GIBSIN Engineers, Ltd. Indoor Coal Yard Project Name: Hsinta Power Station Indoor Coal Yard Client Taiwan Power Company Location Hsinta/Kaohsiung, Taiwan, ROC Description To mitigate local environmental concerns, an indoor-type coal yard and all related handling facilities for Hsinta Power Station is constructed. The indoor-type coal yard consists of four (4) coal domes each with 170,000 metric tons of storage capacity which enables the supply of coal for existing four (4) units for 50 days operation. While building coal domes the project was divided into two stages, in which domes, conveyors, stackers/recla imers were constructed during the first stage to handle coal supply by barge and was transferred from Talin, Kaohsiung Harbors; further, at the second stage an off-shored wharf with ship unloaders and conveyors were constructed to realize the complete coal handling system. Hsinta indoor coal yard is built on the reclaimed land from an ash pond, with area of 12.27 hectares, in Hsinta Power Station where four (4) coal domes are situated. Each dome is 120 meters in diameter, 67 meters in height, and is equipped with one (1) radial semi-porta l type stacker/reclai mer and conveyors to handle coal flow in/out. Coal is unloaded from an offshore wharf which is connected by a 2.3 kilometers long of trestle-bridge from power plant boundary. The wharf is equipped with two (2) continuous ship unloaders (CSU), each with 2,000 t/h unloading capacity. Two (2) 4,000 t/h conveyors are installed for the handling of unloaded coal into coal domes. The system design features for major equipment are as follows:  Coal Domes 1. Quantity: 4 2. Structure system: aluminum space truss, supported by circular RC side wall 3. Dimensions: 120 meters (Diameter) x 67 meters (Height)  Stacker & Reclaimer 1. Manufacturer: VOEST-ALPINE 2. Type: Radial semi-portal 3. Quantity: 4 4. Capacity : Stacker 4,000 t/h Reclaimer 2,000 t/h  Conveyor (between domes and barge) 1. Manufacturer: TCEC 2. Capacity: 4,000/1,500 t/h 3. T otal Length: 4,800 meters  Continuous Ship Unloader 1. Manufacturer: MacGREGOR 2. Type: Screw 3. Quantity: 2 Capacity : 2,000 t/h  Conveyor (from wharf to dome) 1. Manufacturer: POSMEC 2. Capacity: 2,000 t/h 3. T otal Length: 5,200 meters GIBSIN’s Scope of Servi ces  Completed as owner's  Architect Engin eer  Land acquisition and construction development  Complete engineering and design including equipment/construction specification, contractor pre-qualifica tion, bid evaluation and vendor drawing review  Job site advisory service  Witness of performance test  General consulting services Completion Schedule Completed in 2009

Upload: amit-bhaduri

Post on 04-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Hsinta CoalYard

8/13/2019 Case Hsinta CoalYard

http://slidepdf.com/reader/full/case-hsinta-coalyard 1/1

GIBSIN Engineers, Ltd.  

Indoor Coal Yard

Project Name:

Hsinta Power Station IndoorCoal Yard

Client

Taiwan Power Company

Location

Hsinta/Kaohsiung, Taiwan, ROC

Description

To mitigate local environmentalconcerns, an indoor-type coal

yard and all related handling

facilities for Hsinta Power Station

is constructed. The indoor-type

coal yard consists of four (4)

coal domes each with 170,000

metric tons of storage capacity

which enables the supply of coal

for existing four (4) units for 50

days operation.

While building coal domes the

project was divided into two

stages, in which domes,

conveyors, stackers/reclaimers

were constructed during the first

stage to handle coal supply by

barge and was transferred from

Talin, Kaohsiung Harbors;

further, at the second stage an

off-shored wharf with ship

unloaders and conveyors wereconstructed to realize the

complete coal handling system.

Hsinta indoor coal yard is built

on the reclaimed land from an

ash pond, with area of 12.27

hectares, in Hsinta Power

Station where four (4) coal

domes are situated. Each

dome is 120 meters in diameter,

67 meters in height, and is

equipped with one (1) radial

semi-portal type

stacker/reclaimer and

conveyors to handle

coal flow in/out.

Coal is unloaded from

an offshore wharf

which is connected by

a 2.3 kilometers long

of trestle-bridge from

power plant boundary.

The wharf is equipped

with two (2)

continuous ship

unloaders (CSU),each with 2,000 t/h

unloading capacity.

Two (2) 4,000 t/h

conveyors are

installed for the

handling of unloaded

coal into coal domes.

The system design features for

major equipment are as follows:

●  Coal Domes

1. Quantity: 4

2. Structure system:

aluminum space truss,

supported by circular RC

side wall

3. Dimensions: 120 meters

(Diameter) x 67 meters

(Height)

●  Stacker & Reclaimer

1. Manufacturer:

VOEST-ALPINE

2. Type: Radial semi-portal

3. Quantity: 4

4. Capacity :

Stacker 4,000 t/h

Reclaimer 2,000 t/h

●  Conveyor (between domes

and barge)

1. Manufacturer: TCEC

2. Capacity: 4,000/1,500 t/h

3. Total Length: 4,800 meters

●  Continuous Ship Unloader

1. Manufacturer:

MacGREGOR

2. Type: Screw

3. Quantity: 2

Capacity : 2,000 t/h

●  Conveyor (from wharf to

dome)

1. Manufacturer: POSMEC

2. Capacity: 2,000 t/h

3. Total Length: 5,200 meters

GIBSIN’s Scope of Services

●  Completed as owner's

 Architect Engineer

●  Land acquisition and

construction development

  Complete engineering anddesign including

equipment/construction

specification, contractor

pre-qualification, bid

evaluation and vendor

drawing review

●  Job site advisory service

●  Witness of performance test

●  General consulting services

Completion Schedule

Completed in 2009