Page 1: Case sample of a CT option

Case sample of Case sample of a CT optiona CT option

Control of sulfuric aci d use in concentrated

latex industry

Page 2: Case sample of a CT option

Working conditions fou Working conditions fou nd during audit nd during audit

In latex sedimentation, workers ad d sulfuric acid to the latex to promo te coagulation. They do this by dep

- ending on long experience withou t measuring. Then they use a stick

to stir and mix the acid with latex, a nd later scoop the coagula floating on the surface. The water remainin

g is drained into the rubber trap.

Page 3: Case sample of a CT option

Suggested Suggested CT optionCT option

Ensure appropriate consumpti on of acid used in coagulation, by plotting titration curve of s

kimmed latex at various amou nt of ammonia, and add only r

equired amount of acid each time.

Page 4: Case sample of a CT option

Technical feasibility st Technical feasibility st udy udy

It is an operational control mea sure in use.

The factory is capable of implementing.

There are no other technical limitations.

Page 5: Case sample of a CT option

Economic feasibility st Economic feasibility studyudy Investment cost 7 , 000 baht

(handheld pH meter and cost for plotting skim latex titration)

Service cost 50 baht (sampling skimmed latex for ammonia check)

Savings 360 baht (Acid costs saved per sedimentation)

Investment payback after sedimentation23 times

(calculated from 7,000/(360-50 ) times)

Page 6: Case sample of a CT option

Implementation steps Implementation stepsActivity March 00 April 00 Responsible party

1. Prepare details and obtain approval __ CT team

2. Approve assignment __ Management

3. Plot titration of skimmed latex atvarious ammonia concentrations

_ Quality ControlDept.

4. Obtain a handheld pH meter _ _ MaintenanceDept.

5. Train employees on proper workprocedure

__ CT team

6. Proceed and collect data forcomparison

____ Workers and CTteam

Page 7: Case sample of a CT option

Case sample of a Case sample of a CT CT optionoption

Proper use of a watersoftener

Page 8: Case sample of a CT option

Working conditions foun d during assessment

Resin is rinsed off the water sof tener by using 100 kg. of salt in

each regenerating cycle. Regenerationtakes1 5 mi nutes The softener is used for eight h

ours before the next regeneration

Page 9: Case sample of a CT option

Suggested Suggested CT optionsCT options

Usesaltwith10%concentrationforcleaning,orabout125kg.per regenerati ngcycle.

Increase regeneration time to 3 0 minutes

Operationaltimei s i ncreasedto24hours

Page 10: Case sample of a CT option

Technical feasibility st Technical feasibility studyudy

It is a proper resin washing meth od, lasting no less than 3 0 min

utes. Thefactory i s capabl e of i mpl eme

ntingsuchadj ustments. There are no other technical l

imitations.

Page 11: Case sample of a CT option

Economic feasibility st Economic feasibility studyudy

Investment costNone

Savings385 baht/24hours

(salt cost 175 kg./day x 2.2 baht/kg., excluding cost for water, labor and t

ime saved)

Payback peri odImmediate

Page 12: Case sample of a CT option

Work procedure Work procedureActivity Day 1 Day 2 Day 3 Responsible party

1. Prepare details and obtain approval -- CT team

2. Approve assignment - Utility Manager

3. Train employees on proper workprocedure

--- CT team

4. Proceed and collect data forcomparison

--- Operators and CTteam

Page 13: Case sample of a CT option

Samples of differe Samples of differe nt nt CT optionsCT options

Page 14: Case sample of a CT option

When cleaning factory floors, swe ep off dirt and scraps before hosi ng down with water

Check for leaks in various connec tions, e.g., pipes for raw, soft an

d cold water, and repair immediat ely if leaks are found

Ensure that float valves are prope rly functioning

-Where possible, use high pressur e nozzle on water hoses

Page 15: Case sample of a CT option

Avoid cleaning by overflow syst - em; counter flow system is pref

erable Plan production process so tha

t minimal washing is required Product change should not tak

e place too often Check quality of water used an

d use appropriate type of water

Page 16: Case sample of a CT option

Insulate hot and cold water pip es and repair the insulation if d

amaged Consider returning condensate Avoid using steam directly by u

sing indirect heat transfer whe re applicable

Water used to cool machines s hould be reused

Page 17: Case sample of a CT option

Acid and alkaline should not be d umped after only one use; try to r

- e use by adding acid or alkaline t o obtain required concentration

For light, fluffy materials, trap sy stems should be utilized to preve

nt loss Install water meter at key points

so that loss and production effici ency will be known

Avoid using hazardous chemicals

Page 18: Case sample of a CT option

Prepare work manuals and hav e them available for use

Maintain machines in good wo rking condition

Check condition of boilers regularly

If production is much lower tha n production capacity, product

ion process should be revised t o minimize loss

Page 19: Case sample of a CT option

Air conditioner should be set at a n appropriate temperature

Lights should be turned off when not in use; use spot lighting wher

e possible Light switches should be position

ed throughout different work are as. Replace spent bulbs with ene rgy saving bulbs.

Clean light bulbs and reflectors regularly

Page 20: Case sample of a CT option

SummarySummary CT CT benefitsbenefits

Increased production efficiency

Reduced production cost

Reduced environmen tal problems at sourc

e Good image Good relations with lo

cal community

Page 21: Case sample of a CT option

SummarySummary Factors crucial for sus Factors crucial for sus

taining CT taining CT Management support

Team work Determination Communication Training Incentives

Page 22: Case sample of a CT option

SummarySummary Management role in CT imp Management role in CT imp

lementationlementation Continuous support for CT activities

Involve everyone in th e organization in CT ac

tivities Incorporate CT into

management plan (marketing, production, finance, accounting, personnel and information system

Page 23: Case sample of a CT option

For additional information, co For additional information, contact:ntact:

Cleaner Technology Unit Cleaner Technology Unit