Project brief
Supply and lay of 720 tonnes of asphalt to repair the main runway at Stansted
airport. Works were carried out overnight, so not to disturb day to day
operations.
Delivery
Experienced in airport works, our team’s planning adhered to strict security
measures and timeframes.
To ensure works were not delayed, plant and material were delivered to site
ahead of each shift and all security passes and checks were in place, and
operatives ready to go, by the time the last aircraft had departed.
The teams were each assigned a patch of runway in need of repair, which they
resurfaced with 10 SMA PMB, a high-durability asphalt mix with greater
resistance to rutting and cracking.
Achievements
• Right first time, on time
• No disruption
• Accident free
• Defect free
Case study