case study: deployment of a dfss culture into the rme organization

36
05-094 Case Study: Deployment of a DfSS Culture into the RME Organization Raytheon, Rocky Mountain Engineering (RME) Karl Arunski This briefing is intended for those in the process of establishing a Design for Six Sigma (DfSS) culture in their organization.

Upload: vijaybijaj

Post on 18-Jul-2015

453 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

Case Study: Deployment of a DfSS Culture into the RME Organization

Raytheon, Rocky Mountain Engineering (RME)Karl Arunski

This briefing is intended for those in the process of establishing a Design for Six Sigma (DfSS) culture in their organization.

Page 2: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 205-094

Briefing Outline

I. Introduction – The business model/environment

– The Raytheon Design for Six Sigma (DfSS) definition

– The DfSS methodology

– The DfSS training

– The DfSS deployment objective

II. Process Integration– Integrating DfSS into the business process

III. Examples

IV. Conclusions

Page 3: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

I. Introduction

Page 4: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 405-094

What We Provide(The Business Model Environment)

• Command and Control

• Mission Management

• Sensor Data Processing

Operations

Page 5: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 505-094

Design for Six Sigma

Raytheon Definition

“Design for Six Sigma is a methodology, used within the Integrated Product Development Process (IPDP), to predict, manage, and improve Productivity, Affordability, and Robust Performance for the benefit of our customers.”

Page 6: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 605-094

The DfSS Methodology

• Define key parameters

• Define objectives

• Achieve and measure– Model– Predict– Design

– Measure– Iterate as required– Achieve

Page 7: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 705-094

The DfSS Training Class (Outline)

• Module 1. Process Integration

• Module 2. Voice of the Customer

• Module 3. Modeling and Optimization

• Module 4. Creating and EvaluatingArchitecture Alternatives

• Module 5. Value Delivery

• Module 6. Test Optimization

• Module 7. Program Integration

Page 8: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 805-094

The DfSS Deployment Objective

• Predict/Manage/Improve

• “Get people to think about the methodology and to try it out.”

Page 9: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

II. Process Integration

Page 10: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1005-094

II. Integrating DfSS into the Business Process

05-094-1.1

Process Integration

Voice of the Customer

Modeling and Optimization

Create and Evaluate Architecture Alternatives

Value Delivery

Test Optimization

Program Integration

Page 11: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

III. Examples

Page 12: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1205-094

Integrating DfSS into the Business Process

05-094-2.2

Process Integration

Voice of the Customer

Modeling and Optimization

Create and Evaluate Architecture Alternatives

Value Delivery

Test Optimization

Program Integration

• Equipment Failure Analysis

• Gap analysis tool simulation/modeling• Mod and sim tool selection• AFWA DMSP MSS porting study

• FPGA development suite solution• FTN/C++ interface standards

• Make online system (test) more like Goddard Operations• EMOS analysis test cycle• Antero Program regression test

• IDMO DfSS

DfSS projects!

Page 13: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

Example 1. IDMO DfSS

Page 14: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1405-094

Vision and Goal

• Vision– “Redesign the existing Generic Multi-purpose Board

using the most up to date technology available, while presenting the same form/fit/function to the customer.”

• Goal– Reduce the number of projected System Problem

Reports (SPRs)

Page 15: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1505-094

Prioritize: Defect Analysis

0

10

20

30

40

50

60

70

80

Production Engineering Vendor Handling Unknown Chassis Fail

Aurora

Valley Forge

Site

Page 16: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1605-094

Characterize: Production Failure Mode Effects Analysis (FMEA)

Over buy/test105519Component failure (major)

Over buy/test42240Component failure (minor)

New robust connectors/cables189924Conn. Interface

Complete power analysis during design. Power checks as part of TP.

10553Voltage issues (high/low)

Installation training21115Bent pins

Test/verification7167No communication with SBC

Design reviews and testing18993Short to ground (trace)

Testing2115Smoked

Testing/over buy parts147714Bad parts

Will capture in test; will not deliver any board without a personality pre-loaded.

101965Won’t download personality

WAVE solder will limit the occurrence of solder bridging.

138535Component shorts

Selected LEDs that do not require soldering to replace; will spare these items.

21115LED failures

Parts selection criteria is surface mount where possible. Allows for WAVE solder technique.

168875Poor solder flow

Action PlanScoreNon-

DetectionImpactOccurrencesSystem Problem Report

(SPR)

Page 17: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1705-094

Improve: New Architecture

05-094-4.1

General Multi-Purpose (GMP) Board Architecture Current Proposed GMPII Architecture 1

VME Interface

XCVR

DPR

uP

LBUS MBUS

FPGA

Mez Card

FrontPanel

I/O

RAMVME

Interface TUND

MPU

SDRAM

LBUS

PCI

RBUS

MBUS

FPGA

PMC Slot

DPR

FrontPanel

I/O

FLASH

A/D

I/O

VIC

FIFOs

FPGAs

PROM

NCO

Page 18: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1805-094

Improve: New Architecture (cont.)

05-094-5.2

Proposed GMPII Architecture 2 (selected)

VMEInterface TUND

SDRAM

LBUS

PCIBridge

RBUSMBUS

FPGA

PMC Slot

FrontPanel

I/O

FLASH

A/DandCS

I/O

MPU

DPR

• Everything on the PCI busstandard• Minimized the number devices on the boardless soldering• Ball grid arrayno pins to bend• Using surface mount partswave soldering technique• No ribbon cables• Micro robust connectorsfewer

Page 19: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 1905-094

Achieve

0

2

4

6

8

10

12

Projected SPRs Actual SPRs

Aurora

Site

Other

Page 20: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

Example 2. Equipment Failure Analysis

Page 21: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2105-094

Vision and Goal

• Vision– To find new or improved methods to lower or

eliminate failures in the following items: circuit boards, swappable devices (i.e., hard drives)

• Goal– Eliminate failures

Page 22: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2205-094

Prioritize: Business Failure Analysis

Items That Failed

PowerSupplies

PC Boards CPUs Hard Drives Memory

Qu

anti

ty o

f F

ailu

res

Series 1

Series 2

Series 3

Page 23: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2305-094

Prioritize: Program A Failure Analysis

Mem

ory/E

CC

Mem

ory/D

IMM

CPUs

Power S

upply

Hard D

rives

Items That Failed

Qu

an

tity

of

Fa

ilure

s

Page 24: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2405-094

Characterize: Fishbone Analysis

05-094-3.105-094-3.2

EquipmentFailures

Power

Vendor

Temperature

ElectrostaticDischarge

Humidity

Packing/Shipping

Page 25: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2505-094

Improve

• Rearchitect the environment– Temperature– Humidity– Power

• Procedures: electrostatic discharge requirements– Wrist straps– ESD carts– ESD benches

– Management involvement– Data collection– ESD-certified technicians replace items– ESD improvement program

• Equipment failure analysis process– Data collection and analysis

Page 26: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2605-094

Achievement Goal

Program A

Business

Before After

Page 27: Case Study: Deployment of a DfSS Culture into the RME Organization

05-094

Example 3. Online Ops-Like Test Environment

Page 28: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2805-094

Vision and Goal

• Vision– “By incorporating Design for Six Sigma, the intent is

to reduce the number of Discrepancy Reports (DRs) that are written against our software.”

• Goal– Reduce the number of Discrepancy Reports (DRs)

written against the Online System

Page 29: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 2905-094

Prioritize: Online Ops-Like Test Environment Supporting Data

0

1

2

3

4

5

6

Enviro

nmen

t

Telem

etry

Cecil

Comm

and

HMI

Clock

Corr

Histo

ry

Nu

mb

er o

f D

Rs

Page 30: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3005-094

Prioritize: Online Ops-Like Test Environment Supporting Data

CecilCecil waitelrv failed to catch mem load acpt flag during MCL load_R0292

CommandSim cfgs will not allow command if set in past_T1678

CCRTES load commands padded with too many bits_R0272

CecilAuto step messages clutter commanding in central Cecil_R0271

Environmentmove_transferred_files script stopped_R0269

HistoryRTM files not closed automatically_R0261

Cecil“Analyst” misspelled in RTLOG impacts searches/filtering_R0242

CDH & COM derived points stale in eK_LA telemetry_R0234

IntegrationAccess to o:\online\paves_user\ch1\misc\xxxxx.hdp denied support_R0233

CecilFEOF function does not seem to be working_R0231

Awaiting withdrawal

USCCS clock corr. aborts when clock error exceeds approx. 24 hours_R0230

DatabaseOnline derived FMU/SSR telemetry points not accurate_R0229

CCROnline NCC connection anomaly_R0227

Awaiting withdrawal

EMOS error message during FSW log dumps_R0226

CategoryTitleDiscrepancy

Report

Page 31: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3105-094

Prioritize: Online Ops-Like Test Environment Supporting Data (cont.)

CategoryTitleDiscrepancy

Report

CommandTES time fields differ between online and MMS_R0376

DatabaseTES derived parameter needed for ICS motor current_R0370

DatabaseInput derived parameters for TES RCS temperatures_R0369

CCRCH_TDRSS_INFO.dat file update for TD9_R0363

Clock CorrOPS primary terminated during startup of config_R0344

DatabaseAdd limits to TES derived parameters_R0335

Environmentmake_intdmf_transfers. & make_history_transfers.pl died_A0958

EnvironmentInterface services died_R0330

TelemetrySuppression delta messages should be warning, not informational message

_R0329

EnvironmentRBD index only shows most recent file_A0954

Awaiting withdrawal

EMOS RT log incorrectly indicates missing SUROM packets_R0315

CommandError message received after GCMR proc sent_R0314

EnvironmentError when starting transfer scripts_R0294

CommandMulti-partition TES microprocessor loads have incorrect sequence flags_R0293

Page 32: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3205-094

Prioritize: Online Ops-Like Test Environment Supporting Data (cont.)

CategoryTitleDiscrepancy

Report

DatabaseRemove yellow limits from SUROM secondary test derived tlmy pts_R0556

InvestigatingGround config failed to start on EORS12_R0555

HMIPlots show “No Updates Yet”_R0545

DatabaseGNC star tracker voltage derived mnemonics are incorrect_R0535

CCRAQUA telem decommed by AURA EMOS system_R552

InvestigatingIncorrect time tag in real time log_R0512

TelemetryEMOS suppression delta detection incorrect _R0511

DatabaseDelete red limits for GNC mnemonics_R0493

InvestigatingESRS12 fell off talarian_R0462

Clock CorrRDD clock correlation report files deleted_A0999

HMITLM page cell can be “Frozen” with alarm state format_R0406

Telemetry1750a mnemonics not alarming_R0402

DatabaseUnused MLS derived parameters still in online system_R0388

TelemetryMLS temperatures are stale_R0387

Page 33: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3305-094

Characterize: Root Cause Analysis Results

• Not enough “ops like” testing procedures

• Not enough testing done by different users’ logins

• Not keeping interfaces running regularly

Page 34: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3405-094

Improve: Create a More Ops-Like Environment

• Update the “on-line” test procedures

• Implement ops-like procedures

• Test using several different user-name logins

• Keep interfaces running regularly

Page 35: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3505-094

0

1

2

3

4

5

Enviro

nmen

t

Telem

etry

Cecil

Comm

and

HMI

Clock

Corr

Histo

ry

Nu

mb

er o

f D

Rs

Achieve

No Discrepancy Reports!

Page 36: Case Study: Deployment of a DfSS Culture into the RME Organization

01/23/12 Page 3605-094

IV. Conclusion

• DfSS integration into the Business Process is underway

• People are trying it in all phases of the Business Model– Key parameters– Objectives– Achieve/measure