case study forever nutraceutical phoenix, arizona forever... · featured products. ardex mc™...

1

Click here to load reader

Upload: hakien

Post on 01-Apr-2018

216 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: CASE STUDY Forever Nutraceutical Phoenix, Arizona Forever... · Featured Products. ARDEX MC™ ULTRA ... Forever Nutraceutical Phoenix, Arizona. Situation. ... Due to the nature of

888-512-7339www.ardexamericas.com

Project Forever Nutraceutical - Phoenix, Arizona

InstallerArizona Concrete Repair, Inc. - Phoenix, Arizona

ContractorT & M Creations - Glendale, Arizona

Featured ProductsARDEX MC™ ULTRA Moisture Control System

Challenge• Fast-trackinstallationtimeframeforhigh-build quartz/epoxy industrial floor

• 40,000square-footinstallationarea

• Completebuildingtenantimprovementformanufacturingnutritionalproducts

• Buildingtoincludecleanroomandneededtobecompletelysealed

CASE STUDY

Fore

ver

Nut

race

utic

alPh

oeni

x, A

rizo

na

SituationForeverNutraceutical,anutrition,vitaminandweightlossproductmanufacturer,requiredanextremelyhardandindestructiblefloorcoatingforitsmanufacturingspace.Duetothenatureofitsbusiness,ForeverNutraceuticaldidnotwanttoriskmoisturecontrolproblemswhichwouldstallmanufacturing.ARDEXSalesRepresentativeLanceNeffrecommendedARDEXMC™ULTRAMoistureControlSystembecauseofitsunmatchedperformanceandwarranty.Theinstallationspacewaslocatedinanoldbuildingwithnovaporbarrierbelowtheconcrete.Therewerealsoverylargesectionsofexistingconcretethatneededtoberemovedandre-pouredatagreaterthickness.Othersectionsofconcretewereremovedandreplacedsoaninsulatedslabcouldreceivelarge on-grade,walk-incoolers.

SolutionTheprojectwassecuredbyunmatchedpersistence.InstallersweregivendirectaccesstoARDEXTechnical Representative Tim Ellison as on-site technical support. Samples were placed in conjunction with the finished high-buildepoxyquartzfloorforevaluation.ARDEXMCULTRAallowedforquickturnaroundwithnewconcrete sectionsandpour-backs.TheARDEXMCULTRAofferedasand-broadcastsurfaceforadirectbondofthe epoxy floor.

ARDEXMCULTRAwasnottheonlyproductbeingconsidered.Itwas,however,theonlyproductwiththe performancetoallowforaquickinstallationofthefinishfloordirectlybonded.TheForeverNutraceuticalownerwassoldonthesolid,non-proratedwarranty.BoththeownerandT&MCreationswereimpressedwiththe availability,confidenceandquickresponsefromARDEXSalesandTechnicalRepresentatives.Otherhigh-buildtrowelonproductswereoffered,butnonecouldmatchtheoverallperformance,speedofinstallationandlocalsupportofARDEXAmericas.

CS08

6(7/1

2)