caravel easington clipper ... - shell united kingdom · shell u.k. limited reserves the right to...

2
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015 CLIPPER CLIPPER CLIPPER Clipper is in the Southern part of the UK sector of the North Sea in the Sole Pit field. Located 113km (70 miles) north north east of Lowestoft, 73km (46 miles) from Bacton and 66km (41 miles) from the nearest point of the Norfolk coast. It is a Normally Attended Installation (NAI) comprising five fixed bridge linked platforms Clipper PW Wellhead Platform Clipper PT Production Platform - which is manned Clipper PC Compression Platform Clipper PM Metering / Compression Platform Clipper PR Riser Platform The Clipper installation produces and processes natural gas from its own wells and imports and processes gas from Barque PB & PL, Galleon PN & PG, Skiff PS, Cutter QC and Carrack QA. INTERCONNECTOR BBL SOLE PIT THE SEAN FIELD INDE FIELD SCH ZEEBRUGGE BARQUE GALLEON SKIFF SEAN LEMAN CORVETTE CARRACK CUTTER CARAVEL SHAMROCK EASINGTON GREAT YARMOUTH SSIDE LONDON BACTON CLIPPER INDE BALGZA BRIGANTINE KEY FACTS Block Approx distance to land Water Depth Hydrocarbons Produced Export Method Operated / Non-Operated 48/19a 109km (68 miles) North of Lowestoft 112ft (34m) Gas Gas piped to Bacton Gas Terminal Operated Sector Southern North Sea

Upload: hoangthien

Post on 26-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015

CLIPPER

CLIPPER

CLIPPERClipper is in the Southern part of the UK sector of the North Sea in the Sole Pit field. Located 113km (70 miles) north north east of Lowestoft, 73km (46 miles) from Bacton and 66km (41 miles) from the nearest point of the Norfolk coast. It is a Normally Attended Installation (NAI) comprising five fixed bridge linked platforms

Clipper PW Wellhead Platform Clipper PT Production Platform - which is manned Clipper PC Compression Platform Clipper PM Metering / Compression Platform Clipper PR Riser Platform

The Clipper installation produces and processes natural gas from its own wells and imports and processes gas from Barque PB & PL, Galleon PN & PG, Skiff PS, Cutter QC and Carrack QA.

CATS

(BP)

SEA

L

INTERC

ON

NEC

TOR

BBL

SOLE PIT

THE HAGUE

SEAN FIELD

INDE FIELD

SCHIEDAM

EMMEN

ZEEBRUGGE

BARQUE

CLIPPER

GALLEON

SKIFF

SEAN

LEMAN

CORVETTE

AMELAND

CARRACK

CUTTER

CARAVEL

SHAMROCK

EASINGTON

GREAT YARMOUTH

TEESSIDE

LONDON

STANLOW

BACTON

CLIPPERINDE

BALGZAND

DEN HELDER

GRIJPSKERK

BRIGANTINE

KEY FACTS Block

Approx distance to land

Water Depth

Hydrocarbons Produced

Export Method

Operated / Non-Operated

48/19a

109km (68 miles) North of Lowestoft

112ft (34m)

Gas

Gas piped to Bacton Gas Terminal

Operated

Sector Southern North Sea

CLIPPER

INFRASTRUCTURE INFORMATION

Entry Specification:

Outline details of Primary separation processing facilities:

Outline details of gas treatment facilities:

GSV 37-44.5MJ/sm3, Oxygen <0.2%, CO2 Max 2 mol%, H2S <3.3ppm, Total Sulphur <15ppm, WI 48-51.5 MJ/Sm3, Inerts <7%, N2 <5%

Gas Compression

Two Stage Compression Station with Fiscal Metering. Export Pipeline to Shell Bacton Gas Plant

HIGH LEVEL CAPACITY INFORMATIONThe basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

Description

CLIPPER & No4 Sealine

Gas compression: LP 200 MMscf/d

Export capacity: 525 MMscf/d

Comment

Interruptable

100MMscf/day capacity in

Summer

2015 2016 2017 2018 2019

>25% 5% to 25% <5% Unknown

CONTACT INFORMATIONShell

For further enquiries regarding the above please contact Moataz Darwish +31 (0) 592368177 [email protected]

Last update: January 2015

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

Ullage as % of system capacity

Additional capacity may be available if existing production is constrained / backed out

Liquid handling constrains to be considered

Technical modifications are required to cater for additional volumes

Capacity