.2017

N N N N N N NA NA NA 0 N NA N N N NA NA

5012009-10 O

33725Sagar Art Glasses,

No.A-10, III Stage,PIE, Bengaluru-560 058

III StageI

Glass painting11.23 O-34

Glass ceramics, earthen potteries and

Small Orange 2000BA

30.09.2022N N N N N N N NA NA NA 0.2 0.05 NA N Y Y NA Yes

5022009-10 O

14711

Sahayadri Starch & Chemicals Pvt Ltd,

No. 60-61. 4th Main, III Phase, PIA, Bangalore-560058,

III PhaseI

(Starch)Dextrine & Liquid Adhesives through Blending activity of capacity

53.64 O-72Synthetic resins Small Orange 1976

BA30.09.2022

N NA N N N N N NA NA NA 0.5 0.15 ST & SP N N Y NA Yes

5032009-10 CL

-Sai Quality Casting,

No.C-470, I Stage, PIE, Bengaluru-560 058

I StageI

ferrous castingC1 O-28

Non- ferrous metal

extraction Small Orange Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5042009-10 CL

-Sandilya Tubes,

No.B-180, II Stage, PIE, Bengaluru-560 058

II StageI

PVC PipesC1 G-79

covered underPlastic

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5052009-10 CL

-Sangeeta Dyes & Chemicals,

No.439, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Chemical tradingC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

YTCC1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5062009-10 CL

-Sanjaya Minerals (P) Ltd,

No.30-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garment Washing900 O-50

Mechanized laundry using oil fired

Medium Orange ClosedBA

30.06.2013N N N N N N N NA NA NA 0 N NA N N N NA NA

5072009-10 CL

-Sarvana Electroplaters,

No.199, 12th Main, III Phase, PIA, Bangalore-560058,

III PhaseI

Electroplating2.53 R-44

process involving

metal Small Red 1993

BA30.06.2013

Y 30.06.2010 N N N N N NA NA NA 0.25 0.2 ST & SP N N Y NA NA

5082009-10 CL

-Servo Batteries Pvt Ltd,

No.502-1, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Lead Acid Batteries26 R-7

Lead acid batterymanufacturing(excluding

Small Red 1999BA

30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5092009-10 CL

-

Shakthi Prakash Metal Finishers ,

No.C-341, II Stage, PIE, Bengaluru-560 058

II StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5102009-10 O

13813Shakti Treads,

No.B-292(a), 7th Main, II Stage, PIE, Bangalore-560058

II StageI

Tread rubber 76.85 O-70

Automobile Tyre & tube / RubberTubes

Small Orange 1990BA

30.09.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

5112009-10 O

12425Shalini Enterprises,

No.A-6, III Stage, PIE, Bengaluru-560 058

III StageI

Solvent reprocessor and used barrels washing

155 R-72Solvent RecyclingAcid

Small Red 1995BA

30.06.2023Y 30.06.2023 N N N N N NA NA NA 0.8 8.9 NA N Y Y NA Yes12425 washing Acid

recovery BA Y 30.06.2023 N N N N N NA NA NA 0.8 8.9 NA N Y Y NA Yes

5122009-10 CL

12422Shet Electricals Pvt Ltd,

No.49-B, III Phase, PIA, Bangalore-560058

III PhaseI

Engineering with pickling 658 R-44

Industry or process involving metal

Medium Red 2004WA

30.06.2006Y 30.06.2018 N N N N N NA NA NA 0 N NA N N N NA NA

5132009-10 CL

-Dr. Shet Magnetics (P) Ltd,

No.SB-48, I Stage, PIE, Bengaluru-560 058

I StageI

Megnatic Products29 R-3

Industries engaged inrecycling/reprocessing/

Small Red 1980BA

30.06.2012N N N N N N N NA NA NA 1 N NA N Y N NA Yes

5142009-10 CL

-Shobha Enterprises,

No.C-178, II Stage, PIE, Bengaluru-560 058

II StageI

Heat TreatmentC1 O-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5152009-10 CL

-Sri Siddeshwara Coaters,

No.A-275, II Stage, PIE, Bengaluru-560 058

II StageI

Powder coating 19 R-44

Industry or process involving metal

Small Red 2002BA

30.06.2014N N N N N N N NA NA NA 0 N NA N N N NA NA

5162009-10 O

17992Solux Smelting Pvt Ltd,

No.B-247, II Stage, PIE, Bangalore -560058

II StageI

Solder Wires & Solder Stics 9 O-72

Wire drawing and wire netting

Small Orange 1982BA

30.09.2021N NA N N N N N NA NA NA 0.16 N NA N Y N NA Yes

5172009-10 CL

-Sonit Aromatic Chemicals Ltd,

No.257, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Aromatic compoundC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5182009-10 O

26926South India Wire Products,

No.435, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Bright steel Bars (General Engg) 85 G-40

Rolling mill ( gas fired) and coldrolling mill

Small Green 1988BA

31.12.2034Y 31.12.2024 N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

5192009-10 O

11731

Laboratory for Electro Optics System

No.A1 to A6, I cross, I Stage, PIE, Bengaluru-560 058

I StageI

optic lenses106 G-53

Manufacturing of optical lenses(using

Small Green 2016BA

31.12.2026N N N N N N N NA NA NA 2.4 NA NA N Y N NA Yes

5202009-10 CL

-Southern Enterprises,

No.A-18, I Stage, PIE, Bangalore -58 I StageI

Heat TreatmentC1 O-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5212009-10 CL

-Southern Enterprises,

No.D-422, II Stage, PIE, Bengaluru-560 058

II StageI

Heat TreatmentC1 O-63

Engineering Industries with HeatTreatment,

Small Orange ClosedBA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5222009-10 CL Southern Founders,

No.308, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Foundry22 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1999BA

30.06.2012N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

5232009-10 CL

-Southern Mineral Agencies,

No.150, III Phase, PIA, Bengaluru-560 058

III PhaseI

Mineral crushingC1 O-26

processing, mineral

processing, Small Orange Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5242009-10 CL

Space Age Electro Technology India Pvt Ltd,

No.36-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Solar thermal obserbar by using ultra sonic and laser beam welding

97.9 G-114generation

throughsolar

Small Green 1993WA

31.12.2015N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

5252009-10 CL

-Spectrum Powder Coaters,

No.B-121, I Stage, PIE, Bengaluru-560 058

I StageI

Powder coating C1 R-44

Industry or process involving metal

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5262009-10 CL

-

Sphoorthi Machine Tools Pvt Ltd,

No.B-55, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5272009-10 CL

-Sree Associates,

No.B-187, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5282016-17 O

28672Synpack slide N zip Pvt Ltd

No.118/1, 3rd cross, 1st stage, Peenya industrial eestate, bengaluru-560058

I StageI

Polythene & polyprpolyne products

60 G-32Polythene & polyprpolyne products

Small Green 2016WA

-N N N N Y N N NA NA NA NA N ST & SP N N N NA NA

5292009-10 CL

-

Sri Mangalam Chrome Platers Pvt Ltd,

No.412, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5302009-10 CL

-Sri Ram Hot Dip Galvanizers,

No.537A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Zinc galvanizing43.3 R-44

Industry or process involvingmetal

Small Red 1/7/2004BA

30.06.2007C1 30.06.2008 N N N N N NA NA NA 0 N NA N N N NA NA

5312009-10 CL

-Sri Rathna Industries,

No.A-320, II Stage, PIE, Bengaluru-560 058

II StageI

Zinc Sulphate45 R-44

Industry or process involvingmetal

Small Red 1990BA

30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5322009-10 CL

-Sri Sai Krishna Industries,

No.332, Iv Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2002

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5332009-10 CL

-Sri Saibaba Industries,

No.332, Iv Phase, PIA, Bengaluru-560 058

IV PhaseI

pickling10 R-44

Industry or process involvingmetal

Small Red 1998BA

30.06.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5342009-10 O

23860Sri Shankar Enterprises,

No M-2/1, 5th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Grit blasting15.48 G -92

Shot blasting operation Small Green 2003

BA30.06.2019

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

5352009-10 CL

-

Sri Srikanteshwara Eneterprises,

No.M-2, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

536 No.B-95, I Stage, PIE, Bangalore -58 I Stage Engineering Unit Switches 5362009-10 CL

-Sri Varadaraju Industries,

No.B-95, I Stage, PIE, Bangalore -58 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2019

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5372009-10 CL

14912Sri Varu Acid & Chemicals,

No. 134, III Phase, PIA, Bengaluru-560 058

III PhaseI

Copper Oxide from reprocessing of PCB etchant and copper scapt

37.41 R-3Industries engaged in Small Red 2002

BA30.06.2019

Y 30.06.2020 N N N N N NA NA NA 0.5 0.3 ST & SP N N Y NA Yes

5382009-10 CL

-Sri Venkateshwara Industries,

No.283, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5392009-10 O

15222Srinivasa Industrial Chemicals,

No.C-333, 3rd Main road, I Stage, PIE, Bangalore-560058

I StageI

Phospating Chemicals & Chromating Chemicals by formulation process

7.56 R-25recovery/reuse of Hazardous

Small Red 1980BA

30.06.2024Y 30.06.2024 N N N N N NA NA NA 0.2 0.1 NA N Y Y NA Yes

5402009-10 CL

-Standard Engineers,

No.284, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5412009-10 O

11508Standard Screws Industries,

No.471-C, 13th Cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Bright steel bars & Pickling 60.31 R-44

Industry or process involvingmetal

Small Red 1994BA

14.10.2024Y 30.06.2013 N N N N N NA NA NA 1.2 1 NA N Y Y NA Yes

5422009-10 CL

-

Steel Storage & Retrivales Systems Pvt Ltd,

No.A-23 & 24, III, Stage,PIE, Bengaluru-560 058,

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5432009-10 CL

-Strayfield Heating Pvt Ltd,

No.B-17, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Assembly of heating equipments 45.05 W-13

Electrical and electronic item

Small White 1992BA

31.12.2016N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes

5442009-10 CL

-Sudarshan Tubes,

No.490-E, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

PVC PipesC1 G-79

covered underPlastic

Small Green ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5452009-10 O

15504Sudha Minechem Industry,

No.201, 12th Main, IIIPhase, PIA, Bangalore-560058,

III PhaseI

pulverizing of Soap stone, Lime stone, Feldspar, Dolomite

20.93 R- Small Red 1977BA

30.06.2020N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

5462009-10 O

15275Sumuka Electroplaters,

No.B-70, 3rd Stage, PIE, Bengaluru-560 058

III StageI

Electroplating47.45 R-44

Industry or process involvingmetal

Small Red 2001BA

30.06.2025N N N N N N N NA NA NA 1.2 0.25 NA N Y Y NA Yes

5472009-10 CL

-Sunchrome Industries,

No.466, IV Phase, PIA, Bangalore, IV PhaseI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2003

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5482009-10 CL

23553

Suntrac Energy Systems Pvt Ltd,

No.C-214, I Stage, PIA, Bengaluru-560 058,

I StageI

Assembly of batteries20.06 O-73

Dry cell battery ( excludingmanufacturi

Small Orange 2004WA

31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA NA

5492009-10 CL

-Super Bond Adhesives,

No.C-272, I Stage, PIE, Bengaluru-560 058

I StageI

Adhesives C1 O-51

adhesive resin,

wooden boxSmall Orange Closed

WA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5502009-10 O

15053Super Bright Steels Pvt Ltd,

No.A-172, 4th Cross, I Stage, PIE, Banglaore-58,

I StageI

Bright Bars120.65 R-44

Industry or process involvingmetal

Small Red 2002BA

30.06.2022N N N N N N N NA NA NA 0.8 0.12 NA N Y Y NA Yes

5512009-10 O

39352Superceram,

No.C-258, I Stage, PIE, Bengaluru-560 058,

I StageI

Ceramic products25.63 O-22

Ceramics and Refractories

Small Orange 1978BA

30.09.2029N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

5522009-10 CL

-Super Power System,

No.B-136, II Stage, PIE, Bangalore -58 II StageI

Battery asemblyC1 R-7

batterymanufacturing(excluding

Small Red 2001BA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5532009-10 CL

-Super Power Systems,

No.C-90, III Stage,PIE, Bengaluru-560 058

III StageI

Battery manufacture 23 R-7

batterymanufacturing(excluding

Small Red 1990BA

30.06.2009C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

5542009-10 CL

-Supraja Sriram & Co Pvt Ltd,

No.B-70, III Stage,PIE, Bengaluru-560 058

III StageI

Chemical tradingC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5552009-10 CL

-Supreme Industries,

No.446, IV Phase, PIA, Bengaluru-560 058.,

IV PhaseI

electroplating11 R-44

process involving

metal Small Red 2010

BA30.06.2011

Y 30.06.2014 N N N N N NA NA NA 0 N NA N N N NA NA

5562009-10 CL

-Suraj Enterprises,

No.557, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5572009-10 CL

-Surchem Finishers,

No.B-41, III Stage,PIE, Bengaluru-560 058

III StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5582009-10 O

17650Surfa Coats (India) Pvt Ltd,

487/B-2, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Maufacutre of Paints: Water based paints & oil based paints

499.59 O-55Paints and varnishes (mixing and blending

Small Orange 1/11/2000BA

30.09.2022N N N N N N N NA NA NA 1.28 0.7 ST & SP N N Y NA Yes

5592009-10 O

33199Surfa Coats (Bangalore ) Ltd,

No.A-107, II Stage, PIE, Bangalore-560058

II StageI

Manufacture of Paint102 W-14

GowdownSmall White 1994

BA30.09.2022

N N N N N N N NA NA NA 2 N NA N Y N NA Yes

5602009-10 O

17650

Surfa Coats (Bangalore) Ltd - II,

No.A-55, II Stage, PIE, Bangalore-560058

II StageI

paint87.14 O-54

Paint blending and mixing (Ball

Small Orange 1994BA

30.09.2021N NA N N N N N NA NA NA 1.76 N NA N Y N NA Yes17650 mixing (Ball

mill)BA N NA N N N N N NA NA NA 1.76 N NA N Y N NA Yes

5612009-10 CL

15057Surya Hard Chrome Industries,

No.S-10, I Stage, PIE, Bengaluru-560 058

I StageI

Electroplating (Hardchrome) 59.85 R-44

Industry or process involvingmetal

Small Red 2000BA

30.06.2015Y 30.06.2018 N N N N N NA NA NA 0.5 0.25 NA N Y Y NA Yes

5622009-10 CL

-Synthetic Resin Products,

No.A-364, I Stage, PIE, Bengaluru-560 058

I StageI

Synthetic resinC1 O-75 Synthetic

resinsSmall Orange Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5632009-10 CL

-Systems & Services,

No.C-304, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5642009-10 CL

-Technical Think Tank,

No.L17/18, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5652009-10 O Technomet Indsutries,

No.V-28, II Stage, PIE, Bangalore -58 II StageI

Sand Blasting10.25 G-99

Foundry sand reclamation unit/

Small Green 2001BA

31.12.2021N N N N N N N NA NA NA 0.23 N NA N Y N NA Yes

5662009-10 O

12527Technomet Services,

No.B-58, III Stage,PIE, Bengaluru-560 058

III StageI

Heat Treatment39.73 O-63

Engineering Industries with HeatTreatment,

Small Orange 1992BA

30.09.2023N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

5672009-10 CL

-Tejus Engineering ,

No.B-38, III Stage,PIE, Bengaluru-560 058

III StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

WA30.06.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5682009-10 CL Texell Engineers,

No.C-91, III Stage, PIE, Bengaluru-560 058 ,

III StageI

Engineering Unit20.41 W-14

Engineering and fabricationunits (dry

Small White 2003BA

31.12.2012N N N N N N N NA NA NA NA N NA N N N NA Yes

5692009-10 CL

-

Thermal Transfer Products Pvt Ltd,

No.487-C, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

N N N N N N N NA NA NA 0 N NA N N N NA NA

5702009-10 CL

-Thiwari Alloys Pvt Ltd,

No.B-64, III Stage,PIE, Bengaluru-560 058

III StageI

Non Ferrous castingC1 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange ClosedBA

30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5712009-10 CL

-Torkari,

No.B-183, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5722009-10 O

40669Tube Style Interiors Pvt Ltd,

Ltd, No.244, 11th Main, III Phase, PIA, Bangalore-560058,

III PhaseI

Wood/MDS/MS house hold furniture 405.24 O-51

Modular wooden furniture from particle

Small Orange 1987BA

30.09.2027N N N N N N N NA NA NA 1 N NA N Y N NA Yes

5732009-10 CL

39548Tulip Engineers Bangalore,

No.143, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Electroplating (HardChrome) 34 R-44

Industry or process involvingmetal

Small Red ClosedBA

30.06.2011N N N N N N N NA NA NA 0 N NA N N N NA NA

5742009-10 CL

-Tulsi Paints & Allied Products,

, No.283, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

PaintC1 R-21

Manufacturing of paintsvarnishes, pigments

Small Red ClosedBA

30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5752009-10 O

29888Newcast Die casting,

No.120, III Phase, PIA, Bangalore-560058,

III PhaseI

Aluminium Die Casting 168.08 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2002BA

30.09.2022N N N N N N N NA NA NA 2.8 N NA N Y N NA Yes

5762009-10 CL United Forgings,

No.465, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Bolts,Wires and birght bars with pickling 18 R-44

Industry or process involvingmetal

Small Red 1992BA

30.06.2012N N N N N N N NA NA NA 0.72 0.05 ST & SP N N Y NA Yes

5772009-10 CL

R.N. Industries (Bansal Oxides),

No.C-138, II Stage, PIE, Bengaluru-560 058

II StageI

Lead suboxide 24 R-7

Lead acid batterymanufacturing(excluding

Small Red 2001BA

30.06.2015N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

5782009-10 O

15464Vaishnavi Industries,

No.133, III Phase, PIA, Bangalore-560058,

III PhaseI

Repacking and trading of poly Al Chloride & Sodium Hyphochloride

20 O-41 Storage Terminals-Storage and handling of

Small Orange 1/4/1999BA

30.9.2029N NA N N N N N NA NA NA 0.16 N NA N Y N NA Yes

5792009-10 CL

-Valley Paints Pvt Ltd,

No.536 & 537, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Paint74.98 R-21

Manufacturing of paintsvarnishes, pigments

Small Red 1/4/2002BA

30.06.2010N N N N N N N NA NA NA 0 N NA N N N NA Yes

5802009-10 CL

-Varalakshmi Enterprises,

No.A-370, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5812009-10 CL

-Vashishta Engineering,

No.B-231, I Stage, PIE, Bengaluru-560 058,

I StageI

Bright bars54 R-44

process involving

metal Small Red 2001

BA30.06.2008

N N N N N N N NA NA NA 0 N NA N N N NA NA

5822009-10 CL

11488Newcast Die casting,

No.C-27, II Stage, PIE, Bengaluru-560 058,

II StageI

Aromatic chemicals21.17 R-22

Organic Chemicalsmanufacturing

Small Red 2006BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

5832009-10 CL

-Veeyer Formulators,

No.C-87, II Stage, PIE, Bengaluru-560 058

II StageI

Pharmacuitical formulation C1 O-74

Pharmaceutical

formulationSmall Orange Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5842009-10 CL

-Venkateshwara Industries,

No.283, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

585 No.B-107, III Stage,PIE, Bengaluru- III Stage Wire drawing Wire 5852009-10 CL

-Vensions Wires,

No.B-107, III Stage,PIE, Bengaluru-560 058

III StageI

Wire drawing 17.54 O-72

Wire drawing and wire netting

Small Orange 2.5.1993BA

30.06.2008N N N N N N N NA NA NA 0 N NA N N N NA NA

5862009-10 CL

14971Ventech Foundries,

No.SB-42, 1st cross, I Stage, PIE, Bengaluru-560 058

I StageI

Non ferrous casting4.2 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 1973BA

30.06.2018N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

5872009-10 O

Vibromech Engineers & Services Ltd,

No.A-321, II Stage, PIE, Bengaluru-560 058,

II StageI

Vibromation dumpers & Automobile Engine components only without spray

82.9 G-78Switches without

electroplatinSmall Green 1995

BA31.12.2015

N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

5882009-10 CL

-Vijaya Chemical Industries,

No.A-272, II Stage, PIE, Bengaluru-560 058

II StageI

Chemical refiling and trading C1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5892009-10 O

14214Vijaya Metal Finishers,

No.365, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electroplating149.3 R-44

Industry or process involvingmetal

Medium Red 1985BA

30.06.2023Y 30.09.2023 N N N N N NA NA NA 0.4 0.35 NA N Y Y NA Yes

5902009-10 CL

11701

Vijaya Seamless Containers (P) Ltd,

No.189, 11th Main, III Phase, PIA, Bangalore-560058,

III PhaseI

Aluminium Containers/Bottles, shades and plastic components with

107 R-44Industry or process involvingmetal

Small Red 1985BA

30.06.2022Y 30.06.2015 N N N N N NA NA NA 0.6 0.5 ST & SP ETP Y N N NA Yes

5912009-10 O

15901

Vijay Spheroidals Private Limited.,

No.17-B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Cast Iron Casting (Foundry) SG iron castings

302.711 O-66Ferrous and Non- ferrous metalextraction

Small Orange 1988BA

30.09.2022Y 30.06.2015 N N N N N NA NA NA 1.5 N NA N Y N NA Yes

5922009-10 O

15178A.S.Surface Finishers,

No.P-27, 10th Main, III Stage, PIE, Bengaluru-560 058,

III StageI

Electroplating (Hardchrome) 11.35 R-44

Industry or process involvingmetal

Small Red 2004BA

30.06.2024N N N N N N N NA NA NA 0.4 0.1 NA N Y Y NA Yes

5932009-10 CL

15109Alchemist Processors, ,

No.A-150, II Stage, PIE, Bengaluru-560 058,

II StageI

Metal recover11.8 R-3

engaged inrecycling/rep

rocessing/Small Red 2006

BA30.06.2008

Y 30.06.2010 N N N N N NA NA NA 0 N NA N N N NA NA

5942009-10 O

23050Allianz Trans Alloys (P) Ltd,

No.B-279(A), I Stage, PIE, Bangalore-560058,

I StageI

Non ferrous machine components for automobile & other engineering machines

16.16 O-66Ferrous and Non- ferrous metalextraction

Small Orange 2004BA

30.09.2028N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

5952009-10 CL

-

Allied Metallurgical Products Pvt Ltd,

No.293, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Non Ferrous CastingC1 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange ClosedBA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

5962009-10 CL Hermes Chem Impex (P) Ltd,

No.A-29, III Stage, PIE, Bengaluru-560 058,

III StageI

Engineering Unit89.03 G-78

Switches without

electroplatinSmall Green 2004

BA30.06.2006

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

5972009-10 O

12526Jain Wire Industries,

No.C-94, III Stage, PIE, Bengaluru-560 058,

III StageI

Wire drawing ( Brazing and Welding rods)

14.55 O-32ferrous and non- ferrous

metals ( Small Orange 1995

BA30.09.2023

N N N N N N N NA NA NA 0.4 0.02 NA N Y Y NA Yes

5982009-10 O

14831Jaya Vijaya Industries,

No.C-205, 4th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Battery manufacture 122.17 R-7

Lead acid batterymanufacturing(excluding

Small Red 2003BA

30.06.2024Y 30.06.2014 N N N N Y NA NA NA 0.48 0.3 NA N Y Y NA Yes

5992009-10 O

14752

Bright India Steel Industry (Formerly known as Laxmi

Industries),

No.280/3, IV Phase, PIA, Bengaluru-560 058,

IV Phase IBright Steel Bars

167.01 R-44Industry or process involvingmetal

Small Red 1/4/2002BA

30.06.2023N NA N N N N N NA NA NA 1.2 0.27 ST & SP N N Y NA Yes

6002009-10 CL

24740M.M. Heat Treaters,

No.SB-47, I Stage, Peenya Industrial Estate, Bangalore,

I StageI

Heat Treatment20 O-36

treatment using oil

fired furnaceSmall Orange 2004

BA30.06.2008

N N N N N N N NA NA NA 0 N NA N N N NA NA

6012009-10 CL

-M.S.Heat Treaters,

No.B-256, II Stage, PIE, Bengaluru-560 058,

II StageI

Short Blasting activity13.36 G-92

Shot blasting operation Small Green 2003

BA31.12.2006

N N N N N N N NA NA NA 0 N NA N N N NA Yes

6022009-10 CL

-Micast,

B-300, 7th Main Road, II Stage, PIE, Bengaluru-560 058,

II StageI

C.I. casting49 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2004BA

30.06.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes

6032009-10 O

77681Micro Sharp Needles Pvt Ltd,

.B-242, 6th Main, II Stage, PIA, Bangalore-560058,

II StageI

Surgical Sutre needles39.17 O-63

Engineering Industries with HeatTreatment,

Small Orange 2004BA

30.06.2023Y 30.06.2023 N N N N N NA NA NA 1 0.25 NA N Y Y NA Yes

6042009-10 O

32222Multi Carbo,

No.B-303, II Stage, PIE, Bengaluru-560 058,

II StageI

Heat Treatment20.73 O-63

Engineering Industries with HeatTreatment,

Small Orange 1/6/2002BA

30.09.2023N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes

6052009-10 CL

-Pals Industry,

No.20-B, II Phase, PIA, Bangalore, II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6062009-10 O

11537Pragathi Coaters,

No.C-102, III Stage, PIE, Bengaluru-560 058,

III StageI

Powder coating 37 R-44

Industry or process involving metal

Small Red 2004BA

30.06.2023N N N N N N N NA NA NA 0.12 0.15 NA N Y Y NA Yes

6072009-10 O

11493Protective Coatings Pvt Ltd,

No.B-210, II Stage, PIE, Bangalore-560058,

II StageI

Powder coating on job work 59.06 R-44

Industry or process

involving metal

Small Red 2003BA

30.06.2023Y 30.06.2016 N N N N N NA NA NA 0.22 N NA N Y N NA Yes

6082009-10 O

11494R.R.Forgings pvt ltd,

No.332-B, 4th Main 9th cross , IV Phase, PIE, Bengaluru-560 058,

IV PhaseI

Engineering with Forging 292 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2004BA

30.06.2029N N N N N N N NA NA NA 1.72 N NA N Y N NA Yes

6092009-10 O

13931Ring Forgings Pvt Ltd,

No.A-283/284, 6th Mian, II stage, PIE, Bangalore-560058,

II StageI

Forging and Heat Treatment activity 721.41 O-32

Forging of ferrous and non- ferrous

Medium Orange 2005BA

30.09.2022N N N N N N N NA NA NA 1 N NA N Y N NA Yes13931 non- ferrous

metals ( BA N N N N N N N NA NA NA 1 N NA N Y N NA Yes

6102009-10 CL

-S.S.Coating Systems,

No.450-A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Powder coating 20.47 R-44

Industry or process involving metal

Small Red 1/1/2003WA

30.06.2004Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA

6112009-10 CL

16609Sarda Alloy Steels,

No.A-367, 2nd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Bright bars

329.56 R-44process

involvingmetal

Small Red 2006BA

30.06.2007N N N N N N N NA NA NA 1 0.01 NA N Y Y NA NA

6122009-10 CL

-Sil Mirror Pvt Ltd,

No.45-B, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Mirror ManufacturingC1 O-34

ceramics, earthen

potteries andSmall Orange Closed

BA31.12.2015

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6132009-10 O

26992South India Wire Products,

No.A-44(A), II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit86.29 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1999BA

31.12.2024Y 31.12.2018 N N N N N NA NA NA 0.4 N NA N Y N NA Yes

6142009-10 O

14820

Spraymet Surface Technologies (P) Ltd,

No.A-413, II Stage, PIE, Bengaluru-560 058,

II StageI

Grit blasting and plasma spray cooling 46.83 O-62

Spray painting, paint baking, paint

Small Orange 2000BA

30.06.2022N N N N N N N NA NA NA 0.83 N NA N Y N NA Yes

6152009-10 O Varalaxmi Enterprises,

No.A-195, 4th cross. I Stage, PIE, Bengaluru-560 058,

I StageI

Powder coating 85 R-44

Industry or process involving metal

Small Red 1991BA

30.06.2020Y 30.06.2015 N N N N N NA NA NA 0 N NA N Y N NA Yes

6162009-10 O Benz-O-Chem,

No.389, 10th cross, IV Phase, PIA, Banglaore-58,

IV PhaseI

chemical distillation7 R-25

chemicals and electrochemicals

Small Red 1/12/2001BA

30.06.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

6172009-10 O

15407A.B.Engineering Works,

No.N-1/3, 4th cross, I Stage, PIE, Bangalore-560058,

I StageI

Forging 87.65 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 1989BA

30.06.2029N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

6182009-10 CL

23553Suntrac Energy System .

. Plot No 321-A, 8th cross, IV Phase, PIA, Bagalore-58

IV PhaseI

Assembling of Polyprophylene heat sealed batteries (Battery manufacture)

51.68 O-73Dry cell battery ( excludingmanufacturi

Small Orange 2008BA

30.06.2014N N N N N N Y NA NA NA 0.25 N ST & SP N N N NA Yes

6192009-10 CL

-Abay Raj Food Products,

No.B-15, I Stage, PIE, Bengaluru-560 058

I StageI

Pulverizing C1 O-26

involving ore

sintering, Small Orange Closed

BA30.09.2017

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6202009-10 O

34822Shubamangala Industries,

No.A-416, 417& 418 II Stage, PIE, Bangalore-560058

II StageI

Cattle feed and poultry feed 145 O-30

Fish feed, poultry feed and cattle feed

Small Orange 1988BA

30.09.2022N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

6212009-10 CL

-Ajit Global Fashions,

No.119, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6222009-10 CL

-Alankar Enterprises,

No.150, III Phase, PIA, Bengaluru-560 058

III PhaseI

Silk yarn dyeingC1 R-40

Textile processinginvolving

Small Red ClosedBA

30.06.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6232009-10 CL

-Alminrock ,

No.17, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Stone carvingsC1 G-56

sizing and polishing of

marble Small Green Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6242009-10 CL

-

Amaranarayana Grinding Industries,

No.154, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Agarbatti raw material7.79 W-37

Agarbathi Manufacturi

ngSmall White 1990

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6252009-10 CL

-Anitha Enterprises,

No. , II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.09.2017

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6262009-10 O

35318Arvind Motors Pvt Ltd,

No.65-B, III Phase, PIA, Bangalore-560058

III PhaseI

Automobile servicing327 O-18

Automobile servicing,repairing and painting

Small Orange 1992BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 3 N ST & SP N N N NA Yes

6272009-10 O

27249

Aries Tanks & Vessels Pvt Ltd,

No.156, 10th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit58.58 W-14

Engineering and fabricationunits (dry

Small White 1981BA

31.12.2025N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

6282009-10 O

13251

Rinse Top Tex Pvt Ltd, ( Armon Textile)

No.A-418(A), 9th Main, II Stage, PIE, Bangalore-560058,

II StageI

Washing of readymade garments 377 O-50

Mechanized laundry using oil fired

Small Orange 2004BA

30.09.2023N N N N N N N NA NA NA 1.1 22.36 ETP N Y N NA Yes

6292009-10 CL

-Arpee Electricals Pvt Ltd,

No.A-56, II Stage, PIE, Bengaluru-560 058

II StageI

Electrical Componentes 34 G-78

Switches without

electroplatinSmall Green 2001

WA31.12.2004

N N N N N N N NA NA NA 0 N NA N N N NA NA

6302009-10 O Arun Indsutries,

No.193, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit12.5 W-14

Engineering and fabricationunits (dry

Small White 1992BA

30.06.2017N N N N N N N NA NA NA NA N NA N N N NA Yes

6312009-10 O

17319Delta Abrasives,

No.C-257, 5th cross, I Stage, PIE, Bangalore-560058

I StageI

Ceramic products ( usingelectrical kiln)

32 O-22Ceramics and Refractories

Small Orange 1992BA

30.09.2022Y 30.06.2015 N N N N N NA NA NA 0.6 N NA N Y N NA Yes

6322009-10 CL

-Kiran Metal Finishers,

No.C-259, I Stage, PIE, Bengaluru-560 058

I StageI

electroplating8.68 R-44

process involving

metal Small Red 1996

WA30.06.2014

N N N N N N N NA NA NA 0 N NA N N N NA NA

6332009-10 O

23009Micro Paints,

No.SM-6, III Stage, PIE, Bengaluru-560 058

III StageI

Paints: ( water base primer, Distemper, Interior Emulsion, Exterior Emulsion,Oil

10.1 O-54Paint blending and mixing (Ball mill)

Small Orange 2005WA

31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

634Space Age Technology (India)

No.A-323, II Stage, PIE, Bengaluru- II Stage Elctroplating process 6342009-10 CL

-

Space Age Technology (India) Pvt Ltd,

No.A-323, II Stage, PIE, Bengaluru-560 058

II StageI

Elctroplating45 R-44

process involving

metal Small Red 2002

BA30.06.2007

N N N N N N N NA NA NA 0 N NA N N N NA NA

6352009-10 O

15133

Vishnu Hard Chrome Industries,

No.338,9th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electroplating (Hardchrome) 18.88 R-44

Industry or process involvingmetal

Small Red 2005BA

30.06.2022N N N N N N N NA NA NA 0.05 0.02 ST & SP N N Y NA Yes

6362009-10 CL

-

Dwaraka Industrial Enterprises,

No.Spl-11, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering with electroplating 130 R-44

Industry or process involving metal

Small Red 1980BA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6372009-10 O

13863

Nipra Industries Pvt Ltd.,(Formerly Aryes Graph O

Packs),

No.A-349, 9th Main Road, II Stage, PIE, Bangalore-560058,

II StageI

Manufacture P P caps172.67 O-35

Gravure printing, digital printing on

Small Orange 1986BA

30.09.2028N NA N N N N N NA NA NA 0.96 N NA N Y N NA Yes

6382009-10 CL

-Ganapa Industrial Enterprises,

No.185-B, III Phase, PIE, Bengaluru-560 058

III PhaseI

Power coating activity with degreasing & polishing

21.58 R-44Industry or process involving metal

Small Red 1998BA

30.06.2002N N N N N N N NA NA NA 0 N NA N N N NA NA

6392009-10 O

15276Industrial Metal Finishers,

No.118, III Phase, PIA, Bengaluru-560 058

III PhaseI

Electroplating88.78 R-44

Industry or process involvingmetal

Small Red 15/7/05BA

30.06.2025N N N N N N N NA NA NA 1 0.63 NA N Y Y NA Yes

6402009-10 CL

-Quality Wire Products,

No.485-5, IV Phase, PIA, Bangalore-560058

IV PhaseI

Wire drawing and pickling copper coated

81.2 R-51 Copper Smelter

Small Red ClosedBA

30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N ST & SP N N N NA NA

6412009-10 CL

-Ashish Products,

No.A-18, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6422009-10 CL

-B.G.Deeps Chemicals Pvt Ltd,

No.47, III Phase, PIA, Bengaluru-560 058

III PhaseI

Chemical filling and trading C1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.09.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6432009-10 O

23694BMTC Depot-22,

No.481 to 483, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Bus Depot67.17 O-18

Automobile servicing, repairing and

Small Orange 2003BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 0.8 15 ST & SP ETP Y N N NA Yes

6442009-10 CL

-Balaji Foams,

No.B-122, II Stage, PIE, Bangalore -58

II StageI

Foam ProductsC1 O-80

Foam manufacturi

ngSmall Orange Closed

BA30.09.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6452009-10 CL

-Bangalore Drug Co,

No.419, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Pharmacuitical formulation C1 O-74

Pharmaceutical

formulationSmall Orange Closed

BA30.09.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6462009-10 O

21540Bentley & Remington,

No.473C, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Formulation of Pharmaceuticals- Tablets & Capsules

636.42 O-74Pharmaceutical formulation

Medium Orange 1990BA

30.09.2022N N N N N N N NA NA NA 1.6 1 ETP Y Y N NA Yes

6472009-10 CL

33160Bio Gen Extracts Pvt Ltd,

No.167/168, III Phase, PIA, Bengaluru-560 058

III PhaseI

R & D activityC1 R--58

Pharmaceutical (Bulk drug &Active

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6482009-10 O

33269

BioOrganics & Applied Materials Pvt Ltd,

No.B-64/1, III Stage, PIE, Bengaluru-560 058

III StageI

R & D activity73.84 R-58

Pharmaceutical (Bulk drug &Active

Small Red 2002BA

30.06.2022N N N N N N N NA NA NA 0.1 0.01 ST & SP N N Y NA Yes

6492009-10 O

19912

Bio Pharma Drugs & Pharmaceuticals,

No.399, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Tablest & Syrups117.71 O-74

Pharmaceutical formulation

Small Orange 2000BA

30.09.2023N N N N N N N NA NA NA 0.3 0.05 ST & SP N N Y NA Yes

6502009-10 O

35239Biopharm Laboratories,

No.D-434, II Stage, PIE, Bangalore-560058

II StageI

Formulation of Pharmaceuticals 30.21 G-31

Pharmaceutical formulation

Small Green 1992BA

31.12.2027N NA N N N N N NA NA NA 0.1 N NA N Y N NA Yes

6512009-10 CL

12165Bisheshwar Galvanisers,

No.528, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Zinc galvanizing (Hot dip galvanizing) 62.59 R-44

Industry or process involvingmetal

Small Red 1994BA

30.06.2019Y 30.06.2015 N N N N N NA NA NA 0.4 0.02 ST & SP N N Y NA Yes

6522009-10 O

12867Ce-Chem Pharmaceuticals,

No.336, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Formulation of Pharmaceuticals 484.77 O-74

Pharmaceutical formulation

Small Orange 1988BA

30.09.2023Y 30.09.2023 N N N N N NA NA NA 2.4 0.4 NA N Y Y NA Yes

6532009-10 CL

-Chamundeshwari Chemicals ,

No.249, III Phase, PIA, Bengaluru-560 058

III PhaseI

Chemical tradingC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6542009-10 CL

-Aqua Carbons,

No.73, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Activated Carbon65 G-100 Activated

carbonSmall Green 2005

BA31.12.2013

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

6552009-10 O

21733

Dantal Hydraulics Pvt Ltd,No 221, 8th Main, 2nd Cross, III Phase, PIA,Bangalore – 560 058

III PhaseI

Assembling of Hydraulic power packs without generating trade

451 O-62Spray painting, paint baking, paint

Small Orange 2008BA

30.09.2029N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes

6562009-10 CL

-Dolar Equipments Pvt Ltd,

No.83, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Bakery equipment with spray painting 74 O-2

Bakery and confectionery units with

Small Orange 1/9/2000BA

30.06.2013C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

6572009-10 O

12522

Eshwari Textile Processing Pvt Ltd.,

No.109, 6th Main, III Phase, PIA, Bangalore-560058

III PhaseI

Textile processing Dyeing and washing 319.98 R-40

Yarn / Textile processinginvolving

Large Red 2005BA

30.06.2022Y 30.06.2018 N N N N N NA NA NA 2.5 34 ST & SP ETP Y N N NA Yes

6582009-10 O

15357Foam Products Polyurethane,

No.232, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering124.6 G-90

ovens / furnaces) Small Green 2007

BA31.12.2021

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes15357 BA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

6592009-10 O

24139Food Associates Bangalore,

No.B-448, I Stage, PIE, Bangalore-560058

I StageI

Tamrind powder73.15 G-55

Tamarind powder manufacturing

Small Green 1981BA

31.12.2027N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

6602009-10 O

19520Forind Nutrients Pvt Ltd,

, No.V-53, II Stage, PIE, Bengaluru-560 058

II StageI

Animal feed / Poultry feeds 65.42 O-30

Fish feed, poultry feed and cattle feed

Small Orange 07.01.2004BA

30.09.2022N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes

6612009-10 CL

-Ganesh Pulvarisers,

No.C-20, II Stage, PIE, Bengaluru-560 058

II StageI

Pulverizing C1 O-26

involving ore

sintering, Small Orange Closed

BA30.09.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6622009-10 O

20810Giliyal Industries,

No.N-3, 5th cross, I Stage, PIE, Bangalore-560058

I StageI

Engineering with painting 37.09 O-62

Spray painting, paint baking, paint

Small Orange 1994BA

30.09.2029Y 30.06.2015 N N N N N NA NA NA 0.3 N NA N Y N NA Yes

6632009-10 CL Gram Mooliga Co Ltd,

No.V-51, II Stage, PIE, Bengaluru-560 058,

II StageI

Honey reprocessing37.56 W-51

Honey Processing Small White 2004

BA31.12.2015

N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes

6642009-10 CL

-Gurupriya Conductors,

No.B-64/2, III Stage,PIE, Bengaluru-560 058

III StageI

Hard rubber battery containers 19.59 O-73

Dry cell battery ( excludingmanufacturi

Small Orange 1983BA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes

6652009-10 O

-

Hi-Power Equipments (P) Ltd, ( formerly Text port

industries)

(P) Ltd, No.427, 12th Cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment stiching 906 G-72

Stitching/ Stitching ofshoe uppers/

Large Green 1988BA

31.12.2024N N N N N N N NA NA NA 16 N NA N Y N NA Yes

6662009-10 O

15666Hind Comp (P) Ltd,

No.6-A, III Phase, PIA, Bangalore-560058

III PhaseI

Alluminum cans with degrasing 79.62 O-17

Aluminium & copper extraction from

Small Orange 1978BA

30.09.2029Y 30.06.2014 N N N N N NA NA NA 0.45 0.5 ST & SP N N Y NA Yes

6672009-10 O

22818Hot Dip Galvanising,

No.B-305 & 306, II Stage, PIE, Bangalore-560058

II StageI

Zinc galvanizing61.01 R-41

Jelly filled Copper cables ,,Zinc Dross-

Small Red 1984BA

30.06.2024N NA N N N N N NA NA NA 0.3 0.1 NA N Y Y NA Yes

6682009-10 O

16976Industrial Rubber Products,

No.230, 11th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Rubber & Foot Wear Soles 54.87 G-41

Rubber goods industry (with gas

Small Green 2007BA

31.12.2020N N N N N N N NA NA NA 6.4 N ST & SP N N N NA Yes

6692009-10 CL

-Insulac Wires,

No.77, III Phase, PIA, Bangalore -58 III PhaseI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6702009-10 CL

-International Machine Tools,

No.255, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitG-78

Switches without

electroplatinSmall Green Closed

BA30.09.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6712009-10 O

35204Johnson & Smith Co,

No.B-48, III Stage,PIE, Bengaluru-560 058

III StageI

Formulation of Pharmaceuticals 59.3 O-74

Pharmaceutical formulation

Small Orange 1992BA

30.09.2022N N N N N N N NA NA NA 0.3 0.02 NA N Y Y NA Yes

6722009-10 O

36827KHT Agencies Pvt Ltd,

No.305, IV Phase, PIA, Bangalore-560058,

IV PhaseI

Repair & Service station 64.32 O-18

Automobile servicing, repairing and

Small Orange 2001BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 2 2 ST & SP ETP Y N N NA Yes

6732009-10 CL

16766Kamath Transfermers Pvt Ltd,

No.B-124, 2nd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Transformer manufacturing with painting

148 O-69repairing/

manufacturing ( dry

Small Orange 1997BA

30.09.2008N N N N N N N NA NA NA 0 N NA N N N NA NA

6742009-10 CL

-Karnataka Consumer Products,

No.49, III Phase, PIA, Bengaluru-560 058

III PhaseI

Kitchen EquilmentsC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6752009-10 CL

-Karnataka Foods Corporation,

No.A-313, II Stage, PIE, Bangalore -58

II StageI

Confectionery items C1 O-2

confectionery units withproduction

Small Orange ClosedBA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6762009-10 CL

-

Kaveri Enamel & Allid Products,

No.B-113, II Stage, PIE, Bangalore II StageI

Powder coating 38 R-44

Industry or process involving metal

Small Red 1982BA

30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

6772009-10 CL

-Kaveri Winery & Distilleries,

No.138, III Phase, PIA, Bengaluru-560 058

III PhaseI

DistilleryC1 R-60

molasses / grain /

yeast based) Small Red Closed

BA30.06.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6782009-10 CL

-Konica Mirror Co Pvt Ltd,

No.A-143, I Stage, PIE, Bengaluru-560 058

I StageI

Mirror ManufacturingC1 O-47

ng of mirror from sheet

glassSmall Orange Closed

BA30.09.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6792009-10 CL Lens Enterprises,

No.A-181, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering with painting 79 O-62

Spray painting, paint baking, paint

Small Orange 2003BA

30.09.2008N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

6802009-10 CL

11824

Turbotech Precision Engineering,

No.A-343, 9th Mian, II Stage, PIE, Bengaluru-560 058

II StageI

Turbains 1615 G-78

Switches without

electroplatinLarge Green 2007

BA31.12.2022

N C1 N C1 N C1 N NA NA NA 0 N NA N N N NA NA

6812009-10 O

25241

Madhur Pharma & Research Lab,

No.292-294, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Ayurvedic Formulation 319 O-19

Ayurvedic and homeopathicmedicines

Small Orange 1994BA

30.09.2022N N N N N N N NA NA NA 2.3 0.5 NA N Y Y NA Yes

6822009-10 O

20407Mahendra Labs Pvt Ltd,

No.371/372, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Formulation of Drugs335 O-74

Pharmaceutical formulation

Small Orange 1985BA

30.09.2023Y

30.09.2023N N N N N NA NA NA 0.8 0.1 NA N Y Y NA Yes

683 No.C-331, C-332, II Stage, PIE, II Stage Food colours Food and 6832009-10 CL

20150Mallya Fine Chem Pvt Ltd,

No.C-331, C-332, II Stage, PIE, Bengaluru-560 058

II StageI

Food colours 55.3 O-7

Food and food processingincluding

Small Orange 1986BA

30.09.2019N N N N N N N NA NA NA 0.8 2 NA N Y Y NA Yes

6842009-10 CL

-Mayer Industries,

No.C-307, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6852009-10 CL

-Mek Tek Engineers,

No.C-183, II Stage, PIE, Bengaluru-560 058

II StageI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

BA30.06.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6862009-10 O

27348Metal Storage Systems Pvt Ltd,

No.409, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering with spray painting and powder coating

841 G-97Powder coating on surface of furniture (3

Medium Green 2002BA

31.12.2025Y 30.06.2019 N N N N N NA NA NA 2.4 N NA N Y N NA Yes

6872009-10 CL

-Murthy & Co,

No.295, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6882009-10 CL

-Mysore Pharmaceuticals,

No.316, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Pharmacuitical formulation C1 O-74

Pharmaceutical

formulationSmall Orange Closed

BA30.09.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6892009-10 CL

-N.S.S. Engineering Pvt Ltd,

No.529, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit17.2 W-14

Engineering and fabricationunits (dry

Small White 2002BA

31.12.2010N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

6902009-10 CL

-Navahira Graphics,

No.C-305, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Unit17.2 W-14

Engineering and fabricationunits (dry

Small White 2002BA

30.09.2017C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

6912009-10 O

32866Zonta Bauer Pvt Ltd

No.108/E1, 6th Main Road, 3rd Phase, PIA, Bengaluru-560058

III PhaseI

Waste Bins for municipal usage 115 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2016BA

31.12.2026N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

6922009-10 CL

-

Not-Con Fruit & Fodd Processing,

No.490, IV Phase,PIA,Bengaluru-560 058,

IV PhaseI

Food processingC1 O-7

food processingincluding

Small Orange ClosedBA

30.09.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6932009-10 CL

-Oceanic Engineering Co,

No.373, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6942009-10 CL

-

Pacific Pharmaceuticals Pvt Ltd,

No.309, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Ayurvedic Formulation 44.9 O-19

Ayurvedic and homeopathicmedicine

Small Orange 1985BA

30.09.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6952009-10 CL

-Peenya Polymers Pvt Ltd,

No.B-288, II Stage, PIE, Bangalore -58

II StageI

Synthetic resinC1 O-75 Synthetic

resinsSmall Orange Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6962009-10 O Plasmix Limited,

No.404, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Plastic pellets46 G-32

Polythene and plastic processedproducts

Small Green 1997BA

31.12.2034N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes

6972009-10 CL

-Pranava Insulatators,

No.B-283, II Stage, PIE, Bengaluru-560 058

II StageI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6982009-10 CL

-R.X Rubber Industries,

IV Phase, PIA, Bengaluru-560 058, IV PhaseI

Rubber ProductsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

6992009-10 CL

-Rakesh Foams,

No.B-23, I Stage, PIE, Bengaluru-560 058

I StageI

Foam ProductsC1 G-90

foam extrusion as

an allied Small Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7002009-10 CL

-Reliance Marketing,

No.198, III Phase, PIA, Bengaluru-560 058

III PhaseI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7012009-10 CL

-Rhino Rubber Industries,

No.B-83, I Stage, PIE, Bengaluru-560 058

I StageI

Rubber ProductsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

30.06.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7022009-10 CL

13491

Rima Transformers and Conductors Pvt Ltd.,,

No.18-D, II Phase, PIA, Bangalore-560058,

II PhaseI

Transformers650.793 O-69

Transformer repairing/manufacturing ( dry

Medium Orange 1988BA

30.09.2021Y 30.06.2015 N N N N N NA NA NA 2.8 N NA N Y N NA Yes

7032009-10 CL

-S.N.Enterprises,

No.138, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7042009-10 CL

-Sameer Exports,

No.A-266, II Stage, PIE, Bengaluru-560 058

II StageI

GodownC1 G-72

Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2013N C1 N C1 N C1 N NA NA NA 0 N NA N N N NA NA

7052009-10 CL

-Sami Labs,

No.A-53, II Stage, PIE, Bengaluru-560 058

II StageI

Ayurvedic Formulation C1 O-19

Ayurvedic and homeopathicmedicine

Small Orange ClosedBA

30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7062009-10 O Sargur Ceramics Pvt Ltd,

No.B-119, I Stage, PIE, Bengaluru-560 058

I StageI

Ceramic products53.39 G-21

Ceramic colour manufacturing

Small Green 1990BA

30.09.2011N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

7072009-10 O

38731Selva Foods,

No.340-B, 9th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Manu of Redchilly,coriander,termaric powder

17.68 G-112Fragrance, flavours essence etc.

Small Green 1990BA

31.12.2100N N N N N N N NA NA NA 0.54 N ST & SP N N N NA Yes38731 rmaric powder essence etc.

for food BA N N N N N N N NA NA NA 0.54 N ST & SP N N N NA Yes

7082009-10 CL Serendip Associates Pvt Ltd,

No.B-111, III Stage, PIE, Bengaluru-560 058,

III StageI

Manufacture of defence Grade Shelter 137 O-62

Spray painting, paint baking, paint

Small Orange 2000BA

30.09.2017N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

7092009-10 CL

-

Sherief Paper & Pulp Products,

No.A-17, III Stage,PIE, Bengaluru-560 058

III StageI

pulp manufacturingC1 R-81

Paper ( waste paper

based Small Red Closed

BA30.09.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7102009-10 CL

-Shiva Extrusions (P) Ltd,

No.A-147, I Stage, PIE, Bengaluru-560 058

I StageI

Alluminum caps & Straps with degreasing

C1 R-44process

involvingmetal

Small Red ClosedBA

30.06.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7112009-10 CL

-Shrishma Chemicals Pvt Ltd,

No.349, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Chemical tradingC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.09.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7122009-10 CL

11640

Unitex Appearls Ltd. Unit-III,( formerly:,Snow White Hi-Tech

Laundrette)

Unit-III, No.252, 11th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment washing299.01 O-50

Mechanized laundry using oil fired

Small Orange 1998BA

30.09.2018Y 30.09.2017 N N N N N NA NA NA 10 50 ST & SP ETP Y N N NA Yes

7132009-10 CL

-Solar Automobiles,

No.135, III Phase, PIA, Bengaluru-560 058

III PhaseI

Automobile servicingC1 O-18

Automobile servicing, repairing and

Small Orange ClosedBA

30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7142009-10 CL

-Sona Garments & Processing,

No.22, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7152009-10 CL

-Sonarome Chemicals Pvt Ltd,

No.C-136, II Stage, PIE, Bengaluru-560 058

II StageI

Perfumery items C1 O-10

ng of tooth powder,

toothpaste, Small Orange Closed

BA30.09.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7162009-10 CL

-Southern Enterprises,

No.C-265, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7172009-10 CL Sree Raghavendra Spices,

No.166, 10th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Spice mfg21.6 G-44

Spice grinding (20 HP motor)

Small Green 1995BA

31.12.2014N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

7182009-10 CL

-Sri Ram Industries, N

No.B-33, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7192009-10 CL

-

Sri Rama Hot-Dip Galvanizers Pvt Ltd,

No.49a, III Phase, PIA, Bangalore -58 III PhaseI

galvanisingC1 R-44

process involving

metal Small Red Closed

BA30.06.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7202009-10 CL

-Sri Vasavi Traders,

No.14-A, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Wood Powder16 Closed Small Orange 2002

BA30.09.2009

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

7212009-10 CL

-Sri Vignesh Enterprises,

No.B-87, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.09.2017

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7222009-10 O

15658

Srushti Pharmaceuticals Pvt Ltd,

No.154, 10th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Formulation of Pharmaceuticals 180.26 O-74

Pharmaceutical formulation

Small Orange 1987BA

30.09.2022N N N N N N N NA NA NA 2.5 0.3 NA N Y Y NA Yes

7232009-10 CL

-Standard Engineering,

No.284, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.09.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7242009-10 CL

21078Stanmed Labs,

No.428, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Formulation of Pharmaceuticals 17.94 O-74

Pharmaceutical formulation

Small Orange 2001BA

30.09.2021N N N N N N N NA NA NA 1 0.1 ST & SP N N Y NA Yes

7252009-10 CL

21193Super Coat Paints Pvt Ltd,

No.A-51, 2nd Main raod, II Stage, PIE, Bangalore-560058

II StageI

Manufacture Paint 137 R-21

Manufacturing of paintsvarnishes, pigments

Small Red 1998BA

CLN N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

7262009-10 CL

-Suraj Enterprises,

No.557, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7272009-10 CL

-Swan Wash Tech,

No.9, I Stage, PIE, Bengaluru-560 058 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7282009-10 O

41914Teal Power Coatings,

No.49A, III Phase, PIA, Bangalore-560058,

III PhaseI

General Engineering with Powder coating 49.67 O-62

Spray painting, paint baking, paint

Small Orange 1993BA

30.09.2023Y 30.09.2015 N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

7292009-10 CL

-Tedimity Aeromatic Pvt Ltd,

No.B-377, I Stage, PIE, Bengaluru-560 058

I StageI

Aldehyde & Testers (Organic Chemicals) 25 R-25

chemicals and electrochemicals

Small Red 1996BA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7302009-10 CL

-Thumbe Engineering Services,

No.B-235, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering with painting 81.68 O-62

Spray painting, paint baking, paint

Small Orange 1999BA

30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7312009-10 CL

-Tilrode Chemicals,

Tilrode Chemicals, No.A-288, II Stage, PIE, Bengaluru-560 058

II StageI

Chemical tradingC1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

732 No.B-293, II Stage, PIE, Bengaluru- II Stage kitchen cabinets Switches 7322009-10 CL

-Tuflan Interiors,

No.B-293, II Stage, PIE, Bengaluru-560 058,

II StageI

kitchen cabinetsC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7332009-10 CL

-Unicon Systems,

No.194/1, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering with spary painting 58.69 O-62

Spray painting, paint baking, paint

Small Orange 17/6/96BA

30.09.2010C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

7342009-10 CL

-United Technologies,

No.A-367, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7352009-10 CL

-Universal Special Abresvies ,

No.B-355, I Stage, PIE, Bengaluru-560 058

I StageI

abrasive materialsC1 G-91

of Adhesives and

adhesive Small Green Closed

BA30.09.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7362009-10 CL

15660Venkat Pharma,

No.220, 6th Main Raod, III Phase, PIA, Bangalore-560058

III PhaseI

Formulation of Ayurvedic Ointments (Pharmaceuticals)

56.67 O-19Ayurvedic and homeopathicmedicine

Small Orange 2001BA

30.09.2018N NA N N N N N NA NA NA 0.4 0.02 ST & SP N N Y NA Yes

7372009-10 CL

-

Vibromech Engineers & Services Ltd,

No.B-259, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit71.26 G-78

Switches without

electroplatinSmall Green 1/11/1996

BA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA Yes

7382009-10 O Vyoma Switch Gear,

No.33 A/2 II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering Unit and Electroplating 91 R-44

process involving

metal Small Red 2007

BA30.06.2024

N N N N N N N NA NA NA 1.2 0.02 NA N Y Y NA Yes

7392009-10 CL

-Wash Well Processors,

No.17D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7402009-10 CL

-Washwell Processings,

No.143, III Phase, PIA, Bangalore -58 III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2000

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7412009-10 CL

17882Yaka International ,

No.B-69(A), II Stage, PIE, Bangalore-560058

II StageI

Perfume spray & after Shave 12.57 O-10

Manufacturing of tooth powder,toothpaste,

Small Orange 1994BA

30.06.2019N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

7422009-10 CL

-

A.B.Precission Toolings Pvt Ltd,

No.C-145, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7432009-10 CL

-

A K E Infra Structure Private Limited (Formerly Known as

A.K.Engineering),

No.424, II Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit339 G-78

Switches without

electroplatinSmall Green Closed

WA30.06.2002

N N N N N N N NA NA NA 0 N NA N N N NA NA

7442009-10 CL

-Aar Pee Electronics,

No.D-430, II Stage, PIE, Bengaluru-560 058

II StageI

Electronic componenets 9.14 W-14

Engineering and fabricationunits (dry

Small White 1992WA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA

7452009-10 O

32000Bioneeds India Pvt Ltd

No.3,I Main Road, I Stage, PIE, Bengaluru-560 058,

I StageI

R & D activity1115 R-83

Research and Analyticallaboratories

Large Red 2016BA

30.06.2021N N Y 31.12.2100 N N N NA NA NA 1.6 0.32 ST & SP N N Y NA Yes

7462009-10 O

-Accuspirals

No.D-425, 424, 423 II Stage, PIE, Bangalore -58

II StageI

Engineering Unit1118 G-78

Switches without

electroplatinLarge Green 1989

BA31.12.2034

N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

7472009-10 CL

-Accutech Enterprises,

No.450, 12th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit25 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2012N N N N N N N NA NA NA 0.28 N ST & SP N N N NA NA

7482009-10 CL

10286Ace Designers Ltd,

No.A-49, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit39.3 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2001

N N N N N N N NA NA NA 0 N NA N N N NA Yes

7492009-10 O

12799Ace Multi Axes Pvt Ltd,

No 17 , Plot No, 467-469, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

General Engineering without Spray Painting

3090 G-10Carpentry & wooden furnituremanufacturi

Large Green 2006BA

31.12.2021Y

31.12.2025N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes

7502009-10 CL

-Active Microtek,

No.B-70(A), II Stage, PIE, Bengaluru-560 058,

II StageI

Sterilizing agent1078 R-58

Pharmaceutical (Bulk drug &Active

Small Red 2003BA

30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7512009-10 CL

11718Adept Polymers,

No.B-121, 3rd Main, II Stage, PIE, Bengaluru-560 058

II StageI

Plastic injection moulding 1078 G-32

Polythene and plastic processedproducts

Large Green 1988BA

31.12.2022Y 31.12.2016 N N N N N NA NA NA 0.4 N NA N Y N NA Yes

7522009-10 CL

-Adit Sales & Services,

No.302, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7532009-10 O

34330Advith Industries,

No.B-150, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit18.7 W-14

Engineering and fabricationunits (dry

Small White 1995WA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

7542009-10 O

30833Aerosol Filters (P) Ltd,

No.B-200, II Stage, PIE, Bengaluru-560 058

II StageI

Air filters44.83 G-78

Switches without

electroplatinSmall Green 1982

BA31.12.2022

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

7552009-10 CL Agro Exports Inc,

No.C-77, III Stage,PIE, Bengaluru-560 058

III StageI

Bio pesticdites23 G-70

Formulation of Bio-Pesticides

Small Green 1998BA

31.12.2021N N N N N N N NA NA NA 0 N NA N Y N NA Yes

7562009-10 O

35189Airvent Pvt Ltd,

No.460, IV Phase, PIA, Bangalore-560058,

IV PhaseI

Engineering with spary painting 107.5 O-62

Spray painting, paint baking,

Small Orange 1983BA

30.09.2022N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes35189 paint baking,

paintBA N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes

7572009-10 CL

-Akshay Polypacks,

No.471-A2, IV Phase, PIA, Bangalore,

IV PhaseI

Corrugated BoxC1 G-9 Corrugated

BOXSmall Green Closed

BA31.12.2020

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7582009-10 O

15695Akshaya Enterprises,

No.C-59, 2nd Main, 2nd Cross, II Stage, PIE, Bengaluru-560 058

II StageI

Rubber Products11.9 G-41

Rubber goods industry (with gas

Small Green 1996BA

31.12.2020N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

7592009-10 O

40900Alfa Engineers,

No.C-275, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit41.42 G-78

Panel Board, Switches without electroplatin

Small Green 1995BA

31.12.2025N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

7602009-10 CL

-Allied Polymers,

No.407, IV Phase, PIA, Bangalore, IV PhaseI

Synthetic polymersC1 O-75 Synthetic

resinsSmall Orange Closed

BA31.12.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7612009-10 O

77285Allweld Engineering,

No.B-312, 7th Main, II Stage, PIE, Bangalore -58

II StageI

Hydraulic cylinders & Eng Equip 210 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1995BA

31.12.2033N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes

7622009-10 CL Alman Plastics Pvt Ltd,

No.A-196, 4th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Plastic injection moulding 121 G-32

Polythene and plastic processedproducts

Small Green 1997BA

31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

7632009-10 O

29397Alufit (India) Pvt Ltd,

No.A-369, I Stage, PIE, Bangalore-560058

I StageI

Alluminum Fabrication and anodizing

285 R-44Industry or process involvingmetal

Small Red 2014BA

30.06.2021N Y N N N N N NA NA NA 0.8 0.6 NA N Y Y NA Yes

7642009-10 CL

32065Alutop,

No.A-146, I Stage,PIE, Bengaluru-560 058

I StageI

Alluminum caps & Straps 16.1 G-1

utensils fromaluminum circles by

Small Green 1990WA

31.12.2013N N N N N N N NA NA NA 1.4 N NA N Y N NA NA

7652009-10 O Amar Engineering,

No.B-245, II Stage, PIE, Bangalore -58

II StageI

Engineering Unit (Sheet metal fabrication)

44 G-46Steel furniture without spray

Small Green 1999BA

31.12.2023N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes

7662009-10 CL

-Amar Jyothi Plastics,

No.B-245, II Stage, PIE, Bangalore -58 II StageI

plastic injection Moulding C1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7672009-10 CL

-Amarjyothi Plast,

No.B-189, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic injection moulding C1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7682009-10 CL

-Anil Asbestos,

No.34-B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Gasket MfgC1 G-86

including pre-cured

rubberSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7692009-10 CL

-Anil Gears

No.B-229, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit25.1 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1997WA

31.12.2015N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

7702009-10 O

17157Animode Exports,

No.V-24(B), 6th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Stitching of ready made Garments 112 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2009BA

31.12.2022N N N N N N N NA NA NA 4.8 N NA N Y N NA Yes

7712009-10 O

27824Anssons Rubbers Pvt Ltd,

No.A-358, I Stage, PIE, Bengaluru-560 058

I StageI

Rubber componenent36.21 G-98

Automobile Tyre &Tubes/rubber tubes only

Small Green 1987BA

31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

7722009-10 O

23859

Anugraha Electronic Indsutries,

No.C-269, I Stage, PIE, Bengaluru-560 058

I StageI

Alluminium Fabricators (Aluminium Doors and Partition, fall

14.18 G-1Aluminum utensils fromaluminum circles by

Small Green 1988BA

31.12.2022N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

7732009-10 O

17033APD Exports,

No.B-291, II Stage, PIE, Bangalore -58

II StageI

Garment177.31 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2000BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

7742009-10 CL

-Apex Corporations,

Apex Corporations, No.28E, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2001

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7752009-10 CL

-Apex Textiles,

No.233, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2022C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7762009-10 O Arasu Enterprises,

No.B-241, 6th main, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit56 W-14

Engineering and fabricationunits (dry

Small White 2003WA

31.12.2012N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

7772009-10 CL

-Arfa Industries,

No. 103 , II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit23.8 W-14

Engineering and fabricationunits (dry

Small White 1996BA

31.12.2006N N N N N N N NA NA NA 0 N NA N N N NA Yes

7782009-10 O

21204Asian Paints Ltd,

No.B-32, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Paint Godown1008 G-32

Storage & distribution of paint & its products

Large Green 1998BA

31.12.2026Y 31.12.2019 N N N N N NA NA NA 5 N NA N Y N NA Yes

7792009-10 O

23026Asmet Industries,

No.503, IV Phase, PIA, Bangalore-560058,

IV PhaseI

General Engineering (Steel fabrication such as heat exchangers, cabins and

202 O-62Spray painting, paint baking, paint

Small Orange 1981BA

30.09.2023Y 30.09.2023

N

NA N N N NA NA NA 1.2 N ST & SP N N N NA Yes

7802009-10 CL

-Astra Engineering Pvt Ltd,

No.B-253, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

781 No.A-322, II Stage, PIE, Bengaluru- II Stage Engineering Unit Switches 7812009-10 CL

-Atec International,

No.A-322, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.09.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7822009-10 O

39868Atlanta Pumps,

No.487, D1-D2, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Manufacture of pumps 176 O-62

Spray painting, paint baking, paint

Small Orange 1986BA

30.09.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

7832009-10 CL

-Aumac Mounts & Accessories,

No.17A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7842009-10 CL

-Auto Tech Industries,

No.C-289, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7852009-10 O

25663Autograph,

No.C-84, III Stage, PIE, Bengaluru-560 058,

III StageI

Engineering Unit63.5 G-78

Switches without

electroplatinSmall Green 08.04.1986

BA31.12.2025

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

7862009-10 CL

-B.G.K. Precission Products,

No.C-89, III Stage,PIE, Bengaluru-560 058

III StageI

Precision Products48.88 G-78

Switches without

electroplatinSmall Green 2000

WA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7872009-10 CL

-B.P.Products,

No.B-28-A, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit32.16 G-78

Switches without

electroplatinSmall Green 2002

WA31.12.2013

N N N N N N N NA NA NA 0 N NA N N N NA NA

7882009-10 O B.P.Timber Products,

No.A-315, II Stage, PIE, Bangalore -58 II StageI

Timber products22.16 W-14

Engineering and fabricationunits (dry

Small White 1996BA

30.06.2018N N N N N N N NA NA NA NA N NA N N N NA Yes

7892009-10 O B.R.Industries,

No.B-122, 3rd Cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Silver and gold articles 61.53 O-96

Gold and Silver smithy (purification

Small Orange 2001BA

30.09.2029N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

7902009-10 O

24606Bajaj Packlines,

No.A-351, 8th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic carry bags and laminated pouches 195.65 O- 65

Silk screen printing, sari printing bywooden

Small Orange 2009BA

30.09.2030N N N N Y 31.12.2017 N NA NA NA 0.6 N NA N Y N NA Yes

7912009-10 O Balaji Footwear Pvt Ltd,

No.B-153, II Stage, PIE, Bengaluru-560 058

II StageI

Foot wear103.82 G-26

Leather foot wear and leatherproducts

Small Green 1999BA

31.12.2024N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

7922009-10 O Balaji Rubbers,

No.A-154, II Stage, PIE, Bengaluru-560 058

II StageI

Rubber componenent77 G-41

Rubber goods industry (with gas

Small Green 2001BA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

7932009-10 CL

Banashankari Engineering Pvt Ltd,

No.29-A-1, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Assembling of Havai Footwears 26.8 G-26

Leather foot wear and leatherproducts

Small Green 2004BA

31.12.2015N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes

7942009-10 O Banashankari Industries,

No.B-226, I Stage,PIE, Bengaluru-560 058

I StageI

Assembling of Havai Footwears 22.31 G-26

Leather foot wear and leatherproducts

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

7952009-10 CL

-Banavatty & Company,

No.238, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2016

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7962009-10 O

76186Banchalis Prints Pvt Ltd,

No.A-324, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic liner to bp,plastic sheets, roll 110 O-60

Polythene and plastic processedproducts

Small Orange 1999BA

15.1.2024N N N N Y 31.03.2017 N NA NA NA 0.9 N NA N Y N NA Yes

7972009-10 O

28121Bangalore Tool Room,

No.B-445, I Stage, PIE, Bengaluru-560 058,

I StageI

Tool punch99.05 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2002BA

31.12.2025N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

7982009-10 CL

-Bangalore Valves Pvt Ltd,

No.A-252, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit41.75 G-78

Switches without

electroplatinSmall Green 1984

BA31.12.2020

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

7992009-10 O

Bhanu Scientific Instruments Co,

No C-251, 5th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication of Laboratory Glass ware

188.08 G-21Glass , ceramic, earthenpotteries, tile

Small Green 1987BA

31.12.2020N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

8002009-10 CL

-Becmaco Company,

No.C-282, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit7 W-14

Engineering and fabricationunits (dry

Small White 2005BA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8012009-10 CL

-Beedi & Beedi Pvt Ltd,

No.A-285, II Stage, PIE, Bangalore -58 II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2020

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8022009-10 O Bell Scales Pvt Ltd,

No.B-190,5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Weighing scales120 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1980BA

31.12.2035N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

8032009-10 O

41527Bharath Printing & Packaging,

No.B-221 & 222 , II Stage, PIE, Bengaluru-560 058

II StageI

Corrugated Box27.95 G-9

Cardboard or corrugated box and

Small Green 1983BA

31.12.2025N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

8042009-10 CL

-Bharathi Conductors,

No.116, III Phase, PIA, Bengaluru-560 058

III PhaseI

Cable manufacturing 10 W-14

Engineering and fabricationunits (dry

Small White 1995BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

8052009-10 CL

-Bharathi Industries,

No.155, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit13 W-14

Engineering and fabrication

Small White 1995BA

31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- fabrication

units (dry BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8062009-10 O

Bharti Airtel Limited., (Formerly known as Bharathi

Telenet Ltd,)

No.335, IV Phase, PIA, Bengaluru-560 058,

IV PhaseTT

Telephone towerDG SET W-52

Diesel Generator sets (15KVA to 250

Small White 1999AA

31.12.2024N N N N N N N NA NA NA 0 N NA N N N NA Yes

8072009-10 O

12037Bhargava Rotopack Pvt Ltd,

No.79 & 80, III Phase, PIA, Bengaluru-560 058

III PhaseI

Printing lamination and corrugation of packing material

131 O-79Printing press &/or Screen Printing

Small Orange 1990BA

30.09.2029Y 30.9.2024 N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

8082009-10 O Bihani Containers,

No.C-132, II Stage, PIE, Bangalore -58 II StageI

Plastic container 8.27 G-32

nSmall Green 1982

BA31.12.2020

N N N N Y 16.06.2012 N NA NA NA 0.8 N NA N Y N NA Yes

8092009-10 O Bihani Plastics,

No.C-F(A), II Stage, PIE, Bangalore -58

II StageI

Plastic container 15 G-32

Polythene and plastic processedproducts

Small Green 1976BA

31.12.2020N N N N Y 16.06.2012 N NA NA NA 0.8 N NA N Y N NA Yes

8102009-10 O

15602Biyar Rubbers Pvt Ltd,

No.212, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of Tyre retreading material 323 O-70

Tyres and tubes vulcanization/ hot

Small Orange 1986BA

30.09.2029N NA N N N N N NA NA NA 0.8 N NA N Y N NA Yes

8112009-10 CL

-Blue Match Toolings,

No.SM-8, III Stage, PIE, Bengaluru-560 058,

III StageI

Engineering Unit9.19 W-14

Engineering and fabricationunits (dry

Small White 2004BA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8122009-10 CL

39605Bombay Engineering Indusry,

No.A-186, I Stage, PIE, Bengaluru-560 058

I StageI

Manufactures of inudstrial valves operators, bearing bushes, rotary

44 G-7Brass and bell metal utensilsmanufacturi

Small Green 1977BA

31.12.2027N N N N N N N NA NA NA 1 N NA N Y N NA Yes

8132009-10 O

11539Brahad Elastomers Pvt Ltd,

No.A-102(a), II Stage,PIE, Bengaluru-560 058

II StageI

Synthetic rubber moulded components 121.46 G-98

Automobile Tyre &Tubes/rubber tubes only

Small Green 1996BA

31.12.2021N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

8142009-10 O

24471Bremels Rubber Pvt Ltd,

No.128 & 129, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of Tyre retreading material & solid Tyre

1136.98 O-70Tyres and tubes vulcanization/ hot

Large Orange 1984BA

30.9.2021N NA N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

8152009-10 CL

14334Brilliant Electricals,

No.B-118, 3rd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Electrical control pannels 14.05 W-14

Engineering and fabricationunits (dry

Small White 1995BA

31.12.2013N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

8162009-10 CL

-Brilliant Packs,

No.C-77, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic sheet 16 G-32

Polythene and plastic processedproducts

Small Green 1998BA

31.12.2013Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA

8172009-10 O

36587Bulk Packaging Liners Pvt Ltd,

No.485/3, 24th Cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Plastic Liners356 G-79

Plastic sack bags, woven sack -- 10 10 15 -- 15 10

Small Green 2006BA

31.12.2027N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes

8182009-10 CL

-

C.D.Instrumentations Pvt Ltd, No.B-

No.B-254, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8192009-10 O C.K.Engineering Works,

No.69, 6th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit142.31 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1987BA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

8202009-10 CL

-

C.M.Equipments & Instruments (India) Pvt Ltd,

No.B-194, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit61.01 G-78

Switches without

electroplatinSmall Green 4/6/1981

BA31.12.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8212009-10 CL

-Campro Technologies Pvt Ltd,

No.Sb-117, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit21.3 W-14

Engineering and fabricationunits (dry

Small White 1997BA

31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes

8222009-10 CL

-Canara Pipes Pvt Ltd,

No.A-278, 6th Main, II Stage, PIE, Bengaluru-560 058

II StageI

PVC Pipes287 G-79

covered underPlastic

Small Green 1994WA

31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA NA

8232009-10 CL

-Cashwyn Corporation,

No.477, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8242009-10 O

24827Cauvery Enterprises,

No.C-274, I Stage, PIE, Bengaluru-560 058

I StageI

Wood packing4.69 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1994WA

31.12.2024N N N N N N N NA NA NA 0.03 N NA N Y N NA NA

8252009-10 CL

25251Ceebros Automation Pvt Ltd,

No.B-23, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Precision components 34.1 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2003BA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

8262009-10 O

Centraline Lubro Tech Engg Pvt Ltd,

No.A-173, IV cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manfacture of Micro fog lubrication system, mist cool spray lube system and

70.39 W-1Assembly of air coolers/conditioners /repairing

Small White 1990BA

31.12.2021N N N N N N N NA NA NA 0.47 N NA N Y N NA Yes

8272009-10 CL

-Chamundi Creations,

No.A-149, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8282009-10 CL

-Chandru Engineering Works,

No.337, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit56.7 G-78

Switches without

electroplatinSmall Green 2005

BA31.12.2020

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8292009-10 O

31751

Chhaperia Electro Components,

No.270, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Assembling of electrocomponents 56.7 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1994BA

31.12.2026N N N N N N N NA NA NA 1 N NA N Y N NA Yes

830 No.A175 & 176, 4th Cross, I Stage, I Stage Kitchen Equipments furniture 8302009-10 O

33283Kargil Equipment

No.A175 & 176, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Kitchen Equipments1014 G-46

furniture without spray

Large Green 2017BA

31.12.2026N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

8312009-10 CL

-Chitra Rubbers Pvt Ltd,

No.B-241, II Stage, PIE, Bengaluru-560 058

II StageI

Rubber productsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8322009-10 CL

-Circuit Technologies,

No.B-168, II Stage, PIE, Bengaluru-560 058

II StageI

PCB manufacture 48 G-78

Switches without

electroplatinSmall Green 1993

BA31.12.2000

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

8332009-10 CL

-Comsta Forms Pvt Ltd,

No.A-268, II Stage, PIE, Bangalore -58 II StageI

Foam ProductsC1 G-90

foam extrusion as

an allied Small Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8342009-10 CL

-Concerned Tools ,

No.C-97, III Stage,PIE, Bangalore III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8352009-10 CL

-Corinthia Packaging,

No.B-85, I Stage, PIA, Bengaluru-560 058,

I StageI

Corrugated Box25.5 G-9

corrugated BOX Small Green 1993

BA31.12.2012

N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

8362009-10 O Cosmos Engineering,

No.B-246, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit61.44 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2025

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

8372009-10 CL

-Cosmos Tools,

No.C-338, I Stage, PIE, Bangalore, I StageI

Engineering Unit19 W-14

Engineering and fabricationunits (dry

Small White 2004BA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes

8382009-10 CL

-Crystal Home Care Products,

No.B-90, I Stage, PIE, Bangalore I StageI

Kitchen EquilmentsC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8392009-10 O Danam Electronics,

No.Sb-106, I Stage, PIE, Bengaluru-560 058,

I StageI

Sheet metal pressed componenets 11.61 W-14

Engineering and fabricationunits (dry

Small White 1977BA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

8402009-10 O

32744Thacker Sales Corporation

No.271, 8th Cross, 3 Main, IV phase, PIA, Bengaluru-560058

IV PhaseI

Cashew kernal processing and packing

770 O-77Cashew nut processing Medium Orange 2016

BA30.09.2022

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

8412009-10 CL Dash Hydraulines Pvt Ltd,

No.Sb-162, I Stage, PIE, Bangalore I StageI

Manufacture of Lubricants pumps, hydralic equipments

4.45 G-77Manufacture of Motor & Pumpswithout

Small Green 1980BA

31.12.2010N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

8422009-10 CL

-Deepak Industries,

No.25/26, 5th Mian, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit32.59 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA Yes

8432009-10 CL

-Delta Fashions,

No.A-187/188, 4th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Garment75 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2001BA

31.12.2014N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

8442009-10 O Delta Fashions Unit - III,

Unit - III, No.110, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment78 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2001BA

31.12.2021N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

8452009-10 O Delta Fashions Unit-IV,

Unit-IV, No.190-A, I Stage, PIE, Bangalore,

I StageI

Garment91 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2001BA

31.12.2021N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes

8462009-10 O Deshmesh Engineering,

No.D-423, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2005

BA31.12.2021

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

8472009-10 O

15362Design Crafts,

No.63, 4th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

General Engineering Unit 171 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2004BA

31.12.2022N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

8482009-10 O

28255

Devaki Engineering Enterprises,

No.396, 3rd Main. 11th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Battery manu unit90.82 O-73

battery ( excluding

manufacturiSmall Orange 1995

BA31.12.2025

N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

8492009-10 O

Diamond Dies Manufacturing Corporation Ltd,

No.83, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2021

N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes

8502009-10 CL

-Digvijaya Enterprises,

No.M-413, I Stage, PIE, Bengaluru-560 058

I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2020C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8512009-10 CL

-Dimensions,

No.C-277, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2015

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8522009-10 CL Dinesh Exports,

No.B-378, I Stage, PIE, Bangalore -58 I StageI

Garment23.42 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1991BA

31.12.2020N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

8532009-10 O

26325Ducom,

No.Sb-113, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacturing of Metal and Non-metal components for Aerospce and Non-

51.71 G-7 Brass and bell metal utensilsmanufacturi

Small Green 10.11.1975BA

31.12.2025N N N N N N N NA NA NA 0.88 N NA N Y N NA Yes

8542009-10 O

22942Ducom Instruments Pvt Ltd,

No.477-A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Assembling of testing equipments (Engineering Unit)

501.49 G-10Carpentry & wooden furniture

Medium Green 1994BA

31.12.2023N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes22942 (Engineering Unit) furniture

manufacturiBA N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes

8552009-10 CL

-Dustven Pvt Ltd,

No.A-175/176, I Stage, PIE, Bengaluru-560 058,

I StageI

Pollution control equipments 73.37 G-78

Switches without

electroplatinSmall Green 1991

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8562009-10 CL

-Dyanakesh Tools & Devices,

No.355, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BAC1

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

8572009-10 CL

-Dynalite,

No.V-48, II Stage, PIE, Bangalore -58 II StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

WAN

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

8582009-10 CL

-Eagle Graphics,

No.B-206, II Stage, PIE, Bengaluru-560 058

II StageI

Sign BoardsC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8592009-10 CL

-Electrical And Allied Products,

No.B-88/2, I Stage, PIE, Bengaluru-560 058,

I StageI

Elctric control pannel12.7 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

8602009-10 O

Electronic Investment & Devices,

No.484, IV Phase, PIA, Bangalore, IV PhaseI

UPS System78 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

8612009-10 O Electrogear,

No.45, I Stage, PIE, Bangalore, I StageI

Assembling of electropanels 24.36 W-14

Engineering and fabricationunits (dry

Small White 1997BA

31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes

8622009-10 CL

-Elmec Engineers,

No.14-A, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8632009-10 CL

-Elrke Systems Pvt Ltd,

No.A-322, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit10 W-14

Engineering and fabricationunits (dry

Small White 1988BA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8642009-10 CL

-Enamellers & Engineers,

No.446, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8652009-10 CL

-Engineering Enterprises,

No.437-A, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8662009-10 CL

-Engineering Equipments,

No.131, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit29.9 G-78

Switches without

electroplatinSmall Green 1969

BA31.12.2010

C1 N C1 N C1 N C1 NA NA NA 0.2 N ST & SP N N N NA NA

8672009-10 O

Engineering Steel Fabricating Works,

No.161, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit20 W-14

Engineering and fabricationunits (dry

Small White 1985BA

31.12.2013N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

8682009-10 CL

-

Engineers Steel Fabricating Works,

No.161, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Fabrication unit20 W-14

Engineering and fabricationunits (dry

Small White 1995BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

8692009-10 O Equipments & Systems,

No.70/71, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

8702009-10 CL

-Escon Jyothi Pvt Ltd,

No.485-C, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2015

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8712009-10 CL

-Ess Flexi Tubes Pvt Ltd,

No.53, 4th Main Road, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit19.88 W-14

Engineering and fabricationunits (dry

Small White 2001WA

31.12.2012N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

8722009-10 CL

-Ess Vee Engineering,

No.508/1, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit71.52 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2015

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

8732009-10 O Evgrien,

No.C-65, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit36.31 W-14

Engineering and fabricationunits (dry

Small White 1992WA

31.12.2020N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

8742009-10 CL

-

Executive Appareal Processors,

No.376, I Stage, PIE, Bengaluru-560 058,

I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8752009-10 O

12727Fashion Matrix Overseas,

No.284, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment308 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004WA

31.12.2027N N N N N N N NA NA NA 4.8 N NA Y Y N NA NA

8762009-10 O Fashion Power,

No.10, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment78 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

8772009-10 O FDC Ltd,

No.A-7, III Stage, PIE, Banglaroe-58, III StageI

Distribution of Pharmceuticals 41.92 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.20213

N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

8782009-10 CL

-Fibre & Fabrics International,

No.SB-14, I Stage,PIE, Bengaluru-560 058

I StageI

Garment78 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004BA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

879 No.A-282, II Stage, PIE, Bengaluru- II Stage Fiber sheets Switches 8792009-10 CL

-Fibre Shells Ltd,

No.A-282, II Stage, PIE, Bengaluru-560 058

II StageI

Fiber sheetsC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8802009-10 CL

-Fibres & Fabrics International,

No.90A, II Phase, PIA, Bangalore, II PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8812009-10 CL

-

Fibres & Fabrics International Pvt Ltd,

No.124, III Phase, PIA, Bangalore III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8822009-10 CL

-Fibres Foils Ltd,

No.A-181, I Stage, PIE, Bengaluru-560 058

I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8832009-10 CL

-Filt Crafts Pvt Ltd,

No.B-80, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8842009-10 CL

-Fine Crafts,

No.250, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2019

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8852009-10 CL Fine Plastics,

No.53, 4th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Plastic injection moulding 198 G-32

Polythene and plastic processedproducts

Small Green 2009WA

31.12.2013N N N N N N N NA NA NA 0.3 N ST & SP N N N NA NA

8862009-10 O

24117

Fine Tools India Pvt Ltd., Unit-I,

No.449-P, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Plastic injection moulding 74.23 G-32

Polythene and plastic processedproducts

Small Green 2008BA

31.12.2034N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

8872009-10 O Finetech Toolings,

No.V-16, Next To C-177, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit71.22 G-78

Switches without

electroplatinSmall Green 1995

BA31.12.2025

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

8882009-10 CL

-Flexo Tech Products,

No.B-16, I Stage, PIE, Bengaluru-560 058,

I StageI

Machine component46.89 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2002BA

31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

8892009-10 CL Fluro Light Pvt Ltd,

No.M-11, I Stage, PIE, Bengaluru-560 058

I StageI

Lamp assembly45.83 G-78

Switches without

electroplatinSmall Green 1999

BA31.12.2010

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

8902009-10 CL

-Fluro Start Pvt Ltd,

No.A-153, II Stage, PIE, Bangalore II StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8912009-10 CL

-Fluro Start Pvt Ltd -

No.A-418, II Stage, PIE, Bengaluru-560 058

II StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8922009-10 O

32407Fortiforie Plastics Pvt Ltd,

No.B-43, III Stage,PIE, Bengaluru-560 058

III StageI

Thermocol 68 O-67

Thermocol manufacturing ( withboiler)

Small Orange 1991BA

30.09.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

8932009-10 O Fortune Packaging Pvt Ltd,

No.A-33, II Stage, PIE, Bangalore II StageI

Corrugated Box78 G-9

Cardboard or corrugated box and

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

8942009-10 CL

-G-Max Acids & Chemicals,

No.322, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Chemical Trading C1 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8952009-10 CL

-G.K.S. India,

No.C-217, I Stage, PIE, Bengaluru-560 058

I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2023C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

8962009-10 CL

-G.R.V. Mercandising,

No.A-353, II Stage, PIE, Bengaluru-560 058,

II StageI

Corrugated box17.2 G-9

Cardboard or corrugated box and

Medium Green 2003BA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA

8972009-10 O Ganesh Coil Works,

No.23-A, 1st cross, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Transformer and electric chokes assembly

157.82 G-85Transformer assembly unit(industrial

Small Green 1989BA

31.12.2023N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

8982009-10 O

85262Gaviranga Engineering Works,

No.84, 2nd Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication and engineering unit 78 G-93

Manufacturing of nuts and boltswith cold

Small Green 2004WA

31.12.2034N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

8992009-10 CL

-Gaviranga Engineering Works,

N0.408, IV Phase,PIA,Banglore-58, IV PhaseI

Engineering Unit14.80 W-14

Engineering and fabricationunits (dry

Small White 1986WA

NN N N N N N N NA NA NA 0 N NA N N N NA NA

9002009-10 O

Geekay Tarpaullins & Polymers (P) Ltd,

No.B-142, 3rd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Tarpaullins10.32 G-15

Cotton spinning and weaving(small scale)

Small Green 2003BA

31.12.2034N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes

9012009-10 CL Gem Threads Industries,

No.306, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Nylon thread weaving 47.38 G-78

Switches without

electroplatinSmall Green 2000

BA31.12.2015

N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes

9022009-10 O

24125General Magnetics,

No.C-83, II Stage, PIE, Bengaluru-560 058,

II StageI

Relays23 W-14

Engineering and fabricationunits (dry

Small White 1976BA

31.12.2012N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

9032009-10 CL

28012Gera Auto Industries,

No.A-6, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit52.87 G-78

Switches without

electroplatinSmall Green 1974

BA31.12.2002

N N N N N N N NA NA NA 0 N NA N N N NA Yes28012 electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA Yes

9042009-10 CL

-Girimaji & Sons,

No.5, III Phase, PIA, Bangalore III PhaseI

Fabrication unit9.6 W-14

Engineering and fabricationunits (dry

Small White 1974BA

31.12.2015C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

9052009-10 O Giri Engineering Pvt Ltd,

No 25-E, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Fabrication unit133 G-78

Switches without

electroplatinSmall Green 1991

BA31.12.2035

N N N N N N N NA NA NA 0.32 0.43 NA N Y N NA Yes

9062009-10 O

40802

Girish Paper Packaging Pvt Ltd, ,

No.217, III Phase, PIE, Bengaluru-560 058,

III PhaseI

Corrugated Box155 G-9

Cardboard or corrugated box and

Small Green 1990BA

31.12.2025N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

9072009-10 CL

-Golani & Company,

No.B-30, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9082009-10 CL Golden Profile,

No.B-158, II Stage, PIE, Bengaluru-560 058,

II StageI

Hydraulic fittings49.11 G-78

Switches without

electroplatinSmall Green 1994

BA31.12.2013

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

9092009-10 CL

-Golden Steel Industries,

No.111, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit78 G-78

electroplating/ Control

panelSmall Green 2004

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9102009-10 CL

-

Gowri Shankar Engineering Industries,

I Stage, PIE, Bengaluru-560 058 I StageI

Engineering UnitC1 G-78

equipment and power

devicesSmall Green Closed

BA31.12.2015

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9112009-10 O Growell Cnc Systems,

No.C-438, I Stage, PIE, Bangalore, I StageI

Engineering Unit51 G-78 manufacturi

ng/Small Green 2002

WA31.12.2004

N N N N N N N NA NA NA 0.05 N NA N Y N NA NA

9122009-10 O

27543Gupta Electrical Indsutries,

No.158, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fabrication and engineering unit 270 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1981BA

31.12.2025N N N N N N N NA NA NA 2.8 N NA N Y N NA Yes

9132009-10 O

Guruson Engineering Enterprises,

No.C-26, 2nd Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Transformers11 W-14

Engineering and fabricationunits (dry

Small White 1994WA

31.12.2023C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.48 N NA N Y N NA NA

9142009-10 O

H.R.Engineering Works Pvt Ltd., (Formerly known as H.R.Engineering Works),

No.B-224, II Stage, PIE, Bengaluru-560 058,

II StageI

(Fabrication work) Engineering Unit 53 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1982BA

31.12.2023N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

9152009-10 O Hallidon Industries ,

No.B-39, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit7.56 W-14

Engineering and fabricationunits (dry

Small White 2004BA

31.12.2016N N N N N N N NA NA NA NA N NA N N N NA Yes

9162009-10 CL

-Hampa Industry,

No.V-7, 1st A Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit6.56 W-14

Engineering and fabricationunits (dry

Small White 1995BA

31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9172009-10 O

31676Hanuman Weaving Factory,

No.473/B, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Silk weaving 89 G-15

Cotton spinning and weaving(small scale)

Small Green 2006BA

31.12.2026N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

9182009-10 CL

-Harsha Packaging ,

No.A-37, II Stage, PIE, Bengaluru-560 058

II StageI

Corrugated BoxC1 G-9

Cardboard or corrugated box and

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9192009-10 CL

-Heat Core Enterprises,

No.35, III Phase, PIA, Bengaluru-560 058

III PhaseI

Heat treatment activity on job work and oil componenets only

24 O-63Engineering Industries with HeatTreatment,

Small Orange 30/6/10BA

31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9202009-10 CL

-Hegade Engineering Indsutry,

No.C-135 A, II Stage, PIE, Bangalore II StageI

Engineering Unit8.62 W-14

Engineering and fabricationunits (dry

Small White 1990BA

C1N N N N N N N NA NA NA 0 N NA N N N NA NA

9212009-10 CL Hi-Tech Accumulation,

No.B-231, II Stage, PIE, Bengaluru-560 058,

II StageI

PVC Separators23.17 G-79

covered underPlastic

Small Green 2000BA

31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

9222009-10 CL

-

Hi-Tech Supports (India) Pvt Ltd,

No.A-28, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9232009-10 O

30511

Twivi Technology Pvt Ltd., (Formerly known as Hi-Tech

Times),

No.A-352(B), 8th Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit269 G-18

Brass and bell metal utensilsmanufacturi

Small Green 1992BA

31.12.2024N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

9242009-10 CL

-Hidri Tools Pvt Ltd,

No.535, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering with spary painting 47.22 O-62

Spray painting, paint baking, paint

Small Orange 1991BA

30.09.2007N N N N N N N NA NA NA 0 N NA N N N NA NA

9252009-10 O

75304

Capro Labs Exports India Pvt Ltd,

No.A-109, II Stage, PIE, Bengaluru-560 058

II StageI

Ayurvedic Formulation 34.18 O-6

Ayurvedic and homeopathic medicines

Small Green 2004BA

31.12.2028N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes

9262009-10 O

11518

Chempharm Industrial Vessels,

No.512, IV Phase, PIA, Bangalore-560058

IV PhaseI

Process equipments & Fabrication items 51.47 O-62

Spray painting, paint baking, paint

Small Orange 1996BA

30.09.2022N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

9272009-10 CL Explora Marbles,

No.441/442, IV Phase, PIA, Bangalore-560058

IV PhaseI

Granite cutting and polishing 55.75 G-56

Cutting, sizing and polishing ofmarble

Small Green 1992BA

30.09.2019N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes

928Govind Granites ( Formerly

No.347/348, IV Phase,PIA, Bengaluru- IV Phase Granite cutting and sizing and 9282009-10 CL

-

Govind Granites ( Formerly Gayathri Granites (P) Ltd,)

No.347/348, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Granite cutting and polishing 149 G-56

sizing and polishing of

marble Small Green 2006

BA30.09.2010

N N N N N N N NA NA NA 0 N NA N N N NA NA

9292009-10 O

17999Global Food Specialities,

No.529, IV Phase, PIA, Banglaore-58 IV PhaseI

Food flavours 76.84 O-62

Spray painting, paint baking, paint

Small Orange 2005BA

30.09.2022N N N N N N N NA NA NA 0.6 0.4 ST & SP N N Y NA Yes

9302009-10 CL

-Hindustan Feeds,

No.A-287, II Stage, PIE, Bengaluru-560 058

II StageI

Poultry feeds 42.43 O-30

poultry feed and cattle

feedSmall Orange 2004

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9312009-10 CL

-

Integrated Electric Company Pvt Ltd,

No.B-46, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering Unit63.96 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2003

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9322009-10 CL

-

Kayanathu Herbals & Aromatics (P) Ltd,

No.470a, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Ayurvedic Formulation C1 O-19

Ayurvedic and homeopathicmedicine

Small Orange ClosedBA

31.12.2018C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9332009-10 O

15240MPP Technologies Pvt Ltd,

No.A-153 & 154, 3rd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering with spary painting 114 O-62

Spray painting, paint baking, paint

Small Orange 1982BA

30.09.2022Y 30.09.2019 N N N N N NA NA NA 1 N NA N Y N NA Yes

9342009-10 O Parijatha Floorings,

No.1-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Mosaic Tiles170 G-73

Inter locking paving blocks/Manual and

Small Green 1983BA

31.12.2035N N N N N N N NA NA NA 0.32 NA NA N Y N NA Yes

9352009-10 CL

-Spa Labs,

No.23, 13th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Ayurvedic Formulation 29 O-19

Ayurvedic and homeopathicmedicine

Small Orange 2003BA

31.12.2016N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

9362009-10 CL

12781Union Pressings Pvt Ltd,

No.265, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Fabrication 453 O-62

Spray painting, paint baking, paint

Small White 1984BA

30.09.2017N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

9372009-10 O Yes Bee Auto Industries,

No.89, 8th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Precisoin turned componenent 15 W-14

Engineering and fabricationunits (dry

Small White 2008BA

31.12.2013N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

9382009-10 CL

-High Tech Fittings,

No.C-431, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit42.4 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2001BA

31.12.2006N N N N N N N NA NA NA 0 N NA N N N NA Yes

9392009-10 O Hindsutan Furniture Works,

No.234, Iii Phase, PIA, Bangalore III PhaseI

Fabrication unit78 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

9402009-10 CL

-Hindustan Lamps,

No.B-32, I Stage, PIE, Bengaluru-560 058

I StageI

Electric BulbsC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9412009-10 CL

-Honey Hill Synergy Systems,,

N0.365,IV Phase,PIA,Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2021

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9422009-10 O Hotel Gurukrupa,

No.P-1A, 14th corss, III Stage,PIE, Bangalore

III StageHospital

ity

Hotel 23 G-3

confectionery / sweetsproducts

Small White 2000BA

31.12.2019N N N N N N N NA NA NA 2 N NA N Y N NA Yes

9432009-10 CL

-

Hydraulics India Services Pvt Ltd,

No.C-288, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BA31.12.2018

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

9442009-10 O

Hydraulics India Services Pvt Ltd,

No.C-294, 8th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Reconditioning and manufacture of hydraulic cyclinders or earth moving

96.35 G-60Repairing, cleaning, degreasing, painting and

Small Green 1999BA

31.12.2021N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes

9452009-10 CL

-Hydro Controls (P) Ltd,

No.49b, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BAC1

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

9462009-10 O Hydrolines.,

No.497-C,IV Phase,PIA,Bengaluru-560 058

IV PhaseI

Hose assembly172 G-86

Tread rubber including pre-curedrubber

Small Green 1982BA

31.12.2018N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

9472009-10 O Hygrade Steels,

No.B-183, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2021

N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

9482009-10 CL

-I.J.Machines,

No.8, I Stage, PIE, Bengaluru-560 058 I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9492009-10 O India Flexibles,

No.SB-58, I Stage, PIE, Bengaluru-560 058,

I StageI

Hydraulic hose assembly 44.3 W-13

Electrical and electronic item

Small White 2003BA

31.12.2013N N N N N N N NA NA NA NA N NA N N N NA Yes

9502009-10 O Indian Fused Quartz Pvt Ltd,

No.A-110, II Stage, PIE, Bengaluru-560 058

II StageI

laboratory quartz article 3.86 G-108

Fiber glass molding, Fiber Glass reinforced

Small Green 1979BA

31.12.2020N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes

9512009-10 O

21735Indian High Vaccum Pumps,

No.B-28, I Stage, PIE, Bengaluru-560 058

I StageI

Assembly of vaccume pumps 51.58 G-77

Manufacture of Motor & Pumpswithout

Small Green 1979BA

31.12.2023N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

9522009-10 O

Indira Rubber & Plastic Pvt. Ltd.,

No.473,B-1, 12th Cross, IV Phase,PIA,Bengaluru-560 058

IV PhaseI

Battery containers 324 O-73

battery ( excluding

manufacturiSmall Orange 1988

WA31.12.2022

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NAmanufacturi WA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

9532009-10 CL

12420

Cargotech India Private Limited (Multi Assembly Unit),

No.10-B, II Phase, PIA, Bangalore-560058.

II PhaseI

Engineering with spary painting 1100 O-62

Spray painting, paint baking, paint

Large Orange 1989BA

30.09.2017N N N N N N N NA NA NA 2.5 N NA N Y N NA Yes

9542009-10 CL

-Indo Motors,

KIADB 100 Feet Road, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering with spary painting 9.38 O-18

Automobile servicing,repairing and painting

Small Orange 2010BA

30.09.2013N N N N N N N NA NA NA 0.4 2 NA N Y Y NA Yes

9552009-10 O Indus Control & Automation,

No.B-92, 2nd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit (Weigh feeder, Batching plant, belt weigher & filling

67.1 G-7Brass and bell metal utensilsmanufacturi

Small Green 2002WA

31.12.2022N N N N N N N NA NA NA 0.56 N NA N Y N NA NA

9562009-10 O Industrial Automation,

No.12, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BA31.12.2021

N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

9572009-10 O

26597

Industrial Research Corporation,

No.175/176, III Phase, PIA, Bengaluru-560 058

III PhaseI

Ball point pen refills58.91 W-17

Fountain pen manufacturing

Small White 1991BA

31.12.2025N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

9582009-10 O

17011

Infusil Glasstech Machines Manufacutrers,

, No. B-114, III Phase,PIA, Bengaluru-560 058

III PhaseI

Laboratory ware includingglass blowing

46 W-43Laboratory ware includingglass

Small White 1992BA

31.12.2020N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

9592009-10 O Infusil India Pvt Ltd

No.174, 11th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

laboratory glass wares143 G-108

Fiber glass molding, Fiber Glass

Small Green 1992WA

31.12.2034N N N N N N N NA NA NA 0.48 N NA N Y N NA NA

9602009-10 CL

-Innova Polytex,

No.423, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

ResinsC1 O-75 Synthetic

resinsSmall Orange Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9612009-10 CL

-Innova Polytex Pvt Ltd,

No.A-9, I Stage,PIE, Bengaluru-560 058

I StageI

Printed lainatd pouches 54.4 G-32

and plastic processedproducts

Small Green 1998BA

31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9622009-10 O Innovative Equipment,

No.B-123, 3rd Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit29.2 G-78

Switches without

electroplatinSmall Green 1996

BA31.12.2012

N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

9632009-10 O Insufrac Refracteries,

No.345,IV Phase, PIA ,Bengaluru-560 058,

IV PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

BA31.12.2021

N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes

9642009-10 CL

-Insupac Refractories,

No.345, IV Phase, PIA, Bangalore, IV PhaseI

Ceramic productsC1 O-22

Ceramics and Refractories

Small Orange ClosedBA

31.12.2021C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9652009-10 CL

-

Integrated Process Automation Pvt Ltd,

No 497/A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Motor assembly68 G-77

of Motor & Pumpswithout

Small Green 1989BA

31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9662009-10 CL

-

International Chemicals, No.A-46, II Stage, PIE, Bengaluru-

560 058

No.A-46, II Stage, PIE, Bengaluru-560 058

II StageI

plastic5.6 Closed Small Green 1979

BA31.12.2018

C1 N C1 N Y 16.06.2009 C1 NA NA NA 0 N NA N N N NA NA

9672009-10 CL

-International Machine Tools,

No.255, Iv Phase, PIA, Bangalore, IV PhaseI

Engineering Unit39 G-78

Switches without

electroplatinSmall Green 1991

BAC1

N N N N N N N NA NA NA 0 N NA N N N NA NA

9682009-10 CL

-Intigraters,

No.B-302, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2024

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9692009-10 O IPA Engineering Pvt Ltd,

No.447, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electronic Weighing System 123 G-78

Switches without

electroplatinSmall Green 1993

WA31.12.2021

N N N N N N N NA NA NA 0.17 N NA N Y N NA NA

9702009-10 CL

-Ispl Systems Pvt Ltd,

No.V-3, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2020

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9712009-10 CL

16468J.B.C Garments Pvt Ltd,

No.219, 11th Main , 2nd cross, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment463.99 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1999BA

31.12.2024Y 31.12.2016 N N N N N NA NA NA 8 N STP N N N NA Yes

9722009-10 O J.K.Lines,

No.530, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Coils Transformers8.83 G-85

Transformer assembly unit(industrial

Small Green 1991WA

31.12.2023N N N N N N N NA NA NA 0.32 N ST & SP N N N NA NA

9732009-10 O J.M.T Ventoids Pvt Ltd,

No.B-69, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit80 W-14

Engineering and fabricationunits (dry

Small White 1993BA

31.12.2019N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

9742009-10 CL

-J.S.Enterprises,

No.307, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit78 G-78

Switches without

electroplatinSmall Green 2004

WACL

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

9752009-10 CL

-Jain Raising ,

No.Sb-46, I Stage, PIE, Bangalore, I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2000

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9762009-10 CL

-Jay-Pee Shoes Pvt Ltd,

No.A-290, II Stage, PIE, Bengaluru-560 058

II StageI

Rubber foot wear C1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

30.06.2018C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

977 No.199/3, 3rd cross, III Phase, PIA, III Phase Machine Fabrication Engineering 9772009-10 O

17253Jaya Engineering Works,

No.199/3, 3rd cross, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Machine Fabrication26 W-14

Engineering and fabricationunits (dry

Small White 2008BA

31.12.2017N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

9782009-10 O Jeet Industries,

No.D-431, II Stage, PIE, Bangalore -58

II StageI

Engineering Unit9.56 W-14

Engineering and fabricationunits (dry

Small White 1992BA

31.12.2014N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

9792009-10 O

16222Jigar Marketing Pvt Ltd,

No.B-101, 2nd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacture of Bright steel bars 143.08 R-44

Industry or process involvingmetal

Small Red 1994BA

30.06.2023Y 31.12.2014 N N N N N NA NA NA 0.21 0.2 NA N Y Y NA Yes

9802009-10 CL

-K.C. Industries & Fabricators,

No.C-340, 6th cross,3rd Main, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit14.43 W-14

Engineering and fabricationunits (dry

Small White 1995BA

31.12.2013N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

9812009-10 CL

-K.K.Systems,

No.171, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9822009-10 CL

-K.R.Modi & Co,

No.A-182, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2022

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9832009-10 CL

-Kaedia Colthing Co,

No.254/A, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2020C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9842009-10 CL

-

Kalimatha Plastic Machines Manufacturers,

No.A-5, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering with spary painting 20.44 O-62

Spray painting, paint baking, paint

Small Orange 1/1/1979BA

31.12.2002C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

9852009-10 O Kanchan Times,

No.C-285, 7th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit59 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1998BA

31.12.2022N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

9862009-10 CL Kanvas Engineering Indsutries,

No.C-211, 4th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit38.33 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1965BA

31.12.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

9872009-10 O Kapeela Rubbers,

No.C-202, I Stage, PIE, Bengaluru-560 058

I StageI

Rubber componenent41.58 G-41

Rubber goods industry (with gas

Small Green 1980BA

31.12.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

9882009-10 CL

-Kaptronics Pvt Ltd,

No.B-115, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit30.43 G-78

Switches without

electroplatinSmall Green 1983

BA31.12.2012

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

9892009-10 CL

-Karavali Engineers,

No.D-395, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication unit1.73 W-14

Engineering and fabricationunits (dry

Small White 1981WA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

9902009-10 O Karnataka Boats,

No.A-44, II Stage, PIE, Bengaluru-560 058

II StageI

Fiber Glass18.77 G-108

Fiber glass molding, Fiber Glass

Small Green 1981BA

31.12.2020N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

9912009-10 O Karnataka Electrical Industry,

No.A-53, II Stage, PIE, Bengaluru-560 058

II StageI

Electronic panel Board 23 W-14

Engineering and fabricationunits (dry

Small White 1998BA

31.12.2013N N N N N N N NA NA NA NA N NA N N N NA Yes

9922009-10 O Karnataka Electro Controls,

No.C-131, II Stage, PIE, Bengaluru-560 058

II StageI

Assemly Blowers19.9 W-14

Engineering and fabricationunits (dry

Small White 1995BA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

9932009-10 O

34974

Karnataka Engineering Enterprises,

No.420, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit with Spray painting 267.01 O-62

Spray painting, paint baking, paint

Small Orange 1986BA

30.09.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

9942009-10 O Karnataka Errectors,

No.B-153, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit23 W-14

Engineering and fabricationunits (dry

Small White 1998BA

30.06.2014N N N N N N N NA NA NA NA N NA N N N NA Yes

9952009-10 CL

-Karnataka Plywoods,

No.393, Iv Phase, PIA, Bangalore, IV PhaseI

PlywoodC1 G-10

wooden furniture

manufacturiSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

9962009-10 CL

-

Karnataka Texspares & Steel (P) Ltd,

No.21-D, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garments stitching310 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1998BA

30.06.2019N N N N N N N NA NA NA 12 N STP Y N N NA Yes

9972009-10 O

27278Suman Plastics

No.A-343, 8th Main, II stage, PIA, Bengaluru-560 058

II StageI

Plastic Moulded chair92.3 O-63

Engineering Industries with HeatTreatment,

Small Orange 1984BA

31.12.2025N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

9982009-10 CL

-Karnataka Electronics,

No.B-166, I Stage, PIE, Bengaluru-560 058

I StageI

Electronic componenets C1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

999

2009-10 O

11607

Karnataka Instruments,

No.A-269, II Stage, PIE, Bangalore -58

II Stage

I

Industrial thermometers (with degreasing and spray painting) (Engineering activity)

57.41 R-44

Industry or process involvingmetal surface treatment or

Small Red 1983

BA

30.06.2024

N N N N N N N NA NA NA 1.2 0.01 NA N Y Y NA Yes

10002009-10 CL

-Kartex,

No.B-218, II Stage, PIE, Bangalore II StageI

Engineering Unit19.9 W-14

Engineering and fabricationunits (dry

Small White 1997BA

31.12.2010C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

1001 No.C-425, 1st cross, I Stage, PIE, I Stage Auto Turned Brass and 10012009-10 O

23251Karthik Industries,

No.C-425, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Auto Turned Components Pressure (Engineering Unit)

82 G-7Brass and bell metal utensilsmanufacturi

Small Green 2008WA

31.12.2023N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

10022009-10 CL

-Kash Fabror (P) Ltd,

No.376, IV Phase, PIA, Bangalore, IV PhaseI

Engineering Unit23 W-14

Engineering and fabricationunits (dry

Small White 1998BA

31.12.2000N N N N N N N NA NA NA 0 N NA N N N NA Yes

10032009-10 O Kashi Precission Components,

No.B-132, 3rd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacture of Turned Components-Bolts & Nuts

90.42 G-7Brass and bell metal utensilsmanufacturi

Small Green 1977BA

31.12.2020N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes

10042009-10 O Kashyap Industries,

No.C-202/A, 4th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Rubber componenent34.53 G-41

Rubber goods industry (with gas

Small Green 1996BA

31.12.2022N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

10052009-10 O Kaveri Wood & Coir Atainers,

No.287, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Coir product23 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1998BA

31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

10062009-10 O

28962Khedda Insulation Systems,

No.A-279(a), II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit32 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1998BA

31.12.2025N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

10072009-10 O KE Material Handling Pvt Ltd,

No.163, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit12.96 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2033N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

10082009-10 CL

-Akshya Apprels Pvt Ltd,

No.165, III Phase, PIA, Bangalore III PhaseI

Manufacture of ready made grments 25.1 G-72

Stitching/ Stitching ofshoe uppers/

Small Green 2006BA

31.12.2011C1 N C1 N C1 N C1 NA NA NA 6 N ST & SP N N N NA NA

10092009-10 CL

-Khivaraja Appliences ,

No.245, III Phase, PIA, Bangalore III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10102009-10 CL

-Kiran Plastic Industries,

No.B-351, II Stage, PIE, Bangalore II StageI

Plastic injection moulding C1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

31.12.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10112009-10 CL

-Kiv Metal Prints Pvt Ltd,

No.39, III Phase, PIA, Bangalore III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10122009-10 O Krishi Irrigation Pvt Ltd,

No.C-184, II Stage, PIE, Bengaluru-560 058

II StageI

Extrude pipes140 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1986BA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

10132009-10 CL

-Krishna Containers,

No.A-7, III Stage,PIE, Bangalore III StageI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 1971BA

C1C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

10142009-10 CL

-Krishna Industries,

No.200, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Precisoin turned componenent 12 W-14

Engineering and fabricationunits (dry

Small White 1971BA

31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA NA

10152009-10 CL

-Kusum Exim Pvt Ltd,

No.289, IV Phase, PIA, Bangalore, IV PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10162009-10 CL

-L.B.M. Fashions,

No.B-82, I Stage, PIE, Bangalore I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10172009-10 CL

-Bombay Royon Fashions Ltd,

No.498, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment86.26 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1997WA

NN N N N N N N NA NA NA 0 N NA N N N NA NA

10182009-10 CL

-Lakme Paints & Varnishes,

No.498, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

PaintC1 R-21

Manufacturing of paintsvarnishes, pigments

Small Red ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10192009-10 CL

-Lakotia Belting,

No.C-91, II Stage, PIE, Bangalore II StageI

Rubber productsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

31.12.2024C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10202009-10 O Lakshmi Enrerprises,

No 25, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Godown13.03 G-19

Facility of handling, storage andtransportatio

Small Green 2005BA

31.12.2015N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes

10212009-10 CL

-Lalitha Indsutries,

No.C-245, I Stage,PIE, Bangalore I StageI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 1971BA

31.12.2023C1 C1 C1 N C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10222009-10 O Leo Foot Wear Co,

No.A-154, II Stage, PIE, Bengaluru-560 058

II StageI

canvas shoes64.65 G-26

Leather foot wear and leatherproducts

Small Green 1986BA

31.12.2024N N N N N N N NA NA NA 1 N NA N Y N NA Yes

10232009-10 CL

-M.G.Metals Pvt Ltd,

No.406, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10242009-10 CL

24198MPP Technologies Pvt Ltd,

No.B-233, II Stage, PIE, Bangalore, II StageI

Engineering & Fabrication Unit (Stator Stacks and parts)

43.5 G-78Panel Board, Switches withoutelectroplatin

Small Green 29.01.2014BA

31.12.2023N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

10252009-10 O M.S.Storage Industries,

No.C-92, 4th cross, II Stage, PIE, Bengaluru-560 058,

II StageI

General Engineering with spray painting 19.6 W-14

Engineering and Small White 2003 31.12.20992009-10 O M.S.Storage Industries, Bengaluru-560 058, I with spray painting

(dry type) Activity19.6 W-14 and

fabricationunits (dry

Small White 2003BA

31.12.2099N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

10262009-10 O Machine Tool Corporation,

No.C-254, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit21 W-14

Engineering and fabricationunits (dry

Small White 1996WA

NN N N N N N N NA NA NA NA N NA N N N NA NA

10272009-10 CL

-Madhsoodan Foods Pvt Ltd,

No.B-31, Iii Stage,PIE, Bangalore III StageI

Food flavours C1 O-7

food processingincluding

Small Orange ClosedWA

31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10282009-10 O

12302

Magnetic Corporation Of India,

No.C-97, II Stage, PIE, Bangalore-560058,

II StageI

Electro magnetic equipments with spray painting

62.95 O-62Spray painting, paint baking, paint

Small Orange 1982BA

30.09.2029N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

10292009-10 CL Mahaveer Enterprises,

No.B-378, 100 feet ring road, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit65.94 G-79

Plastic sack bags, woven sack -- 10 10 15 -- 15 10

Small Green 1995BA

31.12.2018

N 31.12.2022 N N N N N NA NA NA 0.2 N NA N Y N NA Yes

10302009-10 O

14835Mahe Industries,

No.VP-2, I Stage, PIE, Bngalore-58, I StageI

Engineering Unit124.83 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2022N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

10312009-10 O

14835Excel Agro Chemicals

No. 358/1, 9th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Production of Pesticides, Fungicides, Herbcides and Growth

94 O-29of

Pesticides, insecticides

Small Orange 2016BA

30.09.2022N N N N N N N NA NA NA 19 N ST & SP N N N NA Yes

10322009-10 O

Maini Precission Products Pvt Ltd,

No.B-165, 3rd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit- Precision Components

2128 G-78Switches without

electroplatinLarge Green 1973

BA31.12.2022

Y 31.12.2023 N N N N N NA NA NA 7 N NA N Y N NA Yes

10332009-10 O Uniqtronics Solutions Pvt Ltd

No.387, 10th Cross, 4th Main, IV Phase,PIA, Bengaluru-560 058,

IV PhaseI

Panel Board switches without electroplating control panel equipment

53.77 G-78Switches without

electroplatinSmall Green 2016

BA31.12.2027

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

10342009-10 O Mallar Indsutries ,

No.B-447, I Stage,PIE, Bengaluru-560 058

I StageI

Fabrication work17.81 W-14

Engineering and fabricationunits (dry

Small White 1987BA

31.12.2021N N N N N N N NA NA NA 0.225 N ST & SP N N N NA Yes

10352009-10 CL

-Malnad Laboratory Pvt Ltd,

No.306/A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electrical component5.84 W-14

and fabricationunits (dry

Small White 1981WA

31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10362009-10 O

39421

R.B. Mangaram Foods Products Ltd,

No.322, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Wafer biscuits90 G-3

Bakery / confectionery / sweetsproducts

Small Green 2002BA

31.12.2027N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

10372009-10 CL

-Manisha Polymers,

No.267, IV Phase, PIA, Bangalore, IV PhaseI

ResinsC1 O-75 Synthetic

resinsSmall Orange Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10382009-10 O Manohar Industries,

No.B-110, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit14 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2022N N N N N N N NA NA NA NA N NA N N N NA Yes

10392009-10 O

17294Mereena Creations,

No.65-A, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment452.83 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2023Y 31.12.2019 N N N N N NA NA NA 9.6 N STP - BWSSB N N N NA Yes

10402009-10 O

Maruthi Engineering Enterprieses,

No.D-394, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 1991WA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

10412009-10 O

79253Maruthi Fab Tech,

No.A-45, II Stage, PIE, Bengaluru-560 058,

II StageI

Machinery Parts (Engineering Work) 205 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1971BA

31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

10422009-10 CL Maruthi Shoe Industries,

No.C-287, 8th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Foot wear13 G-26

Leather foot wear and leatherproducts

Small Green 2004BA

31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

10432009-10 O Maruthi Rubber,

No.B-37, III Stage,PIE, Bengaluru-560 058

III StageI

Rubber componenent12 G-41

Rubber goods industry (with gas

Small Green 1971BA

31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes

10442009-10 CL

-Max Polymers,

No.261, IV Phase, PIA, Bangalore, IV PhaseI

ResinsC1 O-75 Synthetic

resinsSmall Orange Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10452009-10 O

22407Mechano Engineering Co,

No.181, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit115.96 W-14

Engineering and fabricationunits (dry

Small White 1983BA

31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

10462009-10 CL

21546Mechatronics,

No.SB-38, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication unit45.19 G-78 Small Green 1974

BA31.12.2015

N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

10472009-10 CL

-

Mectrone Engineering Services,

No.C-146, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit18.7 W-14

Engineering and fabricationunits (dry

Small White 1982BA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA

10482009-10 O Megha Industries,

No.12, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 1971WA

NN N N N N N N NA NA NA NA N NA N N N NA NA

10492009-10 CL

-Metal Craft,

No.B-198, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2021

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10502009-10 CL

-Micro Cold Forge,

No.D-429, II Stage, PIE, Bengaluru-560 058

II StageI

Screw and Reivent18.65 W-14

Engineering and fabricationunits (dry

Small White 1988BA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10512009-10 O

33385Green Chef Appliances Ltd

No.477E, 12th Cross, 3rd Main, IV Phase, PIA, Bengaluru-560058

IV PhaseI

Manufacture of pressure cooker, LPG Stove, Non stick cookware

950 G-1 Aluminium utensils from aluminium circles by

Medium Green 2014BA

23.08.2021N N N N N N N NA NA NA 6.4 N NA N Y N NA Yes

10522009-10 O

Milestone Alluminium Co Pvt Ltd,

No.B-171, 4th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Aluminium Glazing (Fabrication) 490 G-1

Aluminum utensils fromaluminum circles by

Small Green 1997BA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

10532009-10 O Minar Industries,

No.C-289, 8th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit: Manufacture of precision turned components for

435.66 G-77Manufacture of Motor & Pumpswithout

Small Green 2003BA

31.12.2023N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

10542009-10 CL

-

Mivin Engineering Technologies Pvt Ltd,

No.531, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering with vibropolishing 2099 R-44

process involving

metal Large Red 2002

BA31.12.2014

Y 30.09.2014 N N N N N NA NA NA 0 N NA N N N NA NA

10552009-10 CL

-Moktali Electro Devices,

No.306/A, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electronic Devices2.28 W-14

Engineering and fabricationunits (dry

Small White 1993WA

31.12.2004N N N N N N N NA NA NA 0 N NA N N N NA NA

10562009-10 CL

-Multivista Global Ltd,

No.222, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10572009-10 O My Textiles Pvt Ltd,

No.192, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment97.24 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2024N N N N N N N NA NA NA 12 N ST & SP N N N NA Yes

10582009-10 O

Mysonic Industries, No.530, IV Phase, PIA, Bengaluru-560

058,

No.530, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Sign Boards10.66 G-64

Modular wooden furniture from

Small Green 2009BA

31.12.2100N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

10592009-10 O Mysore Enterprises,

No.286, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Gas & Hand cutting and Bailing of Steel scrap (segregation and packing)

114 G-46Steel furniture without spray

Small Green 1980BA

31.12.2023N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

10602009-10 CL

-Mysore Plastics,

No.C-40, II Stage, PIE, Bengaluru-560 058

II StageI

PLASTIC Injection moulding C1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

30.06.2019C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10612009-10 O N.V.Engineers,

No.C-103, III Stage, PIE, Bengaluru-560 058,

III StageI

Fabrication unit13.13 W-14

Engineering and fabricationunits (dry

Small White 1989BA

31.12.2013N N N N N N N NA NA NA 0.29 N NA N Y N NA Yes

10622009-10 CL Nanavati Engineering Co,

No.A-195, I Stage, PIE, Bangalore I StageI

Engineering Unit12 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1971BA

30.06.2019N N N N N N N NA NA NA 0 N NA N Y N NA Yes

10632009-10 CL

20823Nascent Ventures Pvt Ltd,

No.17E, I st Main Road, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Aluminium and copper extraction from scrap using oil fired furnace

52.94 O-36Heat treatment using oil fired furnace

Small Orange 19/4/2000BA

30.06.2019N NA N N N N N NA NA NA 2 N NA N Y N NA Yes

10642009-10 CL

Navakarnataka Publications Pvt Ltd,

No.167/168, III Phase, PIA, Bengaluru-560 058,

III PhaseI

printing press98.09 O-59

Printing press &/or Screen Printing

Small Orange 5/11/1992BA

31.12.2015N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

10652009-10 O Netra Electronics,

No.B-50,10th Main, 2nd Cross III Stage,PIE, Bengaluru-560 058

III StageI

Printed Circuit Board manufacture 14.62 R-44

Industry or process involvingmetal

Small Red 1991BA

30.06.2024Y 30.06.2015 N N N N N NA NA NA 0.8 0.1 NA N Y Y NA Yes

10662009-10 CL

-New Generation Appareals,

No.286, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garment washing51.7 O-50

Mechanized laundry using oil fired

Small Orange 1994BA

30.09.2011C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

10672009-10 CL

-New Tech Industries,

No.B-13, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10682009-10 CL

-Nikitha Build Tech Pvt Ltd,

No.344, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10692009-10 CL

-

Nim Auto Machine Tools Industries,

No.B-40, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10702009-10 CL

-Office Line Collections,

No.B/13, III Phase, PIA, Bengaluru-560 058

III PhaseI

GodownC1 G-19

Facility of handling, storage andtransportatio

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10712009-10 O

OM Shakthi Hydraulics Pvt Ltd.,

No.B-197, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit44.12 G-78

Switches without

electroplatinSmall Green 2000

BA31.12.2021

N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

10722009-10 CL

-Oto Corporation,

No.305, Iv Phase, PIA, Bengaluru-560 058,

IV PhaseI

Stapple Machinery12 W-14

Engineering and fabricationunits (dry

Small White 1991BA

31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA NA

10732009-10 CL

-

P.C.M Crafts, No.789, Peenya, Bengaluru-560 058,

P.C.M Crafts, No.789, Peenya, Bengaluru-560 058,

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

1074 No.B-141, 3rd cross, I Stage, PIE, I Stage Engineering Unit Engineering 10742009-10 O P.M.R. Drilling Equipments,

No.B-141, 3rd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit14 W-14

Engineering and fabricationunits (dry

Small White 2004BA

31.12.2013N N N N N N N NA NA NA 2 N NA N Y N NA Yes

10752009-10 CL

25066P.M.Singania & Co,

No.A-368, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit19.39 W-14

Engineering and fabricationunits (dry

Small White 1971BA

31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA Yes

10762009-10 CL

-P.S.I Hydraulics,

No.A-152, 2nd C Main, II Stage, PIE, Bengaluru-560 058

II StageI

Hydraulic hose44.8 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10772009-10 O Pab Packaging Pvt Ltd,

, No.A-363, I Stage, PIE, Bengaluru-560 058

I StageI

Corrugated box12 G-9

Cardboard or corrugated box and

Small Green 1971BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

10782009-10 CL

-Pan Creations Unit - I,

No.A-188, I Stage,PIE, Bengaluru-560 058

I StageI

Sign BoardsC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10792009-10 CL

-Pan Creations Unit -Iii,

No.A-184, I Stage,PIE, Bengaluru-560 058

I StageI

Sign BoardsC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10802009-10 CL

-Panova Rubber Industries,

No.B-67, I Stage,PIE, Bangalore I StageI

Rubber productsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10812009-10 CL

-Paper & Pulp Products,

No.C-285, I Stage,PIE, Bangalore I StageI

pulp manufacturingC1 R-18

Paper ( waste paper

based Small Red Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10822009-10 O Preston India Pvt Ltd

No.45-A1, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Foot wear233.89 G- 41

Rubber goods industry (with gas

Small Green 1987WA

31.12.2024Y 31.12.2019 N N N N N NA NA NA 0.5 N ST & SP N N N NA NA

10832009-10 CL

-

Parvathi Wood Processing Industries,

No.27/28, III Phase, PIA, Bengaluru-560 058

III PhaseI

Wood packing12 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1971BA

31.12.2004N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

10842009-10 CL Pavan Lamps,

, No.B-56, III Stage,PIE, Bengaluru-560 058

III StageI

Electric bulbs12 W-14

Engineering and fabricationunits (dry

Small White 1971BA

31.12.2004N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

10852009-10 CL Pavers And Blocks,

No.C-.46, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Concrete blocks1.6 G-11

Cement products (without using

Small Green 2002BA

31.12.2012N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

10862009-10 CL

-Peak Performance Pvt Ltd,

No.C-94, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 1971BA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10872009-10 CL

-Peenya Industrial Technique,

No.17E, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10882009-10 CL

-Pheonix Precission Products,

No.17A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10892009-10 CL

-Plasman Industries,

No.206, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10902009-10 CL

-Plastic Gloves Chemicals,

No.C-139, II Stage, PIE, Bengaluru-560 058

II StageI

synthetic glovesC1 G-62

Synthetic detergent

formulationSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10912009-10 CL Plymech Industries,

No.318/P, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Fabrication Assembly16.1 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2003BA

31.12.2024N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

10922009-10 CL

-Polycore Products,

No.276, 4th Main, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Rubber moulded components 23.1 G-86

including pre-cured

rubberSmall Green 1997

BAC1

N N N N N N N NA NA NA 0 N NA N N N NA NA

10932009-10 CL

-Polygon Instrumentation,

No.A-418, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10942009-10 O Polymer Products,

No.C-91, II Stage, PIE, Bengaluru-560 058,

II StageI

Rubber componenent25.5 G-41

Rubber goods industry (with gas

Small Green 1989BA

31.12.2021N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes

10952009-10 CL

-Polyuthrine Pvt Ltd,

No.538, IV Phase, PIA, Bangalore, IV PhaseI

polymer productsC1 R-47

fibers including

rayon ,tyre Small Red Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

10962009-10 O

Power One Micro Systems Pvt Ltd.,

No.F-3 & F-12,Kssidc Building, 5th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Assembly of UPS, Stabilizers & Isolation transformers. (excluding

434.98 G -85Transformer assembly unit(industrial

Small Green 1999BA

31.12.2021N N N N N N N NA NA NA 3 N NA N Y N NA Yes

10972009-10 O Power Plastech Ltd

No.513, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

plastic injection/ extrusion moulded 317 G-32

Polythene and plastic processedproducts

Small Green 2000BA

31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

10982009-10 CL

-

Power Switches And Ancilleries,

No.B-133, I Stage,PIE, Bangalore I StageI

Electric control panels47.9 G-78

Switches without

electroplatinSmall Green 2000

BAC1

N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

10992009-10 CL

-

Prabha Engineering, No.425, IV Phase, PIA, Bangalore,

No.425, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11002009-10 CL

-Pradeep Indsutrial Packaging,

No.A-16, II Stage, PIE, Bangalore II StageI

plastic yarn 24.83 G-32

Polythene and plastic processedproducts

Small Green 1978BA

31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA Yes

11012009-10 CL

-Prajna Rubber Footweras,

No.B-301, II Stage, PIE, Bangalore II StageI

Foot wear47.9 G-26

Leather foot wear and leatherproducts

Small Green 2000BA

C1N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11022009-10 CL

-Prakash Enterprises,

No.B-56, I Stage,PIE, Bangalore I StageI

Engineering Unit47.9 G-78

Switches without

electroplatinSmall Green 2000

WAN

N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11032009-10 O Prakash Leathers,

No.B-234, 5th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Industrial leather hand gloves 15.21 G-26

Leather foot wear and leatherproducts

Small Green 1995BA

31.12.2013N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

11042009-10 CL

-Prameen Industries,

No.9a, II Phase, PIA, Bangalore, II PhaseI

Engineering Unit47.9 G-78

Switches without

electroplatinSmall Green 2000

WAN

N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11052009-10 O Pramukh Plastics (P) Ltd,

No.A-35, 2nd Main II Stage, PIE, Bangalore

II StageI

FRP Sheets 25.42 G-32

Polythene and plastic processedproducts

Small Green 1996WA

31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

11062009-10 CL

-Prasad Industries,

No.C-261, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit9 W-14

Engineering and fabricationunits (dry

Small White 1978BA

31.12.2012N N C1 N C1 N C1 NA NA NA 0.16 N NA N Y N NA NA

11072009-10 O Pratibha Fashions,

No.F-6, I Stage,PIE, Bengaluru-560 058

I StageI

Garment17 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1984WA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

11082009-10 CL

-Precedralics,

No.2/1, I Stage,PIE, Bangalore I StageI

Engineering Unit13 W-14

Engineering and fabricationunits (dry

Small White 1989WA

NC1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11092009-10 CL

39925Preci-fit India,

No.B-143, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering and assembling 46.94 G-1

Aluminum utensils fromaluminum circles by

Small Green 1996BA

31.12.2015N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

11102009-10 O Precimech Engineers,

No.C-67, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit20 W-14

Engineering and fabricationunits (dry

Small White 1984BA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

11112009-10 O

Precission Engineering Pvt Ltd,

No.48, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit17 W-14

Engineering and fabricationunits (dry

Small White 1984BA

31.12.2100N N N N N N N NA NA NA NA N NA N N N NA Yes

11122009-10 CL

-Preemitha Leather Creations,

No.345/1, IV Phase, PIA, Bangalore, IV PhaseI

Reday made leather garmnet 13.3 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1984BA

31.12.2008N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11132009-10 CL

-Premier Controls ,

No.49a, III Phase, PIA, Bangalore III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2019

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11142009-10 CL

-

Premier Engineering Corporation,

No.404, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11152009-10 CL

-Premier Fashions,

No.63, III Phase, PIA, Bangalore III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11162009-10 O

87875Prerana Engineering Works,

No.B-207, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit250 G-78

Switches without

electroplatinSmall Green 2008

BA31.12.2034

N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

11172009-10 CL

28671Press Comp International,

No.B-150, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit37.8 G-78

Switches without

electroplatinSmall Green 1999

BA31.12.2011

Y 31.12.2016 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11182009-10 CL

-Primetech,

No.471, IV Phase, PIA, Bangalore, IV PhaseI

Non-comPliance154 G-78

Switches without

electroplatinSmall Green 2004

WAN

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11192009-10 CL

-Processed Wood Products,

No.M-13, I Stage,PIE, Bangalore I StageI

Plushed wood doors77.5 G-78

Switches without

electroplatinSmall Green 1982

BA31.12.2010

N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11202009-10 CL

-Prod Aid Engineers,

No.B-260, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2022

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11212009-10 O Progressive Industries,

No.B-106, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit46 G-78

Switches without

electroplatinSmall Green 1992

WA31.12.2034

N N N N N N N NA NA NA 0.22 N NA N Y N NA NA

11222009-10 O Pushpak Electrical Industry,

No.C-96, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit7.13 W-14

Engineering and fabricationunits (dry

Small White 1986WA

31.12.2010N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

1123 No.A-151, II Stage, PIE, Bangalore- II Stage Corrugated Box Cardboard 11232009-10 CL

17967Pyramid Packaging Pvt Ltd,

No.A-151, II Stage, PIE, Bangalore-560058

II StageI

Corrugated Box357 O-98

Cardboard or corrugated box and

Small Orange 2007WA

31.12.2022Y 31.12.2020 N N N N N NA NA NA 2 0.15 NA N Y Y NA NA

11242009-10 O Qualitech,

No.27, 1st cross, 8th Main, II Stage, PIE, Banglaore-58,

II StageI

Engineering Unit8.5 W-14

Engineering and fabricationunits (dry

Small White 2002BA

31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

11252009-10 O Quality Rubber Components,

No.C-90, 2nd B, II Stage, PIE, Bengaluru-560 058,

II StageI

Rubber componenent23.69 G-86

Tread rubber including pre-curedrubber

Small Green 2003WA

31.12.2099N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

11262009-10 CL

-R.L.Numericals,

No.P-10, III Stage, PIE, Banglaore-58, III StageI

Engineering Unit12.58 W-14

Engineering and fabricationunits (dry

Small White 1998BA

31.12.2013N N N N N N N NA NA NA 0 N NA N Y N NA NA

11272009-10 O

39417Raghu Industries,

No.508, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit97.58 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1991BA

31.12.2015N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

11282009-10 O

39928

Rajass Technologies Pvt Ltd (Formerly Rajas Engineering)

No.A-285, 6th Main, II Stage, PIE, Bengaluru-560 058.

II StageI

Engineering Unit63.8 G-7

Brass and bell metal utensilsmanufacturi

Medium Green 2003BA

31.12.2023N N N N N N N NA NA NA 3.36 N NA N Y N NA Yes

11292009-10 CL

-Rajesh Electronics,

No.A-178, I Stage,PIE, Bangalore I StageI

Electronic componenets C1 G-78

Switches without

electroplatinSmall Green Closed

WAN

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11302009-10 O

25749Ram Engineering Co,

No.C-100, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit30.29 G-78

Switches without

electroplatinSmall Green 1987

BA31.12.2015

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

11312009-10 O Ram Engineering Unit II,

Unit -II No.P-20, III Stage, PIE, Banglaore,

III StageI

Engineering Unit54.34 G-78

Switches without

electroplatinSmall Green 2003

BA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

11322009-10 O Ram Kamal Industries,

No.B-240, 6th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Manufacture of KPTCL Line Fixtures 9.18 W-14

Engineering and fabricationunits (dry

Small White 1979BA

31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

11332009-10 CL

-Rashi Packs Pvt Ltd,

No.B-376, I Stage,PIE, Bangalore I StageI

Corrugated BoxC1 G-9

Cardboard or corrugated box and

Small Green ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11342009-10 CL

-Ravi Machine Tools ,

No.A-289, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BAC1

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11352009-10 CL

-Regent Engineers,

No.A-279, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitCL G-18

CLOSEDSmall Green 1988

BACL

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11362009-10 CL

-Reliance Engineering Ltd,

No.98, III Phase, PIA, Bengaluru-560 058

III PhaseI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11372009-10 O Reliance Infocomm Ltd,

No.34-B, 4th cross, II Phase, PIA, Bengaluru-560 058,

II PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2003AA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes

11382009-10 CL

-Republic Clothing Co,

Republic Clothing Co, No.129, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11392009-10 CL

-Restolex Company,

No.490, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2024

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11402009-10 CL

-Rigid Industries,

No.228, II Stage, PIE, Bangalore -58 II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11412009-10 O

85938Rock Tools,

No.B-326, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit47 G-78

Switches without

electroplatinSmall Green 1997

WA31.12.2034

N N N N N N N NA NA NA 0.19 N NA N Y N NA NA

11422009-10 O Rollatainers Ltd,

No.A-414, II Stage, PIE, Bengaluru-560 058

II StageI

Packaing machine64.18 G-46

Steel furniture without spray

Small Green 1994BA

31.12.2015N N N N N N N NA NA NA 1 N NA N Y N NA Yes

11432009-10 O

24477Rotary Systems & Elements ,

No.V-32(A), 10th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit53.23 W-14

Engineering and fabricationunits (dry

Small White 1991BA

31.12.2024N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

11442009-10 CL

-S.K.Fabmac Pvt Ltd, ,

No.400, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Fabrication unit18 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2004N N N N N N N NA NA NA 0 N NA N N N NA Yes

11452009-10 O S.R.S Industries,

No.C-64, II Stage, PIE, Banglaore-58, II StageI

Engineering Unit19.7 W-14

Engineering and fabricationunits (dry

Small White 1988BA

31.12.2012N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

11462009-10 CL S.S.Fabs,

No.240/241, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit64 G-14

Engineering and fabricationunits (dry

Small Green 1983BA

31.12.2017N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

11472009-10 CL

35596

Ace Manufacturing Systems Ltd

No.40A, II Phase, PIA, Bengaluru-560 058

II PhaseI

CNC Machine tool2502 G-78

Switches without

electroplatinLarge Green 2015

BANA

N N N N N N N NA NA NA 0 N NA N N N NA Yes35596 electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA Yes

11482009-10 O

40286

S.Subbarao & Associates Pvt Ltd,

No.246, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Rolling milling equipments 42.67 G-78

Switches without

electroplatinSmall Green 1975

WA31.12.2025

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA

11492009-10 O

Saicorp Industrial Trailers Pvt Ltd.,

No.436 , 12th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Industrial Trailers93.62 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2010BA

31.12.2025N N N N N N N NA NA NA 0.9 N ST & SP N N N NA Yes

11502009-10 CL

15059Sai Kripa Insulations Pvt Ltd,

No.A-105, II Stage, PIE, Bangalore II StageI

Carrugated box 161 G-9

or corrugated

box andSmall Green 1979

BA31.12.2022

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11512009-10 CL

11822Sai Packaging Co Unit-II,

Unit-II, No.42/43, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Offset printing1801.92 Closed Large Green 5/15/2003

WA31.12.2014

Y 31.12.2016 N N N N N NA NA NA 2.8 N ST & SP N N N NA NA

11522009-10 CL

-

Shiva Sai Packaging Industries,

No.B-298, II Stage, PIE, Bangalore II StageI

Corrugated Box28.3 G-9

Cardboard or corrugated box and

Small Green 2000BA

31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA Yes

11532009-10 CL

-Saji Harious Metals (P) Ltd,

, No.526, IV Phase, PIA, Bangalore, IV PhaseI

Coiling Leveling90.95 G-78

Switches without

electroplatinSmall Green 1999

WACL

N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

11542009-10 O Sampriya Industries,

No.B-126, II Stage, PIE, Bengaluru-560 058

II StageI

Machnical componenets 31 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1988BA

31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

11552009-10 CL

-Sandeep Enterprises,

No.54/1, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit65 W-14

Engineering and fabricationunits (dry

Small White 1991BA

C1N N N N N N N NA NA NA 0 N NA N N N NA Yes

11562009-10 O

24611Sands Precission Pvt Ltd,

M1, 5th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

CNC machine46.8 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2004BA

31.12.2023N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

11572009-10 O Sanguine Engineering Pvt Ltd,

No.B-204, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit9 W-14

Engineering and fabricationunits (dry

Small White 1983WA

31.12.2010N N N N N N N NA NA NA 0.16 N NA N Y N NA NA

11582009-10 O

23252

Sapthagiri Auto Precission Engineering,

No.C-426, I Stage, PIE, Bengaluru-560 058,

I StageI

CNC Turned components 48 G-18

Carpentry & wooden furnituremanufacturi

Small Green 1992BA

31.12.2023N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes

11592009-10 CL

-Sara & Co,

No.B-208, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11602009-10 CL

-Sarda Plastics,

No.C-278, 7th Cross, I Stage, PIE, Bengaluru-560 058,

I StageI

plastic components11.1 G-32

and plastic processedproducts

Small Green 1976WA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA

11612009-10 O

Sarvodaya Engineering Equipments (P) Ltd,

No.49-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

General Engineering Unit 59.56 G-78

Switches without

electroplatinSmall Green 1982

WA31.12.2022

N N N N N N N NA NA NA 4 N ST & SP N N N NA NA

11622009-10 O

23872Satish Engineering Co,

No.B-69, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit23.57 W-14

Engineering and fabricationunits (dry

Small White 1981BA

31.12.2023N N N N N N N NA NA NA NA N NA N N N NA Yes

11632009-10 CL

-

Savitha Photographics Pvt Ltd, No.486, IV Phase, PIA,

Bangalore,

, No.486, IV Phase, PIA, Bangalore, IV PhaseI

Sign BoardsC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.18 N NA N Y N NA NA

11642009-10 O Scientific Instruments,

No.313, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit34 G-78

Switches without

electroplatinSmall Green 1995

BA31.12.2001

N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

11652009-10 O

15375Scientific Silica Products,

No.M-17, 7th Cross, I Stage, PIE, Bangalore-560058,

I StageI

Fabrication of Lab glass ware 18.49 G-21

Glass , ceramic, earthenpotteries, tile

Small Green 1987BA

31.12.2033N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

11662009-10 CL

-Scorpion Engineering Works,

No.B-27, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit11.28 W-14

Engineering and fabricationunits (dry

Small White 1996BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

11672009-10 CL Scots Fashions Pvt Ltd, .

.B-108, III Stage, PIE, Bengaluru-560 058,

III StageI

Garment42.08 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1998BA

31.12.2014N N N N N N N NA NA NA 5 N NA N Y N NA Yes

11682009-10 CL

13022Scotts Garments,

No.B-66 III Stage,PIE, Bangalore -58 III StageI

Garment24.38 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1999BA

31.12.2014N N N N N N N NA NA NA 4.5 N NA N Y N NA Yes

11692009-10 CL

11333Scotts Garments,

No.481-A & B, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment washing3200 O-50

Mechanized laundry using oil fired

Large Orange 1995BA

30.09.2021N N N N N N N NA NA NA 72 57 STP & ETP Y N N NA Yes

11702009-10 CL

-Sealwell,

No.B-91, I Stage, PIE, Bangalore, I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2000

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11712009-10 O Sedvik Industries,

No.390, IV Phase, PIA, Bangalore, IV PhaseI

Rolling equipment99.92 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2001BA

31.12.2020N N N N N N N NA NA NA 0.8 N ST & SP N N n NA Yes

1172 No.555, 3rd Main, II Stage, PIE, II Stage Plastic processig Polythene 11722009-10 O Services Un Limited,

No.555, 3rd Main, II Stage, PIE, Bengaluru-560 058

II StageI

Plastic processig59.88 G-32

Polythene and plastic processedproducts

Small Green 1992BA

31.12.2015N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

11732009-10 CL

-Services Un Limited,

No.B-262, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11742009-10 CL

-Seven Engineering Pvt Ltd,

No.57-B, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11752009-10 CL

24646Seven Hills International,

No.284, 4th main, 2nd Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Readymade Garments319 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003BA

31.12.2024N N N N N N N NA NA NA 4.8 N ST & SP N N N NA Yes

11762009-10 CL

-

Seven Star Poly Fibres Pvt Ltd,

No.A-12, III Stage, PIE, Bengaluru-560 058

III StageI

Polythene bagsC1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11772009-10 CL

-

Shakthi Hi-Tech Polymenrs Pvt Ltd,

No.18-A, II Phase, PIA, Bengaluru-560 058

II PhaseI

HDDP/PP woven Sacks 46.7 G-32

Polythene and plastic processedproducts

Small Green 1991BA

31.12.2005N N N N N N N NA NA NA 0 N NA N N N NA NA

11782009-10 CL

-Shalini International ,

No.152, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11792009-10 O Shan Marc,

No.C-86, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit15.5 W-14

Engineering and fabricationunits (dry

Small White 1988WA

31.12.2100N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

11802009-10 O

34504

Envs -Eco- Friendly Digital India Pvt Ltd.,

No.284, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Digital printing in fabric/garments & organic washing

1815 O-50laundry using oil

firedLarge Orange 2017

BA30.09.2022

N N N N N N N NA NA NA 1.6 7 ETP N Y N NA Yes

11812009-10 CL

-Shankala Polymers,

No.126, III Phase, PIA, Bengaluru-560 058

III PhaseI

ResinsC1 O-75 Synthetic

resinsSmall Orange Closed

BA31.12.2013

N N N N N N N NA NA NA 0 N NA N N N NA NA

11822009-10 CL

-Sharada Packaging,

No.A-105, II Stage, PIE, Bengaluru-560 058

II StageI

Corrugated BoxC1 G-9

Cardboard or corrugated box and

Small Green ClosedBA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11832009-10 O Shashi Electrocrafts Pvt Ltd,

No.C-335, II Stage, PIE, Bengaluru-560 058

II StageI

Capacitors14.94 W-14

Engineering and fabricationunits (dry

Small White 1985BA

31.12.2012N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

11842009-10 CL

-Shashi Nag Indusries,

No.411, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2003

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11852009-10 O

23163Shilpa Industries,

No.261, 2nd Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Mfg of Rubber Rollers for printing & textile industries

103 G-86Tread rubber including pre-curedrubber

Small Green 1985BA

31.12.2023N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes

11862009-10 CL

-Shilpi Process Equipments,

No. A-9, III Stage,PIE, Bangalore -58 III StageI

Engineering Unit37.1 G-78

Switches without

electroplatinSmall Green 1986

BA31.12.2015

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

11872009-10 O

17574Shoma Enterprises,

No.C-28, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit84.58 G-78

Switches without

electroplatinSmall Green 1990

BA31.12.2020

N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

11882009-10 CL

-

Shree Ganesh Plastic Industries,

No.C-179, II Stage, PIE, Bangalore, II StageI

Plastic7.5 G-32

Polythene and plastic processedproducts

Small Green 2003WA

31.12.2010N N N N Y 16.16.2009 N NA NA NA 0 N NA N N N NA NA

11892009-10 O

22946Shree Haddinkal Udyog,

No.C-95, II Stage, PIE, Bengaluru-560 058,

II StageI

Machine work (Engineering Unit) 22.75 W-14

Engineering and fabricationunits (dry

Small White 1982WA

31.12.2099N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

11902009-10 CL

-Shree Hanuman Enterprises,

No.C-95, II Stage, PIE, Bengaluru-560 058

II StageI

Plastic covers9.49 G-32

Polythene and plastic processedproducts

Small Green 2003BA

31.12.2013N N N N Y N N NA NA NA 0 N NA N N N NA NA

11912009-10 CL

-Shreya Engineering Pvt Ltd,

No.153, III Phase, PIA, Bangalore III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11922009-10 CL Shrinu Engineers,

No.A-183, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit54 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2004WA

31.12.2013N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

11932009-10 CL

-Shubhashree Enterprises,

No.35, III Phase, PIA, Bangalore III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11942009-10 CL

-Shyca Cable Industries,

No.404, IV Phase, PIA, Bangalore, IV PhaseI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

11952009-10 O

Sidhivinayaka Fab Engineering Pvt Ltd,

No.206, III Phase, PIA, Bengaluru-560 058,

III PhaseI

General Engineering and Fabrication work of stainless steel pressure vessels &

76.31 W-14Engineering and fabricationunits (dry

Small White 1995WA

31.12.2013N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

11962009-10 CL

-Sigma Metalinks,

No.B-308, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2023

N N N N N N N NA NA NA 0 N NA N N N NA NA- electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA NA

11972009-10 CL

-

Simha Industries, No.C-433, I Stage, PIE, Banglaore-58,

No.C-433, I Stage, PIE, Banglaore-58, I StageI

Engineering Unit17.79 O-69

Transformer repairing/manufacturing ( dry

Small Orange 2001BA

31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

11982009-10 CL

-

Smart Engineers, No.19, 5th Main, III Phase, PIA, Bengaluru-560 058,

No.19, 5th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Precision Engg componenets 23.81 W-14

Engineering and fabricationunits (dry

Small White 2002BA

31.12.2015N N N N N N N NA NA NA 8 N ST & SP N N N NA Yes

11992009-10 O

Smitha Jyothi Industries, No.164, 10th Main, III Phase,

PIA, Bengaluru-560 058

No.164, 10th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit4.59 W-14

Engineering and fabricationunits (dry

Small White 1981BA

31.12.2020N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

12002009-10 O

24019Sona Engineering Pvt Ltd,

No.159, 10th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

General Engineering and Fabrication 92.79 W-14

Engineering and fabricationunits (dry

Small White 1996BA

31.12.2023N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

12012009-10 O

75204Southern Fastners,

No.537, IV Phase, PIA, Bangalore, IV PhaseI

Manu of bolts, rivets76 G-93

ng of nuts and boltswith cold

Small Green 2009WA

31.12.2018N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

12022009-10 CL

-

Southern Insulations (I) Pvt Ltd,

No.36-B, II Phase, PIA, Bangalore, II PhaseI

Cable manufacturing C1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12032009-10 CL

-Southern Minerals Agencies,

No.150, II Stage, PIE, Bangalore, II StageI

mineral crushingC1 O-26

processing, mineral

processing, Small Orange Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12042009-10 CL

-Space-Way Design Industries,

No.A-21, III Stage,PIE, Bangalore III StageI

Engineering Unit19.99 W-14

Engineering and fabricationunits (dry

Small White 1986BA

31.12.2011N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

12052009-10 CL

-Span Auto Components,

No.405, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12062009-10 O

32314Span Plastics Pvt Ltd,

No.179, III Phase, PIA, Bengaluru-560 058

III PhaseI

plastic injection moulding 83.52 G-32

Polythene and plastic processedproducts

Small Green 1979WA

31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA NA

12072009-10 O

25149

Karnataka Engineering Enterprises Unit-II (Special

Insulation Manufacturing)Co,

No.472-C2 , IV Phase, PIA, Bangalore,

IV PhaseI

Engineering with pretreatment (Dry process)

72 O-62Spray painting, paint baking, paint

Small Orange 1990BA

31.12.2024N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

12082009-10 O

23189

Special Insulators Manufacturing Company,

No.48, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

General Engineering without surface treatment (Steel fabrication such as

226 O-62Spray painting, paint baking, paint

Small Orange 1982BA

31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

12092009-10 CL

-Specialised Micro Tools,

No.B-311, II Stage, PIE, Bangalore II StageI

Twist Micro Tools130 G-78

Switches without

electroplatinSmall Green 1974

BACL

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

12102009-10 O Specitech,

No.23, 5th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit7.1 W-14

Engineering and fabricationunits (dry

Small White 2003BA

31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

12112009-10 CL

-Spectrum, No.

No.B-193, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12122009-10 CL

-Speedvel India Unit - I,

Unit - I, No.C-313, I Stage,PIE, Bangalore

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WACL

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12132009-10 CL

-Sree Brush,

No.B-32, III Phase, PIA, Bangalore III PhaseI

plastic itemsC1 G-32

Polythene and plastic processedproducts

Small Green ClosedWA

CLC1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12142009-10 O

101500

Shree Mahalakshmi Enterprises (Formerly Shree

Ram Polypacks,)

No.C-213, 4th Cross, I Stage, PIE, Bangalore,

I StageI

HDEP/ PP Woven sack bags stitching 166 O-35

Gravure printing, digital printing on

Small Orange 2002BA

30.09.2030N N N N N N N NA NA NA 0.72 N NA N Y N NA Yes

12152009-10 CL

-

Sree Venkateshwara Electricals,

No.33- A2, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Transformer assembly 28.65 G-85

Transformer assembly unit(industrial

Small Green 1981BA

31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA NA

12162009-10 O

13806Sreenathji Chemicals Industry,

No.88, 7th Cross, III Phase, PIA, Bangalore-560058,

III PhaseI

Chemical Trading80.95 R-25

Basic chemicals and electrochemicals

Small Red 1979BA

30.06.2023N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes

12172009-10 CL Sri Ambika Engineers,

No.B-162, II Stage, PIE, Bengaluru-560 058,

II StageI

Borewell bit29.02 G-78

Switches without

electroplatinSmall Green 2003

WA31.12.2013

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

12182009-10 CL

-Sri Brush, N

No.332, IV Phase, PIA, Bangalore, IV PhaseI

plastic itemsC1 G-32

Polythene and plastic processedproducts

Small Green ClosedBA

CLC1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12192009-10 O

12621

SriChakra Engineering Equipments,

No.21(A1), II Phase, PIA, Bengaluru-560 058,

II PhaseI

Hydraulics Presses machines 1008.53 G-78

Switches without

electroplatinLarge Green 1987

BA31.12.2035

N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

12202009-10 CL Sri Gajalakshmi Metal Works,

No.556, II Stage, PIE, Bangalore, II StageI

Engineering industry 24 O-3

Spray painting, paint baking, paint

Small Orange 1995BA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

1221 No.A-321, 7th Main, II Stage, PIE, II Stage Sheet metal Panel Board, 12212009-10 O

34384MJN Industries

No.A-321, 7th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Sheet metal fabrication 696 G-78

Panel Board, Switches withoutelectroplatin

Medium Green 27.12.2009WA

31.12.2026Y 31.12.2023 N N N N N NA NA NA 1.2 N NA N Y N NA NA

12222009-10 CL

-Sri Manjunatha Industries,

No.239, III Phase, PIA, Bangalore III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2002

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N ST & SP N N N NA NA

12232009-10 CL

-Navahira Graphics,

No.C-305, I Stage,PIE, Bangalore I StageI

Metal Engraving C1 R-3

engaged inrecycling/rep

rocessing/Small Red Closed

BA31.12.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12242009-10 O

22880Sri Ramakrishna Dairy,

No.A-22, III Stage,PIE, Bengaluru-560 058

III StageI

mixing of food instants 33.32 O-7

Food and food processingincluding

Small Orange 2007BA

31.12.2024N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

12252009-10 O

Sri Revana Siddeshwara Gears And Sprockets,

No.C-61, 2nd Mian, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit19.79 W-14

Engineering and fabricationunits (dry

Small White 1993WA

31.12.2013N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

12262009-10 CL

-Sri Sai Baba Industries,

No.283, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Manufacture of Bright steel bars with pickling

26.47 R-44Industry or process involvingmetal

Small Red 2004BA

30.06.2014N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

12272009-10 O Sri Sai Fabrications,

No.C-66, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2020N N N N N N N NA NA NA NA N NA N N N NA Yes

12282009-10 O

16395Sri Sai Industries,

No.P-24, III Stage, PIE, Bengaluru-560 058,

III StageI

Engineering Unit with pretreatment, powder coating and spray painting

223 R-44Industry or process involvingmetal

Small Red 1998BA

30.06.2022N N N N N N N NA NA NA 0.16 0.24 NA N Y Y NA Yes

12292009-10 CL

24109Sri Shakti Industries,

No.C-442, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit12.9 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2013N N N N N N N NA NA NA 0.04 N NA N Y N NA NA

12302009-10 CL

-Sri Shila Industries,

No.C-264, I Stage,PIE, Bangalore I StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2022N C1 N C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12312009-10 CL Shri Vardhman Basic Foods,

No.C-302, 9th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Food products60.09 G-19

Food and food processingincluding

Small Green 1998BA

31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

12322009-10 CL

27062Sri Venkateshwara Packging,

No.329, IV Phase, PIA, Bangalore, IV PhaseI

Corrugated BoxC1 G-9

Cardboard or corrugated box and

Small Green ClosedBA

31.12.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12332009-10 CL

-

Sri Vinayaka Engineering Works,

No.54, III Phase, PIA, Bengaluru-560 058

III PhaseI

Mechanical componenets 6.3 Closed Small Green 1981

WA31.12.2010

N N N N N N N NA NA NA 0 N NA N N N NA NA

12342009-10 O Sri Vinayaka Packs,

No.C-330 (A), 3rd Main, I Stage, PIE, Bengaluru-560 058,

I StageI

Corrugated Box108 G-9

Cardboard or corrugated box and

Small Green 2000BA

31.12.2022N N N N N N N NA NA NA 0.024 N NA N Y N NA Yes

12352009-10 O Sringar Electricals,

No.D-388, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Assembly of Electrical control pannels 45.55 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1994BA

31.12.2023N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

12362009-10 O

23735Aluminium Innovation

No A-185, 4th Corss, 1st stage, Peenya Industrial Estate, Banglaore-560058

I StageI

Aluminium Windows, Door/Structrual Glazing and wall cladding

60.66 G -1Aluminum utensils fromaluminum circles by

Small Green 2006BA

31.12.2035N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes

12372009-10 O

Srinivasa Engineering Products,

No.72, 6th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Fabrication unit19.6 W-14

Engineering and fabricationunits (dry

Small White 1984WA

31.12.2014N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA

12382009-10 CL

-

Srinivasa Nursing Home, Mayura Complex,

Next To Pia Bhavana, Kiadb Main Road, I Stage, PIE, Bangalore,

I StageI

Health care establishment C1 O-85

Health-care Establishme

ntSmall Orange Closed

BA30.09.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12392009-10 CL

-Srinivasa Plastics,

No.B-211, II Stage, PIE, Bangalore II StageI

Librillated twisted10.84 W-14

Engineering and fabricationunits (dry

Small White 1985BA

30.12.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12402009-10 O Srinu Engineering Industries,

No.B-120, 3rd Main, II Stage, PIE, Bengaluru-560 058,

II StageI

Machinery componenets 28.26 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2000BA

31.12.2034N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes

12412009-10 CL

-Standard Catrons,

No.B-98, I Stage, PIE, Bengaluru-560 058,

I StageI

Corrugated Box29 G-9

or corrugated

box andSmall Green 2009

WA31.12.2013

N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

12422009-10 CL

-Staro Wood,

No.490F, 4th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Treatment and sea servicing of rubber wood

44.25 G-41Rubber goods industry (with gas

Small Green 2001BA

30.09.2011N N N N N N N NA NA NA 0.64 N ST & SP N N N NA Yes

12432009-10 CL

-Stichers,

No.306-B, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12442009-10 CL

-

Stitch Leathers Pvt Ltd, No.120, III Phase, PIA,

Bangalore

No.120, III Phase, PIA, Bangalore III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12452009-10 CL

-Stress Cret,

, No.9 & 11, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Fabrication unit13 W-14

and fabricationunits (dry

Small White 2000BA

31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- units (dry BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12462009-10 CL

-Subham Indsutries,

No.A-52/4, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit16.5 W-14

Engineering and fabricationunits (dry

Small White 1998WA

CLN N N N N N N NA NA NA NA N NA N N N NA NA

12472009-10 CL

-Sudarshan Industries,

No.A-20, III Stage,PIE, Bangalore III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2009

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12482009-10 CL

-Sudarshan Industries Ltd,

No.51, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12492009-10 CL

-

Sri Darshan Packaging Industries,

No.C-310, I Stage, PIE, Bengaluru-560 058

I StageI

Corrugated Box24 G-9

or corrugated

box andSmall Green Closed

WA31.12.2003

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12502009-10 O Sudeep Packaging Indsutries,

No.A-144, I Stage,PIE, Bengaluru-560 058

I StageI

Corrugated Box11.1 G-9

or corrugated

box andSmall Green 1999

BA31.12.2021

N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes

12512009-10 CL

-Sujatha Engineering Co,

No.490, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2004

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12522009-10 O Sujika Induction Enterprises,

No.541, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Activity67 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1992WA

31.12.2020N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA

12532009-10 O

22621

HMX Systems Pvt Ltd (formerly known as Sumaya

Hmx Systems Ltd,) N

No.A-422, I Stage, PIE, Bengaluru-560 058

I StageI

Aircooler14 W-1

Assembly of air coolers/conditioners /repairing

Small White 2001WA

31.12.2023N N N N N N N NA NA NA 2.06 N NA N Y N NA NA

12542009-10 O

26729Sundaram Industries,

No.31, III Phase, PIA, Bangalore-560058

III PhaseI

Tyre Retreading166 O-70

Tyres and tubes vulcanization/ hot

Small Orange 2006BA

30.09.2030N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

12552009-10 CL

-

Sunmas Machine Tools Pvt Ltd,

No.432/1, IV Phase, PIA, Banglaore-58

IV PhaseI

Engineering Unit65 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1995BA

31.12.2015N N N N N N N NA NA NA 0.09 N ST & SP N N N NA Yes

12562009-10 CL

-Super Bright Bond,

No.486-C, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit23 W-14

Engineering and fabricationunits (dry

Small White 1999BA

31.12.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes

12572009-10 CL

39352Super Chem Indsutries,

No.B-354, I Stage,PIE, Bangalore I StageI

Engineering Unit14.4 W-14

Engineering and fabricationunits (dry

Small White 2002BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

12582009-10 CL

23795Super Corn,

No.C-258, I Stage,PIE, Bangalore I StageI

Food productsC1 O-7

food processingincluding

Small Orange ClosedBA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12592009-10 CL

-Super Star Garments Unit - I,

Unit - I, No.A-190, I Stage,PIE, Bangalore

I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12602009-10 CL

-Super Tech Industries,

No.B-5, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12612009-10 CL

-

Superfine Colourtex Prints Pvt Ltd,

No.Vp-1&2, I Stage, PIE, Bengaluru-560 058,

I StageI

Woven labels C1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12622009-10 O

24692

Superior Electric Machines Pvt Ltd,

No.B-214, 5th Main , II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit38.76 G-78

Switches without

electroplatinSmall Green 1982

BA31.12.2023

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

12632009-10 O

15447Suraj Metal Finishers,

No.99, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Alluminum Cookers36.88 G-1

Aluminum utensils fromaluminum circles by

Small Green 1983BA

31.12.2035N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

12642009-10 CL

-Surendra Engineering Works,

No.C-135, II Stage, PIE, Bangalore II StageI

Engineering Unit11.34 W-14

Engineering and fabricationunits (dry

Small White 1983BA

31.12.2010N N N N C1 N C1 NA NA NA 2 N NA N N N NA NA

12652009-10 CL

41649Sushma Industries,

No.18-E, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Electronic assemblies62.57 G-78

Switches without

electroplatinSmall Green 1986

BA31.12.2035

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

12662009-10 CL

-Swamy Pollution Control,

No.C-308, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit36.69 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12672009-10 CL

-Swamy Pollution Control ,

No.C-128, I Stage,PIE, Bangalore I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12682009-10 CL

-Switch Crafts India,

No.B-383, I Stage,PIE, Bangalore I StageI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12692009-10 CL

-Synthetic Rubber Products,

No.C-18, II Stage, PIE, Banglaore-58, II StageI

Rubber moulded components 21.22 G-41

Rubber goods industry (with gas

Small Green 2002BA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

1270Systems Cable And Wires Pvt

No.A-352, 8th Mian, II Stage, PIE, II Stage Cable manufacturing Switches 12702009-10 O

17573

Systems Cable And Wires Pvt Ltd,

No.A-352, 8th Mian, II Stage, PIE, Bengaluru-560 058,

II StageI

Cable manufacturing 131 G-78

Switches without

electroplatinSmall Green 2002

BA31.12.2021

N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

12712009-10 O

T.G.R.I Engineering & Automotive

No.B-237, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.05 N NA N Y N NA NA

12722009-10 O Tabular Manufacturing,

No.42, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering Unit13.2 W-14

Engineering and fabricationunits (dry

Small White 1979BA

31.12.2021N N N N N N N NA NA NA NA N NA N N N NA Yes

12732009-10 CL

-Tansar Rubber Products,

No.367, IV Phase, PIA, Bangalore, IV PhaseI

Rubber productsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

31.12.2016C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12742009-10 O Tata Telecommunications Ltd,

No.V-88, II Phase, PIA, Bangalore, II PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2004AA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes

12752009-10 O Tata Telesevices Ltd,

No.19, III Phase, PIA, Bengaluru-560 058,

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2004AA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes

12762009-10 O Techno Centre,

No.B-224, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit7.36 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1974BA

31.12.2100N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

12772009-10 CL

-Techno Fab,

No.A-413, 4th cross, I Stage, PIE, Bangalore -58

I StageI

Engineering Unit5.97 W-14

Engineering and fabricationunits (dry

Small White 1974BA

31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12782009-10 O

13225Techno Rubber Products,

No.367, IV Phase, PIA, Bangalore, IV PhaseI

Rubber flaps165 G-41

Rubber goods industry (with gas

Small Green 1986BA

31.12.2021N N N N N N N NA NA NA 9.6 N ST & SP N N N NA Yes

12792009-10 CL

Technoweld Manufacturing Co,

No.229, III Phase, PIA, Bengaluru-560 058

III PhaseI

Welding electrodes62 G-96

Manufacturing of insulatedconductors

Small Green 1994BA

31.12.2016N N N N N N N NA NA NA 0.12 N ST & SP N N N NA Yes

12802009-10 O

20426

Technoheat Bakery Equipments Pvt Ltd,

No.L-1, 7th Cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Bakery Ovens & item equipments with spray painting

355.96 O-62Spray painting, paint baking, paint

Small Orange 1996BA

30.09.2023N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes

12812009-10 O

24465

Technology Development Consultancy Centre,

No.B-446, I Stage, PIE, Bengaluru-560 058,

I StageI

R & D consultancy of Bio-Technology auto machines

19.31 G-81Research laboratories notinvolving

Small Green 2002BA

31.12.2099N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

12822009-10 CL

-Tejpal Extrusions Pvt Ltd,

No.A-363, I Stage,PIE, Bengaluru-560 058

I StageI

R & D activityC1 R--58

Pharmaceutical (Bulk drug &Active

Small Red ClosedBA

C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12832009-10 CL

-Teleplast ,

No.C-85, III Stage,PIE, Bengaluru-560 058

III StageI

General Engineering5.3 W-14

Engineering and fabricationunits (dry

Small White 1988BA

31.12.2002C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12842009-10 CL

-Texport Garments,

No.82, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Storing of Garments71.1 W-10

woolen hosiers

making ( Small Green 2001

BA31.12.2015

N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

12852009-10 O Texport Industries Pvt Ltd.,

No.459/B, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment207 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 1998BA

31.12.2023N N N N N N N NA NA NA 24 N STP Y N N NA Yes

12862009-10 CL

-Texport Overseas,

No.266-A, II Stage, PIE, Bengaluru-560 058

II StageI

Garment97.85 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2002BA

31.12.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12872009-10 CL

-Thanwada Corporation,

No.C-204, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

12882009-10 CL

-The C.L.S. Press,

No.A-11, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12892009-10 CL

-

The Charminar Engineering Co,

No.C-348, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2015

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12902009-10 CL

-The Glory Boys Co,

No.12, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2023

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12912009-10 O Tummala Electronics Pvt Ltd,

No.SB-54, II cross, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Unit42.76 W-13

Electrical and electronic item

Small White 1974BA

31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

12922009-10 CL

-Time Textile Industries,

No.A-198, I Stage,PIE, Bengaluru-560 058

I StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12932009-10 CL

-

Time Textiles Industries Unit - I,

Unit - I, No.1-E, II Phase, PIA, Bengaluru-560 058

II PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12942009-10 CL

-Times Engineering Pvt Ltd,

No.A-106, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12952009-10 CL

28492Tirupati Adhesives ,

No.47, 4th Main, III Phase, PIA, Bangalore -58

III PhaseI

Adhesive tapes78.25 G-91

Manufacture of Adhesives andadhesive

Small Green 1994BA

31.12.2015N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes

12962009-10 O

Athreya CNC (formerly known as Tocol Enterprises),

No.525, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

(Engineering Unit) CNC Machine components for Aerospace, Air Craft,

54.18 G-10Carpentry & wooden furnituremanufacturi

Small Green 1996BA

31.12.2023N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes

12972009-10 CL

-Tool Craft Assecciries,

No.290, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12982009-10 CL

-Tools Corporations,

No.B-311, II Stage, PIE, Bangalore II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2012

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

12992009-10 CL

-Touch Wood Craft,

No.399, I Phase, PIA, Bangalore, I PhaseI

wood packing C1 G-10

Carpentry & wooden furnituremanufacturi

Small Green ClosedBA

31.12.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13002009-10 CL

-Toyo Corporation,

No.305, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2001

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13012009-10 O Transducer & Allied Product,

No.351, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

elcectronic assembly20.6 W-13

electric and elcectronic assembly

Small White 1991BA

31.12.2015N N N N N N N NA NA NA NA N NA N N N NA Yes

13022009-10 CL

16388

Transteel Sheeting Technology Pvt Ltd,

No.1-A, II Phase, PIA, Bangalore, II PhaseI

Engineering Unit354 G-78

Switches without

electroplatinSmall Green 1998

BA31.12.2008

N N N N N N N NA NA NA 0 N NA N N N NA NA

13032009-10 CL

-Trident Engineering,

No.356, IV Phase, PIA, Bangalore, IV PhaseI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes

13042009-10 CL

-Trident Fashions,

No.A-322, II Stage, PIE, Bangalore II StageI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13052009-10 O

26991Trikaya Precission Pvt Ltd,

No.20, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit101 W-14

Engineering and fabricationunits (dry

Small White 2000WA

31.12.2025N N N N N N N NA NA NA 0.48 N ST & SP N N N NA NA

13062009-10 CL

-Triveni Industries.,

No.B-173, II Stage, PIE, Bangalore, II StageI

Engineering Unit70 G-78

Switches without

electroplatinSmall Green 1983

BA31.12.2025

N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes

13072016-17 O Unitech Cnc Centre Pvt Ltd,

Plot No.559, 14th Cross, IV Phase, II Stage, PIA

IV PhaseI

Manufacturing of Hydraulics pumps parts

96.7 G-78Switches without

electroplatinSmall Green 1983

BA31.12.2027

N N N N N N N NA NA NA 2.7 N NA N Y N NA Yes

13082009-10 O

76299Trupti Twines,

No.B-262, II Stage, PIE, Bengaluru-560 058

II StageI

weaving36 G-32

Polythene and plastic processedproducts

Small Green 1999BA

31.12.2028N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes

13092009-10 CL

-Trust Pack,

No.A-3, III Stage,PIE, Bangalore III StageI

Wax coated and laminatd paper roll to rol printing

29.12 G-78Switches without

electroplatinSmall Green 2017

WA31.12.2004

N N N N N N N NA NA NA 0 N NA N N N NA NA

13102009-10 CL

-Tuhina Leather Industries,

No.351, IV Phase, PIA, Bangalore, IV PhaseI

Leather bagsC1 G-26

Leather foot wear and leatherproducts

Small Green ClosedBA

31.12.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13112009-10 O

25488Tulasinath Industries,

No.53, III Phase, PIA, Bangalore, III PhaseI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 1980BA

31.12.2012N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

13122009-10 CL

-Tyre Soles Bangalore,

No.207, III Phase, PIA, Bangalore III PhaseI

Tyre RetreadingC1 O-70

tubes vulcanizatio

n/ hotSmall Orange Closed

WA30.09.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13132009-10 CL U.M.Fiber Works,

No.D-397, I Stage,PIE, Bangalore I StageI

FRP Products17.89 G-108

Fiber glass molding, Fiber Glass reinforced

Small Green 2001WA

31.12.2020N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

13142009-10 O U.R.Condiments,

No.L-2, 9th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Condiments items 50 G-3

Bakery / confectionery / sweetsproducts

Small Green 1995BA

31.12.2035N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

13152009-10 O

25915Uma Industries,

No.C-85, II Stage, PIE, Bengaluru-560 058

II StageI

Turned components66.35 G-18

Switches without

electroplatinSmall Green 1985

WA31.12.2007

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

13162009-10 CL

-Unik Enterprises,

No.A-45, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001WA

NN N N N C1 N C1 NA NA NA 0 N NA N N N NA NA

13172009-10 CL

-Unik Products

No.C-76, II Stage, PIE, Bengaluru-560 058

II StageI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13182009-10 CL Unique Engineering Services

No.C-86, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit32 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2015

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

1319Unique Instruments &

No.423, IV Phase, PIA, Bengaluru-560 IV Phase Calibration process in Engineering 13192009-10 O

Unique Instruments & Manufacturing (P) Ltd,

No.423, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Calibration process in grand job works 10.7 W-14

Engineering and fabricationunits (dry

Small White 1997BA

30.12.2000N N N N N N N NA NA NA 0 N NA N N N NA Yes

13202009-10 O

77040Unique Non-Woven Co,

No 218. III Phase, PIA, Bengaluru-560 058

III PhaseI

Non oven cloth35 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2003WA

31.12.2034N N N N N N N NA NA NA 0.19 N NA N Y N NA NA

13212009-10 CL

-Unique Plastic Industries,

No.B-258, II Stage, PIE, Bengaluru-560 058

II StageI

plastic4.2 G-32

Polythene and plastic processedproducts

Small Green 1982BA

31.12.2010N N N N Y 16.06.2009 N NA NA NA 0 N NA N N N NA NA

13222009-10 CL

-Unique Products, N

No.C-76, II Stage, PIE, Bangalore-560058

II StageI

Plastic injection moulding 32 G-32

Polythene and plastic processedproducts

Small Green 1992BA

30.09.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes

13232009-10 CL

-Unitech Cnc Centre Pvt Ltd,

No.B-443, I Stage, PIE, Bengaluru-560 058,

I StageI

Hydrulic Machine parts 200 G-77

Manufacture of Motor & Pumpswithout

Small Green 2001BA

31.12.2016N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

13242009-10 CL

-United Engineering Works,

No.176, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedWA

30.09.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13252009-10 O

15258Universal Hands,

No.A-103(a), 3rd Main, II Stage, PIE, Bengaluru-560 058

II StageI

Wrist Watch Hands (Electroplating) 33.33 R-44

Industry or process involvingmetal

Small Red 1995BA

30.06.2020N N N N N N N NA NA NA 0.5 0.065 NA N Y Y NA Yes

13262009-10 O

23240Universal Industries,

No.A-197, 4th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Cushion Pillows and wedding fabrics 9.32 G-15

Cotton spinning and weaving(small scale)

Small Green 1980BA

31.12.2099N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

13272009-10 CL

-

Universal Instruments manufacturing Co Pvt Ltd,

No.26-A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.09.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13282009-10 CL

-

Universal Instruments Services Co,

No.26-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13292009-10 CL

10792

Universal Power Transformers Pvt Ltd,

No.26-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Transformer with painting 2223 O-69

repairing/manufacturi

ng ( dry Large Orange 2003

BA30.09.2010

Y 31.12.2013 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

13302009-10 O

22204V.B.Enterprises,

No.B-70-A, II Stage, PIE, Bengaluru-560 058,

II StageI

HDPE bags32.97 G-32

Polythene and plastic processedproducts

Small Green 1994WA

31.12.2023N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

13312009-10 O Gurudev Flex

No.D-361, II Stage, 8th Main, PIE, Bengaluru-560 058,

II StageI

Printing on integral part of packing materils

78 G-18 Small Green 1.1.2017WA

31.12.2026N N N N N N N NA NA NA 0.16 N NA N Y N NA NA

13322009-10 CL

-V.F.India,

No.360, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Garment4 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2000BA

31.12.2004N N N N N N N NA NA NA 0 N NA N N N NA Yes

13332009-10 CL

-V.G.Industries,

No.12, I Stage,PIE, Bengaluru-560 058 I StageI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13342009-10 O

34751Taj Computer Solution Pt Ltd

No.38, No.154/1/3, 1st Main Road, III Phase, PIA, Bengaluru

III PhaseI

E-waste collection segregation refurbishment of e-waste

2.65 R-15Recycling

Plants Components

Small Red 30.09.2017BA

-N N N N N N N NA NA NA 0.72 N ST & SP N N N NA Yes

13352009-10 O V.S.K. Enterprises,

No.A-47, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2000N N N N N N N NA NA NA 0.01 N NA N Y N NA Yes

13362009-10 CL

-V.T.,P. Rubber Products,

No.207/208, III Phase, PIA, Bengaluru-560 058

III PhaseI

Rubber productsC1 G-41

Rubber goods industry (with gas

Small Green ClosedBA

31.12.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13372009-10 O

15347

V.T.Switch Gears Transfermers ,

No.33, 4th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Transformer assembly unit(industrial scale)

87.29 G-18Transformer assembly unit(industrial

Small Green 1986BA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

13382009-10 CL

-Vaccum Techniques Pvt Ltd,

No.433, IV Phase, PIA, Bangalore, IV PhaseI

Engineering Unit81.18 G-78

Switches without

electroplatinSmall Green 1989

BA31.12.2006

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13392009-10 CL

-Varchas Impex Pvt Ltd,

No.A-192, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Unit65 G-78

Switches without

electroplatinSmall Green 2000

BA31.12.2013

N N N N C1 N C1 NA NA NA 0 N NA N N N NA NA

13402009-10 CL

16454Vastushilpi Enterprises,

No.B-219, 4th Cross, I Stage,PIE, Bangalore

I StageI

Engineering Unit77.5 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1982BA

31.12.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

13412009-10 CL

-Veena Industry,

No.30-B, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001WA

31.12.2010N N N N C1 N C1 NA NA NA 0 N NA N N N NA NA

13422009-10 O

12754Vee vee Control Pvt Ltd,

No.216, 11th Main, III Phase,PIA, Banglore-58

III PhaseI

Electrical control panels 332 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1990BA

31.12.2020N N N N N N N NA NA NA 1.65 N ST & SP N N N NA Yes

13432009-10 O Vetril Electronics Pvt Ltd,

No.547-A, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit156 W-13

Electrical and electronic

Small White 2001BA

31.12.2010N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yeselectronic

itemBA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

13442009-10 CL

-Vettiyil Industries,

No.B-69, 2nd cross, cross, Ist Stage,PIE, Bangalore -58

I StageI

Hawai chappel straps40.88 G-26

Leather foot wear and leatherproducts

Small Green 2002BA

31.12.2015N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

13452009-10 O Shree Shyam Polymer.,

No.C-30, 2nd Main, II Stage, PIE, Bengaluru-560 058

II Stage IPolythene industiral packing and bags (above 40 microns)

44.5 G-32Polythene and plastic processedproducts

Small Green 2002WA

31.12.2028N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

13462009-10 CL

-Vibrations,

No.370, IV Phase, PIA, Bangalore, IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2010

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13472009-10 CL

-Video Shack,

No.A-54, 2nd II Stage, PIE, Bengaluru-560 058,

II StageI

Corrugated Box43 G-9

or corrugated

box andSmall Green 1999

BA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA Yes

13482009-10 CL

-Vidoo Technical Pvt Ltd,

No.A-54, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

13492009-10 CL

-Vidya Creations - II,

No.288, IVPhase, PIA, Bangalore, IV PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

30.06.2003C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13502009-10 O

23426Vijaya Building Materials,

No.552, IV Phase, PIA, Bangalore, IV PhaseI

Solid and Hllo Concrete blocks 20.78 G-37

Ready mix cement concrete

Small Green 2001BA

31.12.2020N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

13512009-10 CL

-Vikas Plastic Industries,

No.300, IV Phase, PIA, Bangalore, IV PhaseI

Plastic18 G-32

Polythene and plastic processedproducts

Small Green 2003BA

31.12.2005N N N N Y C1 N NA NA NA 0 N NA N N N NA NA

13522009-10 CL

-Vinayaka Engineering ,

No.54, III Phase, PIA, Bangalore III PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2011

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13532009-10 CL

-

Vinayaka Mosquito Coil Manufacturing Co,

No.A-300, I Stage,PIE, Bangalore I StageI

Mosquito CoilC1 O-48

ng of mosquito repellent

Small Orange ClosedBA

30.09.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13542009-10 CL

-Vinod Industries,

No.421, IV Phase, PIA, Bangalore, IV PhaseI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001WA

30.06.2004N N N N N N N NA NA NA 0 N NA N N N NA NA

13552009-10 O

11702Vinu mac,

No.205/A, III Phase, PIA, Bangalore-560058

III PhaseI

Fabrication with pre treatment and spray painting (Hydrulic Pipes & Table

435 R-44Industry or process involvingmetal

Small Red 1985BA

30.06.2023Y 20.3.2025 N N N N N NA NA NA 2.4 0.16 NA N Y Y NA Yes

13562009-10 CL

-

Virendra Garments Manufacturing Ltd,

No.188, III Phase, PIA, Bangalore III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13572009-10 CL Vishal Polymers,

No.B-96, I Stage,PIE, Bengaluru-560 058

I StageI

Plastic sack bags wooven sack with HDPE, LDPE, polythene bags

64.91 G-79Plastic sack bags, woven sack -- 10 10 15 -- 15 10

Small Green 1992BA

31.12.2022N NA N N Y 31.03.2017 N NA NA NA 0.16 N NA N Y N NA Yes

13582009-10 CL

-Vishal Udyog,

No.306/A, IV Phase, PIA, Bangalore, IV PhaseI

Machine component37 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1995BA

31.12.2000N N N N N N N NA NA NA 0 N NA N N N NA Yes

13592009-10 CL

-Voltas Lted,

No.1a, II Phase, PIA, Bangalore, II PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2000C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13602009-10 O

27956VRL Automation Pvt Ltd,

No.A-170, 4th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit60.97 W-33

Scientific and mathematicalinstrument

Small White 1997WA

31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

13612009-10 CL

-Wad Pack Ltd,

No.A-111/112, II Stage, PIE, Bangalore -58

II StageI

Corrugated Box52.94 G-9

products (excluding

paperSmall Green 1999

BA30.06.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13622009-10 O Washwell Processors,

No.Sb-160, I Stage, PIE, Bangalore, I StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2014N N N N N N N NA NA NA NA N NA N N N NA Yes

13632009-10 CL

-Harshita Enterprises,

No.279, IV Phasee PIA, Bengaluru-560 058

IV PhaseI

Garment 87.5 G-72 without

using boilersSmall Green 2007

BA31.12.2016

N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

13642009-10 CL

-Welflex Polymers,

No.B-126, II Stage, PIE, Bangalore II StageI

Rubber productsC1 G-41

Rubber goods industry (with gas

Small Green ClosedWA

30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13652009-10 CL

-Xl Plastics,

No.332, IV Phase, PIA, Bangalore, IV PhaseI

Plastic Injection Moulding C1 G-32

Polythene and plastic processedproducts

Small Green ClosedWA

31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13662009-10 CL

-Yumi Tools,

No.C-87, III Stage,PIE, Bangalore III StageI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13672009-10 CL

-Zen Graphics,

No.B-237/1, 6th Main, II Stage, PIE, Bengaluru-560 058,

II StageI

sand blasting48.69 G-99

sand reclamation

unit/Small Green 2003

BA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA NA

1368 No.94/95, III Phase, PIA, Bengaluru- III Phase Engineering Unit Diesel 13682009-10 O

15673Zenith Precision Pvt Ltd,

No.94/95, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit1364 G-110

Diesel Generator sets (250 KVA

Large Green 1986BA

31.12.2025Y 31.12.2019 N N N N N NA NA NA 1.64 N ST & SP N N N NA Yes

13692009-10 O

28098Alpha Wires And Cables,

No.C-70, II Stage, PIE, Bengaluru-560 058,

II StageI

electric cables26.43 W-13

Electrical and electronic item

Small White 1998BA

31.12.2015N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

13702009-10 O

29475Alphatech,

No.C-244, I Stage, PIE, Bengaluru-560 058,

I StageI

Protection Tools35.43 W-14

Engineering and fabricationunits (dry

Small White 1990WA

31.12.2023N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

13712009-10 O Altech Industries,

No.B-181, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit20 W-14

Engineering and fabricationunits (dry

Small White 2002BA

31.12.2014N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

13722009-10 O Amba Industries,

No.B-125, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit85.25 G-1

Aluminum utensils fromaluminum circles by

Small Green 1999BA

31.12.2020N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

13732009-10 CL

-Anju Phytochemicals (P) Ltd,

No.A-53, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit36.3 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2021

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

13742009-10 CL

-Anz International,

No.A-322, II Stage, PIE, Banglaore-58, II StageI

Enginerring with heat treatment 165 O-36

treatment using oil

fired furnaceSmall Orange 2003

WA30.09.2005

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

13752009-10 O

25439

Ashwini Engineering Industries,

No.B-205, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit51.83 G-77

Manufacture of Motor & Pumpswithout

Small Green 1983BA

31.12.2024N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

13762009-10 O BSNL,

No.M-7, I Stage, Peenya Industrial Estate, Bangalore,

I StageI

Office Complex (D.G.Set) 33 G-78

Diesel Generator sets (15KVA to 250

Small Green 2008BA

31.12.2021N N N N N N N NA NA NA 0.17 N NA N Y N NA Yes

13772009-10 CL

-Auto Plast Unit-II,

Unit-II, No.556, II Stage, PIE, Banglaore-58,

II StageI

Plastic containers78.84 G-32

Polythene and plastic processedproducts

Small Green 2003BA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes

13782009-10 O Bharath Systems,

No.C-441, I Stage, PIA, Bengaluru-560 058,

I StageI

Electronic assemblies27.16 W-13

Electrical and electronic item

Small White 2002BA

31.12.2014N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

13792009-10 CL

-Bhavana Fluid Power,

No.388, 10th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit8.22 G-78

Switches without

electroplatinMedium Green 2003

BA31.12.2014

N N N N N N N NA NA NA 0 N NA N N N NA NA

13802009-10 CL

-Canara Fastners,

No.C-199A, 4th cross, I Stage, PIA, Bengaluru-560 058,

I StageI

Engineering Unit17.16 W-14

Engineering and fabricationunits (dry

Small White 1974BA

31.12.2013N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

13812009-10 O

24761

Canara Generators And Accoustics (P) Ltd,

No.B-236, II Stage, PIE, Banglaore-58,

II StageI

Engineering Unit15 W-14

Engineering and fabricationunits (dry

Small White 1998WA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

13822009-10 O

30226Compac Industries,

No.17/C, II Phase, PIA, Banglaore-58, II PhaseI

Corrugated Box26.77 O-98

Cardboard or corrugated box and

Small Orange 2001BA

30.09.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

13832009-10 O

22978Deva Industries,

No.B-119, II Stage, PIE, Bengaluru-560 058,

II StageI

Manufacturing of Sheet metal fabrication with Vibropolishing

26.28 O-96Gold and Silver smithy (purification

Small Orange 1993BA

30.09.2028N N N N N N N NA NA NA 1.6 0.1 NA N Y Y NA Yes

13842009-10 O Devilog Systems (India),

No.A-316, II Stage, PIE, Bengaluru-560 058,

II StageI

Filter assembling (General Engineering) 448 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1986BA

31.12.2024N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

13852009-10 O Dhanalakshmi Engineering,

No.480/A-1, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Corrugated Box17.89 G-9

Cardboard or corrugated box and

Small Green 2001BA

31.12.2021N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

13862009-10 O

24723Dynam Electro Controls,

No.186, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Electric control panels18.62 W-14

Engineering and fabricationunits (dry

Small White 1984WA

31.12.2024N N N N N N N NA NA NA 1.3 N ST & SP N N N NA NA

13872009-10 O Energy Enterprises,

No.484, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit10.62 W-14

Engineering and fabricationunits (dry

Small White 2004BA

31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

13882009-10 CL

-Famous Wood Packers,

No.M-2, 5th cross. I Stage, PIE, Bengaluru-560 058,

I StageI

wood packing 14.7 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2003WA

31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

13892009-10 CL Globe Technologies,

No.A-193, 4th cross, I Stage,PIE, Bengaluru-560 058,

I StageI

Pressed Metal Components 68.06 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2003WA

31.12.2015N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

13902009-10 O Goodwill Industries, N

No.C-23, 1st cross, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit22 W-14

Engineering and fabricationunits (dry

Small White 2003BA

31.12.2021N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes

13912009-10 O

Hi-Tech Fittings, No.C-431, I Stage, PIE, Bengaluru-560 058,

No.C-431, I Stage, PIE, Bengaluru-560 058,

I StageI

Lamp assembly17.89 W-12

Electric lamp ( bulb) andCFL manufacturi

Small White 2001WA

NN N N N N N N NA NA NA NA N NA N N N NA NA

13922009-10 O

32984Highway Rubber Industries,

No.70/71, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Rubber products19.97 G-41

Rubber goods industry

Small Green 1989WA

31.12.2023N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA32984 industry

(with gasWA N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

13932009-10 O Hytech Industries,

No.548, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit48.12 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2005

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

13942009-10 O

India Structural And Conveyers (P) Ltd,

No.4, 5th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit12.6 W-14

Engineering and fabricationunits (dry

Small White 1997BA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

13952009-10 O Indus Metal Packaging,

No.V-29, II Stage, PIE, Bengaluru-560 058,

II StageI

Engineering Unit52.904 G-1

Aluminum utensils fromaluminum circles by

Small Green 2000BA

31.12.2025N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

13962009-10 O Insta Furn,

No.B-238, II Stage, PIE, Bengaluru-560 058,

II StageI

wooden kitchen furnitures 9.28 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2002BA

31.12.2013N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

13972009-10 O

24129

Weigh Control Systems Pvt Ltd.,(Formerly known as Ipa Flowmatics Pvt Ltd), No.447, IV Phase, Peenya Industrial

No.447, IV Phase, Peenya Industrial Area, Bangalore,

IV PhaseI

Engineering Unit15.6 W-14

Engineering and fabricationunits (dry

Small White 1993WA

31.12.2013N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

13982009-10 O

39346Jagadish Electronics,

No.C-258, 5th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Process control instruments and non destructive testing equipment

1.78 G-81Research laboratories notinvolving

Small Green 1997BA

31.12.2013N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes

13992009-10 CL

-K.R.M International Ltd,

No.360/361, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001WA

31.12.2005N N N N N N N NA NA NA 0 N NA N N N NA NA

14002009-10 CL

-Kedia Clothing Company,

No.254/A, III Phase, PIA, Bengaluru-560 058

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

30.09.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14012009-10 O

Khedda Insulation Systems (P) Ltd,

No.A-297, II Stage, PIE, Bengaluru-560 058

II StageI

insulation components 122 G-78

Switches without

electroplatinSmall Green 1988

WA31.12.2015

N N N N N N N NA NA NA 0.33 N NA N Y N NA NA

14022009-10 O Koodal Engineers,

No.C-162, 4th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Special purpose machine 177 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

14032009-10 O Koshyma Engineering Pvt Ltd,

No.398 (A), I Stage, PIA, Bengaluru-560 058

I StageI

Industrial fans50.06 W-1

Assembly of air coolers/conditioners /repairing

Small White 1993BA

31.12.2015N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

14042009-10 O

Liebherr Machine Tools India Pvt Ltd,

No.353, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembly of gear730 G-78

Electrical and electronic item

Medium Green 2005BA

31.12.2021N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

14052009-10 O M.A.M Caps And Closures,

No.B-249, II Stage, PIE, Bengaluru-560 058

II StageI

Bottle caps8.5 W-24

Manufacturing of metal capscontainers

Small White 1996WA

31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA NA

14062009-10 O

15409Mama Furnishers, ,

No.C-243, I Stage, PIE, Bengaluru-560 058

I StageI

Furniture from sheet metal with spray painting

35.84 O-62Spray painting, paint baking, paint

Small Orange 1991BA

30.09.2029N N N N N N N NA NA NA 0.21 N NA N Y N NA Yes

14072009-10 O Manju Packaging Industries,

No.C-434, I Stage, PIE, Bengaluru-560 058

I StageI

Corrugated Box17.89 G-9

paper products (excluding paper

Small Green 2001BA

31.12.2021N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes

14082009-10 CL

-Matha Apparels,

No.B-309, II Stage, PIE, Bengaluru-560 058

II StageI

Garment21.39 G-72

or pulp manufacturing and

Small Green 2001BA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA

14092009-10 CL

-Meta Craft,

No.B-80, I Stage, PIE, Bengaluru-560 058

I StageI

CNC Machinery28.9 G-78

Switches without

electroplatinSmall Green 2003

WA31.12.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14102009-10 CL

-

Micrologix Embedded Controls (P) Ltd,

No.413/A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

PCB AssemblingC1 G-78

Switches without

electroplatinSmall Green Closed

WA31.12.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14112009-10 O

Omega Scientific Instruments Pvt Ltd,

No.C-212, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit29.05 W-14

Engineering and fabricationunits (dry

Small White 2003WA

31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

14122009-10 O

28031

Param Shubham Printers & Publishers Pvt Ltd,

No.C-337, II Stage, PIE, Bengaluru-560 058,

II StageI

printing press42.06 O-59

Printing press &/or Screen Printing

Small Orange 1997BA

31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

14132009-10 CL

-Pasuma Industries Unit-II,

Unit-II, No.368/369, 10th cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2014N N N N N N N NA NA NA 0.2 N NA N N N NA Yes

14142009-10 O Power Technologies,

No.185/B, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit80.06 W-14

Engineering and fabricationunits (dry

Small White 1994BA

31.12.2015N N N N N N N NA NA NA 0.075 N ST & SP N N N NA Yes

14152009-10 O Prashanthi Enterprises (India),

No.B-155, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic injection moulding 17.92 G-32

Polythene and plastic processedproducts

Small Green 1996BA

31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

14162009-10 CL

-Prashanthi Polymers,

No.B-155, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic injection moulding 43.69 G-32

Polythene and plastic processedproducts

Small Green 1997WA

31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA NA

1417 No.42B, IIPhase, PIA, Bengaluru-560 II Phase Battery containers battery ( 14172009-10 CL Precission Battery Machines,

No.42B, IIPhase, PIA, Bengaluru-560 058,

II PhaseI

Battery containers 12.7 O-73

battery ( excluding

manufacturiSmall Orange 2004

WA31.12.2013

N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

14182009-10 CL Premier Cnc Tool Room,

No.B-106, III Stage, PIE, Bengaluru-560 058,

III StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2019N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

14192009-10 O Pressweld Engineers (P) Ltd,

No.A-8, III Stage, PIE, Banglaore-58, III StageI

Engineering Unit59.82 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2015

N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

14202009-10 O Protekz,

No.V-6, II Stage, PIE, Bengaluru-560 058,

II StageI

Plastic injection and steel mould 7 G-32

Polythene and plastic processedproducts

Small Green 1987BA

31.12.2025N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

14212009-10 O

33663

Walkaroo International Pvt Ltd (Formerly VKC Footprints

Global Pvt Ltd)

No.488/D/E, 14th Cross, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

PU Footwears manufacturing 2153 G-90

Polyurethane foam extrusion asan allied

Large Green 2001BA

31.12.2027Y 31.12.2025 N N N N N NA NA NA 7.2 N NA N Y N NA Yes

14222009-10 O Ravi Enterprises,

No.D-390, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit4.52 W-14

Engineering and fabricationunits (dry

Small White 1986BA

31.12.2013N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

14232009-10 O

40018

Sanelec Excitation Systems Pvt Ltd,

No.131, 8th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Electronic assemblies67.65 G-78

Switches without

electroplatinSmall Green 1998

BA31.12.2025

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

14242009-10 CL

34390

ICT Services Management Solutions (I) Pvt ltd

No. 30A, Sy.No. 37 & 39, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering Unit666.1 R-10

Industries engaged in recycling/

Large Red 21.9.2017BA

30.06.2022N N N N N N N NA Yes 30.6.2022 9.5 N STP N N N NA Yes

14252009-10 CL

-Schematic Systems Pvt Ltd,

No.A-370/2 6th Main, I Stage,PIE, Bengaluru-560 058,

I StageI

Fabrication unit55.55 G-46

Steel furniture without spray

Small Green 1999WA

31.12.2015N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

14262009-10 CL

-Sonal Garments Unit - III,

Unit - III, No.163, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment312 G-72

Stitching/ Stitching ofshoe uppers/

Small Green 2004BA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 1.8 N ST & SP N N N NA NA

14272009-10 O

26233Super Packs, N

No.39/7, III Phase, PIA, Bengaluru-560 058,

III PhaseI

E.P Foam Filaments, 150 G-9

Cardboard or corrugated box and

Small Green 1986BA

31.12.2025N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

14282009-10 CL

-Sri Ranga Fabtech,

No.281/1c, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14292009-10 O Star Corporation,

No.B-240, II Stage, PIE, Bengaluru-560 058,

II StageI

Staple pins24.66 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2013N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

14302009-10 O

22940Super Abrasives,

No.264, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Engineering Unit170 O-76

Natural Latex processing and/or

Small Orange 1982WA

30.09.2030N N N N N N N NA NA NA 0.68 0.01 (gardening) NA N Y N NA NA

14312009-10 CL

-Synpack Zipper Bags (P) Ltd, ,

No.B-251, II Stage, PIA, Bengaluru-560 058,

II StageI

Ziplock bags49.95 G-78

Switches without

electroplatinSmall Green 2002

BA31.12.2013

N N N N N N N NA NA NA 0 N NA N N N NA NA

14322009-10 O

23001

Deco Textil (Formerly Swan Silk Pvt Ltd),

No.A-108, 3rd Main, II Stage, PIA, Bengaluru-560 058,

II StageI

weaving- Cushion Covers (Madeups) 56.1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004BA

31.12.2023N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes

14332009-10 O

20461TMS India Pvt Ltd,

No.14/B, 5th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Valve components of machine parts 191 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1999BA

31.12.2025N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

14342009-10 O Tata Teleservices, Ltd,

No.V-88, II Phase, PIA, Bengaluru-560 058,

II PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2010AA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes

14352009-10 O Tata Telecommunications Ltd,

No.19, III Phase, PIA, Bengaluru-560 058,

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2001AA

31.12.2017N N N N N N N NA NA NA 0 N NA N N N NA Yes

14362009-10 CL

-Techno Polymers (P) Ltd,

No.B-185, II Stage, PIE, Bengaluru-560 058,

II StageI

fiber glass10 O-92

moulding, Fiber Glassreinforced

Small Orange 1983BA

31.12.2016C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

14372009-10 CL

-Techtronics,

No.B-70, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2012N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

14382009-10 CL Textile Engineering Industries,

No.C-440, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit31.1 G-78

Switches without

electroplatinSmall Green 2002

BA31.12.2013

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

14392009-10 O

Transducers & Allied Products,

No.558, IV Phase, PIA, Bengaluru-560 058,

IV PhaseI

Electronic Items357 W-13

Electrical and electronic item

Small White 1991BA

31.12.2022N N N N N N N NA NA NA 0.88 N ST & SP N N N NA Yes

14402009-10 CL

-Tufflan India Interiors,

No.35, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Kitchen baskets with spray painting 31.91 O-62

painting, paint baking,

paintSmall Orange 2005

BA30.09.2005

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14412009-10 O Universal Air Products (P) Ltd,

No.22, III Stage, PIE, Bengaluru-560 058,

III StageI

Oxygen86.6 W-26

Medical oxygen Small White 2005

BA31.12.2024

N N N N N N N NA NA NA 0.08 N NA N N N NA YesBA N N N N N N N NA NA NA 0.08 N NA N N N NA Yes

14422009-10 O

Micrologix Embedded Controls(P) Ltd.,

No.473/D, 12th Cross, IV Phase, PIA, Bagalore-58

IV PhaseI

Assembly of Electronic items 438 W-13

Electrical and electronic item

Small White 2004BA

31.12.2021N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

14432009-10 O

13243

Sree Raj Hard chrome industries

No.388, 10th Cross, IV Phase Bengaluru-560 058

IV PhaseI

Electroplating (Hardchrome) 97.43 R-44

Industry or process involvingmetal

Small Red 2006BA

30.06.2022N N N N N N N NA NA NA 0.8 0.1 ST & SP N N Y NA Yes

14442009-10 CL

11572Jagan Steels,

No.497-D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Bright steel Bars cutting and acid pickling

22.53 R-44Industry or process involvingmetal

Small Red 2007BA

30.06.2019N N N N N N N NA NA NA 0.08 0.2 ST & SP N N Y NA Yes

14452009-10 O

32720

VBL Innovations Pvt Ltd., Unit-IV

No.17, 5th Main, III Phase, PIA, Bengaluru-560058

III PhaseI

Manufacturing of Leather Watch straps 667 G-72

Leather foot wear and leatherproducts

Medium Green 2017BA

31.12.2026N N N N N N N NA NA NA 2.56 N ST & SP N N N NA Yes

14462009-10 O

11724Metal Arts,

No.344, 9th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Aluminium anodizing209 R-44

Industry or process involvingmetal

Small Red 2006BA

30.06.2022Y 30.06.2017 N N N N N NA NA NA 0.7 0.4 NA N Y Y NA Yes

14472009-10 CL

11503

Alkem Laboratories Ltd (Research and Development

Centre),

No.473-D2, 13th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

R & D activity765.99 R-58

cal (Bulk drug &Active

Medium Red 2007BA

30.09.2017Y 30.06.2018 N N N N N NA NA NA 0 N NA N N N NA NA

14482009-10 CL

-Srinidhi Hard chrome,

No. 333, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

ElectroplatingC1 R-44

process involving

metal Small Red Closed

WA30.09.2007

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14492009-10 O

17656Chaitanya Indusries,

No.C-93, II Stage, PIE, Bangalore-560058

II StageI

3 in 1 chemical powder coating,blending & packing of

37.43 G-Industry or process involvingmetal

Small Green 2006BA

31.12.2034N N N N N N N NA NA NA 0.03 N NA N Y N NA Yes

14502009-10 CL

-Meta Gravures (P) Ltd.,

No. 57/B, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2013

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14512009-10 O

34604ENNARR Enterprises,

No. 57/A, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating (Hardchrome) 92 R-44

Industry or process involvingmetal

Small Red 1/7/2006BA

30.06.2022N N N N N N N NA NA NA 0.16 0.2 ST & SP N N Y NA Yes

14522009-10 O

17610M.R. Enterprises,

No. C-73, II Stage, PIE, Bangalore-560058

II StageI

Aluminium anodizing with screen printing 19.12 R-44

Industry or process involvingmetal

Small Red 2006BA

30.06.2025N NA N N N N N NA NA NA 0.7 0.1 NA N Y Y NA Yes

14532009-10 CL

15282Pratham Pressing,

No.341, 9th cross, IV Phase, PIA, Banagalore,PIA, Bangalore.

IV PhaseI

Pressed Component with electroplating 45.42 R-44

CLOSEDSmall Red 2005

WA30.06.2010

N N N N N N N NA NA NA 0 0 NA N N N NA NA

14542009-10 O

40040

Amara E-waste Recyclers, (Formerly Amara Metals

Enterprises,)

No.V-20/1, 4th Main Road, II Stage, PIE, Bangalore-560058

II StageI

Cln, Seg &Dismantling of ewaste in Sch-IV of e waste

94.73 R-15engaged in recycling

/ Small Red 2010

BA30.06.2023

N N N N N N N NA Yes30.06.2023

0.72 N NA N Y N NA Yes

14552009-10 O

24472TUV SUD South Asia

No.A-151/152, 2nd C Main, II Stage, PIE, Bangalore-560058

II StageI

Mechanical, Chemical & Analytical Testing textil & Food product

2890.17 R-83Research and Analyticallaboratories

Large Red 2007BA

30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.8 8 ETP Y Y N NA Yes

14562009-10 O

11633DC Autoparts,

No. A-267, 6th Mian, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering with Pretreatment 826 G-78

Panel Board, Switches withoutelectroplatin

Medium Green 2007BA

31.12.2034N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes

14572009-10 O

23471Sri Ranganatha Wire Products,

No.333,9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Wire drawing with pre cleaning activity 6.63 R-44

Industry or process involvingmetal

Small Red 1/1/2006BA

30.06.2018N N N N N N N NA NA NA 0.24 0.025 ST & SP N N Y NA Yes

14582009-10 CL

37528Srinivasa Metal Coats, N

No. 333, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Blackening4.1 R-44

process involving

metal Small Red 2006

BA30.06.2018

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14592009-10 YTC

25160Synpack Polyolefin Pvt Ltd

A-150, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacture of polyolefin films 257 G-32

Polythene and plastic processedproducts

Small Green 2005BA

NAN N N N N N N NA NA NA 0 N NA N N N NA Yes

14602009-10 CL Unique Enterprises,

No. B-110, III Stage, PIE, Bengaluru-560 058

III StageI

Powder coating with precleaning 46.31 R-44

Industry or process involving metal

Small Red 2006BA

30.06.2017N N N N N N N NA NA NA 0.4 0.1 NA N Y Y NA Yes

14612009-10 O Technofab Industries,

No. P-17, Behind Shed No. C-103, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit33.5 G-78

Switches without

electroplatinSmall Green 2006

WA31.12.2021

N N N N N N N NA NA NA 0.13 N NA N Y N NA NA

14622009-10 CL

12523Ganapathi Metal Finishers,

No. B-113-1, 3rd cross, III Stage, PIE, Bengaluru-560 058

III StageI

Electroplating Zinc plating 20 R-44

Industry or process involvingmetal

Small Red 2004BA

30.06.2023N N N N N N N NA NA NA 0.4 0.4 NA N Y Y NA Yes

14632009-10 O

12524Mohan Metal Finishers,

No. B-113-2, 3rd cross, III Stage, PIE, Bengaluru-560 058

III StageI

Electroplating Zinc plating 20 R-44

Industry or process involvingmetal

Small Red 2006BA

30.06.2023N N N N N N N NA NA NA 0.4 0.4 NA N Y Y NA Yes

14642009-10 CL

24118Hindusthan Forgings,

No.A-332, 9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Forging26 O-32

ferrous and non- ferrous

metals ( Small Orange 2007

BA30.06.2011

N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

14652009-10 O

17734M.S.R Chemicals,

No. B-232-B, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Formulation of Chemical (used for metal finishing industries)

40.98 R-22Organic Chemicalsmanufacturing

Small Red 2007BA

30.6.2023N N N N N N N NA NA NA 0.4 0.4 NA N Y Y NA Yes

1466 No. B-232/A, 5th Main, II Stage, PIE, II Stage Degreasing, De- Industry or 14662009-10 O

12177M.S. Industrial Services,

No. B-232/A, 5th Main, II Stage, PIE, Bangalore-560058

II StageI

Degreasing, De-rusting, Phospating, Pickling & Spray Painting activity

41.81 R-44Industry or process involvingmetal

Small Red 2007BA

30.6.2023N N N N N N N NA NA NA 0.5 0.5 NA N Y Y NA Yes

14672009-10 CL GFA India (P) Ltd.,

No. A-266, 6th Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Godown63 G-19

Facility of handling, storage andtransportatio

Small Green 2006BA

31.12.2015N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

14682009-10 O Anshul Agro Chemicals,

No.454, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Multi Micronutrients11 G-71

Formulation Organic Nutrientwithout the

Small Green 2006WA

30.09.2017N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

14692009-10 O Aqua Plast,

No.B-106-1, III Stage, PIE, Bengaluru-560 058

III StageI

Air blow extruder20 W-14

Engineering and fabricationunits (dry

Small White 2005WA

31.12.2015N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

14702009-10 O Insil Scientific,

No.41, BFW Layout, 5th Cross, III Stage, PIE, Bangalre-58

III StageI

Laboratory Wares30.85 G-78

Switches without

electroplatinSmall Green 2005

BA31.12.2025

N N N N N N N NA NA NA 0.86 N NA N Y N NA Yes

14712009-10 O Padmajyothi Industries,

No. C Plot-A Main Road, III Stage, PIA Bengaluru-560 058

III StageI

Pressed components13.33 G-78

Switches without

electroplatinSmall Green 2006

WA31.12.2034

N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

14722009-10 CL

-Koncretta Exterior Solutions,

No.519, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit17 W-14

Engineering and fabricationunits (dry

Small White 2006BA

31.12.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes

14732009-10 CL

-Ariatex Garments Pvt Ltd.,

No.288, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment1038 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2005WA

31.12.2009N N N N N N N NA NA NA 0 N NA N N N NA NA

14742009-10 CL

-

Sunchirin Auto Parts Inia (p) Ltd.,

No. 260, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit52.32 G-78

Switches without

electroplatinSmall Green 2006

BA31.12.2009

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

14752009-10 CL

34885Vinayaka Enterprises,

No. 473-A, 12th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment Washing60 O-50

Mechanized laundry using oil fired

Small Orange 2008BA

30.09.2012N N N N N N N NA NA NA 1.5 35 ETP Y N N NA Yes

14762009-10 O GCL India Pvt. Ltd.,

No.353, 8th Main, II Stage, Peenya Industrial Estate, Bengaluru-560 058

II StageI

Engineering Unit172 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

14772009-10 CL

-

Concept Hydro Pneumatic Pvt. Ltd.,

No. 450, IV Phase, Peenya Industrial Area, Bengaluru-560 058

IV PhaseI

Engineering with spary painting 56.22 O-62

Spray painting, paint baking, paint

Small Orange 1998WA

30.09.2005C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

14782009-10 O

35296

Hari Bhargo Engineeing Stamping & Tooling

No.112, 7th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Automotive press and press tools 167 G-88

Power pressSmall Green 25.02.2012

BA31.12.2026

N N N N N N N NA NA NA 2 N NA N Y N NA Yes

14792009-10 O

26956Jyothi Hydraulics,

No. 293, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit19.32 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2006WA

31.12.2025N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

14802009-10 CL

-

Bombay Royon Fashions Ltd. Unit-IV,

Unit-IV, No.471-D2, IV Phase, Peeenya Indutrial Area, Bengaluru-560 058

IV PhaseI

Garment836 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2007BA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA

14812009-10 O

28338Sujay Industries,

No. A-267(a), 6th Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit49.21 G-78

Switches without

electroplatinSmall Green 1999

BA31.12.2025

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

14822009-10 O

28589Vishwa Safety glass Industries,

No. A-354, 8th Main, II Stage, PIE, Bangalore-560058

II StageI

Glass trimming36.24 O-34

Glass ceramics, earthen potteries and

Small Orange 13-7-2005BA

30.09.2030Y 30.09.2020 N N N N N NA NA NA 2.2 0.7 NA N Y Y NA Yes

14832009-10 O Siddhi Foams,

No. A-352, 9th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Foam products 47.61 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1997WA

31.12.2015N N N N N N N NA NA NA 0.04 N NA N Y N NA NA

14842009-10 CL Brahans Rubber Products,

No.C-68, II Stage, PIE, Bengaluru-560 058

II StageI

Rubber moulded components 28.35 G-41

Rubber goods industry (with gas

Small Green 2006WA

31.12.2015N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

14852009-10 O Dakshin Deco Pvt. Ltd.,

No. B-151, 5th Main, II stage, PIE, Bengaluru-560 058

II StageI

HDPE Hooks and Rolls 127 G-32

Polythene and plastic processedproducts

Small Green 2006WA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

14862009-10 O

Tool Grinding Technologies Inc,

No.1-C, Plot No. 467 to 469, IV Phase, PIA, Bagalore-58

IV PhaseI

Engineering Unit44.81 W-14

Engineering and fabricationunits (dry

Small White 2005BA

31.12.2015N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

14872009-10 O

27753

Dr. Fritsch Machines & Powders Pvt. Ltd.,

No.453/A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Polishing of marble stone 128 W-14

Engineering and fabricationunits (dry

Small White 2005BA

31.12.2025N N N N N N N NA NA NA 1.23 N NA N Y N NA Yes

14882009-10 CL

-

Sartorius Mechatronics India (P) Ltd,

No.365/A, I Stage, PIE, Bengaluru-560 058,

I StageI

Testinf of systems376 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2006BA

31.12.2012C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

14892009-10 O

21648Yuken India Ltd.,

No B-80, 2nd cross, I Stage, PIE, Bangalore-560058,

I StageI

Oil Hydraulic equipments spary paiting

487 O-62Spray painting, paint baking, paint

Small Orange 2006BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 2 0.05 -recycled recycled N Y N NA Yes

14902009-10 CL

-V.B.S Petro Chemicals.,

No 11 & 12, I Stage, PIE, Bengaluru-560 058,

I StageI

Grease mfg12 R-4

ng of lubricatingoils ,grease

Small Red 2007BA

C1C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA- oils ,grease BA C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

14912009-10 CL

-Sarda Alloy Steel.,

No B-231, 5th cross, Ist Stage, Peenya Industrial Estate, Bangalore,

I StageI

Bright bars33 R-44

Industry or process involving metal

Small Red 2003BA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA

14922009-10 CL

11232

Uday Computer Aided Manufacturing Pvt Ltd.,

No A-11-A-12 , Ist Cross, Ist Stage, PIE, Bengaluru-560 058,

I StageI

NC Rotary tables & Index tables with spray painting & Assembling of surface

2416 O-62Spray painting, paint baking, paint

Large Orange 1996BA

31.12.2015Y 30.06.2015 N N N N N NA NA NA 2 0.05 NA N Y Y NA Yes

14932009-10 CL

-Varalakshmi Enterprises,

No.A-195, 4th cross, I Stage, PIE, Bangalore

I StageI

Powder coating60.06 R-44

Industry or process involving metal

Small Red 1992BA

31.12.201Y 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA Yes

14942009-10 CL

-

National Metal Processing System & Co.,

No B-25, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Heat Treatment80.31 O-63

Engineering Industries with HeatTreatment,

Small Orange 2004BA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA

14952009-10 CL

-R.B. Industries.,

No B-82, I Stage, Peenya Industrial Estate, Bangalore,

I StageI

Bright bars36 R-44

Industry or process involving metal

Small Red 2005BA

31.12.2015C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

14962009-10 O

11620VBL Innovations Ltd.,

No 81/82, 7th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Leather watch straps767 G-26

Leather foot wear and leatherproducts

Medium Green 1996BA

31.12.2022N N N N N N N NA NA NA 4 N ST & SP N N N NA Yes

14972009-10 CL

-Bundy India Ltd.,

No 13 C,6th Main III Phase, Peenya Industrial Area, Bangalore,

III PhaseI

Manufacture of Auto brake fluid componenets

220 G-78Panel Board, Switches withoutelectroplatin

Small Green 1/9/2005BA

31.12.2005N N N N N N N NA NA NA 0 N NA N N N NA NA

14982009-10 CL

-Mill Mech Engineering ,.,

No M-2, V Cross, I Stage PIE,Bangalore

I StageI

Engineering Unit17.89 W-14

Engineering and fabricationunits (dry

Small White 2001WA

31.12.2005C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

14992009-10 O

27697CNC Automotive - Unit 2.,

Unit 2., No B-228 4th cross, I Stage PIE,Bengaluru-560 058

I StageI

Turn Componenets only 86.93 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2004BA

31.12.2025N NA N N N N N NA NA NA 1.6 N NA N Y N NA Yes

15002009-10 CL Bangalore Clothing House,

No.120, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Garment59.69 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2001BA

31.12.2015N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

15012009-10 CL

-Navami Engineering Pvt Ltd.,

No B-315, 1 Main, I Stage PIE,Bengaluru-560 058

I StageI

Hydraulic fittings84.3 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2006WA

31.12.2017N N N N N N N NA NA NA 0.5 N NA N Y N NA NA

15022009-10 O

16071CNC Automotive - Unit 1.,

Unit 1., No B-444, I Stage PIE,Bengaluru-560 058

I StageI

Engineering Unit314 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2001BA

31.12.2025Y 31.12.2017 N N N N N NA NA NA 0.4 N NA N Y N NA Yes

15032009-10 O ACE Tech.,

No B-226,4th Cross, I Stage PIE,Bengaluru-560 058

I StageI

Precision components, pump barrel and arttist cell

372 G-77Manufacture of Motor & Pumpswithout

Small Green 2006BA

31.12.2025N N N N N N N NA NA NA 1 N NA N Y N NA Yes

15042009-10 CL BDB Packagings ,

No.142/1, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Corrugated Box26 G-9

Cardboard or corrugated box and

Small Green 2002WA

31.12.2015N N N N N N N NA NA NA 0.05 N NA N Y N NA NA

15052009-10 O

40799MRK Industries ,

No.B-398(B) , I Stage, PIE, Bengaluru-560 058,

I StageI

Electric Motor Servising 34.2 G-31

products using Boilers (excluding

Small Green 1995BA

31.12.2025N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

15062009-10 CL

-

Space Age electro Technology (India) Pvt Ltd,

No.A-232, II cross, II Stage, PIE Bengaluru-560 058,

II StageI

Manufacture Of Solar Thermal Absorbers 86.63 R-44

Industry or process involving metal

Small Red 1993BA

30.06.2012N N N N N N N NA NA NA 0.5 0.2 NA N Y Y NA Yes

15072009-10 O

32241P.T Bags ,

No.L-42 & 43, 2nd Main, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Tubular bags(bettery components) 63.95 G-78

Panel Board, Switches withoutelectroplatin

Small Green 9/8/2006BA

31.12.2026N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

15082009-10 CL

-BBR India Pvt Ltd., ,

No.31, II Phase, PIA, Bangalore, II PhaseI

Prestesed tendoses berings shading pipes 91.9 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1/3/2006BA

31.12.2007N N N N N N N NA NA NA 0 N NA N N N NA Yes

15092009-10 CL

-Shiva Exports,

No.C-436, I Stage, PIE, Bengaluru-560 058,

I StageI

Stiching of leather gloves 31.64 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004WA

30.12.2015N N N N N N N NA NA NA 0.07 N NA N Y N NA NA

15102009-10 O

21649 Mechatronics,

No.64 & 65, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Fabrication unit200 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1980BA

31.12.2024N NA N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

15112009-10 O

12272 Asian Pumps,

No.15/A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering Unit with spray painting 99.45 O-62

Spray painting, paint baking, paint

Small Orange 2002BA

30.09.2028N 30.09.2018

N

NA N N N NA NA NA 0.8 N NA N Y N NA Yes

15122009-10 CL

-Gokuldas Images (P) Ltd,

No.48, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garment2483 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2007BA

30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA

15132009-10 O Mandhana Industries (P) Ltd,

No.26/A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Garment1635 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2004BA

31.12.2020Y 30.09.2021 N N N N N NA NA NA 30 N STP Y N N NA Yes

15142009-10 CL

-M.S Ferro Guard Pvt Ltd,

No. N-SPL, 7th Cross, I Stage, PIA, Bangalore,

I StageI

Gril blasting & Zinc aluminium spraying 47 R-44

Industry or process involvingmetal

Small Red 1/4/2006BA

31.12.2016N N N N N N N NA NA NA 0 N NA N N N NA NA

1515 No.25 F, II Phase, Peenya Industrial II Phase Garment Garment 15152009-10 O

12050Nisha Designs., Unit-II

No.25 F, II Phase, Peenya Industrial Area, Bengaluru-560 058,

II PhaseI

Garment1131 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 1/7/2007BA

31.12.2028Y 31.12.2022 N N N N N NA NA NA 34 N STP - BWSSB N N N NA Yes

15162009-10 O

11634

Standard International Precision Engineering Pvt Ltd.,

No A-169, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit- Pre treatment 719 R-44

Industry or process involvingmetal

Medium Red 2010BA

30.06.2016N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes

15172009-10 O

11618

Axalta Coating Systems India Pvt Ltd., (Formerly known as

E.I.Dupont Pvt Ltd).,

No.28-D, II Phase, PIA, Bangalore-560058.

II PhaseI

Spray painting252.6 O-62

Spray painting, paint baking, paint

Small Orange 2006BA

30.09.2023Y 30.06.2023 N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

15182009-10 O

11500

South India Wire Products Pvt Ltd.,

No.17, J-2, II Phase, PIA, Bangalore-560058,

II PhaseI

Bright Steel Bars along with pickling and Electroplating

210.32 R-44Industry or process involvingmetal

Small Red 2008BA

30.06.2024Y 30.06.2024 N N N N N NA NA NA 2.8 0.78 ST & SP N N Y NA Yes

15192009-10 CL

-

Bulk Liquid Solutions Pvt Ltd.,

No.135,8th Main, III Phase, PIA, Bangalore

III PhaseI

PVC TanksC1 G-79

covered underPlastic

Small Green ClosedBA

30.06.2007C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15202009-10 CL

-Bosch Rexroth India Ltd.,

No.118, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit214 G-78

Switches without

electroplatinSmall Green 2005

BA30.06.2007

CL 31.12.2013 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15212009-10 O

34455

Valdel Advanced Technologies Pvt Ltd

No.470P, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit101 G-78

Switches without

electroplatinMedium Green 2000

BA31.12.2026

N N N N N N N NA NA NA 2 N MSR-STP N N N NA Yes

15222009-10 O

31710

Industrial Engineering Instruments,

No.203, 12th Main, III Phase,PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit27.93 G-78

Electrical and electronic item

Small Green 2007BA

31.12.2026N N N N N N N NA NA NA 0.09 N ST & SP N N N NA Yes

15232009-10 CL

-Neri Machine Tools Pvt Ltd.,

No.92/93, III Phase, Peenya Industrial Area, Bengaluru-560 058,

III PhaseI

Engineering Unit15.6 W-14

Engineering and fabricationunits (dry

Small White 2006BA

31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA NA

15242009-10 CL

-Nikhil Enterprises,

No.118/119, III Phase, PIA, Bengaluru-560 058,

III PhaseI

PCB manufacturing with plating 97.43 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2013

C1 30.06.2015 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15252009-10 CL

-Sartorius IndiaPvt Ltd.,

No.68, Iii Phase, Peenya Industrial Area, Bengaluru-560 058,

III PhaseI

Engineering Unit320 G-78

Switches without

electroplatinSmall Green 2006

BA31.12.2013

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15262009-10 CL

-

Maini Precission Products Pvt Ltd,

No.152, IIIrd Phase, PIA, Bangalore III PhaseI

Maintenance of precision components 400 G-78

Switches without

electroplatinSmall Green 2006

BA31.12.2009

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15272009-10 O

11637

Koustubha Scientific Research Laboratory Pvt Ltd (Formerly

L.G.C Research & Development Center).,

No. 403-406, KIADB Complex, (Model Export Bhavan), Plot No. 488-B, 14th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

R & D activity involving chemicals 482 R-58

Pharmaceutical (Bulk drug &Active

Small Red 2008BA

30.06.2022Y 30.06.2020 N N N N N NA NA NA 0.8 0.2 NA N Y Y NA Yes

15282009-10 CL

-Alankar Deaigns.,

No.182, III Phase, PIA, Bengaluru-560 058,

III PhaseI

GarmentC1 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green ClosedBA

30.06.2012C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15292009-10 CL

-Ganesh Chemicals.,

No.201/3, III Phase, Peenya Industrial Area, Bengaluru-560 058,

III PhaseI

Refilling and Trading of Chemicals 20.94 R-25

chemicals and electrochemicals

Small Red 1994BA

30.06.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15302009-10 YTC Aries Industries.,

No.101, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit2.16 G-78

Switches without

electroplatinSmall Green Closed

BANA

N N N N N N N NA NA NA 0 N NA N N N NA NA

15312009-10 CL

-Infomark Marketing Pvt Ltd.,

No.243/A, III Phase, Peenya Industrial Area, Bengaluru-560 058,

III PhaseI

Garment Washing597 O-50

Mechanized laundry using oil fired

Medium Orange 2007BA

30.09.2005C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15322009-10 CL

-Tulip Apperals Pvt Ltd.,

No.134, III Phase, PIA, Bangalore, III PhaseI

Garment212 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2006BA

30.09.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15332009-10 CL

-Bosch Rexroth India Ltd.,

No.96, III Phase, PIA, Bangalore III PhaseI

Engineering Unit977 G-78

Switches without

electroplatinMedium Green 1998

BA31.12.2004

CL CL C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15342009-10 CL

-C.E Gloves India Ltd.,

No 3 , II Phase, PIA, Banagalore 58 II PhaseI

Surgical Gloves1884 R-44

process involving

metal Large Red Closed

BA30.06.2008

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15352009-10 O

10801

ISRO Telematry Tracking and Commond Network.,Unit -II,

Unit -II, No. 7 & 8 II Phase, PIA, Bengaluru-560 058

II PhaseI

satlite tracking4840 G-78

Switches without

electroplatinLarge Green 6/30/1905

BA31.12.2022

N N N N N N N NA NA NA 3.5 N ST & SP N N N NA Yes

15362009-10 O JCR Drillsol Private Limited ,

Plot No 20-B, II Phase, PIA, Bengaluru-560 058.

II PhaseI

Engineering with Heat treatment 654.86 O-63

Engineering Industries with HeatTreatment,

Medium Orange 2001BA

30.06.2012N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

15372009-10 CL

11438

Anu Solar Power Private Limited, Plont

Plont No 248, 3rd Cross, 8th Main, III Phase, PIA, Bangalore-560058

III PhaseI

Enginerring with Surface treatment 633 R-44

process involving

metal Medium Red 2002

BA31.12.2012

Y 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA NA

15382009-10 O

14812

Paragon Polymer Product Pvt Ltd., (formerly Preston India

Pvt Ltd ),

No.29/A, II Phase, PIA, Bangalore-560058,

II PhaseI

Foot wear & PVC shoes 3737 O-76

Natural Latex processing and/or

Large Orange 1/12/2005BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 22 N STP Y N N NA Yes

15392009-10 CL

-Bosch Rexrith India Pvt., Ltd.,

Plot No 96, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering with Painting 1488 O-62

painting, paint baking,

paintLarge Orange 2007

BA30.06.2008

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- paint BA C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15402009-10 O

11735

Paragon Polymer Product Pvt Ltd., (formerly Preston India

Pvt Ltd ),

No.45/A-1, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Rubber Foot wear & Canvas Footwear 1446.41 O-63

Engineering Industries with HeatTreatment,

Large Orange 1987BA

30.09.2021Y 30.09.2021 N N N N N NA NA NA 22 N STP Y N N NA Yes

15412009-10 CL

24473Southern Auto Products.,

No.41A/1, II Phase, PIA, Bengaluru-560 058

II PhaseI

Toughened Glass1672 G-21

Glass , ceramic, earthenpotteries, tile

Large Green 2005BA

31.12.2024Y 31.12.2016 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

15422009-10 O

16544Heatcarb Enterprises.,

No.34, 4th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Heat Treatment46.33 O-36

Heat treatment using oil fired furnace

Small Orange 2007BA

30.09.2023N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

15432009-10 O

33328Aventics India Pvt Ltd

Shed No.2, Plot No.35, 1St Main , II Phase, PIA, Bengaluru-560 058

II PhaseI

Pneumatic cylinder Assembly Unit 221 G-60

Repairing, cleaning,degreasing, painting and

Small Green 01.05.2017BA

31.12.2027N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes

15442009-10 O

31874Mereena Creation.Polt

No 183 , III Phase, PIA, Bengaluru-560 058.

III PhaseI

Garment801 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2007BA

31.12.2026N N N N N N N NA NA NA 18 N NA N Y N NA Yes

15452009-10 CL

12099 Bombay Rayon Fashions Ltd.,

No. 288, Iv Phase, PIA, Banaglore-58 IV PhaseI

Garment333 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2007BA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

15462009-10 O

35268Armstrong Design Pvt Ltd,

No.41B, II Phase, PIA, Bengaluru-560058

II PhaseI

Manufacturing of ferrous & non ferrous casting

842 G-78 Medium Green 2007BA

31.12.2027Y 31.12.2022 N N N N N NA NA NA 3.4 0.2 ST & SP N N Y NA Yes

15472009-10 O

11704Hanuman Metal Finishers,

No.C-133, 2nd B Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating Zinc plating 19.69 R-44

Industry or process involvingmetal

Small Red 2005BA

30.06.2023N N N N N N N NA NA NA 0.8 0.6 NA N Y Y NA Yes

15482009-10 O

20101 Xcyton Diagnostics Ltd.,

No.449, 10th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Diagonistic Kit647 R-58

Pharmaceutical (Bulk drug &Active

Medium Red 2007BA

30.06.2021N NA Y 31.12.2100 N N N NA NA NA 0.61

0.02 (CBMWTF) ST & SP N N N NA Yes

15492009-10 O

12077

Wonder Fex, (Old name Washwinn Processors),

No.270, IV Phase PIA, Bengaluru-560 058

IV PhaseI

Garment dyeing & washing 312 R-40

Yarn / Textile processinginvolving

Small Red 2008BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 0.76 133 ETP Y Y N NA Yes

15502009-10 CL S R Equipments

B-38, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering Unit189 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2016

N N N N N N N NA NA NA 1.5 N NA N y N NA NA

15512009-10 O Rohm India Limited , Plot

Plot No A.-53(B), 2nd Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit430 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2007BA

31.12.2023N N N N N N N NA NA NA 0.22 N NA N Y N NA Yes

15522009-10 O

20176

Mechano Engineering CO. Unit-II,

No. 3 & 4, Sy. No. 467 -469, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Fabrication unit & Painting booth 542 O-62

Spray painting, paint baking, paint

Medium Orange 2006BA

31.12.2022N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

15532009-10 CL

10823

Bangalore Suits (M/S Gokul Das Images) ,

No 48, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment1696 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2005BA

31.12.2022Y 31.12.2022 N N N N N NA NA NA 25 N STP Y N N NA Yes

15542009-10 O

11795

ISRO Telematry Tracking and Commond Network., Unit -1,

Unit -1, No. 12 & 13, II Phase, PIA, Bengaluru-560 058

II PhaseI

Setalite traking1087 G-78

Switches without

electroplatinLarge Green 1988

BA31.12.2022

N N N N N N N NA NA NA 25 N STP Y N N NA Yes

15552009-10 CL

-S S Motors,

Plot No.140, 100 feet Road , III Phase, PIA, Bnaglore- 560058

III PhaseI

Automobille repair13 O-18

Automobile servicing, repairing and

Small Orange 2006WA

30.06.2011N N N N N N N NA NA NA 0 N NA N N N NA NA

15562009-10 O Cooltronics,

Plot No 142, 9th Main, III Phase, PIA. Bnaglore-58.

III PhaseI

Fabrication unit14 G-46

Steel furniture without spray

Small Green 2006BA

31.12.2033N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

15572009-10 CL

24470

Dual Manufacturing Technolgies Private Limited ,

Plot No. SB -116, 3 rd Cross, I Stage, PIE, Bnaglore-58

I StageI

CNC Machinery Components 136.83 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2006BA

31.12.2018N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

15582009-10 O Reddy Engineering Works

No. V-75, 5th Cross, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit78 G-78

Engineering and fabricationunits (dry

Small Green 1987BA

31.12.2034N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

15592009-10 CL

- Sigma Fluid Power Pvt. Ltd.,

No. 470-A,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electroplating64 R-44

process involving

metal Small Red 1/12/2007

BA30.06.2012

N N N N N N N NA NA NA 0 N NA N N N NA NA

15602009-10 O Orient Fab,

No.B-53, III Stage,PIE, Bengaluru-560 058

III StageI

Engineering Unit46 W-14

Switches without

electroplatinSmall White 2007

WA31.12.2016

N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

15612009-10 O Smitvin Engineers Pvt. Ltd.,

No.373, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit36 W-14

Panel Board, Switches withoutelectroplatin

Small White 2007BA

30.06.2016N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

15622009-10 CL

15231Life Line Feeds India Pvt ltd,

No C-214, 4th cross., Ist Stage , PIE, Bengaluru-560 058

I StageI

Cold storage & repacking of chicken meat

308 O-30poultry feed

and cattle feed

Small Orange 2007BA

31.12.2012N N N N N N N NA NA NA 0 N ST & SP N N N NA NA

15632009-10 O Mill Mech Emgioneering

No.205/B, 12th Main, III Phase, PIA, Bengaluru-560 058.

III PhaseI

Fabricatin of Sheet metal 35.25 W-14

Engineering and fabricationunits (dry

Small White 2009BA

31.12.2020N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

1564 No. 187, III Phase, PIA, Bangalore – III Phase Engineering with Engineering 15642009-10 CL

-Satrac Engineering Pvt Ltd.,

No. 187, III Phase, PIA, Bangalore – 560 058

III PhaseI

Engineering with fabrication and painting

16.5 W-14Engineering and fabricationunits (dry

Small White 2004BA

31.12.2010C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15652009-10 O

15107Excel Forge Tech.

No. 360 and 361, IV Phase, PIA, Bangalore-560058

IV PhaseI

Steel Forging62.15 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2007BA

30.09.2029N N N N N N N NA NA NA 0.5

0.25 (hammer feed) ST & SP N N N NA Yes

15662015-16 O

37172Stevia World Agrotech Pvt Ltd

No.39/1, 2nd Floor, 4th Main, III Phase, PIA, Bengaluru-560058

III PhaseI

Formulation & packing of stevia based herbal products

910 G-2Ayurvedic & Homeopathic medicine

Small Green 2015BA

31.12.2027N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

15672009-10 CL

-Dymaxion Pvt. Ltd.,

No. C-178, II Stage, PIE, Bengaluru-560 058

II StageI

Battery manufacture 42 R-7

batterymanufacturing(excluding

Small Red 2007BA

31.12.2009N N N N N N Y NA NA NA 0 N NA N N N NA Yes

15682009-10 O

11247

Thermal Transfer Products Pvt. Ltd.,(TTP),

No.486-D, 13th Cross, IV Phase, PIA, Bengaluru-560 058.

IV PhaseI

Transformer Radiators (Engineering Unit) with spray painting

2720 O-69repairing/

manufacturing ( dry

Large Orange 2005BA

30.09.2022Y 30.09.2023 N N N N N NA NA NA 11 N STP Y N N NA Yes

15692009-10 CL

-Balaji Hard Chrome Unit-II,

Unit-II, No.C-85, III Stage, PIE, Bengaluru-560 058

III StageI

Electroplating23 R-44

process involving

metal Small Red 2007

BA30.06.2008

N N N N N N N NA NA NA 0 N NA N N N NA NA

15702009-10 O

Universal Power Trasnsformer Pvt. Ltd. Unit-

III,

Unit-III, No.313-A, 314-A, 6th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Assembly of transformers and switch gear

369 G-85Transformer assembly unit

Small Green 1995BA

31.12.2012N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

15712009-10 CL

11706

Universal Power Transformer Pvt. Ltd.,

No. 46/A, II Stage, PIE, Bangalore-560058

II StageI

Battery manufacture 127 R-7

batterymanufacturing(excluding

Small Red 2007BA

30.06.2008N N N N N N Y NA NA NA 0 N NA N N N NA NA

15722009-10 CL

-PCB Services .,

No 118/119, III Phase, PIA, Bengaluru-560 058.

III PhaseI

Engineering Unit108 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2008

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15732009-10 CL

-Shiltron Eletronics .,

No 118/119, III Phase, PIA, Bengaluru-560 058.

III PhaseI

PCB Manufacturing with plating 311 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2008

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

15742009-10 CL

-

Shakambari Fashions (P) Ltd (formerly Pitambara creations

(India) Pvt ltd.,

No.30-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment washing117 O-50

Mechanized laundry using oil fired

Small Orange 2006BA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA

15752009-10 CL

-Kamath Transformers.,

No.B-71, 2nd cross. Ist Stage, PIE, Bengaluru-560 058

I StageI

Transformer assembly 89 G-85

Transformer assembly unit(industrial

Small Green 2003BA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA

15762009-10 O Kamath Transformers.,

No.A-155, 3rd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacture of Transformers & its parts(without painting)

164 G-85Transformer assembly unit(industrial

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes

15772009-10 O

15215

Sri Balaji Industries(old name: Jyothi Electroplaters),

No.293/A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electroplating4.52 R-44

Industry or process involvingmetal

Small Red 2006BA

17.3.2025N N N N N N N NA NA NA 0.08 0.05 NA N Y Y NA Yes

15782009-10 O

25870Active Knits

No.30/C, 2 nd & 3rd Floor, II Phase, Peenya, Bengaluru-560 058

II PhaseI

Ready made Garments 63 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2015BA

31.12.2024N NA N N N N N NA NA NA 12 N STP Y N N NA Yes

15792009-10 O

39548Tulip Engineers.,

No.249, 3rd cross, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Electroplating (hardchrome) 74.46 R-44

Industry or process involvingmetal

Small Red 2008BA

30.06.2023Y 30.6.2023 N N N N N NA NA NA 0.4 0.25 ST & SP N N Y NA Yes

15802009-10 O

Victory Aluminium (formerly M/s.Anand Rubber)

No.C-54, III Stage, PIE, Bengaluru-560 058

III StageI

Rubber beedings22.5 G-41

Rubber goods industry (with gas

Small Green 2007BA

31.12.2031N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

15812009-10 O Anand Rubber,

No.C-77, III Stage, PIE, Bengaluru-560 058

III StageI

Rubber beedings54.6 G-41

Rubber goods industry (with gas

Small Green 2007WA

31.12.2016N N N N N N N NA NA NA 0.04 N NA N Y N NA NA

15822009-10 CL

10287ABB Ltd.,

No. 485/6, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

assembling of robotic system 607.45 G-78

Panel Board, Switches withoutelectroplatin

Medium Green 2005BA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA

15832009-10 O

22951 Vijay Power Control Systems,

No.B-65 P-16, III Stage, PIE, Bengaluru-560 058

III StageI

Transformers92.6 O-69

Transformer repairing/manufacturing ( dry

Small Orange 2006BA

31.12.2024N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes

15842009-10 CL

-

International Trimmings Labels India (P) Ltd.,

No.P-6, III Stage, PIE, Bangalore58 III StageI

printing on labels 193 G-91

of Adhesives and

adhesive Small Green 2007

BA31.12.2012

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15852009-10 CL

24269

Fine Transferprints India Pvt. Ltd., N

No. 287, 4th main, IV Phase, PIA, Bangalore58

IV PhaseI

Label Printed on tapes & screen printing 390 G-91

of Adhesives and

adhesive Small Green 2007

BA31.12.2022

N N N N N N N NA NA NA 1.2 0.5 ST & SP N N Y NA Yes

15862009-10 O X.L CNC Machines,

No.C-78, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering Unit12.2 W-14

Engineering and fabricationunits (dry

Small White 2005WA

31.12.2016N N N N N N N NA NA NA 0.04 N NA N Y N NA NA

15872009-10 O

11430

Dressmaster suits (Robet Systems),

No.76/77, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment2680 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 1/2/2007BA

31.12.2025N N N N N N N NA NA NA 20 N NA N Y N NA Yes

15882009-10 O

32426ACWA Automatics.,

No.204, 12th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Powder coating, painting without trade 429 G-97

Activity of Powder

Coating onSmall Green 2006

BA31.12.2026

N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes32426 Coating onsurface of

BA N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

15892009-10 CL

-MPP Technologies Pvt. Ltd.,

No. 489/D, 14th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembly of Transformers with spray painting

313 O-62Spray painting, paint baking, paint

Small Orange 2005BA

30.09.2017Y 30.09.2018 N N N N N NA NA NA 1.2 0.1 ST & SP N N Y NA Yes

15902009-10 O

33268Ador Fontech Ltd., Unit-II

No. A-288, II Stage, PIE, Bangalore-560058

II StageI

Welding electrodes241 O-4

Coated electrode manufacturing

Small Orange 2007BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 1 0.4 NA N Y Y NA Yes

15912009-10 O

14712 Friction Control Productes ,

Plot No 486 B-2, IV Phase, Bnaglore-560058

IV PhaseI

Mixing & blending of base oil & Additives to produceindustrial lubricating

364 G-27Lubricating oil,greases or petroleum

Small Green 2007BA

31.12.2033N NA N N N N N NA NA NA 0.5 N NA N Y N NA Yes

15922009-10 CL

-

PAXAR INDIA Private Limited,

No A- 252 (A), II Stage, PIA, Bangalore

II StageI

Woven labels 90 G-91

of Adhesives and

adhesive Small Green 2007

BA31.12.2009

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15932009-10 CL

-Concreate Extrerir Solutions,

No.519, IV Phase, PIA, Bangalore. IV PhaseI

Concrete tiles170 G-37

Ready mix cement

concreteSmall Green 2006

BA31.12.2009

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

15942009-10 O Bangalore Sanchar Nigam Ltd.,

No. 415,11th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2004AA

31.12.2016N N N N N N N NA NA NA 0 N NA N N N NA Yes

15952009-10 O Gopal Engineering,

No.P6/E, II Stage, PIA, Bengaluru-560 058

II StageI

Engineering Unit42 G-78

Switches without

electroplatinSmall Green 2009

WA31.12.2021

N N N N N N N NA NA NA 0.11 N NA N Y N NA NA

15962009-10 O

38323 Porlu Packers,

No.473/D(1), IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Polythene Bag & Sheets 51.95 G-32

Polythene and plastic processedproducts

Small Green 2003BA

31.12.2027N N N N Y N N NA NA NA 0.4 N ST & SP N N N NA Yes

15972009-10 CL

-Adept Polymers Pvt.,

No. B-34, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering with Surface treatment 102 R-44

Industry or process involving metal

Small Red 2006BA

C1N N N N N N N NA NA NA 0 N NA N Y N NA Yes

15982009-10 CL

-

Pragathi Transmission Private Limited.,

No.B-55, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering with Surface treatment 222 R-44

Industry or process involving metal

Small Red 2006BA

30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA

15992009-10 CL

-Ratan Mani Industries,

No. 267, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Plastic carry bags40.8 G-32

Polythene and plastic processedproducts

Small Green 2002BA

31.12.2016N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

16002009-10 O

34004SAS Precision Engineering,

No.B-51, 2nd cross, III Stage, PIE, Bengaluru-560 058

III StageI

CNC Components with aluminum melting frunace

234 O-28Non- ferrous

metalextraction

Small Orange 2007BA

30.09.2022N N N N N N N NA NA NA 1.2 0.02 NA N Y Y NA Yes

16012009-10 O Sri Gayathri Luch Home,

No. 59, KIADB Complex, NTTF Circle, IV Phase, PIA, Bengaluru-560 058

IV PhaseHospital

ity

Hotel without rooms13 G-3

confectionery / sweetsproducts

Small White 1999BA

31.12.2021N N N N N N N NA NA NA 0 N NA N Y N NA Yes

16022009-10 O

39361Starline Packers Pvt. Ltd.,

No. 490E, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

wood packing 27.82 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2001BA

31.12.2026N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

16032009-10 CL

-

International Trimmings and Labels India (P) Ltd.,

No. P-6, 1st Cross, III Stage, PIE, Bengaluru-560 058

III StageI

printing on labels 193 G-91

of Adhesives and

adhesive Small Green 2007

BA31.12.2008

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16042009-10 O

17969

CNC India Tools and Services (P) Ltd.,

No.C-342, II Stage, PIA, Bengaluru-560 058

II StageI

Engineering Unit58.64 W-14

Engineering and fabricationunits (dry

Small White 2004BA

31.12.2015N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

16052009-10 O

41066 Locus Machine tools (P) Ltd,

No. 392/1, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit36.9 G-78

Machine tool components Small Green 2005

WA31.12.2025

N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA

16062009-10 CL

-SMS Packaging Pvt. Ltd.,

No. A-36, II Stage, PIE, Bengaluru-560 058

II StageI

Corrugated Box285 G-9

or corrugated

box and Small Green 2004

BA31.12.2015

N N N N N N N NA NA NA 0 N NA N N N NA NA

16072009-10 CL

-Hutchison Essat South Ltd.,

No.399, IV Phase, PIA, Bengaluru-560 058

IV PhaseTT

Telephone towerDG Set W-52

products using Boilers (excluding

Small White 2003AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

16082009-10 CL

-

Sumukha Battery Manufacturing, plot

Plot No. B-151, II Stage, PIE, Bengaluru-560 058

II StageI

Battery manufacture 11.92 R-7

pulp manufacturi

ng)Small Red 2004

WA30.06.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16092009-10 CL

-Supertex wraps (P) Ltd.,

No. 457-B, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Plastic sheet 10 G-32

Polythene and plastic processedproducts

Medium Green 2005WA

31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16102009-10 CL

-Raj Enterprises, No. Plot

No. Plot No. 471/D2, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Stiching and leather hand floves 23.5 G-72

Stitching/ Stitching ofshoe uppers/

Small Green 2006BA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16112009-10 CL

-

Seven Seas Industries (P) Ltd.,

No. 485/9-A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2003

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16122009-10 CL

- Access Apparels Exports,

No. 88, Renuka complex, II Stage, PIE, Bengaluru-560 058

II StageI

Garment350 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2005BA

31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

1613 Plot No 49, III Phase, PIA, Bengaluru- III Phase coir Matteress Carpentry & 16132009-10 O Kurlon Limited, Plont

Plot No 49, III Phase, PIA, Bengaluru-560 058

III PhaseI

coir Matteress66 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2007BA

31.12.2025Y 31.12.2020 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

16142009-10 CL

12793Garden City Fshions Pvt Ltd.,

No.356-357, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment698 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2009BA

31.12.2028Y 31.12.2018 Y 31.12.2100 N N N NA NA NA 18 N NA N Y N NA Yes

16152009-10 CL

-Surya Hard Chrome Pvt Ltd.,

No.168, Unit-II, III Phase, Bengaluru-560 058

III PhaseI

Elctroplating80 R-44

process involving

metal Small Red 2008

WA30.06.2014

C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16162009-10 O Bharath Sanchar Nigama Ltd.,

Tower Site No.15/4, 3rd Main Peenya New Extension, Bengaluru-560 058

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2007AA

31.12.2017N N N N N N N NA NA NA 0 N NA N N N NA Yes

16172009-10 O Bharath Sanchar Nigama Ltd.,

Bangalore-III Phase,PIA, Bangalor-58 III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2007AA

31.12.2017N N N N N N N NA NA NA 0 N NA N N N NA Yes

16182009-10 O

53439

Bharath Sanchar Nigama Ltd., Tower Site open Land atM/s

Umbrey Engineers P Ltd.,

No.31, II Phase, PIA, Bangalor-58 II PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2006AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

16192009-10 CL

-Janardhana Enterprises,

No.34/G, 4th Main Raod, III Phase, PIA, Bengaluru-560 058.

III PhaseI

Engineering with Heat treatment 47 O-63

Engineering Industries with HeatTreatment,

Small Orange 2008WA

31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16202009-10 CL

-

PEPPERL + FUCHS (INDIA) PVT. LTD.,

No.C-328, I Stage, PIE, Bengaluru-560 058

I StageI

Proximity switches/ Sensors 107 G-78

Panel Board, Switches withoutelectroplatin

Small Green 27/5/2002BA

31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16212009-10 O

Hutchison essar South Ltd.,C/O Rukmini towers,

No. V-23(A) &(B), PIE, II Stage, Bengaluru-560 058

II StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2003AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

16222009-10 CL

-Universal Gases,

No P-22, Next to B-110, II Stage, PIE, Bengaluru-560 058

II StageI

Industrial Oxygen16.75 G-109

Repacking and

blending of Small Green 2002

WA31.12.2014

N N N N N N N NA NA NA 0 N NA N N N NA NA

16232009-10 O Plexion PDDE,

No. B-116, II Stage, PIE, Bengaluru-560 058

II StageI

Fabrication wings57.85 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2005WA

31.12.2015N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

16242009-10 O Sigma Metaliks,

No. C-490, IV Phase, PIE, Bengaluru-560 058

IV PhaseI

General Engineering activity without surface treatment, plating and spray

448.82 G-10Carpentry & wooden furnituremanufacturi

Small Green 1999BA

31.12.2024N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

16252009-10 CL

-

Shakunthala Mechanized Constructions & Engineering

Pvt. Ltd.,

No. 387, 4th main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Solid and Hllo Concrete blocks 16.9 G-37

Ready mix cement

concreteSmall Green 1993

WA31.12.2011

N N N N N N N NA NA NA 0 N NA N N N NA NA

16262009-10 O Bombay Machines,

No. C-88, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit89.47 W-14

Engineering and fabricationunits (dry

Small White 1992BA

31.12.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

16272009-10 O Premier Packs,

No. B-45, III Stage, PIE, Bengaluru-560 058

III StageI

Corrugated Box20.11 G-9

Cardboard or corrugated box and

Small Green 1994WA

31.12.2024N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

16282009-10 O

39448Sagittarius Metals Pvt. Ltd.,

No. 526, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit90.95 G-7

products using Boilers (excluding

Small Green 1999BA

31.12.2025N N N N N N N NA NA NA 0.9 N NA Y Y N NA Yes

16292009-10 CL

Naval Industrial and Control equipments,

No. 460-C, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of screw and revet 18.32 W-14

paper or pulp manufacturing)

Small White 1994BA

31.12.2014N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes

16302009-10 O Premier packging,

No. B-229, II Stage, PIE, Bengaluru-560 058

II StageI

Cutting and Fabrication of plastic sheet

22 W-14Engineering and fabricationunits (dry

Small White 2003WA

31.12.2016N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

16312009-10 CL Vision Plast,

No. 39, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Plastic injection moulding 32 G-32

Polythene and plastic processedproducts

Small Green 2000WA

31.12.2016N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

16322009-10 O Alpha Industries,

No C-275, Ist Stage, PIE, Bengaluru-560 058

I StageI

CNC Machinery32.69 G-78

Switches without

electroplatinSmall Green 1995

BA31.12.2021

N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes

16332009-10 CL P & S Goldclads,

No A-174, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Immitation Jewellary91 G-23

Gold and silver smithy(purification with acid

Small Green 2005BA

31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

16342009-10 O Asha Engineering,

No B-74, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit18.65 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

16352009-10 O Crescent Tool Engineering,

No B-89, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit78.83 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1985BA

31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

16362009-10 CL

-SB Components ,

No C-206, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Plastic injection moulding 11.41 G-32

Polythene and plastic processedproducts

Small Green 1999BA

31.12.2014N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

16372009-10 O Kumar Industriest,

No 8, 10th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication unit7.59 W-14

Engineering and fabrication

Small White 1977WA

31.12.2014N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NAfabrication

units (dry WA N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

16382016-17 O

30868Celest Pharma Labs Pvt Ltd

No.68,6th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Ayurvedic and Homeopathy medicine 9.2 O-19

Ayurvedic & Homeopathic medicine

Micro Orange 1.11.2017BA

30.09.2022N N N N N N N NA NA NA 28 0.04 ST & SP N N Y NA Yes

16392009-10 O

Shree Ganesh Maruthi Fabricators.,

No. 153, III Phase, 10th Main, PIA, Bengaluru-560 058

III PhaseI

Fabrication unit47 W-14

Engineering and fabricationunits (dry

Small White 2003BA

31.12.2016N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes

16402009-10 CL Meenakshi Engineering Co.,

No.237, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fiber glass1.21 G-108

Fiber glass molding, Fiber Glass reinforced

Small Green 1995BA

31.12.2014N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

16412009-10 CL Anand Rubber Industries.,

No.13, III Phase, PIA, Bengaluru-560 058

III PhaseI

Rubber beedings22.92 G-86

Tread rubber including pre-curedrubber

Small Green 2004BA

31.12.2014N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes

16422009-10 O

28597Arjun Plastics,

No.VP-9 & 10, I Stage, PIE, Bengaluru-560 058,

I StageI

Plastic injection moulding 85.27 G-32

Polythene and plastic processedproducts

Small Green 1993BA

31.12.2024N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

16432009-10 O Sepcon System Pvt Ltd ,

No. M-3, I Stage, 5th Cross, PIE, Bengaluru-560 058

I StageI

Pollution control equiment (fabrication) 189.52 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1995WA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

16442009-10 O

Superfchem Consupack Company,

No B-354, I Stage,PIE, Bengaluru-560 058

I StageI

Fabrication unit19.85 W-14

Engineering and fabricationunits (dry

Small White 2002WA

31.12.2012N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

16452009-10 CL

-Universal Furnaces,

No A-371, I Stage,PIE, Bengaluru-560 058

I StageI

Fabrication and Packing 51.24 W-14

Engineering and fabricationunits (dry

Small White 1991BA

31.12.2013N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

16462009-10 CL

-Mysore Vinyl Industries,

No C-209, I Stage,PIE, Bengaluru-560 058

I StageI

Shoe Upper5.5 Closed Small Green 1975

WA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA NA

16472009-10 O Hema Engineering Industries,

No C-210, 4th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Auto componenets193.91 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1990WA

31.12.2024N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

16482009-10 CL

-Gears India,

No C-439, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Unit23 W-14

Engineering and fabricationunits (dry

Small White 2002BA

31.12.2012N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

16492009-10 CL

Shringar Engineering & Energy Systems (P) Ltd.,

No.93, 7th main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Assembly of solar heaters 56 G-78

Solar power generationthrough solar

Small Green 1999BA

31.12.2016N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

16502009-10 CL

15212

Ashwin precision Product Pvt Ltd.,

, No.C-270, I Stage, PIE, Bangalore-560058,

I StageI

Engineering Unit13.56 G-77

Manufacture of Motor & Pumpswithout

Small Green 2000BA

31.12.2014N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

16512009-10 CL

-G.S. Fabricators.,

No.72, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fabrication unit26.77 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2007BA

31.12.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.1 N NA N Y N NA NA

16522009-10 CL Nucleus Engineers.,

No.68, III Phase, PIA, Bengaluru-560 058

III PhaseI

Mild sheet &Aluminium machine 41 G-1

Aluminum utensils fromaluminum circles by

Small Green 1997WA

31.12.2015N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

16532009-10 O

15212

Ashwin precision Product Pvt Ltd.,

No.C-429, I Stage, PIE, Bengaluru-560 058,

I StageI

Degreasing, Pickling,Phosphating 24.75 R-44

Industry or process involvingmetal

Small Red 2001BA

30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.8 0.25 NA N Y Y NA Yes

16542009-10 O

Bharath Precision Machine Tools., 8,

No.B-14, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit95.55 G-77

Brass and bell metal utensilsmanufacturi

Small Green 1974BA

31.12.2024N N N N N N N NA NA NA 1 N NA N Y N NA Yes

16552009-10 O

Ashwin precision Product Pvt Ltd.,

No.A-158, I Stage, PIE, Bengaluru-560 058,

I StageI

Precesion components 915 G-77

Manufacture of Motor & Pumpswithout

Medium Green 2000BA

31.12.2024Y 31.12.2024 N N N N N NA NA NA 0.8 N NA N Y N NA Yes

16562009-10 CL

-

Ashwin precision Product Pvt Ltd.,

No.B-121, I Stage, PIE, Bengaluru-560 058,

I StageI

Engineering Unit65.42 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2002BA

31.12.2014N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

16572009-10 CL

-

Baliga Lighting Co., No.A-10, I Stage, PIE, Bengaluru-560

058,

No.A-10, I Stage, PIE, Bengaluru-560 058,

I StageI

Manufacture of cable glands and accessories

26 G-10Carpentry & wooden furnituremanufacturi

Small Green 1973WA

31.12.2016y 31.12.2019 N N N N N NA NA NA 0.3 N NA N Y N NA NA

16582009-10 O

37789

Sushil Rubber & Allied Products., No.C-203, 4th

cross, I Stage, PIE, Bengaluru-560 058,

No.C-203, 4th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Rubber componenent43.08 G-41

Rubber goods industry (with gas

Small Green 1973BA

31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

16592009-10 O

Aswathy Heat Tech Pvt Ltd.,No.M-2, 5th cross, I

Stage, PIE, Bengaluru-560 058,

No.M-2, 5th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Fabrication of heatreatment equipents

61 W-14Engineering and fabricationunits (dry

Small White 2006WA

31.12.2026N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA

16602009-10 O

39866Sai Scientific Industries.,

No. N-1/1-A, 4th cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Laboratory Seientific Equipments 37.45 W-43

Laboratory ware includingglass

Small White 2007WA

31.12.2016N N N N N N N NA NA NA 1.8 N NA N Y N NA NA

16612009-10 CL Kaamadhenu Industries.,

No.SB-111/112, 2nd cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Rubber Mixing324 G-41

Rubber goods industry (with gas

Small Green 2008WA

31.12.2017N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

1662 No.B-29, 1st cross, I Stage, PIE, I Stage Manufacture of Brass and 16622009-10 O

40072Ganesh Cam Products.,

No.B-29, 1st cross, I Stage, PIE, Bengaluru-560 058,

I StageI

Manufacture of precesion turn components CNC machine components

81 G-7Brass and bell metal utensilsmanufacturi

Small Green 2006BA

31.12.2025N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

16632009-10 CL

-Cimtrix,

NoI-A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering Unit106 G-78

Switches without

electroplatinSmall Green 2004

BA31.12.2004

N N N N N N N NA NA NA 0 N NA N N N NA NA

16642009-10 O

39854Teknic SwitchGear,

No I7-H, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Electronic equipments30.87 G-78

Switches without

electroplatinSmall Green 1988

BA31.12.2015

N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

16652009-10 CL

10648Jeans Knit Pvt Ltd.,

No 26/A, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Ready made Garments 1929.5 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2004BA

31.12.2024Y 31.12.2019 N N N N N NA NA NA 57.6 N NA N Y N NA Yes

16662009-10 CL

-

Euro Clothing CoJeans Knit Pvt Ltd.,

No 26A, II Phase, PIA, Bangalore, II PhaseI

Garment78 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2004BA

31.12.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16672009-10 CL TIA Technologies.,

No 39/A, II Phase, PIA, Bangalore, II PhaseI

Engineering Unit45.05 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2016

N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

16682009-10 O

17181 Souza Engineering.,

No. 39/1, III Phase, PIA, Bengaluru-560 058

III PhaseI

Turned components8.9 W-14

Engineering and fabricationunits (dry

Small White 1999WA

31.12.2022N N N N N N N NA NA NA 0.16 N ST & SP N N N NA NA

16692009-10 O G.K. Engineering.,

No.B-230, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit31.38 W-14

Engineering and fabricationunits (dry

Small White 2006BA

31.12.2015N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

16702009-10 O

40009

S.G. Equipments & Machine Pvt Ltd.,

No.M-15, I Stage, PIE, Bengaluru-560 058

I StageI

Stainless steel equipment 96.85 G-46

Steel furniture without spray

Small Green 1997BA

31.12.2025N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

16712009-10 CL

-

Precimech Precision Products Pvt Ltd.,

No.B-77, I Stage, PIE, Bengaluru-560 058

I StageI

Precision componenets 73.32 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2011

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

16722009-10 O

28120

Heat Control Instruments & Services.,

Plot No 104, III Phase, PIA, Bengaluru-560 058

III PhaseI

Mfg of heat control instruments 23.2 G-18

Steel furniture without spray

Small Green 2003BA

31.12.2023N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

16732009-10 CL

-Jagan Engineering Company.,

No. C-337, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit23.64 W-14

Engineering and fabricationunits (dry

Small White 1994BA

31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

16742009-10 CL

-

Shrishail Industries., No. C-264, I Stage, PIE, Bengaluru-

560 058

No. C-264, I Stage, PIE, Bengaluru-560 058

I StageI

Automobile parts14 W-14

Engineering and fabricationunits (dry

Small White 1978BA

30.06.2008C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

16752009-10 O

Centra Line Lubro Tech Pvt Ltd.,

No. A-173, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit23 W-14

Engineering and fabricationunits (dry

Small White 2007BA

30.06.2019N N N N N N N NA NA NA NA N NA N N N NA Yes

16762009-10 CL

-Sharman (India) Pvt Ltd,

No. B-22, I Stage, Ist Cross, PIE, Bengaluru-560 058

I StageI

Fabrication unit74 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1972BA

31.12.2016N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes

16772009-10 CL

-

True Image Roto Converter Pvt Ltd,

No. B-15, Ist Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit22.8 W-14

Engineering and fabricationunits (dry

Small White 2001BA

31.12.2007C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16782009-10 CL

-Sonal Garments - IX,

No.110, III Phase, PIA, Bangalore, III PhaseI

Garment10 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2004WA

31.12.2011C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16792009-10 CL

-Sonal Garments -VI,

No.57/B0, III Phase, PIA, Bangalore, III PhaseI

Garment795 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2005BA

30.06.2012C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16802009-10 O Gokuldas India,- Unit II

Unit II No.21 B & 21 C, II Phase, PIA, Bangalore,

II PhaseI

Garment98 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1998BA

31.12.2023Y 28.01.2026 Y 31.12.2100 N N N NA NA NA 27 N STP Y N N NA Yes

16812009-10 CL

-Dantal Hydraulics Pvt Ltd.,

No.480, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering with spary painting 491 O-62

Spray painting, paint baking, paint

Small Orange 2003BA

30.06.2013C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

16822009-10 O

24144

Fine Tools India (P) Ltd., Unit-II,

Unit-II, No.457/B, IV Phase, PIA Bengaluru-560 058

IV PhaseI

Plastic injection moulding 105 G-32

Polythene and plastic processedproducts

Small Green 2008BA

31.12.2023N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

16832009-10 O Allegra Fibres,

No.338, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

fibre glass reinforced14.82 W-14

Engineering and fabricationunits (dry

Small White 2008BA

30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes

16842009-10 O

11710Ace Multi Axes Systems,

No.17, Plot No.467 - 469, IV Phase, PIA, Bengaluru-58

IV PhaseI

CNC Machinery & low pressure Die casting

3669 O-32Forging of ferrous and non- ferrousmetals (

Large Orange 2006BA

30.09.2020N N N N N N N NA NA NA 1.92 N ST & SP N N N NA Yes

16852009-10 CL

-Tanish Technologies (P) Ltd.,

No.B-52, III Stage, PIE, Bengaluru-560 058

III StageI

General Engineering67.86 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2013

N N N N N N N NA NA NA 0 N NA N N N NA NA

16862009-10 O

Fluid Power Technologies Pvt Ltd.,

No.A-23 & 24, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering Unit695 G-78

Switches without

electroplatinMedium Green 2008

BA31.12.2021

N N N N N N N NA NA NA 1.12 N NA N Y N NA Yeselectroplatin BA N N N N N N N NA NA NA 1.12 N NA N Y N NA Yes

16872009-10 O

37886Kurlon Enterprise Ltd

No.28E, 4th Main, II Phase, PIA, Bengaluru-560058

II PhaseI

Manufacture of Spring, Rubberised coir and Foam Mattresses

1519 G-90Polyurethane

foam extrusion

Large Green 1994BA

31.12.2027Y 31.12.2024 N N N N N NA NA NA 4 N NA N Y N NA Yes

16882009-10 O

11487Viziphar Biosciences (P) Ltd.,

No.303-306, Vitc Model Exports Park, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

R & D activity213 R-58

Pharmaceutical (Bulk drug &Active

Small Red 2008BA

30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.4 0.2 NA N Y Y NA Yes

16892009-10 O

11543

Saravana Foundry & Engg Works

No.382,10th cross, IV Phase, Bengaluru-560 058

IV PhaseI

Foundry (Copper & brass sheet/circle) 58.16 O-42

Industry or processes involving

Small Orange 1986BA

30.09.2022Y

30.09.2022N N N N N NA NA NA 1.2 0.05 ST & SP N N Y NA Yes

16902009-10 O

24318Varu Founders,

No.510, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Non-Ferrous Castings24.32 O-32

foundry operations Small Orange 1982

BA30.06.2019

N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes

16912009-10 CL

-

Turbo Tech Precision Eng Pvt Ltd.,

No.343/A, II Stage, PIE, Bengaluru-560 058

II StageI

Turbines 571 O-32

Forging of ferrous and non- ferrousmetals (

Medium Orange 2007BA

31.12.2006N N N N N N N NA NA NA 0 N NA N N N NA NA

16922009-10 O

36722Alpha Linear,

No.V-55, II Stage.PIE, Bengaluru-560 058

II StageI

Fabrication unit70 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2008BA

31.12.2027N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

16932009-10 O Highway Rubber Industries,

C-74, II Stage, Bengaluru-560 058 II StageI

Blending raw materials, rubber 25.51 G-86

Tread rubber including pre-curedrubber

Small Green 2007WA

31.12.2026N N N N N N N NA NA NA 0.16 N NA N Y N NA NA

16942009-10 CL

24113Kavitha Industries

No.C-256, I Stage, Bengaluru-560 058 I StageI

Parts of Solar Water heater and Tunning components with spray painting

17.27 O-22Ferrous and Non- ferrous metalextraction

Small Orange 2002BA

30.06.2012N N N N N N N NA NA NA 0.55 N NA N Y N NA Yes

16952009-10 O

30078Auto Components

No.M-7 7th cross, PIE, I Stage, Bengaluru-560 058

I StageI

Fuel Injection43 G-77

Manufacture of Motor & Pumpswithout

Small Green 1981WA

31.12.2025N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

16962009-10 CL

-Safe Metals,

No.42, II Phase, PIA, Bengaluru-560 058

II PhaseI

Pure lead67.97 R-7

batterymanufacturing(excluding

Small Red 2008BA

30.06.2014Y 30.06.2014 N N N N N NA NA NA 0 N NA N N N NA NA

16972009-10 CL

-kyes Industries,

No.SB-43, I Stage, PIE, Banglaore I StageI

Heat Treatment8.27 O-63

Engineering Industries with HeatTreatment,

Small Orange 1974BA

30.06.2013C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

16982009-10 CL

Arvind Forging and Engineering

No.B-131, 3rd cross, I Stage, Bangalore-560058

I StageI

Forging 89.64 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2000BA

30.06.2012N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

16992009-10 CL

-Maini Precision Products,

No.C-217, 4th cross, I Stage, Bengaluru-560 058

I StageI

Engineering Unit221 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2023

N N N N N N N NA NA NA 5 N NA N Y N NA NA

17002009-10 CL

-A.G.Sons Penel Processors,

No.B-82, I Stage, PIE, Bengaluru-560 058

I StageI

Assembly of electronics 557 G-78

Switches without

electroplatinMedium Green 1991

WA31.12.2011

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17012009-10 O

Maini Precision Products Pvt Ltd,

No.163, I Stage, PIE, Bengaluru-560 058

I StageI

Precisoin turned componenent 576 G-7

Brass and bell metal utensilsmanufacturi

Medium Green 2006BA

31.12.2023Y 31.12.2022 N N N N N NA NA NA 0.4 N NA N Y N NA Yes

17022009-10 O

11588Prianka Graphics Pvt Ltd.,

No.M-6, 6th cross, I Stage , Bengaluru-560 058

I StageI

Printed Laminated pouches 193.52 G-32

Polythene and plastic processedproducts

Small Green 2007BA

31.12.2022Y 31.12.2022 N N N N N NA NA NA 0.5 N NA N Y N NA Yes

17032009-10 O Sankala Polymers p Ltd

No.9-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

PVC Granules82 G-79

covered underPlastic

Small Green 2007BA

31.12.2034N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

17042009-10 CL

12420

Cargatec Manufcturing (India) Old Nmae Indiatals

Construction,

Polt No 10 B , II Phase, PIA, Bangalore.

II PhaseI

Meteralised Handling equipments withh spray painting

945 O-32Ferrous and Non- ferrous metalextraction

Large Orange 1989BA

30.06.2012N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

17052009-10 CL

31004Texport Syndicate (P) Ltd.,

Unit-B9J, Sy No 3 Plot No 9C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment2393 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2007BA

31.12.2016Y 31.12.2022 N N N N N NA NA NA 15 N NA N Y N NA Yes

17062009-10 O

38785Systems Manufacturing,

No.1/A, II Phase, PIA,Bengaluru-560 058

II PhaseI

Engineering Unit1438 O-100

STPs Established at Residential

Large Orange 2008BA

30.09.2023N N N N N N N NA NA NA 19.44 N STP Y N N NA Yes

17072009-10 O

14733Galvano Casting (P) Ltd.,

No.549, 14th cross , IV Phase, Bengaluru-560 058

IV PhaseI

Foundry 1337.65 O-32

Ferrous and Non- ferrous metalextraction

Large Orange 2008BA

30.09.2022Y 30.06.2018 N N N N N NA NA NA 2 N ST & SP N N N NA Yes

17082009-10 O G.L.S.Polymers Pvt Ltd.,

No.415, 11th cross, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Polymer compound based 354 G-32

Polythene and plastic processedproducts

Small Green 2006BA

31.12.2025N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes

17092009-10 CL

-Times Creations (P) Ltd.,

A-354, II Stage, PIE, Bengaluru-560 058

II StageI

Sign BoardsC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2007

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17102009-10 CL

-Super Bright Enterprises,

No.P-21,III Stage, PIE Bengaluru-560 058

III StageI

Bright BarsC1 R-44

process involving

metal Small Red Closed

WA30.06.2014

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

1711 No.9C, II Phase, PIA, Bengaluru-560 II Phase Engineering Unit Switches 17112009-10 CL

-Skill Manufacturing Company,

No.9C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2006

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17122009-10 CL

-Multi castings (P) Ltd.,

No.B-10, II Phase, PIA, Bengaluru-560 058

II PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2014C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17132009-10 CL

15423

G.S.Enterprises, (Formerly Global RMC)

No.28, 5th Main road, III Phase, Bangalore-560058

III PhaseI

Ready Mix Concrete176 G-37

Ready mix cement concrete

Small Green 2008BA

31.12.2017N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes

17142009-10 CL

15132

D F Forging & Machining Centre

No.147/1, 3rd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Mechanical componenets 57 G-77

Brass and bell metal utensilsmanufacturi

Small Green 2008BA

31.12.2017N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

17152009-10 CL

Vidyuth Instrumentation Technologies,

No.20 B ( Shed -1), 3rd cross, II Phase, Bengaluru-560 058

II PhaseI

Assembling and wiring of Electrical panel Board

53.2 G-78Switches without

electroplatinSmall Green 2008

WA31.12.2017

N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

17162009-10 O BSNL,

No.203, III Phase, PIA, Bengaluru-560 058

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2008AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

17172009-10 CL

-G.R.Lubricants (P) Ltd.,

No.72, III Phase, PIA, Bengaluru-560 058

III PhaseI

Grease mfgC1 R-4

ng of lubricatingoils ,grease

Small Red ClosedBA

30.06.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17182009-10 CL

-Karntaka Feeds Corporation

No.313, II Stage, PIE, Bengaluru-560 058

II StageI

Food productsC1 O-7

food processingincluding

Small Orange ClosedBA

30.06.2006C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17192009-10 CL

-

Hindustan Electro Technologies,

No.SB-57, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2002C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17202009-10 CL

15196Galvano Casting Pvt Ltd.,

No.M-9, 7th Cross, I Stage, Bengaluru-560 058

I StageI

Shot blasting and Heat Treatment 249.77 O-63

Industries with Heat

Treatment, Small Orange 2008

BA30.06.2005

Y 30.06.2013 N N N N N NA NA NA 0 N NA N N N NA NA

17212009-10 YTC Sri Varu Udyog,

No.247, III Phase, PIA, Bangalore-560058

III PhaseI

Non Ferrous Metal16 O-28

Non- ferrous metal

extraction Small Orange 2008

WAN

N N N N N N N NA NA NA 0.4 0.05 NA N N N NA NA

17222009-10 O Power Tech,

Plot no.24, 5th Main,III Phase, Bengaluru-560 058

III PhaseI

Engineering Unit121 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2008WA

31.12.2018N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

17232009-10 CL

23235

Athena India Hitech Components (Basrur Uniseal)

(P) Ltd.,

No.20-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Punching of non asbestors gaskets 528 O-62

Spray painting, paint baking, paint

Medium Orange 2008BA

30.09.2020N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

17242009-10 CL

-Accurate extracts,

No.538, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Pulversing and blending 25 O-26

involving ore

sintering, Small Orange 2000

WA30.06.2010

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17252009-10 CL

-

Hindustan Oils and petrochemicals,

No.438, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Oil Blending C1 R-3

engaged inrecycling/rep

rocessing/Small Red Closed

BA30.06.2012

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17262009-10 CL

-Divya Jyothi Plast,

No.135, II Stage, PIE, Bengaluru-560 058

II StageI

P.V.C. Pipe14.1 G-32

and plastic processedproducts

Small Green 2001BA

30.06.2012C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17272009-10 CL

-Sai Quality Casting,

No.B-166, I Stage, PIE, Bengaluru-560 058

I StageI

Diesel Filters8.2 W-14

Engineering and fabricationunits (dry

Small White 1981BA

C1C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17282009-10 O MSG Tradelinks (P) Ltd.,

No.B-256, II Stage, Bengaluru-560 058

II StageI

Plastic sheet 31.59 G-32

Polythene and plastic processedproducts

Small Green 2005BA

31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

17292009-10 O

37734Manuli PSI Hydraulics,

No.A-111 & A-112, 2nd Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Assembly Hydraulics381 G-78

Switches without

electroplatinSmall Green 2008

BA31.12.2027

N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes

17302009-10 CL

-Empire Industries,

No.C-23, II Stage, PIE, Bengaluru-560 058

II StageI

Cuttingh of M.S. and aluminium 39 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2008

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17312009-10 CL

-Leonardo Egineering (P) Ltd.,

No.V-32-B, IV Phase, PIA Bengaluru-560 058

IV PhaseI

Test Rings Hydraulic95.32 G-78

Switches without

electroplatinSmall Green 1985

BA31.12.2004

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17322009-10 O Paragon Metalex (P) Ltd.,

No,B-233, II Stage,PIE, Bengaluru-560 058

II StageI

Engineering Unit43.34 W-14

Engineering and fabricationunits (dry

Small White 1995BA

31.12.2015N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

17332009-10 YTC Rajashree Pipe Products,

No.B-189, II Stage,PIE, Bengaluru-560 058

II StageI

PVC Elecrical22.45 G-79

covered underPlastic

Small Green 2007WA

NN N N N N N N NA NA NA 0 N NA N N N NA NA

17342009-10 CL

-Hegde Engineering Industries,

No.C-135(A), 2nd B Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit65.36 G-78

Switches without

electroplatinSmall Green 1990

BA31.12.2010

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

17352009-10 CL

-Bangalore Spemech (P) Ltd.,

No.340, IV Phase, PIA Bengaluru-560 058

IV PhaseI

Engineering Unit17.19 W-14

Engineering and fabrication

Small White 1991BA

31.12.2020C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- fabrication

units (dry BA C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17362009-10 CL

-Amar Engineering,

No.V-32, II Stage, PIE, Bengaluru-560 058

II StageI

Fabrication unit17.65 W-14

Engineering and fabricationunits (dry

Small White 1983BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

17372009-10 CL Unique Products,

No.C-60, II Stage,PIE,Bengaluru-560 058

II StageI

Plastic injection moulding 24 G-32

Polythene and plastic processedproducts

Small Green 1992WA

31.12.2015N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

17382009-10 O Lab Engineering Industries,

No.B-178, II Stage, PIE, Bengaluru-560 058

II StageI

Laboratory Equipments 11.73 G-81

Research laboratories notinvolving

Small Green 2002WA

31.12.2013N N N N N N N NA NA NA 0.05 N NA N Y N NA NA

17392009-10 O Avant Tools,

No.B-296, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit43.69 G-78

Switches without

electroplatinSmall Green 1997

BA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

17402009-10 CL

-

Textiles Engineering Industries,

No.C-440, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit10.85 W-14

Engineering and fabricationunits (dry

Small White 2002BA

C1N N N N N N N NA NA NA NA N NA N N N NA Yes

17412009-10 CL

-

LGC Research & Development Centre,

No.167/168, III Phase, PIA, Bengaluru-560 058

III PhaseI

R & D activityC1 R--58

Pharmaceutical (Bulk drug &Active

Small Red ClosedBA

30.06.2008C1 30.06.2013 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17422009-10 O

37833ACC Ltd

Plot No.32, II Phase, PIA, Bengaluru-560 058

II PhaseI

Ready Mix Concrete1140 G-78

Switches without

electroplatinLarge Green 2007

BA31.12.2027

N N N N N N N NA NA NA 3.5 N ST & SP N N N NA Yes

17432009-10 CL

-Bangalore Values Pvt Ltd.,

No.A252(a), II Stage II StageI

Engineering Unit41.75 G-78

Switches without

electroplatinSmall Green 1984

BA31.12.2001

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17442009-10 CL

74256Eskay Heat Transfers Pvt Ltd.,

B-253, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit239 G-78

Switches without

electroplatinSmall Green 1994

BA31.12.2000

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17452009-10 O Bharthi Mobile Ltd.,

No.B-252, II Stage,PIE, Bengaluru-560 058

II StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2003AA

NAN N N N N N N NA NA NA 0 N NA N N N NA Yes

17462009-10 CL Cosmo Engineering,

No.28, III Stage, PIE, Bangalore--58 III StageI

Pressed and fabricated compnent 38.3 G-78

Switches without

electroplatinSmall Green 2003

WA31.12.2014

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

17472009-10 CL

-

Amanath Motor Owners Co-operative Society Ltd.,

BMTC depot, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Bus depot23 O-18

Automobile servicing, repairing and

Small Orange 2000WA

30.06.2013C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17482009-10 CL

-Manjunath Restaurant,

No.426, IV Phase, PIA, Bengaluru-560 058

IV PhaseHospital

ity

Hotel9 W-52

Generator sets (15

KVA to 250 Small White 1998

BA30.06.2010

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17492009-10 O Bangalore Sanchara Nigaa,

No 415, IV Phase , PIA , Bengaluru-560 058

IV PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2004AA

NAN N N N N N N NA NA NA 0 N NA N N N NA Yes

17502009-10 CL

-Fluo Lite Pvt Ltd.,

No.11, I Stage, PIE , Bengaluru-560 058

I StageI

Fil Starters32.4 G-78

Switches without

electroplatinSmall Green 1986

BA31.12.2004

N N N N N N N NA NA NA 0 N NA N N N NA Yes

17512009-10 CL

-

Restolex Cor Products Pvt Ltd.,

No.425, IV phase, PIA, Bengaluru-560 058

IV PhaseI

Rubber coir Mattress60.15 G-41

Rubber goods industry (with gas

Small Green 1998BA

30.06.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17522009-10 CL

-Preston India (P) Ltd.,

No.268, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Synthetic Rubber foot wear 7.2 G-26

Leather foot wear and leatherproducts

Small Green 2003BA

31.12.2012N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

17532009-10 CL

-

Bangalore Biotech Labs Pvt Ltd.,

No.460-B, IV Phase IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA31.12.2002

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17542009-10 O

17057Sai Kripa Insulations (P)

A-36, II Stage, Bengaluru-560 058 II StageI

Manufacture of corrugated Board boxer

45 G-9Cardboard or corrugated box and

Small Green 2010BA

31.12.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

17552009-10 CL

-Recabo India Pvt Ltd.,

No.375-A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering UnitC1 G-78

Switches without

electroplatinSmall Green Closed

BA30.06.2008

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17562009-10 CL

-cosmo Engineering,

0-D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Ferrous castingC1 O-28

Non- ferrous metal

extraction Small Orange Closed

BA31.12.2011

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17572009-10 CL

-Audithya Industries

No.A-25 & 26, III Stage, PIE, Bengaluru-560 058

III StageI

Pultry feeds15.86 O-30

poultry feed and cattle

feedSmall Orange 1990

BA30.09.2015

C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17582009-10 CL

-Unique Apparels Pvt Ltd.,

V-40, II Stage, PIE, Bengaluru-560 058

II StageI

Garment139 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2005BA

30.06.2012Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA

17592009-10 CL

-Rajat Gobal,

No.343, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment42 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1997BA

31.12.2008C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

1760 No.C-256, I Stage, PIE, Bengaluru- I Stage Fabrication unit Panel Board, 17602009-10 CL

-Praveen Metal & Alloys,

No.C-256, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2001C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17612009-10 CL

-Lakshmi Metal & Traders,

No.204, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedBA

31.12.2013C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17622009-10 CL Reliance Marketing,

No.198, III Phase, PIA, Bengaluru-560 058

III PhaseI

Wire Drawing10 G-96

Manufacturing of insulatedconductors

Small Green 1997BA

31.12.2011N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

17632009-10 CL

-Track Mack Corporation

No.456, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Fabrication unitC1 G-78

Panel Board, Switches withoutelectroplatin

Small Green ClosedWA

31.12.2003C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

17642009-10 O E.S.I.Dispensary,

No.107, 6th Main, III Phase, PIA, Bengaluru-560 058

III PhaseHCE

Helath Care establishment 25 W-58

a)Non-bedded HCE’s(clinics,

Small White 2000BA

-N N Y 30.06.2016 N N N NA NA NA 0 N NA N N N NA Yes

17652009-10 O Ampere Elecric System,

No.120, 7th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Assembling of wiring of electrical control panel Board

68 G-78Switches without

electroplatinSmall Green 2007

BA31.12.2021

N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes

17662009-10 CL

-

Innova Consumer Care (P) Ltd.,

No.B-293, II Stage, PIE,Bengaluru-560 058

II StageI

Non-Medicated of Soaps and Shampoos. 285 O-13

detergents and

soaps(excludSmall Orange 2006

BA31.12.2013

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17672009-10 O Micron Electric Syste,

No.251, 11th Main, 3rd Cross, III Phase, PIA, Bamgalore-58

III PhaseI

Manufacture of electric panel board 22.04 W-14

Engineering and fabricationunits (dry

Small White 2008WA

31.12.2017N N N N N N N NA NA NA 0.22 N ST & SP N N N NA NA

17682009-10 O

21282Best Coats,

No.B-136, 2nd 'C' Main Road, II Stage, PIE, Bengaluru-560 058,

II StageI

powder Coating45.84 O-17

Aluminium & copper extraction from

Small Orange 1997BA

30.09.2022N N N N N N N NA NA NA 0.4 0.16 NA N Y Y NA Yes

17692009-10 O Kruger Industries.,

No 42, II Phase, PIA, Bengaluru-560 058

II PhaseI

Plastic Injection moulded components 18.85 G-32

Polythene and plastic processedproducts

Small Green 1999WA

31.12.2024N N N N N N N NA NA NA 0.48 N NA N Y N NA NA

17702009-10 CL

15630Zuman Exports Ltd.,

No.183, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment368.79 G-72

Stitching/ Stitching ofshoe uppers/

Small Green 2005BA

31.12.2020N N N N N N N NA NA NA 5 N ST & SP N N N NA Yes

17712009-10 O

39352Superchem oxide,

No.321-B, 8th Cross, IV Phase, PIA, Bangalore -58

IV PhaseI

Lead suboxide40.35 R-7

Lead acid batterymanufacturing(excluding

Small Red 2009BA

30.06.2019Y 30.06.2016 N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

17722009-10 O Indian Electrical Accessories.,

No B-237, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication of electrical distribution boxes.

28 G-78Panel Board, Switches withoutelectroplatin

Small Green 31/12/2014WA

31.12.2018N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

17732009-10 CL

-Sharda Designs,

No 226, 2nd & 3rd Floor, 8th main, III Phase, PIA, Bengaluru-560 058.

III PhaseI

Textile Printing41 R-40

Textile processinginvolving

Small Red 2008WA

30.06.2009C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

17742009-10 O Seth Switch Gears.,

No.M2/1-A, 5th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering Unit12 W-14

Engineering and fabricationunits (dry

Small White 2006BA

31.12.2017N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

17752009-10 CL

15273Spectronic Plating Pvt. Ltd.,

No. A-152, 2nd Main, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating241.24 R-44

Industry or process involvingmetal

Small Red 2009WA

30.06.2018Y 30.06.2015 N N N N N NA NA NA 0.4 0.1 NA N Y Y NA NA

17762009-10 O Sri Sai Industry Unit-II,

No. B-107, III Stage, PIE, Bengaluru-560 058

III StageI

Engineering Unit219 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2018

N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

17772009-10 CL

11644Garden City Fashion Pvt. Ltd.,

No.B-175, II Stage, PIE, Bengaluru-560 058

II StageI

Garment washing150 O-50

Mechanized laundry using oil fired

Small Orange 2008BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 1.6 40 ETP Y Y N NA Yes

17782009-10 CL

-

Belrock Construction Chemicals India (P) Ltd.,

No. B-324, 8th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Construction Chemicals 160 R-25

chemicals and electrochemicals

Small Red ClosedBA

30.06.2010CL 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA NA

17792009-10 O Plasmix Pvt. Ltd. Unit-II,

No. 406, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Plastic Granules45 G-32

Polythene and plastic processedproducts

Small Green 2009BA

31.12.2034N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

17802009-10 O

Akshaya Engineering Industries,

No. A-20, III Stage, PIE, Bangalpre-58 III StageI

Engineering Unit234 G-78

Switches without

electroplatinSmall Green 2009

WA31.12.2021

N N N N N N N NA NA NA 0.48 N NA N Y N NA NA

17812009-10 CL

22801

Synergy Punching Pvt. Ltd., Unit-II,

No. A-3 & A-4, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit- fabrication of sheet metal components

784.12 G-78Switches without

electroplatinMedium Green 2008

BA31.12.2022

N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes

17822009-10 CL Hira Rubber,

No. 519, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Rubber moulded components 56 G-41

goods industry (with gas

Small Green 2008WA

NAN N N N N N N NA NA NA 0.4 N ST & SP ETP Y N N NA NA

17832009-10 O

75447 Shree Polyplast, N

No. C-20, II Stage, PIE, Banaglore-58 II StageI

Plastic carry bags 31.26 G-32

Polythene and plastic processedproducts

Small Green 2008BA

31.12.2022N N N N Y 31.03.2017 N NA NA NA 0.2 N NA N Y N NA Yes

17842009-10 O V.J.Industries,

No. A-290, 6th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit360 G-78

Switches without

electroplatinSmall Green 2008

BA31.12.2023

N N N N N N N NA NA NA 1.6 N NA N Y N NA Yeselectroplatin BA N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

17852009-10 CL

-Rallis India Ltd.,

No.334,9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Micronutrient formulation 58 G-78

Switches without

electroplatinSmall Green 2008

BA31.12.2009

N N N N N N N NA NA NA 0 N NA N N N NA Yes

17862009-10 CL

12734Balaji Super Spandex

No. 497/D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Polywoven Tapes374 G-32

Polythene and plastic processedproducts

Small Green 2007BA

31.12.2013N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

17872009-10 O

32675Nagson And Company

No. 30C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Ready Mix Concrete400 G-37

Ready mix cement

concreteSmall Green 2008

BA31.12.2033

N N N N N N N NA NA NA 2.5 N NA N Y N NA Yes

17882009-10 CL Signericks Tools,

No. B-206, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering Unit21.17 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2008WA

31.12.2016N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

17892009-10 CL

-S.S. Engineering

No. 293, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering Unit46.82 W-14

Engineering and fabricationunits (dry

Small White 2005WA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA

17902009-10 CL

-

Ariatex Apparels Bangalore Ltd.,

No.351, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment1907 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2008WA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

17912009-10 O

13801Gem Paints Ltd.,

No.417 & 418, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Repacking of Paints271 G-109

Refilling, Repacking and

Small Green 2009BA

31.12.2034N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

17922009-10 O

11071

Spraying Systems (India) Pvt. Ltd.,

No. 303 & 304, 2nd Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

General Engineering Unit 1057.79 G-78 blending of

chemicalsLarge Green 2008

BA31.12.2022

Y 31.12.2014 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

17932009-10 O

39957

Sidhi Vinayaka Fab Engineering,

No.173, 11th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

SS Pressure vessel for Pharmaceutical Ind with Fabrication&Buffing

40 G-78Panel Board, Switches withoutelectroplatin

Small Green 2005BA

31.12.2027N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

17942009-10 CL

Siddivinayaka Fab Engineering,

No.172/A, 11th Main, III Phase, PIA, Bangalore,

III PhaseI

Engineering Unit64 O-63

Engineering with heat treatment

Small Orange 2007

BA

31.12.2017

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes1795

2009-10 O14968

Sidhivinayaka Fab Engineering,

, No.172, 11th main, III Phase, PIA, Bangalore-560058,

III PhaseI

Manufacture of steel fabrication and pressure vessel & passivation

158 R-44Industry or process involvingmetal

Small Red 2008BA

30.06.2023Y 30.03.2019 N N N N N NA NA NA 0.96 0.24 NA N Y Y NA Yes

17962009-10 O

23910Ashoka Intercast Foundary,

No.46/B, II Phase, PIA, Bangalore- 560 058,

II PhaseI

Iron Casting (Foundry) 118.35 O-66

Ferrous and Non- ferrous metalextraction

Small Orange 2007BA

30.09.2022N NA N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

17972016-17 O Electohms Pvt Ltd

No.473 D/2, 13 Cross, IV Phase, PIA, Banglaore

IV PhaseI

Manufacturing of current transformers, Hall effect current sensors

411 G-85Transformer Assembly unit

Small Green 2017WA

31.12.2027N N N N N N N NA NA NA 3 N NA N Y N NA NA

17982009-10 CL

-

Anatech Ultra Coater & Controls (P) Ltd.,

No.C-265, 6th Cross, Ist Stage, PIE, Bangalore-560058,

I StageI

Powder coating & Tin Electroplating 26.5 R-44

process involving

metal Small Red 2008

BA30.06.2010

N N N N N N N NA NA NA 0.1 0.1 NA N Y Y NA NA

17992009-10 CL

-

Madhu Machine Systems Pvt Ltd.,

, No.47/1, 4th Main, III Phase, PIA, Bengaluru-560 058.

III PhaseI

Plastic injection moulding 191.72 G-32

Polythene and plastic processedproducts

Small Green 2008BA

31.12.2012N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

18002009-10 CL

-Inbiopro Solutions Pvt Ltd,

No 138-B,II & III Floor, 3rd Phase, PIA, Bangalore,

III PhaseI

R & D activity on Biotechnology 959.28 R--58

Pharmaceutical (Bulk drug &Active

Medium Red 2008BA

31.12.2012N N Y 30.06.2014 N N N NA NA NA 0 N NA N N N NA NA

18012009-10 CL

11647Delkor Technic India Pvt Ltd.,

No.108/D, 6th Main, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Engineering Unit - Filter, agitator 427.29 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2003BA

31.12.2020N N N N N N N NA NA NA 1.3 N ST & SP N N N NA Yes

18022009-10 O Southren Fastners.,

No.C-339, 6th cross, Ist Stage, PIE, Bengaluru-560 058.

I StageI

Engineering (Cold Forging) 76 G-93

Manufacturing of nuts and boltswith cold

Small green 2007BA

31.12.2021N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

18032009-10 CL

24960Felsomat India Pvt ltd.,

No.A-149, Ist Stage, PIE, Bengaluru-560 058.

I StageI

Assembly of gantry automation system and machine tools

445.46 G-7Brass and bell metal utensilsmanufacturi

Small Green 2008WA

31.12.2002N N N N N N N NA NA NA 0.32 N NA N Y N NA NA

18042009-10 O Moda Suola India (P) Ltd,

No.SB-37, 2nd Cross, Ist Stage, PIE, Bengaluru-560 058,

I StageI

Footware soles215.12 G-26

Leather foot wear and leatherproducts

Small Green 2008BA

31.12.2021N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes

18052009-10 O

35267Madox Technologies Pvt Ltd

No.473/D4, 13 Cross, IV Phase, PIA, Bangalore,

IV PhaseI

Assembly of electrical control panels and elevator parts

421 G-78Panel Board, Switches withoutelectroplatin

Small Green 2009BA

31.12.2027N N N N N N N NA NA NA 2.2 N ST & SP N N N NA Yes

18062009-10 CL

-Prescient Bio Scince Pvt Ltd.,

No 101, III Phase, PIA, Bangalore, III PhaseI

R & D activity on Biotechnology 230 R--58

Pharmaceutical (Bulk drug &Active

Small Red 2008WA

31.12.2010C1 N C1 C1 C1 N C1 NA NA NA 0 N NA N N N NA NA

18072009-10 YTC Lavanya Enterprises .,

No.F3(a), Ist Stage, PIE, Bangalore. I StageI

Engineering Unit22 W-14

Engineering and fabricationunits (dry

Small White 2009BA

31.12.2019N N N N N N N NA NA NA NA N NA N N N NA NA

18082009-10 O

75709Abhaya Packagings ,

No.147, 9th Main, III Phase, PIA, Bangalore,

III PhaseI

LLDPE/LDPE plastic liner/roll 141 G-79

Plastic bags, woven sack with HDPE,LDPE

Small Green 2008BA

31.12.2028N N N N N N N NA NA NA 0.58 N ST & SP N N N NA Yes

1809 No.08, Plot No.35, Ist Main, II Phase, II Phase Assembly of control Panel Board, 18092009-10 O

38542Avana Electro Systems Pvt Ltd

No.08, Plot No.35, Ist Main, II Phase, PIA, Bngalore-58.

II PhaseI

Assembly of control and relay panel 613 G-78

Panel Board, Switches withoutelectroplatin

Medium Green 2010WA

31.12.2027N N N N N N N NA NA NA 2.3 N NA N Y N NA NA

18102009-10 O Incite Cam Centre,

No.A-12/1, 1st Main road, II Stage,PIE, Bengaluru-560 058.

II StageI

Syntheic rubber moulded components 464 G-86

paper or pulp manufacturing)

Small Green 2005BA

31.12.2022Y 31.12.2019 N NA N N N NA NA NA 0.8 N NA N Y N NA Yes

18112009-10 O

23231Press Comp International,

No.A-106, 3rd Mian, II Stage, PIE, Bengaluru-560 058.

II StageI

Mfg of Press Tools & Precision Pressing Components (Engineering Unit)

927 G-78Panel Board, Switches withoutelectroplatin

Medium Green 2004BA

31.12.2026Y 31.12.2024 N N N N N NA NA NA 2 N NA N Y N NA Yes

18122009-10 CL

-

Daramic Battery Seperator (I) Pvt Ltd., (Formerly Super

tech)

No.A-101, II Stage,PIE, Bengaluru-560 058.

II StageI

battery separator464 O-73

battery ( excluding

manufacturiSmall Orange 2003

BA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA NA

18132009-10 CL

17653Sree Ranganatha Industries,

No.534/B, 8th Main, II Stage,PIE, Bangalore.

II StageI

Electroplating (Zinc Plating) 32.1 R-44

Industry or process involvingmetal

Small Red 2008BA

30.06.2019N N N N N N N NA NA NA 0.1 0.3 ST & SP N N Y NA Yes

18142009-10 O

35607M.E. Forge Tech, N

No.234, 11 Main, 3rd cross, III Phase, PIA, Bangalore-560058

III PhaseI

Forging754 O-32

Forging of ferrous and non- ferrousmetals (

Medium Orange 2009BA

30.09.2022N NA N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

18152009-10 CL

-GRV Marchandizing,

No.149, II Stage, PIA, Banglore-58 II StageI

Corrugated box520 G-9

or corrugated

box and Medium Green 2003

BA31.12.2001

N N N N N N N NA NA NA 0 N NA N N N NA NA

18162009-10 CL

23590GCL India Pvt. Ltd.,

No.433, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembly tape plant extusion 456.76 G-79

products using Boilers

(excludingSmall Green 2003

WA31.12.2013

N N N N N N N NA NA NA 0 N ST & SP N N N NA NA

18172009-10 O Airel India (P) Ltd.,

No.412, IV Phase,PIA, Banglore-58 IV PhaseI

Dental chair assembly170 G-46

paper or pulp manufacturing)

Small White 2008WA

31.12.2018N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

18182009-10 O Ganesh Metal Works,

No.143-1, 9th Main, III Phase,PIA, Banglore-58

III PhaseI

Engineering Unit182 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009BA

31.12.2034N N N N N N N NA NA NA 1 N NA N Y N NA Yes

18192009-10 CL CNC Automation, Unit-IV,

Unit-IV, No.17/D, 1st Main, II Phase,PIA, Banglore-58.

II PhaseI

Engineering Unit280 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2018

N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes

18202016-17 O

38543

Avana Electro Systems Pvt Ltd Unit-I

No.N1, 4th Cross, I Stage, PIE, Bengaluru-560 058.

I StageI

Manufacturing of relays 387 G-78

Switches without

electroplatinSmall Green 1.1.2013

BA31.12.2027

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

18212009-10 O S.R.Industries,

No.C-75, II Stage,PIA, Banglore-58 II StageI

Engineering Unit32 G-78

Switches without

electroplatinSmall Green 2009

WA31.12.2018

N N N N N N N NA NA NA 0.05 N NA N Y N NA NA

18222009-10 O Progressive Systems,

No.282,6th main,II Stage,PIA, Banglore-58

II StageI

Engineering Unit375 G-78

Switches without

electroplatinSmall Green 2009

WA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

18232009-10 O

11126

Shahi Exports (Formerly known as Hindusthan Clothing

& Marketing Company),

No.323, IV Phase,PIA, Banglore-58 IV PhaseI

Garment1283 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2012BA

31.12.2021Y 31.12.2020 N N N N N NA NA NA 15.8 N STP - BWSSB Y N N NA Yes

18242009-10 O

27014Vee Vee Controls,

No.L-3 & 4, 9th Cross, I Stage,PIE, Bengaluru-560 058

I StageTT

D.G SET428 W-52

Diesel Generator sets (15KVA to 250

Small White 2009BA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

18252009-10 CL

11621G.G.Tronics India Pvt Ltd.,

No.SB-168, I Stage, PIA, Banglore-58 I StageI

assembly of electronics items 834 G-78

Switches without

electroplatinMedium Green 2003

BA31.12.2012

C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

18262009-10 O

17033A.P.D Exports,

No.V-24(B), 6th Main, Annexure Buiding, II Stage,PIA, Banglore-58

II StageI

Garment279 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2000BA

31.12.2023N N N N N N N NA NA NA 5.2 N NA N Y N NA Yes

18272009-10 O

15689Naganda Enterprises,

No.149, 2nd C Main, II Stage,PIA, Banglore-58

II StageI

Engineering Unit221 G-44

Spice grinding (20 HP motor)

Small Green 2008WA

31.12.2019N N N N N N N NA NA NA 0.6 N NA N Y N NA NA

18282009-10 O

85043Advanced Electronic Systems,

No.143, 9th Main, III Phase,PIA, Banglore-58

III PhaseI

Assembly of electrical items 135 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2034

N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes

18292009-10 O

Domacles Engineering Pvt Ltd.,

No.214, 1st cross, III Phase,PIA, Banglore-58

III PhaseI

Truck & wagon loading machine 165 G-46

Steel furniture without spray

Small Green 1993BA

31.12.2034N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

18302009-10 O

11901

Pragathi Transmission Pvt Ltd.,

No.103 & 104, 3rd Cross, II Stage,PIA, Banglore-58

II PhaseI

General Engineering Unit 1616 G-78

Switches without

electroplatinLarge Green 2009

BA31.12.2023

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

18312009-10 CL V.R.Enterprises,

No.333, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Manufacture of Button bolts, hammer 16.82 G-93

Manufacturing of nuts and boltswith cold

Small Green 2005WA

31.12.2018N N N N N N N NA NA NA 0.16 N ST & SP N N N NA NA

18322009-10 O Triveni Hi-Tech Pvt Ltd,

No.B-169, 4th Main, II Stage, PIA, Banglore-58

II StageI

Engineering Unit512 G-7

Brass and bell metal utensilsmanufacturi

Medium Green 1997BA

31.12.2022N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes

18332009-10 CL

-Pepperl+ Fuchs(P) Ltd.,N

No.M-11, I Stage,PIA, Banglore-58 I StageI

Engineering Unit437 G-78

Switches without

electroplatinSmall Green 2009

BA30.06.2009

N N N N N N N NA NA NA 0 N NA N N N NA NA- electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA NA

18342009-10 O Indus Towers Ltd.,

No.97, III Phase, PIA, Banglore-58 III PhaseTT

telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2010AA

30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes

18352009-10 O Wipro Ltd.,

No.183/A, I Stage, PIA, Banglore-58 I StageI

solar lightings225 G-78

Switches without

electroplatinSmall Green 2009

BA31.12.2021

N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes

18362009-10 O Indus Towers Ltd.,

No.99, 8th Main, III Phase, PIA, Banglore-58

III PhaseTT

Telephone towerDG Set W-52

15 KVA DG Set

Small White 2010AA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes

18372009-10 O Tower Vision Pvt Ld.,

No. M-7, 7th cross, Ist Stage, PIE, Banglore-58

I StageTT

Telephone towerDG Set W-52

15 KVA DG Set

Small White 2010AA

31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes

18382009-10 CL

-

Siddhi Vinayaka Fab Engineering (P) Ltd.,

No.B-119, III PHASE, PIA, Banglore-58

III PhaseI

Engineering Unit444 G-78

Switches without

electroplatinSmall Green 2009

BA30.06.2010

Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA

18392009-10 O Khoday Control Systems,

No.B-187, II Stage, PIA, Banglore-58 II StageI

Assembly of electrical pannel 12.7 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

18402009-10 O Precision Sheet Metal Works,

No.A-3 & A-4, III Stage, PIA, Banglore-58

III StageI

Engineering Unit476 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2021

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

18412009-10 CL Preston India (P) Ltd.,

No.97/98, III Phase, PIA, Banglore-58 III PhaseI

Rubber foot wear 143 G-41

Rubber goods industry (with gas

Small Green 2010BA

31.12.2019N N N N N N N NA NA NA 1.5 N ST & SP N N N NA Yes

18422009-10 CL TIA Technology,

Plot No.C-76, II Stage, PIE, Banglore-58

II StageI

Engineering Unit75 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2018

N N N N N N N NA NA NA 2.4 N NA N Y N NA NA

18432009-10 O Thirumalai Industries,

No.A-289, II Stage, PIA, Banglore-58 II StageI

foot wear top wear24 G-26

Leather foot wear and leatherproducts

Small Green 2006BA

31.12.2019N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

18442009-10 CL

-Naganda Enterprises,

No.149, II Stage,PIA, Banglore-58 II StageI

Engineering Unit212 G-78

Switches without

electroplatinSmall Green 2008

BA30.06.2006

Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA

18452009-10 CL Omtech,

No.246, III Phase, PIA, Banglore-58 III PhaseI

Engineering Unit49 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2009WA

31.12.2018N N N N N N N NA NA NA 0.15 N ST & SP N N N NA NA

18462009-10 O

Renukamba Engineering Works,

No.246, III Phase, PIA, Banglore-58 III PhaseI

Engineering Unit49 W-14

Engineering and fabricationunits (dry

Small White 2008WA

31.12.2017N N N N N N N NA NA NA 0.3 N ST & SP N N N NA NA

18472009-10 O Indus Towers Ltd.,

No.P6, III Stage, PIA, Banglore-58 III StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2001AA

31.12.2022N N N N N N N NA NA NA 0 N NA N N N NA Yes

18482009-10 O Tufflan Space Makers,

No.B-226, 1st & 2nd Floor, II Stage, PIA, Banglore-58

II StageI

coating on wires 50 G-96

Manufacturing of insulatedconductors

Small Green 2009BA

31.12.2019N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

18492009-10 O

Transteel Seating Technologies,

No.10/A, 10th Cross, I Stage, PIA, Banglore-58

I StageI

Manufacture of office furniture 451 G-46

Steel furniture without spray

Small Green 1995BA

31.12.2022N N N N N N N NA NA NA 3 N NA N Y N NA Yes

18502009-10 CL Sreeja Enterprises,

No.142, 9th Main, III Phase,PIA, Banglore-58

III PhaseI

Engineering Unit28 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2009BA

31.12.2019N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes

18512009-10 O

Asmet Industries Pvt Ltd, UNIT-II,

No.B-253, II Stage, PIA, Banglore-58 II StageI

Engineering Unit153 G-46

Panel Board, Switches withoutelectroplatin

Small Green 2008BA

31.12.2035N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes

18522009-10 O

11725

Rollon Hydraulics Pvt Ltd(Formerly Known as TMI Rollon Engineering Pvt Ltd.,)

No.272, 8th cross, IV Phase, PIA, Banglore-58

IV PhaseI

Hydraulics valve spools 1304.94 O-63

Engineering Industries with HeatTreatment,

Large Orange 2008BA

30.09.2021N N N N N N N NA NA NA 6.4 0.1 NA N Y Y NA Yes

18532009-10 O Creative Micro Systems,

No.300/B, 5th Main, IV Phase, PIA, Banglore-58

IV PhaseI

Assembly of electronic items 248 W-13

Electrical and electronic item

Small White 2009BA

31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

18542009-10 O vinayaka Industries,

No.220, 2nd cross, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Unit63.69 W-14

Engineering and fabricationunits (dry

Small White 2010BA

31.12.2018N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

18552009-10 O

17026E-R3 Solutions

No.C-430, 1st Cross, Ist State, PIE, Banglore-58

I StageI

Recycle (Cleaning) of printer cartridge reconditioner, E-Waste Dismantling

40.09 R-3Industries engaged inrecycling/reprocessing/

Small Red 2010BA

31.03.2019Y 30.06.2015 N N N N N NA Yes 30.06.2020 0.56 N NA N Y N NA Yes

18562009-10 CL S.K.Industries,

No.D-426/C, 10th Main, II Stage, PIE, Banglore-560058

II StageI

Engineering Unit67 R-44

Industry or process involvingmetal

Small Red 2009BA

30.06.2014N N N N N N NA NA NA 0.08 0.05 NA N Y Y NA Yes

18572009-10 O

Globe Enterprises (Formerly Globe Hard Chrome

Industries)

No.D-426A,10th Main, II Stage, PIE, Banglore-58

II StageI

Electroplating54.78 R-44

Industry or process involvingmetal

Small Red 2008BA

30.06.2024N N N N N N N NA NA NA 0.08 0.06 NA N Y Y NA Yes

1858 No.101, III Phase, PIA, Bangalore. III Phase R & D activity Pharmaceuti18582009-10 CL

-Precient Bio-Sciences,

No.101, III Phase, PIA, Bangalore. III PhaseI

R & D activity944 R--58

Pharmaceutical (Bulk drug &Active

Medium Red 2009BA

30.09.2007N N N N N N N NA NA NA 0 N NA N N N NA NA

18592009-10 O Island Hydraulics,

A-19,III Stage, PIE, Banglore-58 III StageI

Engineering Unit89 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2028

N N N N N N N NA NA NA 1.7 N NA N Y N NA Yes

18602009-10 O

Siddhi vinayaka Fab Engineering Pvt Ltd Unit-3

No.172, III Phase,11th Main, PIA, Banglore

III PhaseI

Engineering Unit157.91 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2021

Y 30.06.2019 N N N N N NA NA NA 0.15 N NA N Y N NA NA

18612009-10 O

16684S&S Gud Services,

No C-24,1st Cross, II Stage, PIE, Banglore-58+E31

II StageI

Electroplating22 R-44

Industry or process involvingmetal

Small Red 2009BA

30.06.2023Y 30.06.2014 N N N N N NA NA NA 0.29 0.13 NA N Y Y NA Yes

18622009-10 CL

-Avatar II Diagnostics Pvt Ltd.,

No 99, 8th Main,, III Phase, PIA, Bangalore-560058.

III PhaseI

Antibody synthesis191 R-58

Pharmaceutical (Bulk drug &

Small Red 2001BA

30.06.2010N N N N N N N NA NA NA 0 N NA N N N NA NA

18632018-19 O

26730Evexia Nutritions Pvt Ltd

No.278/A, 6th Main, II Stage, PIE, Bengaluru-560058

II StageI

Cereals, Flakes, Rolled oats, Malt

based food400 O-7

Food and food

processing including

Small Orange 10.1.2016BA

30.09.2022N N N N N N N NA NA NA 1.2 NA ST & SP N N N NA Yes

18642009-10 CL

-

Indus Intex, No.226 & 227, III Phase, PIA, Banglore

No.226, III Phase, PIA, Banglore-58 III PhaseI

Garment washing2886 O-50

Mechanized laundry using oil fired

Large Orange 2002WA

30.06.2013C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA

18652009-10 CL

12598Micro Coats India,

No.223,8th Main, III Phase, PIA, Bangalore-560058

III PhaseI

Powder coating & Spray Painting Activity

26.8 R-44Industry or process involvingmetal

Small Red 2009BA

30.06.2017Y 30.06.2015 N N N N N NA NA NA 0.16 0.002 ST & SP N N Y NA Yes

18662009-10 O

12525Shree Maruthi Metals,

No.C-82, 3rd cross, III Stage, PIA, Banglore-58

III StageI

Electroplating30 R-44

Industry or process involvingmetal

Small Red 2010BA

30.06.2023N N N N N N N NA NA NA 0.5 0.4 NA N Y Y NA Yes

18672009-10 CL Safe Metals,

No.42 & 43, II Phase, PIA, Banglore-58

II PhaseI

Lead suboxide 67.97 R-7

Lead acid batterymanufacturing(excluding

Small Red 2009BA

31.12.2019N N N N N N N NA NA NA 0 N NA N Y N NA Yes

18682009-10 CL

21099Nippon Paint (India) Pvt Ltd.,

No.A1 & A2, III Stage, PIE, Banglore-58

III StageI

Paint759.77 R-21

Manufacturing of paintsvarnishes, pigments

Medium Red 2009BA

30.06.2021Y 30.06.2015 N N N N N NA NA NA 0.16 0.32 NA N Y Y NA Yes

18692009-10 CL Adobe Metal Products ,

No.120,7th Main, III Phase, PIA, Bengaluru-560 058.

III PhaseI

Electrcial pannel boards 72.89 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2007WA

31.12.2016N N N N N N N NA NA NA 0.5 N ST & SP N N N NA NA

18702009-10 O

39500S.D.Ruparel ,

No.B-67, 2nd cross, I Stage, PIE, Bengaluru-560 058.

I StageI

PVC pipes 9.8 G-79

Plastic sack bags, woven sack with HDPE,

Small Green 2008BA

31.12.2100N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

18712009-10 O Spectra Pavers Pvt Ltd.,

No.437, 12th cross, IV Phase, PIA, Banglore-58

IV PhaseI

CemENT Pavers & Tiles 215 G-37

Ready mix cement concrete

Small Green 2009BA

31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

18722009-10 O

24162Sain Coating Pvt Ltd.,

No.A-25/26, III Stage, PIA, Banglore-58

III StageI

powder coating318 R-44

Industry or process involving metal

Small Red 2009BA

30.06.2024N N N N N N N NA NA NA 0.36 0.25 NA N Y Y NA Yes

18732009-10 O

11485Amar Powder Coating,

No.470-A, Shed No 2, IV Phase, PIA, Banglore-560058

IV PhaseI

Powder coating with surface treatment 67.85 R-44

Industry or process involving metal

Small Red 2008BA

30.06.2023N N N N N N N NA NA NA 0.1 0.1 NA N Y Y NA Yes

18742009-10 CL

16464Larsen & Turbo Ltd.,

No.32/A, II Phase, PIA, Banglore-58 II PhaseI

Ready mix concrete595.02 G-37

Ready mix cement concrete

Medium Green 2009BA

31.12.2012N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

18752009-10 CL

-Shree Suyoga Technologies,

No.D-432,10th Main, II Stage, PIA, Banglore-58

II StageI

Electroplating17.03 R-44

process involving

metal Small Red 2009

BA30.06.2014

N N N N N N N NA NA NA 0.03 0.03 NA N Y Y NA NA

18762016-17 O

38558

Coretec Engineering India Pvt Ltd

No.1, KIADB Plot No.35, II Phase, PIA, Bengaluru-560058

II PhaseI

Hydraulic cylinder & CNC machining 306 O-62

Spray painting, paint baking, paint

Medium Orange 1.1.2017BA

30.09.2022N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

18772009-10 CL

-Sree Manjunath Refreshment,

No.426, IV Phase, PIA, Banglore-58 IV PhaseI

Hotel5 G-3

confectionery / sweetsproducts

Small Green 2003BA

31.12.2012C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA

18782009-10 O

17174Adarsha Control Systems,

No.B-231,5th Main, II Stage, PIA, Banglore-560058

II StageI

Surface Treatment & Powder coating 61.57 R-44

Industry or process involvingmetal

Small Red 2008BA

30.06.2024N N N N N N N NA NA NA 0.64 0.1 NA N Y Y NA Yes

18792009-10 CL

14927Decan Agro Chemicals,

No.411, 11th cross, IV Phase, PIA, Banglore

IV PhaseI

Pesticide formulation34.48 R-11

Processes involvingchlorinated hydrocarbon

Small Red 2010BA

30.06.2019N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

18802009-10 CL

-

Samarthanam Trust for the Disables,

No.66, 6th Main, III Phase, PIA, Banglore-560058

III PhaseI

Printer cartridge reconditioner 7.5 R-80

Currency notes &currency

Small Red ClosedBA

30.06.2016Y 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA NA

18812009-10 CL

16369Dinesh Creations,

No.C-319, 1st Floor, I Stage, PIE, Banglore-560058.

I StageI

Printing on clothes15.4 R-40

Yarn / Textile processinginvolving

Small Red 2009BA

30.06.2019N N N N N N N NA NA NA 0.4 0.045 ST & SP N N Y NA Yes

18822009-10 O

11711Weir Minerals (P) Ltd.,

No.33 A-2, II Phase, PIA, Banglore-560058

II PhaseI

Mfg and supply of slurry handling Equipments like

415.1 O-63Engineering Industries with Heat

Small Orange Mar-10BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 1.5 0.08 STP - BWSSB Y N Y NA Yes11711 Equipments like

pumps , valves, with HeatTreatment,

BA Y 30.09.2022 N N N N N NA NA NA 1.5 0.08 STP - BWSSB Y N Y NA Yes

18832009-10 O

24122A.K.Engineers

No.424/1, 11th cross, IV Phase, PIA, Banglore-58

IV PhaseI

Engineering Unit328 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1996BA

31.12.2023N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

18842017-18 O

19498KHT Agencies Pvt Ltd

No.302, IV Phase, PIA, Bengaluru-560058

IV PhaseI

Automobile service center 57.45 O-18

servicing, repairing

andSmall Orange 1.11.2017

BA30.09.2022

Y 30.09.2022 N N N N N NA NA NA 1.2 2.4 ETP Y Y N NA Yes

18852009-10 O Peeceeyes Industries Pvt Ltd

No.22, 5th Main, III Phase,PIA, Bengaluru-560 058

III PhaseI

Engineering Unit96 G-46

furniture without spray

Small Green 2016BA

31.12.2022N N N N N N N NA NA NA 0.38 N NA N Y N NA Yes

18862009-10 CL

15387Global Hydraulics Pvt Ltd.,

No.222, 8th Main, III Phase, PIA, Banglore-58

III PhaseI

Engineering Unit65.85 G-78

Switches without

electroplatinSmall Green 2008

BA31.12.2020

N N N N N N N NA NA NA 0.64 N ST & SP N N N NA Yes

18872009-10 O

42388

Precitec Precision Machineries Pvt Ltd

No.A-353(b), 8th Main, II Stage, PIA, Banglore-58

II StageI

Engineering Unit466 G-7

bell metal utensils

manufacturiSmall Green 2008

BA31.12.2033

N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

18882009-10 O

39161Mirapro India Pvt Ltd

No.35, I Main, 4th Cross, II Phase, PIA, Bangalore-58

II PhaseI

Cleaning of Vaccum components 248 O-101

cleaning, degreasing, painting and

Small Orange 2008BA

30.09.2022Y 30.9.2022 N N N N N NA NA NA 0.8 0.4 NA N Y Y NA Yes

18892009-10 O

38978Machine Tool Engineering

No.24/2, 5th Main, III Phase, PIA, Bengaluru-560058

III PhaseI

Engineering Unit294 G-78

Switches without

electroplatinSmall Green 2014

BA31.12.2027

N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

18902009-10 O RD CNC Products

No.39, 4th Main, III Phase, PIA, Bengaluru-560058

III PhaseI

Engineering Unit41 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2027

N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

18912010-11 O

Acucom Manufacturing Systems,

No.B-302, 7th MaIn, II Stage,PIE, Bengaluru-560 058

II StageI

Engineering74 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009BA

31.12.2019N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

18922010-11 O

12072Adarsha Control Systems,

No.A-273, 6th Main, II Stage PIE, Bengaluru-560 058

II StageI

Engineering265 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes

18932010-11 CL

-E-Sparsh,

No.C-134, II Stage, PIE, Bangalore-560058.

II StageI

E-Waste45 R-3

Industries engaged inrecycling/reprocessing/

Small Red ClosedBA

30.06.2009C1 N C1 N C1 N C1 NA Yes 0 N NA N N N NA Yes

18942010-11 CL

24114MetaCast Enterprises,

No.190,11th Main Road, III Phase, PIA, Bangalore-560058

III PhaseI

Aluminium Casting (Foundry) 27.49 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2010BA

30.06.2013N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes

18952010-11 O MSR & Sons Investments,

No.470,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Software Techonology 2180 G-78

Panel Board, Switches withoutelectroplatin

Large Green 2010BA

31.12.2021Y 31.12.2018 N N N N N NA NA NA 40 N STP Y N N NA Yes

18962010-11 CL

-

DF Forging & Maching Controls

No.196 , 4th cross, I Stage, PIE, angalore-560058

I StageI

Forging74 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2010BA

CLN N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

18972017-18 O Anil Gears.,

No.A-181 (a), 4th Cross, I Stage, PIE, Bengaluru-560068.

I StageI

Gears and Machine components 25 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2004BA

31.12.2033N N N N N N N NA NA NA 0.43 N NA N Y N NA Yes

18982010-11 O Ixetic DSI Auto Products,

No.21-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering unit- Assembling of Vacuum pumps

434 G-77of Motor &

Pumpswithout

Small Green 2010BA

31.12.2022N N N N N N N NA NA NA 0.64 N ST & SP N N N NA Yes

18992010-11 O

12778Peenya Industrial Gases,

No.313, 8th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Industrial gases other than oxygen and carbon dioxide

867.56 R-84Stand alone Production ofIndustrial

Medium Red 2010BA

30.06.2021N N N N N N N NA NA NA 3 N ST & SP N N N NA Yes

19002010-11 O

15505Vinayaka CNC Precision,

No.168/B, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering83 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2021

N N N N N N N NA NA NA 0.17 N ST & SP N N N NA Yes

19012010-11 O

Wireless TT Info Services Ltd.,

No.182/4, III Phase, PIA, Bengaluru-560 058

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2010AA

31.12.2018N N N N N N N NA NA NA 0 N NA N N N NA Yes

19022010-11 O

17484

Hindustan Clothing & Marketing Company (Unit-II),

No.68, 6th Main, III Phase,PIA, Banglore-58

III PhaseI

Garment stiching 319.62 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2010BA

31.12.2022N N N N N N N NA NA NA 5 N ST & SP N N N NA Yes

19032010-11 O M.G Metals Pvt Ltd.,

No.513-A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Plastic Chairs70 G-32

Polythene and plastic processedproducts

Small Green 2010BA

31.12.2019N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes

19042010-11 O Indus Towers Ltd.,

No.473(D), 13th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2010AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

19052010-11 O

15169Innova Engineering,

No.352, 9th Mian, 4th cross, IV Phase, PIA, B+E31engaluru-560 058

IV PhaseI

Electroplating (Hardchrome) 36.15 R-44

Industry or process involvingmetal

Small Red 2011BA

30.06.2024N NA N N N N N NA NA NA 0.4 0.08 ST & SP N N Y NA Yes

19062010-11 CL

-Aircel Ltd.,

No.C-324/1, I Stage, PIE, Bengaluru-560 058

I StageTT

Telephone towerDG Set White

15 KVA DG Set

Small White 2010AA

30.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes

1907 No.136- 137/2, 8th Main, III Phase, III Phase Manufacture of R.F Brass and 19072010-11 O 4S Telecom Pvt Ltd.,

No.136- 137/2, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of R.F microwave products 273 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009BA

31.12.2034N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes

19082010-11 O

Wireless TT Info Services Ltd.,

No.V-30(C), SS Weighers, II Stage, PIE, Bengaluru-560 058

II StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2010AA

31.12.2019N N N N N N N NA NA NA 0 N NA N N N NA Yes

19092010-11 O

11135Quenby Transfer (I) (P) Ltd.,

No.542, 14th Cross, IV Phase. PIA, Bengaluru-560 058

IV PhaseI

printing on sheets1339 O-65

Silk screen printing, sari printing bywooden

Large Orange 2010BA

30.09.2030Y 30.9.2026 N N N N N NA NA NA 8 4 STP & ETP Y N N NA Yes

19102010-11 O Shree nathaji Fabricators,

, No.146, 9th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering31 W-14

and fabricationunits (dry

Small White 2009BA

31.12.2019N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

19112010-11 CL Peevee Kicthen Equipments,

No.199/5, 12th Main, III Phase. PIA, Bengaluru-560 058

III PhaseI

Engineering43.3 G-46

Steel furniture without spray

Small Green 2006BA

31.12.2019N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

19122010-11 CL

-Sivara Automation & Controls

No.22, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering260 W-14

and fabricationunits (dry

Small White 2010BA

31.12.2011C1 N C1 N C1 N C1 NA NA NA 0 0 NA N N N NA NA

19132010-11 O

63981Surface Technik,

No.C-86, 2nd A Main, II Stage, PIE, Bengaluru-560 058

II StageI

Vibropolishing using ceramic media and soap water (wet polishing) and using

31 O-22Ceramics and Refractories

Small Orange 2010BA

30.09.2023N N N N N N N NA NA NA 0.8 0.1 NA N Y Y NA Yes

19142010-11 O

39904

Hi-Speed Maching India Pvt Ltd

No.A-152, 2nd C Main Road,, II Stage, PIE, Bengaluru -560058

II StageI

Alloy steel tool holder with CNC Machine 200 G-78

Panel Board, Switches withoutelectroplatin

Small Green 5.12.2016BA

31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

19152010-11 CL

12784

Paragon Polymer Products Pvt Ltd (formerly Elastrex

Polymers Pvt Ltd.,)

No.343-A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembly of shoe & leather chappals 587 G-26

Leather foot wear and leatherproducts

Medium Green 2010BA

31.12.2022N N N N N N N NA NA NA 1.5 N ST & SP N N N NA Yes

19162010-11 CL

11721

Concord Creations India (P) Ltd.,

No.57-B,III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment stiching 1941 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2010BA

31.12.2014Y 31.12.2017 N N N N N NA NA NA 17.6 N STP - BWSSB Y N N NA Yes

19172010-11 O

HindusthanTurbo Machinery Ltd.,

No.40-B, II Phase,PIA, Banglore-58 II PhaseI

Engineering803.86 G-78

Switches without

electroplatinMedium Green 2010

BA31.12.2022

N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes

19182010-11 CL

-Nobel Technology,

No.46, 14th cross, IV Phase. PIA Bengaluru-560 058

IV PhaseI

E-Waste15.7 R-10

Industries engaged in recycling/

Small Red 12.5.2011BA

30.06.2017N N N N N N N NA Yes 0.3 N ST & SP N N N NA Yes

19192010-11 O U.K Industries

No.M-8, 7th Cross, I Stage, PIE, Bengaluru-560058

I StageI

Manu of commercial stainless steel kitchen equipment

78.73 G-46Steel furniture without spray

Small Green 1.11.2015BA

31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

19202010-11 O

13597Magnum Enterprises,

No.371, IV Phase, PIA,Bengaluru-560 058

IV PhaseI

Garment stiching 563 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2010BA

31.12.2019N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes

19212010-11 O

11472

Venkat switchgears,(Formerly known as Supreeth

Switchgears,)

No.150, III Phase, PIA, Bangalore-560058

III PhaseI

Powder coating237 R-44

Industry or process involvingmetal

Small Red 2002BA

30.06.2022Y 30.06.2017 N N N N N NA NA NA 1.7 1.6 NA N Y Y NA Yes

19222010-11 O

11523Drawcans Pvt Ltd.,

No.380, 10 th cross , IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Aluminium Containers 490 O-101

Repairing, cleaning, degreasing,painting and

Small Orange 2009BA

30.09.2029Y 30.9.2024 N N N N N NA NA NA 19.2 1.5 ST & SP ETP Y N N NA Yes

19232010-11 CL

25872Sunlight Machine Tools.

No.B-68, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering - Machined turned components

95.36 G-10Carpentry & wooden furnituremanufacturi

Small Green 2010BA

31.12.2019N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

19242010-11 CL

-Metrex Alloys (India) (P) Ltd,

No.358/359, 3rd main , 9th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Copper recycling96 R-10

Industries engaged in recycling/

Small Red 2010BA

30.06.2013Y 30.06.2015 N N N N N NA NA NA 0.6 0.2 ST & SP N N Y NA NA

19252010-11 O

15180Sai Sri Industries,

No.B-151, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating30 R-44

Industry or process involvingmetal

Small Red 2010BA

30.06.2022N N N N N N N NA NA NA 0.12 0.1 ST & SP N N Y NA Yes

19262010-11 O

35047

Dynamatic Technologies Limited,

No.343A, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of gear pumps Lube pumbs 1809 G-77

Manufacture of Motor & Pumps without

Large Green 2018BA

31.12.2033Y 31.12.2024 N N N N N NA NA NA 3.6 N NA N Y N NA Yes

19272010-11 O

80023Adept Polymers Pvt . Ltd.,

No.555, IV Phase, PIA, Bangalore-560058

IV PhaseI

Plastic injection moulding parts with melting & extrusion

256 O-62Spray painting, paint baking, paint

Small Orange 2009BA

30.09.2028N NA N N N N N NA NA NA 1.2 0.01 NA N Y Y NA Yes

19282010-11 O

41356Eco Green Fules Pvt Ltd.

No.E4, 98, II Phase, PIA, Bangalore-560058

II PhaseI

Bio-diesel61.74 R-4

ng of lubricating oils ,grease

Small Red 1.8.2010BA

30.06.2023Y 30.06.2021 N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

19292010-11 O

33278Nash Industries (I) Pvt Ltd.,

No.235,8th Main, 3rd cross III Phase, PIA, Bangalore-560058

III PhaseI

powder coating417.07 O-62

Spray painting, paint baking, paint

Small Orange 2011BA

30.09.2022Y 30.06.2017 N N N N N NA NA NA 2.8 N NA N Y N NA Yes

19302010-11 CL

-Sara Suole Pvt Ltd.,

No.134, 8th Main, 3rd cross, III Phase, PIA, Bengaluru-560 058

III PhaseI

Footwear (Shoe upper pairs) 321 G-26

wear and leather

products Small Green 2010

BA31.12.2000

N N N N N N N NA NA NA 2.5 N ST & SP N N N NA NA

19312010-11 O

11527Korta Engineering Pvt Ltd.,

No.163, 10tjh Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fabrication of machine tool accessories, ball

777.46 G-93Manufacturing of nuts and bolts

Medium Green 2010BA

31.12.2033N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes11527 accessories, ball

screw, lead roller and boltswith cold

BA N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

19322010-11 O

MCC Alcast (P) Ltd (formerly know as Marvel Castings &

Componenets),

No.A-366, 6th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manu of Aluminium casting & components 367 R-50

Aluminum Smelter Small Red 2010

BA30.06.2020

N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes

19332010-11 O Maxpreci Machines Pvt Ltd.,

No.A-373, 4th Main, 6th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering129 G-97

Activity of Powder Coating onsurface of

Small Green 2008BA

31.12.2021N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

19342010-11 O Prashanthi Polymers,

No.A-41, 2nd Main, II Stage, PIE, Bengaluru-560 058,

II StageI

plastic items75.16 G-32

Polythene and plastic processedproducts

Small Green 2010BA

31.12.2019N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

19352010-11 CL

16105

Bangalore Excel Shine Pvt Ltd.,

No.291/292, 8th cross, I Stage, PIE, Bengaluru-560 058

I StageI

PVC coated aluminium sheets 89.62 R-44

Industry or process involvingmetal

Small Red 2010BA

30.06.2016N N N N N N N NA NA NA 0.5 0.1 NA N Y Y NA Yes

19362010-11 O

15130

Globetech Fortune Industries Pvt Ltd (Formerly Fortune

Industries,

No.438, 12th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering with heat treatment 290 O-63

Engineering Industries with HeatTreatment,

Small Orange 2010BA

30.09.2023N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes

19372010-11 O

A.S.R Engineering Equipments,

No.B-83, 2nd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication & Turned components 89 W-14

Engineering and fabricationunits (dry

Small White 2010BA

31.12.2034N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes

19382010-11 CL Hindustan Feeds

No.B-40, 2nd cross, III Stage, PIE, Bengaluru-560 058

III StageI

Cattle Feed31.04 O-30

Fish feed, poultry feed and cattle feed

Small Orange 2004BA

30.09.2017N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

19392010-11 O

34388

Kaynes Technology India Pvt Ltd

No.A-53, 2nd Main,II Stage, Peenya Industrial Estate, Bengaluru-560068

II StageI

Assembling of populated printed circuit Board

5.24 G-78Switches without

electroplatinMedium Green 2018

BA31.12.2027

N N N N N N N NA NA NA 2 N NA N Y N NA Yes

19402010-11 O Cubic Controls Systems.,

No.543, 14th cross, IV Phase. PIA, Bengaluru-560 058

IV PhaseI

Electrical Appliances including washing machines

461.65 G-78Panel Board, Switches withoutelectroplatin

Small Green 2010BA

31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

19412010-11 CL

16464Larsen & Turbro Ltd.,

No.92/93, 7th Main, III Phase,PIA, Bangalore-560058

III PhaseI

Engineering with spray painting 132.13 O-62

Spray painting, paint baking, paint

Small Orange 2010BA

30.06.2017N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

19422010-11 O

37643Hydreco Hydraulics Pvt Ltd

No.A 149, I Stage, PIE, Bengaluru-560058

I StageI

Hydraulic pumps and PTO with assembly and testing

18.35 O-62painting,

paint baking, paint

Small Orange 2017BA

30.09.2023N N N N N N N NA NA NA 0.65 0.033 NA N Y Y NA Yes

19432010-11 O Multiplex Bio-tech Ltd.,

No.A 420, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacturing of liquid Bio-Fertilizers and Bio-Pesticides

24 G-70Formulation of Bio pesticides and

Small Green 2010BA

31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

19442010-11 O

12765

Paragon Polymer Products Pvt Ltd (Formerly Elastrex

Polymers Pvt Ltd).,

No.489, 14th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

PU footwear with cutting,embossing, Screen printing and Stitching

662 O-59 Printing Press &/or screenPrinting

Medium Orange 2010BA

30.09.2029Y 30.9.2023 N N N N N NA NA NA 11.2 N STP N Y N NA Yes

19452010-11 CL

-

Starrag Heckert Machine Tools Ltd.,

No.349 & 350, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering615 G-46

furniture without spray

Medium Green 2010BA

31.12.2013N N N N N N N NA NA NA 4.5 N NA N Y N NA Yes

19462010-11 CL

-Reid & Taylor India Ltd.,

No.28/C,II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment stiching 34146.75 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green ClosedWA

31.12.2003N N N N N N N NA NA NA 0 N NA N N N NA NA

19472010-11 YTC Toyada Micro Matic Machines,

No.A-268, 6th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Engineering500 G-78

Switches without

electroplatinSmall Green 2010

BANA

N N N N N N N NA NA NA 0 N NA N N N NA NA

19482010-11 CL

-Mag Engineering Pvt Ltd.,

Plot No.4, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering with powder coating 935 R-44

Industry or process involving metal

Medium Red 2011BA

30.06.2014N N N N N N N NA NA NA 0 N NA N N N NA NA

19492010-11 CL

-ESCO Coplings,

No.B-325, I Stage, 3rd Main Road, PIE, Bengaluru-560 058

I StageI

Engineering611 G-78

Switches without

electroplatinMedium Green 2010

BA31.12.2005

N N N N N N N NA NA NA 0 N NA N N N NA NA

19502010-11 CL

39223CEJN Products India Pvt Ltd,

No.P-21/1, III Stage, PIE, Bengaluru-560 058

III StageI

Engineeringindustry 101.8 G-78

Switches without

electroplatinSmall Green 2010

WA31.12.2022

N N N N N N N NA NA NA 0.07 N NA N Y N NA NA

19512010-11 O

11224

Alpha Tocol Engineering Services Pvt Ltd,

No.535/540, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering1336 G-46

Steel furniture without spray

Large Green 2009BA

31.12.2021N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

19522010-11 O

13489Armstrong Acmite India,

No.41-B,II Phase, PIA, Bangalore-560058

II PhaseI

Foundry (Copper Casting) 2293.17 O-28

Ferrous and Non- ferrous metal extraction

Large Orange 1.6.2012BA

30.09.2030Y 30.09.2022 N N N N N NA NA NA 2 0.1 ETP N Y N NA Yes

19532010-11 CL

16858Saddhguru Chemicals,

No.B-68, 2nd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Copper Extraction from Hazardous waste 36.2 R-51

Copper Smelter Small Red 2011

BA30.06.2018

Y 30.06.2016 N N N N N NA NA NA 0.2 4 NA N Y Y NA Yes

19542010-11 O

20947GRV Merchandizing,

No.393, 10th cross, IV Phase, PIA, Banglore-58

IV PhaseI

Corrugated box480 O-98

Cardboard or corrugated box and

Small Orange 2011BA

30.09.2029N N N N N N N NA NA NA 1.8 0.15 NA N Y Y NA Yes

19552010-11 O

33160Bio gen Extracts Pvt Ltd

Plot No.253, 245 & 254/B (Part), 11th Main, 3rd Phase, PIA, Bengaluru-560 058

III PhaseI

Formulation of Pharmaceutical Product

380 O-74Pharmaceuti

cal formulation

Small Orange 2017BA

30.9.2023Y 30.09.2023 N N N N N NA NA NA 4.8 0.05 (STP) STP N N N NA Yes

1956 No.P-8B, III Stage, PIE, Bengaluru- III Stage R & D activity on Pharmaceuti19562010-11 CL

-Vital Biotech India Pvt Ltd.,

No.P-8B, III Stage, PIE, Bengaluru-560 058

III StageI

R & D activity on Biotechnology 21 R-58

Pharmaceutical (Bulk drug &Active

Small Red ClosedBA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

19572010-11 O

11723

Indian Designs Exports Pvt Ltd., Unit-3,

No.243 & 243/A, 6th Main III Phase, PIA, Bengaluru-560 058.

III PhaseI

Garment stitching 432.73 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 12 N NA N Y N NA Yes

19582010-11 CL

Hycom Engineering India Pvt Ltd.,

No.M-7/1, 6th cross, I Stage PIE, Bengaluru-560 058

I StageI

Assembling & Testing of hydraulic components

429.743 G-7Brass and bell metal utensilsmanufacturi

Small Green 2011WA

31.12.2020Y 31.12.2020 N N N N N NA NA NA 1.5 N ST & SP N N N NA NA

19592010-11 O Spiro Gears,

No.40-B, II Phase. PIA, Bengaluru-560 058

II PhaseI

Engineeringindustry 195.24 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2020

N N N N N N N NA NA NA 0.72 N ST & SP N N N NA Yes

19602010-11 O

23198Charu Perfumes House,

No.202, 12th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Agarbatties202.63 W-37

Agarbathi Manufacturi

ngSmall White 2010

BA31.12.2012

N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes

19612010-11 O

40546Kiran Metal Finishers,

No.A-370/2, I Stage, PIE, Bengaluru-560 058

I StageI

Electroplating Zinc plating 94.35 R-44

Industry or process involvingmetal

Small Red 2010BA

30.06.2023Y 30.06.2015 N N N N N NA NA NA 0.32 0.15 NA N Y Y NA Yes

19622010-11 O Tower Vision Pvt Ld.,

No 183, III Phase, PIE, Banglore-58 III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2009AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

19632010-11 CL LN Life Care Pvt Ltd.,

No.477-D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Sterilisation of surgical products 1400.28 O-65

medical productsincluding

Large Orange 2010BA

CLN N N N N N N NA NA NA 0 N NA N N N NA NA

19642010-11 O Flexo Tech Products,

No.P-18, III Stage. PIE, Bengaluru-560 058

III StageI

Engineeringindustry 87.7 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2021

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

19652010-11 CL

-

Prime Progression Export Services, No.A-37, A-38, V-42,V42, 2nd Main , II Stage,

PIE, Bengaluru-560 058

No.A-37, A-38, V-42,V42, 2nd Main , II Stage, PIE, Bengaluru-560 058

II StageI

Plastic Large Bags624 G-32

Polythene and plastic processedproducts

Medium Green 2010BA

30.06.2007N N N N N N N NA NA NA 0 N NA N N N NA NA

19662010-11 O

VIvekananda Electrical Industries, No.A-14,II Stage,

PIE, Bengaluru-560 058

No.A-14,II Stage, PIE, Bengaluru-560 058

II StageI

assembly of transformers 51 G-85

Transformer assembly unit

Small Green 20111BA

31.12.2020N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

19672010-11 O

12183

Disa India Ltd., No.1-A,3RD & 5TH Floor, Kushal arcade

Garden II Phase,PIA, Bengaluru-560 058

No.1-A, II Phase,PIA, Bengaluru-560 058

II PhaseI

Software Techonology 819.6 G-84

units generatingwastewater

Medium Green 2010BA

31.12.2024N N N N N N N NA NA NA 3 N STP Y N N NA Yes

19682010-11 CL

24018Trishyiraya Recycling Pvt Ltd.,

No.315,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

E-Waste78.3 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2012BA

30.06.2017N N N N N N N NA Yes 30.06.2019 1.08 N ST & SP N N N NA Yes

19692010-11 O Flexo Tech Products,

No.B-34, 2nd cross, III Stage. PIE, Bengaluru-560 058

III StageI

Engineeringindustry 92.11 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2021

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

19702010-11 O

13774

Vimala Mass Finishing Pvt Ld.,

No.B-154, 5th Main road, II Stage, Bangalore-560058

II StageI

Powder Coating96.37 R-44

Industry or process involvingmetal

Small Red 2011BA

30.06.2022N N N N N N N NA NA NA 0.48 0.45 NA N Y Y NA Yes

19712010-11 CL

11625Supertex Lables (P) Ltd.,

No. 202, 12th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Lables1977 G-91

Manufacture of Adhesives andadhesive

Large Green 2011WA

31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

19722010-11 CL Saravana Centri cast,

No.A-56, 2nd Main, II Stage, PIE, Bangalore-560058

II StageI

Foundry91 O-42

Industry or processes involvingfoundry

Small Orange 2004BA

30.06.2017N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

19732010-11 O Venus Engineering Industries,

No.157, 10th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineeringindustry 46 W-14

Engineering and fabricationunits (dry

Small White 2009BA

31.12.2020N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

19742010-11 CL

17966A.K.S Trading Company.,

No.C-69, 2nd cross, II Stage, PIE, Bangalore-560058

II StageI

Copper recovery137.38 R-10

Industries engaged in recycling/

Small Red 2011BA

30.06.2018Y 30.06.2016 N N N N N NA NA NA 0.096 0.4 NA N Y Y NA Yes

19752010-11 CL

16481Kargil Equipments,

No.199/2, 12th Main, III Phase ,PIA, Bengaluru-560 058

III PhaseI

Stainless steel kitchen equipments 33 G-46

Steel furniture without spray

Small Green 2004BA

31.12.2018N N N N N N N NA NA NA 0.7 N ST & SP N N N NA Yes

19762010-11 O

15435Ra TMT India,

No.246, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineeringindustry 49 W-14

Engineering and fabricationunits (dry

Small White 2009BA

31.12.2018N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

19772010-11 CL

-Sutures India Pvt Ltd.,

No.379 & 380, 10th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

surgical needle238 O-65

Surgical and medical products

Small Orange 2010BA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA

19782010-11 O

39360Starline Packers Pvt. Ltd.,

No. 490F, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

wood packing 27.82 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2014BA

31.12.2027N N N N N N N NA NA NA 2.75 N ST & SP N N N NA Yes

19792010-11 O

36817Metro Fashions

No.A-313 &A-314, 7th Main, II Stage, PIE, Bengaluru-560058

II StageI

Garment washing273 O-50

laundry using oil

firedMedium Orange 2018

BA30.09.2022

N N N N N N N NA NA NA 2.4 57 ETP N Y N NA Yes

19802010-11 O

14279Surface chem Finishers.,

No.B-41, B-Type, III Stage, PIE, Bengaluru-560 058

III StageI

Electroplating( Gold Plating ) 78.63 R-44

Industry or process involving

Small Red 1995BA

30.06.2023Y 30.06.2018 N N N N N NA NA NA 0.3 0.05 NA N Y Y NA Yes14279 involving

metal BA Y 30.06.2018 N N N N N NA NA NA 0.3 0.05 NA N Y Y NA Yes

19812010-11 CL

12453Mandhana Industries Ltd.,

No.21-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment stitching 565 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2010BA

31.12.2021N N N N N N N NA NA NA 10.2 N STP Y N N NA Yes

19822010-11 CL

11332Scotts Garments,

No.V-27, II Stage, PIE, Bengaluru-560 058

II StageI

Garment stitching 900 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2010BA

31.12.2022N N N N N N N NA NA NA 15 N STP Y N N NA Yes

19832010-11 O 3D Concept Tooling,

SB-44, 1st cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineeringindustry 179.84 W-14

Engineering and fabricationunits (dry

Small White 2010BA

30.12.2019Y 30.06.2017 N N N N N NA NA NA 0.4 N NA N Y N NA Yes

19842018 O

39801Venture Lighting India Ltd

No.385 &386, 10th Cross, IV Phase, PIA,Bengaluru -560058

IV PhaseI

Sales, Maintenance and replacement of LED Fixture in Govt. in Pvt companies

200 G-81Research laboratories not involving

Small Green 2018BA

31.12.2028N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

19852018 O Sanju Clinic

No.43, 8th Main, III Phase, PIA, Bengaluru-560058

III PhaseHCE

Clinic0 W-58

ClinicSmall White 2018

BA-

N N Y 31.12.2100 N N N NA NA NA NA N NA N N N NA Yes

19862010-11 O

Fusion Metals Tech India Pvt Ltd.,

No.D-480, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Engineering industry (Sheet Metal Fabrication)

114.78 G-7Steel furniture without spray

Small Green 2010BA

31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

19872010-11 CL

13029Scotts Garments Ltd.,

No.A-353a, 8th Main II Stage,PIE, Bengaluru-560 058

II StageI

Stitching900 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2009BA

31.12.2022Y 31.12.2019 N N N N N NA NA NA 11 N STP - BWSSB Y N N NA Yes

19882010-11 O

29736San Industrial Enterprises

No.198,12th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Powder coating activity without 7 tank process

27.7 G-97Powder

Coating onsurface of

Small Green 2015BA

31.12.2025N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

19892010-11 O

11628

Sri Rama & Sons ( Formerly Bombay Rayon Fashions

Limited., Unit-22

No.193-B, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment stitching 263 G-78

StichingSmall Green 2010

BA31.12.2022

N N N N N N N NA NA NA 6.3 N STP - BWSSB N N N NA Yes

19902010-11 O Thumbe Engineering,

No.1-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineeringindustry 255 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2022

N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes

19912010-11 O HDFC Bank, Mayur Complex,

100ft Road, I Stage, PIE, Bengaluru-560 058

I StageOthers

BankDG set W-52

Diesel Generator sets (15KVA to 250

Small White 2010AA

31.12.2019N N N N N N N NA NA NA 0 N NA N N N NA Yes

19922010-11 O

35335Laboratory for Electro Optics,

No.16, 1st cross, I Stage, PIE, Bengaluru-560 058

I StageI

Electronic Equipments 1800 G-53

Manufacturing of optical lenses(using

Large Green 2002BA

31.12.2022N N N N N N N NA NA NA 14 N STP Y N N NA Yes

19932010-11 CL

12825F.P. Seating Systems Pvt Ltd,

No.485/10, 14 th cross, IV Phase, PIA, Bangalore-560058

IV PhaseI

Polyurethene Foam seatsand assembly 365 O-80

Foam manufacturing

Small Orange 2008BA

30.09.2017N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

19942010-11 O

11414

Mag Engineering (Formerly known as Mag Engineering Pvt

Ltd.,) Plot

Plot No.34/B, II Phase, PIA, Bengaluru-560 058

II PhaseI

(Metal Fabrication) Engineering Industry 1807 G-78

Switches without

electroplatinLarge Green 2010

BA31.12.2022

N N N N N N N NA NA NA 7 N STP Y N N NA Yes

19952010-11 O

38467Center Front Clothing

No.27, 10th Main Road, III Stage, PIE, Bengaluru-560058

III StageI

Ready made garment9432 G-72

Stitching/ Stitching of shoe uppers/

Small Green 2017BA

31.12.2027N N N N N N N NA NA NA 4.5 N ST & SP N N N NA Yes

19962010-11 O Indus Towers Ltd.(Unit-II),

No.99, III Phase, Peenya Industrial Area, Bengaluru-560 058

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2011AA

31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes

19972010-11 O Towers Vision,

No.183, III Phase, PIA, Bengaluru-560 058

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2011AA

NAN N N N N N N NA NA NA 0 N NA N N N NA Yes

19982011-12 O

11645

Almighty Ring Forgings (P) Ltd.,

No.460/A1, IV Phase, PIA, Bangalore-560058

IV PhaseI

Forging194.56 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2012BA

30.09.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

19992011-12 CL

-

Lakshmi Metals & Alloys (P) Ltd.,

No.105, III Phase, PIA, Bangalore-560058

III PhaseI

Mineral Processing15 O-26

processing, mineral

processing, Small Orange Closed

WA30.09.2015

N N N N N N N NA NA NA 0 N NA N N N NA NA

20002011-12 O

Acumac Machine Tools Pvt Ltd,

No. 472/A, 12th Corss, IV phase, Peenya Industrial Area, Bengaluru-560 058

IV PhaseI

Manufacture machine tools components 432 O-62

painting, paint baking,

paintSmall Orange 2012

BA30.09.2012

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

20012011-12 O Statweigh India Pvt Ltd.,

No.447, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electrical weigh bridges and parks 97 W-13

Electrical and electronic item

Small White 2011WA

31.12.2020N N N N N N N NA NA NA 0.25 N ST & SP N N N NA NA

20022011-12 O

13795Veeyor Polymers (P) Ltd.,

No.B-161, 4th Main, II Stage, PIE, Bangalore-560058

II StageI

Resin Manufacturing59.76 O-75

Synthetic resins Small Orange 2009

BA30.09.2022

N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes

20032011-12 O

32475Manjushree Heat Tech Ltd.,

No.C-90, 3rd cross, III Stage,PIE, Bengaluru-560 058

III StageI

Heat Treatment76.43 O-63

Engineering Industries with HeatTreatment,

Small Orange 2011BA

30.09.2022N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

20042011-12 O

Rinse Top Tex (P) Ltd., Unit-II,

No.B-237, 3rd Main road, II Stage, Bengaluru-560 058

II StageI

Ready made garments33.8 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2011BA

31.12.2020N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

2005 No.B-153(b), 5th Main Road, II Stage, II Stage Foot wear soles Leather foot 20052011-12 O Hakasa India,

No.B-153(b), 5th Main Road, II Stage, Bengaluru-560 058

II StageI

Foot wear soles (parts) 48.62 G-26

Leather foot wear and leatherproducts

Small Green 2009WA

31.12.2020N N N N N N N NA NA NA 1.3 N NA N Y N NA NA

20062011-12 O Century Polymers,

No.C-209-A, 4th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Rubber products59.75 G-41

Rubber goods industry (with gas

Small Green 2011BA

31.12.2020N N N N N N N NA NA NA 2 N NA N Y N NA Yes

20072011-12 CL

Hess Enterprises, India (P) Ltd.,

No.4, 5th Main, III Phase , Bengaluru-560 058

III PhaseI

Special Proposemachine 472.38 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2011

N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

20082011-12 O

15059Sai Kripa Insulations Pvt Ltd.,

No.A-151 & 152, 3rd cross, I Stage, PIE,Bengaluru-560 058

I StageI

Corrugated boxes & allied products with boiler

434 O-98Cardboard or corrugated box and

Small Orange 2010BA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

20092011-12 CL

-MBS Metal Refiners,

No.V-20/1, II Stage,PIE, Bengaluru-560 058

II StageI

Lead Reprocessing 81 R-32

engaged in recycling

/ Small Red 2011

BANA

N N N N N N N NA NA NA 0 N NA N N N NA NA

20102000 O

39193Wave Mechanics Pvt Ltd

No.V-3, Ist Main, I Stage, III Stage ,PIE, Bangalore

III StageI

CNC Mechanical components & Electronic sub assembly

2897 G-78Switches without

electroplatinLarge Green 1.3.2000

BA31.12.2028

Y 31.12.2023 N N N N N NA NA NA 2.4 N NA N Y N NA Yes

20112011-12 O Axis Bank,

Axis Bank, No 149, 100 Ft road, I stage, PIE, Bengaluru-560 058

I StageOthers

BankDG Set W-14

Diesel Generator sets (15KVA to 250

Small White 2011WA

NAN N N N N N N NA NA NA 0 N NA N N N NA NA

20122011-12 CL

-Raj Metal Finishers,

No.460-A & 460A-1, IV Phase.PIA, Bengaluru-560 058

IV PhaseI

Electro plating45 R-44

process involving

metal Small Red 2011

BA30.06.2014

CL N Cl N Cl N Cl NA NA NA 0.3 0.08 ST & SP N N Y NA NA

20132011-12 O Canara Hydraulics Pvt Ltd.,

No.26-E, II Phase, PIA, Bengaluru-560 058

II PhaseI

Hydraulics Cylinders404 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2020

N N N N N N N NA NA NA 3.6 N ST & SP N N N NA Yes

20142011-12 CL Maahi Industries,

No.B-379/1, I Stage, PIE, Bengaluru-560 058

I StageI

PVC pipes30.5 G-39

Plastic sack bags, woven sack with HDPE,

Small Green 2011WA

31.12.2020N N N N N N N NA NA NA 0.36 N NA N Y N NA NA

20152011-12 O

38738Das CNC Products,

No.10-B, 10th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacture of precision turned components

94.3 G-75Brass and bell metal utensilsmanufacturi

Small Green 2010BA

31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

20162011-12 O

12799Ace Multi Axes Systems,

No.532, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

General Engineering458.82 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2011BA

31.12.2022N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes

20172011-12 O

23894Integrated Metal Coats,

No.333, 4th main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electroplating8.14 R-44

Industry or process involvingmetal

Small Red 2011BA

30.06.2024N N N N N N N NA NA NA 0.1 0.05 NA N Y Y NA Yes

20182011-12 O

Mamatha Specialities Foods Ltd.,

No.B-170, 4th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Powdering of spices and instant 49.4 G-112

Fragrance, flavours essence etc.for food

Small Green 2009WA

31.12.2020N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

20192011-12 CL

11419Shashikar Enterpries,(P) Ltd.,

No.473/A, 12TH CORSS, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Garments933 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2011BA

31.12.2026N N N N N N N NA NA NA 9.6 N STP Y N N NA Yes

20202011-12 O Weltech Engineering Pvt Ltd.,

No.473D/3, 13th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of chair, table computer table 76 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2011WA

31.12.2035N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

20212011-12 CL

33835Arrow Systems,

No.SM-3, III Stage, PIE, Bengaluru-560 058

III StageI

Electronic Waste24.8 R-33

Items namely -IntegratedRecycling

Small Red 2011BA

30.06.2017Y 30.06.2017 N N N N N NA NA NA 0.96 0.01 NA N Y Y NA Yes

20222011-12 O

15622Mohan Industrial Suppliers,

No.122 , 7th Main, 3rd cross, III Phase,PIA, Bengaluru-560 058

III PhaseI

Engineering350 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2011BA

31.12.2035N N N N N N N NA NA NA 0.72 N ST & SP N N N NA Yes

20232011-12 O

Pallakki NDT exclusive Controls,

No.250, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering75 G-78

Switches without

electroplatinSmall Green 2010

WA31.12.2021

N N N N N N N NA NA NA 0.001 N ST & SP N N N NA NA

20242011-12 CL

-DeBeers India Pvt Ltd.,

No.18/A,II Phase, PIA, Bangalore-560058

II PhaseI

Mineral Processing991.71 O-26

processing, mineral

processing, Medium Orange 17.3.2012

BA31.12.2021

Y 30.06.2016 N N N N N NA NA NA 0 N NA N N N NA NA

20252011-12 O Indus Electro Controls,

No.408/3, II Phase, PIA, Bengaluru-560 058

II PhaseI

Electrical Assembly86.21 G-78

Switches without

electroplatinSmall Green 2004

BA31.12.2020

N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

20262011-12 O

17482Glosil Silicaware Pvt Ltd.,

No.A-353,II Stage, PIE, Bengaluru-560 058

II StageI

Manufacture of Silica ware 184 G-98

Silicon Rubber Mouldings

Small Green 2009BA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

20272011-12 CL Precision Tools Implements,

No.B-259, 6th Main, II Stage,PIE, Bengaluru-560 058

II StageI

General Engineering Industry 326 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2021

N N N N N N N NA NA NA 0 N NA N Y N NA Yes

20282018-19 O

I.E.Power Technologies Pvt Ltd

No.3, 14th Cross, IV Phase, PIA, Bengaluru-560058

IV PhaseI

AC drives, Automatic voltage controller 84 G-78

(Panel Board, Switches without

Small Green 1.10.2017BA

31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

20292011-12 O

14188Shiva Battery Components,

No., A-1/1, 1st Main Road, II Stage,PIE, Bengaluru-560 058

II StageI

Battery containers 127 G-79

bags, woven sack -- 10 10 15 -- 15 10

Small Green 2011BA

31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes14188 15 -- 15 10 BA N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

20302011-12 O

27628Lakshmi Electro platers,

No.338, 9th Cross, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Electroplating24 R-44

Industry or process involvingmetal

Small Red 2011BA

30.06.2025N N N N N N N NA NA NA 0.3 0.05 NA N Y Y NA Yes

20312011-12 CL

-Netway HomeProducts,

No.V-40, II Stage,PIE, Bengaluru-560 058

II StageI

Perfumed floor cleaners 139 O-10

Manufacturing of tooth powder,toothpaste,

Small orange 2011BA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes

20322011-12 O

30739Galaxy Hard Chrome (P) Ltd.,

No.38,B-1, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Electroplating (Hardchrome) 49.8 R-44

process involving

metal Small Red 2011

BA30.06.2021

N N N N N N N NA NA NA 0.16 0.05 ST & SP N N Y NA Yes

20332011-12 O Indus Towers Ltd.,

NO.A-52/1, Plot No 493, 1st cross, II Stage,PIE, Bengaluru-560 058

II StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2011AA

31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes

20342011-12 O

15075Sagittarius Profiles Pvt Ltd.,

No.403, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Engineering activity (Roofing Section- colour coated prifile sheets, "Z" Purlin and

326.8 G-10Carpentry & wooden furnituremanufacturi

Small Green 2012WA

31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

20352011-12 CL Stock Redler India (P) Ltd.,

No.1-A,II Phase,PIA, Bengaluru-560 058

II PhaseI

Assembly of chain conveyors 488.3 G-78

Switches without

electroplatinSmall Green 2009

BA31.12.2018

N N N N N N N NA NA NA 0.6 N STP Y N N NA Yes

20362011-12 O Classic Enterprises,

No.D/396, Ist Cross, I Stage, Peenya Industrial Estate, Bengaluru-58

I StageI

Manufacture of turned components 7.94 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1986WA

31.12.2035N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

20372011-12 O Venkat Switchgears,

No.439 &440, 12th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Sheet shearing, bending, notching and fabrication

196 G-46Steel furniture without spray

Small Green 2012BA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

20382011-12 O

15449Shreyas Machine Tools,k

No.83, 7th Main, III Phase,PIA, Bangalore-560058

III PhaseI

Machine tumed componenets 90.68 G-78

Engineering and fabricationunits (dry

Small Green 2011WA

31.12.2020N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

20392011-12 O

16395Sri Sai Industries, Unit-II,

No.P-26/A,III Stage,PIE, Bengaluru-560 058

III StageI

Laser cutting beding machines 446 W-14

Engineering and fabricationunits (dry

Small White 2011BA

31.12.2020N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes

20402011-12 CL

37190Vinayaka Enterprises,

No.280,4th Main, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Electro plating68 R-44

process involving

metal Small Red 2010

BA31.12.2009

CL N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA

20412011-12 O

10950Shahi Exports Pvt Ltd.,

No.226, 227, 8th Main, 2nd cross, III Phase,PIA, Bengaluru-560 058

III PhaseI

Ready made Garments 1782 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2011BA

31.12.2022Y 31.12.2020 N N N N N NA NA NA 30.4 N STP N N N NA Yes

20422011-12 O

15509Mark Equipments & Services,

Mark Equipments & Services, No.63/3, 4th Main,II,Phase,PIA, Bengaluru-560 058

II PhaseI

Fabrication of refigeration equipments

36.21 W-14Engineering and fabricationunits (dry

Small White 2010BA

31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

20432011-12 CL

24694Cannula Plus India Pvt Ltd

No.V-6, 3rd Main Road, II Stage, PIE, Bengaluru

II StageI

Laser cutting 368 G-78

Switches without

electroplatinSmall Green 2009

BA31.12.2025

N N N N N N N NA NA NA 0.816 N NA N Y N NA Yes

20442011-12 CL

34030Gajanana Enterprises,

No.338, 9th cross,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Grit Blasting16.47 G-92

Shot blasting operation Small Green 2011

BA31.12.2099

N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

20452011-12 O Nagur Forging,

No.63/A, 4th Main, III Phase, PIA, Bangalore-560058

III PhaseI

Forging21.5 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2011BA

31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

20462018-19 O

41566Karnataka Rubber Industries

No.A-286, 6th Main, II Stage, PIE, Bengaluru-560058

II StageI

Stitching of shoe upper and insoles with cutting and stitching oprs

8.49 G-26wear and

leatherproducts

Small Green 2018BA

31.12.2027N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

20472011-12 O

24114Meta Cast,

No.A-359, 1st Main, I Stage,PIE, Bengaluru-560 058

I StageI

Aluminium casting24.15 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2008BA

30.09.2029N N N N N N N NA NA NA 0.61 N NA N Y N NA Yes

20482011-12 O

23793Unique Heat Carbo,

No.B-376, 9th cross, I Stage,PIE, Bangalore-560058

I StageI

Heat Treatment22.77 O-63

Engineering Industries with HeatTreatment,

Small Orange 2010BA

30.09.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

20492011-12 CL

Swastik Technologies Bangalore.

No.17, 5th Main, III Phase,PIA, Bengaluru-560 058

III PhaseI

Electrical Assembly264 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2010BA

31.12.2012N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

20502011-12 O Devilog Systems India, Unit-II,

No. 5 ,21-D, II Phase,PIA, Bengaluru-560 058

II PhaseI

Engineering157 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.56 N ST & SP N N N NA NA

20512011-12 O Futura automation (P) Ltd.,

No.S4, off: 3rd cross, I Stage,PIE, Bengaluru-560 058

I StageI

Assembly of computers 690 G-78

Panel Board, Switches withoutelectroplatin

Medium Green 2008BA

31.12.2035N N N N N N N NA NA NA 1 N NA N Y N NA Yes

20522011-12 O

16376Screen Touch Designs,

V-1C, 1 E Cross, I Stage,PIE, Bengaluru-560 058

I StageI

Textile Screen Printing 34.7 O-12

Screen printing Small Orange 2011

BA30.09.2022

N N N N N N N NA NA NA 0.32 0.03 NA N Y Y NA Yes

20532011-12 CL

100880G.G.Tronics India Ltd.,

No.10, 6th Main, III Phase,PIA, Bengaluru-560 058

III PhaseI

Assembly of computers 1300 G-78

Electrical and electronic item

Large Green 2011BA

31.12.2035N N N N N N N NA NA NA 2.1 N NA N Y N NA Yes

2054 No.34-D,III Phase, 4th Main, PIA, III Phase Refractories and Ceramics 20542011-12 O

15467Anjanadri Refractories,

No.34-D,III Phase, 4th Main, PIA, Bangalore-560058

III PhaseI

Refractories and Alumina tubes 21.42 O-22

Ceramics and Refractories

Small Orange 2011BA

30.06.2017N N N N N N N NA NA NA 0.04 N ST & SP N N N NA Yes

20552011-12 O Moda Suole (India) Pvt Ltd.,

No.SB-105, I Stage,PIE, Bengaluru-560 058

I StageI

Shoes & Leather Chappals 200.63 G-26

Leather foot wear and leatherproducts

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

20562011-12 CL

33199Surfa Coats Ltd., No. Unit-V,

No.VC-84, 3rd Cross, II Stage,PIE, Bangalore-560058

II StageI

Paint formulation30.75 O-54

Paint blending and mixing (Ball mill)

Small Orange 2008WA

30.09.2017Y N N N N N NA NA NA 1.28 0.7 NA N Y Y NA NA

20572011-12 O CIM Tools Pvt Ltd.,

No.467/469, Site No 1D, 12th Cross, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Parts & sub assembly for commercial aricrafts

2269 G-10Carpentry & wooden furnituremanufacturi

Large Green 1997BA

31.12.2035N N N N N N N NA NA NA 4.3 N NA N Y N NA Yes

20582011-12 O Soplar India Pvt Ltd.,

No.1-A,II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering activity207 G-78

Switches without

electroplatinSmall Green 2011

WA31.12.2021

N N N N N N N NA NA NA 0.48 N STP Y N N NA NA

20592011-12 O

10660

Aditya Auto Products & Engineering (I) Pvt Ltd, No.23/24 , II Phase, PIA

Bengaluru-560 058

No.23/24, II Phase,PIA, Bengaluru-560 058

II PhaseI

Engineering activity2143.54 G-78

Panel BoardLarge Green 2011

BA31.12.2021

Y 30.06.2017 N N N N N NA NA NA 72 N STP Y N N NA Yes

20602011-12 O

15394Sri Vanadurga Fabrications,

No.139/149, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering activity10.6 W-14

Engineering and fabricationunits (dry

Small White 2011BA

31.12.2020N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

20612011-12 CL Anjanadri Enterprises,

No.B-70, 2nd cross, II Stage, PIE, Bangalore-560058

II StageI

Phospating and powder coating 51.86 R-44

process involving

metal Small Red 2008

BA30.06.2020

N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes

20622011-12 O Chirag Industries,

No.M-5,I Stage, PIE, Bengaluru-560 058

I StageI

Manufacture of Fasteners 28.09 G-75

Brass and bell metal utensilsmanufacturi

Small Green 2006BA

31.12.2035N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

20632011-12 O

13920Balaji Hard Chrome,

No.473-D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electroplating (Hardchrome) 259 R-44

process involving

metal Small Red 2012

BA30.06.2022

N N N N N N N NA NA NA 0.8 3.9 NA N Y Y NA Yes

20642011-12 O

10653

DF Forging & Maching Centre Pvt Ltd ( Unit-1)

No.498,IV Phase, PIA, Bangalore-560058

IV PhaseI

Engineering activity- Precision machined components

2351 G-110Diesel Generator sets (250 KVA

Large Green 2012BA

31.12.2021N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

20652011-12 O

29688Rishab Heat Treaters,

No.115/B, 3rd cross, III Phase, PIA, Bangalore-560058

III PhaseI

Heat Treatment206.01 O-36

Heat treatment using oil fired furnace

Small Orange 2011BA

30.09.2021N N N N N N N NA NA NA 0.43 N NA N Y N NA Yes

20662011-12 O Amba Industries,

No.B-125, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering activity85.25 G-78

Switches without

electroplatinSmall Green 1995

WA31.12.2007

N N N N N N N NA NA NA 0.35 N NA N Y N NA NA

20672011-12 O

11408Ultratech Cement Ltd.,

No.27-C & 28-B, II Phase,PIA, Bengaluru-560 058

II PhaseI

Ready mix concrete1378 G-37

Ready mix cement concrete

Large Green 2011BA

31.12.2023N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

20682011-12 O Venson Electric Pvt Ltd.,

No.331, 9th cross, IVth Phase, PIA, Bengaluru-560 058

IV PhaseI

Electrical Assembly229 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1983BA

31.12.2022N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes

20692011-12 O Navalagunda Auto Park,

No.92,93 & 100, III Phase,PIA, Bengaluru-560 058

III PhaseI

Service station21.87 O-62

Automobile servicing,repairing and painting

Small Orange 2011BA

30.09.2012N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

20702011-12 O

12159I.G.Workshop.,

No.207& 208, III Phase, Bengaluru-560 058

III PhaseI

Automobile Service station 257.37 O-18

Automobile servicing, repairing and

Small Orange 2012BA

30.09.2021

Y 30.09.2021 N N N N N NA NA NA 1.2 3 ST & SP ETP Y N N NA Yes

20712011-12 O Vyoma Switch Grear Industry,

No.33/A, II Phase,PIA, Bengaluru-560 058

II PhaseI

Electronic choke79 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2011WA

31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

20722011-12 O 3D Concept Tooling,.

No.C-338, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Compnent (Die Casting)

88 G-93Panel Board, Switches withoutelectroplatin

Small Green Dec-11BA

30.12.2034N N N N N N N NA NA NA 1.05 N NA N Y N NA Yes

20732011-12 O Peerless Engineering Products

No.B-174, II Stage,PIE, Bengaluru-560 058

II StageI

Engineering activity6.3 W-14

Engineering and fabricationunits (dry

Small White 2007BA

31.12.2020N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

20742011-12 O Tool Tech Engineers,

No.D-395 , 1st Cross, I Stage, Bengaluru-560 058

I StageI

Engineering activity27.91 G-10

wooden furniture

manufacturiSmall Green 2015

WA31.12.2025

N N N N N N N NA NA NA 0.26 N NA N Y N NA NA

20752011-12 O

24771

Paragon Polymer Products Pvt Ltd (form Elastrex Polymers

Pvt Ltd).,

No.V-42& 42(a), II Stage,PIE, Bengaluru-560 058

II StageI

Footwear961.27 G-26

Leather foot wear and leatherproducts

Medium Green 2011BA

31.12.2024N N N N N N N NA NA NA 2 N NA N Y N NA Yes

20762011-12 O

12765Elastrex Polymers Pvt Ltd.,

No.488/D, 14th Cross, IV Phase, PIA ,Bengaluru-560 058

IV PhaseI

Footwear1829.8 G-26

Leather foot wear and leatherproducts

Large Green 2011BA

31.12.2024N N N N N N N NA NA NA 4 N ST & SP N N N NA Yes

20772011-12 O

12596Galvano centricast (P) Ltd.,

No.152, 10th Main Road, III Phase, PIA, Bangalore-560058

III PhaseI

Castings276 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2010BA

30.09.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

20782011-12 O Viom Netwroks Ltd.,

No.P-6,III Stage, PIE, Bengaluru-560 058

III StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15

Small White 2011AA

NAN N N N N N N NA NA NA 0 N NA N N N NA Yessets (15

KVA to 250 AA N N N N N N N NA NA NA 0 N NA N N N NA Yes

20792011-12 CL

30528CMAX Metals India (P) Ltd.,

No.309,8th Cross, IV Phase , PIA, Bengaluru-560 058

IV PhaseI

Engineering activity329 G-78

Switches without

electroplatinSmall Green 2012

BANA

Y N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

20802011-12 YTC Tech Power Corporation Ltd.,

No.25/A,II Phase,PIA, Bengaluru-560 058

II PhaseI

Engineering activity485.99 G-78

Switches without

electroplatinSmall Green 2000

BANA

N N N N N N N NA NA NA 0 N NA N N N NA NA

20812011-12 O

12203

Homag Machinery Bangalore(P) Ltd.,

No.25 B-C, 3rd Main, 4th Cross, II Phase, PIA, Bengaluru-560 058

II PhaseI

Engineering activity448 G-78

Switches without

electroplatinSmall Green 2012

BA31.12.2021

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

20822011-12 O

18130Sai Industries,

No 02, .9-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Plastic Utencils41.27 G-32

Polythene and plastic processedproducts

Small Green 2010WA

31.12.2021N N N N N N N NA NA NA 0.12 N ST & SP N N N NA NA

20832011-12 O

17422Skanda Machine Tools

No.46, 4th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering activity202.56 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2012BA

31.12.2021N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

20842011-12 O Werner Finely Pvt Ltd.

No.A-105, 3rd Main, II Stage, Bengaluru-560 058

II StageI

Engineering activity284 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2021

N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

20852011-12 O

26493Primex Plastics (P) Ltd.,

No.9-D,II Phase, PIA, Bengaluru-560 058

II PhaseI

Plastic Moulded297 G-32

Polythene and plastic processedproducts

Small Green 2010BA

31.12.2022N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes

20862011-12 YTC

14447

Electric Power Equipment Company,

No.44, III Phase, PIA, Bengaluru-560 058

III PhaseI

AssembLy of Transofrmers 53.2 G-85

Transformer assembly unit(industrial

Small Green 2009BA

NN N N N N N N NA NA NA 0 N NA N N N NA Yes

20872011-12 CL

29650

Lakshmi Vacuum Heat Treaters (P) Ltd.,

No.3B-05,IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Heat treatment84.69 O-63

Engineering Industries with HeatTreatment,

Small Orange 2010BA

30.06.2017N N N N N N N NA Y 30.06.2018 0.4 N NA N Y N NA Yes

20882011-12 O

38391

ITW India Pvt Ltd-BISS Division (Formerly Bangalore

Integrated Systems),

No.497-E,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of servo Hydraulic testing systems components (Engineering unit)

1092 G-10Carpentry & wooden furnituremanufacturi

Large Green 2010BA

31.12.2023Y 31.12.2019 N N N N N NA NA NA 2.8 N STP Y N N NA Yes

20892011-12 O Crescent Enterprises,

No.V-12(a), III Stage, PIA, Bengaluru-560 058

III StageI

Buffing & Polishing Watch components 42.47 G-1

Aluminum utensils fromaluminum circles by

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes

20902011-12 CL

24141E-Waste Managers,

No.C-311, 9th cross, I Stage, PIA, Bengaluru-560 058

I StageI

E-Waste25.2 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2010BA

30.06.2017N N N N N N N NA Y 0.432 N NA N Y N NA Yes

20912011-12 O Indus Towers Ltd.,

No.473-D, 13th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseTT

Telephone TowerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2012AA

31.12.2021N N N N N N N NA NA NA 0 N NA N N N NA Yes

20922011-12 O

16750Crescent Polymers,

No.93, 4th main, III Phase, PIA, Bangalore-560058

III PhaseI

silicon emulsions for garment washing with blending andpackaging operation

327 G-62Synthetic detergent formulation

Small Green 2012BA

31.12.2032N NA N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

20932011-12 O

12167Slider Bags Bangalore Pvt Ltd,

, No.B-113, 3rd Main, II Stage, Bengaluru-560 058

II StageI

LDPE Stretch Roll (More than 40 Microns)

107.24 G-32Polythene and plastic processedproducts

Small Green 2012WA

31.12.2022N N N N N N N NA NA NA 0.16 N NA N Y N NA NA

20942011-12 O Technoheat ovens & Furnaces,

No.C-127, 2nd B Main road, II Stage, Bengaluru-560 058

II StageI

Engineering13 W-14

Engineering and fabricationunits (dry

Small White 2011WA

31.12.2021N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

20952011-12 O Indian Clothing Company,

No.A-315, 7th Main Raod ,II Stage,PIE, Bengaluru-560 058

II StageI

Ready made garments 270 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2012BA

31.12.2022N N N N N N N NA NA NA 4 N ST & SP N N N NA Yes

20962011-12 O

22852Shipai Industries,

No.V-15A, Shed No.C-178, 4th main, II Stage,PIE, Bengaluru-560 058

II StageI

Alluminum Fabrication with anodising

87.42 R-44Industry or process involvingmetal

Small Red 2011BA

30.06.2023N N N N N N N NA NA NA 0.28 0.3 ST & SP N N Y NA Yes

20972011-12 O N.S.R. Copper,

No.22, 5th Main, III Phase,PIA, Bengaluru-560 058

III PhaseI

Copper drawing94.71 G-32

Polythene and plastic processedproducts

Small Green 2011BA

31.12.2024N N N N N N N NA NA NA 0.27 N ST & SP N N N NA Yes

20982011-12 O R.S. CNC,

No.C-186,II Stage,PIE, Bengaluru-560 058

II StageI

Engineering 192 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2012

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

20992018 O

41917

Alpha Elsec Defence and Aerospace Systems Pvt Ltd

No.193B, 4th Cross, I Stage, PIE, Bengaluru-560058

I StageI

Optical instruments850 O-62

painting, paint baking,

paintMedium Orange 2018

BA30.09.2023

N 30.09.2023

N

N N N N NA NA NA 2.2 N NA N Y N NA Yes

21002011-12 O Tower Vision India Ltd.,

No.36 & 37,II Phase,PIA, Bengaluru-560 058

II PhaseTT

Telephone TowerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2011AA

NAN N N N N N N NA NA NA 0 N NA N N N NA Yes

21012011-12 O CNC India Tools & Services,

No.A-319,A-320, 7th Main, II Stage,PIE, Bengaluru-560 058

II StageI

Manufacture of electrical panels Jigs fixtures, cutting tools, Electrical panel

491 G-78Panel Board, Switches withoutelectroplatin

Small Green 2004BA

31.12.2024N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

21022011-12 O Shrusti Innovation,

No.466, 3rd Main, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Engineering activity32.31 G-46

Steel furniture without spray

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2103 No. 484/A, IV pahse peenya Industrial IV Phase Engineering activity Spray 21032011-12 O

29268Bulkmov Engineering

No. 484/A, IV pahse peenya Industrial area, Banglaore 560058

IV PhaseI

Engineering activity with spray paintng 112 O-62

Spray painting, paint baking, paint

Small Orange 1.10.1992BA

31.12.2025N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

21042011-12 O

15661Sun Modular Systems,

No.C-179, 5th C Main Road II Stage,PIE, Bengaluru-560 058

II StageI

Modular Furniture46.87 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

21052011-12 O

POM Systems Services Pvt. Ltd.,

No.75, 6th Main, III Phase,PIA, Bengaluru-560 058

III PhaseI

Engineering activity160 W-13

Electrical and electronic item

Small White 2000WA

31.12.2021N N N N N N N NA NA NA 1.9 N ST & SP N N N NA NA

21062011-12 CL R.O.Dasa

rahalliGajendra Enterprises,

No.129,IV Phase,PIA, Bangalore-560058

IV PhaseI

Forging23.55 O-63

Industries with Heat

Treatment, Small Orange 2010

WANA

N N N N N N N NA NA NA NA N NA N N N NA NA

21072011-12 CL R.O.Dasa

rahalli

Varsha Castings & engineering,

No.129,IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Non-Ferrous CAstingV 31.94 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2010WA

NAN N N N N N N NA NA NA 0 N NA N N N NA NA

21082011-12 O

15693Aries Precision Technologoies,

No.A-352, 8th Main II Stage,PIE, Bengaluru-560 058

II StageI

Engineering activity326.3 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009BA

31.12.2023N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

21092011-12 O

42492Perfect Laser Serivces,

No.B-231, 6th cross, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering activity157 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2011WA

31.12.2012N N N N N N N NA NA NA 0.14 N NA N Y N NA NA

21102011-12 CL

-Mahe Industries,

No.V-P, I Stage,PIE, Bangalore I StageI

Engineering activity120 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2022

N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes

21112011-12 CL

-Mallar Industries,

No.B-447,I Stage,PIE, Bangalore I StageI

Engineering activity17.81 W-14

Engineering and fabricationunits (dry

Small White 2011WA

NN N N N N N N NA NA NA NA N NA N N N NA NA

21122011-12 O United Engineers,

No.VP-8, I Stage,PIE, Bengaluru-560 058

I StageI

Engineering Activity & Fabrication 12.49 W-14

Engineering and fabricationunits (dry

Small White 2004WA

31.12.2021N N N N N N N NA NA NA 0.22 N NA N Y N NA NA

21132011-12 O

35475Shreyas Meta Castings,

No.83/1 , III Phase,PIA, Bangalore-560058

III PhaseI

Alluminium Gravity Die casting 30.5 O-28

Ferrous and Non- ferrous metalextraction

Small Orange 2011BA

30.09.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

21142011-12 O

17186Aries Precision Technologoies,

No.182/C, III Phase,PIA, Bengaluru-560 058

III PhaseI

Engineering and fabrication 41.85 W-14

Engineering and fabricationunits (dry

Small White 2006WA

31.12.2021N N N N N N N NA NA NA 0.14 N ST & SP N N N NA NA

2115O

Bhagyalakshmi Industrial Corporation,

B-85, 2nd Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Steering coloumn27.54 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1982WA

31.12.2035N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

2116O

Electrical and Allied Products, No. 136-137/5, 8th Main, III Phase PIA, Bangalore – 560 058

III PhaseI

Manufacture of cable assys and ATC brands 74.4 G-78

Switches without

electroplatinSmall Green 2002

WA31.12.2021

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2117O Goodwill Industries,

No.148, 9th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Sheet metal components 542 G-7

Brass and bell metal utensilsmanufacturi

Medium Green 2008WA

31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA NA

2118O

Prakash Industries, B-225, 4th Cross, I stage, PIE, Bangalore – 560 058

I StageI

Electrical components21.62 W-13

Electrical and electronic item

Small White 1981BA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2119O Pressed Products,

No.222, 8th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Manufacture of press components 46.77 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2010WA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2120O

Rajdeep Engineering Works, B-126, 3rd Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Sheet metal fabrication 48 G-78

Switches without

electroplatinSmall Green 2003

WA31.12.2021

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2121O

Replica Xerography Pvt Ltd., B-375, 100Ft Road, I stage, Peenya Industrial Estate, Bangalore – 560 058

I StageI

Scanning, printing and documetation service

445 G-78Switches without

electroplatinSmall Green 2007

BA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

2122O

14330

Sadbhava Fabricators (P), No.SB-52, 4th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Machined turned Components 245 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1996WA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2123O

Hydro-Links Flexibles Pvt Ltd.,

No.C-329, 3rd Main Road, I Stage, PIE, Bangalore – 560 058

I StageI

Hose assemblies95.94 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1990WA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2124O

M M Equipments, B-387, I Stage,PIE, Bangalore – 560 058

I StageI

Commercial kitchen equipments 107 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2003BA

31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

2125O

Mesh Well Gears, No.221, 9th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Manufacture of gears and sprockets 89.19 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1981BA

31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

2126O

Precision Engineering Accessories,

SB-109, I Stage, KSSIDC, PIE, Bangalore – 560 058

I StageI

Hydrulic and pneumatic cylinders156 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1973BA

31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes

2127O

Pride Machine Tools, No.89/1, 7th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

CNC machine components 113 G-78

Switches without

electroplatinSmall Green 2005

BA31.12.2021

N N N N N N N NA NA NA 0.45 N ST & SP N N N NA Yeselectroplatin BA N N N N N N N NA NA NA 0.45 N ST & SP N N N NA Yes

2128O

Sainit Engineering,B-18, I Stage,PIE, Bangalore – 560 058

I StageI

Fabrication54.45 G-78

Switches without

electroplatinSmall Green 2006

WA31.12.2021

N N N N N N N NA NA NA 0.05 N NA N Y N NA NA

2129O

Sridarshan Packaging Industries, No.26, 5th Main, III Phase, PIA,

Bangalore – 560 058

III PhaseI

Wooden pacakaging54.25 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

2130O

Veda Tooling systems (P) Ltd., B-317, I Stage, PIE, Bangalore – 560

058

I StageI

CNC Machine156 G-78

Switches without

electroplatinSmall Green 1991

BA31.12.2021

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

2131O

Auto Cut Enterprises, No.54/1, 4th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

CNC Machines34.52 G-78

Switches without

electroplatinSmall Green 2006

WA31.12.2021

N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA

2132O

B M L Industries, No.39/3, 4th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Repacking of chemicals 21.21 G-109

Refilling, Repacking andblending of

Small Green 2005WA

31.12.2021N N N N N N N NA NA NA 0.19 N ST & SP N N N NA NA

2133O

29844

Indvac Systems & Components,

No.B-28/B, I Stage, PIE, Bangalore – 560 058

I StageI

Vaccum pumps assembly 23.69 W-13

Electrical and electronic item

Small White 2011BA

31.12.2021N N N N N N N NA NA NA 0.38 N NA N Y N NA Yes

2134O

14316Micro Moulds & Plastics,

No.C-206, 4th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Tools dies and components 87.56 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2004WA

31.12.2021N N N N N N N NA NA NA 0.225 N NA N Y N NA NA

2135O R.R. Techno Products,

No.25/3, V Main, Near UCO Bank, III Phase, PIA, Bangalore – 560 058

III PhaseI

CNC machine components 82.55 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2136O Samm Technologies,

No.198/A, 2nd Cross, 11th main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Fabrication150 G-78

Switches without

electroplatinSmall Green 2001

BA31.12.2021

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

2137O V-3 CNC Centre,

Plot-M1, 4th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

CNC machined components 93.18 G-78

Switches without

electroplatinSmall Green 2012

WA31.12.2021

N N N N N N N NA NA NA 0.25 N NA N Y N NA NA

2138O Deepak Industries,

No.25, 5th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Bandsaw cutting of steel 32.59 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2004WA

31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA

2139O

Electric Power Equipment Company,

No.44, 4th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Assembly of high voltage instrument transformers

60.92 G-78Switches without

electroplatinSmall Green 2009

WA31.12.2021

N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA

2140O Kashyap Machine Tools,

No.C-208, 4th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

CNC Machine shop39.26 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2021

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2141O

14526Nag Tech Electronics,

No.A-421, I Stage, PIE, Bangalore – 560 058

I StageI

Fabrication of sensing instruments 19 W-14

Engineering and fabricationunits (dry

Small White 20012WA

31.12.2021N N N N N N N NA NA NA 0.225 N NA N Y N NA NA

2142O

14359N R Automats, No.93, 7th Main, III Phase, PIA,

Bangalore – 560 058

III PhaseI

Automobile components 9.28 W-14

Engineering and fabricationunits (dry

Small White 2012WA

31.12.2021N N N N N N N NA NA NA 0.225 N ST & SP N N N NA NA

2143O Opto Electronics Pvt Ltd., No.C-346, I Stage, PIE, Bangalore –

560 058

I StageI

Manufacture of opto mechanical products 19.75 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2012WA

31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

2144O

Skanda Manufacturing Systems Pvt Ltd.,

No.46, 4th Main, III Phase, PIA, Bangalore – 58

III PhaseI

Retrofinishing of machinieries 76.24 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2010WA

31.12.2021N N N N N N N NA NA NA 0.7 N ST & SP N N N NA NA

2145O

14494

Sree Lakshmi Narasimha Automats,

No.93, 7th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Automobile components 29.85 G-78

Switches without

electroplatinSmall Green 2011

WA31.12.2021

N N N N N N N NA NA NA 0.45 N ST & SP N N N NA NA

2146O S R R Enterprises,

Plot No.M-10, 7th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

packing boards1.68 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

2147O

Sunlight Interiors & Exhibitions Pvt Ltd.,

Plot No.B-239, 6th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Making of wooden furniture 20.82 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2009WA

31.12.2021N N N N N N N NA NA NA 0.03 N NA N Y N NA NA

2148O Hidri Tools, No.38-B/2, II Phase, PIA, Bangalore –

560 058

II PhaseI

Fabrication f machine tools components 14.84 W-14

Engineering and fabricationunits (dry

Small White 2011WA

31.12.2021N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

2149O Maruthi Enterprises, No.460/A-1, III Phase, PIA, Bangalore

– 560 058

III PhaseI

CNC machining12.98 W-14

Engineering and fabricationunits (dry

Small White 2008BA

31.12.2021N N N N N N N NA NA NA NA N NA N N N NA Yes

2150O

14475Nisarga Enterprises,

No.168/A,Behind Sonal Garments, III Phase, PIA, Bangalore – 560 058

III PhaseI

Manufacture of soaps, shampoo, detergents 17.22 G-43

Soap manufacturing (hand made

Small Green 2003WA

31.12.2021N N N N N N N NA NA NA 1.5 N ST & SP N N N NA NA

2151O

Precimeasures Controls Pvt Ltd.,

No.168/C, III Phase, PIA, Bangalore – 560 058

III PhaseI

Manufacture of assembly of temperature indicators and cables

425 G-78Panel Board, Switches withoutelectroplatin

Small Green 2005WA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

2152Sree Manjunatha Engineering

No.93/1, 9th Main, III Phase, PIA, III Phase Engineering activity Engineering 2152O

14500

Sree Manjunatha Engineering Works,

No.93/1, 9th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Engineering activity6.95 W-14

Engineering and fabricationunits (dry

Small White 2003WA

31.12.2021N N N N N N N NA NA NA 0.03 N ST & SP N N N NA NA

2153O Taurus Technologies,

No.40-B/2, II Phase, PIA, Bangalore – 560 058

II PhaseI

Manufacture of milling 21.81 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.27 N ST & SP N N N NA NA

2154O

14400Twilight Plasic Industries,

No.B-79, I Stage, PIE, Bangalore – 560 058

I StageI

PVC sleeving and tubing 27.57 G-79

covered underPlastic

Small Green 1975WA

31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2155O Ven-Tech Systems,

No.B-160, 3rd Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Fabrication80.87 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2021

N N N N N N N NA NA NA 0.75 N NA N Y N NA NA

2156O CNC Automative Unit-VII,

Unit-VII, No.26/A, 5th Main, III Phase, PIE, Bangalore – 560 058

III PhaseI

precision auto components 3.22 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2021

N N N N N N N NA NA NA 0.75 N ST & SP N N N NA Yes

2157O

HIV AC Instruments & Service Centre,

No.B-230, 4th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Fabrication of vaccum components 8.51 W-14

Engineering and fabricationunits (dry

Small White 1993BA

31.12.2021N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes

2158O

14505

Indus Arc Power Private Limited,

No.108E, III Phase, PIA, Bangalore – 560 058

III PhaseI

Engineering activity43.41 G-78

Switches without

electroplatinSmall Green 2010

WA31.12.2021

N N N N N N N NA NA NA 0.06 N ST & SP N N N NA NA

2159O

Kolekar Toolings Private Limited,

No.63, 4th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

CNC cutting components 94.97 G-78

Switches without

electroplatinSmall Green 2009

BA31.12.2021

N N N N N N N NA NA NA 0.35 N ST & SP N N N NA Yes

2160O

14523M.V Auto Mats,

No.93, 7th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Fabriction of precision turning components

8.31 W-14Engineering and fabricationunits (dry

Small White 2005BA

31.12.2021N N N N N N N NA NA NA 0.03 N ST & SP N N N NA Yes

2161O

Cingularity Tooling & Engineering

Concepts India Pvt Ltd

No.SB.164, 3rd Cross, I Stage,PIE, Bangalore – 560 058

I StageI

Fabrication of CNC machinery 83.1 G-78

Switches without

electroplatinSmall Green 2007

BA31.12.2021

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes

2162O

14539Prajwal Logic Controls,

No.300, 5th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

panel board assembly15.07 W-14

Engineering and fabricationunits (dry

Small White 2007WA

31.12.2021N N N N N N N NA NA NA 0.025 N ST & SP N N N NA NA

2163O Shree Laxmi Saw Mills,

Plot No.185, 11th Cross, 100Ft Road, KIADB, III Phase, PIA, Bangalore – 560 058

III PhaseI

Saw mills6.76 W-14

Engineering and fabricationunits (dry

Small White 2010BA

31.12.2021N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

2164O

14439

SNG Test & Measurement Systems,

No.68, VI Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

Fabrication of energy metre testing equipment

56.59 G-78Switches without

electroplatinSmall Green 2009

WA31.12.2021

N N N N N N N NA NA NA 0.17 N ST & SP N N N NA NA

2165O

14343Sri Laxmi Metal Works,

Plot No.72, 6th Main, III Phase, PIA, Bangalore – 560 058

III PhaseI

tools dies and components 11.25 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2012WA

31.12.2021N N N N N N N NA NA NA 0.04 N ST & SP N N N NA NA

2166O Standard Cartons,

No.245, III Phase, PIA, Bangalore – 58

III PhaseI

Manufacture of corrugated boxes 59.4 G-9

Cardboard or corrugated box and

Small Green 2000BA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2167O Subas Technologies,

No.54, III Phase, PIA, Bangalore – 58 III PhaseI

Fabrication of turning and milling 19.21 W-14

Engineering and fabricationunits (dry

Small White 2004WA

31.12.2021N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA

2168O Trans Generators Pvt Ltd.,

No.7, 5th Main, III Phase, PIA, Bangalore – 58

III PhaseI

D G set assembling62.24 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2004WA

31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA

2169O

87525

Trio-Tech Manufacturing System,

No.848/5, 4th Cross East End, I Stage, PIE, Bangalore – 58

I StageI

Machinery components 80.6 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1998BA

31.12.2034N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

2170O Unite Industries,

No.C-350, I Stage, PIE, Bangalore – 58

I StageI

Transformer assembly, motar rewinding

63.11 G-85Transformer assembly unit(industrial

Small Green 1971BA

31.12.2021N N N N N N N NA NA NA 1.05 N NA N Y N NA Yes

2171O Adarsh Machine Tools,

No.40B/4A, II Phase, PIA, Bangalore – 58

II PhaseI

CNC Machine 102 G-78

Switches without

electroplatinSmall Green 2003

WA31.12.2021

N N N N N N N NA NA NA 0.125 N ST & SP N N N NA NA

2172O Excellence Technologies,

No.B-380, 4th Main, 8th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Precision components126 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2173O

14340G S Gears India (P) Ltd.,

No.C-439, (Behind Peenya Police Station), I Stage, PIE, Bangalore – 58

I StageI

Manufacture of gears and pnions 116 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2004WA

31.12.2021N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

2174O Mighty Machines,

No.C-283, 7th Cross, I Stage, PIE, Bangalore – 58

I StageI

CNC machines67.5 G-78

Switches without

electroplatinSmall Green 2004

WA31.12.2021

N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

2175O Schleif Master Pvt Ltd.,

No.A/189, 4th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Fabrication of starter box and control panel 22.29 W-14

Engineering and fabricationunits (dry

Small White 1974WA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2176O

14515Trimurthi CNC Machining,

No.B-355, 9th Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Turning components70.3 G-7

Brass and bell metal utensils

Small Green 1995WA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA14515 utensils

manufacturiWA N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2177O

14470Sahyadri Electro Controls,

No.10, Vinay complex, 1st Cross, Rajgopalnagar Main Road, III Phase, PIA, Bangalore – 58.

III PhaseI

Assembly of electrical appliances 79.04 G-78

Switches without

electroplatinSmall Green 2006

WA31.12.2021

N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

2178O 2 M Enterprises,

C-74, III Stage, PIE, Bangalore – 560 058

III StageI

Manufacture of Brakes, brake motars 13.92 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2000WA

31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

2179O 2 M Enterprises,

D-427, 10th Main, II Stage, PIE, Bangalore – 560 058

II StageI

Manufacture of spinning machine 26.06 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

2180O 2 M Enterprises,

A-27, III Stage, PIE, Bangalore – 560 058

III StageI

Manufacture os spinning machine, needli for machine

136 G-7Brass and bell metal utensilsmanufacturi

Small Green 2010WA

31.12.2021N N N N N N N NA NA NA 0.09 N NA N Y N NA NA

2181O Dashmesh Engineering,

No.255/2, 8th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Engineering activity15.37 W-14

Engineering and fabricationunits (dry

Small White 1979WA

31.12.2021N N N N N N N NA NA NA 0.15 N ST & SP N N N NA NA

2182O Data Care Networks,

B-11, 1st floor, II Block, 14th cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

DISPLAY AND SALES OF ELECTRIC GOODS

2.51 W-14Engineering and fabricationunits (dry

Small White 1994BA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

2183O Data Care Systems Pvt Ltd..,

No.11 & 12, 1st Floor, 2nd Block, KIADB Industrial Complex, plot No.488, 14th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Assembly of electronic items like linedrivers, multiplexar

91.85 G-78Switches without

electroplatinSmall Green 1994

BA31.12.2021

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

2184O EMKAY Engineers

No.A-5/1, III Stage, Peenya Industrial Estate, Bangalore – 560 058.

III StageI

Engineering activity168 G-78

Switches without

electroplatinSmall Green 1996

WA31.12.2021

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2185O Hegde Engineering Industries, No.C-135(A), 2nd B Main, II stage,

PIE, Bangalore – 560 058

II StageI

Cold wire drawing65.36 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1990BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

2186O

International Machine Tool Accessories,

No. 255/2, 8th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Machine tool accessories 64.62 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1991BA

31.12.2021N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes

2187O

Process Care Systems (India) Pvt Ltd.,

No.11 & 12, 1st Floor, 2nd Block, KIADB Industrial Complex, plot No.488, 14th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Electric instruments15.58 W-14

Engineering and fabricationunits (dry

Small White 1993WA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2188O SITAS,

C-72, III Stage, Peenya Industrial Estate, Bangalore – 560 058

III StageI

Non Destructive radiographic & Ultrascan inspection

265 G-78Panel Board, Switches withoutelectroplatin

Small Green 1979WA

31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2189O

Surabhi Engineering Enterprises,

No.P6/D, III Stage, Behind BTS Depot, Peenya Industrial Estate, Bangalore – 560 058.

III StageI

Fabrication17.55 W-14

Engineering and fabricationunits (dry

Small White 2006WA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2190O Accuspirala Unit-2, No.B-60, III Stage, PIE, Bangalore –

560 058

III StageI

Gears, spirala, wheels369 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

2191O G R S Industries,

No.C-83/2, 2nd Main, II Stage, PIE, Bangalore – 560 058

II StageI

Manufacture of tools and dies 37.33 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2003WA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

2192O G S Fabricators,

Plot No. 473/D(6), 13th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Fabrication Unit74.29 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2000BA

31.12.2021N N N N N N N NA NA NA 0.55 N ST & SP N N N NA Yes

2193O

18385

IPA Pvt Ltd. (Fabrication Unit),

No.464, 12th Cross, Near Brindavan Bus Stop, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Fabrication Unit81.86 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 0.55 N ST & SP N N N NA Yes

2194O Joy Industries,

No.391, 10th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

fabrication of sheet metal components and panels

378 G-78Panel Board, Switches withoutelectroplatin

Small Green 1974BA

31.12.2021N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes

2195CL

-

OM Shakthi Hydraulics Pvt Ltd.,

20No. B-197, 5th Main, II Stage, PIE, Bangalore –58

II StageI

fabrication of sheet metal components and panels

44.12 G-78Panel Board, Switches withoutelectroplatin

Small Green 25.05.2000WA

31.12.2000N N N N N N NA NA NA 0 N NA N N N NA NA

2196O Prakash Engineering Works,

No.B-44, 2nd Cross, III Stage, PIE, Bangalore – 560 058

III StageI

Turning components40.82 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2006BA

31.12.2021N N N N N N N NA NA NA 0.325 N NA N Y N NA Yes

2197O Shree Durga Equipments,

No.C-96, III Stage, PIE, Bangalore – 560 058

III StageI

Commercial kitchen equipments 29.13 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2000BA

31.12.2021N N N N N N N NA NA NA 0.19 N NA N Y N NA Yes

2198O Sundarlam Industries,

No.A-12, III Stage, PIE, Bangalore – 560 058

III StageI

plastic machinery and its parts 87.73 G-32

Polythene and plastic processedproducts

Small Green 1985BA

31.12.2021N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes

2199O

Universal Instruments MFG. Company (P) Ltd.,

No.268A, 1st Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Manufacture of battery charge solar power controller

119 G-78Switches without

electroplatinSmall Green 1971

BA31.12.2021

N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes

2200O Anura Metals (India),

No.C-345, 1 st Main road, I stage PIE, Bangalore – 560 058

I StageI

Earth movers equipments 29.16 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1974WA

31.12.2021N N N N N N N NA NA NA 0.25 N NA N Y N NA NA

2201 Plot No. 395, 11th Cross, IV Phase, IV Phase fabrication Switches 2201O

14408Balaji Engineers,

Plot No. 395, 11th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

fabrication39.25 G-78

Switches without

electroplatinSmall Green 1996

WA31.12.2021

N N N N N N N NA NA NA 0.32 N ST & SP N N N NA NA

2202O Hi-Tech Automats

Hi-Tech Automats B-125, 3rd Main Road, II Stage, PIE, Bangalore – 560 058

II StageI

CNC machine components 45 G-78

Switches without

electroplatinSmall Green 1993

WA31.12.2021

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA

2203O Hi-Tech Toolings (Unit-) No.B-195, 5th Main Road, II Stage,

PIE, Bangalore – 560 058

II StageI

Precision components46 G-78

Switches without

electroplatinSmall Green 1993

WA31.12.2021

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2204O Hi-Tech Toolings (Unit-2), B-125, 3rd Main Road, II Stage, PIE,

Bangalore – 560 058

II StageI

Auto components45 G-78

Switches without

electroplatinSmall Green 2010

WA31.12.2021

N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2205O Indotech Toolings Pvt Ltd., No. 549/A, IV Phase, PIA, Bangalore

– 560 058

IV PhaseI

Pressed components295 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1991WA

31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA

2206O J.S. Industries, No.395, 11th Cross, IV Phase, PIA,

Bangalore – 560 058

IV PhaseI

Manufacture of machine tools 43.81 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2008WA

31.12.2021N N N N N N N NA NA NA 0.35 N ST & SP N N N NA NA

2207O Madhura Industries, No.C-104, III Stage, Peenya Industrial

Estate, Bangalore – 560 058

III StageI

turned and pressed components 11.08 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1991WA

31.12.2021N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

2208O Micro Tech CNC, No.339, 9th Cross, IV Phase, PIA,

Bangalore – 560 058

IV PhaseI

Precision components79.21 G-78

Switches without

electroplatinSmall Green 2008

WA31.12.2021

N N N N N N N NA NA NA 0.23 N ST & SP N N N NA NA

2209O

23289Ram Tech, No.P-19, III Stage, PIE, Bangalore –

560 058

III StageI

Machine components97.35 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2005BA

31.12.2021N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes

2210O S.K. Plastics Works, No.346, 9th Cross, IV Phase, Peenya

Industrial Area, Bangalore – 560 058

IV PhaseI

Polythene pipes for agriculture purpose 18.65 G-32

Polythene and plastic processedproducts

Small Green 2010WA

31.12.2021N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA

2211O

14327

Spoorthy Irrigation Equipments,

No.B-61, 2nd Cross, III Stage, PIE, Bangalore – 560 058

III StageI

Manufacture of irrigation of equipments

24.96 G-7Brass and bell metal utensilsmanufacturi

Small Green 2005WA

31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

2212O Sri Laven Enginnering Pvt ltd., No.B-37, III Stage, PIE,

Bangalore – 560 058

III StageI

Machine tools 58.1 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2006WA

31.12.2021N N N N N N N NA NA NA 0.47 N NA N Y N NA NA

2213O

Sri Tanish Innovations Pvt ltd.,

No.490-B/1, II Stage, Peenya Industrial Estate, Bangalore – 560 058

II StageI

Machinery and steel forgings 46.65 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009WA

31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

2214O

Sri Tanish Technologies Pvt ltd.,

No.490-B/2, II Stage,PIE, Bangalore – 560 058

II StageI

Fabrication and machine components 30.24 G-78

Switches without

electroplatinSmall Green 2007

WA31.12.2021

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

2215O Aadi Tech,

No.453-B, 12th Cross, IV Phase, PIA, Bangalore –-560 058

IV PhaseI

precision machined tools 14.72 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009WA

31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2216CL

-Accutech CNC,

No.450/A, 12th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Machined Components 103 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2008BA

31.12.2012N N N N N N N NA NA NA 2 N NA N Y N NA Yes

2217CL

-Brilliant Electricals,

No.487, D1 & D2, 13th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Manufacture of control panels 166 G-78

Switches without

electroplatinSmall Green 2011

WA31.12.2021

N N N N N N N NA NA NA 0.25 N ST & SP N N N NA NA

2218O Concentra Heavy Engineering,

No.B-230, 5th Main, II Stage, PIE, Bangalore – 560 058

II StageI

miling and drilling60.96 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2007BA

31.12.2021N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

2219O Culture Instruments,

No. D-428, 10th Main, II Stage, PIE, Bangalore – 560 058

II StageI

Fabrication of laboratary equipments 8.13 W-14

Engineering and fabricationunits (dry

Small White 1993WA

31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

2220O

14411Divya Enterprises,

Plot No V-45, 9th Main, Ridge Road, II Stage, PIE, Bangalore – 560 058

II StageI

Turned components5.95 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1990WA

31.12.2021N N N N N N N NA NA NA 0.025 N NA N Y N NA NA

2221O

14338Dynamic Innovation,

No.405, 11th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Fabrication and machine components 36.11 G-78

Switches without

electroplatinSmall Green 2011

WA31.12.2021

N N N N N N N NA NA NA 0.3 N ST & SP N N N NA NA

2222O

14352Flex-Trans Industries,

No.B-183, 4th Main, II Stage, PIE, Bangalore – 560 058

II StageI

Machine tool components 47.88 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2001WA

31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

2223O

Gowrishankar Engineering Industries,

No.269, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

precision turned parts275 G-78

Switches without

electroplatinSmall Green 1985

BA31.12.2021

N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes

2224O Hoshi Tools (P) Ltd.,

No.A-17, 10th Main, III Stage, Peenya Industrial Estate, Bangalore – 560 058

III StageI

Machine Components878 G-7

Brass and bell metal utensilsmanufacturi

Medium Green 1994BA

31.12.2021N N N N N N N NA NA NA 2 N NA N Y N NA Yes

2225O

14484Lakshma Tools,

No. V-45, Opp. 9th Main, Ridge Road, II Stage, Peenya Industrial Estate, Bangalore – 560 058

II StageI

press toll components12.11 G-7

Brass and bell metal utensils

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes14484 Bangalore – 560 058 utensils

manufacturiBA N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes

2226O Malhar Ceat (India) Pvt Ltd.,

No.B-217, II Stage, PIE, Bangalore – 560 058

II StageI

Engineering Unit53.77 G-78

Switches without

electroplatinSmall Green 1981

WA31.12.2021

N N N N N N N NA NA NA 0.3 N NA N Y N NA NA

2227O

38684

Wolf Precision Tools India Pvt Ltd

No.18/A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Carbide tools for aerospace auto components

610 G-78Switches without

electroplatinMedium Green 2018

BA31.12.2027

N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

2228O Rajass Kabel, No.B-55, III Stage, PIE, Bangalore –

560 058

III StageI

PVC cables and wires161 G-79

covered underPlastic

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes

2229O Reva Project Engineers,

No.C-103, III Stage, PIE, Bangalore – 560 058

III StageI

Special Purpose machine 22.47 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2000BA

31.12.2021N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes

2230O Techno Scientific Products, No.B-61, 10th Main, 2nd Cross, III

Stage, PIE, Bangalore – 560 058

III StageI

Laboratory Equipments 9.48 W-43

Laboratory ware includingglass

Small White 1985WA

31.12.2021N N N N N N N NA NA NA 0.35 N NA N Y N NA NA

2231O

Unnathi CNC Technologies Pvt Ltd.,

No.487, D1 & D2, 13th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Auto components279 G-78

Switches without

electroplatinSmall Green 2011

WA31.12.2021

N N N N N N N NA NA NA 0.5 N ST & SP N N N NA NA

2232O Yame Tools, No. V-41, 7th Main, II Stage, PIE,

Bangalore – 560 058

II StageI

Manufacture of tools jigs and fixutures 141 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1999WA

31.12.2021N N N N N N N NA NA NA 1.68 N NA N Y N NA NA

2233O Burji Enterprises, No.471/A, 12th Cross, IV Phase, PIA,

Bangalore – 560 058

IV PhaseI

CNC Machined components 91.18 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1982WA

31.12.2021N N N N N N N NA NA NA 0.27 N ST & SP N N N NA NA

2234CL

Fleurdelis Technologies Pvt Ltd.,

No.440, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Manufacture of Speical purpose machicnes

1180 G-7Brass and bell metal utensilsmanufacturi

Large Green 2008BA

31.12.2012N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

2235O

Maruthi Machine Tools Pvt Ltd.,

No.460/A, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

CNC Machinig175 G-78

Switches without

electroplatinSmall Green 1989

WA31.12.2021

N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

2236O

14504

Shree Shiva Shakhi Shekar Industries,

Plot No.344, 9th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Electrical transformers 23.08 W-13

Electrical and electronic item

Small White 1980BA

31.12.2012N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

2237O Sign Age Products, No.452, 12th Cross, IV Phase, PIA,

Bangalore – 560 058

IV PhaseI

Fabrication of machine tools components

23.22 W-14Engineering and fabricationunits (dry

Small White 1986BA

30.06.2017N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

2238O Tocol Machine Tools Pvt Ltd., NO.472, C-1, 13th Cross, IV Phase,

PIA, Bangalore – 560 058

IV PhaseI

Manufacture of steam turbines spares 263 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1985BA

31.12.2021N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

2239O A R Industries, AP Complex, No.470/D, 12th Cross, IV Phase,

Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Fabriction13.59 W-14

Engineering and fabricationunits (dry

Small White 2009WA

31.12.2021N N N N N N N NA NA NA 0.08 N ST & SP N N N NA NA

2240O ACETECH Unit II, No.B-218, 5th Main, II Stage, PIE,

Bangalore – 560 058

II StageI

Machined turned Components 81.3 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009BA

31.12.2021N N N N N N N NA NA NA 1.1 N NA N Y N NA Yes

2241O

14520ACME Technologies, No.C-80, II Main, II Stage, PIE,

Bangalore – 560 058

II StageI

Machine tools12.73 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2010WA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2242O Adpac Industries, No.B-244, 6th Main, II Stage, Peenya

Industrial Estate, Bangalore – 560 058

II StageI

Manufacture of corrugated boxes 98.73 G-9

Cardboard or corrugated box and

Small Green 2000BA

31.12.2021N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes

2243O

14429Balaji Polymer Industries,

, No.C-340, 8th Main, II Stage, Peenya Industrial Estate, Bangalore – 560 058

II StageI

Assembly plastic components for making toys etc

38.22 G-32Polythene and plastic processedproducts

Small Green 1999WA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2244

2013-14 O19230

Cerebra Integrated Technolgies Ltd.,

No.S5, 3rd Cross, I Stage, PIE, Bangalore – 560 058

I StageI

Assembling of computer peripherals PCB

420 G-78Switches without

electroplatinSmall Green 1999

BA31.12.2021

Y 30.06.2015 N N N N N NA NA NA 0.8 N NA N Y N NA Yes

2245O CNC Automative Unit-V, No.B-198, 5th main, II Stage, PIE,

Bangalore – 560 058

II StageI

Precision auto turned components 209 G-78

Switches without

electroplatinSmall Green 2009

BA31.12.2021

N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes

2246O CNC Automative Unit-VI, No.A-268, 6th main, II Stage, PIE,

Bangalore – 560 058

II StageI

Precision auto components 4.55 G-78

Switches without

electroplatinSmall Green 2010

BA31.12.2021

N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes

2247O G L N Industries,

No.453-B, 12th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Precision machined cmponents, 19.82 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2006WA

31.12.2021N N N N N N N NA NA NA 0.04 N ST & SP N N N NA NA

2248O

23251Karthik Industries, No.B-105, III Stage, PIE, Bangalore –

560 058

III StageI

Precision tools and components 36.52 G-78

Switches without

electroplatinSmall Green 1994

WA31.12.2021

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA

2249O

K N S Engineering Works Pvt Ltd., Plot

Plot No.383, 10th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Fabrication4.58 W-14

Engineering and fabricationunits (dry

Small White 1987BA

31.12.2021N N N N N N N NA NA NA 0.55 N ST & SP N N N NA Yes

2250M & M Manufacturing

No.C-136, 2nd C Main, II Stage, PIE, II Stage Precision machined Brass and 2250O

14521

M & M Manufacturing Solutions,

No.C-136, 2nd C Main, II Stage, PIE, Bangalore – 560 058

II StageI

Precision machined components 58.8 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2009WA

31.12.2021N N N N N N N NA NA NA 0.52 N NA N Y N NA NA

2251O Mechsys, No.A-52/1, I Cross, II Stage, PIE,

Bangalore – 560 058

II StageI

CNC machined components 21.39 W-14

Engineering and fabricationunits (dry

Small White 2007BA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

2252O

14472Meghana Precitech, No.B-49, 10th Main, 2nd Cross, III

Stage, PIE, Bangalore – 560 058

III StageI

Manufacture of CNC turned components 129 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2004WA

31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2253O Mehra Packaging, Plot No.411, 11th Cross, IV Phase,

Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Manufacturing of corrugated box 51.15 G-9

Cardboard or corrugated box and

Small Green 2009BA

31.12.2021N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

2254O Pattansheti Industries,

Plot No.291, IV Phase, Peenya Industrial Area, Bangalore – 560 058

IV PhaseI

Transformer assembly, motar rewinding

30.52 G-85Transformer assembly unit(industrial

Small Green 1990BA

31.12.2021N N N N N N N NA NA NA 0.54 N ST & SP N N N NA Yes

2255O Precise Small Motors Pvt Ltd., No B-243, 6th Main, II Stage, PIE,

Bangalore – 560 058

II StageI

FHP Motars86.13 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1995BA

31.12.2021N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes

2256O

14487Pushpagiri Punch Forms,

No.C-87, 10th Main, III Cross, III Stage, PIE, Bangalore – 560 058

III StageI

Fabrication of steel metal components 59 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.05 N NA N Y N NA NA

2257CL

-R A Enterprises,

Plot No.291, IV Main, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Fabrication of electrical fixtures 10.7 W-14

Engineering and fabricationunits (dry

Small White 1994WA

NN N N N N N N NA NA NA NA N NA N N N NA NA

2258O

14434Ravijay Engineers,

No.453-B, 12th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Manufacture of spindles, spacens, housing

17.79 O-62Spray painting, paint baking, paint

Small Orange 1997WA

31.12.2021N N N N N N N NA NA NA 0.05 N ST & SP N N N NA NA

2259O Seal Well (P) Ltd.,

No.335, 9th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Manufacturing of hydraulic seal 96.11 O-62

Spray painting, paint baking, paint

Small Orange 2001BA

31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes

2260O

14347Shiva Sai Packaging,

No.B-298, 7th Main, II Stage, PIE, Bangalore – 560 058

II StageI

Manufacture of corrugated boxes 28.3 G-9

Cardboard or corrugated box and

Small Green 2000-2001WA

31.12.2021N N N N N N N NA NA NA 0.045 N NA N Y N NA NA

2261O

14425S L N Precision Works,

No.C-134, 2nd B Main, II Stage, PIE, Bangalore – 560 058

II StageI

Precision machine components 103 O-62

Spray painting, paint baking, paint

Small Orange 2007BA

31.12.2021N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes

2262O Trinity NDT Engineers,

Plot No.V-22(A), Beside KSSIDC Complex, II Stage, PIE, Bangalore – 560 058

II StageI

Fabrication of finished goods testing lab

45.9 G-78Switches without

electroplatinSmall Green 2012

BA31.12.2021

N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes

2263O Ven Pack,

No.556, Block-C, III Main, 2nd Stage, PIE, Bangalore – 560 058

II StageI

Wooven bags and lines 42.6 G-32

Polythene and plastic processedproducts

Small Green 2007BA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2264O

14441Accurate CNC Toolroom,

Plot No.388, 10th Cross, III Main, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Precision tools and components 62.34 G-78

Switches without

electroplatinSmall Green 1996

BA31.12.2021

N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

2265O Adarsh CNC, No.40B/4B, IV Phase, Peenya

Industrial Area, Bangalore – 560 058

IV PhaseI

CNC Machining36.26 G-78

Switches without

electroplatinSmall Green 2006

WA31.12.2021

N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA

2266O Dhanalakshmi Enterprises, Plot No.480-A1, IV Phase, PIA,

Bangalore – 560 058

IV PhaseI

Corrugated box185 G-9

Cardboard or corrugated box and

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

2267O Gajalakshmi Industries,Plot

Plot No.556, 3rd Main Road, II Stage, PIE, Bangalore – 560 058

II StageI

Manufacture of sericulture machinery 9.46 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2006WA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2268O

14533 Varun Industries,

No.411, 11th Cross, IV Phase, PIA, Bangalore – 560 058

IV PhaseI

Machine tool components 87.12 O-62

Spray painting, paint baking, paint

Small Orange 2009BA

31.12.2021N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

2269O

23291 Ram Engineering.,

No.P-20, III Stage, PIE, Bangalore- 560 0058.

III StageI

Machined Components 67.93 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2002BA

31.12.2034N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

2270O

Qualitech Precision Industries.,

No.473, 13th Cross, IV Phase, PIA Bangalore- 560 058.

IV PhaseI

CNC Machining235 G-78

Switches without

electroplatinSmall Green 2011

WA31.12.2021

N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA

2271O Vidmas.,

No.A-52/2, 1st Cross, 2nd Stage, PIE, Bangalore- 560 058.

II StageI

Machined Components 21.39 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1992WA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

2272O

37633

Super PVD Technbologies, (P) Ltd.,

No.B-211, 5th Main, II Stage, Bangalore-560058

II StageI

PVD Coating on watch components 155 O-42

Coated electrode manufacturing

Small Orange 2012BA

30.09.2022N NA N N N N N NA NA NA 0.36 0.05 NA N Y Y NA Yes

2273O S.N.Enterprises,

No.V-9, 2nd Main road, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacturing of shoe uppers 54.5 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes

2274CL

22825Chamundi Engineering Works,

No.432 4th Main,,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of precision turned components

109 G-10Carpentry & wooden furniture

Small Green 1990BA

31.12.2012N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes22825 components furniture

manufacturiBA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

2275O

39092Niqueu Heat Treaters,

No.B-140/A, 3rd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Heat treatment15.04 O-63

Engineering Industries with HeatTreatment,

Small Orange 2009BA

30.09.2029N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2276

2011-12 CL12035

Bangalore Shirt company, No.254/A, Sy No 87 &150, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garment stitching1310 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2012BA

31.12.2022CL N N N N N NA NA NA 38 N STP - BWSSB Y N N NA Yes

2277O

15286Avco Tech India) (P) Ltd.,

No.110/3, 7th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Assembly of Pneumatic Valves, Cylnders,punch

25.07 W-13Electrical and electronic item

Small White 2011BA

31.12.2021N N N N N N N NA NA NA 0.26 N ST & SP N N N NA Yes

2278O Puronics Systems,

No 162/1, 10th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture filters and air dryer 51.7 W-14

Engineering and fabricationunits (dry

Small White 1993WA

31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA

2279CL

-High Tech Fittings,

No.C-431,I Stage, PIE, Bengaluru-560 058

I StageI

Sheet metal fabrication work 42.4 W-14

and fabricationunits (dry

Small White 2012WA

31.12.2015N N N N N N N NA NA NA 0.14 N NA N Y N NA NA

2280CL

16524Yashas Industries,

No.139 & 140, 100 ft Ring road, III Phase, PIA, Bangalore-560058

III PhaseI

Fettling and shot blasting 6.26 G-92

Shot blasting operation Small Green 2011

BA31.12.2020

N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

2281O

Chaitanya Precitech Pvt Ltd., Unit-II,

Unit-II, No.316, 8th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Automobile precision components 436 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2007BA

31.12.2021N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

2282O

17583

Chaitanya Hi-Tech Engineering Company Pvt Ltd.,

No.A-328,II Stage, PIE, Bengaluru-560 058

II StageI

Automobile precision components 433 G-78

Switches without

electroplatinSmall Green 2008

BA31.12.2021

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

2283CL

-Krishna Fabricators,

No.448, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Heavy sheet metal Fabrications 291 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2010BA

31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes

2284O

40549

Hexa Technologies (India) (P) Ltd.,

No.B-229, 5th Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Plastic Moulding, Precision,plasatic tubes

82.51 G-32Polythene and plastic processedproducts

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

2285YTC Shree Deepam Enterprises,

No.A-48/A, 2nd Main, II Stage, PIE, Bengaluru-560 058

II StageI

Phosphating and powder coating activity

75 R-44Industry or process involvingmetal

Small Red 2012BA

NAN N N N N N N NA NA NA 0.4 0.3 NA N Y Y NA NA

2286O

24134Festo Power Industries,

No.C-178,II Stage, PIE, Bengaluru-560 058

II StageI

Batteries32 R-7

batterymanufacturing(excluding

Small Red 2012BA

30.6.2022Y 30.6.2022 N N N N Y NA NA NA 0.12 0.05 ST & SP N N Y NA Yes

2287O KALPA ENGINEERING.,

No.326, 9th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Engineering machine components 65 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2012BA

31.12.2021N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

2288O

53062M.M Metal Industries

No.B-122A, 3rd Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacturing of Copper granules from PCB scraps

76 R-34engaged in recycling

/ Small Red 1.10.2018

BA30.6.2023

Y 30.6.2023 N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2289O

12171Makam Agrochem (P) Ltd.,

No.A-280,II stage, PIE, Bengaluru-560 058

II StageI

Phaceutical formulation product 95 O-74

Pharmaceutical

formulationSmall Orange 1978

BA30.09.2033

N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes

2290O Texel Engineers

No.A-418(a1), II Stage, PIE, Bengaluru-560058

II StageI

Hydraulic piston rods of earth moving equipments

169 G-79Plastic sack bags, woven

sackSmall Green 2003

BA31.12.2027

N N N N N N N NA NA NA 1 N NA N Y N NA Yes

2291CL

-Mitte Construction Chemicals,

No.201/4,III Phase, PIA, Bengaluru-560 058

III PhaseI

Ready mix concrete35.34 G-37

Ready mix cement concrete

Small Green 2011BA

31.12.2002N N N N N N N NA NA NA 0 N NA N N N NA NA

2292YTC Ra Bio-Energy.

No246, III Phase, 8th Main, 3rd cross., PIA, Bangalore-560058

III PhaseI

Recycling of rubber oil, carbon black 95 R-6

carbon includingelectrodes

Small Red 2012BA

NAY N N N N N N NA NA NA 0 N NA Y N N NA NA

2293O

15346Accu Precisions.

No.223, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Machine turned components 97.48 W-14

Engineering and fabricationunits (dry

Small White 2011BA

31.12.2021N N N N N N N NA NA NA 0.144 N ST & SP N N N NA Yes

2294O R.A.Enterprises,

No.291,IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Fabrication of Electrical fitness 10 W-14

Engineering and fabricationunits (dry

Small White 2012WA

31.12.2021N N N N N - - NA NA NA 0.18 N ST & SP N N N NA NA

2295O

15677Vin Precise Punch,

No.B-168, 4th Main , II Stage, Bengaluru-560 058

II StageI

Manufacture of sheet metal components 86.42 O-62

Spray painting, paint baking, paint

Small Orange 2010BA

31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes

2296O Chesters,

No.182,III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of wooden furniture 235.67 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2004BA

31.12.2021N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes

2297O

15132DF Forgings Ltd (Unit-II)

No.498, IV Phase, PIA, Bangalore-560058

IV PhaseI

Steel Forging 432 O-32

Forging of ferrous and non- ferrousmetals (

Small Orange 2012BA

30.09.2022N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

2298O Serwel Electronics Ltd,

No.27, III Stage, PIE, Bengaluru-560 058

III StageI

Manufacture of Transformers & servo stabilizers

144 O-62Spray painting, paint baking, paint

Small Orange 2011BA

31.12.2021N N N N N N N NA NA NA 0.45 N NA Y Y N NA Yes

2299 No.337, 10th Cross, IV Phase, PIA, IV Phase Sheet Metal Carpentry & 2299O Synergy Punching Pvt Ltd.,

No.337, 10th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Sheet Metal Component 316 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2001BA

31.12.2023N N N N N N N NA NA NA 2.7 N NA N Y N NA Yes

2300O

11626VRL Media Ltd.,

No 193/A,No.257,III Phase, PIA, Bengaluru-560 058

III PhaseI

Newspaper printing2990 O-59

Printing press &/or Screen Printing

Large Orange 2012BA

31.12.2021Y 31.12.2016 N N N N N NA NA NA 1.44 N ST & SP N N N NA Yes

2301O

L Square Eco-Products (P) Ltd.,

No.149/A, & 150/A, 5th Main, II Stage, PIE, Bangalopre-58

II StageI

Manufacturing of Honeycomb,& Honecore furniture

250 W-51 Honey Processing

Small White 2011BA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2302O

Flowline Instrumentation (P) Ltd.,

No.B-235 , 6th cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication & assembly of sampling & analyser system

70.09 W-14Engineering and fabricationunits (dry

Small White 2010BA

31.12.2021N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

2303O

17708E Pragathi (A-Devision)

. M-405, 1st & 2nd Floor, 7th & 8th cross, I Stage, PIE, Bengaluru-560 058

I StageI

E-Waste Recycling8.6 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2012BA

30.06.2022Y 30.6.2022 N N N N N NA Yes

30.06.20220.4 N ST & SP N N N NA Yes

2304O Bairavi Industries

No.V-45, 8th Mian, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacture of Engineered components

53.4 W-14Engineering and fabricationunits (dry

Small White 2010BA

31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

2305O

15099Analytica Chemie INC,

No.307 & 308,,IV Phase, PIA, Bangalore-560058

IV PhaseI

Marketing & Distribution of reagents, columns.R & D lab,

98.84 R-58Pharmaceutical (Bulk drug &Active

Small Red 2012BA

30.06.2022N N N N N N N NA NA NA 0.5 0.2 NA N Y Y NA Yes

2306CL

-Enzene Biosciences Ltd.,

No.101,III Phasee, PIA, Bengaluru-560 058

III PhaseI

Reasearch and development of biopharmaceuticals

417.95 R-58Pharmaceutical (Bulk drug &Active

Small Red 2012BA

30.06.2017Y N Y N N N N NA NA NA 0.8 0.1 ST & SP N N Y NA Yes

2307O Sawant Dyes & chemicals,

No.3B-46, Block -3, M S Industrial Complex, IV Phasae, PIA, Bengaluru-560 058

IV PhaseI

Heat Transfer Lables41 G -91

Manufacture of Adhesives andadhesive

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2308O

18129Global Fab,

No.10/A,II Phase, PIA, Bangalore-560058

II PhaseI

Fabrication32.02 W-14

Engineering and

FabricationSmall White 2011

BA31.12.2021

N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes

2309CL

11574Colour Plus Enterprises,

No.450/A, 12th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Powder Coating28.17 R-44

Industry or process involving metal

Small Red 2012BA

30.06.2016N N N N N N N NA NA NA 3.2 0.05 ST & SP N N Y NA Yes

2310O Hydro Products,

No.A-270. 6th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacture of Hydraulic cylinders 72.14 G-60

leak proof testing of L.P.G.cylinders

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

2311O Tekcel Engineering (P) Ltd.,

No.B-212, 5th Main Road, II Stage. PIE, Bengaluru-560 058

II StageI

Manufacture of Special purpose 203 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1995BA

31.12.2021N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

2312CL

-

Alkem laboratories Ltd R & D Unit,

R & D Unit, # 473-D2, 13th cross, IV phase, PIA, Bangalore - 58

IV PhaseI

R & D only No mfg activity 632 R-58

Pharmaceutical (Bulk drug &Active

Medium Red 2007BA

30.06.2012N N N N N N N NA NA NA 0.8 0.5 ST & SP N N Y NA Yes

2313O

11649KDDL ltd, (Unit: Hands-II),

No, 408, IV Phase,PIA Bangalore- 58 IV PhaseI

Nickle & gold Eletroplating on wrist watch hands

783 R-44Industry or process involvingmetal

Medium Red Jun-12BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 4.8 5.1 STP & ETP Y N N NA Yes

2314O

12528

Shree Hari Precision Products Private ltd,

No 124,7th Main III Phase PIA, Bangalore-560058

III PhaseI

Mechanical Assembly, Spray Painting, Power Coating

159.82 R-44Industry or process involvingmetal

Small Red 2003BA

30.06.2023Y 30.06.2023 N N N N N NA NA NA 8 0.08 STP Y N Y NA Yes

23152017 O

39981

Paragon Polymer Products Pvt Ltd.,

No.397/398, III Main, IV Phase PIA Bangalore -58

IV PhaseI

Ethylene vinyl acetate chappell pellets with banbury mixing & calendaring process

1435 O-99DG set capacity more than 1MVA to

Large Orange 1985BA

30.09.2023Y 30.9.2023 N N N N N NA NA NA 6.5 4 STP & ETP N N N NA Yes

2316O

LSQUARE ECO- PRODUCTS pvt Ltd,.

No B-194, 5 th Main, II stage, PIE , Bengaluru-560 058

II StageI

Manufacturing Honeycore 118 W-51

Honey Processing Small White 2007

BA31.12.2021

N N N N N N N NA NA NA 0.2 N NA N Y N Yes

2317O

15661 Sun Modular Systems,

No 72, 4th Main III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacturing of Modular Furniture 21.93 O-51

Modular wooden furniture from

Small Orange 2011BA

31.12.2021N N N N N N N NA NA NA 0.38 N ST & SP N N N Yes

2318O

16472

Dynatech Tools and Devices, Unit-II,

Unit-ll, No 55, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Machine tools and accessories 329.25 G-110

Diesel Generator sets (250 KVA

Small Green 2006BA

31.12.2020N N N N N N N NA NA NA 1.4 N ST & SP N N N Yes

2319O

12136

Paragon Polymer Products Pvt Ltd (Formerly Elastrex

Polymers Pvt Ltd.,

No 97/98. III phase, PIA, Bengaluru-560 058

III PhaseI

PU Foot wear665 G-26

Leather foot wear and leatherproducts

Medium Green 2011BA

31.12.2024N N N N N N N NA NA NA 6 N ST & SP N N N Yes

2320O Manjunath Industries,

No 242, 11th main, 2nd cross, III Phase, PIA, Bengaluru-560 058

III PhaseI

Fabriction work & Machine turned components

314.67 G-78Panel Board, Switches withoutelectroplatin

Small Green 2010BA

31.12.2034N N N N N N N NA NA NA 0.8 N NA N Y N Yes

2321O

15390

Shraddha Saburi Printers Pvt Ltd,.

No 224, 8th Main, 2nd cross, KIADB III Phase;PIA, Bengaluru-560 058

III PhaseI

Block Manufacturing, offset printing on cartoons, & LABEL

100 O-58Printing press &/or Screen Printing

Small Orange 2012BA

30.09.2029Y 30.09.2025 N N N N N NA NA NA 2.2 N NA N Y N Yes

2322O

Lazzari Machines India Pvt Ltd,.

Special Plot, Next to B-82, 2nd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Assembly of wood working machines 144.16 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2007WA

31.12.2022N N N N N N N NA NA NA 0.35 N NA N Y N NA

2323CL Oom Sakthi Enterprises,

No.B-236, 5th Main, I stage, PIE, Bengaluru-560 058

I StageI

Engaged in lathe working, miling & machining work

38.5 G-7Brass and bell metal utensils

Small Green 2009BA

31.12.2015N N N N N N N NA NA NA 0.4 N NA N Y N Yesmachining work utensils

manufacturiBA N N N N N N N NA NA NA 0.4 N NA N Y N Yes

2324CL

25479

Dynatech Tools & Devices (Unit-I)

No. 355, IV phase, PIA, Bengaluru-560 058

IV PhaseI

Machine tool components 154 G-10

Carpentry & wooden furnituremanufacturi

Small Green 1991BA

31.12.2017N N N N N N N NA NA NA 1.8 N ST & SP N N N Yes

2325O Trident Infosol Pvt Ltd

1st Floor, Block A, Kushal Garden Arcade, 1A, II Phase , PIA ,Bengaluru-560 058

II PhaseI

Fabrication & assembly of electronic product

824.84 G-78Switches without

electroplatinMedium Green 2010

BA31.12.2021

N N N N N N N NA NA NA 1.2 N STP Y N N Yes

2326O

16267

Integral Systems & Components Pvt Ltd,.

No D-388/1,I cross, I stage, PIE, Bengaluru-560 058

I StageI

Production of electronic switches & components

249.95 G-78Panel Board, Switches withoutelectroplatin

Small Green 2012BA

31.12.2022N N N N N N N NA NA NA 0.16 N NA N Y N Yes

2327O Synpack Zipper Bags Pvt Ltd,.

No. SB 161, 3rd cross, I stage, PIE, Bengaluru-560 058

I StageI

Manufacture of plastic sack bags 294 G-32

Polythene and plastic processedproducts

Small Green 2002BA

31.12.2022N N N N Y N N NA NA NA 0.15 N NA N Y N Yes

2328O Hittco Tools Ltd (Unit-II).,

(Unit-II) No.B-162, 3rd cross, I stage, PIE, Bengaluru-560 058,

I StageI

Manufacture of solid carbide Tools 734 G-77

Manufacture of Motor & Pumpswithout

Medium Green 2012BA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N Yes

2329O

Wireless TT info services limited.

No B - 130/A, 3rd cross,I stage, PIA, Bengaluru-560 058

I StageTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2009AA

31.12.2100N N N N N N N NA NA NA 0 N NA N N N Yes

2330CL

-Bharath Machines,

No 9-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Fabrication of conveyor system work

99.85 G-78Switches without

electroplatinSmall Green 2002

BA31.12.2002

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA

23312012-13 O

53335Accu Plast

No.C-98, 3rd Cross, III Stage, PIE, Bengaluru-560 058

III StageI

Melting of virgin of PP & HDPE pipes 67.41 G-32

Polythene and plastic processed products

Small Green 2018WA

31.12.2028N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

23322012-13 CL

-Power Gear,

No.275, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of electrical bus duct assembly

910 G-78Switches without

electroplatinMedium Green 2010

BA31.12.2012

N N N N N N N NA NA NA 0 N NA N N N NA

23332012-13 CL

-Delkor Technic India Pvt Ltd.,

No.421 11th cross, Iv Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of Filters, Agitators,Thickeners,Linear screens,

488 G-46Steel furniture without spray

Small Green 2012WA

31.12.2021CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

23342009-10 CL Jaya Engineering Works,

No.234, 12th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Machine Fabrication26 G-78

Engineering and fabricationunits (dry

Small Green 2008BA

31.12.2013N N N N N N N NA NA NA 0.64 N NA N Y N Yes

2335O

41593

Ausa Medical Devices Pvt. Ltd (Formerly Cannula Plus Pvt

Ltd)

No.375A, 10th Cross, IV Phase, PIA, Bengaluru-560058.

IV PhaseI

SSTubes, Needles for surgical/medical application

900 G-78Panel Board,

Switches without

electroplatin

Medium Green 2018BA

31.12.2027N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

23362012-13 O Rigid industries

No.C-449, I stage, PIE , Bengaluru-560 058

I StageI

Manufacture of footwear parts 16.33 G-26

Leather foot wear and leatherproducts

Small Green 2012WA

31.12.2100N N N N N N N NA NA NA 0.4 N NA N Y N NA

23372012-13 O

11401Pepperl+ Fuchs(P) Ltd.,

No.546/1, 7th Main, IV phase, PIA, Banglore-58

IV PhaseI

Manufacture of prosimity switches 1051 G-78

Panel Board, Switches withoutelectroplatin

Large Green 2012BA

31.12.2021N N N N N N N NA NA NA 3.6 N ST & SP N N N N Yes

23382012-13 O

15683Kiran Enterprises

No.V-61, Near Andrahalli Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Grinding of Hydraulic piston rod 34 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2012BA

31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N Yes

23392012-13 O

10814Nash Industries (I) Pvt Ltd,

No.247, 8th Main, 3rd cross, III Phase, PIA, Bengaluru-560 058

III PhaseI

Sheet metal press components 488 G-110

Diesel Generator sets (250 KVA

Small Green 2012BA

31.12.2021Y 31.12.2025 N N N N N NA NA NA 5.2 N NA N Y N Yes

23402012-13 CL

21502STI Sanoh India Ltd.,

No.471/D1, 13th cross, IV phase, PIA, Bangalore-56

IV PhaseI

Break pipes, Fuel pipes 581 G-79

Plastic sack bags, woven sackwith HDPE,

Medium Green 2012BA

31.12.2021Y 31.12.2016 N N N N N NA NA NA 4.8 N ST & SP N N N Yes

23412012-13 CL

20572Encore Asia,

No.271, IV phase, PIA, Bengaluru-560 058

IV PhaseI

Washing of readymade garments 43.9 O-50

Mechanized laundry using oil fired

Small Orange 2011BA

30.09.2017N N N N N N N NA NA NA 0.2 1.3 ST & SP N N Y Yes

23422012-13 CL

15439Delkor Technic India Pvt Ltd.,

No.31, 6th Main Road, II Phase, PIA, Bengaluru-560 058,

II PhaseI

Engineering unit601.83 G-7

Brass and bell metal utensilsmanufacturi

Medium Green 2011BA

31.12.2021CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

23432012-13 O

24171Maruthi Steel Wires.,

No.29-B, II Phase, PIA, Bengaluru-560 058

II PhaseI

Bright Steel Bars & coils 108 G-96

Manufacturing of insulated conductors

Small Green 2005BA

31.12.2034N NA N N N N N NA NA NA 0.11 N NA N Y N Yes

23442012-13 O

15678Standard Polypack,

B-255, II Stage, PIA, Bengaluru-560 058

II StageI

P E Master batch polypack Granules 11.36 G-32

Polythene and plastic processedproducts

Small Green 2006BA

31.12.2099N N N N N N N NA NA NA 0.16 N NA N Y N Yes

23452012-13 O Priyanka Twines & Ropes

No B-255, II stage, PIE, Bengaluru-560 058

II StageI

Manufacture of P E Master batch polypack Granules

378 G-78Engineering and fabricationunits (dry

Small Green 2012WA

31.12.2034N N N N N N N NA NA NA 0.2 N NA N Y N NA

23462012-13 CL Swathi Agro Biotech,

No B-38, III Stage, PIE, Bengaluru-560 058

III StageI

Manufacture of Biomass pellets or Briquette

87 G-78Panel Board, Switches withoutelectroplatin

Small Green 2000BA

NAN N N N N N N NA NA NA 0 N NA N N N NA NA

23472012-13 CL

11421

KOTAK URJA Pvt Ltd+D1580.,

No 56, III Phase, PIA, Bangalore-560058

III PhaseI

Manufacture of solar water heating and lighting system

127 O-62Spray painting, paint baking, paint

Small Orange 1997BA

30.09.2017Y 30.09.2017 N N N N N NA NA NA 0.8 0.01 ST & SP N N Y NA Yes

2348 No, V-88, II Stage bus Stop, II stage, II StageHospital

Hotel Generator 23482012-13 O Sri Rama Deluxe,

No, V-88, II Stage bus Stop, II stage, PIE, Bangalore

II StageHospital

ity

Hotel38.09 W-52

Generator sets (15

KVA to 250 Small White 2007

WA31.12.2016

N N N N N N N NA NA NA 4.4 N NA N Y N NA

23492012-13 O

17553

Marvel Technology & Tools Pvt Ltd.,

No B-177 , II Stage, PIE,Bengaluru-560 058

II StageI

Engineering Activity152 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2012WA

31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA

23502012-13 O

15692

Accurate Engineering Industries,

B-159,4th Main, II Stage, PIA, Bengaluru-560 058

II StageI

Fabrication of Alluminium Frames 54.56 G-1

Aluminum utensils fromaluminum circles by

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA

23512012-13 O

34956Stanzen Engineering,

No.260, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Manufacture of automobile parts 755 G-110

Diesel Generator sets (250 KVA

Medium Green 2011BA

31.12.2021Y 31.12.2025 N N N N N NA NA NA 1.6 N ST & SP N N N Yes

23522012-13 O

12424

Micromatic Machine Tools Pvt Ltd.,

No. 240/241, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engineering Activity1857 G-81

Research laboratories notinvolving

Large Green 2011BA

31.12.2035N N N N N N N NA NA NA 5 N NA N Y N Yes

23532012-13 O

15109

Alchemy Surface Technologies,

No.344, 9th cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electroplating64.73 R-44

Industry or process involvingmetal

Small Red 2009BA

30.06.2024N N N N N N N NA NA NA 0.4 0.1 NA N Y Y Yes

23542012-13 O R & M Corrosion Preventers ,

No.213, 1st Cross, III Phase, PIA, bangalore-560058

III PhaseI

Grit Blasting machine34.27 G-92

Shot blasting operation Small Green 2009

BA31.12.2026

N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes

23552012-13 O

15662Cam - Pro Technologies

No.123/1, 7th main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of CNC turned components 310 G-46

Steel furniture without spray

Small Green 2010BA

31.12.2034N N N N N N N NA NA NA 1.2 N NA N Y N N Yes

23562012-13 O

22829SNS Industries,

Plot No.P 26 © & strom water drain, 10th main, 3rd Cross, III Stage, PIE, Bengaluru-560 058

III StageI

Manufacture of relays,coils, transformers

200 O-69Transformer repairing/manufacturing

Small Orange 2010BA

31.12.2021Y 31.12.2017 N N N N N NA NA NA 3.2 N ST & SP N N N Yes

23572012-13 CL

34112E-Parisara Pvt Ltd., Unit-2,

Unit-2, No P-10(A), III Stage, PIE, Bengaluru-560 058

III StageI

E-Waste Recycling75 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2012BA

30.06.2017N NA N N N N N NA Yes 0.8 N NA N Y N Yes

23582012-13 CL Tex Labels, Division- II,

No.326 (Part), 9th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Narrow woven polyester labels 161 G-91

Manufacture of Adhesives andadhesive

Small Green 2011BA

31.12.2020N N N N N N N NA NA NA 0.4 N ST & SP N N N Yes

23592012-13 O

17514Sri Balaji Industries,

No.D-361, 8th Main, II Stage, PIE, Bengaluru-560 058

II StageI

CNC machining98.48 W-14

Engineering and fabricationunits (dry

Small White 2012BA

31.12.2021N N N N N N N NA NA NA 0.64 N NA N Y N Yes

23602012-13 O

Entente Retail Fixtures Pvt Ltd.,

No SB-56, 2nd cross, I Stage, PIE, Bengaluru-560 058

I StageI

Manufacturing of retail fixtures and furnitures

125 G-10Carpentry & wooden furnituremanufacturi

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 1.05 N NA N Y N Yes

23612012-13 O

14453Aditya Industries,

No B-376, I Stage, PIE, Bengaluru-560 058

I StageI

Embroidary works on ready made garments 107 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2007WA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA

23622012-13 O Polylam Industries,

No.A-11, III Stage, PIE, Bengaluru-560 058

III StageI

HDPE Lamination Processing 51.67 G-32

Polythene and plastic processedproducts

Small Green 2005WA

31.12.2033N N N N N N N NA NA NA 0.36 N NA N Y N NA

23632012-13 O

402684R Recycling Pvt Ltd.,

Shed No, A-5, III Stage, PIE, Bengaluru-560 058

III StageI

Dismantling and recycling of E-waste 460 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2012BA

30.06.2023Y 30.6.2023 N N N N N NA Yes 30.6.2023 1 N NA N Y N Yes

23642012-13 CL

19255

Cerebra Integrated Technolgies Ltd.,

No 422/2, 11th Cross, 3rd Main, IV Phase, PIA, Bangalore -58

IV PhaseI

Dismantling and recycling of E-waste 273 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2011BA

30.06.2017N N N N N N N NA Yes NA 0.2 N ST & SP N N N NA Yes

23652012-13 O

11092

Sphoorthi Machine Tools Pvt Ltd,

Plot No. 467-469, Site No. 18, 12th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

CNC machining with turn,dril,mill,black 1083 O-63

Engineering Industries with Heat Treatment,

Medium Orange 1996-97BA

30.09.2021Y 30.06.2023 N N N N N NA NA NA 2.78 0.6 NA N Y Y NA Yes

2366O

14285Makam Pharmachem,

No. A-281, 6th Main, II stage, PIE, Bengaluru-560 058

II StageI

Formulation of pesticides 80.29 O-26

Formulation of Pesticide,insecticide, & fungicide

Small Orange 2011BA

30.09.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

2367O

10520

Dynamatic Technologies Limited,

No. 11, Dynametic park, II Phase, PIA, Bengaluru-560 058

II PhaseI

R & D activites and manufacture of Hydraulic equipments

16708 R-44Industry or process involvingmetal

Large Red 1974BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 30 1.25 STP & ETP Y N N NA Yes

23682012-13 O

34257Hi-tech Blasters & Metallizers,

No.480-D, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Grit Blasting activity44 G-92

Shot blasting operation Small Green 2012

BA31.12.2031

N N N N N N N NA NA NA 0.6 N ST & SP N N N Yes

23692012-13 CL

Sante Mernaud Pharmaceuticals Pvt Ltd,

NO 466, 12th Cross, IV pahse Peenya Industrial Area, Bangalore -560058

IV PhaseI

Formulation of Pharmaceuticals 500 O-74

Pharmaceutical

formulationSmall Orange 2010

BANA

N N N N N N N NA NA NA 1 0.02 ST & SP N N Y NA NA

23702012-13 YTC

40623Alliage Metal Casting Pvt Ltd

No.480-D, IV Phase, PIA, Bengaluru-560058

IV PhaseI

Steel Forging Activity 391 O-32

Steel and steel products using

Small Orange 2018BA

17.5.2023N N N N N N N NA NA NA 2.5 N ST & SP N N N NA NA

2371O

31017

Alpha Design Technologies Pvt Ltd

No. 193A, 4th Cross, I Stage, PIE, Bengaluru-560058

I StageI

Assembly of ULAB electronic components

295 G-78Switches without

electroplatinSmall Green 15.1.2017

BA31.12.2028

N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes

2372O

11646

Bhandari Precision Forgings Pvt Ltd.,

No.A-271, II stage, PIA, Bengaluru-560 058

II StageI

Hazardous waste (Used oil) 843 O-81

Industries engaged in recycling /

Medium Orange 2000BA

30.09.2021Y 30.09.2022 N N N N N NA NA NA 1.5 N NA N Y N NA Yes11646 recycling /

reprocessingBA Y 30.09.2022 N N N N N NA NA NA 1.5 N NA N Y N NA Yes

2373O

42735Biomylz Limited

No. 21-D, II Phase, PIA, Bengaluru-560 058

II PhaseI

Capsules, cream/Get liquids powder & tablets

600 O-74Pharmaceuti

cal formulation

Medium Orange 2018BA

30.09.2029N N N N N N N NA NA NA 3.8 N STP N N N NA Yes

2374O

37686Universal Industries

No.V-32/A, 10th Main Road, II Stage, PIE, Bengaluru-560058

II StageI

SS brist watch buckels 412 G-93

Manufacturing of nuts and boltswith cold

Small Green 2018BA

31.12.2027N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes

2375CL

11707DST Chemicals India Pvt Ltd.,

B-172,4th Main,II stage, PIE, Bengaluru-560 058

II StageI

Repacking of chemicals 100 R-22

Organic Chemicalsmanufacturing

Small Red 2011BA

30.06.2016N N N N N N N NA NA NA 0.4 0.15 NA N Y Y N Yes

2376O

33614Hi-Tech Pest control,

P-5, Ist Floor, III Stage, PIE, Bengaluru-560 058

III StageI

Phaceutical formulation product 24.4 O-26

Formulation of Pesticide,insecticide, & fungicide

Small Orange 2010BA

30.09.2022N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes

2377O

24666Sara Soule Pvt Ltd.,

No.P-27, III Stage, PIE, Bengaluru-560 058

III StageI

Manufacture of leather upper 117 G-26

Leather foot wear and leatherproducts

Small Green 2007BA

31.12.2022N N N N N N N NA NA NA 1.84 N NA N Y N NA Yes

2378O Shree Polypacks.,

No. C-29, II Stage, PIE, Bengaluru-560 058

II StageI

Plastic sack bags93.95 G-32

Polythene and plastic processedproducts

Small Green 2005BA

31.12.2022N N N N Y 31.03.2017 N NA NA NA 0.25 N NA N Y N NA Yes

2379O

11582

Mann & Hummel Filter Pvt Ltd.,

No.231/1, 11th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

R & D Testing center for automatic and industrial filter

3943 G-81Research laboratories notinvolving

Large Green 2010BA

31.12.2022Y 31.12.2021 N N N N N NA NA NA 4 N NA N Y N NA Yes

2380O

30838

Vee vee Controls Pvt Ltd, Unit-III

No.A-187 & 188, 4th cross, I Stage, PIE, Bengaluru-560058

I StageI

PV Solar compact stations for Solar Electrical panels

793 G-78Switches without

electroplatinMedium Green 2015

BA31.12.2027

N N N N N N N NA NA NA 1.56 N NA N Y N NA Yes

2381O Fine Tools India Pvt Ltd.,

No.441, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Plastic injection moulding 206 G-32

Polythene and plastic processedproducts

Small Green 2011BA

31.12.2023N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes

2382O Arasu Enterprises.,

No.V-12(a), II Stage, PIA, Bengaluru-560 058

II StageI

General Engineering56 G-78

Switches without

electroplatinSmall Green 2011

BA31.12.2021

N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes

2383O

Gemini Dyeing & Printing Mills Ltd., Garment Division-1, No. 1-E, 1st Main, II Phase,

PIA, Bengaluru-560 058

No. 1-E, Ist main, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment stitching 592 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2011BA

31.12.2022N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes

2384O

Maini Precision Products Pvt Ltd.,

No. B-59, I Stage, PIE, Bengaluru-560 058

I StageI

Filter Assmbly251 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2011BA

31.12.2024Y 31.12.2024 N N N N N NA NA NA 2.4 N NA N Y N NA Yes

2385O

15367

Parvathi Shankar Engineering Pvt Ltd.,

No.119, 7th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Moto stamping and Automobile Components

406.44 G-78Panel Board, Switches withoutelectroplatin

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 2 N NA N Y N NA Yes

2386O

11734

Texport Syndicate India (P) Ltd.,

No. 9B/1, II Phase, PIA, Bengaluru-560 058

II PhaseI

Ready made Garment3026 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2015BA

31.12.2026Y 31.12.2022 N N N N N NA NA NA 54 N STP N N N NA Yes

2387O

29376

Devilog systems (India), Unit-III,

No.A-414 9th Main, II Stage, PIA, Bengaluru-560058

II StageI

Automotive Diesel scale fillter with die casting operations

350 R-50 Die casting operations

SmallRed 2015

BA30.06.2021

N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes

2388O

15414Trans-I Press Parts Pvt Ltd.,

Shed No.3, No.154, 10th Main, III phase, PIA, Bengaluru-560 058

III PhaseI

Deep Drawn Metal Components 77.89 G-95

Shell Moulding withoutgenerating

Small Green 2012BA

31.12.2021N N N N N N N NA NA NA 0.096 N ST & SP N N N NA Yes

2389O Radhalakshmi Metallurgicals No.446, Sy.No.46, IV Phase, Peenya

Industrial Area, Bengaluru- 560058 IV Phase

OthersImports of Ferrous and non Ferrous metal scraps

NA HW ImporterHWM - Reg Importer Small White 5.7.2016

BANA

Y 30.06.2100 N N N N N NA NA NA 0 N NA N Y N NA Yes

2390O

32136Vescon Engineering

Plot No.480B, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Heat treatment 35.97 O-36

Heat treatment using oilfired furnace

Small Orange 2016BA

30.09.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

2391O

12092

Healthium Medtech Pvt Ltd (Formerly Sutures India Pvt

Ltd.),

No.477C, Opp. to Bata Factory, BMTC Depot Main Road, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

surgical needle1388 R-44

Industry or process involvingmetal

Large Red 2009BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 1.6 0.03 ST & SP N N Y NA Yes

2392CL

23799

Tenonyx Precision Technologies (p) Ltd.,

No.B-19, 1st Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering components (Aluminum and Zinc Casting)

164.86 O-28Non- ferrous

metalextraction

Small Orange 21.4.2004BA

30.06.2012N N N N N N N NA NA NA 1 N NA N Y N NA Yes

2393O

Ace Super Auto Forge (P) Ltd.,

No.V-60,II Stage, PIE, Bengaluru-560 058

II StageI

Engineering components 165.55 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 0.96 N ST & SP N N N NA Yes

2394O Srivinayaka Industries.,

No.A-343(A), II Stage, PIE , Bengaluru-560 058

II StageI

Manufacture of Plastic cups and Glases

22.05 G-32Polythene and plastic processedproducts

Small Green 2005WA

31.12.2018N N N N N N N NA NA NA 0.32 N NA N Y N NA NA

2395O

81859Power Tech Fab Systems.,

No.261, 2nd cross, 3rd Main, IV Phase,PIA, Bengaluru-560 058

IV PhaseI

Engineering Activity46 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2008WA

31.12.2033N N N N N N N NA NA NA 0.6 N NA N Y N NA NA

23962012-13 O

14733Galvano Casting Pvt Ltd.,

No.134, III Phase, PIA, Bangalore-560058

III PhaseI

Heat treatment330 O-36

Heat treatment using oil fired furnace

Small Orange 2012BA

30.09.2022Y 30.06.2017 N N N N N NA NA NA 1.6 N NA N Y N NA Yes

2397 No.57/A, III Phase, PIA, Bengaluru- III Phase Garments stitching Garment 23972012-13 O

31290Creative Garments Pvt Ltd.,

No.57/A, III Phase, PIA, Bengaluru-560 058

III PhaseI

Garments stitching 900 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2016-17BA

31.12.2026N N N N N N N NA NA NA 36 N ST & SP N N N NA Yes

2398O

14198SCJ Polybatch.,

No.B-228, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Plastic Granules128.6 G-32

shoe uppers/ Cotton knitting

Small Green 2010BA

31.12.2022N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes

2399O Paras Engineering Pvt Ltd.,

No.434, 12th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Voltage Transformers with Painting 389 O-69

including Socks, Shoe lace/

Small Orange 2001BA

30.09.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

2400

2012-13 YTCDevilog systems (India), Unit-

III,

No.C at 9-B, 2nd Phase, PIA, Bengaluru-560 058.

II PhaseI

Aluminum Die Casting 327 O-28

Readymade leather garments

Small Orange 2011WA

NN N N N N N N NA NA NA 2 N ST & SP N N N NA NA

2401O

27792Uma industries,

Uma industries, No.45/5, III Phase, PIA, Bengaluru-560 058,

III PhaseI

Glass Processing 66.35 G-21

Glass , ceramic, earthenpotteries, tile

Small Green 31.1.2009BA

31.12.2035N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes

24022015-16 CL

31212J.K.Clothing Company

No.B-108, 3rd Cross, 3rd Stage, PIE, Bengaluru-560058

III StageI

Garment Stitching950 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2015WA

31.12.2021N N N N N N N NA NA NA 13 N NA N Y N NA NA

24032012-13 O

21194

Bimal Auto Agency India Pvt Ltd.,

No.A-37 & 38, II Stage, PIA, Bengaluru-560 058

II StageI

Servicing of Maruthi vehicles and painting 602 O-18

Automobile servicing, repairing and

Medium Orange 15.12.2012BA

30.09.2021Y 30.09.2022 N N N N N NA NA NA 2.8 5 ETP Y Y N NA Yes

2404O

12285Diamond Plastics.,

No.A-350,II Stage, PIE, Bengaluru-560 058

II StageI

Plastic moulded Furnitures 154 G-32

Polythene and plastic processedproducts

Small Green 2003BA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

24052015-16 O

Radiant Research Services Pvt Ltd

No.99/A, 8th Main Road, III Phase, PIA, Bengaluru-560058

III PhaseI

Research Laboratories71 R-83

and Analytical

laboratories Small Red 2015

BA30.06.2025

N N Y 31.12.2100 N N N NA NA NA 0.525 0.11 NA N Y Y NA Yes

24062007-08 O

83441Kaizen CNC Center Pvt Ltd.,

No.SB-14, 3rd Cross, I Stage, PIE, Bangalore,

I StageI

Engineering 438 G-7

Brass and bell metal utensilsmanufacturi

Small Green 2007BA

31.12.2035N N N N N N N NA NA NA 1.9 N NA N Y N NA Yes

24072012-13 CL

23852Alkem NCE R & D Labs,

No. 64/1B, III Stage, PIE, Bengaluru-560 058

III StageI

R & D Centre(finding new therapies for diseases)

1065.67 R-58Pharmaceutical (Bulk drug &Active

Large Red 2012BA

30.06.2015CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24082012-13 CL

29360Anu Solar Power Pvt Ltd.,

No.19-A, II Phase, PIA, Banglore-58 II PhaseI

Solar Water Heating Systems, Solar Lighting System, Solar Power

1855 R-65Generation plant and Bio Mass

Large Red 2012BA

30.06.2016Y N N N N N N NA NA NA 6 0.06 ST & SP N N Y NA Yes

2409O

18005Apoorva Auto Components,

, No. V-58, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Fuel injection parts, Speedometer parts & Horlogical parts

243.2 G-78Panel Board, Switches withoutelectroplatin

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 1 N NA N Y N NA Yes

2410O Venus Precision Industries,

No.N1/2, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication of machine tools components

67.38 G-78Panel Board, Switches withoutelectroplatin

Small Green 2011WA

31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA NA

2411O vinayaka Industries,

vinayaka Industries, No.238, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Motor Winding & Rewinding activity 121 W-45

Repairing of electric motorsand

Small White 2008BA

31.12.2023N N N N N N N NA NA NA 0.8 N NA N N N NA Yes

2412O

10845Shahi Exports Pvt Ltd.,

No.10-A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment2667.67 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2007BA

31.12.2023Y 31.12.2020 N N N N N NA NA NA 30 N STP Y N N NA Yes

2413O

S.V Rubber Industries (Formerly Polymer India).,

No.335, 9th Cross, IV Phase, Peenya Industrial Area, Bengaluru-560 058

IV PhaseI

Rubber moulded components 65 G-86

Tread rubber including pre-curedrubber

Small Green 2007BA

31.12.2027N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes

24142012-13 CL

22617Nippon Paint (India) Pvt Ltd.,

No.39-A, II Phase, PIA, Banglore-560 058

II PhaseI

ware house 332 W-52

Diesel Generator sets (15KVA to 250

Small White 2012BA

31.12.2023CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24152016-17 O

32540Supercraft 3d wellness Pvt Ltd

No.B-17, I cross, I stage, PIE, Bengaluru-560058.

I StageI

Printing of plastic & metal models tools 165 G-78

on plastic&meta

l Small Green 2017

BA31.12.2033

Y 31.12.2024 N N N N N NA NA NA 0.6 N NA N Y N NA Yes

24162012-13 O Indovedic Nutrients Pvt Ltd.,

No.96, III Phase, PIA, Bangalore-560058

III PhaseI

Formulation & finishing of Herbal extracts

148.88 G-2Ayurvedic and homeopathicmedicines

Small Green 2013WA

31.12.2022N N N N N N N NA NA NA 0.4 0.02 NA N Y Y NA NA

24172012-13 O

21653

Hallite Sealing Solutions India Pvt Ltd.,

No.10, III Main, I Stage, PIE, Bengaluru-560 058

I StageI

Repacking of Hydraulic sealing items

366.28 G-78Re-packing of finishedproducts (Dry

Small Green 2012BA

31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

24182012-13 CL

23701

Brandis Manufacturing & Marketing Pvt Ltd.,

No.490-A, 2nd Main Road, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Ready made garments 1142 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 2012BA

31.12.2022N N N N N N N NA NA NA 16 N STP Y N N NA Yes

24192012-13 CL

-

Prime Progression Export Service Pvt Ltd.,

No.422, 11th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Container liners & Bulk Heads made of Woven fabrics

188 G-78Switches without

electroplatinSmall Green 2009

BA31.12.2001

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24202012-13 O

34799Fashion Matrix Clothing.,

No 284, II Cross, IV Phase, PIA, Bangalore-058

IV PhaseI

Ready made garments 107 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2012WA

31.12.2021N N N N N N N NA NA NA 7.5 N NA N Y N NA NA

24212012-13 O

22181BMTC Depot-9,

BMTC Depot-9, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Sevicing of buses33.63 O-18

Automobile servicing, repairing

Small Orange 1987BA

30.09.2029Y 30.09.2023 N N N N N NA NA NA 20.3 8 ETP Y Y N NA Yes22181 repairing

andBA Y 30.09.2023 N N N N N NA NA NA 20.3 8 ETP Y Y N NA Yes

24222012-13 O Merrick Industries Pvt Ltd.,

Plot No. 103, 113 & 114, 7th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Coal feeders, Chain Conveyors 464 G-60

Repairing, cleaningdegreasing, painting and

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

24232012-13 O Eurosit Systems Furniture's,

No.273, IV Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Coal feeders, Chain Conveyors 250.63 G-10

Carpentry & wooden furnituremanufacturi

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes

24242012-13 O

23805Mythri Metallizing India.,

No.177-178, III Phase, PIA, Bangalore-560058

III PhaseI

Cast iron & MS Engineering 641 O-63

Engineering Industries with HeatTreatment,

Medium Orange 2012BA

30.09.2028N N N N N N N NA NA NA 0.43 N NA N Y N NA Yes

24252012-13 O Vodafone South Ltd.,

Plot No.19, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseTT

Telephone towerDG Set W-52

Diesel Generator sets (15KVA to 250

Small White 2012AA

31.12.2016N N N N N N N NA NA NA 0 N NA N N N NA Yes

2426O

31751

Chhaperia International Company, No.270, IV Phase,

PIA, Bengaluru-560 058

No.270, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Mica Tape78.53 G-6

Blending of melamine resins

Small Green 2007BA

31.12.2026N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

2427O

16258Karnataka Fine Chem.,

No.8, 10th Cross, I Stage, PIE, Bangalore-56008

I StageI

Trading of Laboratory chemicals with packing & refilling

53.01 R-25Basic chemicals and electrochemicals

Small Red 2009WA

30.06.2024N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

2428O Janma Precision.,

No.C-83, III Stage, PIE, Bengaluru-560 058

III StageI

Manufacture of precision turned components

33 G-78Switches without

electroplatinSmall Green 2010

WA31.12.2020

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA

2429O

24823Global Electro Enterprises

No.510, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Electrical panel wiring21 G-78

Panel Board, Switches without

Small Green 2001WA

31.12.2025N N N N N N N NA NA NA 0.15 N NA N Y N NA NA

2430CL

24112Protective Coating Pvt Ltd.,

No.A-29, 2nd Cross, III Stage, PIE, Bengaluru-560 058

III StageI

Shot blasting and Spray painting (Dry type)

89.59 O-62Spray painting, paint baking, paint

Small Orange 2009BA

30.06.2018N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes

2431O

23199

Rajath Material Handling Systems Pvt Ltd.,

No. P-8, 2nd Cross, III Stage, PIE, Bengaluru-560 058

III StageI

Fabrication Work21.21 W-14

Engineering and fabricationunits (dry

Small White 2012WA

31.12.2099N N N N N N N NA NA NA 0.24 N NA N Y N NA NA

2432O Comet Environs.,

No.B-57, III Stage, PIE, Bengaluru-560 058

III StageI

Manufacture of sub zero chambers, water re coolers & oil coolers

19 G-7Brass and bell metal utensilsmanufacturi

Small Green 2010BA

31.12.2034N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes

2433O Sri Maruthi Precision.,

No.C-82, 3rd Cross, III Stage, PIE, Bengaluru-560 058

III StageI

Precision components12.66 O-62

Spray painting, paint baking, paint

Small Orange 2011BA

31.12.2020N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes

24342012-13 CL

15254

David Brown Hydraulics India Pvt Ltd.,

No.C-200, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Hydraulic Press Pumps & PTO Valves (With painting)

199 O-62Spray painting, paint baking, paint

Small Orange 2013BA

30.09.2016CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24352012-13 O

16476

Komtech Plastic Technologies India Pvt Ltd.

No 81 & 82 (B1&B2) 7th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of polythene & plastic products

979.4 G-32Polythene and plastic processedproducts

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

24362012-13 O Krishi Biosys ( Bio Fertilizer)

No 471, D1/S2, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of Bio- fertilizer not involving spent wash

37 W-4Bio fertilizer andbio-pesticides

Small White 18.02.2013WA

31.12.2022N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

24372012-13 O Krishi Biosys ( Bio pesticide )

No 471, D1/S2, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Formulation of Bio-pesticides 37 O-29

Formulation of Pesticide,insecticide, & fungicide

Small Orange 18.02.2013BA

31.12.2022N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes

24382012-13 CL

-XL Engineering & Fabricators,

No. B-188, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

E-waste35 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2012BA

30.06.2018Y N N N N N N NA Yes 0.4 N ST & SP N N N NA Yes

24392013-14 O

Armstrong Manufacturing Center

No.490L, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

HVAC Pumps and Accessories 1184.48 O-62

Spray painting, paint baking, paint

Medium Orange 06.07.2007BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 3.4 N ST & SP N N N NA Yes

2440

2013-14 CL16882

Diamond Hard Chrome Platers.,

No.C-130, 2nd 'B' Cross, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating Hard Chrome Plating activity (Hardchrome)

49.6 R-44Industry or process involvingmetal

Small Red 2008BA

30.09.2017Y 30.06.2011 N N N N N NA NA NA 0.15 0.1 NA N Y Y NA Yes

24412013-14 O

17501Yashaswini CNC.,

No.54, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

CNC Turned componenets 41.65 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2009BA

31.12.2021N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

24422013-14 O

Precimeasure Controls Pvt. Ltd.,

Unit-II, No.B-71, 2nd Cross, I Stage, PIE , Bengaluru-560 058

I StageI

Pressure Gauges & Marshalling Box & Panel

365 G-78Electrical and electronic item

Small Green 2011BA

31.12.2021N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes

24432012-13 O

Wistra Elemetherma India Pvt Ltd.,

No.530, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Ovens, Kilns, and Special purpose machine

83.83 W-13Electrical and electronic item

Small White 2013WA

31.12.2022N N N N N N N NA NA NA 0.45 N ST & SP N N N NA NA

24442013-14 O

24137R.K. Engineering Industries.,

No.B-87, 2nd Cross, I Stage, PIE , Bengaluru-560 058

I StageI

Electro polishing 12.5 R-44

Industry or process involvingmetal

Small Red 2000BA

30.06.2024N N N N N N N NA NA NA 1.5 0.05 NA N Y Y NA Yes

24452013-14 CL

23800Tes-Amm India Pvt Ltd,

No.A-365,6th cross, I stage, Peenya Industrial Estate, Bengaluru-560 058

I StageI

Electro polishing (E-waste Dismentling) 220 R-3

Industries engaged inrecycling/reprocessing/

Small Red 2013BA

30.06.2018N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

2446ABB India Limited, Service

No. SB-115, 3rd cross, Ist Stage , I Stage Service Centre Research 24462013-14 O

23368

ABB India Limited, Service Center

No. SB-115, 3rd cross, Ist Stage , Peenya industrial Estate, Bangalore-=58

I StageI

Service Centre (Recovery of copper clad & strips)

64.73 G-81Research laboratories notinvolving

Small Green 2013WA

31.12.2022N N N N N N N NA NA NA 0.32 N NA N Y N NA NA

24472013-14 CL

-Indus Intex Pvt Ltd.,

No. 183, III Phase, 100 feet road, Peenya Industrial Area, Bengaluru-560 058

III PhaseI

Readymade Garments616.09 G-72

Stitching/ Stitching ofshoe uppers/

Medium Green 2013BA

31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24482013-14 O Dynamatic Hydraulics.,

Unit-II, No.K-11, Between 5th & 6th Cross, I Stage, Bengaluru-560 058

I StageI

Manufacturing of Composite Bush & Gear Hobing

1216.5 G-7Brass and bell metal utensilsmanufacturi

Large Green 2013BA

31.12.2022Y 31.12.2022 N N N N N NA NA NA 1.2 N NA N Y N NA Yes

24492013-14 O SAP Engineering.,

No.B-16, 1st Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabricted items (Hyraulic tanks, frames) & machined components

93.46 G-10Carpentry & wooden furnituremanufacturi

Small Green 05.01.2011BA

31.12.2022Y 31.12.2017 N N N N N NA NA NA 0.6 N NA N Y N NA Yes

24502013-14 O

24898

Magod Laser Machining Pvt Ltd.,

No.490-G, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

General Engineering of sheet metal components (CNC Laser cutting)

642.78 G-46Steel furniture without spray

Medium Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes

24512013-14 O

21286Santhosh Sharp Tools.,

No.105, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Engineering cutting tools 18.48 G-10

paintingSmall Green 2013

WA31.12.2100

N N N N N N N NA NA NA 0.13 N ST & SP N N N NA NA

24522013-14 O

23691Nash Industries (I) Pvt Ltd.,

No.102/103, III Phase, 6th Main Road, 3rd Cross, PIA, Bengaluru-560 058

III PhaseI

Sheet Metal Press Components 984 G-110

Diesel Generator sets (250 KVA

Medium Green 2013BA

31.12.2022Y 31.12.2025 N N N N N NA NA NA 5.6 N NA N Y N NA Yes

24532013-14 O

21453Alufit India Pvt Ltd.,

No.C-331, IV Phase, I Stage, PIE, Bengaluru-560 058

IV PhaseI

General Engineering (Aluminium Composite Panel Sheet)

164.29 G-1Aluminum utensils fromaluminum circles by

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes

24542013-14 O Shri Cauvery Industries.,

No.B-33, II Stage, PIE, Bengaluru-560 058

II StageI

Sheet metal fabrication parts for machining (cutting, deburring, bending,

189.33 G-78Switches without

electroplatinSmall Green 2013

BA31.12.2022

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes

24552013-14 O

20466TMS India Pvt Ltd.,

Unit-V, No.5, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Valve components & machined parts 708.77 G-78

Panel Board, Switches withoutelectroplatin

Medium Green 2013BA

31.12.2022N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes

24562013-14 O

21685Gears & Pinions Pvt Ltd.,

No.A-323, 7th Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

General Engineering (Straight Spiral Bevel Gear & Pinion)

362 G-92.Shot blasting operation

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

24572013-14 O

22107

Paragon Polymer Products Pvt Ltd.,

No.SB-107 & 108, 2nd Cross, I stage, PIE, Bengaluru-560 058

I StageI

Designing of New Foot wear (Mould designing/upper designing, sample

189 G-26Leather foot wear and leatherproducts

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes

24582013-14 CL

21751

Pentair Technical Products Pvt Ltd.,

No.10-C, II Phase, PIA, Bengaluru-560 058

II PhaseI

General Engineering (S.S.Enclosures & cabients)

1212 G-78Switches without

electroplatinLarge Green 2013

BA31.12.2027

Y 31.12.2019 N N N N N NA NA NA 3.6 N STP Y N N NA Yes

24592013-14 CL

22360ADC India Communications.,

No.485/ 8A & 8B, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

D.G SET2004.59 G-110

Diesel Generator sets (250 KVA

Large Green 2013BA

31.12.2022Y 31.12.2023 N N N N N NA NA NA 8 N ST & SP N N N NA Yes

24602013-14 CL

-Kongovi Electronics Pvt Ltd.,

No.53-A, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Moulding of plastics components 382.81 G-32

Polythene and plastic processedproducts

Small Green 2013BA

30.06.2021CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24612013-14 O

22432Delta Electro Controls.,

No.160, 4th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Assembling of Electric panel Boards 72 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2013WA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

24622013-14 CL Span Diagnostics Ltd.,

No.B-42, III Stage, PIE, Bengaluru-560 058

III StageI

Distribution Depot of Diagnostic reagents 99.82 R-25

chemicals and electrochemicals

Small Red 2013BA

NN N N N N N N NA NA NA 0.24 N NA N Y N NA NA

24632013-14 O Span Diagnostics Ltd.,

No.17(i), 2nd Floor, I C Main Road, II Phase, PIA, Bengaluru-560 058

II PhaseI

Assembling of control panel accessories, locks, hinges, latches & industrial handles.

116.52 G-78Switches without

electroplatinSmall Green 2013

WA31.12.2022

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

24642013-14 O

23569

Mittal Clothing Company Unit-I (Formerly known as S.A.S

Apparels).,

No.471-D2, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Garment Stitching 628.42 G-72

Garment Stitching/ Stitching ofshoe uppers/

Medium Green 2013BA

31.12.2022N N N N N N N NA NA NA 9.6 N STP - BWSSB Y N N NA Yes

24652013-14 O Quality Insulated Conductors.,

No.A-12, 1st Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Insulated Copper, Aluminum conductor manufacturing

187.54 G-78Panel Board, Switches withoutelectroplatin

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes

24662013-14 O

22807

Torry Harries Restaurants Pvt Ltd.,

No.25-A, 5th Main, III Phase, PIA, Bangalore-560058

III PhaseHospital

ity

Food Processing Industry 760.12 G-52

Hotel/Resorts having more than 20 rooms

Medium White 2013BA

31.12.2027N N N N N N N NA NA NA 1.2 3.5 ST & SP N N Y NA Yes

24672013-14 O

23368ABB India Ltd-Robotics,

No.1-A, II Phase, PIA, Bangalore-560058

II PhaseI

Assembling and testing of Robotic system along with spary painting

1601.68 O-62Spray painting, paint baking, paint

Large Orange 2013BA

30.09.2022Y 30.09.2022 N N N N N NA NA NA 2.6 N STP Y N N NA Yes

24682013-14 O

74848Sai Bikes.,

No.P-6, 1st Cross, I Stage, PIA, Bengaluru-560 058

I StageI

Servicing of Honda Bikes 312 O-18

Automobile servicing, repairing and

Small Orange 2013BA

30.09.2023Y 30.09.2023 N N N N N NA NA NA 0.72 5 ETP N Y N NA Yes

24692013-14 O

83573

Dynamatic Hydraulics-Unit-I, A.Div. of Dynamatic

Technologies.,

Unit-I, No.1A/1, 1st Main Road, II Phase, PIA, Bengaluru-560 058

II PhaseI

Manufacture of Hydraulic Gears and Pumps of capacity 5 Lakh No's/ Annum

2412.91 G-77Manufacture of Motor & Pumpswithout

Large Green 2013BA

31.12.2023Y 31.12.2023 N N N N N NA NA NA 17 N STP Y N N NA Yes

24702013-14 O

AESTHEBIO., ( Formerly Ayurpetals

No.466, 1st & 2nd Floor, 12th A Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Formulation and finishing of Ayurvedic herbal

100 G-2Ayurvedic and homeopathic

Small Green 2013WA

30.09.2018N 30.09.2018 N N N N N NA NA NA 0.5 0.2 ST & SP N N Y NA NA058 Ayurvedic herbal

extractshomeopathicmedicines

WA N 30.09.2018 N N N N N NA NA NA 0.5 0.2 ST & SP N N Y NA NA

24712013-14 O

75778

RKN Heat Treatment Solutions.,

No.C-185, 5th Cross,2nd Stage, PIE, Bangalore-560058

II StageI

Heat Treatment unit on job work 98.21 O-36

Heat treatment using oil fired furnace

Small Orange 2013BA

30.09.2022N N N N N N N NA NA NA 1.08 N NA N Y N NA Yes

24722013-14 O

29704

Strecken India Manufacturing Pvt Ltd (Formerly Synpack

Flexipacks Pvt Ltd).,

No.A-45(a) 2nd Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

LDPE Stretch film for integral packing 168.8 G-32

Polythene and plastic processedproducts

Small Green 2013WA

31.12.2034N N N N N N N NA NA NA 0.7 N NA N Y N NA NA

24732013-14 CL

-Aries Powder Coaters.,

No.A-322, 7th Main, II Stage, PIE, Bangalore-560058

II StageI

Powder Coating with Precleaning 86 O-62

painting, paint baking,

paintSmall Orange 2013

BA31.12.2023

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

24742013-14 O Matxin Labs Pvt Ltd.,

No.M-11, I Stage, PIE, Bengaluru-560 058

I StageI

Herbal Products (Tablets) 178 G-2

Ayurvedic and homeopathicmedicines

Small Green 2013WA

31.12.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA NA

24752013-14 O Lakhotia Belting Pvt Ltd.,

No.276, 4th Main, IV pHase, PIA, Bengaluru-560 058

IV PhaseI

Rubber Products (Conveyor Belts) 328 G-86

Tread rubber including pre-curedrubber

Small Green 2013BA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

24762013-14 O Sudhir Enterprises.,

No.200, III Phase, PIA, Bengaluru-560 058

III PhaseI

Sheet Metal Components & Precision Turned components

299.74 G-78Engineering and fabricationunits (dry

Small Green 2013BA

31.12.2022N NA N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes

24772013-14 O

30466

Paragon Polymer Product Pvt Ltd., (formerly Preston India

Pvt Ltd ),

No.486-A, 13th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Foot Wear Manufacturing 3782 G-26

wear and leather

products Large Green 2014

BA31.12.2026

N N N N N N N NA NA NA 4.8 N STP Y N N NA Yes

24782013-14 O

23803Varasiddi Induction.,

No.40-B/8, II Phase, PIA, Bengaluru-560 058

II PhaseI

Heat Treatment by induction method for automobile, agricultural

111 G-24Heat treatment with any of the

Small Green 2014WA

31.12.2032N N N N N N N NA NA NA 0.56 N NA N Y N NA NA

24792013-14 CL

22311Balaji Metal Finishers.,

No.68-A, 1st Floor, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating activity of Nickel & Copper 21 R-44

Industry or process involvingmetal

Small Red 2014BA

30.06.2018N N N N N N N NA NA NA 0.4 0.06 NA N Y Y NA Yes

24802013-14 O

24069S R Pharmaceuticals.,

No.309, 8th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Herbal Products (Tablets) 270 G-02

Ayurvedic and homeopathicmedicines

Small Green 2014BA

31.12.2022N N N N N N N NA NA NA 0.48 0.2 ST & SP N N Y NA Yes

24812013-14 CL

Orion CNC Components Ltd., Shed

Shed No.6, Plot No.498, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Precision Machined Components 392 G-10

wooden furniture

manufacturiSmall Green 2014

BANA

N N N N N N N NA NA NA 0 N NA N N N NA NA

24822013-14 O

11605

Synthetic Packers Pvt Ltd-(Unit0-II),

No.171/A,4th Cross, I Stage, Peenya Industrial Estate, Bengaluru-560 058,

I StageI

polythene rolls and 1864 G-32

Polythene and plastic processedproducts

Large Green 2013BA

31.12.2022N N N N Y 31.1.2021 N NA NA NA 1.2 N NA N Y N NA Yes

24832013-14 O Sri Vyoma Clothing,

No.28C, 1st Floor, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment Stiching 485.7 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 2014BA

31.12.2022N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes

24842013-14 CL

-Alpa Design Technologies

No.193A and 193B, 4th Cross, 1st Stage, PIE, Bengaluru-58

I StageI

Precision machined components and Unit level switch board

873 G-78Panel Board, Switches withoutelectroplatin

Medium Green 2016BA

26.01.2022N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes

24852013-14 O Sunil Steel & Scrap Traders.,

No.363/1, 10th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Scrap import and trading 85 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2014BA

31.12.2021Y 31.12.2015 N N N N N NA NA NA 0.1 N NA N Y N NA Yes

24862013-14 O

77333

Mallya Fine Chem (P) Ltd., Unit-2,

No.V-40, 9th Main Road, II Stage, PIE, Bangalore-560058

II StageI

Food Color Preparation and detergent flavours

194 O-7Food and food processingincluding

Small Orange 2014BA

30.09.2023N N N N N N N NA NA NA 0.6 0.52 NA N Y Y NA Yes

24872013-14 O

77443Fine Plastics,

No.43, I st cross, I stage PIA, Bengaluru-560 058,

I StageI

Plastic injection moulding components 198 G-32

Polythene and plastic processedproducts

Small Green 2012WA

31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA

24882013-14 O

39995Barrix Agro Sciences (P) Ltd,

No 68A, ground Floor, 6th Main, III Phase, Peenya Industrial Area, Bangalore -560058

III PhaseI

Pest Control Catches and R&D for Pheramones

106 R-58cal (Bulk drug &Active

Small Red 2014BA

30.06.2023N NA N N N N N N N NA 1 0.15 NA N Y Y NA Yes

24892013-14 O

24203

National Metal Processing System & Co.,

No A348, 8th main , II Stage, PIE, Bangalore-560058,

II StageI

Heat Treatment on job work 250 O-63

Engineering Industries with HeatTreatment,

Small Orange 2012BA

30.06.2017N NA N N N N N NA NA NA 0.8 N NA N Y N NA Yes

24902013-14 O

84765Sri Vijaya Sai Heat Carbo.,

No.M-9, 7th Cross, I Stage, Bengaluru-560 058

I StageI

Heat treatment 242.5 O-63

Engineering Industries with HeatTreatment,

Small Orange 2014BA

30.09.2029N N N N N N N NA NA NA 1.7 N NA N Y N NA Yes

24912012-13 O Shivajyothi coaters,

No SM-7&8, 3rd stage, Peenya Industrial Estate, Bangalore -560058

III StageI

Powder coating 24.14 G-97

Activity of Powder Coating on surface of

Small Green 2013BA

31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

24922013-14 O Bitzer india pvt ltd ,

No.17(1), 2nd Floor,1st C Main Road, II Phase, PIA, Bengaluru-560 058

II PhaseI

Repair and aervice of air conditioners 111.48 G-78

Panel Board, Switches withoutelectroplatin

Small Green 2013WA

31.12.2022N N N N N N N NA NA NA 0.13 N ST & SP N N N NA NA

24932014-15 O

34330

Advaith Metal Finishers (Formerly Known as Profal

Coaters).,

No.342, , IV Phse, PIA, Bangalore-560058

IV PhaseI

Powder Coating51.04 R-44

Industry or process involving metal

Small Red 24.02.2010BA

30.06.2017N N N N N N N NA NA NA 0.4 0.5 NA N Y Y NA Yes

24942014-15 O Cimtrix Systems Pvt Ltd.,

No.320, 8th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembling of Armature winding machines including SBD turning machine

154 G-10Carpentry & wooden furnituremanufacturi

Small Green 08.05.2014BA

31.12.2023N N N N N N N NA NA NA 1.2 NA ST & SP N N N NA Yes

2495 4th Main, 11th Cross, No, 408, IV IV Phase Precision sheet metal Brass and 24952013-14 O

17880KDDL ltd, (Unit: EIGEN),

4th Main, 11th Cross, No, 408, IV Phase,PIA, Bangalore- 58

IV PhaseI

Precision sheet metal pressed cmponents and Precision press tools

1504.4 G-7Brass and bell metal utensilsmanufacturi

Large Green 01.10.2006BA

31.12.2022N N N N N N N NA NA NA 4 N STP Y N N NA Yes

24962014-15 O

Samcal Cutting Solutions (I) Pvt Ltd.,

No.B-251, 6th Main, II Stage, PIE, Bengaluru-560 058

II StageI

High pressure Water jet cutting activity 136 G-54

Mineralized water Small Green 05.05.2014

BA31.12.2022

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

24972014-15 CL

25890

Bonfiglioli Renewable Power Conversion India (P) Ltd.,

No.543, 14th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Assembly of electrical control panels and elevator parts

845 G-78Panel Board, Switches withoutelectroplatin

Medium Green 08.05.2014BA

31.12.2026N N N N N N N NA NA NA 2.64 N ST & SP N N N NA Yes

24982014-15 O

ABB India Ltd., (LV Capacitor),

(LV Capacitor), No.485/6, 14th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Carrying out inspecting, testing & packing os assembled Electrical and

497 G-78Panel Board, Switches withoutelectroplatin

Small Green 2014BA

31.12.2023Y 31.12.2023 N N N N N NA NA NA 3 NA ST & SP N N N NA Yes

24992014-15 O Powertrek Industries.,

No.B-197, 5th Main Road, II Stage, Bengaluru-560 058

II StageI

Lead Sub-Oxide (by using pure lead ingots only)

134.05 R-7Lead acid batterymanufacturing(excluding

Small Red 2013BA

30.06.2020

N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes

25002014-15 O

Therelek Engineers Private Limited.,

Plot No.'N' Special, 7th Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Fabrication of furnaces along with paint touchup & ovens

212.23 G-46Steel furniture without spray

Small Green 01.04.2014BA

31.12.2022N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes

25012014-15 CL

Rubber Extrusion & Moulding Company.,

No.B-26, 2nd Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacture of Rubber Profiles 54.97 O-76

Natural Latex processing and/or

Small Orange 2005BA

30.06.2018N N N N N N N NA NA NA 0.55 N NA N Y N NA Yes

25022014-15 O Shri Balaji Components.,

No.14-C, 5th Main, III Phase, PIA, Bangalore-560058

III PhaseI

Manufacture of cold forged fasteners (Nuts & bolts for Automoblies)

242 O-32Forging of ferrous and non- ferrousmetals (

Small Orange 28.10.2010BA

31.12.2022N NA N N N N N NA NA NA 0.2 0.3 NA N Y Y NA Yes

25032014-15 O Veerabhadreshwra Industries.,

No.21, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Machine Components25.44 W-14

Engineering and fabricationunits (dry

Small White 2010WA

30.09.2020N N N N N N N NA NA NA 0.12 N NA N Y N NA NA

25042014-15 O

Sri Nitya Packaging Company.,

No.A-313 & 314, 7th Main, II Stgae, PIE, Bengaluru-560 058

II StageI

Corrugated box331 G-9

Cardboard or corrugated box and

Small Green 28.02.2014BA

31.12.2023

N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes

25052014-15 O Industrial Rubber Works.,

No.C-89, 2nd B Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacturing Moulded products & Rubber extrusion products (rubber

78.51 G-86products using Boilers (excluding

Small Green 26.06.2014BA

31.12.2023

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes

25062014-15 CL

-Vam International.,

No.V-43 B-(1), 2nd B Main Raod, II Stage, PIE, Bengaluru-560 058

II StageI

Solar street lights integration and assembling only

25.46 W-34paper or pulp manufacturing)

Small White 27.06.2014WA

31.12.2023

N N N N N N N NA NA NA 0.08 N NA N Y N NA NA

25072014-15 O

Ajax Fiori Engineering (India) Pvt Ltd.,

No.253/1, 11thMain, III Phase, PIA, Bengaluru-560 058

III PhaseI

Engaged in Industrial Warehouse and Corporate office

1158.52 G-78Panel Board, Switches withoutelectroplatin

Large Green 27.06.2014BA

31.12.2023Y 31.12.2026 N N N N N NA NA NA 3.2 N STP Y N N NA Yes

25082014-15 O

SRP Synthetic Rubber Products Pvt Ltd.,

No.C-81, 2nd "A" Main, II Stage, Peenya Industrial Estate, Bengaluru-560 058

II StageI

Manufacture of Rubber Moulded Component

174.76 G-41Rubber goods industry (with gas

Small Green 17.06.2014BA

31.12.2023N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes

25092014-15 O

Sri Venkateshwara Equipments.,

No.24/1, 5th Main, III Phase, PIA, Bangnalore-58

III PhaseI

Fabrication of Kitchen Equipment maily with SS material

78.38 W-14Engineering and fabricationunits (dry

Small White 11.07.2014BA

31.12.2023N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes

25102014-15 O

12161

Madhur Pharma & Research Laboratories (P) Ltd.,

No.274, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacture of Glucose bolts & powder & Capsule (Formulation- Dry

138 G-2Ayurvedic and homeopathicmedicines

Small Green 01.08.2014BA

31.12.2024N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes

25112014-15 O

24436Robust Hydraulics.,

No.22, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacturing of hydraulic Cylinders (Only turning, assembling and

20.166 G-14Engineering and fabricationunits (dry

Small Green 2009BA

31.12.2100N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

25122014-15 CL

37948

International Trimmings and Labels India Pvt Ltd.,

No.471/A2, IV Phase, PIA, Bangalore58

IV PhaseI

Engaged in printing on lables, stickers, tags, paper tickets & packing materials

501 O-12Silk screen printing, sari printing bywooden

Medium Orange 01.08.2014BA

31.12.2023Y 31.12.2018 N N N N N NA NA NA 2.4 N NA N Y N NA Yes

25132014-15 CL

-Para Fine-Chem Industries.,

No.V-43B, 2nd B Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Refilling of Acids and Trading of Chemicals 96.64 R-25

Basic chemicals and electrochemicals

Small Red 2012BA

30.09.2018N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

25142014-15 O

Maini Precision Products Pvt Ltd.,

No.C-217, I Stage, PIE, Bengaluru-560 058

I StageI

Auto Components (Precision Products) 327 G-7

Brass and bell metal utensilsmanufacturi

Small Green 30.07.2014BA

31.12.2023Y 31.12.2023 N N N N N NA NA NA 1.8 N NA N Y N NA Yes

25152014-15 O GRV Merchandizing,

No.368 & 369,10th Cross, IV Phase, PIA, Banglore-58

IV PhaseI

BOPP Tapes186 G-32

Polythene and plastic processedproducts

Small Green 01.08.2014BA

31.12.2023N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes

25162014-15 O M N Industries.,

No.209, 12th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

General Engineering and Motor Winding 230 G-78

Switches without

electroplatinSmall Green 06.09.2014

BA31.12.2023

Y 31.12.2018 N N N N N NA NA NA 0.64 N NA N Y N NA Yes

25172014-15 CL

37605Srinivasa Metal Coats.,

No. 293, IV Phase, Peenya Industrial Area, Bengaluru-560 058

IV PhaseI

Blackening Section 8.2 R-44

Industry or process involvingmetal

Small Red 08.04.2014BA

30.06.2017N N N N N N N NA NA NA 0.4 0.15 ST & SP N N Y NA Yes

25182013-14 O

24468Sam Machinery.,

No.51, 4th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Special Purpose machine assembly and Lab for Siemens Equipment Validation

153 R-83Research and Analyticallaboratories

Small Red 06.12.2013BA

30.06.2021Y 30.06.2021 N N N N N NA NA NA 0.54 0.08 NA N Y Y NA Yes

25192013-14 CL

-Delkor Technik India Pvt Ltd.,

No.32-A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Manufacturing of Engineering items: Filters, Agitators,

959.27 O-62Spray painting, paint baking,

Medium Orange 01.11.2012WA

30.06.2015CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL- Filters, Agitators,

Thickeners, Linear paint baking, paint

WA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

25202014-15 O

24999

Auxel FTG India Private Limited.,

No.124, 1st Floor, 7th Main Road, III Phase, PIA, Bengaluru-560 058

III PhaseI

Manufacture of Electrical Terminal Blocks- 3 Lakhs units and Buss Bars- 1.8

2358 G-78Panel Board, Switches withoutelectroplatin

Large Green 01.01.2014BA

31.12.2024N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes

25212014-15 O

36728Rajasthan Patrika Pvt Ltd.,

No.A-198, 4th Cross, I Stage, PIA, Bengaluru-560 058

I StageI

News Paper Printing490 O-59

Printing press &/or Screen Printing

Small Orange 12.09.2014BA

31.12.2024Y 31.12.2024 N N N N N NA NA NA 1.2 N NA N Y N NA Yes

25222014-15 O

42563N.K. Pack

No.151,11 th Main, III Phase, PIA, Bengaluru-560058

III PhaseI

Paper back support for shirt packing for garments

348 G-79Plastic sack bags, woven sack with HDPE,

Small Green 7.1.2017WA

31.12.2028N N N N N N N NA NA NA 0.5 N NA N Y N NA NA

25232014-15 O

Cartonal Machine India Pvt Limited.,

No.52, 4th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Automatic Folder Gluer, Liner & Auto Die Cutter Machine. Main Activity

45.08 W-14Engineering and fabricationunits (dry

Small White 10.05.2013BA

31.12.2022N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes

25242014-15 O

24639

Seven Hills Internationals- Unit-II.,

No.13-C, 5th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

Readymade Garments Stitching 140 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 05.11.2014BA

31.12.2023N N N N N N N NA NA NA 4.8 N NA N Y N NA Yes

25252014-15 O Buildmet Fibers Pvt Ltd.,

No.B-24, I Stage, PIE, Bengaluru-560 058

I StageI

Stitching of PP Bags150 G-32

Polythene and plastic processedproducts

Small Green 01.07.2010BA

31.12.2023N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes

25262014-15 O Sonal Apparel Pvt Ltd.,

No.28-C, II Phase, PIA, Bengaluru-560 058

II PhaseI

Garment Stitching1560 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 19.12.2014BA

31.12.2023N N N N N N N NA NA NA 5.6 N NA N Y N NA Yes

25272014-15 O

Eyyani Electric Machines Pvt Ltd.,

No. B-234, II Stage, PIE, Bengaluru-560 058

II StageI

Industrial blowers and Fans 76 G-78

Electrical and electronic item

Small Green 06.12.2014BA

31.12.2023N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes

25282013-14 O Shiva Krupa Industries.,

No.D-426/C, 10th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating

9.4 R-44Industry or process involvingmetal

Small Red 01.06.2012BA

30.06.2024N N N N N N N NA NA NA 0.03 0.06 NA N Y Y NA Yes

25292013-14 O Ambika Industries.,

No.V-48, 5th Main, II Stage, PIE, Bengaluru-560 058

II StageI

Electroplating

42.4 R-44Industry or process involving metal surgace treatment such as packing

Small Red Aug-09BA

30.06.2024N N N N N N N NA NA NA 0.2 0.16 NA N Y Y NA Yes

25302014-15 CL

-Creative Garments Pvt Ltd.,

No.351, 9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI Manufacturing of

readymade garments

1031 G-72Garment Stitching/ Stitching ofshoe uppers/

Large Green 2014BA

31.12.2023

Y 31.12.2019 N N N N N NA NA NA 12 CL NA N Y N NA Yes

25312014-15 O

32650Pearl Global Industries Ltd.,

No.19/A, II Phase, PIA, Bengaluru-560 058

II PhaseI

Washing of readymade garments

2456 O-50Mechanized laundary Large Orange 21.1.2015

BA30.09.2022

Y 30.09.2022 N N N N N NA NA NA 48 25.16 STP&ETP Y N N N Yes

25322014-15 O Rigid industries

No C-252, I stage, PIE , Bengaluru-560 058

I StageI

Foorwear products

231 G-26Leather foot wear and leatherproducts

Small Green 1.6.2014BA

31.12.2023

N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes

25332014-15 O

Dual Manufacturing Technolgies Private Limited ,

No. 321, 8th Cross, IV Phase, PIA, Bnaglore-58

IV PhaseI Precision Machined

Components

215 G-78Panel Board, Switches withoutelectroplatin

Small Green 2014WA

31.12.2023

N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA

25342014-15 O Royal Touch.,

No.B-126, 3rd Cross, I Stage, PIA, Bengaluru-560 058

I StageI Powder coating with 3

in 1 chemical

65 G-97Activity of Powder Coating onsurface of

Small Green Feb-15BA

31.12.2034

N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes

25352014-15 CL D.S Foundries India Pvt Ltd.,

No.C-204, 4th Cross, I Stage, PIE, Bengaluru-560 058

I StageI Foundary activity

centrugal castings

95 O-42Industry or processes involving foundary

Small Orange 16.4.2014BA

30.06.2018

N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes

25362014-15 O

27348Metal Storage Systems.,

No.384, 10th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI spray painting

without trade effluent

N O-62Spray painting, paint baking, paint

Small Orange Sep-14BA

31.12.2023

N N N N N N N NA NA NA 0.85 N NA N Y N NA Yes

25372014-15 O

Solidex Manufacturing Company.,

No.25A/2, KIADB Main Road, II Phase, PIA, Bengaluru-560 058

II PhaseI Sheet metal

fabrication

43 G-78Switches without

electroplatinSmall Green 15.10.2014

BA31.12.2023

N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes

25382014-15 CL Metpack Industries

No.C-85, 3rd Cross, III Stage, PIE, Bamgalore-58

III StageI Reprocessed graules

of PE

11.45 O-101cleaning,

degreasing, painting and

Small Orange Dec-13BA

30.09.2018

N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

25392014-15 O

24607Macro Precision Components.,

No.131, 8th Main, III Phase, PIA, Bengaluru-560 058

III PhaseI

General Engineering

476 G-78Switches without

electroplatinSmall Green 14-Aug

BA31.12.2024

N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes

25402014-15 O

Ace Multi Axes Systems Limited.,

No.A-47, 2nd Main, II Stage, PIE, Bengaluru-560 058

II StageI

General Engineering

420 G-1Aluminum utensils fromaluminum circles by

Small Green 2015BA

31.12.2024

Y 31.12.2020 N N N N N NA NA NA 1.6 N NA N Y N NA Yes

25412013-14 CL

31003

Peenya Pharmaceuticals PVt Ltd

No.68, 6th Main, 3rd Phase, PIA, Bengaluru-560 058

III PhaseI

Ayurvedic/Herbal formulation and dietary supplements

385 O-19and

homeopathicmedicine

Small Orange 2016BA

30.09.2022N N N N N N N NA NA NA 2.5 1 ST & SP N Y Y NA Yes

25422014-15 O

24620Magnum Enterprises Unit-II.,

No.18/A, II Phase, PIA, Bengaluru-560 058

II PhaseI Readymade Garment

stitching

606 G-72Garment Stitching/ Stitching ofshoe uppers/

Medium Green 1.1.2015BA

30.12.2024

N N N N N N N NA NA NA 14 N NA N Y N NA Yes

25432015-16 O Hoshi Tools (P) Ltd.,

No.B-76, 2nd Cross, I Stage, Peenya Industrial Estate, Bangalore – 560 058

I StageI

Engineeering Activity

867 G-10Carpentry & wooden furnituremanufacturi

Medium Green 1.1.2015BA

31.12.2024

N NA NA NA NA NA NA NA NA NA 1.85 N NA N Y N NA Yes

2544 Dynamatic Hydraulics Unit-II, K-12, 5th Cross, I Stage, PIE, I Stage Manufacture of gear Industries 25442015-16 O

Dynamatic Hydraulics Unit-II, A Division of Dynamatic

Technologies Ltd.,

K-12, 5th Cross, I Stage, PIE, Bengaluru-560 058.

I StageI

Manufacture of gear

units, control valves,

hand pumps

1864 O-63Industries with Heat

Treatment, Large Orange Aug-15

BA30.09.2020

Y 30.09.2024 N N N N N NA NA NA 6.2 0.1 NA N Y Y NA Yes2545

2015-16 O Sara Soule Private Limited., No.443, 12th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Shoe upper pairs

475 G-45Leather foot wear and leather products

Small Green 19.9.2015BA

31.12.2024

N NA NA NA NA NA NA NA NA NA 5.6 N ST & SP N N N NA Yes

25462015-16 CL

24865Hydac (India) Pvt Ltd.,

No. 275, 4th Main Road, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Manufacturing of hydralic power packs calibration

606 G-78Engineering Industries Medium Green 01.02.2015

BA31.12.2024

Y 31.12.2021 NA NA NA NA NA NA NA NA 1.2 N NA N Y N NA Yes

25472015-16 CL

Talin Modular Office Furniture Systems Pvt Ltd.,

Unit-II, No. A-17, III Stage, PIE, Bengaluru-560 058

III StageI

Modular wooden kitchens 201 O-51

Modular wooden furniture

from

Small Orange 1.1.2015BA

30.09.2018N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

25482015-16 CL M.M Heat Treaters.,

No.B-25/A, 2nd Cross, 2nd Main, II Stage, PIE, Bengaluru-560 058

II StageI

Heat Treatment44.5 O-36

Heat treatment using oil fired furnace

Small Orange 2013BA

30.06.2018

N NA NA NA NA NA N NA NA NA 0.15 N NA N Y N Yes

25492015-16 O

24985

Digiflic Enerpax Global Private Limited.,

No.387, 10th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

LED lights Manufacturing 2090 G-114

Solar power generation through, solar

Small Green 29.10.2014

BA31.12.2025

N NA NA NA NA NA NA NA NA NA 0.7 N NA N Y N NA Yes2550

2015-16 O24771

Paragon Polymer Products Pvt Ltd (Formerly Elastrex

Polymers Pvt Ltd).,

No.B-69, 2nd Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Hot and Cold Insole69 G-78

Panel Board, Switches withoutelectroplatin

Small Green 24.4.2015BA

31.12.2025

N NA NA NA NA NA NA NA NA NA 0.75 N NA N Y N NA Yes

25512015-16 O

24986

Digiflic Controls India Private Limited.,

No.3B-04, No.3, Plot No. 488-B, MS Industrial Complex, 14th Cross, IV Phase, PIA, Banagalore-58

IV PhaseI

Solar home lighting system 40 G-114

Solar power generation through, solar

Small Green 20.10.2009BA

31.12.2024N NA NA NA NA NA NA NA NA NA 0.85 N NA N Y N NA Yes

25522015-16 O

29066BPE Biotree India Pvt Ltd.,

No.96,III Phase, PIA, Banghalore-560058

III PhaseI Bio pharmaceutical

equipments

345 G-46Steel furniture without spray

Small Green 01.04.2015BA

31.12.2025

N NA NA NA NA NA NA NA NA NA 2 N NA N Y N NA Yes

25532015-16 O

Allied Metallurgical Products Pvt Ltd,

No.201/3, 12th Main, III Phase, PIA, Bangalore-560058,

III PhaseI Metallurgical

products

400 G-109Refilling, Repacking andblending of

Small Green 2007BA

30.6.2019

N NA N N N N N NA N NA 0.64 N NA N Y N NA Yes

25542015-16 O Velox Tyres Pvt Ltd.,

No.A-345, 9th Main, II Stage, PIE, Bengaluru-560 058

II StageI Solid tyre

manufacturing

160 O-70Tyres and tube volcanization / hot retreading

Small Orange 1.1.2015BA

12.01.2025

N NA NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes

25552015-16 O

25334RA Fashions Pvt Ltd.,

No.57-B, III Phase, Peenya Industrial Area, Bengaluru-560 058

III PhaseI

Garments stitching

1216 G-72Garment Stitching/ Stitching ofshoe uppers/

Large Green 01.05.2015BA

31.12.2024

N NA NA NA NA NA NA NA NA NA 17.5 N ST & SP N N N NA Yes

25562015-16 O

25465A.T.E Enterprises Pvt Ltd.,

No. 103, 113 & 114, III Phase, PIA, Bengaluru-560 058

III PhaseI

Industrial pre cooling system 760 G-90

Polyurethane foam extrusion as an allied activityMedium Green 01.09.2015

BA31.12.2024

N NA NA NA NA NA NA NA NA NA 3.2 N ST & SP N N N N Yes

25572015-16 CL

25072Shahi Exports Pvt Ltd.,

No.V-80, 1st A Main Road, II Stage, PIE, Bengaluru-560 058

II StageI

Manufacturing of readymade garments

500 G-98Garments Stitching

Small Green 2012BA

31.12.2025

Y 31.12.2020 NA NA NA NA NA NA NA NA 8 N NA N Y N Yes

25582015-16 O

24865Hydac (India) Pvt Ltd.,

No. 17/i, 1st Main Road, II Phase, PIA, Bengaluru-560 058

II PhaseI

Manufacturing of hydralic cylinder

486 G-60Repairing, cleaning,degreasing, painting and

Small Green 01.01.2015WA

31.12.2024Y 31.12.2021 NA NA NA NA NA NA NA NA 1.3 N NA N Y N NA NA

25592015-16 CL Sairam Creations.,

No.40B, II Phase, PIA, Bangalore- 560058

II PhaseI

Garments washing

398 O-13Mechanized laundry using oil fired boiler

Small Orange 2015BA

30.09.2019

Y 30.09.2020 NA NA NA N N NA NA NA 0.4 18 ETP Y Y N Yes

25602015-16 O

25460Mahesh Machine Tools.,

No.2-B, 1st Cross, 5th Main, III Phase, PIA, Bnagalore-58

III PhaseI

Machine Components

25.2 G-78Panel Board, Switches withoutelectroplatin

Small Green 25.2.2004WA

31.12.2024

N NA NA NA NA NA NA NA NA NA 0.04 N NA N Y N NA NA

25612014-15 CL

MJS Metal Coaters Private Limited.,

No.729/B, 3rd Cross, I Stage, PIE, Bengaluru-560 058

I StageI

Sheet blasting painting and power coating

66 R-44Industry or process involving metal surgace treatment such as packing

Small Red Jul-14BA

30.06.2019

Y 30.06.2019 NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes

25622015-16 CL PADM Laboratiories Pvt Ltd.,

No.453/A, First Floor, 12th Cross, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Pharmaceutical Products

150 O-74Pharmaceuti

cal formulation

Small Orange 2015BA

30.09.2028

N NA NA NA NA NA NA NA NA NA 0.4 0.05 ST & SP N N Y NA Yes

25632013-14 CL

Radhalakshmi Smelters Private Limited.,

No.446, IV Phase, PIA, Bengaluru-560 058

IV PhaseI

Aluminium alloy ingots and billets

65.45 R-50Aluminium alloy ingots and billets

Small Red 16.1.2013BA

30.06.2017

N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes

25642015-16 O

26425Kaba steels,

No. 53/13, Andrahalli main road, PEENYA Ind ESTATE -stage

2,peenya,bangalore urban

II StageI

Aluminium waste

copper waste

corrugated box

15 G-1Aluminium waste copper waste corrugated box

Small Green 1.1.2016BA

31.12.2099N NA NA NA NA NA NA NA NA NA 0.4 N NA N Y N NA Yes

25652015-16 O

Newgen wires & coils Pvt Ltd.,

V-28 , 9th main road peenya ind estate, II Stage, PIE ,Banglore-58

II StageI

insulator conductor

including wire

drawing with

541 O-72

Wire

drawing and

wire netting

Medium Orange 04.01.2016BA

31.12.2025Y 31.12.2025 NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes

25662015-16 O

Ponalab biogrowth private limited ,

10th cross , III Stage, PIE, Bengaluru-560 058

III StageI

Biocontrol agents and

animal feed

suppliments

73 O-21Fish feed, poultry feed and cattle feed

Small Orange Aug-15BA

30.09.2029N NA NA NA NA NA NA NA NA NA 0.72 0.31 NA N Y Y Yes

25672015-16 CL 33274 Surya metal finishers ,

P-17 , 3rd cross, III Stage ,PIA, Bengaluru-560 058

III StageI

Job working electroplating

30.84 R-44Industry or process involving metal surgace treatment such as packing

Small Red Aug-11

BA30.06.2016

N N N N N N N NA NA NA 0.08 0.08 NA N Y Y NA Yes2568

2015-16 O25226

SO Design factory, No.244,4th main, IV Phase,PIA

Bengaluru-560 058IV Phase

IGarments stitching

21.66 G-72Garment Stitching/ Stitching of

Small Green 01.07.2014BA

31.12.2024N NA NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes25226 Garments stitching Stitching of

shoe uppers/ BA N NA NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes

25692015-16 O Fine Plastics,

No.546/2, 7th main,IV phase,PIA , Bengaluru-560 058

IV PhaseI

Plastic injection moulded components N G-32

Polythene and plastic processedproducts

Small Green 2010BA

31.12.2021N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes

25702015-16 O Hanu Vibro technologies,

No.C 248,5th cross, I State,peenya industrial estate ,banglore 58

I StageI

Metal and steel

blockening and grit

plasting

10 R-44Industry or process involving metal surgace treatment such as packing

Small Red 2012BA

30.06.2020N NA NA NA NA NA NA NA NA NA 0.16 0.03 NA N Y Y NA Yes

25712015-16 CL

-Super Power System,

No.B-151, 5th main,II Stage, PIE, Bangalore -58

II StageI

Battery manufacturing

23 R-7Lead acid batterymanufacturing(excluding

Small Red 2009BA

30.06.2011N N N N N N Y NA NA NA 0.2 0.75 NA N Y Y NA Yes

25722015-16 O 25924

Master Heat Treaters Private Limited.,

No.102-A (B), II Stage, PIE, Bangalore-560058

II StageI Heat Treatment on

job work

472 O-36Heat treatment using oil fired furnace

Small Orange May-14

BA

30.09.2029

N NA NA NA NA NA NA NA NA NA 1.044 0.2 NA N Y Y NA Yes2573

2015-16 O HeatronixNo 296, 297, IV Phase, 5th main,

Peenya Industrial Area, Bengaluru 560 058

IV PhaseI

Extrusion of

aluminium and

fabrication

42.9 O-17Aluminium & copper extraction from

Small Orange 2014

BA

30.09.2020

N NA NA NA NA NA NA NA NA NA 0.6 N NA N Y N NA Yes2574

2015-16 O11470

Synergy Punching Pvt Ltd., No.374, 10th Cross, IV Phase, PIA,

Bengaluru-560 058IV Phase

I

Sheet metal

enclosures with

surface treatment

260 R-9

enclosures

with surface

treatment

Medium Red 28.7.2010 BA 30.06.2022N NA NA NA NA NA NA NA NA NA 6 10 ST & SP ETP Y N N NA Yes

25752015-16 O

29263P & S Chemtech

Plot No. B-223, I st Stage, Peenya Indl Estate, Bengaluru-560 058

I Stage I Chemical blending &

packaging

50 R-25chemicals

and electrochemicals

Small Red 22.08.2016 BA 30.06.2021N NA NA NA NA NA NA NA NA NA 0.08 0.01 NA N Y Y NA Yes

25762015-16 O

24749Steer Engineering Pvt Ltd

No. 349/350, 9th Cross, IVth Phase, Peenya Indl Area, Bengaluru-560 058

IV Phase IR & D

654 G-81laboratories

notinvolving

Medium Green 2010 BA 31.12.2034Y 31.12.2024 NA NA NA NA NA NA NA NA 4 N NA N Y N NA Yes

25772015-16 CL

25139Bel Pharma

No. 271, IVth Phase, Peenya Indl Area, Bengaluru-560 058

IV Phase IFood and herbal

tablets 364 G-2Ayurvedic and homeopathicmedicines

Small Green 09.09.2015 BA NAN NA NA NA NA NA NA NA NA NA 0 N ST & SP N N N NA Yes

25782015-16 CL Chaitanya Colourants

No. C-93/A, 2nd B Main, 2nd Stage, Peenya Indl Estate, Bengaluru-560 058

II Stage IPowder

manufacturing 85.2 O-81Repackaging and blending of chemicals

Small Orange Jan-16 BA NAN NA NA NA NA NA NA NA NA NA 0 N NA N Y N NA Yes

25792015-16 O

27110Tholasi Prints India Pvt Ltd

Plot No 379, 10th Cross, IV Phase, Peenya Industrial Area, Bengaluru 560

058IV Phase I

Printing publicity materrial 1205 O-59

Printing press &/or Screen PrintingLarge Orange 13.11.2013 BA 31.12.2024

N NA NA NA NA NA NA NA NA NA 0.08 0.2 ST & SP N N Y NA Yes

25802015-16 O

11616

Ams Bhargava Machining Pvt Ltd

Plot No. 132, 8th Main, IIIrd Phase, Peenya Indl Area, Bengaluru-560 058

III Phase IMachine tools parts

CNC job works 1039 G-78Machine tool parts and CNC job works

Large Green 19.08.2010 BA 31.12.2027N NA NA NA NA NA NA NA NA NA 1.8 N NA N Y N NA Yes

25812015-16 O

31743

SAPL Industries Pvt Ltd (Printing Div)

Plot No. 28C, 2nd Phase, Peenya Indl Area, Bengaluru-560 058

II Phase IPrint on ready made

garments 24 O-12Silk screen printing, sari printing bywooden

Small Orange Dec-14 BA 30.09.2021N NA NA NA NA NA NA NA NA NA 1 0.38 NA N Y Y NA Yes

25822015-16 O

24059Metal Storage Systems Pvt Ltd

No. 410, 11th Cross, 4th Phase, Peenya Indl Area, Bengaluru-560 058

IV Phase IPowder coating

474 G-97Activity of

Powder Coating onsurface of

Small Green 06.01.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes

25832015-16 O

26986

Life Line Feeds(India) Pvt Ltd No 25, B-C, 3rd main, 4th cross, II Phase, Peenya Industrial Area,

Bengaluru 560 058 II Phase I

Cold storage and redistribution 700 O-10

Chilling plant cold storage and ice making Medium Orange 15.3.2016 BA 30.09.2030

N NA NA NA NA NA NA NA NA NA 2.9 N NA N Y N NA Yes

25842015-16 O

28588

Deccapel Fashions Pvt. Ltd (formerly Deccan Leather

Fashions)

No. 306-B, IVth Phase, 4th Main, Peenya Indl Area, Bengaluru-560 058

IV Phase IReady made leather

garments 1574 G-72Leather cutting and stitching including Ready made leather garments

Large Green 10.03.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.8 N NA N Y N NA Yes

25852015-16 O

24689Colors Matrix

Plot No 310, 8th cross, 4th phase, Peenya Industrial Area, Bengaluru 560

058IV Phase I

Garment Stiching 240.7 G-72

Garments StitchingSmall Green 06.01.2014 BA 31.12.2025

N NA NA NA NA NA NA NA NA NA 3.8 N NA N Y N NA Yes

25862015-16 O

28508Karthik Electricals

No. 79-80, Ranjit compound, peenya 3rd Phase, PIA, Bengaluru-560 058

III Phase IDistribution transformer

48 G-85Transformer assembly unit

Small Green 01.04.2014WA

31.12.2025N NA NA NA NA NA NA NA NA NA 0.15 N NA N Y N NA NA

25872015-16 O

28117HK Wentworth India Pvt Ltd

No. 73, 6th Main, 3rd Phase, Peenya Indl Area, Bengaluru-560 058

III Phase I

encaptulation resin,

thermal interfcae

material

833 O-75 Synthetic

resins

Small Orange 2.4.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.5

0.2 (inceneration) NA N Y N NA Yes

25882015-16 O RPS Industries

No. 79/80, 3rd Phase, Peenya Indl Area, Chokkasandra, Bengaluru-560

058III Phase I

air,exhaust systmes,

air pollution

equipments, kitechn

29 G-78Panel Board, Switches withoutelectroplatin

Small Green 12.08.2015BA

31.12.2025N NA NA NA NA NA NA NA NA NA 0.16 N NA N Y N NA Yes

25892015-16 O

29353Rajendra Enterprises

No. 21, 5th Main, IIIrd Phase, Peenya Indl Area, Chokkasandra, Bengaluru-

560 058III Phase I

Powder coating for furnitures and machinery parts

8 G-97Activity of Powder Coating onsurface of

Small Green 01.04.2013 WA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.18 N NA N Y N NA NA

25902015-16 O

25187BPE Bio Tree India Pvt Ltd

No. 105, IIIrd Phase, Peenya Indl Area, Bengaluru-560 058-560058

III Phase IManufacturing of Bio pharmaceutical equipments

471 G-78Panel Board, Switches withoutelectroplatin

Small Green 16.05.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 2 N NA N Y N NA Yes

25912015-16 O Nikitech Electric Pvt Ltd

No 627/3, Plot No 36B, NTTF Circle, Peenya 2nd Phase, Peenya Industrial

Area, Bengaluru 560 058II Phase I

Manufacturing of

electric control panel

boards

317 G-78Panel Board switches without electroboard / control panel

Small Green 01.02.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.25 N ST & SP N N N NA Yes

25922015-16 O

29699

Facade Clad Tech Private Limited

No 310/2, 8th cross, 4th phase, Peenya Industrial Area,, Bengaluru 560 058

IV Phase IAlunimuim panels

13.2 W-14Engineering and fabricationunits (dry

Small White 20.06.2015WA

31.12.2025N NA NA NA NA NA NA NA NA NA 0.18 N NA N Y N NA NA

2593 No 460 B, Ist and 2nd floor, Near Garments stitching Garment 25932015-16 O

29724Akash Apparels

No 460 B, Ist and 2nd floor, Near NTTF Circle, Ivth phase,

Chokkasandra, Bengaluru Urban District, Bengaluru 560 058

IV Phase IGarments stitching

112 G-72Garment Stitching/ Stitching ofshoe uppers/

Small Green 01.01.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 6 N ST & SP N N N NA Yes

25942015-16 O

29722

Coastal Heat Treatment Solution

No. B188/1, 5th Main Rd, Peenya 2nd Stage, Bengaluru-560 058

II Stage IHeat treatment

130 O-36Heat treatment using oil fired furnace

Small Orange 2016 BA 30.09.2023N NA NA NA NA NA NA NA NA NA 0.4 N NA N Y N NA Yes

25952015-16 O

26993

Maruthi Microcomponents Pvt Ltd

No. 17 G1, IInd Phase, Peenya Indl Area, Bengaluru-560 058

II Phase IGeneral engineering

485 G-10Carpentry & wooden furnituremanufacturi

Small Green 01.04.1999 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes

25962015-16 O Kurlon Enterprise Limited

No. 287, 4th Phase, Peenya Indl Area, Bengaluru-560 058

IV Phase I foam mattress spring

mattress

317 G-90foam

extrusion asan allied

Small Green 01.05.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 2.2 N ST & SP N N N NA Yes

25972015-16 O

28310Tharu & Sons

Plot No. 9E/20, IInd Phase, Peenya Indl Area,Bengaluru-560 058

II Phase IMechanized laundry

432 O-46Mechanized laundry using oil fired boiler

Small Orange May-16 BA 30.09.2021N NA NA NA NA NA NA NA NA NA NA N NA N Y N NA Yes

25982015-16 O

25499

Pronk Multiservice India Pvt Ltd Unit-2

No A52, nd main road, 2nd stage, Peenya Industrial Estate, Bengaluru

560 058II Stage I

Wooden boxes,

Wooden crates and

Pallets

135 G-7Brass and bell metal utensilsmanufacturi

Small Green 01.10.2015 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 2 N NA N Y N NA Yes

25992015-16 O

Indvac Systems And Components

B-167, 4th Main, 2nd Stage, Peenya Indl Estate, Chokkasandra, Bengaluru-

560 058II Stage I

Assembly, testing and

service, manufacture

of vaccum pumps

128 G-78Panel Board, Switches withoutelectroplatin

Small Green 28.112005WA

31.12.2025N NA NA NA NA NA NA NA NA NA 0.1 N NA N Y N NA NA

26002015-16 CL

30555

Tirupathi Lpg Industries Pvt Ltd Unit-II

No. 15, 2nd Phase, Peenya Indl Area, Bengaluru-560 058-560058

II Phase I Manufacturing of LPG

cylinders

450 O-101manufacture of cylinders caps for L.P.G. cylinders

Small Orange 01.08.2016 BA 30.09.2017Y N N N N N N N N NA 3.8 0.12 ST & SP N N Y NA Yes

26012015-16 O

26701Akshara Drug House Pvt Ltd

No 333, Ist Floor, 9th Cross, 4th Main, IVth Phase, Peenya Industrial Area,

Bengaluru 560 058IV Phase I Manufacturing of

Ayurvedic products

90 O-19Ayurvedic and homeopathic medicine

Small Orange 04.12.2015 BA 30.09.2020N NA NA NA NA NA NA NA NA NA 1 0.2 NA N Y Y NA Yes

26022015-16 O 24305 Washport Processing

No. 288, 4th Phase, Peenya Industrial Area, Peenya, Bengaluru-560 058

IV Phase I Washing of

readymade garments

345 O-50Mechanized laundry using oil fired

Small Orange 9.9.2016 BA 30.09.2017

N NA NA NA NA NA NA NA NA NA 1.8 45 ETP Y Y N NA Yes2603

2015-16 CL28650

Marman Food & Beverage Technologies India Pvt Ltd

No. 49A & 49B, IIIrd Phase, Peenya Indl Area,Chokkasandra, Bengaluru-

560 058III Phase I

Food and beverages

584 O-7Food and food processing

Medium Orange 02.04.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.6 N ST & SP N N N NA Yes

26042015-16 O Minebea Intec India Pvt Ltd

No.26D, II Phase, PIA, Bengaluru-560 058.

II Phase I Assembly of Weighing

Machine

2500 G-78Switches without

electroplatinLarge Green 16.12.2016 BA 31.12.2026

Y 31.12.2024 NA NA NA NA NA NA NA NA 0.001 N NA N Y N NA Yes

26052015-16 CL Gayathri Metal Finishers, No.C-212, I Stage, PIE, Banglaore -58 I Stage I

Electroplating126 R-44

processingSmall Red 2014 BA 30.06.2016

N NA NA NA NA NA NA NA NA NA 0.064 0.03 NA N Y Y NA Yes2606

2015-16 OAstek Electric Company Pvt

LtdNo.B-301, 7th Main, 2nd Stage,

Peenya Indl Estate, Bengaluru-560 058II Stage I

Manufacture of AC & DC motors

76 G-77Motor manufacturing

Small Green 1.2.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.18 N NA N Y N NA Yes

26072015-16 O

25475Neoairtech India Pvt Ltd

No 546/2, 7th main, IVth phase, Peenya Industrial Area, bengaluru 560

058IV Phase I

Air pollution control equipment

223 G-46Steel furniture without spray

Small Green 13.8.2012 BA 31.12.2024N NA NA NA NA NA NA NA NA NA 0.17 N NA N Y N NA Yes

26082015-16 CL

11046

Bangalore Shirt company, (Printing Div)

No.254/A, Sy No 87 &150, III Phase, PIA, Bangalore-560058

III Phase IPrinting and readymade garments 51.98 R-40

Yarn / Textile processinginvolving

Small Red 6.4.2015 BA 30.06.2014Y 31.12.2020 N N N N N NA NA NA 0.15 0.05 NA N Y Y Yes

26092015-16 O

41505

Komtech Plastic Technologies India Pvt Ltd.

No 136/137 , I st Floor, III Phase, PIA, Bengaluru-560 058

III Phase ISpray painting

59.75 O-62Spray painting, paint baking, paint

Small Orange 2013 BA 30.09.2023N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

26102015-16 O

17881Hanu Heat Treaters, Unit-II

No.B-317, 2nd Main Road, I Stage, PIE, Bengaluru-560 058,

I Stage IHeat Treatment

285 O-36Heat treatment using oil fired furnace

Small Orange 15.5.2016 BA 30.09.2030N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes

26112015-16 O

28439Sri Venkateshwara Packging,

No.333, 9th cross, IV Phase, PIA, Bangalore,

IV Phase IManufacturing of packing machine and accessories

36 G-78Panel Board, Switches withoutelectroplatin

Small Green 1.7.2015WA

31.12.2025N NA NA NA NA NA NA NA NA NA 0.4 N NA N Y N NA NA

26122015-16 O

29398Maruthi Steels

Mo. B-141, 3rd Cross, II Phase, Peenya Indl Area, Chokkasandra,

Bengaluru-560 058II Phase I

Iron, steel scraps

4.6 W-14

and

fabrication

units (dry

Small White 17.11.2006BA

31.12.2024N NA NA NA NA NA NA NA NA NA 0.1 N NA N Y N NA Yes

26132015-16 O

40872Excelon Technologies

Plot No.340, 9th Cross, IV Phase, Peenya Indl Area, Bengaluru-560 058

IV Phase I

machined

components for

airospace

324 G-78Switches without

electroplatinSmall Green 1.6.2016 BA 31.12.2027

N NA NA NA NA NA NA NA NA NA 1.8 N NA N Y N NA Yes2614

2015-16 O27563

Mitsubishi Electric India Pvt Ltd

No. 56, 4th Main, Peenya 3rd Phase, Peenya Indl Area, Bengaluru-560 058

III Phase I

cooler/conditioners ,

repairing and

servicing

2180 G-78Switches without

electroplatinLarge Green 2016 BA 31.12.2026

N NA NA NA NA NA NA NA NA NA 0.64 N NA N Y N NA Yes

2615 2018-19O

41291Echakra Innovations Pvt Ltd

No. SB/47, I Cross, I Stage, Peenya Indl Estate, Bengaluru-560 058

I Stage Ie-waste dismantling

128 R-33engaged in recycling/

Small Red 2018 BA 30.06.2023N NA NA NA NA NA NA NA NA NA 0.26 N NA N Y N NA Yes

2616 2018-19O

63945

Hydratech Industries India Pvt Ltd

No.307 & 308, 5th Main, IV Phase, PIA, Bangalore-560058

IV Phase IAssembling and testing of cooling systems for wind turbine

1373 O-101cleaning,

degreasing, painting and

Large Orange 2018 BA 30.09.2027N NA N NA NA NA NA NA NA NA 2.5 N NA N Y N NA Yes

2617 2018-19YTC

53371Shoma Automation Pvt Ltd

No.C-28, 2nd Main, II Stage PIE, Bengaluru=560058

II Stage IManufacture of Fabricated metal products, except

81 G-78Switches without

electroplatinSmall Green 2018 BA 10.12.2023

N NA N NA NA NA NA NA NA NA NA N NA N N N NA Yes53371 products, except machinery and

electroplatin N NA N NA NA NA NA NA NA NA NA N NA N N N NA Yes

2618 2018-19YTC

53369Evgrien Services Pvt Ltd

No.C-65, 2nd Main, II Stage, PIE, Bengaluru-560058

II Stage IManufacture of Fabricated metal products, except machinery and

196 Switches without

electroplatinSmall Green

2017 BA 10.12.2023 N NA N NA NA NA NA NA NA NA NA N NA N N N NA Yes

2619 2018-19O

40779Sri Sai Enterprises

No.P-10-A, 3rd Cross, III Stage, PIE, Bengaluru-560058

III Stage IFurniture cushion moulds with mixing & moulding

11.8 O-80Foam manufacturing

Small Orange10.10.2017 BA 30.09.2022 N NA N NA NA NA NA NA NA NA 0.32 N NA N Y N NA Yes

2620 2018-19O

23357Veeresh Industries

No.C-27, II Stage , PIE, Bengaluru-560058

II Stage IAromatic Chemicals

2.2 R-22Chemicalsmanufacturing

Small Red2007 BA 30.06.2023 N NA N NA NA NA N NA NA NA 0.24 N NA N Y N NA Yes

2621 2018-19O

34596Sai Sathyasiri Eximm

No.116, 7th Main, III Phase, PIA, Bengaluru-560058

III Phase IEdibal super olein plam oil

98 O-71Vegetable oil manufacturing including solvent

Small Orange 2018 BA 30.09.2023N NA N NA NA NA NA NA NA NA 0.48 N NA N Y N NA Yes

2622 2018-19O

39611Ceramed Engineers Pvt Ltd,

No.290, 6th Main, II Stage, PIE, Bengaluru-560058

II Stage IHeat treatment furnace and its parts 202 G-78

switches without electroboard

Small Green 2018 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes

2623 2018-19CL

28611

Lakshmi Vacuum Heat Treaters (P) Ltd

No.27 & 28, 5th Main, III Phase, PIA, Bengaluru-560058

III Phase IVaccum heat treatment of engineering tools & components

1281 O-36treatment using oil fired furnace

Large Orange 2018 BA 30.09.2022N NA N NA NA NA NA NA NA NA 0.8 0.05 NA N Y Y NA Yes

2624 2018-19O

76077Srujana Enterprises

No.116/117-1, III Phase, PIA, Bengaluru-560058

III Phase ICu&Pb precision components 747.56 G-7

bell metal utensilsmanufacturi

Medium Green 20.3.2018 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.96 N NA N Y N NA Yes

2625 2018-19O

75481Lecon Energetics Pvt Ltd

No.484, B & C, IV Phase, PIA, Bengaluru-560058

IV Phase IAssembly of electrical control panels with soft starter

112 O-62painting, paint baking, paint

Small Orange 26.12.2018 BA 30.09.2023N NA N NA NA NA NA NA NA NA 0.84 N NA N Y N NA Yes

2626 2018-19O

76855SET Manufacturing Systems

No.C-351/1, I Stage, 9th Cross, PIA, Bengaluru-560058

I Stage IPrcession components with CNC machining 112 G-7

bell metal utensilsmanufacturi

Small Green 1.1.2019 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.33 N NA N Y N NA NA

2627 2018-19O

76959AMS Technologies

No.16, I Cross, I Stage, PIE, Bengaluru-560058

I Stage IPlastic injection moulded components 296 G-32

and plastic processed products

Small Green 1.3.2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 1.6 N NA N Y N NA Yes

2628 2018-19O

76799Excellent Engineering No.C-283, I Stage, PIE I Stage I

Borewell drill bits and hammers with CNC machining

151 G-93ng of nuts and bolts with

Small Green 2012 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.54 N NA N Y N NA NA

2629 2018-19O

75136STJ Industries No.A/364, 1 Main, I Stage, PIE I Stage I

Borewell drill bit & hammer 93 O-36

treatmentusing oil fired furnace

Small Orange 2015 BA 30.09.2023N NA N NA NA NA NA NA NA NA 0.24 N NA N Y N NA Yes

2630 2018-19O

77127

Unique punch systems Pvt Ltd - Unit III

No.57-B, 3rd Main, III Phase, Peenya Industrial Area, Bengaluru-560 058

III Phase IFabrication, Assembly & screen printing of electrical cabinet radical equipments

1267 O-59press &/or Screen Printing

Large Orange 2018 WA 30.09.2023N NA N NA NA NA NA NA NA NA 3.32 N NA N Y N NA NA

2631 2018-19O

75917VEC Solutions

No.C-284, 7th Cross, I Stage, PIE, Bengaluru-560058

I Stage IAssembly/testing of lab vaccum equipments

110 G-7bell metal utensilsmanufacturi

Small Green 2010 WA 31.12.2029N NA N NA NA NA NA NA NA NA 0.54 N NA N Y N NA NA

2632 2018-19O

25458Dandy Rolls India Pvt Ltd

No.A-179, 4th Cross, I Stage, PIE, Bengaluru-560058

I Stage ISS hollow plaint rolls m/c paper parts 301 G-7

bell metal utensilsmanufacturi

Small Green 1975 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.48 N NA N Y N NA Yes

2633 2018-19O

77051Easun Enterprises

No.231, 11th Main Road, III Phase, PIA, Bengaluru-560 058

III Phase IGrinding & Milling f m/c MS Rollers & shafts

30 G-93ng of nuts and bolts with with

Small Green 2017 WA 31.12.2029N NA N NA NA NA NA NA NA NA 0.33 N NA N Y N NA NA

2634 2018-19O

75982Mehta Industrial Corporation

No.35/1, I Main, II Phase, PIA, Bengaluru-560058

II Phase IAluminium cooking wares with pressing 94 G-1

utensils from aluminium circles by

Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.25 N NA N Y N NA Yes

2635 2018-19O

77213Sri Venkateshwara Glass N Ply

No.A-357/B, 9th Cross, I Stage, PIE, Bengaluru-560058

I Stage Icutting and cnc polising of glass 209 G-21

ceramic, earthenpotteries, tile

Small Green 2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.19 N ST & SP N N N NA NA

2636 2018-19O

24085Mallya Fine Chem (P) Ltd.,

No.A-266(A), II Stage, PIE, Bengaluru-560058

II Stage IFragrance powder detergent application 264 G-62

Synthetic detergent formulation

Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.21 N NA N Y N NA Yes

2637 2018-19O

75184

Schunk Metal & Carbon (India) Pvt Ltd

No.485/2, 14th Cross, IV Phase, PIA, Bengaluru-560058

IV Phase IAss & test of electric tain earth return brush 2240 G-78

Switches withoutelectroplatin

Large Green 18.1.2019 BA 31.12.2028Y 31.12.2024 N NA NA NA NA NA NA NA 3.6 N NA N Y N NA Yes

2638 2018-19O

77476Uday Industries

No.239, 11th Main, III Phase, PIA, Bengaluru-560058

III Phase IFabrication & m/c of MS electrical motor components

60 G-77of Motor & Pumpswithout

Small Green 2019 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.48 N NA N Y N NA Yes

2639 2018-19O

77484BIR Metal Systems

No.A-276, II Stage, PIE, Bengaluru-560058

II Stage ISheet metal components for CNC m/c

116 G-46furniture without spray

Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 1.08 N NA N Y N NA Yes

2640 2018-19O

76165Trinity NDT Engineers -Unit-II

No.491, 14th Cross, IV Phase, PIA, Bengaluru-560058

IV Phase ITesting of Ferrous &Non Ferrous fabricated and welding items and

179 G-81laboratories notinvolving

Small Green 2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.28 N NA N Y N NA NA

2641 2018-19 O

75612Mamatha Industries

No.1A, 6th Main, &th Cross, III Phase, PIA, Bengaluru-560058

III Phase IPrecision components for aerospace application with m/c &turning opers

277 G-93 ng of nuts and bolts with with

Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.72 N NA N Y N NA Yes

2642 2018-19No.49/A, II Phase, PIA, Bengaluru-

Modular wooden wooden 2642 2018-19O

41493Namma Karkhane LLP

No.49/A, II Phase, PIA, Bengaluru-560058

II Phase IModular wooden kitchens 5.34 G-64

wooden furniture from

Medium Green 2017 BA 31.12.2023N NA N NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes

2643 2018-19O

41076

Difacto Robotics & Automation Pvt Ltd

No.151A, 152A, 3rd Cross, I Stage, PIE, Bengaluru-560058

I Stage IAssembling & testing of Robotic &automation m/c with software

993 G-7bell metal utensilsmanufacturi

Medium Green 2.12.2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 2.88 N NA N Y N NA Yes

2644 2018-19O

78318Cosmo Engineering,

No.446, 4th Phase, PIA, Bengaluru-560058

IV Phase IHydraulic pressing of Automobile components

71 G-78Switches withoutelectroplatin

Small Green 6.4.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.24 N NA N Y N NA NA

2645 2018-19O

75535Para Fine-Chem Industries.,

No.B-230, 5th Main, II Stage, PIE, Bengaluru-560058

II Stage IFormulationm, blending & packing of speciality chemicals for

185 R-1storage of hazardouschemicals

Small Red 28.12.2018 BA 30.06.2023N NA N NA NA NA NA NA NA NA 0.26 0.1 NA N Y Y NA Yes

2646 2018-19O

76264ITL India Pvt Ltd

No.463/1, IV PhaseKIADB Main Road, PIA, Bengaluru-560058

IV Phase IPaper labels for garments & printed fabric labels

1564 O-59Printing press &/or Screen Printing

Large Orange 9.2.2017 BA 30.09.2023N NA N NA NA NA NA NA NA NA 6.84 0.11 NA N Y Y NA Yes

2647 2018-19O

77323Usha steel Centre

No.M-2, 5th Cross, I Stage, PIE, Bengaluru-560 058

I Stage IMS&CI steel rods with lath machine

oprs59 G-93

ng of nuts and bolts with with

Small Green 1.1.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.24 N NA N Y N NA NA

2648 2018-19O

77443Fine Plastics,

No.SB-43, I stage, PIE, Bengaluru-560 058

I Stage IPlastic injection

moulded components 118 G-32Polythene and plastic processed products

Small Green 2.4.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.4 NA NA N Y N NA NA

2649 2018-19O

76973Vainatheya Enterprises Pvt Ltd

No.246, 8th Main, III Phase, PIA, Bengaluru-560058

III Phase IFabrication Assembly and testing of Solar lights&Solar water

heaters

69G-7

bell metal utensilsmanufacturi

Small Green 2.5.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.2 NA NA N Y N NA NA

2650 2018-19O

77178Elmec Engineers

No.14, 5th Main, III Phase, PIA, Bengaluru-560058

III Phase IMS &SS Eng components with drilling & cutting oprs

8 G-93ng of nuts and bolts with with

Small White 1.10.2017 WA 31.12.2100N NA N NA NA NA NA NA NA NA 0.18 NA NA N Y N NA NA

2651 2018-19O

75728Dfab Stainless Systems Pvt Ltd

No.3B-415/8, I stage, PIE, Bengaluru-560 058

I Stage ICopper buss cutting & welding Oprs 56 G-7

bell metal utensilsmanufacturi

Small Green 1.6.2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.32 NA NA N Y N NA NA

2652 2018-19O

77063Das Industries

No.M-5, 5th Cross, I stage, PIE, Bengaluru-560 058

I Stage IBolts&Rivets with wire drawing, cold forging, polishing,trimming&threading

468 G-93ng of nuts and bolts with with

Small Green 1.11.2018 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.52 NA NA N Y N NA Yes

2653 2018-19O

77616Fine Wood Industries

No.184 & 184/2, 11th Main, III Phase, PIA, Bengaluru-560058

III Phase ISaw mill with cutting of silver oak wood 29 G-42 Saw Mill Small Green 10.10.2017 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.24 NA NA N Y N NA NA

2654 2018-19O

75738Shree Manjunath Profiles

No.222/2, 8th Main, III Phase, PIA, Bengaluru-560058

III Phase IMS&SS sheet metal

profile&plasma cutting

150 G-7bell metal utensilsmanufacturi

Small Green 8.12.2016 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.43 NA ST & SP N N N NA NA

2655 2018-19O

75055Lohia Corp Ltd

No.486-C1, 14th Cross, IV Phase, PIA, Bengaluru-5600058

IV Phase IHDPE/PP wovensack

machineries for cement/ fertilizer ind with asmbly & paint

25 O-62painting, paint baking, paint

Large Orange 6.7.2017 BA 30.09.2029N NA N NA NA NA NA NA NA NA 2.8 NA NA N Y N NA Yes

2656 2018-19O

75695S.P.Precision Engineering

ComponentsNo.50/A, 4th Main, III Phase, PIA,

Bengaluru-5600058III Phase I

SS & Aluminium components with

CNC turning & m/c45 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1.1.2019 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.12 NA NA N Y N NA NA2657 2018-19

O76803

Wacker Chemie (I) Pvt LtdNo.9E, II Phase, PIA, Bengaluru-

5600058II Phase I

Demo&testing of adhesive polymer

powder for binding floor/wall tiles

264 O-54blending and mixing (Ball mill)

Small Orange 10.12.2017 WA 30.09.2023N NA N NA NA NA NA NA NA NA 0.25 NA NA N Y N NA NA

2658 2018-19O

77989Mahaveer Pipes

No.B-378, 100 Ft Rd, I Stage, PIE, Bengaluru-560058

I Stage IIDPE irrigation pipes by extrusion of recycled plastic granules

28 G-32Polythene and plastic processed products

Small Green 1.12.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.18 NA NA N Y N NA NA

2659 2018-19O

76932Chiranthana Agri Solutions

No.93, 7th Main, III Phase, PIA, Bangalore – 560 058 III Phase I

LDPE&HDPE irrigation pipes of various sizes by extrusion of recycled

89 G-32Polythene and plastic processed products

Small Green 3.5.2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.12 NA NA N Y N NA NA

2660 2018-19O

76929

Vedantha Irrigation Systems Pvt Ltd

No.111, 3rd Phase, PIA, Bangalore – 560 058

III Phase ILDPE&HDPE irrigation pipes of various sizes by extrusion of recycled

527 G-32Polythene and plastic processed products

Medium Green 15.6.2016 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.72 NA NA N Y N NA NA

2661 2018-19CL

11700Swan Silk Pvt Ltd,

No.107/108, III Phase, PIA, Bengaluru-560058

III Phase ISilk yarn dyeing

305 R-40Textile processinginvolving

Small Red 1.1.2019 BA 30.06.2022N NA N NA NA NA NA NA NA NA 0.8 5 ETP N Y N NA Yes

2662 2018-19O

78225

Insil ScientificNo.491/2B, 14th Cross, IV Phase, PIA,

Bengaluru-560058IV Phase I

Analytical cellulose thimbles310 G-81

Research laboratories notinvolving

Small Green 5.2.2019 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 1.2 N NA N Y N NA Yes2663 2018-19

O

78112

Envisys Technologies Pvt LtdNo.SB.118, 3rd Cross, I Stage, PIE,

Bengaluru-560058I Stage I

Assembly & testing of Environment test chambers with accessories363 G-78

Panel Board, Switches withoutelectroplatin

Small Green 9.10.2018 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes2664 2018-19

CL

33578

RKN Heat Treatment Solutions., - Unit-II

No. A-56, 2nd Cross, II Stage, Peenya Industrial Estate, Bengaluru-560058

II Stage I Heat treatment of Alloy Steel components with induction

329 O-36

(Heat treatment using oil fired

Small Orange 5.3.2017 BA 30.09.2023

N NA N NA NA NA NA NA NA NA 0.48 0.032 NA N Y Y NA Yes2665 2018-19

O

78025

ESS CEE EnterprisesNo.256, 8th Cross, IV Phase, PIA,

Bengaluru-560 058 IV Phase I

duplex board cartoon boxes for various packing applications with cutting and off

1806 O-35

Gravure printing, digital printing on

Large Orange 15.1.2018 BA 30.09.2023

Y 30.09.2023 N NA NA NA NA NA NA NA 0.4 N NA N Y N NA Yes2666 2019-20

O

39155

Steer Life India (P) LtdNo.290, 4th Main, IV Phase, PIA,

Bengaluru-560058IV Phase I

R&D for PSDC and PDC 749 R-58

Pharmaceutical (Bulk drug &Active

Medium Red 13.3.2018 BA 30.06.2021

N NA N NA NA NA NA NA NA NA 0.8 0.005 ST & SP N N Y NA Yes39155 Active N NA N NA NA NA NA NA NA NA 0.8 0.005 ST & SP N N Y NA Yes2667 2019-20

O

75482

Dirak India Panel Fittings Pvt Ltd

No.111, 1st Main Road, II Phase, PIA, Bangalore – 560 058

II Phase IAssembly & testing of electrical panel board locks & hinges

505 G-78

Panel Board switches without electroboard

Medium Green 1.5.2018 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.96 N NA N Y N NA Yes2668 2019-20

O

78364

Unimech Aerospace & Manufacturing Pvt Ltd

No.103,113,114, 7th Main, III Phase, Bengaluru-560058

III Phase I Ferrous & Non ferrous aerospace m/c repair tooling

1019 G-93

Manufacturing of nuts and boltswith cold

Large Green 1.10.2019 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 3.6 N NA N Y N NA Yes2669 2019-20

O

77367

Venkateshwara Manufacturing & system

No.B-303 &304, 7th Main road, II Stage, PIE, Bengaluru-560058

II Stage Iprecision turned parts

146 G-78

Panel Board switches without electroboard

Small Green 1.4.2018 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.5 N ST & SP N N N NA NA2670 2019-20

O

75983

Fine craftsNo.18-B, II Phase, PIA, Bengaluru-

560058II Phase I

Micro meters with turning, milling, assembling &chrome plating

127 R-44Industry or process involving metal

Small Red 6.6.2018 BA -

N NA N NA NA NA NA NA NA NA 0.36 0.16 ST & SP N N Y NA Yes2671 2019-20

O

79085

Sharat EngineeringNo.A-18, III Stage, PIE, Bengaluru-

560058III Stage I

Manufac153 G-93

Manufacturing of nuts and boltswith cold

Small Green 17.5.2018 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.5 N NA N Y N NA Yes2672 2018-19

O

32460

Chem Star Marketing Pvt LtdNo.P-5/A, 1 Cross, 10th Main Road,

III Stage, PIE, Bengaluru-560058III Stage I

Special purpose herbal extraction with R & D

26 O-19

Ayurvedic and homeopathic medicine

Small Orange 15.2.2017 BA 30.09.2021

N NA N NA NA NA NA NA NA NA 0.4 0.35 NA N Y Y NA Yes2673 2019-20

O

77610

Rotzler Semices Pvt LtdNo.4, 5th Main Road, III Phase, PIA,

Bengaluru-560058III Phase I

Assembly& testing of printed circuit board 497 G-93

Manufacturing of nuts and boltswith cold

Small Green 5.5.2019 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.55 NA ST & SP N N N NA NA2674 2019-20

O

79234

Ambika Industries.,No.491, IV Phase, PIA, Bengaluru-

560058IV Phase I

JCB Hydraulic piston rods with CNC M/c 330 G-93

Manufacturing of nuts and boltswith cold

Small Green 16.5.2019 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.28 NA NA N Y N NA NA2675 2019-20

O

79707

Traab Engg India Pvt LtdNo.5, III Phase, PIA, Bengaluru-

560058III Phase I

Asmbly&testing of printed circuit board 558 G-93

Manufacturing of nuts and boltswith cold

Small Green 15.5.2019 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.28 NA NA N Y N NA NA2676 2019

O

77154

Rigid Industries.,No. SB 37, I Stage, PIE, Bengaluru-

560058.I Stage I

PVC 138 G-26

Leather foot wear and leatherproducts

Small Green 26.2.2019 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.96 NA NA N Y N NA Yes2677 2019

O

75698

Space SpectrumNo.466, 3rd Main, 12th Cross, IV

Phase,PIA, Bengaluru-560 058IV Phase I

Modular Kitchen cabinets and Furniture’s with cutting & Assembly

40 G-10

Carpentry & wooden furniture manufacturi

Small Green 7.2.2017 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.29 NA NA N Y N NA Yes2678 2019

O

76221

Box Tech BangaloreNo.C-101/1, 3rd Cross, III Stage, PIE,

Bengaluru-560058III Stage I

MS Carton folding & Gluing machines 203 G-93

Manufacturing of nuts and boltswith cold

Small Green 1.4.2014 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.36 NA NA N Y N NA NA2679 2019

O

76263

Wel Fold Glue MachinesNo.P-12, 3rd Cross, III Stage, PIE,

Bengaluru-560058III Stage I

MS Carton folding & Gluing machines 28 G-93

Manufacturing of nuts and boltswith cold

Small Green 1.4.2015 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.22 NA NA N Y N NA NA2680 2019

O

75925

Precision RivetsNo.C-430, 1st Cross, I Stage, PIE,

Bengaluru-560058I Stage I

Aluminium revets with cold forging 25 G-93

Manufacturing of nuts and bolts with cold

Small Green 2.6.2016 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA NA2681 2019

O

79991

Seshaasai E Forms Pvt LtdNo.GF-1, 6th Cross, I State, PIE,

Bengaluru-560058I Stage I

Bank cheque books, letter heads offset & digital printing

1254 O-59

Printing press &/or Screen Printing

Large Orange 1.4.2016 BA 30.09.2023

Y 30.09.2024 N NA NA NA NA NA NA NA 1.44 NA NA N Y N NA Yes2682 2019

O

79253

Maruthi Fab Tech Unit-IINo.526/A, IV Phase, PIA, Bengaluru-

560058IV Phase I

Road Machinary components 199 G-78

Panel Board switches without electroboard

Small Green 10.1.2012 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 1 NA NA N Y N NA Yes2683 2019

O

75783

Sahara SolutionsNo.B-206, II Stage, PIE, Bengaluru-

560 058 II Stage I

CNC Machine guards88 G-78

Panel Board switches without electroboard

Small Green 10.1.2012 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 1 NA NA N Y N NA NA2684 2019

O

80041

Seven Hills International No.347, 348, 9th Cross, IV Phase,

PIA, Bengaluru-560058IV Phase I

Cutting & Stitching of ready made garments 1923 G-72

Garment Stitching/ Stitching ofshoe uppers/

Large Green 01.05.2019 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 12 NA STP N N N NA Yes2685 2019

O

77637

IPA Pvt Ltd No.447, IV Phase, PIA, Bengaluru-560

058, IV Phase I

Assmbly &testing of Electronic indication 67 O-62

Spray painting, paint baking, paint

Small Orange 1.3.2019 BA 30.09.2023

N NA N NA NA NA NA NA NA NA 1.44 NA NA N Y N NA Yes2686 2019

O

76042

Pushpagiri Punch Forms, No.331 & 322, II Stage, PIE,

Bengaluru-560058IV Phase I

Manuf of Sheet Metal Enclosed 486 G-78

Panel Board switches without electroboard

Small Green 3.1.2017 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.5 NA NA N Y N NA NA2687 2019

O

76014

Unique precisionNo.547A, IV Phase, PIA, Bengaluru-

560058IV Phase I

Manu of Machined components 76 G-78

Panel Board switches without electroboard

Small Green 2.11.2016 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.94 NA NA N Y N NA NA2688 2019

O

78227

VKC Footprints Global Pvt Ltd

No.26 A, II Phase, PIA, Bengaluru-560058

II Phase ICutting synthetic rexin sole 595 G-90

Polyurethane foam extrusion as an allied

Medium Green 1.10.2018 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 2.16 NA NA N Y N NA Yes2689 2019

O

80497

S.S Tools No.P-6/240, III Stage, PIE, Bengaluru-

560058III Stage I

Automobile injection moulding components 70 G-32

Polythene and plastic processed products

Small Green 06.06.2013 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA NA2690 2019

O

75855

Chaithanya Hi-Tech Engineering

No.289, IV Phase, PIA, Bangalore, IV Phase ICNC Machining & grinding of Automobile spare parts

708 G-93

Manufacturing of nuts and bolts with cold

Medium Green 24.01.2011 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA Yes2691 2019

Total Power Conditioners Pvt No.522, 10th Main, 4th Cross, IV Assembly and testing

Panel Board switches 2691 2019

O

76100

Total Power Conditioners Pvt Ltd

No.522, 10th Main, 4th Cross, IV Phase, PIA, Bengaluru-560058

IV Phase IAssembly and testing of UPS solar 124 G-78

switches without electroboard

Small Green 14.10.2009 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.6 NA NA N Y N NA NA2692 2019

O

80306

Seshaasai Business Forms Pvt Ltd

No.S1/C, 1st Cross, I State, PIE, Bengaluru-560058

I Stage IBanking service smart cards 1394 O-59

Printing press &/or Screen Printing

Large Orange 20.05.2015 BA 30.09.2028

Y 30.09.2024 N NA NA NA NA NA NA NA 2.1 NA NA N Y N NA Yes

2693 2019O

76862

Sunglow IndustriesNo.72, 6th Main Road, III Phase, PIA,

Bengaluru-560058III Phase I

Aluminium aerospace components 62 G-93

Manufacturing of nuts and bolts with cold

Small Green 1.7.2015 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2694 2019

O

76289

Sri Shivasakthi IndustriesNo.B-82/1, 2nd Cross, I State, PIE,

Bengaluru-560058I Stage I

MS Piston rods148 G-93

Manufacturing of nuts and bolts with cold

Small Green 1.7.2015 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2695 2019

O

76916

Akshaya Creations No.183, III Phase, PIA, Bengaluru-

560058III Phase I

Ready made garments226 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 1.7.2018 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 6 NA NA N Y N NA Yes2696 2019

O

76266

Vasu Industries No.B-18/2, 1st Cross, I State, PIE,

Bengaluru-560058I Stage I

MS Piston rods106 G-93

Manufacturing of nuts and bolts with cold

Small Green 1.7.2015 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2697 2019

O

76631

Wavell Investments Pvt LtdNo.A3, I Cross, PIE, II State, PIE,

Bengaluru-560058II Stage I

Aluminium hydraulic components 343 G-78

Panel Board switches without electroboard

Small Green 14.10.2009 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.6 NA NA N Y N NA Yes2698 2019

O

76180

Guru ElectricalsNo.M-14/A, 7th Cross, I State , PIE,

Bengaluru-560058I Stage I

Repair and aervice of electrical motor 10 G-93

Manufacturing of nuts and bolts with cold

Micro Green 9.1.2010 WA 31.12.2100

N NA N NA NA NA NA NA NA NA 0.18 NA NA N Y N NA NA2699 2019

YTC

80171

Jindo Chemical Solutions Pvt Ltd

No.M-18, 9th Cross, I Stage, PIE, Bengaluru-560058

I Stage IR & D for textiles and leather industry 686 R-83

Research and Analytical laboratories

Medium Red 1.7.2020 BA 30.6.2025

N NA N NA NA NA NA NA NA NA 0.9 1 NA N Y Y NA Yes2700 2019

O

78851

Primex No.1-A, I-BI, III Stage, PIE,

Bengaluru-560058III Stage I

Automobile seatbelt buckle 227 O-36

Heat treatment using oil fired furnace

Small Orange 01.05.2019 BA 30.09.2028

N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA Yes2701 2019

O

75830

Aditi Precision TechnologyNo.3B/415/32, II Phase, PIA,

Bengaluru -560058II Phase I

CNC & other machine parts 209 G-7

Brass and bell metal utensilsmanufacturi

Small Green 1.1.2018 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.3 NA NA N Y N NA NA2702 2019

O

75786

Nascent Ventures Pvt LtdNo.B-258/2, 6th Main Road, II Stage,

PIE, Bengaluru-560058II Stage I

Fabrication & Assmb of conveyors 52 G-93

Manufacturing of nuts and bolts with cold

Small Green 01.11.2014 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.32 NA NA N Y N NA NA2703 2019

O

75725

KNS Engineering Technology Pvt Ltd

No.451, 12th Cross, IV Phase, PIA, Bengaluru -560058

IV Phase IM.S fabrication &assembly of heavy m/c parts

543 G-93

Manufacturing of nuts and bolts with cold

Small Green 01.02.2014 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.32 NA NA N Y N NA NA2704 2019

O

75918

Vasavi Inonnovations No.P.21, III Stage, PIE, Bengaluru-

560058III Stage I

Modular Kitchen cabinets and Furniture’s with cutting & Assembly

177 G-10Carpentry & wooden furniture manufactirin

Small Green 22.10.2009 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.36 NA NA N Y N NA Yes2705 2019

O

77288

G.M.IndustriesNo.C-333 &334, 7th Main, II Stage,

PIE, Bengaluru-560058II Stage I

Aluminium/ MS Aerospace/Automobil

e components with CNC machining &

401 G-78Panel Board switches without electroboard

Small Green 01.10.2017 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.55 NA NA N Y N NA NA2706 2019

O

81804

T S International No.C-200 &C-201, 4th Cross, I Stage,

PIE, Bengaluru-560058I Stage I

Assembly & testing of Reactor for CFD panels and transfermers for cnc

288 G-85Transformer assembly unit

Small Green 01.07.2012 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 1.9 NA NA N Y N NA Yes2707 2019

O

76000

Yashas Industries, No.39/1, 4th Main, III Phase, PIA,

Bengaluru -560058III Phase I

MS/SS precision engineering components

44 G-93

Manufacturing of nuts and bolts with cold

Small Green 02.11.1995 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 1.9 NA NA N Y N NA Yes2708 2019

O

77794

Shreyas Machine ToolsNo.92/93, 7th Main, III Phase,PIA,

Bangalore-560058III Phase I

MS/SS precision engineering components

136 G-93

Manufacturing of nuts and bolts with cold

Small Green 01.12.2017 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.84 NA NA N Y N NA NA2709 2019

O

8115

Cloudwave Technologies Pvt Ltd

No.18, 5th Main, III Phase,PIA, Bangalore-560058

III Phase IMS/SS Enclosure

108 G-7

Brass and bell metal utensilsmanufacturi

Small Green 13.08.2014 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 1.9 NA NA N Y N NA Yes2710 2019

O

77146

Hi-Tech CNC TechnologiesNo.8, 10th Cross, I Stage, PIE,

Bangalore-560058I Stage I

Al Precision components with CNC M/c

336 G-93

Manufacturing of nuts and bolts with cold

Small Green 01.04.2017 BA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.6 NA NA N Y N NA Yes2711 2019

O

75849

Shri Krishna PlasticsNo.C340/A, 7th Main, II Stage, PIE,

Bengaluru-560058II Stage I

Plastic moulded components with virgin plastic granules

10 G-32

Polythene and plastic processed products

Micro Green 25.05.2017 WA 31.12.2100

N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2712 2019

O

-

Arrow MetalsNo.47, 4th Main, III Phase, PIA,

Bengaluru-56058III Phase Others

Import and Trading of Iron & steel scrap listed in Part-D of Schedule-III of the

NAHW

ImporterHWM - Reg

ImporterSmall White 30.05.2017 NA NA

Y One time N NA NA NA NA NA NA NA NA NA NA N NA N NA NA2713 2019

O81760

Intech DMLS Pvt LtdNo.239, 11th Main, III Phase, PIA,

Bengaluru-560058III Phase I

Ferrous & Non ferrous aerospace components 3D printing

2033 G-95

Shell Moulding withoutgenerating

Large Green 01.07.2019 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 1.92 NA NA N Y N NA NA2714 2019

O

76305

Indvac PumpsNo.B167/1, II Stage, PIE, Bengaluru-

560058II Stage I

Vacum pumps/systems assembly of A, GI & alloy

13 G-77

Manufacturing of motor & pumps without

Small Green 10.02.2014 WA 31.12.2028

N NA N NA NA NA NA NA NA NA 0.5 NA NA N Y N NA NA2715 2019

O

81431

Synpack Slide N Zip Pvt LtdNo.A-156, 3rd Cross, I Stage, PIE, Bengaluru-560058

I StageI LDPE slider container

for integral packaging 299 G-32

Polythene and plastic processed products

Small Green 22.12.2012 WA 31.12.2033

N NA N NA Y NA NA NA NA NA 0.72 NA NA N Y N NA NA81431 products N NA N NA Y NA NA NA NA NA 0.72 NA NA N Y N NA NA2716 2019

O

81371

Synpack Zipper Bags Pvt Ltd,. No.156/1, 3rd Cross, I Stage, PIE, Bengaluru-560058

I StageI LDPE Zip lock

container for integral packaging

247 G-32

Polythene and plastic processed products

Small Green 19.01.2001 WA 31.12.2033

N NA N NA Y NA NA NA NA NA 0.62 NA NA N Y N NA NA2717 2019

O

80984

Supra TechnologiesNo.B-78, 2nd Cross, I Stage, PIE, Bengaluru-560058

I StageI Hydraulic cylinder

precision components with CNC M/c

182 G-93

Manufacturing of nuts and bolts with cold

Small Green 01.08.2015 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.43 NA NA N Y N NA NA2718 2019

OSeshaasai E Forms Pvt Ltd

No.C-261, 6th Cross, I Stage, PIE, Bengaluru-560068

I StageI Paper envelops for

dispatching bank documents

261 G-9Cardboard or corrugated box and

Small Green 01.03.2019 WA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.96 NA NA N Y N NA NA2719 2019

O

80483

Hycom Engineering India Pvt Ltd., No.40, 4th Main Road, III Phase, PIA,

Bengaluru-560058III Phase

I Design,Assm,&Test of CI hydraulic valves of earth moving equipment

1641 G-77Manufacture of motor and pumps without

Large Green 28.01.2019 WA 31.12.2034

Y 31.12.2034 N NA NA NA NA NA NA NA 1.68 NA NA N Y N NA NA2720 2019

O

77184

Prema Engineering WorksNo. 18, 5th Main, III Phase, PIA, Bengaluru-560058

III PhaseI SS hoppers for

Pharmaceuticals using CNC M/c.

62 G-7

Brass and bell metal utensilsmanufacturi

Small Green 01.03.2016 WA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.28 NA NA N Y N NA NA2721 2019

O

82947

Enginium Designs Private Limited No. 39/1, First Floor, 4th main road,

III Phase, PIA, Bengaluru-560058III Phase

I Assembly & Testing of Aluminum/SSDefense equipment enclosures & racks

103 G-1

Aluminium utensils from aluminium circles by

Small Green 20.08.2019 WA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.46 NA NA N Y N NA NA2722 2019

O

82829

Seshaasai Business Forms Pvt Ltd Plot No. S1/D, 1st Cross, I Stage, PIE,

Bengaluru-560068 I Stage

I smart card & Radio-frequency identification cards (RFID) & Allied

770 G-18

Digital printing on PVC clothes

Medium Green 15.10.2019 BA 31.12.2034

N NA N NA NA NA NA NA NA NA 2.8 NA NA N Y N NA Yes2723 2019

O

75973

Specitech No 138/A,8th main,III Phase, PIA, Bengaluru-560058 III Phase

I MS/SS Machine precession components

85 G-93

Manufacturing of nuts and bolts with cold forging

Small Green 08.09.2017 WA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.67 NA NA N Y N NA NA2724 2019

O

75858

Protech Engineers No.B-15, I Stage, PIE, Bengaluru-560068 I Stage

I Machinery components like filter head, weld flangers, check valves

136 G-93

Manufacturing of nuts and bolts with cold forging

Small Green 10.08.2017 BA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.57 NA NA N Y N NA Yes2725 2019

O

81682

Precision Tools and Implements Co No.35/10, 1st Main Road, II

Phase,PIA, Bengaluru-560058 II Phase

IAlloy steel press tools & injection moulds

1016 G-7

Brass and bell metal utensilsmanufacturi

Large Green 01.03.2019 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 1.2 NA NA N Y N NA Yes2726 2019

O

82163

Dynatech Tools & Devices(Bengaluru) Pvt Ltd No.42-43, 4th Main, III Phase, PIA,

Bengaluru-560058III Phase

I SS Precision M/c tool components 1108 G-93

Manufacturing of nuts and bolts with cold forging

Large Green 12.05.2019 BA 31.12.2034

N NA N NA NA NA NA NA NA NA 1.24 NA NA N Y N NA Yes2727 2019

O

81733

Adso Naturals Pvt LtdNo.N-436, 10th Main, 14th Cross, II Stage, PIE, Bengaluru-560068

II StageI Formulation of Herbal

Ayurvedic products 84 G-2

Ayurvedic and homeopathic medicine

Small Green 01.10.2019 BA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.24 NA NA N Y N NA Yes2728 2019

O

80990

Unique Panel ProcessorsNo.C-291, 8th Cross, I Stage.PIE, Bengaluru-560068

I StageI Modular wooden

furniture for kitchen 188 G-10

Carpentry & wooden furniture manufacturing (excluding saw mill)

Small Green 01.03.2016 BA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.33 NA NA N Y N NA Yes2729 2019

O

83029

Kaveri TechnicsNo.S-1(i), 1st Cross, I Stage.PIE, Bengaluru-560068

I StageI grit blasting of ms, ss,

cast iron and aluminum fabricated items on

139 G-92

Shot blasting operation

Small Green 01.03.2016 BA 31.12.2034

N NA N NA NA NA NA NA NA NA 0.36 NA NA N Y N NA Yes2730 2019

O

82779

Synpack Flexibles Pvt LtdNo.A-302 (a), 7th Main, II Stage, Peenya Industrial Estate, Bengaluru-560058

II StageI LDPE/LLDPE

multilayers plastic air bubble bags > 50 micron

446 G-32

Polythene and plastic processed products manufacturing (virgin plastic)

Small Green 01.03.2016 WA 31.12.2033

N NA N NA NA NA NA NA NA NA 0.62 NA NA N Y N NA NA2731

2019 O82219

N.K. PackNo. 205/B-3,, III Phase, PIA, Bengaluru-560058

III PhaseI

Paper back support for shirt packing for garments

349 G-79Plastic sack bags, woven sack with HDPE,

Small Green 07.01.2017WA

31.12.2034N N N N N N N NA NA NA 0.2 N NA N Y N NA NA

2732 2019O

76297

Zonje Solar Llp#522, 10th main , 4th cross, IV Phase, PIA, Bengaluru-560058

IV PhaseI Assembly of Solar

Photovoltaic Panels with cutting andLamination fixing of

374 G-114

Solar power generation through, solar photovoltaic cell, wind, power and mini hydel power

Small Green 01.07.2017 BA 31.12.2028

N N N N N N N NA NA NA 2.1 N NA N Y N NA Yes2733 2019

O

81231

SV Power Control A-253(a), 6th Main Road, 2nd Stage, .PIE, Bengaluru-560068

II StageI Electrical Control

Panel Assembly with wiring

72 G-78

Panel Board switches without electroboard

Small Green 01.07.2017 BA 31.12.2033

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2734 2019

O

83314

Ethereal Machines Pvt LtdNo.202, 12th Main, III Phase, PIA, Bengaluru-560058

III PhaseI Design,

Assmb,3DPrnt and prottype small machines

284 G-95

Shell moulding without generating waste water

Small Green 01.04.2017 WA 31.12.2034

N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2735 2019

O

76510

Accutech EnterprisesNo.480/A-2, 1st Cross, III Stage, PIE, Bengaluru-560058

III StageI Aerospace

components with CNC M/c

1665 G-93

Manufacturing of nuts and boltswith cold

Large Green 01.09.2018 BA 31.12.2033

N N N N N N N NA NA NA 4 N NA N Y N NA Yes2736 2019

O

83234

Gee Pee Fortune IndustriesNo.A-42, 2nd Main Road, II Stage, PIE, Bengaluru-560058

II StageI Hydraulic pressing of

alloy steel components

296 G-93

Manufacturing of nuts and boltswith cold

Small Green 6.10.2019 BA 31.12.2033

N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes2737 2019

O

82158

Sprout Tech Toolings[S]No. 117/6, Opp A-12, 1st main road, 2nd stage Peenya Industrial Estate, Bengaluru - 560058

II StageI Mould &dies,fixture

m/c of components 46 G-93

Manufacturing of nuts and boltswith cold

Small Green 13.04.2019 WA 31.12.2033

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2738 2019

O

82159

Saanvi Technologies[S] No.117/3, II Stage, PIE, Bengaluru II StageI Mould &dies,fixture

m/c of components 162 G-93

Manufacturing of nuts and boltswith cold

Small Green 17.10.2014 WA 31.12.2033

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2739 2019

O

83062

Vividh TechnologiesNo.39/1, 4th Main, III Phase, PIA, Bengaluru-560058

III PhaseI SS steam urbines,

blades with CNC M/c 60 G-93

Manufacturing of nuts and boltswith cold

Small Green 16.5.2017 WA 31.12.2033

N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2740 2019

Concord United Products Pvt No.A-157, 3rd Cross, I Stage, PIE, I Manufacturing of

Manufacturing of nuts 2740 2019

O

76128

Concord United Products Pvt Ltd[S]

No.A-157, 3rd Cross, I Stage, PIE, Bengaluru

I StageI Manufacturing of

EDM machines 676 G-93ng of nuts and boltswith cold

Medium Green 28.1.2000 BA 31.12.2033

N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes2741 2019

YTC

83546

Fedex Healthcare Pvt. LtdNo.536, 537, IV Phase, PIA, Bengaluru-560058

IV PhaseI Sterile Adhesive

dressing 110 G-91

Manufacture of Adhesives andadhesive

Small Green 1.8.2020 BA 7.11.2024

N N N N N N N NA NA NA 4 N NA N Y N NA Yes

2742 2019O

83404

Birdy Exports Pvt LtdNo.473A, 12th cross, IV Phase, PIA, Bengaluru-560058

IV PhaseI Readymade Garment

stitching 2456 G-98

Garment Stitching/ Stitching ofshoe uppers/

Large Green 1.9.2019 BA 31.12.2033

Y 31.12.2023 N N N N N NA NA NA 9.8 N NA N Y N NA Yes2743 2019

O

78035

Aeramic Aerospace (India) Pvt Ltd No.B-173, 4th Cross, II Stage, PIE,

Bengaluru-58II Stage

I Manufacture of Aerospace components

72 G-78

Panel Board switches without electroboard

Small Green 1.2.2019 BA 31.12.2033

N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes2744 2019

O

75676

S S S EngineeringNo.B-382/1, 7th Cross, 4th Main, I Stage, PIE, Bengaluru-58

I StageI Precision

Components 124 G-93

Manufacturing of nuts and boltswith cold

Small Green 15.1.2015 WA 31.12.2033

N N N N N N N NA NA NA 0.18 N NA N Y N NA N2745 2019

CL

80829

Envigreen Biotech India Pvt Ltd No.14, Plot No.9E, II Phase, PIA,

Bengaluru-58II Phase

I Manufacturing of biodegradable granules from natural starch & vegetable

482 G-30

Packing materials manufacturing

Medium Green 1.7.2019 BA 31.12.2033

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2746 2019

O

76906

Indigotech Building Solution (I) Pvt Ltd No.248, 8th Main, 3rd Cross, III

Phase, PIA, Bengaluru-58III Phase

I Manufacturing of fire rated metal doors 1343 G-40

Rolling mill ( gas fired) and coldrolling mill

Large Green 30.12.2015 BA 31.12.2033

N N N N N N N NA NA NA 1.1 N NA N Y N NA Yes2747 2019

O

84656

V3 TechnologyNo.B-196, 5th Main Road, II Stage, PIE, Bengaluru-58

II StageI Aluminium & Ferrous

metal components with CNC machining

oprs

458G-93

Manufacturing of nuts and boltswith cold

Small Green 01.08.2017 WA31.12.2033

N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2748 2019

O

84722SS Automation Solutions Pvt

LtdNo.1 &2, 12th Cross, IV Phase, PIA,

Bengaluru-58

IV PhaseI Automation and

robotics solution machines

164 G-46 Steel furniture without spray

Small Green 01.11.2019 BA31.12.2034

Y 31.12.2024 N N N N N NA NA NA 1.7 N NA N Y N NA Yes2749 2019

O84832 Smart Technologies

Plot No.B-128, 3rd Cross, I State, Peenya Industrial Estate, Bengaluru-

560058

I Stage I Precision turned components

452G-93

Manufacturing of nuts and boltswith cold

Small Green 15.13.2013 BA31.12.2034

N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes2750 2019

O 84814 Ujjwala GarmentsPlot No.V-2,3 Ground, I & Mezzanine Floor, I State, Peenya Industrial Estate, Bengaluru-560058

I StageI Stitching of ready

made garments 43 G-72

Garment Stitching/ Stitching ofshoe uppers/

Small Green 05.11.2017 BA 31.12.2033

N N N N N N N NA NA NA 1.62 N NA N Y N NA Yes2751 2019

O

82750

Power One Micro Systems Pvt Ltd Unit-II

No.C-332, 3rd Main, 8th Cross, I Stage, PIA, Bengaluru-58

I StageI Assembling of

Stabilizer 18 G-78

Panel Board switches without electroboard

Micro Green 01.05.2019 WA 31.12.2099

N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2752 2019

O

84829

Vishwas LodgeNo.C-324/1, 3rd Main, I Stage, PIE, Bengaluru

I StageHospital

ityHotel with 25 rooms

75 G-52

The Hotels/Resorts havingmore than 20

Small Green 15.8.2017 BA 31.12.2033

N N N N N N N NA NA NA 1.62 N NA N Y N NA Yes2753 2019

O

84841

Akshaya Minerals & Fee Supplements

No.172/A3, 11th Main, III Phase, PIA, Bengaluru-58

III PhaseI Poultry feed & cattle

feeds 91 O-30

Fish feed, poultry feed and cattle feed

Small Orange 17.10.2017 BA 30.09.2029

N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes2754 2019

O

84933

V.G.Industries, No.12, 4th Cross, I Stage, PIE, Bengaluru-58

I StageI Manufacturing of Jigs & Fixture

40 G-78

Panel Board switches without electroboard

Small Green 2.6.2016 WA 31.12.2033

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2755 2019

O 76980 Essen & CoNo.92, 7th Main, III Phase, PIA, Bengaluru

III PhaseI Analysis of Water and

Waste water samples for physic chemical & biological parameters

148 R-83

Research and Analyticallaboratories

Small Red 06.05.2013 BA 30.06.2024

N N N N N N N NA NA NA 0.9 0.015 NA N Y Y NA Yes2756 2020

O 84899 Kunal Pipe IndustriesNo.B-379, 8th Cross, I Stage, PIE, Bengaluru-58

I StageI HDPE/LDPE Irrigation pipes

60 G-79

Plastic sack bags, woven sack -- 10 10 15 -- 15 10

Small Green 2.7.2013 WA 31.12.2033

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2757 2020

O 85140 System InfotechNo.165, 10th Main Road, III Phase, PIA, Bengaluru

III PhaseI Assembling of

Electric panel Boards 119 G-78

Panel Board switches without electroboard

Small Green 1.1.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.96 N NA N Y N NA NA2758 2020

O 85101 Krishna Lodge No.16/A, I Stage, PIE, Bengaluru I StageHospital

ityHotel with 30 rooms

68 G-52

The Hotels/Resorts havingmore than 20

Small Green 01.7.2017 BA 31.12.2034

N N N N N N N NA NA NA 9.6 N NA N Y N NA Yes2759 2020

O 77811 Klassic LabelsNo. 213/1-2, 1st Cross, 3rd Phase, Peenya Industrial Area

III PhaseI Cutting & rolling of

jumbo craft roll papers

130 G-9

Cardboard or corrugated box and

Small Green 15.3.2019 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA

0.55 NA NA NA Y N NA NA2760 2020

O 84670 Island Hydraulics (I) Pvt Ltd No.A29, III Stage, PIE, Bengaluru III StageI MS, SS hydraulic/

pneumatic cylinder for earth moving equipment

186 G-78Panel Board switches without electroboard

Small Green 3.1.2019 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA

1.2 NA NA NA Y N NA NA2761 2020

O 85302Power One Micro Systems Pvt Ltd Unit-III

No.75, 6th Main, III Phase, PIA III PhaseI

CNC Machining components

171 G-78Panel Board switches without electroboard

Small Green 05.02.2019 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA

0.48 NA NA NA Y N NA NA2762 2020

O 85327 Smart Solutions No.171/A, III Phase, PIA, Bengaluru III PhaseI

Maching of CNC components

44 G-93Manufacturing of nuts and boltswith cold

Small Green 15.6.2017 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA

0.48 NA NA NA Y N NA NA2763 2020

O 85307 Jyothi EnterprisesN1/2, 4th Cross, I Stage, Peenya Industrial Estate, Bengaluru

I StageI

Machining of components

70 G-93Manufacturing of nuts and boltswith cold

Small Green 06.10.2017 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA

0.72 NA NA NA Y N NA NA2764 2020

O 85315 Roofing India SystemsNo.A326, 7th Main, II Stage, PIE, Bengaluru

II StageI

Roof sheet profiling & fabrication

223 G-93Manufacturing of nuts and bolts

Small Green 10.07.2017 BA 31.12.2034 NA NA NA NA NA NA NA NA NA NA

0.12 NA NA NA Y N NA Yesand boltswith cold

0.12 NA NA NA Y N NA Yes2765 2020

O 85007 Island Hydraulics (I) Pvt Ltd No.C-71, III Stage, PIE, Bengaluru III StageI Processing of MS/ SS hydraulic cylinder for earth moving equipment

84 G-78

Panel Board, Switches withoutelectroplatin

Small Green 1.1.2020 WA 31.12.2033

Y NA2766 2020

O

89318

Stalwart Elevators Products Pvt Ltd

No.296/297,5th main, 4th phase,Peenya Industrial area, Bengaluru-560058,

IV PhaseI fabrication and

assembling of elevators

394 G-78Panel Board switches without electroboard

Small Green 1.7.2018 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA

1.7 NA NA NA Y N NA NA2767

2020 O 75577 TejatNo. 25, 5th main, III Phase Peenya Industrial Area,Bengaluru-560058

III Phase I Machinery equipments

90 G-63Brass and bell metal utensilsmanufacturi

Small Green 15.2.2017 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA

0.24 NA ST & SP NA N N NA NA2768 2020

O

85500

J.K. Engineering EquipmentsNo.B-71, 2nd cross. Ist Stage, PIE, Bengaluru-560 058

I StageI M/c of CNC

components on job work

441 G-78Panel Board switches without electroboard

Small Green 21.7.2018 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA

0.33 NA NA NA Y N NA NA2769 2020

O84528 R.R Industries No.848, 4th Cross, I Stage, PIE,

Bengaluru I StageI Turned components

sleeves 43 G-93Manufacturing of nuts and boltswith cold

Small Green 25.1.2001 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA

0.16 NA NA NA Y N NA NA2770 2020

O84830

TDJG electrical IndustriesNo.SB-52/1, 4th Cross, I Stage, PIE,

BengaluruI Stage

I Transformers assembly 16 G-85

Transformer assembly unit(industrial

Micro Green 18.1.2011 WA 31.12.2099 NA NA NA NA NA NA NA NA NA NA

0.24 NA NA NA Y N NA NA2771 2020

O 84672MSA Global Optoelectronics

Pvt LtdNo.7, 5th Main, PIA, Bengaluru III Phase

I Precision components457 G-93

Manufacturing of nuts and boltswith cold

Small Green 12.11.2019 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA

0.24 NA NA NA Y N NA NA2772 2020

O 79034 Shaurya Polymers Pvt Ltd No.253/254, III Phase, PIA, Bengaluru III PhaseI Plastic cane

516 G-32

Polythene and plastic processedproducts

Small Green 30.6.2014 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA

0.192 NA NA NA Y N NA NA2773 2020

O85587

Sun Manufacturing solutionsNo.151, 11th Main, III Phase, PIA,

BengaluruIII Phase

I Special purpose machine fixtures 57 G-93

Manufacturing of nuts and boltswith cold

Small Green 22.10.2015 WA 31.12.2033

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2774 2020

O84837

Evirocor Packaging India Pvt Ltd

No.142, 9th Main, III Phase, PIE, Bengaluru

III PhaseI Corrugated boxes for

food packing 417 G-9Cardboard or corrugated box and

Small Green 6.07.2018 WA 31.12.2024

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2775 2020

O85340

Varuni Industries No.138/B, 9th Main, III Phase, PIA,

BengaluruIII Phase

I Manufacture of Ply wood boxes and

pallets59

G-78 Panel Board switches without

electroboard

Small Green 01.07.2017 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2776 2020

O85605

R.R HydraulicsNo.177 & 178, 11th Main, III Phase,

PIA, BengaluruIII Phase

I Hydraulic baling press & baling m/c200 G-93

Manufacturing of nuts and boltswith cold

Small Green 5.10.2017 WA 31.12.2033

N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2777 2020

O85405

Ramph IndiaNo.172/A2, 11th Main, III Phase, PIA,

BengaluruIII Phase

I Hydraulic pressed components61 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.07.2018 BA 31.12.2033

N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes2778 2020

O85704 Sri Sai Industries Unit-2

No.40-A, II Phase, PIA, Bengaluru II PhaseI Metal fabrication &

powder coating without pre treatment

2270 G-97

Activity of Powder Coating onsurface of

Large Green 01.02.2019 BA 31.12.2034

N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes2779 2020

O84977 Aceinotech Manufacting Pvt

LtdNo.465, IV Phase, PIA, Bengaluru

IV PhaseI Precision components

1453 G-93Manufacturing of nuts and boltswith cold

Large Green 01.04.2014 BA 31.12.2033

N N N N N N N NA NA NA 2.9 N NA N Y N NA Yes2780 2020

O85130 3D Concept Tooling Pvt Ltd

(Unit-II)No.B-383, 6th Cross, I Stage, PIE,

Bengalur I StageI Manufacting of dies

& moulds 128 G-93Manufacturing of nuts and boltswith cold

Small Green 01.07.2019 BA 31.12.2034

N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes2781 2020

O85131 3D Concept Tooling Pvt Ltd

(Unit-III)No.C-271, 6th Cross, I Stage, PIE,

Bengalur I StageI Manufacting of dies

& moulds 186 G-93Manufacturing of nuts and boltswith cold

Small Green 01.07.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2782 2020

O 85770

S V Engineering Works No.C-80, III Stage, PIE, Bengaluru-560058 III Stage

I Machining of CNC components 68 G-93

Manufacturing of nuts and boltswith cold

Small Green 26.3.2019 WA 31.12.2033

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2783 2020

O 85762

Vickram Tecser No.C81/1, 3rd Cross, III Stage, PIE, Bengaluru-560058

III Stage I Machining of CNC components

84 G-93

Manufacturing of nuts and boltswith cold forging

Small Green 26.3.2019 WA 31.12.2033

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2784 2020

O 85678

Garitha Enterprises No.V-1(B), 4th Cross, I Stage, PIE, Bengaluru-560058

I Stage I Transformers tank body & accessories, turbine base plates230 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.07.2014 BA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2785 2020

O 85007

Island Hydraulics (I) Pvt Ltd No.C-71, III Stage, PIE, Bengaluru III Stage I hydraulic/pneumatic cylinders for earth moving equipments

84 G-93Manufacturing of nuts and boltswith cold

Small Green 01.01.2020 WA 31.12.2033

N N N N N N N NA NA NA 1.2 N NA N Y N NA NA2786 2020

O 77812

Mahalasshmi Adhesive Tapes Industry

No.213/1, Ist Cross, III Phase, PIA, Bengaluru-58

III Phase I Adhesive tapes76 G-91

Manufacture of Adhesives andadhesive

Small Green 01.08.2017 WA 31.12.2033

N N N N N N N NA NA NA 0.3 N NA N Y N NA NA2787 2020

O

83441

Kaizen CNC Center Pvt Ltd., No.49/B-1, 3rd Cross, II

Phase, PIA, Bengaluru-58II Phase

I Engineering activity29 G-93

Manufacturing of nuts and boltswith cold

Small Green 11.202017 BA 31.12.2033

N N N N N N N NA NA NA 2.2 N NA N Y N NA Yes2788 2020

O

83545

Chemicals & AssocitesNo.B-230/1 (A), II Stage, PIE, Bengaluru

II StageI Adhesive tapes

44 G-91

Manufacture of Adhesives andadhesive

Small Green 25.11.2019 WA 31.12.2033

N N N N N N N NA NA NA 0.08 N NA N Y N NA NA83545 adhesive N N N N N N N NA NA NA 0.08 N NA N Y N NA NA2789 2020

OPrecision Engineering

Products Pvt Ltd No.94/95, III Phase, PIA, Bengaluru-58

III PhaseI CNC components

92G-78 Panel Board

switches without

electroboard

Small Green 20.8.2019 WA 31.12.2034

N N N N N N N NA NA NA 1.6 N NA N Y N NA NA

2790 2020O

85909

Subbaiah EnterprisesNo.37/7, II Phase, PIA, Bengaluru II Phase

I Induction hardening & flame hardening of m/c components

510 G-24

Heat treatment with any of the

Medium Green 25.11.2018 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2791 2020

O

85696

PneudraulicsNo.N-1/4, 4th Cross, I Stage PIE, bengaluru-58

I StageI CNC M/c components

53 G-78Panel Board switches without electroboard

Small Green 14.5.2017 BA 31.12.2033

N N N N N N N NA NA NA 0.38 N NA N Y N NA Yes2792 2020

O

84235

Techno vision ToolsNo.#3B/415/13, II Phase, PIA, Bengaluru

II PhaseI Press components

375 G-93Manufacturing of nuts and boltswith cold

Small Green 20.4.2017 BA 31.12.2033

N N N N N N N NA NA NA 1 N NA N Y N NA Yes2793 2020

O

85179

Geetha EngineeringNo.143, III Phase, PIA, Bengaluru III Phase

I Engineering components on job work

88 G-93Manufacturing of nuts and boltswith cold

Small Green 15.8.2017 WA 31.12.2033

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2794 2020

O

85701

Jai Enterprises No.1, 4th Cross, I Stage, PIE, Bengaluru

I Stage I Sheet metal components 104 G-93

Manufacturing of nuts and boltswith cold

Small Green 15.6.2017 WA 31.12.2033

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2795 2020

O84506 V-Texwash No.252, 11th Main, 2nd Cross, III

Phase, PIA, Bengaluru-58 III PhaseI Washing of

readymade garments 495 O-50Mechanized laundry using oil fired

Small Orange 16.6.2015 BA 30.09.2029

N N N N N N N NA NA NA 2.25 0.5 NA N Y Y NA Yes2796 2020

O

85918

RNS CNC Centre No.P-5/A, III Stage, PIE, BengaluruIII Stage

I CNC turning components 80 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.07.2017 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2797 2020

O86039 Aim Tooling systems No.B120/2, 3rd Main Road, II Stage,

PIE, Bengaluru II StageI Cutting tools

425 G-78Panel Board switches without electroboard

Small Green 22.4.2016 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2798 2020

O

85394

Viwin SolutionNo.1/2, 4th Cross, I Stage, PIE,Bengaluru

I StageI Engineering activity

57 G-78Panel Board switches without electroboard

Small Green 01.10.2017 WA 31.12.2033

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2799 2020

OManjunatha Engineering

Works, No.C-312, 9th Cross, I Stage, PIE, I StageI CNC Machinery

Earch Moving components

117 G-78Panel Board switches without electroboard

Small Green 01.08.2018 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2800 2020 O 86253 Burji Speed on Clutches No.C 247, 5th Cross, I Stage, PIE,

Bengaluru-58I Stage I Automobile parts 47

G-78Panel Board switches without electroboard

Small Green06.12.2016

WA 31.12.2033

N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2801 2020 O 77040 Trio Tech Manufacturing

SystemsNo.848/5, 4th Cross, I Stage, PIE,

Bengaluru-58I Stage I Engineering

components68 G-78 Panel Board

switches without

electroboard

Small Green 31.12.2034 BA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2802 2020 O 84569 Venkateswara Packagings No.329/330, 4th Phase, PIA,

Bengaluru-58IV Phase I Corrugated box 74 G-78 Panel Board

switches without

electroboard

Small Green 01.04.1979 WA 31.12.2033

N N N N N N N NA NA NA 0.45 N NA N Y N NA NA2803 2020 O 85352 RVS Machine Tools No.315, IV Phase, PIA, Bengaluru IV Phase I Jigs & fixture 94 G-78 Panel Board

switches without

electroboard

Small Green 10.3.1995 BA 31.12.2033

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2804 2020 O 86447 Aradhana Fibreglass

TechnologiesNo.295/2, 8th Cross, IV Phase, PIA,

Bengaluru-58IV Phase I Manufacturing of

FRP products339 G-78 Panel Board

switches without

electroboard

Small Green 01.01.2019 BA 31.12.2033

N N N N N N N NA NA NA 0.19 N NA N Y N NA Yes2805 2020

O86122 Srinivasa Engineering No. 2, 1st Stage, Peeny Industrial

Estate, Bengaluru I StageI CNC Machinery tools

components 73 G-93Manufacturing of nuts and boltswith cold

Small Green01.08.2018 WA

31.12.2033

N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2806 2020

O85721 Precis Pharma Containers

No.341, 9th Cross, IV Phase, PIA, Bengaluru

IV PhaseI Manufacture of plastic

bottles using injection moulding

253G-78 Panel Board

switches without

electroboard

Small Green10.2.2020 WA

31.12.2033

N N N N N N N NA NA NA 1 N NA N Y N NA NA2807 2020 O 86197 Auto Enterprises No.N-1/5, 4th Cross, I Stage, PIE,

Bengaluru I StageI CNC machine

components 79 G-93Manufacturing of nuts and boltswith cold

Small Green1.7.2017 WA

31.12.2034

N N N N N N N NA NA NA 0.28 N NA N Y N NA NA2808 2020

O79661 Hamsi Products No.C292, 8th Cross, I Stage, PIE,

Bengaluru-58I Stage I Hydraulic fittings

120G-78 Panel Board

switches without

electroboard

Small Green10.2.2020 WA

31.12.2033

N N N N N N N NA NA NA 1 N NA N Y N NA NA2809 2020

O

83034

Abone Surgicals Pvt Ltd.No.27, III Stage, PIE, Bengaluru-560 058

III StageI SS/Titanium implants

for surgical orthopedic application

270G-93 Brass and

bell metal utensils

manufacturi

Small Green10.2.2020 BA

31.12.2033

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2810 2020

O

86097

Comet Environs Pvt LtdNo.V-34/B, 7th Main, II Stage, PIE Bengaluru-560058

II StageI Environmental test

chamber, subzero, oil recooler

158 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.12.2019 BA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2811 2020

O

85493

Mac Precitec IndiaNo.B-291(a), 7th Main Road, II Stage, PIE, Bengaluru-58

II StageI Manufacturin of CNC

Machinery cutting tools

110 G-93

Manufacturing of nuts and boltswith cold

Small Green BA31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2812

2020 O

86655

Micro CNC Systems Ltd No.C-427, I Cross, I Stage, Peenya Industrial Estate, Bengaluru-560058 I Stage

I Manufacturin of CNC Machinery cutting tools

112 G-93

Manufacturing of nuts and boltswith cold

Small Green 4.5.2015 WA 31.12.2034

N N N N N N N NA NA NA 0.48 N NA N Y N NA NA86655 tools with cold N N N N N N N NA NA NA 0.48 N NA N Y N NA NA2813 2020

O

86182

Nimishamba Engineering Steel Fabricating Works No.161/B, 10th Main Road, III Phase,

PIA, Bengaluru-560058III Phase

I Manufacturing of stopper, washer 84 G-93

Manufacturing of nuts and boltswith cold

Small Green 30.7.2014 WA31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2814 2020

O

86440

Alpha Design Technologies Pvt Ltd - II Unit No.3B/415/12, II Phase, PIA,

Bengaluru -560058II Phase

I Combat Net Radio466 G-93

Manufacturing of nuts and boltswith cold

Small Green 15.3.2020 BA31.12.2034

N N N N N N N NA NA NA 1.45 N NA N Y N NA Yes2815 2020

O

86853

Fine craftsNo.250, III Phase, PIA, Bengaluru-560 058

III PhaseI CNC turning

components 320 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.07.2017 BA31.12.2034

N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes2816 2020

O

86858

ABB Power Products & Systems India Ltd No.4A, 5 & 6, II Phase, PIA,

Bengaluru-560058II Phase

I Electrical equipment - relay, capacitors, panel

7190 O-25

DG set of capacity >1MVA but <

Large Orange 01.06.2020 BA 30.09.2029

Y 30.09.2025 N N N N N NA NA NA 220.003 (pre trt

facl) STP at ABB unit N N N NA Yes2817 2020

YTC

76664

4R Recycling Pvt LtdNo.P6, III Stage, PIE, Bengaluru III Stage

I Refurbishment & sale of electrical & electronic components

406 R-44

ndustry or process involvingmetal

Small Red 01.12.2018 BA -

N N N N N N N NA NA NA 0.22 N NA N Y N NA Yes2818 2020

O

86898

Lakshmi EnterprisesNo.18-C/7, II Phase, PIA, Bengaluru II Phase

I Manufacturing of Ice cream 844 G-106

Ice cream (Without boilers /oven for

Medium Green 14.08.2020 BA 31.12.2024

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2819 2020

O

84197

Athena India Hitech Components

No.309/4, 8th cross, IV Phase, Peenya Industrial Area

IV PhaseI Manufacturing of anti

vibration dampers and non asbestos gaskets

923 O-63

/ Steel and steel products using

Medium Orange 01.01.2020 BA 30.09.2028

N N N N N N N NA NA NA 1.72 N NA N Y N NA Yes2820 2020

O Visat Tools Pvt Ltd No.198, III Phase, PIA, Bengaluru-58 III PhaseI Manufacturing of

plastic automotive parts

171 G-78

Panel Board switches without electroboard

Small Green 01.05.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2821 2020

O 87420 Chandan EnterprisesNo.848, 4th Cross, I Stage, PIE, Bengaluru

I StageI Manufacturing of

CNC Machine components

45 G-78

Panel Board switches without electroboard

Small Green 01.04.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2822 2020

O

87525

Max Milan Tooling Pvt Ltd 180/A, III Phase, PIA, Bengaluru III PhaseI Manufacturing of

cutting tools 122 G-78

Panel Board switches without electroboard

Small Green 28.11.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2823 2020

O

87612

SLN Vibro Finishers No.332, 1/1, 4th Cross, I Stage, PIE I StageI Vibro polishing of

MS/SS metals components

40 O-42

Industry or processes involvingfoundry

Small Orange 01.03.2020 BA 30.09.2029

N N N N N N N NA NA NA 0.32 0.1 NA N Y Y NA Yes2824 2020

O

87670

Dantal Hydraulics Pvt Ltd No.238, 8th Main, 3rd Cross, 3rd Phase, Peenya Industrial Area, Bangalore - 560058

III PhaseI Spray painting activity

466 O-62

Spray painting, paint baking, paint

Small Orange 2.10.2019 BA 30.09.2029

N N N N N N N NA NA NA 1 N NA N Y N NA Yes2825 2020

O

87450

Ten Onyxx Prici Tech Pvt LtdNo.A, 16, 1st Cross, III Stage, PIE, Bengaluru

III Stage I washing machine & electric motor components

367 O-32

Ferrous and Non- ferrous metalextraction

Small Orange 01.07.2019 BA 30.09.2029

N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes2826 2020

CL

85166

Ananya MouldingsNo.225, 2nd Cross, 8th Main, III Phase, PIA, Bengaluru

III PhaseI Manufacturing of Pet

bottles 44 G-78

Panel Board switches without electroboard

Small Green 16.12.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA N2827 2020

O 87171

Gokul Industries No.498/3, IV Phase, PIA, BegaluruIV Phase

I Blending of industrial and automotive lubricants

175 G-27

Lubricating oil, greases orpetroleum

Small Green 1.1.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA N2828 2020

O

89319

ThermotechN0.149/B, 9th Main, III Phase, PIA, Bengaluru

III PhaseI Manufacture of

Radiators 393 G-78

Panel Board switches without electroboard

Small Green 19.09.2017 BA 31.12.2034

N N N N N N N NA NA NA 2 N NA N Y N NA Yes2829 2020

O

87912

Bioamrit Mediscience No.151, 9th Main, III Phase, Bengaluru

III PhaseI blending, refilling of

disinfectant 30 O-57

Potable alcohol ( IMFL) by blending,

Small Orange 25.10.2019 BA 30.09.2029

N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes2830 2020

O

86445

Jayanth EnterprisesNo.B-211, 5th Main, II Stage, PIE , Bengaluru-58

II StageI Manufacturing of

components for components

9 G-78

Panel Board switches without electroboard

Small Green 7.7.2018 WA 31.12.2100

N N N N N N N NA NA NA 0.36 N NA N Y N NA N2831 2020

O

85202

Srinivasa Heat Tech No.A-196, 4th Cross, I Stage, PIE, Bengaluru I Stage

I Heat treatment of components 297 O-36

Heat treatment with any of the

Small Orange 01.01.2020 BA 30.09.2029

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2832 2020

O

76873

Kulpak Steel And Forgings Pvt Ltd

123, 7th Main, 3rd Phase, PIA, Bengaluru

III Phase I Forging of ferron and non ferrous metals 106 O-32

Forging of ferrous and non- ferrous metals

Small Orange 15.6.2018 BA 30.09.2028

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes2833 2020

O

87954

Likhith EnterprisesNo.353-A, II Phase, PIA, Bengaluru II Phase

I Cutting & Stitching of shirts & PPE Kits 225 G-72

Garment Stitching/ Stitching of shoe uppers/

Small Green 10.2.2019 BA 31.12.2034

N N N N N N N NA NA NA 5.6 N NA N Y N NA Yes2834 2020

O77187 Pro Sim R & D Pvt Ltd, No.B-378/1, I Stage, Bengaluru-58 I Stage I R & D on engineering

design services204 G-84 Software

units generatingwastewater

Small Green 1.1.2018BA 31.12.2034

N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes2835 2020

O

76863

Suresh Precision ToolsNo.C-434, I Cross, I Stage, PIE, Bengaluru-58

I StageI Manufacturing of

Automative sheet metal parts

180 G-78

Panel Board switches without electroboard

Small Green 1.9.2018 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA N2836 2020

O

87796

AMS Engineering Industries India Pvt Ltd No.121, 7th Main road, III Phase, PIA,

Bengaluru-58III Phase

I Manufacturing of MS brackets 109 G-78

Panel Board switches without electroboard

Small Green 01.04.22018 BA 31.12.2034

N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes2837 2020 Vishwa safety glass Pvt Ltd

No.93, 3rd Cross, III Stage, PIE, I Glass cutting &

Fiber glass molding, 2837 2020

O

82929

Vishwa safety glass Pvt Ltd No.93, 3rd Cross, III Stage, PIE, Bengalore-58

III StageI Glass cutting &

cleaning 149 G-108molding, Fiber Glass 10 -- 10 - -- --

Small Green 01.11.2019 BA 31.12.2034

N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes2838 2020

O 87127

Excel Industries No.329/A, I Stage, PIE, Bengaluru-58I Stage

I MS/SS tool components 36 G-93

ng of nuts and boltswith cold

Small Green 29.4.2008 WA 31.12.2034N N N N N N N NA NA NA 0.25 N NA N Y N NA N

2839 2020O

88181

Vibgayor Interiors A14, I Cross, III Stage, PIA, Bengaluru-58

III StageI Modular kitchen and

wardrobes 317 O-51

Modular wooden furniture from particle

Small Orange 01.02.2020 BA 30.09.2029

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2840 2020

O

86458

Value B Infra No.306/2, IV Phase, PIA, Bengaluru-58 IV Phase

I Engineering of fabrication and tensile fabric welding

378 O-62

Spray painting, paint baking, paint

Small Orange 01.03.2019 BA 30.09.2028

N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes2841 2020

O 87722

Durga Tech NO SB 44, 1st Cross,I Stage, PIE, Bengaluru-58 I Stage

I Mild steel precision turned components 301 G-93

Manufacturing of nuts and boltswith cold

Small Green 30.3.2015 BA 31.12.2034

N N N N N N N NA NA NA 0.72 N NA N Y N NA Yes2842 2020

O 84615

Accuspirals No.B40, 2nd Cross, III Stage, PIE, Bengaluru III Stage

I Manufacture of gear and transmission parts 169 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.06.2019 BA 31.12.2034

N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes2843 2020

YTC

98466

HPLA IndustriesNo.134, 8th Main, 3rd Cross, III Phase, PIA, Bengaluru

III PhaseI Manufacture of aluminium and copper ingots

78 O-17

Aluminium & copper extraction from scrap

Small Orange 18.8.2020 BA 25.8.2025

N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes2844 2020

O

88049

G.D Packaing B-143,3rd Cross 1st Stage PIE Bangalore-58

I StageI manufacturing of

LDPE /HDPE bags for industrial packaging using virgin

90 O-35

Gravure printing, digital printing on

Small Orange 20.7.2017 BA 30.09.2029

N N N N N N N NA NA NA 0.29 N NA N Y N NA Yes2845 2020

O

86451

Prad AutomotiveNo.66/2, B-235, I Stage, PIE, Bengaluru-58

I StageI SS/MS components

97 G-93

Manufacturing of nuts and boltswith cold

Small Green 10.5.2017 WA 31.12.2034

N N N N N N N NA NA NA 0.54 N NA N Y N NA NA2846 2020

O 98700

Sharp InotechNo.B-38, 2nd Cross, III Stage, PIE, Bengaluru

III StageI Sheet metal processing

181 G-93

Manufacturing of nuts and boltswith cold

Small Green 22.6.2014 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2847 2020 O 87706 Incresol Incresol Engineering

Solutions Private LimitedM-14, 7th Cross, Peenya Industrial

Estate, I StageI Stage I Low inductive

laminated bus bar393 G-93 Manufacturi

ng of nuts and boltswith cold

Small Green 25.11.2019 WA31.12.2034

N N N N N N N NA NA NA 0.43 N NA N Y N NA NA2848 2020

O 87433

Raghavendra Spectro Metallurgical Laboratory

No.326, 9th Cross, IV Phase, PIA, Bengalore IV Phase

I Analytical services testing of metal alloy & water samples

401 R-83

Research and Analytical laboratories

Small Red1.4.1998 BA 30.06.2024

N N N N N N N NA NA NA 0.9 0.015 NA N Y Y NA Yes2849 2020

O

98373

Motherland Garments Pvt Ltd No. 40-B, 2nd Phase, Peenya Industrial Area, Bangalore - 560058 II Phase

I Washing of readymade garments 273 O-50

Mechanized laundry using oil fired

Small Orange 01.05.2020 BA 30.09.2029

N N N N N N N NA NA NA 1.6 25 ETP NA Y N NA Yes2850 2020

OMaruthi Engineering

Enterprises No.A-7, I Stage, PIE, Bengaluru-560058

I StageI MS/SS Automatic

machine & its spare parts

173 G-93Manufacturing of nuts and boltswith cold

Small Green01.09.2017 BA 31.12.2034

N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes2851 2020

OSri Lakshmi Industries

No.72, 6th Main Road, III Phase, PIA, Bengaluru-560058

III PhaseI Powder coating of

MS/AL (3 in one chemicals)

24 G-97

Activity of Powder Coating onsurface of

Small Green 26.6.2017 BA 31.12.2034

N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes2852 2020

OFine crafts

No.C-349, I Main, I Stage, PIE, Bengaluru-560058

I StageI MS/SS Components

with CNC machining G-93Manufacturing of nuts and boltswith cold

Small Green02.09.2019 BA 31.12.2034

N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2853 2020

OTrichem Laboratories

No.63/2, III Phase, PIA, Bengaluru-560058

III PhaseI Blending & repacking

of animal feed supplements

129 G-81

Research laboratories notinvolving

Small Green 15.9.2018 WA 31.12.2034

N N N N N N N NA NA NA 0.36 N NA N Y N NA NA2854 2020

OSaraswathi Industries

No.7E, 7th Main, III Phase, PIA, Bengaluru-58

III PhaseI CNC machining of

Al/MS/CI metal components

175 G-93Manufacturing of nuts and boltswith cold

Small Green07.6.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2855 2020

O

86948

S.S Fab Tech No.93, 7th Cross, III Phase, PIA, Bangalore – 560 058 III Phase

I Mild Steel & stainless structure/ fixtures 367 G-93

Manufacturing of nuts and boltswith cold

Small Green6.7.2011 BA 31.12.2034

N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2856 2020

OUniversal Hands

No.V12(a), II Stage, PIE, Bengaluru-560058

II StageI Aluminium sliding

doors 31 G-93Manufacturing of nuts and boltswith cold

Small Green25.9.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2857 2020

OSouthern Enterprises No.410/A, 11th Cross, IV Phse, PIA,

BengaluruIV Phase I Fabrication of

transformer boxes, gates, reills

33 G-93Manufacturing of nuts and boltswith cold

Small Green11.7.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.25 N NA N Y N NA NA2858 2020

OEntuple Emobility Private

LimitedNo. C-98, 10th Main, 3rd Cross, III

Stage, PIA III StageI Electric motors

G-93Manufacturing of nuts and boltswith cold

Small Green14.10.2020 WA 31.12.2034

N N N N N N N NA NA NA 1 N NA N Y N NA NA2859 2020

OJayadiv Engineering Company No.P-26(A), 3rd Cross, III Stage, PIE,

III StageI Engineering activity

415 G-93Manufacturing of nuts and boltswith cold

Small Green14.7.2020 BA 31.12.2034

N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes2860 2020

OSapnis Innovations, No.315B, 8th Cross, II Stage, PIE

II StageI CNC Mechanical

components 182 G-93Manufacturing of nuts and boltswith cold

Small Green07.6.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.32 N NA N Y N NA NA2861 2020

OHi-Tech CNC Technologies No. 3/B, Site No. 4, II Phase, KIADB

Main Road, Opp. BWSSB , Peenya 1st Stage, Bengaluru - 560 058

II PhaseI Alunimuim

components 395 G-93Manufacturing of nuts and bolts

Small Green10.5.2017 WA 31.12.2034

N N N N N N N NA NA NA 0.7 N NA N Y N NA NAStage, Bengaluru - 560 058 and boltswith cold

N N N N N N N NA NA NA 0.7 N NA N Y N NA NA2862 2020

OAkshaya Crop Care No, A103(A), 3rd Main, II Stage, PIE,

Bengaluru II StageI Micronutrients &

Fertilizers 124 G-93Manufacturing of nuts and boltswith cold

Small Green 15.8.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2863 2020

O

99258

Synpack Zipper Bags Pvt Ltd No.C-292, 8th Cross, I Stage, PIE, Bengaluru I Stage

I gloves ( HMHDPE) and ldpe ziplock bags > 50 micron thickness

207 G-32

Plastic sack bags, woven sack with HDPE,

Small Green 1.5.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2864 2020

O

88151

Magnum Engineers, No.M6-(A), 7th Cross, I Stage, PIE, Bengaluru I Stage

I TRIBO Meters & Testing Rigs 210 G-93

Manufacturing of nuts and boltswith cold

Small Green 17.11.2019WA 31.12.2034

N N N N N N N NA NA NA 0.96 N NA N Y N NA NA2865

OAccurate Panel Processors

No. SB-58, 2nd Cross, I stage Peenya, Bengaluru

I StageI Modular Wooden

Furniture 36 G-64

Modular wooden furniture from

Small Green1.10.2015 BA 31.12.2034

N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes2866 2020 O V.R.Engineering, No.A-186, 4th Cross, I Stage, PIE,

Bengaluru I StageI CNC/VMC

Machinging 417 G-93Manufacturing of nuts and boltswith cold

Small Green15.2.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2867 2020

OKaamadhenu Industries , C-202, 4th Cross, 1st Stage, Peenya

Industrial Estate, Bengaluru - 560 058 I StageI Polyrethane footwear

145 G-93Manufacturing of nuts and boltswith cold

Small Green 1.3.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.9 N NA N Y N NA NA2868 2020

OSai Samruddhi Apparels , No. 9E/26, 2nd Phase, Peenya

Industrial Area, Bengaluru - 560 058 II PhaseI Stitching of Garments

547 G- Medium Green 15.10.2019 BA 31.12.2034

N N N N N N N NA NA NA 7 N NA N Y N NA Yes2869 2020

OSri Maruthi Metals (Formerly

Gajanana Enterprises),No.338, 9th Cross, IV Phase, Peenya Industrial Area, Bengaluru -560058 IV Phase

I grit blasting of ms, ss, components 45 G-93

Manufacturing of nuts and boltswith cold

Small Green1.10.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes2870 2020

O

75729

Fillenpac Industries Pvt Ltd No.322/A, 7th Main, II Stage, PIE, Bengaluru-58 II Stage

I PET preforms of different colors from virgin plastic granules

1035 G-32Polythene and plastic processed products

Large Green17.10.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2871 2020

OWell Thought Chemicals No.355, 9th Cross, IV Phase,

Bengaluru-58 IV PhaseI Refilling, repacking,

blending of chemicals 260 G-93Manufacturing of nuts and boltswith cold

Small Green17.10.2012 WA 31.12.2034

N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2872 2020

OUnique Inc No.C-289, 9th Cross, I Stage, PIE,

Bengaluru-560058 I StageI MS/SS/Al

components 150 G-93Manufacturing of nuts and boltswith cold

Small Green29.10.2005 BA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2873 2020

OM&M Manufacturing

SolutionsNo.490/B/1, IV Phase, PIA,Bengaluru-

560058 IV PhaseI Precision machined

components 204 G-93Manufacturing of nuts and boltswith cold

Small Green02.02.2007 WA 31.12.2034

N N N N N N N NA NA NA 0.57 N NA N Y N NA NA2874 2020

OGlobetch Engineers , No. 410A, 11th Cross, 4th Phase,

KIADB Industrial Area, Peenya , Bengaluru - 560 058

IV PhaseI Jigs & fixture

14 G-93Manufacturing of nuts and boltswith cold

Small Green4.4.2007 WA 31.12.2034

N N N N N N N NA NA NA 0.11 N NA N Y N NA NA2875 2020

ODivine Auto VNC No.411, 11th Cross, IV Phase, PIA,

Bengaluru-560058 IV PhaseI CNC Machining

components 180 G-93Manufacturing of nuts and boltswith cold

Small Green16.1.2004 WA 31.12.2034

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2876 2020

OZigma Engineering A 275 (B), II Stage, PIE, bengaluru

II StageI Bio mass gasifiers,

manual operated soil block machine & fabrication

36 G-93Manufacturing of nuts and boltswith cold

Small Green8.4.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2877 2020

YTCMean Well India Electronics

Private LimitedNo. 9C, Peenya Industrial Area, II

Phase, BengaluruII Phase I L E D driver (l p v, x l

g, a p c series) 1256 G-93Manufacturing of nuts and boltswith cold

Large GreenFeb-20 BA 20.10.2025

N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2878 2020

OSunlight Machine Tools No.3B, II Phase, PIA, Bengaluru

II PhaseI Precision components

446 G-93Manufacturing of nuts and boltswith cold

Small Green01.12.2019 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2879 2020

OSri Matha Engineering &

Power EquipmentNo.559, IV Phase, PIA, Bengaluru

IV PhaseI engineering industry

with powder coating activity

72 G-97 Activity of

Powder Coating on surface of

Small GreenOct-09 BA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2880 2020

OMetal Build Tech (P) Ltd No.SB55, 2ned Cross, I Stage, PIE,

Bengaluru I StageI Precision machining

parts 68 G-93Manufacturing of nuts and boltswith cold

Small Green01.10.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes2881 2020

O

99822

PADM Laboratories Pvt Ltd No. C-139, 2nd C-Main, 2nd stage, Peenya Industrial Estate II Stage

I Testing of Pharmaceutical products

183 R-58

Pharmaceutical (Bulk drug &Active

Small Red 3.11.2020 BA 30.6.2025

N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes2882 2020

O Unite Industries #342-B, 4th Phase, 9th Cross, Peenya

Industrial Area, Bangalore-560058. IV PhaseI Primary current

sensor & voltage transfermor

96 G-93Manufacturing of nuts and boltswith cold

Small Green1.11.1991 BA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2883 2020

O ALUTOP No.146/A, 3rd Cross, I Stage, Peenya

Industrial Estate, Bengaluru-560058 I StageI Aluminium ROPP

250 G-93Manufacturing of nuts and boltswith cold

Small Green9.11.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2884 2020

O Yoga Apparels No.471/A-2, 12th Cross, IV Phase,

Peenya Industrial Area, Bengaluru-560058

IV PhaseI Stitching of ready

made garments 266 G-72Garment Stitching/ Stitching ofshoe uppers/

Small Green01.11.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2885 2020

O Machine Elements No.48, II Phase, Peenya Industrial

Area, Bengaluru-560058 II PhaseI Manufacturing of

machinery spares 224 G-93Manufacturing of nuts and boltswith cold

Small Green25.3.1991 BA 31.12.2034

N N N N N N N NA NA NA 1.1 N NA STP N N NA Yes2886 2020 Surface Tech No.C-130/1, B Main Road, II Stage, I Abrasive blasting activity Small Green2886 2020

O Surface Tech No.C-130/1, B Main Road, II Stage,

Peenya Industrial Estate, Bengaluru-560058

II StageI Abrasive blasting activity

78 G-78

Panel Board

Small Green01.10.2018 BA 31.12.2034

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes2887 2020

O S.L.N Industries No.A-46/1, 2nd Main, II Stage, PIE,

Bengaluru II StageI CNC M/c components

457 G-93Manufacturing of nuts and boltswith cold

Small Green4.3.2011 BA 31.12.2034

N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes

2888 2020O

Chromachemie Laboratory Pvt Ltd,

No.103, 14 th Cross, IV Phase, PIA, Bengaluru IV Phase

I refilling of stevia chemicals

207G-109

Refilling, Repacking

and blending of chemicals

Small Green 9.11.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2889 2020

O

99757

S V Silvary Textiles Private Limited,

No. N-2, 4th cross, 1st stage, Peenya Industrial Area I Stage

I Twisting of yarns and warping of polyester

and cotton yarns123 G-91

Manufacture of Adhesives and adhesive tapes &/ or

Large Green 1.6.2020 WA 31.12.2034

N N N N N N N NA NA NA 1 N NA N Y N NA NA2890 2020

O Inventask Pvt ltd No.342/A, 9th Cross, IV Phase, PIA,

Bengaluru IV PhaseI Fabrication of steel

furniture & structures 66 G-93Manufacturing of nuts and boltswith cold

Small Green 01.11.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.64 N NA N Y N NA NA2891 2020

OFine crafts

No.470-B, IV Phase, PIA, Bengaluru IV PhaseI Micro meter with

turning, milling 203 G-93Manufacturing of nuts and boltswith cold

Small Green 01.1.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes2892 2020

O

100187

Hari Om PlasticsNo.C-184, 5th Cross,2nd Stage, PIE, Bangalore-560058

II StageI reprocessing of plastic

and production of granules & powder

71 O-60

Reprocessing of waste plasticincluding

Small Orange 26.8.2013 WA 30.09.2030

N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2893 2020

OMAP System (India) Pvt Ltd

No.5/1, 12th Main, III Phase, PIA, Bengaluru-560058

III PhaseI Aerospace Ms/SS

components 186 G-93

Manufacturing of nuts and boltswith cold

Small Green 01.11.2010 WA 31.12.2034

N N N N N N N NA NA NA 0.28 N NA N Y N NA NA2894 2020

OSLN Hitech Laser

No.A-46, 2nd Main, II Stage, PIE, Bengaluru

II StageI fabrication of metal

sheets 302 G-78

Panel Board switches without electroboard

Small Green 07.02.2010 WA 31.12.2034

N N N N N N N NA NA NA 0.41 N NA N Y N NA NA2895 2020

ORanganatha Engineering

Works, No.P4, III Stage, PIE, Bengaluru-58

III StageI engineering avtivity

78 G-78

Panel Board switches without electroboard

Small Green 07.02.2010 WA 31.12.2034

N N N N N N N NA NA NA 0.062 N NA N Y N NA NA2896 2020

OOmega Scientic Instruments

Pvt Ltd No.B-377, 10th Cross, I Stage, PIE, Bengaluru

I StageI SS Vessels for

pharmaceutical industry

203.8 G-78

Panel Board switches without electroboard

Small Green 08.8.2020 BA 31.12.2034

N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes2897 2020

O Priya IndustriesSite No. 3, 2nd Cross, Dead end (Near SBI), I Stage, Peenya Industrial Estate, Bangalore - 560058

I StageI Precision components

36 G-78

Panel Board switches without electroboard

Small Green 08.8.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes2898 2020

O Apex EngineeringSite No. 3/1, 2nd Cross, I Stage, Peenya Industrial Estate, Bangalore - 560 058

I StageI Precision components

36 G-78

Panel Board switches without electroboard

Small Green 08.8.2020 BA 31.12.2034

N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes2899 2020

O Koshama Engineering Pvt Ltd No.398(a), I Stage, PIE, Bengaluru I StageI Industrial fans with

engineering activity 75 G-93

Manufacturing of nuts

Small Green 5.10.2015 BA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2900 2020

O Manjushree TechnologiesNo.21, 3rd main, II Phase, PIA, Bengaluru

II PhaseI Dry & wet vibro

polishing activity for automobilecomponents on job

216 O-63

Steel and steel products using

Small Orange 01.02.2010 BA 30.09.2030

N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes2901 2020

O Gallant Electronic Controls No.C-313, 9th Cross, I Stage, PIE I StageI Power conversion

products 526 G-78

Panel Board switches without electroboard

Medium Green 1.1.2017 BA 31.12.2034

N N N N N N N NA NA NA 1.08 N NA N Y N NA Yes2902 2020

O Souza Engineering No.9E/4, II Phase, PIA, Bengaluru-58 II PhaseI CNC Machining components

291 G-78

Panel Board switches without electroboard

Small Green 1.7.2017 WA 31.12.2034

N N N N N N N NA NA NA 1.7 N NA N Y N NA NA2903 2020

O A T E Enterprises,Plot.No.A-422, Ist Cross, I Stage, Peenya Indutrial area, Bangalore - 560058

I StageI Industrial pre cooling

system 473 O-86 Foam manufacturing

Small Orange 1.4.2020 WA 30.09.2029

N N N N N N N NA NA NA 2 N NA N Y N NA NA2904 2020

O Bhumika Machine ToolsNo. 338, 9th Cross, IV Phase, PIA, Bengaluru

IV PhaseI Machine Components

133 G-78

Panel Board switches without electroboard

Small Green 24.11.2009 WA 31.12.2034

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2905 2020

O Sri Shreyas Engineering No.263, II Stage, PIE, bengaluru II StageI Agriculture flanges

175 G-78

Panel Board switches without electroboard

Small Green 15.3.2010 BA 31.12.2034

N N N N N N N NA NA NA 1.12 N NA N Y N NA Yes2906 2020

OTejas Impex Pvt Ltd No.FF-7, III Stage, PIE, Bengaluru-58

III StageI Coffee/tea vending machine

77 G-78

Panel Board switches without electroboard

Small Green 1.1.2011 WA 31.12.2034

N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2907 2020

O Shiva Precision FabricationsNo.198, 12th Cross, III Phase, PIA, Bengaluru

III PhaseI MS Furniture

37 G-78

Panel Board switches without electroboard

Small Green 14.12.2015 WA 31.12.2034

N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2908 2020

OSinar Sheetmetal Solutions Pvt

LtdNo.A-153, 2nd C Main Road, II Stage, PIE, Bengaluru

II StageI Design & manufacturing of forming machine tools

42 G-93

Manufacturing of nuts

Small Green 1.6.2017 BA 31.12.2034

N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes2909 2020

O KAR PolymersNo.18-C/5, II Phase, PIA, Bengaluru-58

II PhaseI Rubberised rollers &

pulleys 245 G-32

Polythene and plastic processedproducts

Small Green 14.12.2017 WA 31.12.2034

N N N N N N N NA NA NA 0.26 N NA N Y N NA NA2910 2020

O BSS CorporationNo.326, 9th Cross, IV Phase, PIA, Bengalore

IV PhaseI Manufacturing of

adhesive tapes with printing

49 O-59

Printing press and/ or Screen Printing

Small Orange 1.12.2016 BA 30.09.2029

N N N N N N N NA NA NA 0.5 N NA N Y N NA Yesprinting Printing N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes2911 2020

OSanco Supports

No.199, 12th Main, III Phase, PIA, Bengaluru

III PhaseI MS/GI Metal cable

tray 46 G-78

Panel Board switches without electroboard

Small Green 1.1.2010 WA 31.12.2034

N N N N N N N NA NA NA 1 N NA N Y N NA NA2912 2020

OSri shankar Enterprises

No.108/A, 3rd Cross, I Stage, PIE, Bengaluru

I StageI Shot blasting of MS

components 33 G-78

Panel Board switches without electroboard

Small Green 1.3.2020 BA 31.12.2034

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2913 2020

OSri shankar Enterprises

No.293, IV Phase, PIA, Bengaluru IV PhaseI manufacturing of

precision components 133 G-78

Panel Board switches without electroboard

Small Green 1.10.2020 WA 31.12.2034

N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2914 2020

OSri Lakshmi Profile No.471 D02, IV Phase, PIA, B-58

IV PhaseI Gas Cutting of MS

Plates 34 G-78

Panel Board switches without electroboard

Small Green 1.06.2017 BA 31.12.2034

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2915 2020

O

101072

EN ES Foams, 24, 3B, II Phase, PIA, BengaluruII Phase

I Polyrethane foam cushion 94 O-80

Foam manufacturing

Small Orange 15.2.2020 BA 30.09.2030

N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2916 2020

O

100771

Vinass Heat Treaters No.M-2/1, 5th Cross, I Stage, PIE, Bengaluru-58

I Stage I Heat treatment of components

174 O-36 Heat treatment using oil

fired furnace

Small Orange 15.10.2020BA 30.09.2029

N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2917 2020

OSuhaas Engineering No.17-G/A, II Phase, PIA, Bengaluru-

58II Phase I General engineering 455

G-78

Panel Board switches without electroboard

Small Green1.5.2010

BA 31.12.2035

N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2918 2020

OShree Om Engineering No.17-G/A, II Phase, PIA, Bengaluru-

58II Phase I General engineering 178

G-78

Panel Board switches without electroboard

Small Green1.1.2011

WA 31.12.2035

N N N N N N N NA NA NA 0.3 N NA N Y N NA NA2919 2020

OTexel Engineers No.B 228, 5th Main, II Stage, Peenya

Industrial Estate, Bengaluru-560058. II StageI Precision turned

components 134 G-78

Panel Board switches without electroboard

Small Green 1.6.2020 WA 31.12.2035

N N N N N N N NA NA NA 0.52 N NA N Y N NA NA2920 2020

OCambrian Bio Works LLP No.M-11, 7th Cross, I Stage, Peenya

Industrial Estate, B'lore-560058 I StageI Plastic spin column

tubes 223 G-78

Panel Board switches without electroboard

Small Green 11.1.2020 WA 31.12.2035

N N N N N N N NA NA NA 1.8 N NA N Y N NA NA2921 2020

OShree Ram Polypacks No.C-211, 4th Cross, I Stage, PIE,

Bengaluru-58 I StageI Stitching of HDPE/PP

woven poly sack bags 50 G-78

Panel Board switches without electroboard

Small Green 16.1.2019 WA 31.12.2035

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2922 2020

ODelta Interconnect No.229, III Phase, Peenya Industrial

Area, Bengaluru III PhaseI Assembling of cable

harness , junction box /Panels

386 G-78

Panel Board switches without electroboard

Small Green 8.1.2009 BA 31.12.2035

N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes2923 2020

OEsvee Industries No.B-233&234, 6th Cross, I Stage,

PIE, Bengaluru-58 I StageI Transformer Oil

sample collection kit 32 G-78

Panel Board switches without electroboard

Small Green 6.1.1980 BA 31.12.2035

N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2924 2020

ONisus Hitech Pvt Ltd, C-287, 8th Cross, I Stage, PIA,

Bengaluru-58 I StageI CNC machining

126 G-78

Panel Board switches without electroboard

Small Green 1.7.2017 WA 31.12.2035

N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2925 2020

OUday Engineers C-287, 8th Cross, I Stage, PIA,

Bengaluru-58 I StageI Fabrication of

Transformer oil recovery filtering machine , MS Storage

27 G-78

Panel Board switches without electroboard

Small Green 15.10.2019 BA 31.12.2035

N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2926 2020

OHydrotherm Fluids Controls

Pvt LtdNo.280, 4th Main, IV Phase, PIA,

Bengaluru IV PhaseI Assembling of

hydraulic cylinders 286 G-78

Panel Board switches without electroboard

Small Green 15.5.2019 BA 31.12.2035

N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes2927 2020

O 87865CICB Chemicon Pvt Ltd No.135, III Phase, PIA, Bengaluru

III PhaseI

1020 G-78

Panel Board switches without electroboard

Large Green 20.6.2019 BA

Yes2928 2020

OV Aim Group B-111, 11th Main, III Stage, PIE, Beng

III StageI Sheet Metal

fabrication, cabinet & racks fabrication

268 G-78

Panel Board switches without electroboard

Small Green 01.06.2018 WA 31.12.2034

N N N N N N NA NA NA NA 0.36 NA NA N Y NA NA NA2929 2020

OV Aim Group B-112, 11th Main, III Stage, PIE, Beng

III StageI Sheet Metal

fabrication, cabinet & racks fabrication

137 G-78

Panel Board switches without electroboard

Small Green 20.03.20017 WA 31.12.2034

N N N N N N NA NA NA NA 0.54 NA NA N Y NA NA NA2930 2020

OV Aim Group B-204, II Stage, PIE, Beng

II StageI Sheet Metal

fabrication, cabinet & racks fabrication

453 G-78

Panel Board switches without electroboard

Small Green 15.06.2020 WA 31.12.2034

N N N N N N NA NA NA NA 0.36 NA NA N Y NA NA NA2931 2020

OHigh Vacuum Technologies &

Products Pvt LtdNo.C-302, 9th Cross, I Stage, PIE

I StageI

Industrial vaccum pumps

440 G-78

Panel Board switches without electroboard

Small Green 1.07.2019 WA 31.12.2035

N N N N N N NA NA NA NA 0.6 NA NA N Y NA NA NA2932 2020

OSri Sapthagiri Industries No. A 196, 4th Cross, 1st Stage ,

Peenya Industrial Estate, Bengaluru-560058

I StageI

Assemly testing of CNC m/c

327 G-78

Panel Board switches without electroboard

Small Green 20.06.2018 WA 31.12.2035

N N N N N N NA NA NA NA 0.5 NA NA N Y NA NA N2933 2021

YTC

101742

Wistron Infocomm Manufacturing (India) Pvt.

LTd.,

Plot No. 30/A, II Phase, Peenya Indl. Area, Bengaluru-560058.

II Phase I Electronic

manufacturing services

474 O-100

STPs Established at Residential

Large Orange 1.10.2020 BA 03.02.2026

N N N N N N N NA NA NA 85 N NA STP N N NA Yes2934 2021

OCNC Technik, B-36, 10th Main, III Stage, PIE,

Bengaluru III StageI Precision machined

components 102 G-78

Panel Board switches without electroboard

Small Green 20.06.2008 WA 31.12.2035

N N N N N N N NA NA NA 0.8 N NA NA Y N NA NA2935 2021 Geometry Engineering No.B-66, III Stage, PIE, B-58 I Sheet metal

Panel Board switches 2935 2021

OGeometry Engineering

InnovationsNo.B-66, III Stage, PIE, B-58

III StageI Sheet metal

fabrication 115 G-78switches without electroboard

Small Green 10.09.2019 WA 31.12.2035

N N N N N N N NA NA NA 0.8 N NA NA Y N NA NA2936 2021

O

101591

M D PlasticsNo.190, 11th Main Road, III Phase, PIA, Bengaluru-58

III PhaseI Manufacturing of

Plastic granules 25 O-60

Reprocessing of waste plasticincluding

Small Orange WA 30.09.2030

N N N N N N N NA NA NA 0.24 N NA NA Y N NA NA

2937 2021O

Effee Induction Pvt Ltd No.14, IV Phase, Peenya Industrial Area, Bengaluru-560058

IV Phase IInduction hardening

equipments163 G-78

Panel Board switches without electroboard

Small Green 26.6.2019 WA 31.12.2035

N N N N N N N NA NA NA 6 N NA NA Y N NA NA2938 2021

O J V Enterprises No.491/8, Site No.1-B, 14th Cross,

Peenya Industrial Area, IV Phase, Bengaluru-560 058

IV PhaseI assembling of

accillary relays in numbers

108 G-78

Panel Board switches without electroboard

Small Green 07.01.2017 WA 31.12.2035

N N N N N N N NA NA NA 1.04 N NA NA Y N NA NA2939 2021

O Bhagyalakshmi Industrial

Corporation ,No.B-124, III Main, II Stage, PIE,

Bengaluru-58II Stage I Steering columns

25 G-78

Panel Board switches without electroboard

Small Green 08.03.2021 WA 31.12.2035

N N N N N N N NA NA NA 0.5 N NA NA Y N NA NA2940 2021

O Ayush Oils No.401, IV Phase, 4th main, PIA ,

Bengaluru-58 IV PhaseI Cold pressing of

edible oil, oil cake 85 G-29

Oil mill Ghani and extraction (no

Small Green 07.01.2017 WA 31.12.2100

N N N N N N N NA NA NA 0.04 N NA NA Y N NA NA2941 2021

O Charvik Technologies No.352, 4th Main, 9th Cross, IV

Phase, PIA IV PhaseI Machining componets

80 G-78

Panel Board switches without electroboard

Small Green 07.01.2017 WA 31.12.2035

N N N N N N N NA NA NA 0.12 N NA NA Y N NA NA2942 2021

O Jhalak Polywear 333, 9th Cross, 4th Main, IV Phase,

Peenya Industrial Area, Bengaluru - 560058

IV PhaseI PU footwear

18 G-78

Panel Board switches without electroboard

Micro Green 07.01.2017 WA 31.12.2100

N N N N N N N NA NA NA 0.4 N NA NA Y N NA NA2943 2021

O Pallakki NDT Excellence

Center Pvt Ltd.,No.411/A, 11th Cross, IV Phase, PIA,

Bengaluru-58 IV PhaseI Fabricated finished

goods 75 G-78

Panel Board switches without electroboard

Small Green 07.01.2017 WA 31.12.2035

N N N N N N N NA NA NA 0.36 N NA NA Y N NA NA2944 2021

O Givi Misure Pvt Ltd No.488, 14th cross, IV phase, PIA,

Bangalore-58 IV PhaseI Assembling of digital

optical linear 85 G-78

Panel Board switches without electroboard

Small Green 8.7.2003 WA 31.12.2035

N N N N N N N NA NA NA 0.32 N NA NA Y N NA NA2945 2021

O Madhu Enterprises No.446, IV Phase, PIA, B-58 IV Phase I Machined

Components 143 G-78

Panel Board switches without electroboard

Small Green 14.12.2004 WA 31.12.2035

N N N N N N N NA NA NA 1.04 N NA NA Y N NA NA2946 2021

O Fine Tools India Pvt Ltd No.275, 4th main, 4th Cross, IV Phase,

PIA, Bengaluru-58IV Phase I Plastic components

488 G-78

Panel Board switches without electroboard

Small Green 27-01-2020 WA 31.12.2035

N N N N N N N NA NA NA 1.2 N NA NA Y N NA NA2947 2021

OIndian Industrial Machines Pvt

LtdNo.3, 14th Cross, IV Phase, PIA,

Bengaluru-560058IV Phase I assembling of PLC

based automation m/c 112 G-78

Panel Board switches without electroboard

Small Green 15.6.2019 WA 31.12.2035

N N N N N N N NA NA NA 1.4 N NA NA Y N NA NA2948 2021

OBalaji Industries

No.504, IV Phase, PIA, Bengaluru-58 IV PhaseI

251 G-78

Panel Board switches without electroboard

Small Green 12.10.1992 WA

NA2949 2021

OMicron Machine Tools No.34/G, III Phase, 4th Main Road,

PIA, Bengaluru-58 III PhaseI Cast Iron machine

components with Tuning, Milling, drilling operation

74 G-78

Panel Board switches without electroboard

Small Green 5.2.2017 WA 31.12.2035

N N N N N N N NA NA NA 0.3 N NA NA Y N NA NA2950 2021

OMultitech Systems No.274, 4th Main, IV Phase, Peenya

Industrial Area, Bengaluru-58 IV PhaseO Battery dealers

- - - - - - - - - - - - - -

Y 9.3.2026 NA NA N N NA NA N N NA2951 2021

OTUV India Pvt Ltd No.105, III Stage, Peenya Industrial

Estate, Bengaluru-58 III StageI electrical &electronic product testing

1488 G-78

Panel Board switches without electroboard

Large Green 1.4.2021 BA 31.12.2035

N N N N N N N NA NA NA 2 N NA NA Y N NA Yes2952 2021

ORPS Industries,

No.180/A, 11th Main, III Phase, PIA, Bengaluru-58

III PhaseI chimney blower kitchen equipment

87 G-78

Panel Board switches without electroboard

Micro Green 1.4.2015 BA 31.12.2035

N N N N N N N NA NA NA 2 N NA NA Y N NA Yes2953 2021

OAmbit Power solutions Pvt Ltd No.4/1, II Phase, PIA, Bengaluru

II PhaseI Assembling of electrical control panels

232 G-78

Panel Board switches without electroboard

Small Green 26.2.2015 WA 31.12.2035

N N N N N N N NA NA NA 0.68 N NA NA Y N NA N2954 2021

OSidma Polymers

No.B-151, 5th Main Road, II Stage, PIE, Bengaluru

II StageI Polymer compounds & master batched (granules)

122 G-78

Panel Board switches without electroboard

Small Green 28.1.2020 WA 31.12.2035

N N N N N N N NA NA NA 0.3 N NA NA Y N NA Yes2955 2021

ODurga Control Systems India

Pvt LtdNo.488/B, IV Phase, PIA, Bengaluru

IV PhaseI Assembling of

electrical control panels

70 G-78

Panel Board switches without electroboard

Small Green 15.9.2007 WA 31.12.2035

N N N N N N N NA NA NA 0.2 N NA NA Y N NA N2956 2021

OStandard Automotive

Machines India Pvt Ltd,No. A 373, 4th Main, 6th Cross, 1

Stage, PIE, Bengaluru-58 I StageI

Small Green

N N N N N N N NA NA NA 0.3 N NA NA Y N NA N2957 2021

OCEJN Products IndiaLtd, No.1A, II Phase, PIA, Bengaluru-58

II PhaseI

176 G-78

Panel Board switches without electroboard

Small Green 11.9.2006 WA

N N N N N N N NA NA NA 0.3 N NA NA Y N NA N2958 2021

O

102553

Sleep Factory International Pvt Ltd No.A/371, I Stage, PIE, Bengaluru-58 I Stage

I matressess, pillows and cushions 273 G-78

Panel Board switches without electroboard

Small Green 1.4.2021 WA 31.12.2035

N N N N N N N NA NA NA 1.2 N NA NA Y N NA N2959 2021

OAnil CNC & Gears, No.B-229, 4th Cross, I Stage, PIE,

BengaluruI Stage I CNC M/c components

97 G-78

Panel Board switches without electroboard

Small Green 1.7.2017 WA

electroboard 2960 2021

OFly Vaccum Technologies Pvt

Ltd No.338, 9th Cross, IV Phase, Peenya Industrial Area, Bengaluru -560058

IV PhaseI M/c of vaccum systems and components

49 G-78

Panel Board switches without electroboard

Small Green 5.1.2017 WA 31.12.2035

N N N N N N N NA NA NA 0.18 N NA NA Y N NA N