Case Study: CO2 Removal and Stripping Column Ventilation at
Bell Aquaculture
Steven Summerfelt, Jacob Bartlett, Jamie Thompson, Brian Vinci, and
Norman McCowan
![Page 2: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/2.jpg)
Conflicting Goals
• 25 to 35 mg/L CO2 concentration begins to reduce rainbow trout
• CO2 removal requires contacting large volumes of air with cascading water
• Heating & cooling costs increase with increased cascade column ventilation
![Page 3: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/3.jpg)
Air Ventilation Considerations %
CO
2 Str
ippi
ng P
er P
ass
Inlet Stripping Gas CO2 (ppm)
0
10
20
30
40
50
60
70
0 2000 4000 6000
G:L=1G:L=5G:L=10
![Page 4: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/4.jpg)
125 Tonne/yr WRAS Module
![Page 5: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/5.jpg)
Design of Bell Aquaculture Growout WRAS for Yellow Perch
• 26 m3/min (6,900 gpm) total water recirculating flow rate in each WRAS – 85 HP energy for water recirculation
• Pumping, aeration, drum filtration, oxygenation
– 30 minute culture tank retention time – 2,300 gpm/tank – 20 to 40 gpm makeup flow per WRAS
![Page 6: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/6.jpg)
Trout & Salmon Production Tanks (10.7 m ɸ x 3.05 tall; 260 m3 culture volume)
24-hr light and feeding every 2 hrs
![Page 7: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/7.jpg)
CO2 Production & Removal • CO2 produced in culture tank & biofilter • CO2 removed during plunge into sidewall box
![Page 8: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/8.jpg)
CO2 Stripping Across Gas Balancing Unit
![Page 9: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/9.jpg)
CO2 Stripping Depends on Packing Height and Air:Water (G:L) %
CO
2 Rem
oval
Packing Height (m)
0102030405060708090
100
0.0 0.5 1.0 1.5 2.0 2.5
G/ L=1
G/ L=5
G/ L=10
Design Target
![Page 10: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/10.jpg)
Ventilation Fan on CO2 Stripping Column
• Variable Frequency Drive (VFD) used to adjust fan motor speed and air flow ventilated through stripping columns in each RAS
• Observational data collected from all tanks in two identical RAS modules – fan speed adjusted using VFD to three set-points
• 20, 30, & 50 hz – 15.5˚C water temp – 1300 to 1500 ppm CO2 in room air
![Page 11: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/11.jpg)
Culture Tank CO2 Depends on Daily Feed Load and Fan Speed
0
5
10
15
20
25
30
35
40
45
0.0 100.0 200.0 300.0 400.0
Diss
olve
d CO
2, m
g/L
Daily Feed Rate in a Culture Tank, kg/d
50 hz
30 hz
20 hz
![Page 12: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/12.jpg)
Culture Tank CO2 Depends on Tank Specific Feed Load and Fan Speed
• Feed and Fan Speed significantly affect CO2 in the culture tank (ANCOVA, P < 0.01) – CO2 stripping across cascade aeration column
• 45±1% at 50 hz • 24±1% at 30 hz • Not measured at 20 hz (but very little stripping)
– 15± 6% CO2 stripped across sidewall box plunge
Fan - 50 hz Fan - 30 hz Fan - 20 hz
Feed, kg/d CO2, mg/L CO2, mg/L CO2, mg/L 150 22 28 38 200 25 31 NA
![Page 13: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/13.jpg)
Culture Tank CO2 Depends on Daily Feed Load and ∆O2 across Culture Tank
RAS #1 Fan - 50 hz
RAS #4 Fan - 30 hz
Tank - Heavy Feed, kg/d 292 299 CO2, mg/L 31.3 35.8 ∆O2, mg/L 16.0 13.9
Tank - Medium Feed, kg/d 210 230 CO2, mg/L 24.8 32.8 ∆O2, mg/L 11.2 11.5 Tank - Light Feed, kg/d 96 115 CO2, mg/L 20.0 26.5 ∆O2, mg/L 6.8 7.7
![Page 14: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/14.jpg)
Air Ventilated out the Stripping Column Requires Energy
Control Strategy: Set VFD on CO2 stripper exhaust fans to achieve target CO2 removal. The associated makeup air units are ran from a building pressure controller. Maintain building pressure neutral to slightly negative.
![Page 15: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/15.jpg)
Air Ventilated out the Stripping Column Significantly Affects Energy
• CO2 Exhaust fan energy in Row 3* Full Capacity-81,000 cfm (60hz)= $29,025 Yr 85% Capacity-68,850 cfm (51hz)= $17,760 Yr 55% Capacity-45,000 cfm (33hz)= $6,450 Yr
• Associated Makeup Air Cost in Row 3* 100% 69,000 cfm= $226,500 Yr 85% 58,522 cfm= $192,000 Yr 55% 38,250 cfm= $125,000 Yr • Based on ASHRAE weather bin data for Fort Wayne, IN.; $0.07 kWh electric rate; $0.90 therm NG rate;
water set point 15 C; Room set point 15.56 C
![Page 16: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/16.jpg)
Design Conclusions • Ventilation fans must operate near full-speed to
control CO2 at 25 mg/L in culture tanks when a tank is operated at ≈ 200 kg/d feed – Reduced air flow creates problems at high feed load – Air flow can be reduced to save energy when tank
CO2 levels are below 25 mg/L • Real time monitoring of pump sump CO2 concentration
could be used in a feed-back control loop to adjust ventilation rate to minimize building air exchange
![Page 17: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/17.jpg)
Design Conclusions-Energy • Even small reductions in exhaust rates can have
significant influence on operational costs. – VFD’s are essential on the CO2 stripper exhaust fans
and on the makeup air units.
![Page 18: Case Study: CO2 Removal and Stripping Column Ventilation ...€¦ · Case Study: CO 2 Removal and Stripping Column Ventilation at Bell Aquaculture Steven Summerfelt, Jacob Bartlett,](https://reader030.vdocuments.net/reader030/viewer/2022040920/5e982b34ae971f38063a1b4c/html5/thumbnails/18.jpg)
Thank You!