+46 479 177 00 Fax +46 479 177 25 [email protected] www.osbyparca.se Box 93, 283 22 Osby 2011-11-18. All rights reserved. Information subject to change without notice. The Professional´s choice since 1935 Location Biomass boiler case study E.ON district heating plant Broby Description Fuel used Scope of supply Date delivered CO2 saving Output delivered Operation Village of Broby, Sweden Dual setup with Biomass boilers PB2 delivering 3MW and 1MW of hot water for district heating of village. The boilers are fed with briquettes from an underground fuel pocket Briquettes from wood waste November 2006 13GWh/year 3,500 tonnes/year 2x Biomass boilers PB2, 3MW & 1MW with all associated sensors & switches and control system. Flue gas equipment consisting of multi cyclone and flue gas fan. Ash container and chimney. The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.

Upload: bio-nordic-ltd

Post on 20-Mar-2016

214 views

Category:

Documents


0 download

DESCRIPTION

Scope of supply Operation 13GWh/year Output delivered Date delivered Fuel used Location Description The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met. Briquettes from wood waste 3,500 tonnes/year The Professional´s choice since 1935

TRANSCRIPT

Page 1: Case study Broby

+46 479 177 00 Fax +46 479 177 [email protected]

www.osbyparca.seBox 93, 283 22 Osby

2011

-11-

18. A

ll rig

hts

rese

rved

. Inf

orm

atio

n su

bjec

t to

chan

ge w

ithou

t not

ice.

The Professional´s choice since 1935

Location

Biomass boiler case studyE.ON district heating plant Broby

Description

Fuel used

Scope of supply

Date delivered

CO2 saving

Output delivered

Operation

Village of Broby, Sweden

Dual setup with Biomass boilers PB2 delivering 3MW and 1MW of hot water for district heating of village. The boilers are fed with briquettes from an underground fuel pocket

Briquettes from wood waste

November 2006

13GWh/year

3,500 tonnes/year

2x Biomass boilers PB2, 3MW & 1MW with all associated sensors & switches and control system.

Flue gas equipment consisting of multi cyclone and flue gas fan.

Ash container and chimney.

The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.