Scope of supply Operation 13GWh/year Output delivered Date delivered Fuel used Location Description The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met. Briquettes from wood waste 3,500 tonnes/year The Professional´s choice since 1935TRANSCRIPT
+46 479 177 00 Fax +46 479 177 [email protected]
www.osbyparca.seBox 93, 283 22 Osby
2011
-11-
18. A
ll rig
hts
rese
rved
. Inf
orm
atio
n su
bjec
t to
chan
ge w
ithou
t not
ice.
The Professional´s choice since 1935
Location
Biomass boiler case studyE.ON district heating plant Broby
Description
Fuel used
Scope of supply
Date delivered
CO2 saving
Output delivered
Operation
Village of Broby, Sweden
Dual setup with Biomass boilers PB2 delivering 3MW and 1MW of hot water for district heating of village. The boilers are fed with briquettes from an underground fuel pocket
Briquettes from wood waste
November 2006
13GWh/year
3,500 tonnes/year
2x Biomass boilers PB2, 3MW & 1MW with all associated sensors & switches and control system.
Flue gas equipment consisting of multi cyclone and flue gas fan.
Ash container and chimney.
The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.