Owner
SMC Consolidated Power Corporation
Client
Formosa Heavy Industries Corporation, Taiwan
Chimney EPC Contractor
Zelan BEC Consortium
Lining System
SCR-Ten 2
Project
Participants
Challenges Rack Limited site space available
Tight construction timelines
Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works.
SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction in Bataan. The new 900 MW power facility will provide energy to help boost the Luzon grid and address the tight power supply in the region.
San Miguel Corporation was constructing a 2 x 150 MW coal-fired power station in Bataan, Limay, Philippines. The main EPC contractor for the chimney was BEC.
SM
C L
IMA
Y P
RO
JE
CT
CASE STUDY SMC LIMAY (K1AU3)
PROJECT UNITS 1 + 2
BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966
Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]
Chimney Data
Height 100m
No. of internal steel flue 2
No. of internal platforms 5
Diameter of internal flue 3.9m
External concrete diameter 14.68m-11.98m
Piles 165 x 600 dia
Pile Cap 28080 dia x 4000 thk
Limay Project 1 + 2 Stack elevation
Windshield slip form Rig erection in progress
Steelwork Fabrication
Owner
SMC Consolidated Power Corporation
Client
Formosa Heavy Industries Corporation, Taiwan
Chimney EPC Contractor
Balanced Engineering and Construction Pte Ltd
Lining System
SCR-Ten 2
Project
Participants
Challenges Limited site space available
Tight construction timelines
Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including piles, pilecap, slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and internal liners.
SMC Limay 3 + 4 Project SMC has proposed a 2 x 150 MW coal fired power station for construction in Bataan. The new 900 MW power facility will provide energy to help boost the Luzon grid and address the tight power supply in the region.
San Miguel Corporationn was constructingf a 2 x 150 MW coal-fired power station in Bataan, Limay, Phillipines. The main EPC contractor for the chimney was Formosa Heavy Industries Corporation..
SM
C L
IMA
Y P
RO
JE
CT
CASE STUDY SMC LIMAY (K1AU3)
PROJECT UNITS 3 + 4
BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966
Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]
Chimney Data
Height 100m
No. of internal steel flue 2
No. of internal platforms 3
Diameter of internal flue 3.9m
External concrete diameter 14.68m-11.98m
Piles 165 x 600mm dia
Pile Cap 28080mm dia x 4000mm thk
Limay Project 3 + 4 Stack elevation
Completed chimney Rig erection in progress
Steelwork Fabrication